[{"ai_classification":"unknown","city":"Papillion","confidence":"medium","contains_osm":true,"id":"compute_atlas-00100b4cdc03f7f8","lat":41.1783633,"location_precision":"approximate","lon":-96.1621103,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/clop-omaha-papillion-ne","value":5.0}],"name":"CLOP Omaha NE Data Center (5 MW)","operator":"CLOP Omaha NE, LLC","source_notes":"New five-megawatt data center (SIC 7374) with seven diesel-fired emergency generator engines and their diesel storage tanks. Anticipated NOx 39.66 tpy. The beneficial owner behind CLOP Omaha NE, LLC is not identified. Whether the permit was issued after the comment period was not confirmed as of October 2026, so status stays proposed. Coordinates are a point on S 158th St in ZIP 68138, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Public notice: CLOP Omaha NE, LLC air construction permit (FID 122487)","publisher":"Nebraska Department of Water, Energy, and Environment","retrievedAt":"2026-10-12","url":"https://dwee.nebraska.gov/news-events/public-notices/clop-omaha-ne-llc"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/clop-omaha-papillion-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"mixed_use","city":"King of Prussia","confidence":"medium","id":"compute_atlas-001af319bd826fd6","lat":40.092,"location_precision":"approximate","lon":-75.347,"name":"Renaissance Park and Innovation Data Center Campus","operator":"MLP Ventures","source_notes":"Five separate applications in Upper Merion Township totaling about 4.6 million sq ft, on parcels including 411 Swedeland Road (1.6M sq ft), 2201/2301/2701/2901 Renaissance Blvd (1.9M sq ft), 2100 Renaissance Road (187,000 sq ft) and 3200 Horizon Drive (370,000 sq ft). Applicant entities are affiliated with MLP Ventures founder Brian O'Neill. Filed just before Upper Merion's March 2026 data center ordinance took effect, so reviewed under the prior rules. A company document cited by DeSmog puts campus investment at $35.16 billion; that figure is not independently corroborated, so no investment figure is recorded. Distinct site from MLP Ventures' Plymouth Township proposal.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Proposed King of Prussia data center campus faces renewed scrutiny as review continues","publisher":"6abc Philadelphia","retrievedAt":"2026-08-17","url":"https://6abc.com/post/proposed-king-prussia-data-center-campus-faces-renewed-scrutiny-review-continues/19560357/"}],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/renaissance-park-upper-merion-king-of-prussia-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-003867f9ed1746e2","lat":37.3619343,"location_precision":"exact","lon":-121.9537306,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-svy02-ca","value":48.0}],"name":"STACK SVY02","operator":"STACK Infrastructure","source_notes":"Confirmed via operator page: 48MW, Santa Clara, distinct from the San Jose SVY01 campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1460855151","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1460855151"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/stack-svy02-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1460855151"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stack-svy02-osmway-1460855151"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460855151"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Highlands Ranch","confidence":"medium","contains_osm":true,"id":"compute_atlas-00bc11e76ec4e056","lat":39.5536247,"location_precision":"approximate","lon":-104.9944646,"name":"Visa OCC North & OCC South Data Centers (Highlands Ranch)","operator":"Visa Inc.","source_notes":"Two Visa data centers (OCC North and OCC South) in Highlands Ranch per Uptime Institute. The coordinates are the OSM point for Visa Inc. on S Ridgeline Blvd, not a confirmed point for each building. No capacity is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Uptime Institute awards: Visa Inc. data centers","publisher":"Uptime Institute","retrievedAt":"2026-10-19","url":"https://uptimeinstitute.com/uptime-institute-awards/client/visa-inc/41"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/visa-occ-highlands-ranch-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"compute_atlas-00cef92f1ee404d8","lat":41.1278101,"location_precision":"approximate","lon":-104.8110116,"name":"Cogent Cheyenne Data Center","operator":"Cogent Communications","source_notes":"Carrier-neutral colocation facility near downtown Cheyenne: 32,860 total square feet, 16,200 square feet available for wholesale, 2.50 MW of power with an additional 2.5 MW available on request and 2.08 MW of protected power. These are facility power figures; the datasheet does not state an IT capacity, so no operational capacity is recorded. Sits on 1.6 acres zoned for City use. Available carriers include Cogent, Zayo, EchoStar, Charter and CenturyLink/Lumen. Coordinates are an address-level geocode. Figures come from Cogent's own datasheet, which states the information is for informational purposes and may change.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cogent-cheyenne-114-w-10th-wy"}],"state":"Wyoming","status":"operating"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-00fafc91b44cb46b","lat":48.34,"location_precision":"approximate","lon":-103.48,"name":"Nakota AI Data Campus","operator":"Tachyon9 Corp. / Nixxy Inc.","source_notes":"Proposed AI/HPC campus on roughly 620 acres in Williams County. No town or site has been published, so coordinates are an approximate Williams County point. No development, financing or construction milestones had been announced as of June 2026. The project depends on the Nixxy-Tachyon9 transaction and on financing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"North Dakota AI campus plans 1 GW of gas-fired power","publisher":"Pipeline & Gas Journal","retrievedAt":"2026-10-26","url":"https://www.pgjonline.com/news/2026/june/north-dakota-ai-campus-plans-1-gw-of-gas-fired-power"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/tachyon9-nixxy-nakota-ai-data-campus-williams-county-nd"}],"state":"North Dakota","status":"planned"},{"ai_classification":"mixed_use","city":"Kearneysville","confidence":"medium","contains_osm":true,"id":"compute_atlas-0130c01dda6a8ad1","lat":39.3985849,"location_precision":"approximate","lon":-77.9163203,"name":"IRS Enterprise Computing Center (Martinsburg Computing Center)","operator":"Internal Revenue Service","source_notes":"Long-running federal data center, referred to interchangeably as the Martinsburg Computing Center and the Kearneysville Enterprise Computing Center; the IRS exhibit gives the main building as 379,200 GSF occupied 1999, plus 165,000 GSF of annex space. AI classification is mixed-use, not confirmed: the facility's primary workload is tax processing and it houses the IRS Master File, but a February 2025 procurement covers an NVIDIA DGX B200 SuperPOD of 31 systems for the Research, Applied Analytics and Statistics division's Compliance Data Warehouse. The Intercept noted at the time that the hardware \"has not yet been purchased or installed,\" so installation is not asserted here. DOE awarded a $2.2 million AFFECT grant toward an energy savings performance contract at the site. Coordinates are the OSM point for the IRS building, not a parcel survey. No capacity, cooling or water figures are published, so those fields are omitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"The IRS Is Buying an AI Supercomputer From Nvidia","publisher":"The Intercept","retrievedAt":"2026-09-15","url":"https://theintercept.com/2025/02/14/irs-ai-nvidia-tax/"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/irs-enterprise-computing-center-kearneysville-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Myton","confidence":"medium","id":"compute_atlas-018daef5e69fba4b","lat":40.193,"location_precision":"approximate","lon":-110.0568,"name":"Nine Mile Data Center (Uinta Basin Data Center Project)","operator":"Nine Mile Data, LLC","source_notes":"Approximately 6 miles southwest of Myton near Wells Draw and South Myton Bench; ~475 acres for data-center use within a ~879-acre leased area; targeting operational by 2029. Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy. The county's conditional-use findings report carries no tax-abatement, CRA/RDA or payment-in-lieu-of-taxes term, and no Duchesne County or Myton CRA project area was found to exist at all. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Infrastructure — Uintah Basin Data Center Project Information","publisher":"Uintah Basin Data Center Project","retrievedAt":"2026-08-25","url":"https://uintahbasindatacenter.com/infrastructure.html"},{"kind":"press","label":"Public Hearing Scheduled On Nine Mile Data LLC Conditional Use Permit","publisher":"Basin Now","retrievedAt":"2026-08-25","url":"https://www.basinnow.com/public-hearing-scheduled-on-nine-mile-data-llc-conditional-use-permit/"},{"kind":"permit","label":"Duchesne County findings report — Nine Mile Data, LLC conditional use permit","publisher":"Duchesne County","retrievedAt":"2026-09-21","url":"https://duchesne.utah.gov/wp-content/uploads/2026/03/Findings-Report-Nine-Mile-Data-LLC-040226.pdf"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/nine-mile-data-myton-duchesne-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Fort Morgan","confidence":"medium","id":"compute_atlas-01f20beadc003922","lat":40.2502582,"location_precision":"approximate","lon":-103.799951,"name":"Prometheus Hyperscale Fort Morgan","operator":"Prometheus Hyperscale","source_notes":"Early-stage pipeline site. DCD reports Prometheus Hyperscale plans four data centers beyond its Evanston, Wyoming flagship — Pueblo and Fort Morgan in Colorado, Phoenix and Tucson in Arizona — with timelines and specifications not shared. Big Pivots separately reports the company intends to create data centers in Fort Morgan and Pueblo. No capacity, acreage, investment or permit filing is recorded because none is sourced. Coordinates are the Fort Morgan town centroid (approximate); no parcel is known. Deliberately not attributing the Evanston flagship's 1.25 GW to this site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Looming questions about data centers","publisher":"Big Pivots","retrievedAt":"2026-08-26","url":"https://bigpivots.com/looming-questions-about-data-centers/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-fort-morgan-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Highlands Ranch","confidence":"medium","id":"compute_atlas-022311dcf5f99872","lat":39.549201,"location_precision":"approximate","lon":-105.032671,"name":"Csquare (Centersquare) DEN1 Denver - Highlands Ranch","operator":"Csquare (Centersquare)","source_notes":"The operator spec sheet lists 41,593 sq ft, 18.3 MW of utility capacity, 9.2 MW of UPS capacity, 15 MW of generator capacity, and chilled water, with a Littleton 80129 mailing address in Highlands Ranch. Utility capacity is not IT load, so no IT capacity is recorded. The site was formerly branded Cyxtera, then Centersquare. Coordinates are a Census geocode of 9180 Commerce Center Cir.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/centersquare-den1-highlands-ranch-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"likely","city":"Haines City","confidence":"medium","id":"compute_atlas-0244c54c034ad731","lat":28.1114,"location_precision":"approximate","lon":-81.6198,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://finance.yahoo.com/technology/ai/articles/florida-data-center-project-stalls-180033586.html","value":300.0}],"name":"Cielo Haines City Data Center","operator":"Cielo Digital Infrastructure","source_notes":"300 MW planned, ~74-acre site along Marion Road and State Road 544 East, Haines City, Polk County -- pre-application stage (no site plan, zoning request, or development agreement filed as of Aug 2026), distinct from the Lakeland (Ryan Companies/Project Swan) and Fort Meade (Stonebridge/Florida Ecopark) Polk County sites, both tracked as of August 2026. As of August 2026, no precise parcel address, investment figure, or jobs figure was disclosed in any source found; coordinates are the Haines City area centroid, not the actual site. The Data Center Dynamics original report could not be retrieved directly as of August 2026; the story is corroborated via Yahoo Finance syndication and independent Citrus Tea investigative reporting citing city commission records. Multiple other independent local outlets (WFLA, Fox 13 Tampa Bay, Bay News 9) covered the same story at headline level.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Florida data center project stalls amid water permit fight","publisher":"Yahoo Finance (syndicating Data Center Dynamics)","retrievedAt":"2026-09-14","url":"https://finance.yahoo.com/technology/ai/articles/florida-data-center-project-stalls-180033586.html"},{"kind":"press","label":"Haines City data center: new documents show what commissioners were told before the public, and when","publisher":"The Citrus Tea","retrievedAt":"2026-08-02","url":"https://thecitrustea.com/2026/07/haines-city-data-center-new-documents-show-what-commissioners-were-told-before-the-public-and-when/"},{"kind":"press","label":"Planned data center in Florida held back by lack of available water from city","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/planned-data-center-in-florida-held-back-by-lack-of-available-water-from-city/"},{"kind":"press","label":"Haines City water limits puts data center plan on hold","publisher":"Spectrum Bay News 9","retrievedAt":"2026-10-20","url":"https://baynews9.com/fl/tampa/news/2026/07/10/haines-city-officials-explain-water-capacity-address-data-center-concerns"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/cielo-haines-city-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Conshohocken","confidence":"medium","id":"compute_atlas-02860b621406f302","lat":40.086,"location_precision":"approximate","lon":-75.312,"name":"MLP Ventures Plymouth Township Data Center (former Cleveland-Cliffs Conshohocken plant)","operator":"MLP Ventures","source_notes":"Proposed ~2 million sq ft hyperscale data center converting the former Cleveland-Cliffs/Alan Wood steel mill at 900 Conshohocken Road in the Connaughtown section of Plymouth Township, Montgomery County. Roughly 66-acre heavy-industrial parcel; developer Brian O'Neill (MLP Ventures) cites ~$9B investment and ~110 permanent jobs (~55 per shift). Coordinates are an approximate geocode of the cited street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Battle begins over proposed data center in Plymouth Township","publisher":"Metro Philadelphia","retrievedAt":"2026-08-02","url":"https://metrophiladelphia.com/stories/plymouth-township-data-center-proposal,145572"},{"kind":"press","label":"Developer proposes another hyperscale data center in MontCo","publisher":"The Chestnut Hill Local","retrievedAt":"2026-09-21","url":"https://www.chestnuthilllocal.com/stories/developer-proposes-another-hyperscale-data-center-in-montco,40801"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/mlp-ventures-plymouth-township-conshohocken-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Cedar Creek","confidence":"medium","id":"compute_atlas-029fe4ee52f17d91","lat":30.139438,"location_precision":"approximate","lon":-97.565051,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edgeconnex-cedar-creek-tx","value":384.0}],"name":"AUS02 / Cedar Creek Campus","operator":"EdgeConneX","source_notes":"4-building campus, approximately 140 acres near Wolf Ln/FM 535.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"EdgeConneX plans second data center campus in Bastrop County","publisher":"Community Impact","retrievedAt":"2026-07-17","url":"https://communityimpact.com/bastrop-cedar-creek/government/edgeconnex-plans-second-data-center-campus-in-bastrop-county/"},{"kind":"other","label":"EdgeConneX data center update, May 2026","publisher":"Bastrop County Chamber","retrievedAt":"2026-08-16","url":"https://bastropcc.com/blog/edgeconnex-data-center-update-may-2026/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/edgeconnex-cedar-creek-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"likely","city":"Pittsburg","confidence":"medium","id":"compute_atlas-02b0ce1901e8c631","lat":38.011358,"location_precision":"approximate","lon":-121.91098,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.avaiodigital.com/updates/avaio-digital-marks-major-milestone-as-cec-approves-99mw-for-bay-area-data-center-project-perseus","value":99.0}],"name":"AVAIO Digital Perseus","operator":"AVAIO Digital Partners","source_notes":"Redevelopment of the former Delta View Golf Course (76 acres) into a 3-phase Pittsburg Technology Park; Phase 1 is the ~300,000 sq ft Perseus Data Center, targeting first occupancy in 2027. The record is listed as permitted, not proposed: the project holds a CEC opt-in certification (99 MW, Dec 8 2025) and a City of Pittsburg Commercial Design Review approval (Dec 11 2025, modified Feb 12 2026); no source confirms groundbreaking/construction has started. The planned capacity of 99 MW reflects the CEC-certified figure. AVAIO's December 2025 release says the Pittsburg Technology Park Specific Plan \"allows AVAIO to develop up to 500MW\"; that is a ceiling the plan permits, not a planned capacity, so it is not recorded. Investment ($800M+) is AVAIO's own Dec 2024 disclosure, widely syndicated but not independently audited. Jobs figures are not disclosed in any source found and are omitted. The AI classification is recorded as likely: AVAIO's own materials use explicit 'AI and cloud-driven deployments' language but do not publish GPU/HPC-specific technical specs. The Center for Biological Diversity's CEQA lawsuit (Case No. N24-2162, filed Dec 2024) was settled in Dec 2025 (CBD agreed not to oppose Phase 1 in exchange for 100% renewable/carbon-free electricity, rooftop solar, 100% recycled water for cooling, wildlife monitoring, and a $750,000 community climate-resiliency payment) - it is not an active legal threat, though broader public opposition continues (see community).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"AVAIO Perseus (Pittsburg, CA) project page","publisher":"AVAIO Digital Partners","retrievedAt":"2026-08-02","url":"https://www.avaiodigital.com/developments/pittsburg-california"},{"kind":"press","label":"AVAIO Digital marks major milestone as CEC approves 99MW for Bay Area data center project Perseus","publisher":"AVAIO Digital Partners","retrievedAt":"2026-09-21","url":"https://www.avaiodigital.com/updates/avaio-digital-marks-major-milestone-as-cec-approves-99mw-for-bay-area-data-center-project-perseus"},{"kind":"permit","label":"Notice of Determination - Commercial Design Review modification","publisher":"California CEQAnet","retrievedAt":"2026-09-21","url":"https://ceqanet.lci.ca.gov/2025100607/4"},{"kind":"filing","label":"Center for Biological Diversity v. City of Pittsburg - case record","publisher":"Sabin Center Climate Litigation Database","retrievedAt":"2026-08-02","url":"https://www.climatecasechart.com/collections/center-for-biological-diversity-v-city-of-pittsburg_4f57be"},{"kind":"press","label":"Agreement secures renewable energy, recycled water for California data center","publisher":"Center for Biological Diversity","retrievedAt":"2026-08-02","url":"https://biologicaldiversity.org/w/news/press-releases/agreement-secures-renewable-energy-recycled-water-for-california-data-center-2025-12-16/"},{"kind":"press","label":"Residents blast Pittsburg City Council over data center approval","publisher":"Contra Costa News","retrievedAt":"2026-08-02","url":"https://contracosta.news/2026/06/16/residents-blast-pittsburg-city-council-over-data-center-approval/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/avaio-perseus-pittsburg-ca"}],"state":"California","status":"planned"},{"ai_classification":"confirmed","city":"Muskogee","confidence":"medium","id":"compute_atlas-02d73c38e02f667b","lat":35.72,"location_precision":"approximate","lon":-95.42,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/core-scientific-muskogee-ok","value":1000.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/core-scientific-muskogee-ok","value":70.0}],"name":"Core Scientific Muskogee Campus","operator":"Core Scientific","source_notes":"1525 W Smith Ferry Rd, Port Muskogee Industrial Park. Distinct from the existing tracked Google Muskogee County campuses - same county, different developer/site. Coordinates are approximate. CoreWeave is the anchor customer.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus","publisher":"Core Scientific (investor release)","retrievedAt":"2026-09-10","url":"https://investors.corescientific.com/news-events/press-releases/detail/135/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-muskogee-oklahoma-campus"},{"kind":"press","label":"Core Scientific and Port Muskogee Break Ground on 100 MW HPC Data Center (investor press release)","retrievedAt":"2026-07-24","url":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"},{"kind":"press","label":"Core Scientific Plans Expansion to 1.5 Gigawatts of Gross Power at Muskogee, Oklahoma Campus","publisher":"Business Wire","retrievedAt":"2026-08-06","url":"https://www.businesswire.com/news/home/20260506005927/en/Core-Scientific-Plans-Expansion-to-1.5-Gigawatts-of-Gross-Power-at-Muskogee-Oklahoma-Campus"},{"kind":"press","label":"Core Scientific announces 440 MW expansion at Oklahoma site","publisher":"Blockspace","retrievedAt":"2026-08-06","url":"https://blockspace.media/insight/core-scientific-jumps-7-in-morning-markets-as-data-center-firm-announces-440-mw-expansion-at-oklahoma-site/"},{"kind":"other","label":"Oklahoma Data Center | High-Density in Muskogee","publisher":"Core Scientific","retrievedAt":"2026-09-14","url":"https://corescientific.com/high-density-data-centers/muskogee-ok/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/core-scientific-muskogee-ok"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Massaponax","confidence":"medium","id":"compute_atlas-02f112e2048b0039","lat":38.204738259414135,"location_precision":"approximate","lon":-77.47623258858057,"name":"Cosner Technology Campus","operator":"Amazon Web Services","source_notes":"329 acres in Massaponax, ~1.9M sq ft; one of four AWS Spotsylvania/Caroline campuses (Summit Crossing, Carter's Store, Cosner, Orrock). Spotsylvania case ST23-0031.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon files for four data center campuses in Spotsylvania and Caroline Counties","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Submission provenance (not controlling source) — Public Evidence record for permit 74288-2","publisher":"Public Evidence Project","retrievedAt":"2026-07-30","url":"https://publicevidence.org/records/amazon-data-services-inc-iad450-cosner-tech-campus-air-permit-74288-2"},{"kind":"press","label":"DEQ issued air pollution violations on Spotsylvania data center campus in 2025","publisher":"Fredericksburg Free Press","retrievedAt":"2026-08-26","url":"https://www.fredericksburgfreepress.com/2026/06/04/deq-issued-air-pollution-violations-on-spotsylvania-data-center-campus-in-2025/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/aws-cosner-technology-campus-massaponax-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"confirmed","city":"Port Washington","confidence":"medium","contains_osm":true,"id":"compute_atlas-0302a12da272b263","lat":43.3882,"location_precision":"approximate","lon":-87.8753,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stargate-port-washington-wi","value":902.0}],"name":"Stargate Lighthouse Campus","operator":"Vantage Data Centers","source_notes":"The planned 902 MW is the campus's IT capacity, per Data Center Knowledge (December 2025).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage Breaks Ground on $15B Stargate Campus in Wisconsin — Data Center Knowledge","publisher":"Data Center Knowledge","retrievedAt":"2026-07-05","url":"https://www.datacenterknowledge.com/data-center-construction/vantage-breaks-ground-on-15b-stargate-campus-in-wisconsin"},{"kind":"filing","label":"Did Port Washington voters stop a $458 million data center project?","publisher":"Wisconsin Watch","retrievedAt":"2026-07-06","url":"https://wisconsinwatch.org/2026/04/port-washington-data-center-project-voters-referendum-tif-district-wisconsin/"},{"kind":"press","label":"Groundbreaking held as construction begins on $15 billion Port Washington data center","publisher":"BizTimes Milwaukee","retrievedAt":"2026-08-04","url":"https://biztimes.com/groundbreaking-held-as-construction-begins-on-15b-port-washington-data-center/"},{"kind":"press","label":"Tech giant sues Wisconsin regulator over data center restrictions","publisher":"The Daily Reporter","retrievedAt":"2026-09-10","url":"https://dailyreporter.com/2026/06/24/oracle-sues-wisconsin-public-service-commission-data-center-rules/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stargate-port-washington-wi"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Manchester","confidence":"medium","id":"compute_atlas-0326372ee33cefe2","lat":38.63778,"location_precision":"approximate","lon":-83.69306,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-sprigg-township-adams-county-oh","value":1300.0}],"name":"AWS Sprigg Township Data Center Campus (Buck Canyon)","operator":"Amazon Web Services (land held via Buck Canyon Properties)","source_notes":"No formal development proposal has been filed with Adams County per county officials as of Aug 2026, but a U.S. Army Corps of Engineers Nationwide Permit 39 was issued 2026-02-18 covering site work, and the county's own AWS project page states initial earthwork is expected in 2026 (general contractor not yet determined).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"AWS - Adams County, OH (official project page)","publisher":"Amazon / Adams County, OH","retrievedAt":"2026-08-27","url":"https://amazon.adamscountyoh.gov/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/aws-sprigg-township-adams-county-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Meridian","confidence":"medium","id":"compute_atlas-0327abd10d2fd99f","lat":32.3643,"location_precision":"approximate","lon":-88.7037,"name":"Echelon Data Centres Meridian (Sonny Montgomery Industrial Park)","operator":"Echelon Data Centres","source_notes":"This is a separate site from Compass Datacenters' Key Brothers Industrial Park campus (compass-lauderdale-meridian-ms), which the source places just south of it. The coordinates are Meridian city-level only. No MW, investment or end user has been disclosed, and the land sale was not confirmed closed as of the source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/echelon-data-centres-meridian-lauderdale-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Florence","confidence":"medium","id":"compute_atlas-03777a5593aee14b","lat":33.1183,"location_precision":"approximate","lon":-111.4733,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/","value":720.0}],"name":"Dobson Farms East","operator":"EdgeCore Digital Infrastructure","source_notes":"239 acres at the northeast corner of Arizona Farms Road and Attaway Road; conceptual plan shows ten two-story data center buildings of roughly 332,100 sq ft each at about 72 MW apiece, which the source states as 720 MW total. EdgeCore appears as the party behind the concept plans, not yet as a confirmed owner of record. Coordinate derived from the OSM geometries of Arizona Farms Road and Attaway Road.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Florence Approves Data Centers on 1,619 Acres as Dobson Farms Becomes Major Tech Park","publisher":"Pinal Post","retrievedAt":"2026-09-23","url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/edgecore-dobson-farms-east-florence-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Kiowa","confidence":"medium","id":"compute_atlas-038805689d617c7a","lat":34.7206516,"location_precision":"approximate","lon":-95.8991586,"name":"Project Emerald (Kiowa)","operator":"IREN","source_notes":"Proposed 2,000-acre campus along U.S. Highway 69 just south of Kiowa in Pittsburg County, with an alternative siting roughly 8 miles south in Atoka County also under consideration; both sides of Highway 69 are in play. Coordinates are the town of Kiowa, not a parcel-confirmed footprint. This is a different IREN site from the already-tracked IREN Woods County campus in northwest Oklahoma. Capacity and investment figures circulating in secondary coverage were not stated in the two sources read here, so they are deliberately omitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"'Project Emerald': AI data center plan in Pittsburg County moving forward","publisher":"KJRH","retrievedAt":"2026-09-14","url":"https://www.kjrh.com/news/local-news/project-emerald-ai-data-center-plan-in-pittsburg-county-moving-forward"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/iren-project-emerald-kiowa-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"high","contains_osm":true,"id":"compute_atlas-03d150e07d14880e","lat":41.8717114,"location_precision":"approximate","lon":-87.6392312,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/serverfarm-ch1-chicago-il","value":21.5}],"name":"Serverfarm CH1","operator":"Serverfarm","source_notes":"443,000 sq ft eight-storey building with 130,000 sq ft of data halls; 32MW utility power and 21.5MW IT power per the operator. Subsidy value is the state's estimated tax benefit (6.25% of a $285,000,000 investment commitment), not cash received. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (Serverfarm LLC dba SF CH1, LLC, Chicago, 2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/serverfarm-ch1-chicago-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/152449872"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/serverfarm-ch1-osmway-152449872"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/152449872"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Marietta","confidence":"medium","id":"compute_atlas-03e5fabdeb4ce4f9","lat":33.9916854,"location_precision":"approximate","lon":-84.5507217,"name":"Bells Ferry Road Data Center (MMM Acquisitions)","operator":"MMM Acquisitions LLC (developer; end user undisclosed)","source_notes":"347,200 sq ft across two buildings near Interstate 75. The site previously held a cell tower and five billboards; the SLUP allows relocating the tower. No megawatt figure is asserted here — a 108 MW figure appears in trade coverage that could not be retrieved as of September 2026. Coordinates are approximate to Bells Ferry Road.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/mmm-acquisitions-bells-ferry-marietta-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"medium","id":"compute_atlas-04097edc2e4b108a","lat":43.4968,"location_precision":"approximate","lon":-96.7845,"name":"Midco Sioux Falls Data Center","operator":"Midco (Midcontinent Communications)","source_notes":"Tier III, SOC 2 colocation facility, ~11,000 sq ft with 9,000+ sq ft raised floor. Wholesale and retail colocation, with fiber PoP links to Minneapolis, Chicago, Omaha, Kansas City and Denver. Street address is from the archived Data Center Map listing. Coordinates are a US Census geocoder match.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Sioux Falls Data Center","publisher":"Midco Business","retrievedAt":"2026-10-10","url":"https://business.midco.com/services/security/data-centers/sioux-falls-data-center/"}],"updated":"2026-10-10","url":"https://www.compute-atlas.com/facilities/midco-sioux-falls-sd"}],"state":"South Dakota","status":"operating"},{"ai_classification":"confirmed","city":"Haskell","confidence":"medium","id":"compute_atlas-041aa2f1528b229d","lat":33.1576,"location_precision":"approximate","lon":-99.7337,"name":"Google Haskell County Data Center Campus","operator":"Google","source_notes":"Two data center buildings at one Haskell County site; treated as a single campus record. Announced Nov 14 2025 as part of Google's $40B Texas investment through 2027 (which also covers Armstrong County and a Wilbarger County/Vernon site); no Haskell-specific investment figure disclosed, so no investment figure is recorded (the $40B is a Texas-wide aggregate). Data-center IT capacity in MW not publicly disclosed. One building is co-located with the Quantum Clean Energy Project (Intersect Power, acquired by Google March 2026): 640 MW solar PV + 1.3 GWh battery storage, scheduled operational June 2026 - this is energy-project capacity, not data-center IT load. Job figures cited in press (1,200 construction / up to 11 permanent) come from the co-located Intersect energy project, not the data center, so they are noted here rather than recorded as job counts. Coordinates are the Haskell city centroid (no parcel-level GPS found).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Governor Abbott, Google Announce $40 Billion Investment In Texas","publisher":"Office of the Texas Governor","retrievedAt":"2026-07-07","url":"https://gov.texas.gov/news/post/governor-abbott-google-announce-40-billion-investment-in-texas"},{"kind":"press","label":"Google's $40 billion data center investment to transform Texas town","publisher":"KTXS ABC Abilene","retrievedAt":"2026-07-07","url":"https://ktxs.com/news/local/its-jarring-googles-40-billion-data-center-investment-to-transform-texas-town"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-haskell-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Chaska","confidence":"medium","contains_osm":true,"id":"compute_atlas-041f85ce75ebfb16","lat":44.81068,"location_precision":"approximate","lon":-93.63557,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloudhq-msp-campus-chaska-mn","value":200.0}],"name":"CloudHQ MSP Campus (Chaska)","operator":"CloudHQ","source_notes":"CloudHQ markets the campus as \"200 MWs Total Critical IT Load\" across \"one or two data centers\" totalling \"1,100,000 SF\"; the City of Chaska describes a \"Data center totaling approximately 1.5 million square feet in the West Creek Corporate Center\" at 2007 Schoolmaster Dr. Chaska states \"Cloud HQ has not applied for, and the City of Chaska has not offered, any form of tax relief or other subsidies.\" Coordinates are CloudHQ's own published campus point (44.81068, -93.63557), which sits ~200 m from the OSM point for the city-stated street address. Distinct from the two Chaska sites already tracked (Flexential MSP01 at 3500 Lyman Blvd and LightEdge at 1708 W Creek Ln).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CloudHQ — MSP Campus specifications (200 MW critical IT load, 1,100,000 SF)","publisher":"CloudHQ","retrievedAt":"2026-09-18","url":"https://cloudhq.com/campus/msp-campus/"},{"kind":"permit","label":"City of Chaska — Cloud HQ project page (approval dates, water use, no subsidies)","publisher":"City of Chaska, Minnesota","retrievedAt":"2026-09-18","url":"https://www.chaskamn.gov/841/Cloud-HQ"}],"updated":"2026-09-18","url":"https://www.compute-atlas.com/facilities/cloudhq-msp-campus-chaska-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"South Strabane Township","confidence":"medium","id":"compute_atlas-0445236c0fca43f4","lat":40.156,"location_precision":"approximate","lon":-80.19,"name":"Zediker Station Data Center Site","operator":"CNX Resources","source_notes":"1,500-acre CNX-owned, industrially zoned site in South Strabane Township about 20 miles southwest of Pittsburgh, with 400 buildable acres, marketed for lease/development with JLL. No tenant or operator has publicly committed, and South Strabane Township was still finalizing a data center ordinance as of early 2026 — this is a marketed development site, not an approved facility.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/cnx-zediker-station-south-strabane-washington-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"medium","id":"compute_atlas-044baf03db3a3c64","lat":40.4433,"location_precision":"approximate","lon":-80.1697,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-pit2-summit-park-pittsburgh-pa","value":5.0}],"name":"DataBank PIT2 (Summit Park)","operator":"DataBank","source_notes":"47,100 IT square feet with 5 MW of critical IT load and 29 on-site carriers, on a 17-acre campus near Pittsburgh International Airport that DataBank says has room for multiple additional data centers.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/databank-pit2-summit-park-pittsburgh-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Portsmouth","confidence":"medium","id":"compute_atlas-047441cdd83da4e3","lat":43.0617779,"location_precision":"approximate","lon":-70.7931847,"name":"Liberty Mutual Portsmouth Data Center","operator":"Liberty Mutual","source_notes":"An enterprise (single-tenant) data center on Liberty Mutual's Portsmouth campus near the Pease International Tradeport. It rests on directory listings only, with no operator confirmation, hence the record is marked reported. One aggregator (dcmap.us) shows a 7.5 MW figure but labels it 'estimated', so it is not used. The coordinates are the OSM address point, which agrees with the Census geocode to within about 150 m.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"LIBERTY MUTUAL DATA CENTER, Borthwick Ave, Portsmouth NH: active","publisher":"DC Hub","retrievedAt":"2026-10-08","url":"https://dchub.cloud/facilities/liberty-mutual-data-center-5ac875d5"},{"kind":"other","label":"New Hampshire data centers: 225 Borthwick Ave, Portsmouth, Liberty Mutual, operational","publisher":"Kadoa US Datacenter Tracker","retrievedAt":"2026-10-26","url":"https://www.kadoa.com/datacenter/state/new-hampshire"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/liberty-mutual-portsmouth-nh"}],"state":"New Hampshire","status":"operating"},{"ai_classification":"confirmed","city":"Pecos","confidence":"medium","id":"compute_atlas-050c6fb03c28efd9","lat":31.44,"location_precision":"approximate","lon":-103.58,"name":"Core Scientific Pecos AI Campus","operator":"Core Scientific","source_notes":"High-density AI/HPC colocation. ~1.5 GW gross / ~1.0 GW leasable is an expansion ceiling (in notes). Co-located in Reeves County with Microsoft's separate 'Project Kirby' Pecos campus (distinct operator/parcel; tracked separately as of July 2026). Address on record: 1939 FM 2119. Core Scientific historically a bitcoin miner, repositioned to HDC. Coordinates are the Pecos area centroid. No Pecos-specific capex is disclosed (Q4 FY2025 capex of $279.2M is company-wide; the $226.2M CoreWeave-funded portion is contract revenue, not capex) -> no investment figure is recorded. No Reeves County abatement attributable to Core Scientific was found (the 'Pecos Power Plant LLC' abatement is a separate gas-plant entity).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Core Scientific plans expansion to 1.5 gigawatts of gross power at Pecos, Texas campus","publisher":"Core Scientific Inc.","retrievedAt":"2026-07-08","url":"https://investors.corescientific.com/news-events/press-releases/detail/134/core-scientific-plans-expansion-to-1-5-gigawatts-of-gross-power-at-pecos-texas-campus"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/core-scientific-pecos-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Ringgold","confidence":"medium","id":"compute_atlas-052371d985d220c1","lat":36.6048,"location_precision":"approximate","lon":-79.2905,"name":"58 East Data Campus (Route 58 East Data Center Campus)","operator":"Anchorstone Advisors LLC","source_notes":"Also referred to in some coverage as 'Route 58 East Data Center Campus'. Board of Zoning Appeals granted the Special Use Permit under the county's new M-2 heavy-industrial data-center-by-SUP ordinance (adopted May 21, 2024). Construction of phase 1 targeted mid-2025 to early 2026 per developer statements at time of approval; up to ~5 buildings, 200MW with room for expansion, ~$4-5B projected investment, build-out over ~10 years. Coordinates are town-centroid for Ringgold, VA (approximate) — the exact parcel had not been geocoded from a parcel ID in the cited sources as of July 2026. Pittsylvania County's first data-center rezoning (~945 ac off US-58, Ringgold), approved 2024 per Cardinal News; ~$5B investment and ~200 MW are reported estimates from secondary coverage (not in the primary) — not recorded as structured figures pending a county case document.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Permit approved for Ringgold data center campus","publisher":"Showcase Magazine","retrievedAt":"2026-07-17","url":"https://showcasemagazine.com/2024/11/15/permit-approved-for-ringgold-data-center-campus/"},{"kind":"press","label":"950-acre data center campus proposed in Pittsylvania County","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/950-acre-data-center-campus-proposed-in-pittsylvania-county-virginia/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/anchorstone-58-east-data-campus-ringgold-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Allen","confidence":"medium","contains_osm":true,"id":"compute_atlas-05394b18756e0dbb","lat":33.1385206,"location_precision":"exact","lon":-96.6599516,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-dfw3-dfw5-allen-tx","value":50.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-dfw3-dfw5-allen-tx","value":77.0}],"name":"CyrusOne DFW3-DFW5 (Allen)","operator":"CyrusOne","source_notes":"Confirmed 90-acre, 3-building, 50MW campus at Allen, TX (largest DC development in the state per operator page). AI/HPC (likely): Allen campus marketed for AI training, HPC, multi-cloud.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/590213771","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/590213771"},{"kind":"press","label":"DataCenterDynamics: CyrusOne signs 40MW wind and solar PPA with Gexa Energy in Texas","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/cyrusone-signs-40mw-wind-and-solar-ppa-with-gexa-energy-in-texas/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cyrusone-dfw3-dfw5-allen-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Beaver Dam","confidence":"medium","id":"compute_atlas-05802913c200847a","lat":43.4578,"location_precision":"approximate","lon":-88.8373,"name":"Oppidan Beaver Dam Edge Data Center","operator":"Oppidan Investment Company","source_notes":"A 90,000-square-foot single-story regional edge data center — a separate, much smaller project from Meta's ~700,000-square-foot Beaver Dam campus already tracked. Council deliberations raised water use, utility rates and tax-fairness concerns. Coordinates are a municipality-level locator; the site is at Highway 151 and Hemlock Road.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Beaver Dam Common Council Approves Second Data Center","publisher":"Daily Dodge","retrievedAt":"2026-09-01","url":"https://dailydodge.com/beaver-dam-common-council-approves-second-data-center/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/oppidan-beaver-dam-edge-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Dalton","confidence":"medium","id":"compute_atlas-05d61ec98c0871be","lat":34.69265485,"location_precision":"exact","lon":-84.94183002,"name":"CoreWeave Dalton II / Core Scientific Old Tilton Road Data Center","operator":"Core Scientific","source_notes":"Whitfield County BOC rezoning (3-2, tie broken by Chairman Jevin Jensen) approved March 2025 for 'heavy manufacturing' use (AI data center per contemporaneous reporting), conditioned on Enterprise Drive access. A June 2026 Whitfield Superior Court validated a $1.2B Integra SPV equipment-bond package tied to this ~167-173 acre site, naming CoreWeave Dalton II LLC as sublessee/operator. Same June 2026 hearing validated much larger CoreWeave Dalton / CoreWeave Dalton II bond series ($900M + $6.4B + $6.7B) that likely cover Core Scientific's OTHER Whitfield campus sites (Industrial South Road, Enterprise Drive) — those are separate parcels/rezonings and are not tracked as additional records here as of July 2026, to avoid parcel-level double-counting. Core Scientific is site owner; CoreWeave Dalton II, LLC is sublessee/operator.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Whitfield County Board of Commissioners rezoning vote, Old Tilton Road (Core Scientific)","publisher":"Dalton Daily Citizen","retrievedAt":"2026-09-21","url":"https://daltoncitizen.com/2025/03/11/whitfield-county-commissioners-approve-rezoning-for-data-center-despite-opposition/"},{"kind":"filing","label":"Court reviews $15 billion in data center bonds: Integra SPV A/B/C $1.2B bonds for ~167-acre Tilton Road site owned by Core Scientific, subleased to CoreWeave Dalton II","publisher":"Dalton Daily Citizen","retrievedAt":"2026-07-17","url":"https://daltoncitizen.com/2026/06/03/court-reviews-15-billion-in-data-center-bonds-thursday-citizens-hold-limited-intervention-rights/"},{"kind":"filing","label":"Judge validates $15.2 billion in data center-related bonds","publisher":"Dalton Daily Citizen","retrievedAt":"2026-07-17","url":"https://daltoncitizen.com/2026/06/04/judge-validates-15-2-billion-in-data-center-related-bonds/"},{"kind":"other","label":"Whitfield County GIS/Tax Assessor parcel detail, parcel 13-060-01-000","retrievedAt":"2026-07-18","url":"https://gis.whitfieldcountyga.com/GIS/WCGIS/parceldetail.asp?txtrealkey=31339"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/coreweave-dalton-ii-old-tilton-road-whitfield-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Beaverton","confidence":"medium","id":"compute_atlas-060e7e202792ad86","lat":45.47633,"location_precision":"exact","lon":-122.77615,"name":"Digital Fortress PTL2 (Beaverton)","operator":"Digital Fortress","source_notes":"Suburban colocation site in the Quad 217 Corporate Center, Beaverton; operator describes it as 15 minutes from downtown Portland in a low to low-mid seismic risk area and an NWAX member. Capacity not published. Coordinates are the OSM building footprint for 9705 SW Sunshine Ct.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Portland Interconnected Data Centers — Digital Fortress (PTL2: 9705 SW Sunshine Ct)","publisher":"Digital Fortress","retrievedAt":"2026-09-17","url":"https://digital-fortress.com/portland-interconnected-data-centers/"},{"kind":"press","label":"Digital Fortress Acquires Three Datacenter Facilities in Portland, Oregon (press release, 2021-01-19)","publisher":"Digital Fortress","retrievedAt":"2026-09-17","url":"https://digital-fortress.com/digital-fortress-acquires-three-datacenter-facilities-in-portland-oregon/"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/digital-fortress-ptl2-beaverton-or"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Portland Interconnected Data Centers — Digital Fortress (PTL3: 9610 SW Sunshine Ct)","publisher":"Digital Fortress","retrievedAt":"2026-09-17","url":"https://digital-fortress.com/portland-interconnected-data-centers/"},{"kind":"press","label":"Digital Fortress Acquires Three Datacenter Facilities in Portland, Oregon (press release, 2021-01-19)","publisher":"Digital Fortress","retrievedAt":"2026-09-17","url":"https://digital-fortress.com/digital-fortress-acquires-three-datacenter-facilities-in-portland-oregon/"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/digital-fortress-ptl3-beaverton-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Nashville","confidence":"medium","id":"compute_atlas-062c49afa3aa8642","lat":36.1667902,"location_precision":"approximate","lon":-86.7973014,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/fisk-quantum-leap-nashville-tn","value":30.0}],"name":"Fisk University Quantum Leap Innovation & Technology Center","operator":"Fisk University","source_notes":"Announced May 2026 as the anchor of Fisk's ~$1 billion \"Quantum Leap\" campus master plan. The 100,000 sq ft Innovation & Technology Center splits into 30,000 sq ft of academic space and a 70,000 sq ft, 30MW technology shell that DCD reports will be set aside for a data-center partner not yet named; the $400m figure is that portion of the project, not the whole master plan. Fisk itself avoids the phrase \"data center\" and calls it an Innovation & Technology Center. Site is five undeveloped acres, a former athletics track just west of Johnson Gymnasium at 17th Avenue North and Herman Street in the 37208 ZIP. Still awaiting Nashville Metropolitan Planning Commission approval as of the sources' dates, so status is proposed. Coordinates are a geocode of Herman Street within 37208, not a parcel; no source states lat/lon. No subsidy agreement is mentioned in either source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fisk University looks to build data center in Nashville, Tennessee","publisher":"DataCenterDynamics (archived)","retrievedAt":"2026-09-09","url":"https://web.archive.org/web/20260819034031/https://www.datacenterdynamics.com/en/news/fisk-university-looks-to-build-data-center-in-nashville-tennessee/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/fisk-quantum-leap-nashville-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-063bc1733b873ca2","lat":31.96,"location_precision":"approximate","lon":-108.48,"name":"Site Layer 1 Data Center (Playas)","operator":"Site Layer 1 LLC (Granite Renewables)","source_notes":"Private ranchland (Hurt Cattle Co.) about 4.5 miles northeast of Playas and nearly 12 miles from Hachita, along N.M. 9, in southern Grant County. Coordinates are an approximate point derived from that description. The data center's size and end use are undefined, and the developer said it does not yet know the facility's end purpose. Linked to similarly named Site Layer 2 (Logan County, CO) and Site Layer 4 (Platte County, WY).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"In Silver City, rapid community response to local data center proposal","publisher":"Albuquerque Journal","retrievedAt":"2026-10-17","url":"https://www.abqjournal.com/news/in-silver-city-rapid-community-response-to-local-data-center-proposal/3115188"},{"kind":"press","label":"Grant County residents raise alarm over secretive proposed data center","publisher":"Searchlight New Mexico","retrievedAt":"2026-10-17","url":"https://searchlightnm.org/grant-county-residents-raise-alarm-over-secretive-proposed-data-center/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/site-layer-1-playas-grant-county-nm"}],"state":"New Mexico","status":"planned"},{"ai_classification":"unknown","city":"Des Moines","confidence":"medium","id":"compute_atlas-065c3dbf56bedbca","lat":41.5868299,"location_precision":"exact","lon":-93.6227589,"name":"Fidium Des Moines Data Center","operator":"Fidium (Consolidated Communications)","source_notes":"Small carrier-hotel colocation suite: 500 sq ft of raised floor with a 65 kVA commercial generator, three redundant transformers, separate substation feeds, Liebert sub-floor cooling and biometric access. Located above the downtown flood plain. Single-source record, so confidence is 'reported.'","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-04","url":"https://www.compute-atlas.com/facilities/fidium-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Secaucus","confidence":"high","contains_osm":true,"id":"compute_atlas-066a55b0bf7e11ad","lat":40.7775822,"location_precision":"exact","lon":-74.0759403,"name":"Equinix NY2","operator":"Equinix","source_notes":"Equinix's own IBX page gives the address as 275 Hartz Way, Secaucus, NJ 07094. Tracked separately from the Equinix NY3/NY4/NY5 records already held because NY2 is a distinct IBX code at a distinct street address with its own mapped building footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Equinix NY2 IBX data center page (Internet Archive capture of equinix.com; the live page answers 403 to non-browser clients)","publisher":"Equinix","retrievedAt":"2026-09-14","url":"https://web.archive.org/web/20251112153023/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny2"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/equinix-ny2-secaucus-nj"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/193611192","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/193611192"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/equinix-ny5-nj"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Equinix NY6 IBX data center page (Internet Archive capture of equinix.com; the live page answers 403 to non-browser clients)","publisher":"Equinix","retrievedAt":"2026-09-14","url":"https://web.archive.org/web/20251206004158/https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/new-york-data-centers/ny6"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/equinix-ny6-secaucus-nj"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/193611192"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/193611211"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/193611216"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"North Bergen","confidence":"medium","contains_osm":true,"id":"compute_atlas-06b0cf5cee4b36c2","lat":40.7968626,"location_precision":"exact","lon":-74.0311403,"name":"Equinix NY7","operator":"Equinix","source_notes":"5851 West Side Avenue, North Bergen, NJ per Equinix directory; corroborated by datacenters.com.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/95782052","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/95782052"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-ny7-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Douglasville","confidence":"high","contains_osm":true,"id":"compute_atlas-06e1ca5a3ef0d551","lat":33.7307027,"location_precision":"exact","lon":-84.6112398,"name":"Flexential Atlanta - Douglasville 2","operator":"Flexential","source_notes":"Distinct Flexential metro campus; not the same site as DC BLOX Atlanta West (different operator, 7.9km away).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential official facility page","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/ga/atlanta/douglasville-2-data-center"},{"kind":"osm","label":"OpenStreetMap way/1258702591","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1258702591"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-atlanta-douglasville-2-ga"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1097502168"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1258702591"}],"state":"Georgia","status":"operating"},{"ai_classification":"confirmed","city":"Mount Pleasant","confidence":"medium","id":"compute_atlas-07381c63a0f43c4c","lat":42.7209,"location_precision":"approximate","lon":-87.9023,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-mount-pleasant-wi","value":1000.0}],"name":"Microsoft Mount Pleasant Data Center Campus","operator":"Microsoft","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft data center coming to Racine County, Wisconsin — Milwaukee Journal Sentinel","publisher":"Milwaukee Journal Sentinel","retrievedAt":"2026-07-05","url":"https://www.jsonline.com/story/money/business/2025/01/09/microsoft-data-center-racine-county/77568940007/"},{"kind":"press","label":"Made in Wisconsin: the world's most powerful AI datacenter","publisher":"Microsoft On the Issues","retrievedAt":"2026-09-13","url":"https://blogs.microsoft.com/on-the-issues/2025/09/18/made-in-wisconsin-the-worlds-most-powerful-ai-datacenter/"},{"kind":"press","label":"Microsoft's Wisconsin AI Data Center Campus Now Fully Operational","publisher":"Data Center Knowledge","retrievedAt":"2026-07-06","url":"https://www.datacenterknowledge.com/data-center-construction/microsoft-s-wisconsin-ai-campus-moves-from-construction-to-operations"},{"kind":"press","label":"Microsoft in Racine County","publisher":"Racine County Economic Development Corp","retrievedAt":"2026-09-13","url":"https://rcedc.org/microsoft-in-racine-county/"},{"kind":"press","label":"Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin","publisher":"Microsoft","retrievedAt":"2026-08-04","url":"https://news.microsoft.com/source/2026/06/23/microsoft-completes-construction-on-first-datacenter-facility-in-mount-pleasant-wisconsin/"},{"kind":"press","label":"Microsoft's $7.3 Billion AI Data Center Just Caught a Nasty Lawsuit From Furious Neighbors","publisher":"Futurism","retrievedAt":"2026-09-10","url":"https://futurism.com/artificial-intelligence/microsoft-ai-data-center-lawsuit-neighbors"},{"kind":"press","label":"Microsoft data centers will use up to 8.4M gallons of water each year, records show","publisher":"Wisconsin Public Radio","retrievedAt":"2026-10-30","url":"https://www.wpr.org/news/microsoft-data-centers-8-million-gallons-water-each-year"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/microsoft-mount-pleasant-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-07554cde734f0079","lat":42.0224688,"location_precision":"approximate","lon":-87.9621839,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prime-ord-elk-grove-village-il","value":175.0}],"name":"Prime ORD Chicago Campus","operator":"Prime Data Centers","source_notes":"Site-level figures, not entity-wide: the $1B and 175MW are stated for this Elk Grove Village campus at full build-out across three buildings; first building ORD-01 is 384,000 sq ft and up to 72MW. Status reflects the most recent sourced stage (2022 groundbreaking) — no fetched source confirms a live date, so this may lag reality. Distinct from the tracked TA Realty Elk Grove Village site (different operator, different parcel/acreage). Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/prime-ord-elk-grove-village-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"confirmed","city":"Archbald","confidence":"medium","id":"compute_atlas-0767de35726023e1","lat":41.51,"location_precision":"approximate","lon":-75.54,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/wildcat-ridge-archbald-lackawanna-county-pa","value":1600.0}],"name":"Wildcat Ridge AI Data Center Campus","operator":"Cornell Realty Management","source_notes":"Business Route 6 / Wildcat Rd; 400-574 acres (a range across sources, so no acreage is recorded). 14 three-story buildings, ~17.2M sq ft total. In zoning approval process; developer 'resting its case' as of June 2026. One of three competing proposals in the Lackawanna County cluster (see also Project Gravity and Triboro Industrial Park). Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$2.1bn data center campus proposed in Archbald, Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/21bn-data-center-campus-proposed-in-archbald-pennsylvania/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/wildcat-ridge-archbald-lackawanna-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Cottonwood Heights","confidence":"medium","id":"compute_atlas-07d9b68e1cd51e06","lat":40.633117,"location_precision":"approximate","lon":-111.809456,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/regence-salt-lake-city-ut","value":2.0}],"name":"Regence BlueCross BlueShield Salt Lake City Data Center","operator":"Regence BlueCross BlueShield","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. Cottonwood Heights' Community Development and Renewal Agency (CDRA, established 2006) has created exactly one project area in its history — the Canyon Centre CDA at 3700 East 7000 South, a different site — and its dedicated financial analysis (LRB Public Finance Advisors, Feb 2024) does not mention this address or Regence. No Cottonwood Heights or Salt Lake County filing found naming Regence in connection with an incentive, subsidy, RDA, or abatement. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing. Note: no source confirms this address houses a data center rather than Regence's general Utah corporate/insurance office.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/regence-salt-lake-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"confirmed","city":"Limestone","confidence":"medium","id":"compute_atlas-085186c12adb24c1","lat":46.9502,"location_precision":"approximate","lon":-67.8849,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/liquidcool-loring-afb-me","value":50.0}],"name":"Loring LiquidCool Data Center (Green 4 Maine Campus)","operator":"LiquidCool Solutions / Green 4 Maine","source_notes":"115,000 sq ft leased within Green 4 Maine's 450-acre innovation hub on former USAF base. LiquidCool Solutions is a Minnesota-based technology company. First phase starts at 5-6MW; 50MW total available at base. Project marketed as cross-border US/Canada AI hub.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Maine's 1st AI Data Center Planned for Aroostook County","publisher":"Bangor Daily News","retrievedAt":"2026-07-06","url":"https://www.bangordailynews.com/2025/10/14/aroostook/ai-data-center-loring-air-force-base/"},{"kind":"press","label":"Maine's Proposed Data Center Ban Could Restrict Facility Planned at Loring","publisher":"Bangor Daily News","retrievedAt":"2026-07-06","url":"https://www.bangordailynews.com/2026/03/10/aroostook/aroostook-business/maine-data-center-ban-loring-joam40zk0w/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Maine's proposed data center ban could restrict facility planned at Loring","publisher":"The County","retrievedAt":"2026-10-22","url":"https://thecounty.me/2026/03/10/news/maines-proposed-data-center-ban-could-restrict-facility-planned-at-loring/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/liquidcool-loring-afb-me"}],"state":"Maine","status":"planned"},{"ai_classification":"mixed_use","city":"Greenville","confidence":"high","contains_osm":true,"id":"compute_atlas-08c16001c59835fb","lat":34.8075277,"location_precision":"approximate","lon":-82.3434922,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://greenvilleeconomicdevelopment.com/dartpoints-expands-greenville-county-operations/","value":12.5},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dartpoints-greenville-sc","value":2.5}],"name":"DartPoints Greenville Data Center","operator":"DartPoints","source_notes":"Colocation / edge facility rather than a hyperscale campus, but explicitly positioned by the operator and the state for AI, enterprise and edge workloads. Coordinates are the OSM address point for 78 Global Drive. As of 2026-09-10, per DartPoints' own Greenville location page (dated after this record's 2026-08-26 last update), the status is unchanged: still operational, running continuously since 2007. No utility name or energy-source disclosure was found on the operator's site or in the Nov 2025 / SC Commerce / Greenville EDC press coverage. None of the sources checked (SC Commerce, Greenville EDC, DartPoints' own site) states a land acreage figure for the Greenville site. No FILOT agreement, tax abatement, or other incentive is mentioned in any press source checked (SC Commerce, Greenville EDC press release, Governor's office quote, County Council Chairman's quote) for either the existing facility or the 2025 expansion. This is an absence in press coverage only, not an audited negative at the level of county council minutes (GASB77-grade): as of September 2026, Greenville County's agenda and minutes portal could not be navigated to confirm at that stronger tier, so the question is unresolved, not confirmed clean.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DartPoints Expands Greenville County Operations","publisher":"Greenville Area Development Corporation","retrievedAt":"2026-09-10","url":"https://greenvilleeconomicdevelopment.com/dartpoints-expands-greenville-county-operations/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/dartpoints-greenville-sc"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8390959153"}],"state":"South Carolina","status":"operating"},{"ai_classification":"confirmed","city":"Nesquehoning","confidence":"medium","id":"compute_atlas-08fb6e24cedd2092","lat":40.8564,"location_precision":"approximate","lon":-75.8283,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/panther-creek-hpc-ai-campus-nesquehoning-pa","value":350.0}],"name":"Panther Creek HPC/AI Data Center Campus","operator":"Bitfarms Ltd.","source_notes":"An HPC/AI data center campus at the Panther Creek waste-coal power plant site in Nesquehoning, Carbon County. In August 2025 Bitfarms engaged T5 Data Centers to provide pre-construction design, development-approval and construction guidance. This is a separate record from the already-tracked Panther Creek plant / crypto-mining operation at the same site, as with the split Homer City generation and campus records. The planned capacity of 350 MW follows Bitfarms' October 2025 financing release, in which Macquarie describes a '350 MW HPC/AI campus', and WFMZ's August 2026 report that, according to the website of Keel Infrastructure (formerly Bitfarms Ltd.), the campus has secured capacity of 350 MW, with possible expansion to 510 MW. As of October 2026, none of the cited sources confirms trade reports of a 350 MW firm power contract by 2028 (scalable toward 500 MW+). A February 2026 report carried by Yahoo Finance states, citing Times News Online, that the Nesquehoning Planning Commission granted a special exception permit; the same report says a $50 million draw in October 2025 accelerated equipment orders and substation construction. In April 2026 the Carbon County Planning Commission recommended conditional rejection of the Carbon Node East Development plan, and the DEP scheduled a public meeting and hearing for August 20, 2026 on the developer's NPDES permit application.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bitfarms Announces Partnership with T5 Data Centers to Advance HPC/AI Development at Panther Creek Campus","publisher":"Bitfarms Ltd.","retrievedAt":"2026-08-17","url":"https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-announces-partnership-t5-data-centers-advance-hpcai"},{"kind":"press","label":"Bitfarms Announces Partnership To Develop A.I. Data Center At Panther Creek Waste Coal-Fired Power Plant In Carbon County","publisher":"PA Environment Digest","retrievedAt":"2026-08-17","url":"https://paenvironmentdaily.blogspot.com/2025/08/bitfarms-announces-partnership-to.html"},{"kind":"filing","label":"Bitfarms Converts Macquarie Debt Facility to $300M Project Financing and Draws Additional $50M to Accelerate HPC/AI Development at Panther Creek Campus","publisher":"Bitfarms Ltd.","retrievedAt":"2026-08-31","url":"https://investor.bitfarms.com/news-releases/news-release-details/bitfarms-converts-macquarie-debt-facility-300m-project-financing"},{"kind":"press","label":"Nesquehoning data center plans need work","publisher":"Times News Online","retrievedAt":"2026-09-12","url":"https://www.tnonline.com/20260422/nesquehoning-data-center-plans-need-work/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/panther-creek-hpc-ai-campus-nesquehoning-pa"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"mixed_use","city":"Landover","confidence":"medium","id":"compute_atlas-08fd14566aad3b8e","lat":38.931,"location_precision":"approximate","lon":-76.868,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://afrotech.com/prince-georges-county-pauses-landover-mall-data-center-project","value":820.0}],"name":"Brightseat Tech Park","operator":"Lerner Enterprises / The Tower Companies (Brightseat Associates LLC)","source_notes":"2101 Brightseat Road, Landover MD. Project has final plan approvals but is politically frozen pending task force report. Five buildings on 87 acres of former mall site. As a permitted-but-frozen project, no facility-specific water design, subsidy award, or committed job figures have been disclosed; job figures circulating in press are Maryland Tech Council sector benchmarks, not Brightseat commitments. As of 2026-09-10, status remains permitted (the status vocabulary has no value for 'construction paused by opposition/moratorium'). Groundbreaking has not occurred; community opposition (more than 23,000 petition signatures) and PG County Council ordinances CB-019-2026/CB-020-2026 (introduced March 2026 to repeal the qualified-data-center site-plan-review exemption) continue to threaten the timeline. Subsidies: as of September 2026, only a general-program reference was found (MD/PG County 2020 sales-and-use tax exemption for qualified data centers, Tax-General Article Sec.11-239(a)(5)(i)) with no site-specific dollar figure for this project, so no subsidy is recorded; the exemption is a program-level fact only. As of September 2026, no street address had been independently sourced; the status history cites 2101 Brightseat Road from an earlier source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lerner's Maryland data center campus could total 820MW","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/lerners-maryland-data-center-campus-could-total-820mw/"},{"kind":"press","label":"Prince George's County Executive Orders Temporary Halt to Landover Mall Data Center Project","publisher":"AfroTech","retrievedAt":"2026-07-06","url":"https://afrotech.com/prince-georges-county-pauses-landover-mall-data-center-project"},{"kind":"press","label":"Two-year moratorium on data center development passes in Prince George's Co.","publisher":"WTOP News","retrievedAt":"2026-09-13","url":"https://wtop.com/maryland/2026/07/prince-georges-co-extends-pause-on-hyperscale-data-center-development/"},{"kind":"other","label":"Chair Oriadha Announces Two-Year Moratorium to Prevent New Data Centers from Operating in the County","publisher":"Prince George's County Council","retrievedAt":"2026-09-13","url":"https://pgccouncil.us/m/newsflash"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/lerner-brightseat-tech-park-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"medium","id":"compute_atlas-0916e1a17697e7cf","lat":38.9220674,"location_precision":"exact","lon":-104.8426568,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-colorado-springs-co","value":14.0}],"name":"QTS Colorado Springs Data Center","operator":"QTS Data Centers","source_notes":"249,958 sq ft on a 21-acre site with 14 MW+ of critical building capacity, per the operator's own location page. Distinct site from the QTS Aurora-Denver campus already tracked. Capacity recorded as 14 MW (operator states '14 MW+').","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/qts-colorado-springs-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"mixed_use","city":"Benton","confidence":"medium","id":"compute_atlas-09ab60a04ca6f49e","lat":32.77,"location_precision":"approximate","lon":-93.74,"name":"Amazon Web Services Bossier Parish Campus (Benton)","operator":"Amazon Web Services","source_notes":"One of the two campuses covered by Amazon's $12 billion northwest Louisiana announcement; the other is just north of Blanchard Latex Road in Caddo Parish. KSLA places this campus about five miles north of Benton on the west side of Highway 3. STACK Infrastructure is the developer partner and each campus is approximately 2-3 million sq ft. Program-level figures are deliberately not attributed to this site: the $12 billion investment and the roughly 1,500 construction / 540 permanent job figures cover both campuses jointly, and Amazon's up-to-$400 million public water-infrastructure commitment covers all of its northwest Louisiana campuses. The separately announced Resilient Technology Park campus in west Shreveport is, as of August 2026, tracked as Amazon Web Services Shreveport Campus (Resilient Technology Park); KSLA reported on 2026-02-24 that it is not part of the $12 billion investment. Coordinates are derived from the published road description and are approximate; no parcel coordinate has been published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/aws-benton-bossier-parish-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"likely","city":"Upper Mount Bethel Township","confidence":"medium","id":"compute_atlas-09e370645fdb3ef0","lat":40.9,"location_precision":"approximate","lon":-75.13,"name":"Slate Belt Holdings Data Center Campus (Upper Mount Bethel)","operator":"Slate Belt Holdings LLC (Talen Energy / River Pointe Logistics joint venture)","source_notes":"Site is roughly 30 miles northeast of Allentown, near Bangor. Land was acquired from River Pointe Logistics in 2026. The developers are challenging Upper Mount Bethel Township's zoning ordinance restrictions on data center use. Coordinates are township-level, not parcel-confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Talen looks to develop 23-building data center campus in Pennsylvania","publisher":"BIC Magazine","retrievedAt":"2026-08-31","url":"https://www.bicmagazine.com/departments/AI-Infrastructure/talen-looks-to-develop-23-building-data-center-campus-in-pennsylvania/"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/slate-belt-holdings-upper-mount-bethel-northampton-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"compute_atlas-09e8f3fd5bf18038","lat":33.2468,"location_precision":"approximate","lon":-84.2641,"name":"75 South Data Center Campus","operator":"Industrial VI Enterprises LLC (with Hillwood Industrial/Logistics and PowerHouse)","source_notes":"Seven two-story buildings (2.24M sq ft) plus a separate power station on 292.41 acres at 1221 Tomochichi Road, north of SR 16. The developer withdrew on June 25, 2026 and said it would resubmit; later reports say it was resubmitted in July. A county moratorium took effect Aug 3. One tracker reports the applications were withdrawn again in September 2026, which is unverified. Coordinates are the Griffin city centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/industrial-vi-75-south-data-center-campus-spalding-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"San Diego","confidence":"medium","contains_osm":true,"id":"compute_atlas-0a2bc471a50cd22f","lat":32.8423554,"location_precision":"exact","lon":-117.1694226,"name":"EdgeConneX SDG01","operator":"EdgeConneX","source_notes":"Confirmed via EdgeConneX's own San Diego location page: facility code SDG01, operational, ENERGY STAR certified, 9,477 sq ft (2,386 sq ft raised floor).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/31803515","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/31803515"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/edgeconnex-sdg01-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Franklin Furnace","confidence":"medium","id":"compute_atlas-0a5de064d15c7b0d","lat":38.68,"location_precision":"approximate","lon":-82.72,"name":"Project Dazzler","operator":"Google","source_notes":"792-acre site in Green Township, east of the Ohio River. 500,000 sq ft phase 1, up to 1.7M sq ft total. Ohio EPA wetlands permit ('Project Dazzler') administratively complete March 2026; 75%/15-year tax abatement. Distinct from other tracked Google Ohio sites (Lancaster, Project BOSC-Lima, New Albany).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google confirmed as company behind 500,000 sq ft data center in Scioto County, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500000-sq-ft-data-center-in-scioto-county-ohio/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Scioto County Daily News — \"Commissioners Respond to Open Meetings Lawsuit Over Data Center\"","retrievedAt":"2026-07-26","url":"https://sciotocountydailynews.com/commissioners-respond-to-open-meetings-lawsuit-over-data-center/"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/google-project-dazzler-franklin-furnace-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"mixed_use","city":"Hazle Township","confidence":"medium","id":"compute_atlas-0a7b392576fae398","lat":40.985,"location_precision":"approximate","lon":-75.955,"name":"Project Hazelnut","operator":"NorthPoint Development (NP Hazleton Holdings 1 LLC)","source_notes":"Site: Humboldt North Industrial Park, Hazle Township, Luzerne County PA (within a larger ~3,000-acre industrial park); a few miles from Amazon's nuclear-adjacent data center campus (acquired from Talen Energy) - proximity only, AWS is not a confirmed tenant/operator for Project Hazelnut; NorthPoint's own project site names no end-tenant, describing this as a speculative build. Phased: Phase 1 (5 buildings) to begin Q4 2026, Phase 2 (3 buildings) Q1 2028, Phase 3 (7 buildings) Q2 2029. Developer projects ~900-1,300 construction jobs and ~900-950 permanent jobs ($50K-$158K salary range) - not yet delivered, so no job count is recorded; similarly $13.47M in projected county tax revenue over 20 years is a projection, not a subsidy. First surfaced publicly in connection with PA's Permit Fast Track Program (Executive Order 2024-04). NorthPoint's own site explicitly frames this as a general 'data center campus' supporting 'cloud platforms, digital payments, streaming, and healthcare systems' - no AI-specific language found; classified as mixed-use given hyperscale-tier campus scale makes AI workloads plausible even absent explicit branding.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Northpoint proposes 15-building, 1,280-acre data center campus in Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/northpoint-proposes-15-building-1280-acre-data-center-campus-in-pennsylvania/"},{"kind":"other","label":"Project Hazelnut - official project site","publisher":"NorthPoint Development","retrievedAt":"2026-07-09","url":"https://projecthazelnut.com/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/project-hazelnut-hazle-township-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"confirmed","city":"Vernon","confidence":"medium","id":"compute_atlas-0a81da64530129d4","lat":34.1551,"location_precision":"approximate","lon":-99.294,"name":"Google Wilbarger County Campus","operator":"Google","source_notes":"Air-cooled data center near Vernon, Wilbarger County — a Google/AES 'power-first' initiative. Part of Google's broader Texas expansion. IT capacity not disclosed. Coordinates are the Vernon area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"A new data center in Wilbarger County, Texas","publisher":"Google","retrievedAt":"2026-07-07","url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-wilbarger-county/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-wilbarger-vernon-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Pocatello","confidence":"medium","contains_osm":true,"id":"compute_atlas-0aac39e427111e8b","lat":42.90482,"location_precision":"approximate","lon":-112.46388,"name":"FBI Grey Wolf Data Center","operator":"Federal Bureau of Investigation (U.S. Department of Justice)","source_notes":"A ~$100 million expansion (dubbed 'Grey Wolf') consolidating IT operations for the FBI, U.S. Marshals Service, a U.S. Attorney's Office, the Bureau of Prisons, and the Treasury Department, as part of a nationwide DOJ consolidation from roughly 110 data centers down to three (Pocatello, ID; Clarksburg, WV; Sterling, VA) -- reported to have generated over $135 million in savings. 140,000 sq ft total: 100,000 sq ft of secure data-center space plus 40,000 sq ft of office space. Broke ground October 2017; ribbon-cutting held 2019-11-18, with 300 staff at opening and stated room to grow by roughly 250 more over two to five years. Coordinates corrected 2026-09-12 from a Pocatello city-centroid placeholder to the OpenStreetMap POI for the FBI facility on Duckett Byrnes Street (cited below); the pin is building-level, not parcel-surveyed, hence precision remains approximate. Neither press source fetched stated a street address or MW capacity. No AI classification is recorded: this is general-purpose government IT/records infrastructure, not an AI-oriented facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/584965860 — Federal Bureau of Investigation, Duckett Byrnes Street, Pocatello","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-12","url":"https://www.openstreetmap.org/way/584965860"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/fbi-greywolf-pocatello-id"}],"state":"Idaho","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-0abe6b02ba2ee0cc","lat":36.93,"location_precision":"approximate","lon":-80.86,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tac-data-centers-wythe-county-va","value":1000.0}],"name":"TAC Data Centers Wythe County Campus","operator":"TAC Data Centers (The Ardent Companies)","source_notes":"Nine to eleven buildings totalling 3.5–4 million sq ft on roughly 1,000 acres owned by the Rogg Partnership, just southeast of I-81 about 10 miles east of Wytheville near the Pulaski County line. Distinct from the already-tracked Solis Arx Progress Park campus, which is a 99-acre lot inside Wythe County's Progress Park under a different developer and landowner. Coordinates are an approximate geocode of the described area, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TAC Data Centers Plans Gigawatt Scale Campus in Wythe County, Virginia","publisher":"US Data Center Projects","retrievedAt":"2026-09-10","url":"https://usdatacenterprojects.com/virginia/tac-data-centers-plans-gigawatt-scale-campus-in-wythe-county-virginia"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/tac-data-centers-wythe-county-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Archbald","confidence":"medium","id":"compute_atlas-0ad3c5503fbff5d3","lat":41.509,"location_precision":"approximate","lon":-75.535,"name":"Eynon Jermyn Road Data Center Campus (former auto salvage yard)","operator":"Five Up Realty LLC","source_notes":"Three two-story buildings of roughly 150,000 sq ft footprint each, under 70 feet tall, plus a 20,000 sq ft office building, equipment yards and a 211,000 sq ft electrical substation yard on 86.1 acres. The site sits in a C-2 general commercial district where data centers were principally permitted; the borough has been moving to make them conditional uses. Principal named in the filing: James Marzolino. No capacity figure has been published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/five-up-realty-eynon-jermyn-road-archbald-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Mead","confidence":"medium","id":"compute_atlas-0aebddf215f321ce","lat":34.0005295,"location_precision":"approximate","lon":-96.5110921,"name":"SmartTec Site 01 (Mead)","operator":"SmartTec by Z1Power","source_notes":"Very small GPU colocation site on US-70 in Bryan County: three existing buildings (A 1,500 sq ft compute, B 2,083 sq ft batteries/utilities, C 3,535 sq ft compute), ~5,035 sq ft of gross data-center area. The operator's initial proposal is 8 Supermicro systems with 64 B300 GPUs. As of October 2026 the operator publishes no IT-load figure for them, so no planned capacity is recorded; a load derived from the GPU count would be an estimate, not a figure the operator states. The operator's shared electrical service is rated about 1,081 kVA (3,000 A at 208 V three-phase), which it says is not an available IT allocation. The record is listed as proposed rather than under construction because the operator's own page, as retrieved in October 2026, still lists construction start as a target (24 September 2026) and does not report that work has begun. Single-source (operator self-published), so the record is marked reported. Coordinates are the town of Mead; the street address did not resolve in OSM.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Mead, Oklahoma Data Center Site — 39.39 acres, Bryan County","publisher":"SmartTec by Z1Power","retrievedAt":"2026-09-14","url":"https://www.smarttec.dev/site"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/smarttec-site-01-mead-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"mixed_use","city":"Laveen","confidence":"medium","id":"compute_atlas-0b98860220609b33","lat":33.3727,"location_precision":"approximate","lon":-112.1669,"name":"AWS Laveen Data Center Campus","operator":"Amazon Web Services","source_notes":"~220-acre land acquisition ($277M) near Loop 202 & Dobbins Rd, Laveen (Phoenix), Maricopa County. No capacity, utility, or AI-specific program announced as of July 2026 — recorded as proposed, with a mixed-use AI classification, pending a construction announcement. Coordinates are the Laveen area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon acquires 220 acres in Phoenix, Arizona for possible data center","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/amazon-acquires-220-acres-in-phoenix-arizona-for-possible-data-center/"},{"kind":"press","label":"Arizona Technology Council — Amazon buys massive Valley site","retrievedAt":"2026-07-25","url":"https://www.aztechcouncil.org/amazon-buys-massive-valley-site-for-potential-data-center/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/aws-laveen-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Andover","confidence":"high","contains_osm":true,"id":"compute_atlas-0be26c56aa5ccebe","lat":42.6857078,"location_precision":"exact","lon":-71.2086024,"name":"TierPoint Boston - Andover","operator":"TierPoint","source_notes":"Address confirmed via third-party listing (15 Shattuck Road, Andover, MA) matching TierPoint's own Massachusetts directory page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/211832626","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/211832626"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-boston-andover-ma"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/211832626"}],"state":"Massachusetts","status":"operating"},{"ai_classification":"likely","city":"Jeffersonville","confidence":"medium","id":"compute_atlas-0c18a429bcec60dd","lat":39.6534,"location_precision":"approximate","lon":-83.5677,"name":"AWS Fayette County (Jefferson Township)","operator":"Amazon Web Services","source_notes":"AWS's first Ohio campus outside the central-Ohio cluster, in Jefferson Township near I-71 & US-35 (adjacent to the Honda/LG EV battery plant). ~590 acres; $5B AWS investment (part of a larger multi-billion Fayette-area / statewide AWS commitment through 2030), announced Dec 2024 by AWS VP Roger Wehner; 30-year 100% CRA tax exemption approved; construction slated to begin early 2025. Capacity is not disclosed — AWS explicitly withheld building count/MW citing security — so no capacity is recorded (a third-party ~1,800 MW estimate is unverified and not recorded). Coordinates approximate (Jeffersonville / township-level).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Columbus Construction: ~590 acres, I-71 & US-35, $5B, 30-yr 100% CRA exemption, construction slated early 2025","publisher":"Columbus Construction","retrievedAt":"2026-08-05","url":"https://columbusconstruction.org/amazon-web-services-to-build-new-datacenter-campus-in-fayette-county/"}],"updated":"2026-08-05","url":"https://www.compute-atlas.com/facilities/aws-jefferson-township-fayette-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"medium","contains_osm":true,"id":"compute_atlas-0c55b5b1b519379f","lat":41.5143718,"location_precision":"approximate","lon":-93.7083034,"name":"Microsoft Project Alluvion Data Center","operator":"Microsoft","source_notes":"Announced April 2014. 8-building campus on SE White Crane Rd / 3590 SE Soteria Ave, south of the Ginger East site. Distinct parcel/campus from all Microsoft IA records tracked as of August 2026. Annual property tax ~$8.1M, $45M public infrastructure investment per WDM Chamber (not campus construction cost). Other reporting citing ~$1.1B total investment had not been independently retrieved as of August 2026 and is omitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","retrievedAt":"2026-08-08","url":"https://wdmchamber.org/economic-development/microsoft-data-centers/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/microsoft-alluvion-west-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Eagle Mountain","confidence":"high","id":"compute_atlas-0c784314cb8703e4","lat":40.30935,"location_precision":"approximate","lon":-112.01198,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-eagle-mountain-ut","value":400.0}],"name":"Tract Eagle Mountain Data Center Park","operator":"Tract","source_notes":"Triple Tail Community Reinvestment Project Area (Eagle Mountain Redevelopment Agency, Title 17C): 55% of property-tax increment for 40 years to Utah County ($101,979,662 cap), Alpine School District ($904,447,677 cap), Eagle Mountain City (no stated cap), and the Unified Fire District ($209,244,856 cap), plus 55% for 20 years to the Central Utah Water Conservancy District ($2,487,309/phase cap), and a 35% rebate of Eagle Mountain City's Electric ME Tax for 40 years. As of September 2026, no single document found names Tract inside the Triple Tail record by name — the attribution rests on a two-document chain: the RDA's own Project Area Plan parcel list (Exhibit C) names the project area's largest landowner as UTLCO Eagle Mtn Two, LLC (671.49 of 1,170.44 acres), and a separate Utah Public Service Commission filing (Docket No. 24-035-43, Petition to Intervene) identifies UTLCO Eagle Mtn., LLC and UTLCO Eagle Mtn. Two, LLC as subsidiaries of Tract Capital Management, LP. Treat the Tract attribution as inferred from these two independently-sourced primary documents, not as stated by any single filing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tract announces acquisition of 668 acres in Eagle Mountain, UT, promising further investment for data center campuses","publisher":"Eagle Mountain City (hosting Tract press release, January 2024)","retrievedAt":"2026-08-14","url":"https://eaglemountain.gov/wp-content/uploads/2024/10/Eagle-Mountain-Press-Release_1.17.2024-1.pdf"},{"kind":"filing","label":"Petition to Intervene of Tract Capital Management, LP, UTLCO Eagle Mtn., LLC, and UTLCO Eagle Mtn. Two, LLC (Utah PSC Docket No. 24-035-43)","publisher":"Utah Public Service Commission","retrievedAt":"2026-09-05","url":"https://pscdocs.utah.gov/electric/24docs/2403543/336619PtnIntrvnTract11-20-2024.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/tract-eagle-mountain-ut"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-pole-canyon-pony-express-ut-pg"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","id":"compute_atlas-0cbe164f46a9d09a","lat":37.3882663,"location_precision":"approximate","lon":-121.963779,"name":"Intel Santa Clara High-Performance Computing Data Center","operator":"Intel Corporation","source_notes":"Intel describes the facility as running at 1.06 PUE, with over 400,000 Xeon servers, 700+ PB of storage and 800,000+ network ports. It supports Intel Products and Intel Foundry. The point is Intel's Santa Clara HQ campus; the exact data center building is not pinned.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bloom Energy Announces Largest Silicon Valley Data Center Power Capacity Agreement","publisher":"Bloom Energy","retrievedAt":"2026-10-19","url":"https://www.bloomenergy.com/news/bloom-energy-announces-largest-silicon-valley-data-center-power-capacity-agreement/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/intel-santa-clara-hpc-data-center-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","contains_osm":true,"id":"compute_atlas-0d365ec5dae75e19","lat":39.0109445,"location_precision":"approximate","lon":-94.5046094,"name":"Iron Mountain Kansas City Data Center (KCM-1)","operator":"Iron Mountain","source_notes":"Underground colocation facility ~110 ft below ground (the operator FAQ also says 100 ft) on a 22-acre campus. 50,000 sq ft building with 13,000 sq ft of data hall, and 3.9 MW 'total potential capacity' (not recorded as operational MW because it is stated as potential). 2N electrical, N+1 cooling. Coordinates are the address geocode of the campus entrance (approximate for an underground facility).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/iron-mountain-kcm-1-kansas-city-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-0d705aeb09b7c52a","lat":37.4183407,"location_precision":"approximate","lon":-121.9466942,"name":"300 Holger Way Data Center (Menlo Equities conversion)","operator":"Menlo Equities (Holger Technology Partners LLC)","source_notes":"Conversion of an existing ~97,800 sq ft research-and-development building in North San José to data center use (SUP SP25-029). Capacity not stated in the exemption notice.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"CEQAnet SCH 2026070652 — SP25-029 / ER25-243 300 Holger Way Data Center Project, Notice of Exemption (posted 2026-07-16)","publisher":"California Office of Land Use and Climate Innovation (CEQAnet)","retrievedAt":"2026-09-21","url":"https://ceqanet.lci.ca.gov/2026070652"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/menlo-equities-300-holger-way-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"confirmed","city":"Glenrock","confidence":"medium","id":"compute_atlas-0d7821c9f27ef086","lat":42.87,"location_precision":"approximate","lon":-106.15,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-casper-wy","value":1500.0}],"name":"Prometheus Hyperscale Falls Ranch Data Center Campus","operator":"Prometheus Hyperscale","source_notes":"1.5GW campus proposed on the Falls Ranch property spanning the Natrona/Converse county line near I-25, roughly 10 miles east of Casper. Site plan still in flux as of July 2026, with developers weighing an alternate parcel south of I-25; targeted operational by 2028.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prometheus Hyperscale plans data hall, energy infrastructure in Natrona County","publisher":"Oil City News","retrievedAt":"2026-07-22","url":"https://oilcity.news/community/business/2025/10/10/prometheus-hyperscale-plans-data-hall-energy-infrastructure-in-natrona-county/"},{"kind":"press","label":"Commissioners: Prometheus data center developers considering new Natrona County site","publisher":"Oil City News","retrievedAt":"2026-07-22","url":"https://oilcity.news/community/county-community/county/2026/07/08/commissioner-prometheus-data-center-developers-consider-new-natrona-county-site/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Natrona County Residents Pack Meeting To Hear Plans For Huge Data Center","publisher":"Cowboy State Daily","retrievedAt":"2026-10-17","url":"https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-casper-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-0e18fb07ff9b7627","lat":40.08878,"location_precision":"approximate","lon":-82.72274,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edgeconnex-mcn-new-albany-licking-county-oh","value":224.0}],"name":"EdgeConneX MCN New Albany (South Campus)","operator":"EdgeConneX","source_notes":"EdgeConneX's ~$1B multi-phase \"MCN New Albany\" South campus. Per the Ohio Tax Credit Authority scope-of-work filing: Phase I converts a ~525,000 sq ft existing warehouse (9850 Innovation Campus Way) into an 80 MW data center; Phase II proposes two new 72 MW facilities (144 MW) — the planned capacity is 224 (80 + 144, IT load). A co-located PowerConneX natural-gas energy center (reported 140–216 MW of generation across sources) is excluded from the capacity figure as on-site generation, not IT load. Footprint is the four EdgeConneX MCN New Albany South PropCo 2 LLC parcels (97.53 ac per the Licking County Auditor, incl. the 33.86 ac built anchor at 9850 Innovation Campus Way). As of October 2026, the adjacent North PropCo 1 parcel (3356 Clover Valley Rd NW, 170.29 ac) is tracked separately as the EdgeConneX New Albany North Campus. \"MCN\" is EdgeConneX's internal project prefix (not publicly decoded). Distinct from EdgeConneX's separate Piper Farms land (12 parcels, 136.38 acres in Monroe Township per the Licking County Auditor, deeded 2025-11-17; as of October 2026 about 2.8 mi from this campus's recorded point, and no cited source states its intended use) and from EdgeConneX's Ashville Campus (Pickaway County). Public reception, as of 2026-09-10: this is EdgeConneX's New Albany/Licking County campus (Innovation Campus Way; PowerConneX I (120 MW) and II (216 MW) serve this campus; PowerConneX New Albany 3 (OPSB lists 450 MW; an operator notice said up to 430 MW) serves the North Campus). It is a separate EdgeConneX project from the heavily-opposed EdgeConneX proposal in Ashville, Pickaway County, OH (denied annexation 2026-02-02 after packed council meetings and a Change.org petition). For New Albany/Licking County specifically, a 2025 article on EdgeConneX's separate Piper Farms land purchase (checked 2026-09-10) mentions only general Central Ohio-wide concern that data centers could raise electricity costs, immediately caveated because this project's power comes from dedicated on-site generation (PowerConneX), not the residential grid. No hearing, resident testimony, or official statement specific to this Licking County site was found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$1 billion data center development buys 136 more acres in New Albany (describes EdgeConneX's separate Piper Farms purchase)","publisher":"614NOW","retrievedAt":"2026-07-18","url":"https://614now.com/2025/hot-topics/1-billion-data-center-development-buys-136-more-acres-in-new-albany"},{"kind":"filing","label":"OPSB case-tracking map data, case 26-0361-EL-BGN (PowerConneX New Albany 3 Energy Center)","publisher":"Ohio Power Siting Board (case-tracking map data)","retrievedAt":"2026-10-28","url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-0361-EL-BGN%27&outFields=*&f=html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/edgeconnex-mcn-new-albany-licking-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Franklin","confidence":"high","contains_osm":true,"id":"compute_atlas-0e7a77e2b0371fbf","lat":35.951045,"location_precision":"exact","lon":-86.833406,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-nashville-cool-springs-tn","value":3.15}],"name":"Flexential Nashville - Cool Springs","operator":"Flexential","source_notes":"74,679 sqft, 3.15MW.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1210515186","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1210515186"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-nashville-cool-springs-tn"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1210515186"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-nashville-cool-springs-osmway-1210515186"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210515186"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Harrison","confidence":"high","contains_osm":true,"id":"compute_atlas-0e9b8fe4826d77c9","lat":44.2044349,"location_precision":"exact","lon":-88.3449304,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ark-data-centers-green-bay-harrison-campus-wi","value":20.0}],"name":"Ark Data Centers Green Bay (Harrison Campus)","operator":"Involta (rebranded Ark Data Centers, May 2024)","source_notes":"Former Kimberly-Clark data center on a 24.5-acre campus at W6149 Old Highway Road, Village of Harrison (straddles Calumet/Outagamie counties); acquired by Involta and expandable up to 20MW. Company rebranded from Involta to Ark Data Centers in May 2024 — same operator, new name. Corroborated by DataCenterDynamics and Area Development coverage of the Involta acquisition/opening.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Involta (rebranded Ark Data Centers, May 2024) facility directory","publisher":"Involta (rebranded Ark Data Centers, May 2024)","retrievedAt":"2026-07-22","url":"https://www.arkdna.com/data-centers/wisconsin/"},{"kind":"osm","label":"OpenStreetMap way/766768556","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/766768556"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/ark-data-centers-green-bay-harrison-campus-wi"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/766768556"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"likely","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-0e9ce52bb366efd8","lat":35.4676,"location_precision":"approximate","lon":-97.5164,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloudburst-oklahoma-city-campus-ok","value":200.0}],"name":"CloudBurst Oklahoma City Campus","operator":"CloudBurst Data Centers","source_notes":"200 MW IT load across a planned multi-building campus reported near 2000 S Council Rd. Coordinates are an Oklahoma City centroid approximation. Oklahoma City's 2026 data-center moratorium is reported to have affected the timeline.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CloudBurst Data Centers — Oklahoma City campus","publisher":"CloudBurst Data Centers","retrievedAt":"2026-08-19","url":"https://cloudburstdc.com/oklahoma-city-campus/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/cloudburst-oklahoma-city-campus-ok"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Myrtle Beach","confidence":"high","contains_osm":true,"id":"compute_atlas-0e9dfb9c8ecd6e20","lat":33.6746096,"location_precision":"exact","lon":-78.9440697,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dc-blox-myrtle-beach-cls-sc","value":19.0}],"name":"DC BLOX Myrtle Beach Cable Landing Station","operator":"DC BLOX","source_notes":"125,000 sq ft and 19 MW at full build-out, in the International Technology & Aerospace Park. Landing point for the Google Firmina and Nuvem cables and Meta's Anjana cable. DC BLOX announced an expansion on 2025-10-14 to add capacity for five more subsea cables. The recorded land area of 21 acres is a floor: the Office of the Governor of South Carolina's 2022 announcement describes the site as more than 21 acres, and the expansion announcement says DC BLOX acquired approximately 20 additional adjacent acres, which are not included. Coordinates come from the named OSM feature for the facility itself. As of 2026-09-10, per DC BLOX's own Myrtle Beach facility page (dated after this record's 2026-08-26 last update), the status is unchanged: still operational, with a second facility on the same campus 'in development' per the expansion announcement. No utility name or grid/on-site-generation disclosure appears in any source checked. Neither the 2023 opening announcement nor the Oct 2025 expansion announcement discloses a dollar investment figure for Myrtle Beach specifically (DC BLOX's disclosed green-loan financing figures apply company-wide/to other campuses, not this site). No AI classification is recorded: the CEO's framing ('leverage this infrastructure to create an AI-driven future') is generic aspirational language about the company's broader direction, not a statement that this cable-landing-station site itself is AI-dedicated. The Office of the Governor of South Carolina's May 10, 2022 announcement states that the company's $31.5 million investment will create three new jobs; as of October 2026, no jobs figure appears in DC BLOX's own opening announcement, expansion announcement or Myrtle Beach facility page. No FILOT or incentive agreement is mentioned in any press source checked (DC BLOX's own site, the 2023 opening announcement, the Oct 2025 expansion announcement). This is an absence in press coverage only; Horry County's council-minutes/ordinance portal and the ITAP authority's own site could not be reached as of September 2026, so a stronger county-level confirmation is unresolved, not ruled out. No independent local-reception reporting was found: a Sept 8 2026 company-wide 'Community Commitment' pledge announcement references Myrtle Beach only via a linked headline, not in its own body text, so it does not count as site-specific community evidence and was not used.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/dc-blox-myrtle-beach-cls-sc"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1320038649"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/dc-blox-myrtle-beach-cable-landing-station-osmway-1320038649"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1320038649"}],"state":"South Carolina","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-0ead2ac432fc4c33","lat":37.3407675,"location_precision":"approximate","lon":-78.9909489,"name":"Cabin Field Road Data Center","operator":"Mesh Capital LLC","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/mesh-capital-cabin-field-road-data-center-campbell-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"West Jordan","confidence":"medium","id":"compute_atlas-0ed3a5b673a12c4e","lat":40.60613,"location_precision":"approximate","lon":-111.93952,"name":"Oracle West Jordan Data Center (Project Sequoia)","operator":"Oracle","source_notes":"A Governor's Office of Economic Development (GOED) state tax rebate reported at more than $15 million, and a local West Jordan Economic Development Area (EDA) reimbursing a portion of Oracle's property-tax increment (reported at \"nearly $10 million,\" for property acquisition and site improvements), were reported in May 2008 for this project. As of that reporting the local EDA's structure was still pending (\"Representatives from local governments will meet sometime in July to determine the structure of the incentive\"), and construction was halted from March 2009 to 2010; as of September 2026, no document found confirms the local EDA was finalized or survived the halt. Recorded as reported in 2008, not confirmed executed. No subsidies entry is recorded, since reported eligibility for an incentive is not the same as a confirmed award.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Oracle South Jordan Data Center — Land Use Database entry","publisher":"The Center for Land Use Interpretation","retrievedAt":"2026-08-14","url":"https://clui.org/ludb/site/oracle-south-jordan-data-center"},{"kind":"press","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","retrievedAt":"2026-08-14","url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/"},{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/oracle-west-jordan-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Appleton","confidence":"medium","contains_osm":true,"id":"compute_atlas-0eee08c5ae884065","lat":44.2998488,"location_precision":"approximate","lon":-88.370814,"name":"New Era Technology Appleton Data Center","operator":"New Era Technology","source_notes":"Tier 3 colocation facility built in 2020, offering colocation, cross-connects, remote hands, backup generation and managed services. New Era Technology's own locations page lists only a Milwaukee-area office (10400 West Innovation Drive, Wauwatosa) and does not mention Appleton, so the address rests on a directory listing corroborated by the Journal Sentinel's statewide map — hence \"reported\". The directory also publishes a PUE of 1.40, which is not recorded here because it is not attributed to the operator.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/new-era-technology-appleton-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Englewood","confidence":"high","contains_osm":true,"id":"compute_atlas-0f1b4e05bfb810c7","lat":39.558994,"location_precision":"exact","lon":-104.8375559,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-denver-englewood-co","value":18.0}],"name":"Flexential Denver - Englewood","operator":"Flexential","source_notes":"8636 S Peoria St, Englewood CO, 18MW per datacentermap corroboration; distinct from Centennial (12500 E Arapahoe Rd) and Downtown Denver (1500 Champa St).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential facility directory","publisher":"Flexential","retrievedAt":"2026-09-21","url":"https://www.flexential.com/data-centers/co/denver/englewood-data-center"},{"kind":"osm","label":"OpenStreetMap way/377545385","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/377545385"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-denver-englewood-co"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/377545385"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-denver-englewood-osmway-377545385"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377545385"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"South Whitehall Township","confidence":"medium","id":"compute_atlas-0f1dbec7319d660b","lat":40.6400848,"location_precision":"approximate","lon":-75.5443246,"name":"Project Atlas Data Center Campus (South Whitehall Township)","operator":"CDE Acquisitions, LLC","source_notes":"Three parcels at 2493, 2807 and 2747 N. Cedar Crest Boulevard totalling 410 acres across from Parkland High School, owned by Jeras Corporation, with CDE Acquisitions, LLC of Atlanta as applicant. The revised program is three data center buildings of 492,285 sq ft each plus a 40,680 sq ft administration building and a 39,167 sq ft warehouse, 1,556,702 sq ft in total - down from six buildings over 5 million sq ft. Parking drops from 966 to 399 spaces and weekday trips from 3,865 to 1,154. Includes an on-site electrical substation, emergency generators and a private septic field, with a water main extension requested along Ritter Road. Three barns are to be restored and dedicated to the township; a brick house and farmstead would be removed. Stated construction start November 2029, completion April 2030.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Residents push for public hearing as South Whitehall takes new look at hyperscale data center","publisher":"Lehigh Valley Public Media","retrievedAt":"2026-09-25","url":"https://www.lehighvalleypublicmedia.org/news/local/residents-push-for-public-hearing-as-south-whitehall-takes-new-look-at-hyperscale-data-center/"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/cde-acquisitions-project-atlas-south-whitehall-lehigh-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Hayward","confidence":"medium","id":"compute_atlas-0f3436d716b1a791","lat":37.626012,"location_precision":"approximate","lon":-122.1133978,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/amazon-sf011-corporate-avenue-hayward-ca","value":35.0}],"name":"Amazon Data Center SF011 (26415 Corporate Avenue)","operator":"Amazon Web Services","source_notes":"Capacity of 35 MW is the City of Hayward's estimate. 150,000 sq ft building on 4.21 acres across Corporate Avenue from Amazon SF09.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/amazon-sf011-corporate-avenue-hayward-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/amazon-sf09-corporate-avenue-hayward-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Atlantic City","confidence":"medium","id":"compute_atlas-0f74b0048cd7c4c0","lat":39.3630994,"location_precision":"approximate","lon":-74.4385634,"name":"Continent 8 Atlantic City (Convention Center)","operator":"Continent 8 Technologies","source_notes":"Data center inside the Atlantic City Convention Center serving licensed online gaming and sports-wagering platforms; built as a CRDA public-private partnership and licensed by the NJ Division of Gaming Enforcement. A later expansion (DC3) at the same building was reported by Continent 8. Capacity, sq ft and investment were not stated in the sources read. Coordinates from the Colo Map facility record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Continent 8 Technologies Opens State-of-the-Art Data Center in Atlantic City","publisher":"Porzio Governmental Affairs","retrievedAt":"2026-09-21","url":"https://porziogov.com/continent-8-technologies-opens-state-of-the-art-data-center-in-atlantic-city/"},{"kind":"other","label":"Continent 8 Atlantic City DC3 – Colocation in Atlantic City, NJ","publisher":"Colo Map","retrievedAt":"2026-09-21","url":"https://colomap.com/facilities/continent-8-atlantic-city-dc3/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/continent-8-atlantic-city-convention-center-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Allentown","confidence":"medium","id":"compute_atlas-0f98c1faba337140","lat":40.566986,"location_precision":"approximate","lon":-75.473678,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/quantm-group-2401-w-emaus-avenue-allentown-pa","value":80.0}],"name":"Quantm Group Allentown Data Center (2401 W. Emaus Ave.)","operator":"Quantm Group LLC","source_notes":"Conversion of a vacant 224,000 sq ft warehouse in the I-3 General Industrial district into an 80 MW data center, with a substation, sound walls and 32 backup generators. The pin is the census geocode of the address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/quantm-group-2401-w-emaus-avenue-allentown-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Prineville","confidence":"medium","id":"compute_atlas-0f9cd05488d1c975","lat":44.30349,"location_precision":"approximate","lon":-120.84639,"name":"Apple Prineville Data Center Campus","operator":"Apple","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Gilliam County puts a little juice in Apple","publisher":"Columbia Community Connection","retrievedAt":"2026-10-12","url":"https://columbiacommunityconnection.com/sherman-gilliam-county-1/gilliam-county-puts-a-little-juice-in-apple"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/apple-prineville-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Miami","confidence":"medium","id":"compute_atlas-0feb1fe81fb38e24","lat":25.7758419,"location_precision":"approximate","lon":-80.1929625,"name":"Digital Realty MIA10","operator":"Digital Realty","source_notes":"Carrier-neutral colocation building in downtown Miami; 150,000 sq ft across 7 stories per the operator's own current listing (some aggregators cite an older 162,000 sq ft figure). No MW capacity disclosed by the operator; third-party aggregators report conflicting, unconfirmed figures (roughly 1.3-2.0 MW). Digital Realty brands the full building as MIA10, though other colo resellers (including DataBank) also operate space within it. No AI/HPC-specific marketing found for this facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Digital Realty MIA10","publisher":"Digital Realty","retrievedAt":"2026-08-02","url":"https://www.digitalrealty.com/data-centers/americas/miami/mia10"},{"kind":"press","label":"Digital Realty Miami","publisher":"Digital Realty","retrievedAt":"2026-08-02","url":"https://www.digitalrealty.com/data-centers/americas/miami"}],"updated":"2026-08-02","url":"https://www.compute-atlas.com/facilities/digital-realty-mia10-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"likely","city":"Mesa","confidence":"medium","id":"compute_atlas-10177d89b5337007","lat":33.4152,"location_precision":"approximate","lon":-111.8315,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor","value":36.0}],"name":"Edged Mesa Data Center","operator":"Edged US","source_notes":"Operator-stated densities of 400+ kW per rack with liquid cooling and 120+ kW per rack with air cooling support an AI-capable classification, though no named AI tenant is disclosed. PUE, water-savings and density figures are the operator's own claims from its launch release and are not independently verified. Street address not published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Edged US Opens Waterless, AI-Ready Data Center in Arizona's Silicon Desert Tech Corridor","publisher":"Edged US","retrievedAt":"2026-08-28","url":"https://edged.us/news/edged-us-opens-waterless-ai-ready-data-center-in-the-heart-of-arizonas-silicon-desert-tech-corridor"}],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/edged-mesa-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Van Meter","confidence":"medium","contains_osm":true,"id":"compute_atlas-104e47e5e009f1fd","lat":41.5332166,"location_precision":"approximate","lon":-93.9548406,"name":"Microsoft Van Meter Data Center (Vision Park)","operator":"Microsoft","source_notes":"Microsoft's first data center site outside the West Des Moines cluster - farmland acquired in Van Meter's Vision Park (a state-certified shovel-ready site since 2014). The recorded investment of $40M is the land purchase only, not construction capex. Status is early planning per the cited sources (no confirmed site plan or construction start). Other reporting suggests a much larger eventual campus. The Van Meter City Council's 23 March 2026 workshop packet includes a development agreement with Microsoft stating an estimated investment of about $420 million, with a schedule for 10 buildings (Exhibit C); adoption of the agreement is not confirmed in a readable source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft's Van Meter data center signals expansion beyond West Des Moines","publisher":"AOL (via Des Moines Register)","retrievedAt":"2026-09-10","url":"https://www.aol.com/microsofts-van-meter-data-center-120442101.html"},{"kind":"filing","label":"Van Meter City Council workshop packet, March 23, 2026 (Resolution 2026-25, Microsoft development agreement)","publisher":"City of Van Meter, Iowa","retrievedAt":"2026-10-30","url":"https://www.vanmeteria.gov/wp-content/uploads/3-23-26-Workshop-Packet.pdf"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/microsoft-van-meter-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Parker","confidence":"medium","id":"compute_atlas-1065de178d11ba3f","lat":39.5620551,"location_precision":"approximate","lon":-104.8119323,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-parker-co","value":22.5}],"name":"Flexential Parker (Compark)","operator":"Flexential","source_notes":"249,000 sq ft on 17 acres on Compark Boulevard near South Chambers Road. The town of Parker approved rezoning and a data center overlay district in February 2024 after a January 2024 planning-commission approval. Douglas County commissioners unanimously approved a business-personal-property tax rebate over 35 years in August 2026 (KOAA, 2026-08-12); the Denver Gazette (2026-09-12) gives it as $19.3 million, a 100% rebate of the county's share of that tax, and it is recorded as a subsidy. County documents estimate 16 permanent positions, and Flexential confirmed 16 jobs to KOAA in August 2026; company representatives had suggested 30-50 at public meetings in 2024. Coordinates are an approximate Compark Boulevard geocode, not parcel-confirmed. Distinct from Flexential's existing Aurora, Centennial, Downtown and Englewood Denver-market sites.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/flexential-parker-co"}],"state":"Colorado","status":"under construction"},{"ai_classification":"likely","city":"Buckeye","confidence":"high","id":"compute_atlas-10cf32ef1a2aa3df","lat":33.4136,"location_precision":"approximate","lon":-112.7203,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-buckeye-tech-corridor-az","value":1800.0}],"name":"Buckeye Tech Corridor","operator":"Tract","source_notes":"Master-planned data center park on a ~2,069-acre former residential (Cipriani) parcel Tract acquired for ~$136M, south of I-10 in Buckeye; planned for up to ~20M sq ft across as many as 40 data centers at full build-out over ~15 years (~$20B). Coordinates are an approximate town-level geocode (Buckeye, south of I-10), not a parcel-confirmed point. The City of Buckeye executed a development agreement with AZLCO Buckeye, LLC (Ordinance No. 08-24, adopted unanimously 2024-08-06). It reimburses the developer for six enumerated regional infrastructure components it builds and dedicates to the city — two public-safety sites, temporary and permanent public-safety facilities, $15M toward the Johnson Road interchange, and oversized regional water infrastructure — funded by 20% of the tax revenue the project itself generates, beginning only after the city has received $60M cumulatively and terminating 20 years from the effective date. It is capped at \"the lesser of\" the developer's verified costs or $50,000,000, so it cannot exceed what the developer actually spent; it is cost recovery for public infrastructure rather than an incentive, abatement or credit, and is therefore not recorded as a subsidy. Nothing has been paid to date. Buckeye's economic-development director has projected \"more than 360 jobs at full build out\" — an end-state across as many as 40 separate future data centers, none yet leased, permitted or built, and so not recorded as a permanent-jobs figure for this site. A search of 226 Buckeye Council and P&Z agendas (Feb 2024 – Aug 2026) found no GPLET and no Foreign Trade Zone instrument.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tract plans 1,700-acre data center campus in Phoenix, Arizona","publisher":"Data Center Dynamics","retrievedAt":"2026-07-15","url":"https://www.datacenterdynamics.com/en/news/tract-plans-1700-acre-data-center-campus-in-phoenix-arizona/"},{"kind":"press","label":"2,069-acre parcel will become a $20 billion data center park in Buckeye","publisher":"AZ Big Media","retrievedAt":"2026-07-15","url":"https://azbigmedia.com/real-estate/2069-acre-parcel-will-become-a20-billion-data-center-park-in-buckeye/"},{"kind":"press","label":"Tract Planning 1,700-acre Buckeye Data Center Campus","publisher":"AZBEX","retrievedAt":"2026-07-15","url":"https://azbex.com/planning-development/tract-planning-1700-acre-buckeye-data-center-campus/"},{"kind":"other","label":"Maricopa County Assessor Parcel Viewer — 'AZLCO BUCKEYE LLC' parcel assemblage","retrievedAt":"2026-07-18","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0"},{"kind":"other","label":"AZFamily: Developer wants to power the future of AI in Buckeye with new data center","retrievedAt":"2026-07-24","url":"https://www.azfamily.com/2024/08/30/developer-wants-power-future-ai-buckeye-with-new-data-center/"},{"kind":"filing","label":"City of Buckeye Regular Council Meeting agenda packet, 6 August 2024 — Ordinance No. 08-24 and the executed Development Agreement with AZLCO Buckeye, LLC (§12 Regional Infrastructure Components and reimbursement terms)","retrievedAt":"2026-08-31","url":"https://d3n9y02raazwpg.cloudfront.net/buckeyeaz/0eb9a025-6f87-11ee-b4aa-0050569183fa-8fca9741-32ef-4a0f-b8ad-ee8a00454790-1722900291.pdf"},{"kind":"filing","label":"City of Buckeye council minutes, 6 August 2024 — adoption of Ordinance No. 08-24 approving the development agreement with AZLCO Buckeye, LLC (motion passed unanimously)","retrievedAt":"2026-08-31","url":"https://granicus-azasp-hypatia.s3.amazonaws.com/nsS6HQab68He3biSvWFmwm8B?response-content-disposition=inline%3B%20filename%3D%224R%2008.06.2024_Regular_Council_Meeting_Minutes.pdf%22%3B%20filename%2A%3DUTF-8%27%274R%252008.06.2024_Regular_Council_Meeting_Minutes.pdf&response-content-type=application%2Fpdf&X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Credential=AKIATHOFOHMMNY5Z5H5B%2F20261026%2Fus-east-1%2Fs3%2Faws4_request&X-Amz-Date=20261026T230429Z&X-Amz-Expires=300&X-Amz-SignedHeaders=host&X-Amz-Signature=eb4eb60ca5976fd651decb51e8c4b9f0f4a36dabed24d51ca46f8dd415961d0f"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tract-buckeye-tech-corridor-az"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-phoenix-data-center"}],"state":"Arizona","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-1105bb32512bdc10","lat":39.554,"location_precision":"approximate","lon":-77.882,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/penzance-bedington-berkeley-county-wv","value":600.0}],"name":"Bedington Campus","operator":"Penzance Management","source_notes":"Falling Waters District, Berkeley County WV eastern panhandle — adjacent to Maryland border. 1.9 million sq ft at full buildout. Penzance (DC/NoVA developer) is also developing a Fairfax County VA campus reportedly pre-leased to Amazon. Coordinates approximate for Falling Waters area. As of 2026-09-10, status was unchanged (proposed). The most recent coverage found (wvgazettemail article, published 2026-02-28, updated 2026-09-04) reports no groundbreaking, permit, or construction start yet; a tenant announcement was still described as pending later in 2026. The street address remains unresolved: governor.wv.gov, WV Division of Economic Development, SEDC, and county/trade press coverage all describe only '548 acres in the Falling Waters District of Berkeley County' with no house number or parcel ID; Berkeley County GIS/assessor records could not be reached as of September 2026, so no street address is recorded rather than one approximated. As of 2026-09-10 the Governor's office states explicitly that no state funding was used for Bedington Campus. HB 2014's revenue-sharing formula (50% Personal Income Tax Reduction Fund / 30% host county / 10% all counties per capita / 5% Electric Grid Stabilization and Security Fund / 5% Economic Enhancement Grant Program) is a distribution of the taxes the facility itself will generate, not an incentive granted to the facility, so it is not recorded as a subsidy. As of September 2026, no county-level PILOT or abatement agreement was found in the sources checked (governor.wv.gov, WV DED, SEDC).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Morrisey Announces $4 Billion Private Investment in WV's First High Impact Intelligence Center","publisher":"WV Office of the Governor","retrievedAt":"2026-10-28","url":"https://governor.wv.gov/article/governor-morrisey-announces-4-billion-private-investment-west-virginias-first-high-impact"},{"kind":"press","label":"D.C.-based real estate firm investing $4B for new data center development in Berkeley County, WV","publisher":"West Virginia Watch","retrievedAt":"2026-07-06","url":"https://westvirginiawatch.com/2026/02/26/d-c-based-real-estate-firm-investing-4b-for-new-data-center-development-in-berkeley-county-wv/"},{"kind":"press","label":"Penzance targets 600MW data center campus in West Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/penzance-targets-600mw-data-center-campus-in-west-virginia/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"$4 Billion Data Center Campus Planned for Berkeley County — \"up to 600 megawatts of critical IT capacity\"","publisher":"West Virginia Division of Economic Development","retrievedAt":"2026-09-15","url":"https://westvirginia.gov/4-billion-data-center-campus-planned-for-berkeley-county-positioning-west-virginia-for-the-ai-and-cloud-economy/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/penzance-bedington-berkeley-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"compute_atlas-11220e9e074ee8c5","lat":36.147409,"location_precision":"approximate","lon":-86.681369,"name":"Lumen Nashville 2 (2530 Perimeter Place Drive)","operator":"Lumen Technologies","source_notes":"Separate from the Lumen Sidco Drive site, tracked as of October 2026 as Lumen Nashville (Sidco Drive) — Level(3), which WSMV lists as 'Lumen Nashville 1'. The coordinates are a US Census geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-10","url":"https://www.compute-atlas.com/facilities/lumen-nashville-perimeter-place-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"likely","city":"Hallam","confidence":"medium","contains_osm":true,"id":"compute_atlas-11d95aba135d1752","lat":40.5485515,"location_precision":"approximate","lon":-96.782795,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crusoe-monolith-hallam-lancaster-ne","value":35.0}],"name":"Crusoe Hallam Data Center (Monolith Olive Creek campus)","operator":"Crusoe","source_notes":"Phase 1 is modular, shipping-container-sized buildings on about 10 acres in the northeast part of Monolith's Olive Creek carbon-black campus (I-2 Heavy Industrial), 35 MW, 15 jobs. A larger Phase 2 parcel east of the campus would need a separate approval. Crusoe Technologies is named as the data center developer; Monolith signed a special permit with Crusoe in July 2026. No construction timeline has been released. This is distinct from the Sagebrush Hallam hyperscale campus and from NPPD's Sheldon and Princeton Road stations. Coordinates are the Monolith Olive Creek plant point from OSM, not the 10-acre parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/crusoe-monolith-hallam-lancaster-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-11dd64ba4d810efd","lat":37.68,"location_precision":"approximate","lon":-77.68,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-tuckahoe-technology-park-goochland-county-va","value":900.0}],"name":"Tuckahoe Technology Park","operator":"Tract","source_notes":"Eastern Goochland County, west of West Creek Business Park; 13 parcels, up to 7 development areas/buildings. $3B+ construction spending projected over a 5-7 year buildout. Pre-application for a conditional-use permit filed June 10, 2026 - the first project under Goochland's new Technology Overlay District. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tract-tuckahoe-technology-park-goochland-county-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Greensburg","confidence":"medium","id":"compute_atlas-11eaa361be54e325","lat":39.3372,"location_precision":"approximate","lon":-85.4836,"name":"Jumping Bison Greensburg Data Center","operator":"Jumping Bison LLC","source_notes":"Two-phase project of roughly 340 acres north of Greensburg inside a newly established 550-acre Economic Revitalization Area at the Business Enterprise Park along I-74, opposite Honda's Indiana Auto Plant, at $400 million per phase. Staff are to be paid 125% of the average Decatur County wage. Local opponents have organized a petition against the campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Greensburg Council Approves ERA Establishment, Data Center Abatement","publisher":"WRBI Radio","retrievedAt":"2026-09-01","url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/jumping-bison-greensburg-decatur-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"confirmed","city":"Kevil","confidence":"medium","id":"compute_atlas-11ee54f1e251d644","lat":37.11389,"location_precision":"approximate","lon":-88.81028,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/brookfield-nextera-paducah-site-mccracken-ky","value":1800.0}],"name":"Paducah Site AI Data Center Campus","operator":"Brookfield","source_notes":"Announced 2026-07-29 on part of DOE's former Paducah Gaseous Diffusion Plant (a Superfund site). Brookfield develops/operates the AI/HPC campus; NextEra builds dedicated adjacent generation (see the linked power-generation record, NextEra Paducah Site Dedicated Generation). First components could come online as soon as 2028; construction expected complete 2031. Investment reported as 'more than $100 billion' — recorded as $100,000,000,000.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Paducah Gaseous Diffusion Plant (USDOE) | Superfund Site Profile","publisher":"U.S. EPA","retrievedAt":"2026-09-10","url":"https://cumulis.epa.gov/supercpad/cursites/csitinfo.cfm?id=0404794"},{"kind":"press","label":"DOE Site in Western Kentucky Revitalized with Data Center Campus and Dedicated Energy Project","publisher":"NextEra Energy / Brookfield (newsroom release, July 29, 2026)","retrievedAt":"2026-09-22","url":"https://newsroom.nexteraenergy.com/2026-07-29-DOE-Site-in-Western-Kentucky-Revitalized-with-Data-Center-Campus-and-Dedicated-Energy-Project,-Creating-Jobs-and-Protecting-Residents-and-Businesses-from-Costs"},{"kind":"press","label":"DOE, Private Partners Launch $100B Data Center Project in Kentucky","publisher":"Rigzone","retrievedAt":"2026-10-22","url":"https://www.rigzone.com/news/doe_private_partners_launch_100b_data_center_project_in_kentucky-31-jul-2026-184268-article/"},{"kind":"press","label":"$100B data center campus coming to DOE land in Kentucky","publisher":"E&E News","retrievedAt":"2026-10-22","url":"https://www.eenews.net/articles/100b-data-center-campus-coming-to-doe-land-in-kentucky/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/brookfield-nextera-paducah-site-mccracken-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Overland Park","confidence":"medium","id":"compute_atlas-1232bf8b0ce49f84","lat":38.975738717441,"location_precision":"approximate","lon":-94.708635080112,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-overland-park-ks","value":2.0}],"name":"DataBank MCI2 Pine Ridge Data Center","operator":"DataBank","source_notes":"Operator's own site lists this as (MCI2) Pine Ridge Data Center, 11,510 IT sq ft, 2MW critical IT load, 15 onsite carriers, and describes it as home to DataBank's primary Network Operations Center. Coordinates are the US Census geocode of the listed street address, retrieved 2026-09-13; precision set to approximate since the parcel/building footprint was not independently confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/databank-overland-park-ks"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Ladson","confidence":"high","contains_osm":true,"id":"compute_atlas-124652fa9d38dbe7","lat":32.9648939,"location_precision":"exact","lon":-80.1012147,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dartpoints-charleston-ladson-sc","value":1.3}],"name":"DartPoints Charleston Data Center (CHS01)","operator":"DartPoints","source_notes":"Colocation facility in Palmetto Commerce Park: 15,000 sq ft raised floor, 7 on-site network providers. Operator states 1.3 MW utility power with 100 kW critical IT load; the operational capacity records the 1.3 MW utility figure. Coordinates are the OSM building footprint centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DartPoints — Charleston, SC (CHS01) data center","publisher":"DartPoints","retrievedAt":"2026-09-22","url":"https://dartpoints.com/locations/chs01-charleston-sc/"},{"kind":"osm","label":"OpenStreetMap way 648154126 — DartPoints Charleston (telecom=data_center)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-22","url":"https://www.openstreetmap.org/way/648154126"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/dartpoints-charleston-ladson-sc"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/648154126"}],"state":"South Carolina","status":"operating"},{"ai_classification":"unknown","city":"Elm Mott","confidence":"medium","contains_osm":true,"id":"compute_atlas-1283f53e3398d994","lat":31.6715215,"location_precision":"approximate","lon":-97.1000553,"name":"Infrakey Lacy Lakeview Data District","operator":"Infrakey","source_notes":"The site is described as in the Ross area near Elm Mott. Coordinates are the Elm Mott town point, not the parcel. MW figures from aggregators conflict (925 MW vs ~1 GW, plus a 1.2 GW gas plant in the company's materials) and were not read on a primary page, so capacity is omitted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/infrakey-lacy-lakeview-data-district-mclennan-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Woodward","confidence":"medium","id":"compute_atlas-128ad00c31764961","lat":41.857,"location_precision":"approximate","lon":-93.922,"name":"Microsoft Woodward Data Center Campus","operator":"Microsoft","source_notes":"Site lies between Highway 141 and Seminole Avenue in Woodward (Dallas County). Land was rezoned from agricultural use in June 2026. Design work is expected to take 2-3 years, with first commercial cloud capability targeted by 2030. The report says the campus is for cloud and storage, not AI training. No capacity or investment has been disclosed. The point is approximate, at the city level.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft Acquires 600 Acres for Eco Business Park Data Center in Woodward, Iowa","publisher":"Construction Review Online","retrievedAt":"2026-10-28","url":"https://constructionreviewonline.com/microsoft-acquires-600-acres-for-eco-business-park-data-center-in-woodward-iowa/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/microsoft-woodward-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Strasburg","confidence":"medium","id":"compute_atlas-13f22fc1ef4a9cdf","lat":38.9893,"location_precision":"approximate","lon":-78.3589,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/takanock-project-tallmadge-strasburg-va","value":180.0}],"name":"Project Tallmadge","operator":"Takanock, LLC","source_notes":"87-acre site on Borden Mowery Drive near Interstate 81 Exit 296 and the Mercury Paper plant in Strasburg's industrial park; roughly 2 million sq ft planned. Takanock develops the land and intends to sell to an as-yet-unnamed operator. Construction reported as potentially starting in late 2027 and concluding around 2030.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"87-acre 'Project Tallmadge' to be built in Strasburg, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260819034219/https://www.datacenterdynamics.com/en/news/87-acre-project-tallmadge-to-be-built-in-strasburg-virginia/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/takanock-project-tallmadge-strasburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-13fbd466c013ad8b","lat":41.9927374,"location_precision":"approximate","lon":-87.9968732,"name":"Digital Realty CH3","operator":"Digital Realty","source_notes":"305,500 sq ft; LEED Gold and Energy Star. Operator does not publish a megawatt figure for this site. Coordinates are an OSM street-level match on E Devon Avenue, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty CH3 — 1400 East Devon Avenue, Elk Grove Village, IL (305,500 sq ft)","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch3"},{"kind":"other","label":"Digital Realty Chicago metro data center index","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/digital-realty-ch3-elk-grove-village-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Golden","confidence":"medium","id":"compute_atlas-1426b70980b365eb","lat":39.74024,"location_precision":"approximate","lon":-105.16718,"name":"ESIF High-Performance Computing Data Center (Kestrel supercomputer)","operator":"National Laboratory of the Rockies (formerly NREL), U.S. Department of Energy","source_notes":"This is the HPC data center inside the Energy Systems Integration Facility (ESIF) on the lab campus in Golden. It houses the Kestrel supercomputer (HPE, CPU plus GPU nodes), which arrived in March 2023. The lab needed '2.5-megawatt upgrades to support Kestrel'. No total facility MW figure appears in the cited sources, so no capacity is recorded. Coordinates are a Census geocode of the lab's 15013 Denver West Pkwy campus address, not the ESIF building itself.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/nlr-esif-hpc-data-center-golden-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Rockingham","confidence":"medium","id":"compute_atlas-142b8e5afdce345a","lat":34.9151,"location_precision":"approximate","lon":-79.7948,"name":"Terra Nexus Rockingham Data Center (Old Cheraw Highway)","operator":"Terra Nexus Land Fund I, LLC","source_notes":"Separate from the AWS Richmond County campus already tracked — different applicant, different parcel inside the City of Rockingham, and reported locally as the county's third data center project. No capacity figure has been disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Rockingham Planning Board Backs $1.2B Data Center Rezoning as Residents Raise Concerns","publisher":"WKML 95.7","retrievedAt":"2026-08-15","url":"https://wkml.com/2026/08/13/rockingham-planning-board-backs-1-2b-data-center-rezoning-as-residents-raise-concerns/"},{"kind":"press","label":"Rockingham approves rezoning request for data center","publisher":"WSOC-TV","retrievedAt":"2026-10-15","url":"https://www.wsoctv.com/news/local/rockingham-approves-rezoning-request-data-center/WRPPAYICBVE2NNG7B64U5YQZXU/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/terra-nexus-rockingham-richmond-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"likely","city":"Boardman","confidence":"medium","id":"compute_atlas-145b8fab266f75ea","lat":45.84,"location_precision":"approximate","lon":-119.702,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-boardman-morrow-county-or","value":1000.0}],"name":"Amazon Boardman Exascale Data Center Campus","operator":"Amazon Web Services","source_notes":"Amazon confirmed the land purchase ($37M per Morrow County property records, confirmed by multiple news sources) but stated development plans are not final. Planning documents submitted to Morrow County describe a 1 GW exascale campus with 20 buildings across 4 million sq ft; Johnson Economics estimated $8B-$12B total investment. Land previously owned by Threemile Canyon Farms dairy. Distinct from Amazon's existing ~800 acres of operating/under-construction OR facilities. The Lincoln Chronicle source could not be retrieved as of July 2026; the primary claim is supported by the DCD source. The utility is PacifiCorp (Pacific Power), the retail utility, rather than Bonneville Power Administration (wholesale). Coordinates are Boardman city centroid; exact site not publicly confirmed. Johnson Economics' economic-impact analysis (Morrow County Planning Commission, Jan 2025) models the full 1 GW campus at roughly $8 billion investment (potential range $7-12 billion), about 6,400 construction FTE over an eight-year build (~800/year) and about 560 operations FTE, assuming an Oregon Strategic Investment Program (SIP) property-tax abatement — modeled projections for a still-proposed campus, not firm commitments.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon Purchases 1,300 Acres in Morrow County, Oregon","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/amazon-purchases-1300-acres-in-morrow-county-oregon/"},{"kind":"press","label":"Oregon Communities Envision 9,100 Acres for New Data Centers","publisher":"Lincoln Chronicle / The Oregonian","retrievedAt":"2026-10-12","url":"https://lincolnchronicle.org/oregon-communities-envision-9100-acres-for-new-data-centers-quadrupling-the-industrys-footprint/"},{"kind":"other","label":"How Amazon data centers use water for cooling","publisher":"Amazon","retrievedAt":"2026-07-06","url":"https://www.aboutamazon.com/news/sustainability/amazon-data-center-water-usage"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/aws-boardman-morrow-county-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"likely","city":"Roxboro","confidence":"medium","id":"compute_atlas-145cb539e483de62","lat":36.396,"location_precision":"approximate","lon":-78.9828,"name":"Microsoft Person County Mega Park","operator":"Microsoft","source_notes":"1,385-acre Person County Mega Park (Woodsdale township, near Roxboro); ~$26.85M land purchase. Powered by Duke Energy per a Q4-2025 8-K; the campus's MW is in a large-load contract filed under seal (NCUC) — not publicly disclosed (omitted). Coordinates are the Roxboro / Woodsdale area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft buys Person County Mega Park for $27 million","publisher":"Business North Carolina","retrievedAt":"2026-07-07","url":"https://businessnc.com/microsoft-buys-person-county-mega-park-for-27-million/"},{"kind":"press","label":"Microsoft to start permitting for 1,385-acre data center campus in North Carolina","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/microsoft-to-start-permitting-for-1385-acre-data-center-campus-in-north-carolina/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-person-county-roxboro-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"mixed_use","city":"Troy","confidence":"medium","id":"compute_atlas-146af5a19a58ec16","lat":42.68056,"location_precision":"approximate","lon":-73.69722,"name":"Rensselaer Center for Computational Innovations (CCI), Rensselaer Technology Park","operator":"Rensselaer Polytechnic Institute","source_notes":"RPI describes a 22,000 sq ft facility with a 4,500 sq ft machine room at the Rensselaer Technology Park. It hosts the AiMOS supercomputer (14 racks, 252 nodes, 1,512 NVIDIA V100 GPUs), an AiMOSx GPU cluster, Xeon and EPYC clusters, and 11 PB of storage. AiMOS also serves as the test bed for the NYS-IBM Research AI Hardware Center. The AI classification is mixed-use because AI hardware runs alongside co-equal general HPC clusters. The center originated as a $100M RPI-IBM-New York State collaboration. No power figure is published. Coordinates are the Wikipedia point (42°40′50″N 73°41′50″W). It is in the same technology park as, but distinct from, MetLife Information Systems Computer Center, North Greenbush (500 Jordan Road).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Center for Computational Innovations: RPI Future of Computing Institute","publisher":"Rensselaer Polytechnic Institute","retrievedAt":"2026-10-09","url":"https://foci.rpi.edu/computing-resources/center-computational-innovations"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/rpi-center-for-computational-innovations-troy-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Washington","confidence":"medium","contains_osm":true,"id":"compute_atlas-150237b37d6fc85a","lat":38.9102295,"location_precision":"approximate","lon":-77.0067321,"name":"DC OCTO/DDOT Replacement Data Center (60 Florida Avenue NE)","operator":"District of Columbia Office of the Chief Technology Officer (OCTO)","source_notes":"A December 2022 report says the District picked 60 Florida Ave. NE in Eckington in fall 2022 as the building where OCTO/DDOT data center functions moving out of the Reeves Center would be rebuilt. The relocation and decommissioning were budgeted at about $47M; that is a program-wide figure, not this site's investment, so it is not recorded. DGS's 2021 request specified about 500 kW of critical power with N+1 UPS, generators and cooling, which is a requirement and not built capacity. DC permit records show building permit B2306169 (issued 2023-09-21) for an interior renovation of a 2-story commercial building, about 37,000 sq ft, owned by 60 Florida Avenue NE LLC. They also show supplemental electrical, mechanical and plumbing permits from October 2023 through June 2024. None of those permits mentions a data center, so the record stays listed as proposed rather than under construction or operational.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"D.C. Issues New RFP For Long-Delayed Reeves Center Remake (Dec 5, 2022) – data center functions to be rebuilt at 60 Florida Ave. NE, Eckington","publisher":"Three60","retrievedAt":"2026-10-20","url":"https://threee60.com/d-c-issues-new-rfp-for-long-delayed-reeves-center-remake/"},{"kind":"filing","label":"DC DGS Request for Space DGS-RFS-2021-11: OCTO and DDOT Data Center, June 2021","publisher":"DC Department of General Services","retrievedAt":"2026-10-20","url":"https://dgs.dc.gov/sites/default/files/dc/sites/dgs/event_content/attachments/OCTO%20and%20DDOT%20Relocation%20from%20Reeves%20-%20RFS%20%282021.06.08%29.pdf"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/dc-octo-ddot-data-center-60-florida-ave-ne-washington-dc"}],"state":"District of Columbia","status":"planned"},{"ai_classification":"unknown","city":"Wyalusing","confidence":"medium","id":"compute_atlas-152092f6a0ad8446","lat":41.6966,"location_precision":"approximate","lon":-76.244,"name":"Klondike Wyalusing Data Center","operator":"KDI Wyalusing Power LLC (Klondike Digital Infrastructure / New Fortress Energy)","source_notes":"The exact position of the data center within the 335-acre parcel has not been disclosed, so coordinates are the Wyalusing Township point. The site previously held a 2019 air approval for an LNG processing plant that was never built and has expired. Permitted annual limits reported for the energy center: ~74 tons NOx, 93 tons CO, 92 tons PM, and just over 1.1 million tons CO2e — recorded here in notes rather than as emissions fields because the cited source is press coverage rather than the permit document itself.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/klondike-wyalusing-data-center-bradford-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-1548f3ce0dfbbb4f","lat":45.5493273,"location_precision":"exact","lon":-122.9278183,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-por01-or","value":40.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-por01-or","value":36.0}],"name":"STACK POR01","operator":"STACK Infrastructure","source_notes":"Confirmed operational, 36MW expansion capacity, part of Portland's 3-campus cluster.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/471691757","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/471691757"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/stack-por01-or"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/899634245","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/899634245"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/stack-por03-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"mixed_use","city":"Clarksville","confidence":"medium","contains_osm":true,"id":"compute_atlas-15ab24c98b73a875","lat":36.5288,"location_precision":"approximate","lon":-87.3636,"name":"Google Montgomery County Data Center","operator":"Google","source_notes":"Address: 1000 Boolean Dr, Clarksville, TN 37040 (former Hemlock Semiconductor site). Coordinates are approximate for that site. Google reports $2.5B+ total Tennessee investment since 2018 but facility-level investment is $600M. 30% veteran workforce. Correction: Original announcement was December 2015 (not 2018); facility opened November 2019 (not 2022).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Haslam Announces Google to Locate New Data Center in Clarksville","publisher":"Tennessee Department of Economic & Community Development","retrievedAt":"2026-09-09","url":"https://tnecd.com/news/governor-haslam-commissioner-boyd-announce-google-to-locate-new-data-center-in-clarksville/"},{"kind":"press","label":"Google officially opens Clarksville-Montgomery County data center","publisher":"ClarksvilleNow","retrievedAt":"2026-07-06","url":"https://clarksvillenow.com/local/google-officially-opens-clarksville-montgomery-county-data-center/"},{"kind":"osm","label":"OpenStreetMap way 708931343 — 'Google Montgomery Data Center', operator=Google LLC, addr 1000 Boolean Drive, Clarksville","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-21","url":"https://www.openstreetmap.org/way/708931343"},{"kind":"subsidy","label":"Google's secrecy agreement with the Montgomery County IDB should be undone (Tennessee Coalition for Open Government, Sept 30, 2018) — Dec 22, 2015 PILOT agreement terms","publisher":"Tennessee Coalition for Open Government","retrievedAt":"2026-09-21","url":"https://tcog.info/google-secrecy-agreement-with-the-montgomery-county-industrial-development-board-should-be-undone/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-montgomery-county-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Groton","confidence":"medium","id":"compute_atlas-15b75c7f6423d69c","lat":41.334586,"location_precision":"approximate","lon":-72.076516,"name":"State of Connecticut Groton Data Center (Pfizer campus Building 230)","operator":"Connecticut Department of Administrative Services","source_notes":"State government Tier II data center, leased from Pfizer for $1 a year in Building 230 of Pfizer's Groton research campus under a 2014 agreement. It serves roughly 50,000 state personnel and pairs with a Springfield, MA site. The contractor's fast-track renovation covered 9,000+ sq ft, including raised floor, electrical work and four replacement CRAC units. Coordinates are a Census geocode of the Pfizer Groton campus address on Eastern Point Road, not Building 230, so precision is approximate and no street is recorded. Not the Pfizer or NE Edge hyperscale proposals.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CT DAS BITS — Statewide Data Center Facilities (Tier II Groton Data Center)","publisher":"Connecticut Department of Administrative Services","retrievedAt":"2026-09-30","url":"https://portal.ct.gov/das/best/platform-services/statewide-data-center-facilities"},{"kind":"other","label":"State of CT — Connecticut Data Center renovation, Pfizer campus Groton (9,000+ sq ft)","publisher":"Carlin Construction","retrievedAt":"2026-09-30","url":"https://www.carlinconstruction.com/project/state-ct-connecticut-data-center"},{"kind":"filing","label":"State Properties Review Board minutes, July 13, 2017 — PRB #17-183, DAS-BEST State Data Center, Building 230, 445 Eastern Point Road, Groton","publisher":"CT State Properties Review Board","retrievedAt":"2026-10-19","url":"https://portal.ct.gov/das/-/media/das/state-properties-review-board/agendas-and-meetings/2017/2017-07-13m.pdf"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/ct-das-groton-data-center-ct"}],"state":"Connecticut","status":"operating"},{"ai_classification":"likely","city":"Irving","confidence":"medium","id":"compute_atlas-15f92b1199cc099a","lat":32.8211516,"location_precision":"approximate","lon":-96.9169508,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-dallas-irving-tx","value":24.0}],"name":"Edged Dallas (Irving)","operator":"Edged Energy","source_notes":"Edged's April 2024 announcement says the facility at 505 N Wildwood Drive \"will deliver 24 MW of critical capacity\"; DataCenterNews US reported on 16 January 2026 that Edged US opened the first Edged Dallas facility in January 2025. The operator cites a portfolio-average PUE of 1.15 and a 74% reduction in energy overhead against a 1.58 global average. DataCenterNews US reported on 16 January 2026 that Irving City Council unanimously approved a second 24 MW building on the same campus, with groundbreaking expected in the second quarter of 2026; that expansion is not recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Edged Continues North American Expansion with New, Ultra-Efficient, AI Ready Data Center in Irving, Texas","publisher":"Edged Energy","retrievedAt":"2026-08-26","url":"https://edged.us/news/edged-dallas-irving"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/edged-dallas-irving-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Elkridge","confidence":"medium","id":"compute_atlas-16914f308f6962ae","lat":39.204016181007,"location_precision":"exact","lon":-76.711386050454,"name":"Cogent Data Center – Elkridge","operator":"Cogent Communications","source_notes":"Coordinates confirmed via US Census geocoder (exact match on 6050 Race Road, Elkridge, MD 21075). Brochure states 61,734 sq ft (10,131 sq ft non-raised, 29,182 sq ft raised floor), two 250kVA UPS units, and diesel generators rated 750kW and 1500kW, but does not state a total facility power rating in MW or an acreage figure, so no capacity or acreage is recorded; third-party aggregator listings were not independently verified.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/cogent-elkridge-howard-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","contains_osm":true,"id":"compute_atlas-16aecd272ede6ea2","lat":37.3806176,"location_precision":"approximate","lon":-121.9337744,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/goodman-innovation-centre-san-jose-ca","value":97.3}],"name":"Goodman Innovation Centre San Jose (NorthTown Data Center)","operator":"Goodman Group","source_notes":"Site is 350 & 370 West Trimble Road at Orchard Parkway. The CEC applicant of record for the backup generating facility is GIC San Jose, LLC; Goodman announced the acquisition and redevelopment and renamed the estate. The 45.8 acres is the whole estate; the CEC gives the data center project site as about 28.5 acres.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Goodman acquires prime Silicon Valley site for data center redevelopment","publisher":"Institutional Real Estate, Inc.","retrievedAt":"2026-09-14","url":"https://irei.com/news/goodman-acquires-prime-silicon-valley-site-for-data-center-redevelopment-3/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/goodman-innovation-centre-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"medium","contains_osm":true,"id":"compute_atlas-16cedf855cdda02f","lat":41.500537,"location_precision":"approximate","lon":-93.7755662,"name":"Microsoft Project Osmium Data Center","operator":"Microsoft","source_notes":"Announced 2016; Microsoft's largest Iowa campus (1.7M sq ft once built out), at 5855 SW Kerry St. Distinct parcel/campus from all Microsoft IA records tracked as of August 2026. Other reporting (not independently retrieved as of August 2026) says the site spans 160 acres in Warren County + 40 in Madison County, and totals $1.5-2B investment; as of that date only the Warren County / building-address / sqft facts were independently confirmed from sources read directly. Business Record's April 2025 listing of Iowa data centers gives Project Osmium's site as 110 acres.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Microsoft Osmium Data Center - Go West Des Moines","publisher":"Go West Des Moines (city economic development)","retrievedAt":"2026-08-08","url":"https://gowestdesmoines.com/portfolio-works/microsoft-osmium-data-center/"},{"kind":"other","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","retrievedAt":"2026-08-08","url":"https://wdmchamber.org/economic-development/microsoft-data-centers/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/microsoft-osmium-west-des-moines-ia"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Ann Arbor","confidence":"medium","contains_osm":true,"id":"compute_atlas-1710c7ff87d0b4db","lat":42.2813722,"location_precision":"approximate","lon":-83.7484616,"name":"Otava Ann Arbor Data Center","operator":"Otava","source_notes":"The operator page places this facility in the Avis Farms business park south of downtown but does not print a street address, and the commonly-cited 640 Avis Dr address appeared only in a search-results summary, never on a page that was reviewed — so no street is asserted and the pin is a city-level geocode, not the building. Generator/UPS figures are in kVA as published; no MW is derived from them.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/otava-ann-arbor-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"mixed_use","city":"Omaha","confidence":"high","contains_osm":true,"id":"compute_atlas-17de4099d91a5d66","lat":41.2578,"location_precision":"approximate","lon":-95.9375,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/1623-farnam-omaha-ne","value":8.0}],"name":"1623 Farnam","operator":"1623 Farnam","source_notes":"Omaha's carrier hotel: a nine-story, ~75,000 sq ft facility with around 8 MW of capacity at 1623 Farnam Street downtown, home to the OmahaIX internet exchange and some 60 carriers. News Press & Gazette Co. subsidiary Berks Group acquired Nebraska Data Centers and the 1623 Farnam carrier hotel in 2018 and established 1623 Farnam LLC, so 'Nebraska Data Centers' as an operator name is historical, not current. Build-out history: a $10 million expansion in 2019 built out the fifth floor, floors six through nine were added in 2021, and the final two data halls completed in June 2025 added 1.5 MW of IT capacity and space for 280 racks. CEO Bill Severn cites 'significant demand from AI workloads, edge deployments, content platforms, and broadband networks'. The company is separately planning an OMA2 campus expansion explicitly aimed at AI and edge infrastructure growth, with no site, size or date disclosed on its own page; it is not listed separately as of August 2026. DCD also reports the facility serves Trump Media & Technology Group; DCD attributes that tenant claim to other reporting, and it is not otherwise recorded. The recorded capacity is the ~8 MW total, not the 1.5 MW increment; no investment figure is recorded, because the only sourced amount is the $10 million 2019 fifth-floor expansion and, as of October 2026, neither cited source gives a total site investment. Coordinates are a street-address approximation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"1623 Farnam adds 1.5MW to Omaha data center in Nebraska — nine-story facility, 'around 8MW of capacity across 75,000 sq ft'; final two data halls and 280 racks; $10M fifth-floor expansion 2019, floors six-nine added 2021; OmahaIX and some 60 carriers","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-08-14","url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/"},{"kind":"other","label":"1623 Farnam Omaha Edge Data Center — 1623 Farnam Street, Omaha NE 68102; access to 60+ carriers and seven top IP transit providers; Omaha IX; planning a future OMA2 campus expansion for AI and edge infrastructure growth","publisher":"1623 Farnam","retrievedAt":"2026-08-14","url":"https://www.1623farnam.com/omaha-edge-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/1623-farnam-omaha-ne"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/818167571"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/1623-farnam-osmway-818167571"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/818167571"}],"state":"Nebraska","status":"operating"},{"ai_classification":"likely","city":"Aurora","confidence":"high","contains_osm":true,"id":"compute_atlas-18414fde1abcf26f","lat":41.7966077,"location_precision":"exact","lon":-88.2438232,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-chi1-chi3-aurora-il","value":109.0}],"name":"CyrusOne CHI1-CHI3 (Aurora)","operator":"CyrusOne","source_notes":"Confirmed at 2905 Diehl Road, Aurora, IL via aggregator cross-reference; operator directory page also lists Aurora IL: CHI1-CHI3. AI/HPC (likely): Aurora campus AI-optimized via CyrusOne Intelliscale high-density design.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/199252950","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/199252950"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/cyrusone-chi1-chi3-aurora-il"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/199252950"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426146790"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Norwalk","confidence":"high","id":"compute_atlas-18890b6ba3753fba","lat":41.460963,"location_precision":"approximate","lon":-93.6978644,"name":"Tract Norwalk Data Center Park (Project West)","operator":"Tract","source_notes":"Tract is a master-planned data center park developer; it buys, entitles and powers land rather than operating data centers itself, so the eventual operator is not yet named. The city projects roughly $5 million a year in new city property tax revenue ($15 million across all taxing entities) and says no tax incentives were offered, only a waiver of sanitary sewer district fees. Local reporting cites a roughly $12 billion eventual campus investment; that figure is a city expectation for a future, unnamed operator rather than a committed site-level investment, so it is not recorded as an investment figure.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-04","url":"https://www.compute-atlas.com/facilities/tract-norwalk-ia"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/city-council-in-norwalk-iowa-approves-potential-data-center-development-agreement-despite-public-concerns/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-west"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Riverbank","confidence":"medium","id":"compute_atlas-18bdbaa460fa4869","lat":37.7276467,"location_precision":"approximate","lon":-120.922033,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/spartan-aemetis-riverbank-industrial-complex-ca","value":60.0}],"name":"Riverbank Industrial Complex Data Center","operator":"Spartan Data Centers (with Aemetis, Inc.)","source_notes":"The site is the former Army ammunition plant at Claus and Claribel roads, and Aemetis is the city's leasing agent for it. The ~$1 billion investment is Spartan's own claim as reported. The status of the moratorium extension vote was not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/spartan-aemetis-riverbank-industrial-complex-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Manassas","confidence":"medium","id":"compute_atlas-18c94148288a9505","lat":38.7509,"location_precision":"approximate","lon":-77.4753,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/yondr-cerberus-manassas-va","value":72.0}],"name":"Yondr Manassas Data Center Campus","operator":"Yondr Group / Cerberus Capital Management","source_notes":"The announcement names Manassas but no street address or parcel, so coordinates are an approximate city-level geocode. Distinct from the tracked CloudHQ Manassas MCC Campus and Iron Mountain VA-6 (different operators and sites).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cerberus and Yondr Acquire 40 Acres in Northern Virginia to Build 72MW Data Center","publisher":"Cerberus Capital Management","retrievedAt":"2026-08-27","url":"https://www.cerberus.com/media/cerberus-and-yondr-acquire-40-acres-in-northern-virginia-to-build-72mw-data-center/"}],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/yondr-cerberus-manassas-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Abilene","confidence":"medium","id":"compute_atlas-18d98b67994eda94","lat":32.5001,"location_precision":"approximate","lon":-99.784,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stargate-abilene-tx","value":1200.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stargate-abilene-tx","value":618.0}],"name":"Stargate Abilene","operator":"OpenAI / Oracle / Crusoe","source_notes":"Also known as the Lancium Clean Campus. Lancium announced the site in December 2021 as a Clean Compute Campus that would host Bitcoin mining and other energy-intensive applications; Crusoe has since built an eight-building AI campus on it. Oracle gives the campus as 1,100 acres; the 2021 announcement gave about 800. Epoch AI describes the AI chips as owned by Oracle and used by OpenAI. Taylor Central Appraisal District's 2026 roll (Texas appraises property as of 1 January) lists Lancium entities as owners of the land, buildings and campus substations; Crusoe-managed entities as owners of each building's \"MEP\" accounts; and Oracle America as owner of computer equipment for \"BUILDING 1 & 2\" only, valued at $3.43 billion. Business Insider reported in July 2025 that Crusoe \"has committed to spending up to $3.5 billion to build the data center site in exchange for its property tax abatement\"; that is a commitment under the abatement agreements, not a reported project cost, so no investment figure is recorded here. Crusoe, Blue Owl Capital and Primary Digital Infrastructure describe the campus as funded by a \"$15 billion joint-venture\" (May 2025); the release does not split the figure into debt and equity or state a total project cost. Newmark said it arranged a $7.1 billion construction loan, led by JP Morgan, for the second phase. Crusoe gives the eight buildings \"a total power capacity of 1.2 gigawatts\"; Oracle describes its 618 MW for six buildings as \"75% of total capacity\", without saying what kind of capacity; Epoch AI projects 843 MW of IT power for the campus by Q4 2026. The operational capacity shown is Oracle's figure for capacity \"delivered to the customer\" as of 2026-09-10. Oracle did not say whether it is IT load, and \"delivered\" is Oracle's word, not an observation of running hardware. Crusoe expected the second phase to finish in mid-2026 (March 2025) and later \"by the end of 2026\" (March 2026). A separate 900 MW Crusoe campus for Microsoft (two buildings and an onsite power plant, the first building expected to be energized in mid-2027) is being built on adjacent land and is not part of this record; Epoch AI reported in April 2026 that OpenAI had reversed plans to expand this site. Construction-workforce figures conflict widely across sources and are not repeated here. Coordinates are the approximate centre of the eight data halls outlined on Epoch AI's satellite map of the campus (retrieved 2026-10-16).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Announcing the Stargate Project — OpenAI","publisher":"OpenAI","retrievedAt":"2026-07-05","url":"https://openai.com/index/announcing-the-stargate-project/"},{"kind":"other","label":"OpenAI Stargate: where the US sites stand — Epoch AI","publisher":"Epoch AI","retrievedAt":"2026-09-21","url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand"},{"kind":"other","label":"Stargate Data Centers Site-by-Site: Status, Dependencies, and What to Watch","publisher":"Measured AI","retrievedAt":"2026-07-06","url":"https://measuredai.substack.com/p/stargate-site-by-site-status"},{"kind":"press","label":"Stargate data center poised to complete construction this year in Abilene","publisher":"Texas Standard","retrievedAt":"2026-07-06","url":"https://texasstandard.org/stories/stargate-data-center-abilene-texas-construction-ai-artificial-intelligence/"},{"kind":"other","label":"OpenAI Stargate: where the US sites stand","publisher":"Epoch AI","retrievedAt":"2026-07-06","url":"https://epochai.substack.com/p/openai-stargate-where-the-us-sites"},{"kind":"press","label":"Taylor County residents raise concerns on tax breaks at commissioners meeting","publisher":"KTXS News","retrievedAt":"2026-07-06","url":"https://ktxs.com/news/local/taylor-county-residents-raise-concerns-on-lancium-tax-breaks-at-commissioners-meeting"},{"kind":"other","label":"OpenAI Stargate Abilene | AI Data Centers","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene"},{"kind":"press","label":"Crusoe Begins Construction on Second Phase of Abilene, Texas Data Center Campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/crusoe-begins-construction-on-second-phase-of-abilene-texas-data-center-campus-will-add-six-buildings/"},{"kind":"press","label":"Lancium, Crusoe Executives Brief Abilene Leaders on Major Northside Investment","publisher":"KTXS (Sinclair)","retrievedAt":"2026-07-10","url":"https://ktxs.com/news/local/lancium-crusoe-executives-brief-abilene-leaders-on-major-northside-investment"},{"kind":"press","label":"City of Abilene, Taylor County to Build Billion-Dollar Data Center to Host Bitcoin Mining","publisher":"Bitcoin Magazine","retrievedAt":"2026-07-10","url":"https://bitcoinmagazine.com/business/city-of-abilene-taylor-county-to-build-billion-data-center-host-bitcoin-mining"},{"kind":"other","label":"Oracle Q4 fiscal 2026 earnings call, third-party transcript (June 10, 2026)","publisher":"StockAnalysis","retrievedAt":"2026-10-16","url":"https://stockanalysis.com/stocks/orcl/transcripts/592465-q4-2026/"},{"kind":"other","label":"Oracle Q1 fiscal 2027 earnings call, third-party transcript (September 10, 2026)","publisher":"StockAnalysis","retrievedAt":"2026-10-16","url":"https://stockanalysis.com/stocks/orcl/transcripts/689425-q1-2027/"},{"kind":"press","label":"Oracle Seeks Bigger Tax Breaks in Texas With Property Value Protest","publisher":"Business Insider","retrievedAt":"2026-10-16","url":"https://www.businessinsider.com/oracle-seeks-bigger-tax-break-texas-property-value-protest-2025-7"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/stargate-abilene-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Ferguson","confidence":"medium","contains_osm":true,"id":"compute_atlas-191952b9d7ba9484","lat":38.744707,"location_precision":"approximate","lon":-90.3038975,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/next-revolution-emerson-campus-ferguson-mo","value":300.0}],"name":"Former Emerson Campus Data Center (Next Revolution Technologies)","operator":"Next Revolution Technologies LLC","source_notes":"217-acre former Emerson Electric campus in Ferguson, bought in 2026 by Next Revolution Technologies LLC (run by Onder Law's James Onder). The campus already has a smaller data center; the approved plan includes renovating it and a potential future 300 MW data center (the planned capacity reflects that potential expansion). Up to $22B in industrial revenue bonds authorized. Community payments: $700K to the city, $250K environmental mitigation fund, $7.5M over 10 years to the Ferguson Neighborhood Improvement Program. Coordinates are the Ferguson municipal centroid (approximate); no street address was given in the cited sources. The record is listed as proposed: the council approval is a tax-incentive/redevelopment package, not a building permit.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/next-revolution-emerson-campus-ferguson-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Michigan City","confidence":"medium","id":"compute_atlas-195305ebc40c857c","lat":41.7075394,"location_precision":"approximate","lon":-86.8950297,"name":"Google Michigan City Data Center","operator":"Google","source_notes":"Announced by Google in 2026 as a planned Indiana data center, distinct from Google's operational Fort Wayne site and its Morgan County (Monrovia) development. As of August 2026, no capacity figure had been published. Northwest Indiana Business Magazine, WNDU and WSBT (April 2026) each give the project cost as $832 million. Jobs figures are floors: Northwest Indiana Business Magazine reports that more than 500 construction workers will be needed, and quotes the executive director of the Economic Development Corp. of Michigan City describing \"30-plus high-skill jobs\" from the project, which the record counts as permanent jobs; the permanent figure is that official's statement, not a figure from Google. Coordinates are the Michigan City centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Michigan City welcomes Google as data center owner","publisher":"Northwest Indiana Business Magazine","retrievedAt":"2026-09-01","url":"https://nwindianabusiness.com/industries/professional-services/information-technology/michigan-city-welcomes-google-as-data-center-owner/77568/"},{"kind":"permit","label":"Phoenix Investors / Project Maize — City of Michigan City major projects","publisher":"City of Michigan City","retrievedAt":"2026-09-13","url":"https://michigancityin.gov/major-projects/phoenix-investors-project-maize/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/google-michigan-city-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"mixed_use","city":"Gilroy","confidence":"medium","id":"compute_atlas-1966c37496a4ea00","lat":36.997,"location_precision":"approximate","lon":-121.541,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/amazon-gilroy-ca","value":98.0}],"name":"Amazon AWS Gilroy Data Center","operator":"Amazon Web Services","source_notes":"Status updated to under construction: grading permit issued December 11, 2025; building permit issued March 19, 2026; City of Gilroy lists project as Under Construction as of July 2026. Site at 8050 Camino Arroyo in east Gilroy along Hwy 101. Full build-out: 438,000 sq ft across 56 acres. Amazon cites a ~$2 billion investment for the Gilroy project (recorded as the investment figure); its broader Northern California investment of ~$5.1B and ~1,890 jobs since 2009 is regional and not attributable to this site. The 2020 land purchase was $31.3M. Operational job figures conflict and are unconfirmed: the FEIR says employment 'may grow to 50 full-time employees' (a ceiling), the permit application lists 25, and Amazon's promotional materials cite ~90 on-site; the construction workforce is not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon Data Services Gains Approval for Data Center on 56 Acres in Gilroy, California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/amazon-data-services-gains-approval-for-data-center-on-56-acres-in-gilroy-california/"},{"kind":"permit","label":"Gilroy Data Center (by Amazon Web Services) — Official City Project Page","publisher":"City of Gilroy","retrievedAt":"2026-07-06","url":"https://www.cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS"},{"kind":"press","label":"Data Center Set for Construction in East Gilroy","publisher":"Gilroy Dispatch","retrievedAt":"2026-07-06","url":"https://gilroydispatch.com/data-center-set-for-construction-in-east-gilroy/"},{"kind":"press","label":"Guest View: What Amazon didn't tell you (Gilroy data center FEIR water figures)","publisher":"Gilroy Dispatch","retrievedAt":"2026-07-07","url":"https://gilroydispatch.com/guest-view-what-amazon-didnt-tell-you-and-what-happened-when-we-asked/"},{"kind":"permit","label":"Gilroy Data Center (by Amazon Web Services) — City of Gilroy project page","publisher":"City of Gilroy","retrievedAt":"2026-09-14","url":"https://cityofgilroy.org/1019/Gilroy-Data-Center-by-AWS"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/amazon-gilroy-ca"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Tulsa","confidence":"medium","contains_osm":true,"id":"compute_atlas-1976ba5f4375d74a","lat":36.1585898,"location_precision":"exact","lon":-95.9886293,"name":"TierPoint Tulsa - Archer","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page (Tulsa - Archer).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/159959672","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/159959672"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-tulsa-archer-ok"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/tierpoint-tulsa-state-farm-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"medium","id":"compute_atlas-1987c8480fa32c4c","lat":35,"location_precision":"approximate","lon":-106.63,"name":"Innova Data Center (Mesa del Sol)","operator":"NOVA Corporation (Diné Development Corporation, Navajo Nation); operated by Innava Data Solutions","source_notes":"Navajo Nation-owned colocation and HPC facility in the Mesa del Sol development in south Albuquerque; ~130,000 sq ft building on a 30-acre site that, per the 2015 source, came with 8 MW of power, and a full-buildout potential of 80,000 sq ft of white space. As of October 2026, the cited source states no operating capacity. A projected $100-150 million figure in the source is for the full campus build-out, not a booked site investment, so an investment figure is deliberately omitted. As of September 2026, current ownership had not been confirmed by a newer source — the cited source is from 2015 and describes what NOVA built, not necessarily who operates it today. Coordinate is a Mesa del Sol locality approximation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Navajo-owned data center offers way to diversify tribe's revenue base beyond casinos","publisher":"Data Center Knowledge","retrievedAt":"2026-09-15","url":"https://www.datacenterknowledge.com/business/navajo-owned-data-center-offers-way-to-diversify-tribe-s-revenue-base-beyond-casinos"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/nova-innova-data-center-albuquerque-nm"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Palmetto","confidence":"medium","id":"compute_atlas-1a7745a9dcd031c6","lat":33.5182,"location_precision":"approximate","lon":-84.6693,"name":"Project Peach (CyrusOne Palmetto Data Center Campus)","operator":"CyrusOne (joint venture with North Coweta Investors)","source_notes":"Eight buildings planned, completion projected 2036. Distinct from the tracked T5 @ Atlanta IV, which is also at Palmetto but a different operator, site and jurisdiction (Fulton County).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How Data Center Developers Staked Their Claim in Rural Georgia","publisher":"DeSmog","retrievedAt":"2026-08-28","url":"https://www.desmog.com/2026/04/07/how-data-center-developers-staked-their-claim-in-rural-georgia/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/cyrusone-project-peach-palmetto-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Quincy","confidence":"medium","id":"compute_atlas-1a8f6685b54ae9f1","lat":47.2333,"location_precision":"approximate","lon":-119.8667,"name":"Microsoft Columbia Data Center (Quincy)","operator":"Microsoft","source_notes":"Microsoft's first Quincy data center, on land bought in 2006. Began as a 500,000 sq ft building and reached about 800,000 sq ft across two buildings on a 270-acre complex by 2016; reported to draw 30-50 MW in 2012. No current capacity figure is asserted — Microsoft does not release the size or capacity of its Quincy facilities, and the 2012 figure is stale. Microsoft has roughly 400 employees in Quincy across its facilities there. Grant County PUD supplies power. Coordinates are the published minute-precision location (47°14'N 119°52'W).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/microsoft-columbia-quincy-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Moses Lake","confidence":"medium","id":"compute_atlas-1ae5bf721d117241","lat":47.1554,"location_precision":"approximate","lon":-119.25,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/serverfarm-titan-moses-lake-wa","value":22.0}],"name":"TiTAN (Serverfarm Moses Lake)","operator":"Serverfarm LLC","source_notes":"Former US Titan missile-defense command center repurposed by Serverfarm (ex-Cyxtera MWh1); two buildings totaling 413,000 sq ft; a new 120MW substation sits adjacent to the campus. Distinct site from the tracked Bitfarms and Salcido Wheeler facilities in Moses Lake.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-22","url":"https://www.compute-atlas.com/facilities/serverfarm-titan-moses-lake-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Westview","confidence":"medium","id":"compute_atlas-1b030ea5901b0c7c","lat":25.88416,"location_precision":"approximate","lon":-80.247556,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/iron-mountain-mia-1-miami-fl","value":16.0}],"name":"Iron Mountain MIA-1","operator":"Iron Mountain","source_notes":"150,000 sq ft. Classified a \"telecom hub\" rather than \"data center\" under Miami-Dade county code. Opens 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Iron Mountain breaks ground on first data center in Miami","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/iron-mountain-breaks-ground-on-first-data-center-in-miami/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Iron Mountain solution guide — MIA-1 Miami: \"By mid 2026 this 150,000 ft2 AI-ready facility will phase up to support 16 MW of customer IT load based on 26 MVA of redundant operational power\"; Tier III, 3.4-acre site","publisher":"Iron Mountain","retrievedAt":"2026-09-14","url":"https://resources.ironmountain.com/solution-guides/d/data-centers-miami-data-center-mia-1"},{"kind":"press","label":"Iron Mountain breaks ground on its first data center in Miami","publisher":"Miami-Dade Beacon Council","retrievedAt":"2026-10-20","url":"https://www.beaconcouncil.com/media/miami-news/2025/iron-mountain-breaks-ground-on-its-first-data-center-in-miami/"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/iron-mountain-mia-1-miami-fl"}],"state":"Florida","status":"under construction"},{"ai_classification":"unknown","city":"Idaho Falls","confidence":"medium","id":"compute_atlas-1b396d7a2e41550d","lat":43.4666,"location_precision":"approximate","lon":-112.0341,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://jedunn.com/projects/idaho-national-laboratory-c3-data-centers/","value":4.0}],"name":"Idaho National Laboratory Collaborative Computing Center (C3)","operator":"Idaho National Laboratory (U.S. Department of Energy)","source_notes":"High-performance computing data center on INL's Research and Education Campus (REC) in Idaho Falls -- distinct from INL's much larger remote desert 'Site' reservation (see the separate Aalo Atomics record). Houses DOE/INL supercomputers including Sawtooth, Hoodoo, and Bitterroot, supporting nuclear-energy modeling/simulation, materials science, and data science research; remote access is provided to Idaho university researchers via the Idaho Regional Optical Network. Built alongside the adjacent Cybercore Integration Center (80,979 sq ft) as part of a combined ~148,000 sq ft project; C3 itself is variously reported as 66,520 sq ft (general contractor JE Dunn) and 73,000 sq ft (engineering subconsultant AEI), and its power capacity is similarly inconsistent between sources -- JE Dunn describes an '8MW High Performance Computing (HPC) Data Center with 2MW of redundancy' and a 'Day 1 installation of 4MW capacity,' while AEI's page states '1.5 MW total power'. The operational capacity recorded is JE Dunn's Day 1 installation of 4MW; as of October 2026, neither cited source reconciles it with AEI's 1.5 MW figure. Completed circa 2022 per JE Dunn's project metadata. No exact street address was given in either source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Idaho National Laboratory C3 Data Centers","publisher":"JE Dunn Construction","retrievedAt":"2026-09-21","url":"https://jedunn.com/projects/idaho-national-laboratory-c3-data-centers/"},{"kind":"other","label":"Idaho National Laboratory - The Collaborative Computing Center (C3)","publisher":"AEI Engineering","retrievedAt":"2026-09-12","url":"https://aeieng.com/markets/project/idaho-national-laboratory-the-collaborative-computing-center-c3"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/inl-c3-idahofalls-id"}],"state":"Idaho","status":"operating"},{"ai_classification":"unknown","city":"Ghent","confidence":"medium","contains_osm":true,"id":"compute_atlas-1b3e71427c76770c","lat":38.7375625,"location_precision":"approximate","lon":-85.0582835,"name":"Carroll County Digital Campus (Ghent)","operator":"Deca Companies","source_notes":"Distinct from the PowerHouse/Poe 'Carrollton Industrial Campus' already tracked in Carroll County: different developer, different site (a several-hundred-acre parcel on Sharon Road east of Ghent, near the Gallatin County line, versus 550 acres south of Carrollton near the Kentucky River). Deca projects roughly $40 million a year in local tax revenue by 2034 ($33M to Carroll County Schools, the balance to the county, library, health department and extension services). The project's own site describes phases 1–3 (site selection, evaluation, power) as complete and phase 4 (permitting/engagement) in progress. No capacity figure has been published. Construction-jobs figures differ slightly between sources (7,400 in the Carroll News-Democrat, 'more than 7,000' in Louisville Business First); the more specific figure is recorded. Coordinates are the Ghent city centroid and are approximate — the parcel has not been mapped publicly.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Carroll County Digital Campus — project information site (Deca)","publisher":"Deca","retrievedAt":"2026-09-15","url":"https://ghentdc.com/"},{"kind":"press","label":"See where data center developers are looking to build in Kentucky (project tracker: Carroll County, Deca Companies, planned)","publisher":"Hoptown Chronicle / Kentucky Lantern","retrievedAt":"2026-09-15","url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/deca-ghent-carroll-county-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-1bb9374fb6a37b17","lat":32.9229,"location_precision":"approximate","lon":-112.0148,"name":"Arizona Independent Technology Campus","operator":"Zinke Investments LLC","source_notes":"Proposed 1,517-acre campus in unincorporated Pinal County, southeast of Porter and Barnes roads, about two miles east of Highway 347, between Barnes and Lelaan roads and east of Porter Road. 956 acres require redesignation from Moderate Low-Density Residential to Employment; the balance is already Employment. Proposed land-use split reported as 50% data center, 25% energy generation, 25% manufacturing/warehousing/general industrial. Reported job ranges (3,000-6,500 peak construction; 1,350-2,800 permanent) are stated as ranges in the sources and are therefore not recorded as figures here. Coordinates are the Porter Road / Barnes Road intersection derived from OpenStreetMap road alignments; the campus lies southeast of that point, so the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data centers proposed south of Maricopa: County reviews 956-acre land-use change for Arizona Independent Technology Campus","publisher":"Pinal Post","retrievedAt":"2026-09-10","url":"https://pinalpost.com/data-center-south-of-maricopa-tech-campus-2026-september-worksession/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/zinke-arizona-independent-technology-campus-pinal-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Saint Louis","confidence":"medium","contains_osm":true,"id":"compute_atlas-1be5cfd860ef3454","lat":38.633535,"location_precision":"exact","lon":-90.2126613,"name":"TierPoint St. Louis - Locust","operator":"TierPoint","source_notes":"135,840+ sq ft total with 22,640 sq ft raised floor (phase 1) and 45,000 sq ft expansion space. Four 2.0 MW generators (8.0 MW generator capacity; no facility IT capacity stated). Marketed for high-density AI/GPU colocation. The operator page reads both 'NOW AVAILABLE' and 'currently under development', so it is treated as operational with ongoing phased build-out. One of three TierPoint St. Louis sites; TierPoint St. Louis - Olive and TierPoint St. Louis - Millpark are tracked separately as of October 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-locust-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"high","contains_osm":true,"id":"compute_atlas-1c3a548a892fe4c7","lat":41.1289,"location_precision":"exact","lon":-104.8974,"name":"NCAR-Wyoming Supercomputing Center","operator":"University Corporation for Atmospheric Research (UCAR)","source_notes":"High-performance computing and data-archival facility in the North Range Business Park, Cheyenne, operated by NCAR for UCAR under a partnership with the State of Wyoming and the University of Wyoming. 153,000 total square feet with 24,000 square feet of raised-floor modules. Coordinates and street are corroborated by the OpenStreetMap building tagged telecom=data_center with operator 'University Corporation for Atmospheric Research'. No megawatt figure is published in the sources read, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NCAR-Wyoming Supercomputing Center - Computational and Information Systems Lab","publisher":"NCAR/UCAR","retrievedAt":"2026-09-02","url":"https://www.cisl.ucar.edu/ncar-wyoming-supercomputing-center"}],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/ncar-wyoming-supercomputing-center-cheyenne-wy"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/231047065"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ncar-wyoming-supercomputing-center-osmway-231047065"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/231047065"}],"state":"Wyoming","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-1c408827222e213f","lat":31.9357724,"location_precision":"approximate","lon":-110.9997989,"name":"Project Gravel","operator":"Sahuarita Holdings, LLC","source_notes":"Landowner is Sahuarita Holdings, LLC, a subsidiary of Idaho-based W.R. Henderson Construction; the eventual data center operator has not been disclosed. Pima County was weighing a 120-day data center moratorium at the time of reporting. Coordinate is a road-level geocode of W Twin Buttes Road, so the pin is approximate within the road's length.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New 160-acre data center proposed in Sahuarita","publisher":"Arizona Daily Star (tucson.com)","retrievedAt":"2026-09-23","url":"https://tucson.com/news/local/government-politics/article_88b66e8c-6502-49de-832e-7cba5f958a77.html"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/sahuarita-holdings-project-gravel-pima-county-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"confirmed","city":"Monrovia","confidence":"medium","id":"compute_atlas-1c57f789de973e91","lat":39.57,"location_precision":"approximate","lon":-86.35,"name":"Google Project Louie (Morgan County)","operator":"Google","source_notes":"Codename 'Project Louie'; Google initially concealed via shell company 'Woodland Caribou LLC'. Campus totals approximately 550 acres in Morgan Township east of Monrovia (bounded by Keller Hill Rd, N Antioch Rd, SR-42, W Union Church Rd); additional ~80 acres acquired within Monrovia town limits, bringing total Google holdings to ~628 acres. Planned 1,200 MW AES Indiana substation per IURC Cause No. 46394 (filed Apr 22 2026); that figure is the utility substation capacity ceiling, not a confirmed steady-state data center load — so it is noted here rather than recorded as capacity. Six buildings plus substation planned. Total investment is reported as $1 billion: the Indiana Daily Student cites documents submitted during Terri Moore's lawsuit over the rezoning, and the Daily Journal, reprinting an Indianapolis Business Journal report (October 2025), says Google has promised to spend at least $1 billion on the campus. Land acquisition spend: ~$78 million for ~15 parcels Sep–Nov 2025. Coordinates approximate (site east of Monrovia near SR-42/Keller Hill Rd area). Annexation dispute with Town of Monrovia active July 2026: county transferred Google parcels to RDC under IC 36-4-3-4.3 to block annexation; Google offered $12M sewer plant upgrade to Monrovia to drop the effort.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google behind 390-acre data center development in Morgan County, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/google-behind-390-acre-data-center-development-in-morgan-county-indiana/"},{"kind":"press","label":"The billion-dollar neighbor: Data center special report","publisher":"Indiana Daily Student","retrievedAt":"2026-07-07","url":"https://specials.idsnews.com/data-center-morgan-county-indiana-billion-dollar/"},{"kind":"press","label":"Google reveals itself as developer behind 500-acre Morgan County data center campus","publisher":"Daily Journal","retrievedAt":"2026-07-07","url":"https://dailyjournal.net/2025/10/22/google-reveals-itself-as-developer-behind-500-acre-morgan-county-data-center-campus/"},{"kind":"other","label":"IURC Must Prioritize Public Interest in AES Indiana Data Center Proposal","publisher":"Citizens Action Coalition","retrievedAt":"2026-07-07","url":"https://www.citact.org/news/iurc-must-prioritize-public-interest-aes-indiana-data-center-proposal"},{"kind":"filing","label":"AES Indiana Lee Direct Testimony, IURC Cause No. 46394 (filed Apr 22 2026)","publisher":"Indiana Utility Regulatory Commission","retrievedAt":"2026-07-07","url":"https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/9859d501-903e-f111-88b3-001dd802f839/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46394_AESIN_Lee+Direct+Testimony+-+3_042226.pdf"},{"kind":"press","label":"Google pressures Monrovia to end annexation effort","publisher":"Morgan County Correspondent","retrievedAt":"2026-07-07","url":"https://morgancountycorrespondent.com/2026/07/02/google-pressures-monrovia-to-end-annexation-effort/"},{"kind":"press","label":"AES Indiana plans 1,200-megawatt substation for Morgan County data center","publisher":"Daily Journal (Johnson County, IN)","retrievedAt":"2026-07-17","url":"https://dailyjournal.net/2025/10/17/aes-indiana-plans-1200-megawatt-substation-for-morgan-county-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-project-louie-monrovia-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"likely","city":"Karthaus Township","confidence":"medium","id":"compute_atlas-1c73eed3ddb836ce","lat":41.1420054,"location_precision":"approximate","lon":-78.1040324,"name":"Iron City Wells A.I. Data Center","operator":"Iron City Wells, LLC","source_notes":"Application documents are held at DEP's Northcentral Regional Office, 208 West Third Street, Suite 101, Williamsport. Coordinate is a township-centroid geocode; the permit notice does not give a site address. No megawatt rating is stated for the generators, so capacity is not recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DEP Issues Air Quality Permit For 15 Natural Gas Generators To Power Iron City Wells, LLC Data Center In Karthaus Twp., Clearfield County","publisher":"PA Environment Digest","retrievedAt":"2026-09-12","url":"https://paenvironmentdaily.blogspot.com/2026/01/dep-issues-air-quality-permit-for-15.html"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/iron-city-wells-karthaus-township-clearfield-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"confirmed","city":"Pecos","confidence":"medium","id":"compute_atlas-1d481b2ae9519c83","lat":31.42,"location_precision":"approximate","lon":-103.49,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-pecos-tx","value":2000.0}],"name":"Microsoft Pecos Data Center Campus","operator":"Microsoft","source_notes":"7,000-acre campus in Reeves County. Natural gas plant investment estimated at $7B separate from campus construction. No groundbreaking date reported as of July 2026; coordinates are Pecos city center as exact parcel not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft announces Pecos data center campus","publisher":"Microsoft","retrievedAt":"2026-09-10","url":"https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/"},{"kind":"press","label":"Microsoft plans 2 GW data center campus in Pecos, Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-plans-2gw-data-center-campus-in-pecos-texas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-pecos-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Cedar Rapids","confidence":"medium","id":"compute_atlas-1d5ee878766a2b20","lat":41.936,"location_precision":"approximate","lon":-91.723,"name":"Google Cedar Rapids Data Center Campus","operator":"Google","source_notes":"Coordinates approximate for Big Cedar Industrial Center at 76th Ave SW and Edgewood Rd SW in SW Cedar Rapids. Cedar Rapids campus investment ~$576M; part of Google's $7B+ total Iowa commitment announced May/June 2025. Adjacent to QTS campus in same 1,391-acre industrial park. Also exploring a second Linn County campus near Duane Arnold nuclear plant in Palo.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google pledges $7bn to expand Iowa data center footprint","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/google-pledges-7bn-to-expand-iowa-data-center-footprint/"},{"kind":"other","label":"Google Announces Data Center Project at Big Cedar Industrial Center — Alliant Energy","publisher":"Alliant Energy","retrievedAt":"2026-07-06","url":"https://www.alliantenergy.com/news/news-center/2025/06/060425-googlebigcedarannouncement"},{"kind":"press","label":"Google announces new $7 billion investment in Iowa","publisher":"Google","retrievedAt":"2026-07-06","url":"https://blog.google/feed/new-7-billion-investment-iowa/"},{"kind":"press","label":"Cedar Rapids data centers ignite concern from energy advocates","publisher":"The Daily Iowan","retrievedAt":"2026-07-06","url":"https://dailyiowan.com/2025/12/09/cedar-rapids-data-centers-ignite-concern-from-energy-advocates-excitement-from-officials/"},{"kind":"filing","label":"Data Center Sales and Use Tax Incentives","publisher":"Iowa Department of Revenue","retrievedAt":"2026-07-06","url":"https://revenue.iowa.gov/taxes/tax-guidance/sales-use-excise-tax/data-centers"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-cedar-rapids-ia"}],"state":"Iowa","status":"under construction"},{"ai_classification":"likely","city":"Lyon Township","confidence":"medium","id":"compute_atlas-1d80da8b8ad7ac75","lat":42.47,"location_precision":"approximate","lon":-83.53,"name":"Project Flex","operator":"Verrus (Sidewalk Infrastructure Partners)","source_notes":"6 buildings, 1.8M sq ft. Anthropic (maker of Claude) reported as the intended end-user tenant, not confirmed directly by Anthropic. Conditional site plan approval since Sept 2025. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"180-acre data center set to be built in Lyon Township, Michigan (DCD)","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/180-acre-data-center-set-to-be-built-in-lyon-township-michigan/"},{"kind":"other","label":"Project Flex — FAQ","publisher":"Verrus (Sidewalk Infrastructure Partners)","retrievedAt":"2026-09-09","url":"https://projectflexmi.com/faq/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/verrus-project-flex-lyon-township-oakland-county-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Milpitas","confidence":"high","contains_osm":true,"id":"compute_atlas-1dd0bd820e43d40b","lat":37.405683,"location_precision":"exact","lon":-121.9162603,"name":"CoreSite SV2 (Milpitas)","operator":"CoreSite","source_notes":"76,000+ sq ft. Coordinates are the OSM 'CoreSite SV2' building footprint.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-sv2-milpitas-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/299388896"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Luther","confidence":"medium","id":"compute_atlas-1dd359062410a25b","lat":35.6612,"location_precision":"approximate","lon":-97.1961,"name":"Luther Horizon Technology Park","operator":"Beltline Energy","source_notes":"A third Beltline Energy site in Oklahoma, distinct from the tracked OKC/Frisco Road and Piedmont proposals. Coordinates are a Luther town-centroid approximation; the parcel is near OG&E's Redbud Energy Facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Luther Horizon Technology Park — official project site","publisher":"Beltline Energy","retrievedAt":"2026-08-19","url":"https://lutherhorizontechnologypark.com/"}],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/beltline-luther-horizon-technology-park-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Pueblo","confidence":"medium","id":"compute_atlas-1de0df380ede1d7b","lat":38.263995,"location_precision":"approximate","lon":-104.6141867,"name":"Prometheus Hyperscale Pueblo","operator":"Prometheus Hyperscale","source_notes":"Early-stage pipeline site named alongside Fort Morgan. No capacity, acreage, investment or permit filing is sourced, so none is recorded. Coordinates are the Pueblo city centroid (approximate). Not connected in the sources to the Comanche generating station or any specific parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Looming questions about data centers","publisher":"Big Pivots","retrievedAt":"2026-08-26","url":"https://bigpivots.com/looming-questions-about-data-centers/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-pueblo-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Red Oak","confidence":"medium","id":"compute_atlas-1e3c5941e84ada0b","lat":32.537981,"location_precision":"approximate","lon":-96.804371,"name":"Red Oak Campus","operator":"Compass Datacenters","source_notes":"Second DFW-area Compass site (buildings 3/4). Distinct operator/site from DataBank's separate Red Oak, TX campus (same town, different companies).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Compass Datacenters looks to expand Red Oak campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/compass-datacenters-looks-to-expand-red-oak-campus/"},{"kind":"press","label":"DeSoto Tribune — Red Oak data center sparks controversy as expansion moves forward","retrievedAt":"2026-07-26","url":"https://desototribune.com/2026/05/27/red-oak-data-center-sparks-controversy-as-expansion-moves-forward/"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/compass-red-oak-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Piedmont","confidence":"medium","id":"compute_atlas-1e5ae3d4adacc929","lat":35.7,"location_precision":"approximate","lon":-97.8,"name":"Cloverleaf Project Open Sky","operator":"Cloverleaf Infrastructure","source_notes":"630-acre proposed data campus near the Mathewson Substation, NW 248th Street, Piedmont (Canadian/Kingfisher county line) — part of a transmission corridor drawing multiple competing proposals; see the Beltline Energy Piedmont Site, a separate, distinct 321-acre site nearby — do not conflate despite both being in Piedmont. Closed-loop cooling planned. Cloverleaf recently withdrew from two Wisconsin data center projects after local opposition (context, not this project). Radio Oklahoma News, citing information provided to the city, reported that the project represents a $1 billion investment, which is the figure recorded. Job and capacity figures are not recorded because the sources give ceilings or disagree: Cloverleaf's chief development officer told the planning commission the project would create \"up to 300 jobs, with potentially a thousand more during construction\" (KOKH FOX 25), while Radio Oklahoma News reported \"up to 500 permanent jobs\" and \"up to 1.4 gigawatts of electricity\", and KOKH FOX 25 reported that the campus \"would require 1.5 gigawatts of power\".","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma","publisher":"Data Center Dynamics","retrievedAt":"2026-08-06","url":"https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/"},{"kind":"press","label":"Piedmont planning commission encourages city council to deny data center proposal","publisher":"KFOR","retrievedAt":"2026-07-11","url":"https://kfor.com/news/local/piedmont-planning-commission-encourages-city-council-to-deny-data-center-proposal/"},{"kind":"press","label":"A Transmission Line Built to Fix Grid Congestion Has Become Oklahoma's Hottest Data Center Address","publisher":"Oklahoma Watch","retrievedAt":"2026-07-11","url":"https://oklahomawatch.org/2026/06/26/a-transmission-line-built-to-fix-grid-congestion-has-become-oklahomas-hottest-data-center-address/"},{"kind":"press","label":"Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review","publisher":"KOKH FOX 25","retrievedAt":"2026-09-14","url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review"},{"kind":"press","label":"'You've dragged your feet': Piedmont delays data center vote for fifth time","publisher":"News 9","retrievedAt":"2026-10-28","url":"https://www.news9.com/data-centers-in-oklahoma/youve-dragged-your-feet-piedmont-delays-data-center-vote-for-fifth-time"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cloverleaf-project-open-sky-piedmont-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Newton Township","confidence":"medium","id":"compute_atlas-1e85324d5f17e695","lat":41.4539024,"location_precision":"approximate","lon":-75.7539478,"name":"Newton Township Data Center Campus (Newton Road)","operator":"Popca LLC","source_notes":"About 90 acres on the East Newton Ira Tripp Tract off Newton Road, in the rural resource district. Two 145,200 sq ft buildings, two generation yards and a substation. About $280M per the township application. The pin is the township centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/popca-newton-township-data-center-lackawanna-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Sacramento","confidence":"high","contains_osm":true,"id":"compute_atlas-1e9376bb3bd90ce5","lat":38.6463763,"location_precision":"exact","lon":-121.4862686,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-sacramento-ca","value":4.0}],"name":"QTS Sacramento","operator":"QTS Data Centers","source_notes":"Confirmed operational, 1100 N Market Blvd, Sacramento, CA 95834, 7-acre campus, 4MW+ critical power.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS facility directory","publisher":"QTS","retrievedAt":"2026-09-21","url":"https://q.com/data-centers/sacramento/"},{"kind":"osm","label":"OpenStreetMap way/194049551","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/194049551"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-sacramento-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/194049551"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/qts-sacramento-osmway-194049551"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/194049551"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"medium","contains_osm":true,"id":"compute_atlas-1eb5a69c9e7dc815","lat":43.6069708,"location_precision":"exact","lon":-96.8091949,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tierpoint-sioux-falls-west-sd","value":1.0}],"name":"TierPoint Sioux Falls - West","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page; address 5300 N La Mesa Dr, Sioux Falls, SD.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/239032142","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/239032142"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/tierpoint-sioux-falls-west-sd"}],"state":"South Dakota","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-1efdca36182ef2b6","lat":35.6944,"location_precision":"approximate","lon":-80.3974,"name":"Long Ferry Road Data Center Campus (Rowan County)","operator":"Undisclosed developer","source_notes":"Developer and end user are not named in the reporting; the parcel was rezoned in fall 2025 to allow data center use. Separate site from the Flexential/Trammell Crow proposal inside Salisbury city limits roughly ten miles away.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/long-ferry-road-rowan-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"likely","city":"Archbald","confidence":"medium","id":"compute_atlas-1f10ab313ea34862","lat":41.5,"location_precision":"approximate","lon":-75.55,"name":"Project Gravity","operator":"Archbald 25 Developer LLC","source_notes":"186 acres, Business Route 6 / Eynon Jermyn Rd. Developer formerly known as Western Hospitality Partners - Jermyn LLC. Up to 6 two-story buildings, 135,000 sq ft each. No tenant signed as of January 2026; removed from PA's Permit Fast Track program May 2026; still awaiting final land development approval. One of three competing proposals in an emerging Lackawanna County cluster (see also Wildcat Ridge and Triboro Industrial Park). Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Plans filed for 1.6 million sq ft data center campus in northeast Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/project-gravity-archbald-lackawanna-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Poughkeepsie","confidence":"medium","contains_osm":true,"id":"compute_atlas-1f25801c7f89042d","lat":41.6603798,"location_precision":"exact","lon":-73.9400178,"name":"IBM Quantum Data Center, Poughkeepsie","operator":"IBM","source_notes":"IBM's quantum computing data center on its Poughkeepsie campus. IBM describes it as operating the highest number of available utility-scale quantum computers at a single location in the world. IBM does not publish electrical capacity, water use, land area or investment for this facility, so those fields are omitted rather than estimated.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/ibm-quantum-data-center-poughkeepsie-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Bristow","confidence":"medium","id":"compute_atlas-1f5445c0f5b371bd","lat":38.746,"location_precision":"approximate","lon":-77.523,"name":"Wellington Road Data Center Campus (Sharpless)","operator":"Sharpless Enterprises LLC","source_notes":"Four data center buildings, an electric substation, auxiliary equipment structures and a small administrative building on 181 acres along the north side of Wellington Road west of Piney Branch Lane, just north of the Jiffy Lube Live amphitheater. The land was previously owned by Atlantic Research Corp, which produced and tested missiles and rockets under Department of Defense contract until 2005. Sharpless Enterprises is a Delaware-registered entity that trade press has linked to Google; that link is reported rather than confirmed by the applicant, so the operator field records the filing entity only.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Army Corps of Engineers greenlights Bristow data center complex","publisher":"InsideNoVa","retrievedAt":"2026-09-09","url":"https://www.insidenova.com/news/business/army-corps-of-engineers-greenlights-bristow-data-center-complex/article_49d8ed9a-dd87-11ee-9f08-d383b6399e7e.html"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/sharpless-wellington-road-bristow-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sterling","confidence":"high","contains_osm":true,"id":"compute_atlas-1f5672dc6290349d","lat":38.997949,"location_precision":"exact","lon":-77.4302306,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-ashburn-ii-va2-va","value":96.0}],"name":"Vantage Ashburn II (VA2)","operator":"Vantage Data Centers","source_notes":"Ashburn II campus: 3 buildings, 800,000 sq ft, 96MW, per Vantage's own facility page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1344901575","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1344901575"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/vantage-ashburn-ii-va2-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701924665"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Charlestown","confidence":"medium","id":"compute_atlas-1f64947cd0b871a0","lat":38.4517,"location_precision":"approximate","lon":-85.67,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qlevr-charlestown-clark-county-in","value":3.0}],"name":"QLEVR Charlestown Data Center","operator":"QLEVR LLC","source_notes":"A 55,000 sq ft, 3 MW facility on 12 acres in Shadow Lake Industrial Park, with a stated 14-16 month construction period. The developer did not request tax abatements and says it will pay for any required utility upgrades.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/qlevr-charlestown-clark-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Red Oak","confidence":"medium","id":"compute_atlas-203508f25da3dbe0","lat":32.5135,"location_precision":"approximate","lon":-96.7282,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://dallasinnovates.com/databank-announces-new-480mw-north-texas-data-center-campus-featuring-eight-two-story-data-centers/","value":480.0}],"name":"Red Oak Campus","operator":"DataBank","source_notes":"292-acre, 8-building campus. Distinct operator/site from Compass Datacenters' separate Red Oak, TX campus (same town, different companies).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Dallas Innovates — DataBank Announces New 480MW North Texas Data Center Campus Featuring Eight Two-Story Data Centers","retrievedAt":"2026-07-25","url":"https://dallasinnovates.com/databank-announces-new-480mw-north-texas-data-center-campus-featuring-eight-two-story-data-centers/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/databank-red-oak-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"compute_atlas-20645fca4834c8f5","lat":41.8422152,"location_precision":"approximate","lon":-87.6689701,"name":"QTS Chicago 1","operator":"QTS Data Centers","source_notes":"30-acre campus; QTS describes a \"Two building facility at full build-out\" with \"Pre-leasing is now available for our second building\". The state report's estimated tax-benefit value is calculated at 6.25% of the $250,000,000 investment commitment, not money already received. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS Chicago data center campus","publisher":"QTS Data Centers","retrievedAt":"2026-09-21","url":"https://q.com/data-centers/chicago/"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (Quality Technology Service (QTS), Chicago, 2021 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-chicago-1-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Madison","confidence":"medium","contains_osm":true,"id":"compute_atlas-206de1344bcbb8a1","lat":43.075033,"location_precision":"approximate","lon":-89.525037,"name":"SupraNet Madison Data Center","operator":"SupraNet Communications, Inc.","source_notes":"SOC 2 Type II carrier-neutral colocation facility in Old Sauk Trails Park on Madison's west side, with on-net access to Spectrum, TDS, AT&T, WIN, Lumen, US Signal and Verizon and no cross-connect fees. Distinct address from every tracked Madison-area site (US Signal WI01 at 222 W. Washington Ave., US Signal WI02/OneNeck at 5515 Nobel Dr. in Fitchburg, EdgeConneX MAD01, Lumen Madison 1).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/supranet-madison-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Belleville","confidence":"high","contains_osm":true,"id":"compute_atlas-20e38fcb4834160f","lat":42.2356076,"location_precision":"approximate","lon":-83.4450278,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-mi03-van-buren-township-mi","value":1.5}],"name":"US Signal MI03 Detroit Data Center","operator":"US Signal","source_notes":"Multi-tenant colocation marketed as 'Detroit' but physically at 9275 Haggerty Road in Van Buren Charter Township (Belleville mailing address), Wayne County. Operator's facility page (retrieved 2026-09-09) states: generators 2,000 kW at 2N, UPS 1,500 kW at 2N, utility 2,500 kVA, HVAC 422 tons N+1, Tier 3, built 2020, 99.999% uptime SLA. As of October 2026, the page also gives a critical IT workload of 1,500 kW, 25,000 total sq ft and 14,000 sq ft of whitespace; the operational capacity records the 1,500 kW critical IT workload, not the generator rating. Cooling medium not stated. Coordinates from Nominatim, which resolved the exact house number; parcel footprint not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-mi03-van-buren-township-mi"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/773848531"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Muncy","confidence":"high","id":"compute_atlas-2130b9c622150d89","lat":41.23,"location_precision":"approximate","lon":-76.804,"name":"Muncy Data Center","operator":"Danko Holdings II","source_notes":"Three-building data center complex (two 14-pod facilities and one eight-pod facility) with water storage/treatment infrastructure along John Brady Drive in Muncy Township, eastern Lycoming County. Site engineering by Livic Civil; applicant Danko Holdings II/Fishlips LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Data center developers want to build in three PA communities. Each has its own experience.","publisher":"Postindustrial","retrievedAt":"2026-09-25","url":"https://postindustrial.com/stories/data-center-developers-want-to-build-in-three-pa-communities-each-has-its-own-experience/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/muncy-data-center-lycoming-county-pa"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/muncy-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"high","contains_osm":true,"id":"compute_atlas-21347d8c941d15fd","lat":41.8533507,"location_precision":"approximate","lon":-87.6183067,"name":"Digital Realty ORD10","operator":"Digital Realty","source_notes":"350 East Cermak Road, Chicago IL. Distinct site from ORD11 (600 S Federal St).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord10"},{"kind":"osm","label":"OpenStreetMap node/10910879064","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/10910879064"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-ord10-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10910879064"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-realty-ord10-osmnode-10910879064"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10910879064"}],"state":"Illinois","status":"operating"},{"ai_classification":"confirmed","city":"El Paso","confidence":"medium","id":"compute_atlas-213e8aa66f38ea63","lat":31.81,"location_precision":"approximate","lon":-106.55,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-el-paso-tx","value":1000.0}],"name":"Meta El Paso AI Data Center Campus","operator":"Meta","source_notes":"Campus located in far Northeast El Paso near Texas-New Mexico state line on approximately 1,000 acres; coordinates are approximate city-area centroid, exact parcel not publicly identified. Meta's third Texas data center. Campus can scale to 1 GW. Construction jobs figure (4,000) reflects updated peak estimate from March 2026 $10B expansion announcement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta breaks ground on El Paso AI-optimized data center","publisher":"Meta","retrievedAt":"2026-07-06","url":"https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/"},{"kind":"press","label":"Meta boosts El Paso investment from $1.5B to $10B","publisher":"CNBC","retrievedAt":"2026-07-06","url":"https://www.cnbc.com/2026/03/26/meta-to-spend-10-billion-on-ai-data-center-in-el-paso-1gw-by-2028.html"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-el-paso-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Pearl City","confidence":"medium","contains_osm":true,"id":"compute_atlas-21775ad4b6ccf88f","lat":21.41146,"location_precision":"approximate","lon":-157.97475,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cogent-pearl-city-waihona-hi","value":0.8}],"name":"Cogent Data Center – Hawaii (96-1402 Waihona Place)","operator":"Cogent Communications","source_notes":"This is a former Sprint facility. Cogent got it from T-Mobile in 2022, when T-Mobile sold its wireline business to Cogent for $1; that is an entity-level deal, not a value for this site. The building is 10,320 sq ft on a 2.5-acre site with 800 kW of power. Carriers on site are Hawaiian Tel, Lumen and Spectrum, and it sits next to an AT&T facility. In March 2025 Cogent listed the building for sale as 'move-in-ready' at an $8M asking price, through Hawaii Commercial Real Estate. As of October 2026, no sale, vacancy or closure was confirmed, so status is operational but confidence is reported. The operational capacity is the stated 800 kW building power, not a measured IT load. Coordinates are the OSM building at this address tagged office=telecommunication.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/cogent-pearl-city-waihona-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Georgetown","confidence":"medium","contains_osm":true,"id":"compute_atlas-218b32a2373d9043","lat":30.6370152,"location_precision":"approximate","lon":-97.6775634,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/","value":25.0}],"name":"Blueprint Data Centers Georgetown","operator":"Blueprint Data Centers","source_notes":"Part of Blueprint's 85 MW, two-site Austin-area plan. As of October 2026, Blueprint's own site lists the Georgetown energization timeline as 2026 and 2027, later than the \"energized by 2026\" in the August 2025 announcement. Coordinates are the Georgetown city point. The abatement jurisdiction is not named in the source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Blueprint Data Centers plans 85MW Austin expansion, energized by 2026","publisher":"Converge Digest","retrievedAt":"2026-10-14","url":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/blueprint-georgetown-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Brookwood","confidence":"medium","id":"compute_atlas-2206ce806355ed68","lat":33.2112238,"location_precision":"approximate","lon":-87.2715693,"name":"Project Brookwood Data Center Campus","operator":"Youngwoo & Associates","source_notes":"New York developer Youngwoo & Associates, doing business locally as Project Brookwood LLC, which already owned 200 acres on the site. Rezoning petition states the intended use is a 'Data Center Campus'. Site plans, a land development permit, building permits and state environmental permitting all remain ahead. Distinct from the adjacent Applied Digital tract. Coordinates are a Brookwood Parkway street-segment geocode near Brookwood Middle School, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meeting Confirms Plans for Second Major Brookwood Data Center","publisher":"Tuscaloosa Thread","retrievedAt":"2026-09-22","url":"https://tuscaloosathread.com/second-brookwood-data-center/"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/youngwoo-project-brookwood-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Columbus","confidence":"medium","id":"compute_atlas-225cb8ceeeb6e484","lat":40.0057597,"location_precision":"approximate","lon":-83.0446845,"name":"State of Ohio Computer Center (SOCC)","operator":"State of Ohio","source_notes":"360,000 sq ft total with 225,000 sq ft of raised-floor computer room, shared by multiple Ohio government agencies on the west end of the Ohio State University campus. The Ohio Supercomputer Center occupies roughly 10,000 sq ft with about 1,200 kW of usable power — that is OSC's allocation, not the building's total, so no capacity is recorded for the building. Street address was not on the cited page; coordinates are an approximate geocode consistent with the cited 'west end of the OSU campus'.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/state-of-ohio-computer-center-columbus-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"McCormick","confidence":"medium","contains_osm":true,"id":"compute_atlas-226ff522d3ff99d4","lat":33.8992855,"location_precision":"approximate","lon":-82.2674735,"name":"Pollard Data Center Site (McCormick County)","operator":"Undisclosed end user (site facilitated by Pollard Lumber Company)","source_notes":"The site is Pollard Lumber Company land between Whitetown Road and Main Street, a few miles from downtown McCormick. The pin is the Whitetown Road segment nearest town, approximate only. Construction is estimated at about 6 years. No end user, MW or investment figure has been disclosed. The chairman said he does not know whether the full project will happen.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/pollard-mccormick-county-data-center-sc"}],"state":"South Carolina","status":"planned"},{"ai_classification":"likely","city":"Gainesville","confidence":"medium","id":"compute_atlas-22791ae541aec1a9","lat":38.78,"location_precision":"approximate","lon":-77.62,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/corscale-gainesville-crossing-va","value":300.0}],"name":"Gainesville Crossing Digital Campus (GCDC)","operator":"Corscale Data Centers (Patrinely / USAA Real Estate)","source_notes":"~130-acre campus on Interstate 66; ~306 MW via an on-site Dominion substation. Distinct from the QTS/Compass 'PW Digital Gateway' site (~2,100 acres at Pageland Lane; tracked separately as of July 2026) — which QTS terminated in July 2026. Capacity recorded at 300 MW per the DCD primary source (a 326 MW figure also circulates). Coordinates are the Gainesville area centroid. The only confirmed money figure is the ~$74.5M 2020 land purchase (a real-estate transaction, not construction capex) -> no investment figure is recorded; no headcount is disclosed; the VA sales-and-use tax exemption is eligibility-gated with no public award.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New hyperscale developer Corscale is behind 300MW Gainesville Crossing campus in Prince William County","publisher":"Data Center Dynamics","retrievedAt":"2026-07-08","url":"https://www.datacenterdynamics.com/en/news/new-hyperscale-developer-corscale-is-behind-300mw-gainesville-crossing-campus-in-prince-william-county/"},{"kind":"press","label":"Digital Gateway data center project dies after final developer withdraws appeal","publisher":"WTOP","retrievedAt":"2026-07-07","url":"https://wtop.com/virginia/2026/07/digital-gateway-data-center-project-dies-after-final-developer-withdraws-appeal/"},{"kind":"other","label":"Gainesville Crossing Digital Campus (GCDC)","publisher":"Affinius Capital","retrievedAt":"2026-07-08","url":"https://affiniuscapital.com/projects/gcdc/"},{"kind":"other","label":"Gainesville Crossing data center complex","publisher":"Coalition to Protect Prince William County","retrievedAt":"2026-07-08","url":"https://protectpwc.org/gainesville-crossing-data-center-complex/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/corscale-gainesville-crossing-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Salem","confidence":"medium","id":"compute_atlas-228f8d91e95b2395","lat":44.88315,"location_precision":"approximate","lon":-122.96941,"name":"Oakline at Mill Creek","operator":"Verrus","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Kotek Directs State to Withdraw Land for Proposed Salem Data Center Site (July 30, 2026) — directs the Department of Administrative Services to terminate the state's contract for the sale of approximately 32 acres at the Mill Creek Corporate Center in southeast Salem","publisher":"Office of the Governor, State of Oregon","retrievedAt":"2026-08-14","url":"https://apps.oregon.gov/oregon-newsroom/OR/GOV/Posts/Post/governor-kotek-directs-state-to-withdraw-land-for-proposed-salem-data-center-site"},{"kind":"press","label":"Massive $5.1B data center proposed for Salem draws praise and pushback — developer Verrus; project 'Oakline at Mill Creek'; $5.1 billion; 75 acres at Mill Creek Corporate Center near Turner Road SE and Deer Park Drive SE; 75 permanent jobs; ~$9M/yr to Salem's general fund and ~$1.5M to the Community Livability Levy; power and water figures not yet disclosed by the company","publisher":"KATU","retrievedAt":"2026-10-12","url":"https://katu.com/news/local/massive-51b-data-center-proposed-for-salem-draws-praise-and-pushback-oregon-environment-local-money-water-energy-local-portland-hillsboro-companies-business-jobs"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/verrus-oakline-mill-creek-salem-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Auburn Hills","confidence":"medium","id":"compute_atlas-22924f1c477ce7e1","lat":42.675,"location_precision":"approximate","lon":-83.215,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.oakland.edu/CCF/","value":26.0}],"name":"Oakland University Campus Computing Facility","operator":"Fairmount Properties (with Oakland University)","source_notes":"Proposed shared university/industry colocation facility on OU's campus (Auburn Hills/Rochester border); site shifted from Parking Lot 35 to Parking Lot 37 to increase distance from a campus hall, a nature preserve, and a Native American heritage site. Cleveland-based Fairmount Properties funds construction, operations, and eventual decommissioning; OU pays nothing and gains an 8x expansion of its own computing capacity. Board of Trustees voted 7-0-1 to proceed into due diligence, design, and construction phases (June 2026); published timeline has due diligence running Oct 2026-June 2027, design July 2027-Fall 2028. Coordinates are an approximate campus-area estimate, not parcel-geocoded. Status as of September 2026, no change: the only 2026 milestone on the university's own timeline is a Board of Trustees authorization to proceed into due diligence and design (June 2026, already before the record's 2026-08-08 basis). A governing-board authorization is not a municipal permit and no construction start is claimed, so the record stays listed as proposed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Infrastructure Project - Oakland University","publisher":"Oakland University","retrievedAt":"2026-09-09","url":"https://www.oakland.edu/CCF/"},{"kind":"press","label":"The Oakland Post — June 2026 BOT: trustees advance data center (20–26 MW; Lot 37; Fairmount Properties with DTE; closed-loop water cooling; 7-0-1 vote 2026-06-26)","publisher":"The Oakland Post","retrievedAt":"2026-09-21","url":"https://oaklandpostonline.com/58898/campus/june-2026-bot-meeting-trustees-vote-to-move-forward-with-data-center-president-ora-pescovitz-declares-it-is-a-project-ou-will-desperately-need/"},{"kind":"press","label":"WDIV — Oakland University moves forward with AI data center project (~15 acres at Parking Lot 37; due diligence from Oct 2026)","publisher":"WDIV ClickOnDetroit","retrievedAt":"2026-09-21","url":"https://www.clickondetroit.com/news/local/2026/06/26/oakland-university-moves-forward-with-ai-data-center-project-amid-campus-opposition/"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/oakland-university-computing-auburn-hills-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Holyoke","confidence":"medium","contains_osm":true,"id":"compute_atlas-229438b49086b8fe","lat":42.1975752,"location_precision":"approximate","lon":-72.600908,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/","value":20.0}],"name":"Chestnut River Holyoke Data Center (former Hampden Papers complex)","operator":"Chestnut River Power and Infrastructure","source_notes":"Status is \"proposed\", not \"cancelled\": Holyoke's City Council voted 9-4 on 2026-06-17 to ban AI data centers above 12 MW, which would bar this 20 MW project as designed, but the developer stated \"We're not closing the door - and we hope Holyoke won't either\" and had neither filed permits nor bought the property. The coordinate is the OSM-mapped former Hampden Paper Co building at the cited address, marked approximate because the proposal covers the wider complex. The 20 MW is the developer's stated figure; $200M is the reported project cost for this site only. Holyoke's ban explicitly exempts the tracked MGHPCC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Daily Hampshire Gazette, 2026-06-17 - Holyoke first in state to ban development of AI data centers; developer Chestnut River, 20 MW, $200M, adaptive reuse of the former mill","publisher":"Daily Hampshire Gazette","retrievedAt":"2026-09-15","url":"https://gazettenet.com/2026/06/17/holyoke-first-in-state-to-ban-development-of-ai-data-centers/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/chestnut-river-holyoke-ma"}],"state":"Massachusetts","status":"planned"},{"ai_classification":"confirmed","city":"Pine Island","confidence":"medium","id":"compute_atlas-22aa2bf8fac590fc","lat":44.2019,"location_precision":"approximate","lon":-92.6496,"name":"Google Project Skyway (Pine Island)","operator":"Google","source_notes":"Google's first Minnesota campus, Pine Island (Goodhue County), powered by Xcel Energy; ~250,000 sq ft initial building for AI applications. Electric Service Agreement pending MPUC approval as of Feb 2026 → proposed. The associated 1,900 MW (1,400 MW wind + 200 MW solar + 300 MW storage) is a new clean-energy build-out, not the data center's IT load — DC capacity not disclosed (omitted). Faces a local legal challenge. Coordinates are the Pine Island area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Xcel Energy to power new Google data center in Minnesota","publisher":"Xcel Energy","retrievedAt":"2026-07-07","url":"https://newsroom.xcelenergy.com/news/xcel-energy-to-power-new-google-data-center-in-minnesota"},{"kind":"press","label":"A new data center in Pine Island, Minnesota","publisher":"Google","retrievedAt":"2026-09-18","url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/data-center-pine-island/"},{"kind":"permit","label":"City of Pine Island — Project Skyway: ~482 acres, ~$36.5M abatement over 28 years, max 152,000 gal/day at full build-out, Xcel Energy as energy provider","publisher":"City of Pine Island, Minnesota","retrievedAt":"2026-09-18","url":"https://pineislandmn.gov/skyway"},{"kind":"press","label":"KTTC — council approves $36,578,343 abatement 5-0; agreement requires \"at least 38 full time, on-site jobs, paying at least $31 an hour\"","publisher":"KTTC","retrievedAt":"2026-09-18","url":"https://www.kttc.com/2026/02/05/pine-island-city-council-approves-financial-incentives-data-center-project/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-skyway-pine-island-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"St. Louis","confidence":"medium","contains_osm":true,"id":"compute_atlas-22cc2bbe242aefbe","lat":38.6292617,"location_precision":"approximate","lon":-90.1971749,"name":"Netrality 210 North Tucker (St. Louis)","operator":"Netrality Data Centers","source_notes":"OSM candidate is a generic unaddressed 'Netrality Data Centers' point in St. Louis; Netrality operates TWO distinct downtown St. Louis carrier hotels (210 North Tucker and 900 Walnut, both ex-Digital Realty, acquired 2016). Resolved to 210 North Tucker as the larger/primary flagship (400,000 sq ft vs 100,000 sq ft) since only one OSM point was supplied, but this is an assumption — recommend the discovery pipeline split this into two explicit candidates (210 N Tucker + 900 Walnut) on a future pass so both real facilities get tracked distinctly.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/42323063","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/42323063"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/netrality-210-north-tucker-st-louis-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Aurora","confidence":"medium","contains_osm":true,"id":"compute_atlas-22e3b82bf690f86d","lat":39.7704988,"location_precision":"approximate","lon":-104.6782723,"name":"Aerotropolis Logistics Center Data Center Campus","operator":"Aerotropolis Industrial Development","source_notes":"The article describes the plan as 'about 500 acres of new data centers' and also as a '1 million-square-foot site'. Those two figures conflict, so neither is recorded. No power or water figures are published, and the developer did not respond to the press. The coordinates are a point on Aerotropolis Pkwy, the site's western boundary road, between 26th and 48th Avenues. They are not a parcel centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/aerotropolis-industrial-development-aurora-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"confirmed","city":"Fayetteville","confidence":"medium","id":"compute_atlas-22e920552c07bb4b","lat":33.4487,"location_precision":"approximate","lon":-84.4549,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-fairwater-fayetteville-ga","value":1500.0}],"name":"Microsoft Fairwater Atlanta (Azure AI Superfactory)","operator":"Microsoft","source_notes":"615-acre, up-to-13-building QTS-built campus on Hwy 54W near Fayetteville, Fayette County (Microsoft's materials say 'Atlanta'). Began operation Oct 2025 as Fairwater 2 — a 'multi-gigawatt' AI campus. ~1,500 MW is the anticipated ultimate Georgia Power load across all buildings (planned figure; ~433 MW cited as initially online). Distinct from Microsoft's smaller Tyrone, GA campus. Two-story design with no UPS or backup generators. Coordinates are the Fayetteville area centroid. Microsoft has not disclosed tenant capex for the Fairwater Fayetteville space; the ~$1B/$6.5B figures are QTS developer build-out estimates for the full multi-tenant campus, and the widely-cited $14.5M abatement / $1.8B / $75M figures attach to different Microsoft/Fulton-County sites (the $75M was FCDA land-sale proceeds, not a subsidy to QTS) -> no investment figure is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"From Wisconsin to Atlanta, Microsoft connects datacenters to build its first AI superfactory","publisher":"Microsoft","retrievedAt":"2026-07-07","url":"https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/"},{"kind":"press","label":"Microsoft launches Atlanta Fairwater data center, two stories, no UPS or gen sets","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/microsoft-launches-atlanta-fairwater-data-center-two-stories-no-ups-or-gen-sets/"},{"kind":"press","label":"Behind Fayette's QTS water controversy: a missed meter, 8,000 workers","publisher":"The Citizen","retrievedAt":"2026-07-08","url":"https://thecitizen.com/2026/05/11/behind-fayettes-qts-water-controversy-a-missed-meter-8000-workers-and-a-massive-construction-project/"},{"kind":"press","label":"Microsoft Fairwater Atlanta: a grid-only gigawatt AI data center","publisher":"Measured AI","retrievedAt":"2026-07-08","url":"https://measuredai.substack.com/p/microsoft-fairwater-atlanta-data-center"},{"kind":"other","label":"Incentives & tax rates","publisher":"Fayette County Development Authority","retrievedAt":"2026-07-08","url":"https://fayettega.org/doing-business/incentives-tax-rates/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-fairwater-fayetteville-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-22ebe4e0b1c193d5","lat":35.0462,"location_precision":"approximate","lon":-78.8394,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prsm-group-cumberland-county-nc","value":225.0}],"name":"PRSM Group Cumberland County AI Data Center (undisclosed industrial park)","operator":"PRSM Group","source_notes":"The developer declined to disclose the site beyond 'an industrial park, not near residences', so coordinates are a Cumberland County-level approximation only. The end user is an unnamed PRSM client, not PRSM itself. Developer said he does not expect the project to advance before a moratorium is enacted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New Data Center Emerges as Cumberland Considers Moratorium","publisher":"CityView (Fayetteville, NC)","retrievedAt":"2026-09-10","url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/prsm-group-cumberland-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"medium","id":"compute_atlas-230e980a7de87ce4","lat":43.5947,"location_precision":"approximate","lon":-96.7193,"name":"TierPoint Sioux Falls - East (SFE)","operator":"TierPoint","source_notes":"Colocation facility listed as 'Now Available'. 16,000+ sq ft total, 4,200+ sq ft raised floor, 8,100+ sq ft business-continuity seating, two 800 kW redundant generators (48-hour minimum runtime), A/B power. Interconnected with TierPoint Sioux Falls - West (already tracked as a separate record) and Omaha. Coordinates are a US Census geocoder match for the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-10","url":"https://www.compute-atlas.com/facilities/tierpoint-sioux-falls-east-sd"}],"state":"South Dakota","status":"operating"},{"ai_classification":"unknown","city":"Mason","confidence":"medium","id":"compute_atlas-233675e12b2770c0","lat":42.582234294066,"location_precision":"approximate","lon":-84.479676261494,"name":"Mason / Vevay Township Data Center (unnamed developer)","operator":"Undisclosed developer (represented by Dykema Gossett PLLC)","source_notes":"Hyperscale proposal on roughly 400 acres of farmland at 3388 W. Columbia Road, currently in Vevay Township and the subject of an annexation petition to the City of Mason. Operator/end user is deliberately recorded as undisclosed: neither the developer nor the eventual tenant has been publicly identified — an attorney at Dykema Gossett PLLC notified city officials in February 2026 on behalf of an unnamed client. Investment: WILX quotes the city manager on a 'minimum investment of a billion dollars' (recorded here); the Baldori Law tracker separately states a 'minimum $500 million taxable investment' — these are different measures (total investment vs taxable base) and the divergence is recorded rather than reconciled. Expected tax capture reported at $7.6 million annually. No megawatt capacity, water figure, or job count is stated in either source, so those fields are omitted. Coordinates from the US Census geocoder for the address in the utility request; parcel boundary not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Michigan Data Center Tracker (updated June 2026)","publisher":"Baldori Law","retrievedAt":"2026-09-09","url":"https://baldorilaw.com/resources/michigan-data-center-tracker"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/mason-columbia-road-data-center-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Holyoke","confidence":"medium","id":"compute_atlas-23595e45a47835e9","lat":42.20285,"location_precision":"exact","lon":-72.60693,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/mghpcc-holyoke-ma","value":15.0}],"name":"Massachusetts Green High Performance Computing Center","operator":"MGHPCC consortium (BU/Harvard/MIT/Northeastern/UMass/Yale)","source_notes":"90,300 sq ft, opened 2012, hydro-powered university research-computing consortium (100 Bigelow St). Explicitly exempted from Holyoke's 2026 data center ban. Houses the MIT Lincoln Laboratory Supercomputing Center (LLSC / TX-GAIA) — recorded as one facility, not two.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"MGHPCC","publisher":"mghpcc.org","retrievedAt":"2026-07-17","url":"https://mghpcc.org/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"MIT CSAIL Infrastructure Group, Holyoke Data Center (MGHPCC) - \"a 15-megawatt utility connection\", \"10 MW is dedicated to computing systems\", \"about 70% of which is sourced locally from hydroelectric facilities on the Connecticut River\", \"90,000-square-foot data center facility\"","publisher":"MIT CSAIL","retrievedAt":"2026-09-21","url":"https://tig.csail.mit.edu/hardware/mghpcc/"},{"kind":"press","label":"Ban, ban, ban: data center discontent reaches western Massachusetts","publisher":"The Shoestring","retrievedAt":"2026-10-24","url":"https://theshoestring.org/2026/07/02/ban-ban-ban-data-center-discontent-reaches-western-massachusetts/"}],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/mghpcc-holyoke-ma"}],"state":"Massachusetts","status":"operating"},{"ai_classification":"unknown","city":"Wrightstown","confidence":"medium","id":"compute_atlas-2363e1ed42cd6b7f","lat":44.3269,"location_precision":"approximate","lon":-88.1631,"name":"Cloverleaf Wrightstown Data Center Inquiry (Village of Wrightstown)","operator":"Cloverleaf Infrastructure","source_notes":"No formal application has been filed and no acreage or megawatt figure has been published for this jurisdiction; this is a live, sourced siting inquiry that the village itself acted on. Village officials denied at spring 2026 meetings that they had seen a proposal; emails later showed communication with Cloverleaf since January 2026. Related to but distinct from the Village of Greenleaf / Town of Wrightstown site Cloverleaf abandoned in January 2026; as of September 2026, whether they are separate parcels was unconfirmed. Coordinates are a municipality-level locator.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Wrightstown hosts public meeting as data centers target village land","publisher":"Spectrum News 1 Wisconsin","retrievedAt":"2026-09-01","url":"https://spectrumnews1.com/wi/milwaukee/news/2026/06/01/data-center-wrightstown-meeting"},{"kind":"press","label":"Wisconsin voters push back on AI data center development","publisher":"Wisconsin Watch","retrievedAt":"2026-09-01","url":"https://wisconsinwatch.org/2026/08/wisconsin-ai-data-center-land-big-tech-wrightstown-voters-opposition-opinion/"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/cloverleaf-wrightstown-village-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"mixed_use","city":"Henrico","confidence":"medium","id":"compute_atlas-236c70295cfe8f25","lat":37.556,"location_precision":"approximate","lon":-77.427,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/iron-mountain-white-oak-henrico-va","value":200.0}],"name":"Iron Mountain White Oak Technology Park Campus","operator":"Iron Mountain","source_notes":"6110 Technology Creek Drive, Henrico County (Richmond metro area). White Oak Technology Park has fiber connections and subsea cables to three continents. Henrico County passed stricter data center requirements June 2025, including 500-foot tree buffer near residential. The investment figure is stated as 'more than $1 billion' — treated as floor.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Iron Mountain acquires 66 acres outside Richmond for 200MW data center campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/iron-mountain-acquires-66-acres-outside-richmond-for-200mw-data-center-campus/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Submission provenance (not controlling source) — Public Evidence record for permit 53266-1","publisher":"Public Evidence Project","retrievedAt":"2026-07-30","url":"https://publicevidence.org/records/iron-mountain-information-management-llc-air-permit-53266-1"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/iron-mountain-white-oak-henrico-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Jessup / Olyphant","confidence":"medium","id":"compute_atlas-23821ef2162857e2","lat":41.45,"location_precision":"approximate","lon":-75.58,"name":"Triboro Industrial Park / Triboro Commerce Park","operator":"Ercor Triboro LLC (Sansone Group)","source_notes":"Jessup/Olyphant border. Converted from a 4-warehouse plan to up to 9 proposed data centers; ~$80M land acquisition; first building targeted 2027. Rezoning/litigation resolved via an Olyphant Borough Council settlement. PPL confirmed a transmission project is being built to serve it but would not name the customer (NDA). One of three competing proposals in the Lackawanna County cluster (see also Project Gravity and Wildcat Ridge). Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"The Times-Tribune — \"Firm linked to DeNaples challenges Olyphant over data center zoning\" (corroborated by lackawannacounty.com settlement coverage)","retrievedAt":"2026-07-26","url":"https://www.thetimes-tribune.com/2026/04/29/firm-linked-to-denaples-challenges-olyphant-over-data-center-zoning/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/triboro-industrial-park-jessup-olyphant-lackawanna-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Richmond","confidence":"high","contains_osm":true,"id":"compute_atlas-238c9ca7c8b905f9","lat":37.6468902,"location_precision":"exact","lon":-77.4386952,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-richmond-ric01-02-va","value":2.8}],"name":"Flexential Richmond (RIC01/02)","operator":"Flexential","source_notes":"Address 8851 Park Central Dr, Richmond, VA 23227. Distinct from Mountain Road Technology Park (different operator, 10km away).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential official facility page (corroborated by DataCenterJournal RIC01/02 listing)","publisher":"Flexential","retrievedAt":"2026-09-21","url":"https://www.flexential.com/data-centers/va/richmond/data-center"},{"kind":"osm","label":"OpenStreetMap way/257581364","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/257581364"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-richmond-ric01-02-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/257581364"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-richmond-osmway-257581364"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/257581364"}],"state":"Virginia","status":"operating"},{"ai_classification":"mixed_use","city":"Oak Ridge","confidence":"medium","contains_osm":true,"id":"compute_atlas-244f83acab9986c1","lat":35.92951,"location_precision":"approximate","lon":-84.31057,"name":"Oak Ridge Leadership Computing Facility (Frontier supercomputer)","operator":"Oak Ridge National Laboratory (UT-Battelle for the U.S. Department of Energy)","source_notes":"DOE Office of Science user facility housing Frontier (exascale HPC used for simulation and AI training/analysis) and, from 2028, the Discovery supercomputer for the DOE Genesis Mission. Facility power draw and floor area are not stated on the fetched pages, so no capacity is asserted. Distinct from the tracked DOE Oak Ridge Reservation AI data center lease sites.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node 10648552506: 'Frontier (supercomputer)', operator Oak Ridge National Laboratory, telecom=data_center","publisher":"OpenStreetMap","retrievedAt":"2026-09-21","url":"https://www.openstreetmap.org/node/10648552506"},{"kind":"press","label":"Call for Proposals Open to Develop Discovery Supercomputer's First Science Applications (OLCF, Jan 12, 2026) — Discovery arriving in 2028 at ORNL","publisher":"Oak Ridge Leadership Computing Facility / ORNL","retrievedAt":"2026-09-21","url":"https://www.olcf.ornl.gov/2026/01/12/call-for-proposals-open-to-develop-discovery-supercomputers-first-science-applications/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ornl-oak-ridge-leadership-computing-facility-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Evans","confidence":"medium","id":"compute_atlas-248edcbcdad44f39","lat":33.5313102,"location_precision":"approximate","lon":-82.2563979,"name":"Google Evans Data Center","operator":"Google","source_notes":"Announced by Google in 2026 as a planned new Georgia data center. Google names only the county; the coordinate is the Columbia County centroid (approximate) and no city has been disclosed. No capacity or investment figure published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/google-columbia-county-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"confirmed","city":"Windsor","confidence":"medium","id":"compute_atlas-24a5e89e0ac73ec5","lat":40.4653149,"location_precision":"approximate","lon":-104.909,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/global-ai-windsor-co","value":27.5}],"name":"Global AI Windsor Data Center (former Kodak/Carestream campus)","operator":"Global AI","source_notes":"Global AI, a New York-based firm, bought a 438-acre former Kodak/Carestream property in unincorporated Weld County near Windsor in November 2025 and is developing a 41-acre data center on it. Phase 1 is stated at 27.5 MW with an ambition to reach 1 GW; no timeline for later phases has been shared. The company says it plans to operate the site alongside Nvidia and Humain. Coordinates are approximate (former Kodak campus, Eastman Park Drive area), not parcel-confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Weld County commissioners approve permit for Global AI data center","publisher":"KUNC","retrievedAt":"2026-09-30","url":"https://www.kunc.org/news/2026-09-12/weld-county-commissioners-approve-permit-for-global-ai-data-center"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/global-ai-windsor-co"}],"state":"Colorado","status":"under construction"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-24b72413a6e80741","lat":42.0039,"location_precision":"approximate","lon":-87.9703,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ta-realty-elk-grove-village-il","value":250.0}],"name":"TA Realty Elk Grove Village Data Center","operator":"TA Realty","source_notes":"Four-building, 1.183 million sq ft development east of Elmhurst Road and south of Old Higgins Road; the approved plan includes an electrical substation expansion. Single-source; no end tenant named.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/ta-realty-elk-grove-village-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"likely","city":"Oregon","confidence":"medium","id":"compute_atlas-24fe6d7f35b4dba5","lat":41.649,"location_precision":"approximate","lon":-83.4614,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/oregon-industrial-park-data-center-lucas-oh","value":500.0}],"name":"Oregon Industrial Park Data Center Campus","operator":"Capacity LLC","source_notes":"Proposed ~168-acre, up-to-8-building data-center campus at Wynn Rd & Corduroy Rd in the Oregon Industrial Park (Toledo area) — as of August 2026, Lucas County's first tracked site. The city assembled parcels for site developer Capacity LLC (~$2–3B, ~500 MW at build-out); in late July 2026 officials publicly named Vantage Data Centers as the prospective developer, but the city administrator said no decisions are finalized and a citizen group ('United Neighbors of Oregon') is petitioning for a November 2026 referendum. The record is marked reported because the prospective developer is not settled and the project is unbuilt; coordinates approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of Oregon official Q&A: ~168 acres at Wynn/Corduroy Rds, up to 8 buildings, ~500 MW at build-out, $2–3B, developer Capacity LLC","publisher":"City of Oregon, OH","retrievedAt":"2026-09-21","url":"https://oregonohio.org/oregon-industrial-park-information-on-data-centers/"},{"kind":"press","label":"13abc (2026-07-29): Oregon officials name Vantage Data Centers as prospective developer; no decision finalized; citizen referendum petition underway","publisher":"13abc WTVG","retrievedAt":"2026-08-05","url":"https://www.13abc.com/2026/07/29/oregon-officials-eye-vantage-data-centers-proposed-development-near-wynn-corduroy-roads/"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/oregon-industrial-park-data-center-lucas-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Portland","confidence":"high","contains_osm":true,"id":"compute_atlas-2518c5d08d578c23","lat":45.5318147,"location_precision":"exact","lon":-122.6839805,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://h5datacenters.com/portland-data-center.html","value":2.0}],"name":"H5 Data Centers Portland","operator":"H5 Data Centers","source_notes":"42,000 SF carrier-neutral colocation facility in Portland's Pearl District with N+1 CRAC cooling, N+1 UPS, 2 MW of generator backup and 48-hour diesel runtime. H5 publishes no critical IT-load figure. No H5 site is currently tracked in Oregon.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"H5 Data Centers Portland data center (42,000 SF, 1233 NW 12th Avenue)","publisher":"H5 Data Centers","retrievedAt":"2026-09-21","url":"https://h5datacenters.com/portland-data-center.html"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/h5-data-centers-portland-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13748555787"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/h5-dc-portland-osmnode-13748555787"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13748555787"}],"state":"Oregon","status":"operating"},{"ai_classification":"confirmed","city":"Wisconsin Rapids","confidence":"medium","id":"compute_atlas-25af7b9f8282d659","lat":44.3917589,"location_precision":"approximate","lon":-89.8228767,"name":"DPO Wisconsin Rapids AI Computing Facility","operator":"Digital Power Optimization","source_notes":"Pre-development funded by an investor consortium led by Salutem Capital; Stantec providing engineering support. As of October 2026, the announcement gives no exact street address or acreage; BizTimes Milwaukee reports plans for \"approximately 10 acres of land in Wisconsin Rapids\", located \"near downtown Wisconsin Rapids along Highway 34\". Coordinates are the Wisconsin Rapids city geocode. As of October 2026, the cited sources are the announcement and a BizTimes Milwaukee report that attributes the project to a company announcement, so no independent reporting is cited and the record is marked reported. The announcement says the project \"will enable up to 20 megawatts of AI computing\"; as a ceiling, that is not recorded as planned capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center developer plans $200 million project in Wisconsin Rapids (up to 20 MW, ~10 acres, power from Consolidated Water Power Company, 50-year land lease)","publisher":"BizTimes Milwaukee","retrievedAt":"2026-09-13","url":"https://biztimes.com/data-center-developer-plans-200-million-project-in-wisconsin-rapids/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/dpo-wisconsin-rapids-hpc-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Gaffney","confidence":"medium","contains_osm":true,"id":"compute_atlas-25d1877672678ced","lat":35.0666365,"location_precision":"approximate","lon":-81.5576062,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://scbiz.com/cielo-2b-data-center-cherokee-county/","value":300.0}],"name":"Cielo Digital Infrastructure Gaffney Campus","operator":"Cielo Digital Infrastructure, LLC","source_notes":"Announcement describes four buildings of roughly 400,000 sq ft each plus an associated electrical substation, at '000 Ford Road, Gaffney'. Initial operations expected online by year-end 2028. Coordinates are an approximate geocode of Ford Road — no parcel-level location was published. As of October 2026, the state announcement states no capacity. Trade coverage gives a full-build-out figure of 300 MW: SCBiz, citing Data Center Dynamics, says the site could total 300 megawatts when built out, and DC Byte lists the same figure. The planned capacity records that trade-coverage figure. SCBiz and DC Byte both describe the site as 86 acres, which is the recorded land area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cielo Digital Infrastructure selects Cherokee County for first South Carolina development project","publisher":"Office of the Governor of South Carolina","retrievedAt":"2026-08-26","url":"https://governor.sc.gov/news/2025-06/cielo-digital-infrastructure-selects-cherokee-county-first-south-carolina-development"},{"kind":"other","label":"Digital infrastructure company to invest $2.1B in Cherokee County data center","retrievedAt":"2026-09-10","url":"https://scbiz.com/cielo-2b-data-center-cherokee-county/"},{"kind":"other","label":"Gaffney facility profile (Cielo Digital Infrastructure)","publisher":"DC Byte","retrievedAt":"2026-10-27","url":"https://www.dcbyte.com/facility/gaffney/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cielo-gaffney-cherokee-county-sc"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Peosta","confidence":"medium","id":"compute_atlas-261fef3aca8a70a8","lat":42.4508,"location_precision":"approximate","lon":-90.8501,"name":"Karis Peosta Data Center Site (south of U.S. 20)","operator":"Karis","source_notes":"This is an informal concept, not a formal application. Peosta (extended six-month pause) and Dubuque County (one-year pause) both have data center moratoria. Distinct from the separately tracked Karis 420-acre site near Dubuque Regional Airport. The point is approximate, at the city level.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developers scouting multiple data center sites in Dubuque County","publisher":"Telegraph Herald","retrievedAt":"2026-10-28","url":"https://www.telegraphherald.com/news/tri-state/article_254d3b68-c566-4795-aeb5-4e266b9aa72c.amp.html"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/karis-peosta-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","contains_osm":true,"id":"compute_atlas-26423fb1d31635ae","lat":33.3520091,"location_precision":"approximate","lon":-111.6475291,"name":"EdgeConneX Mesa Campus (PHX11 / 3302 S Hawes Rd)","operator":"EdgeConneX","source_notes":"Candidate labeled 'PHX02' but no official EdgeConneX page uses that code; press/industry sources refer to this Mesa campus as PHX11. Under construction per DCD and ConnectCRE reporting, targeting >1M sq ft across 3 buildings, on-site substation, completion target ~2027. Official name resolved to the address-based description rather than an unverified 'PHX02' label.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"DatacenterDynamics: EdgeConneX files for new 1M sq ft data center campus in Mesa, Arizona","publisher":"EdgeConneX","retrievedAt":"2026-07-22","url":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-for-new-1-million-sq-ft-data-center-campus-in-mesa-arizona/"},{"kind":"osm","label":"OpenStreetMap way/1015704066","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1015704066"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/edgeconnex-mesa-campus-phx11-3302-s-hawes-rd-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Nikiski","confidence":"medium","id":"compute_atlas-26cdcb26b93a90dc","lat":60.6903,"location_precision":"approximate","lon":-151.2889,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.adn.com/business-economy/2026/08/19/underwater-data-center-proposed-for-alaskas-cook-inlet-by-east-coast-company/","value":100.0}],"name":"Cook Inlet Subsea-Compute & Infrastructure Hub","operator":"DeepGreen Cook Inlet SPV LLC","source_notes":"The plan calls for 66 modular data-center pods in a 1,650-acre seabed envelope west of Nikiski (East Foreland corridor), 45-166 ft deep, with a 3.5-mile cable to a Nikiski landing. Only preliminary studies are proposed (about $4.5M over 4 years). The pin is the Nikiski hamlet; the site is offshore to the west.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Underwater data center proposed for Alaska's Cook Inlet by East Coast company","publisher":"Anchorage Daily News","retrievedAt":"2026-09-28","url":"https://www.adn.com/business-economy/2026/08/19/underwater-data-center-proposed-for-alaskas-cook-inlet-by-east-coast-company/"}],"updated":"2026-09-28","url":"https://www.compute-atlas.com/facilities/deepgreen-cook-inlet-nikiski-ak"}],"state":"Alaska","status":"planned"},{"ai_classification":"mixed_use","city":"Appling","confidence":"medium","id":"compute_atlas-26d6228abbedb329","lat":33.6,"location_precision":"approximate","lon":-82.28,"name":"White Oak Technology Park","operator":"Trammell Crow Company (CBRE subsidiary)","source_notes":"8.076M sq ft across up to 29 buildings; 10-year build-out. Zoning rezoned to S-1 (Feb 2026), the first of several required approval steps. Described as a mixed-use tech park (data centers, R&D, cybersecurity), not AI-branded. A second, separate 'Pumpkin Technology Campus' was approved at the same Feb 2026 hearing in nearby Harlem, Columbia County GA - as of October 2026, it is tracked as its own record, which lists Cloverleaf Infrastructure as operator. Coordinates are approximate (near Augusta).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Plans filed for 8 million sq ft data center and technology park outside Augusta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-8-million-sq-ft-data-center-and-technology-park-outside-augusta-georgia/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/white-oak-technology-park-columbia-county-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Stronach","confidence":"medium","contains_osm":true,"id":"compute_atlas-26f81ff807f7ed28","lat":44.2119349,"location_precision":"approximate","lon":-86.171785,"name":"Stronach Township Data Center (Stronach Road)","operator":"Tondu Corporation","source_notes":"Coordinates are a township-level geocode, not the parcel. Gander Newsroom reports a temporary township moratorium on data center development was subsequently adopted; no capacity, investment or end user has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Stronach Township residents voice concerns about proposed data center development","publisher":"UpNorthLive (WPBN/WTOM)","retrievedAt":"2026-09-14","url":"https://upnorthlive.com/newsletter-daily/stronach-township-residents-voice-concerns-about-proposed-data-center-development-manistee-water-power-grid"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-14","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/tondu-stronach-township-manistee-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"compute_atlas-2744d462fe5b283b","lat":38.56070838764574,"location_precision":"approximate","lon":-77.78314256153212,"name":"Gigaland Data Centers","operator":"Gigaland LLC","source_notes":"The record is listed as proposed. The original 202-acre application, about 2.2 million sq ft, was withdrawn in August 2025. The Piedmont Environmental Council, an advocacy group, reports a revised application renamed Remington Digital Campus: just over 200 acres, six data center buildings totaling nearly one million square feet. The Fauquier County Planning Commission voted 4-1 on July 16, 2026 to recommend that the Board of Supervisors deny it, and the Board could vote as early as September 2026. As of October 2026, no fetched source states the Board's decision.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/gigaland-data-centers-remington-fauquier-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Huntsville","confidence":"medium","id":"compute_atlas-2771bc024e3e7eac","lat":34.73652,"location_precision":"exact","lon":-86.6731271,"name":"Alabama Supercomputer Center","operator":"Alabama Supercomputer Authority","source_notes":"State-funded research computing facility in Cummings Research Park, operated by the Alabama Supercomputer Authority (a state corporation founded in 1989) alongside the Alabama Research and Education Network. The building spans nearly 24,000 square feet and houses the authority's Security Operations Center, Network Operations Center, Data Recovery Center, data center and operations offices. ASA's business office is at 445 Dexter Avenue, Montgomery - the same street address as the separately tracked RSA Dexter Avenue Datacenter, which is a different facility. Power and cooling capacity are not published. Single-source record: the operator's own facility page. Coordinate is the OpenStreetMap feature at the stated address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Alabama Supercomputer Center","publisher":"Alabama Supercomputer Authority","retrievedAt":"2026-09-15","url":"https://asc.edu/alabama-supercomputer-center"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/alabama-supercomputer-center-huntsville-al"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"El Dorado","confidence":"medium","id":"compute_atlas-282c29ba9c2d51c9","lat":33.207042,"location_precision":"approximate","lon":-92.6137253,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/paradox-data-union-county-campus-el-dorado-ar","value":150.0}],"name":"Paradox Data Union County Campus","operator":"Paradox Data LLC (definitive agreement for acquisition by Z Squared Inc.)","source_notes":"About 8 MW is already energized. Entergy told the Democrat-Gazette Paradox is not a data center. Closing of the Z Squared deal was not confirmed. Coordinates were geocoded from the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Z Squared Inc. Signs Definitive Agreement to Acquire 100% of Paradox Data and Its Union County Campus","publisher":"Finviz (company press release)","retrievedAt":"2026-10-18","url":"https://finviz.com/news/375817/z-squared-inc-signs-definitive-agreement-to-acquire-100-of-paradox-data-and-its-union-county-campus"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/paradox-data-union-county-campus-el-dorado-ar"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"Andrews","confidence":"medium","id":"compute_atlas-28510f71a1500148","lat":32.3187,"location_precision":"approximate","lon":-102.5457,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cipher-stingray-andrews-county-tx","value":100.0}],"name":"Cipher Stingray HPC Data Center","operator":"Cipher Digital","source_notes":"Cipher's Stingray HPC/AI data center site, ~250 acres in Andrews County, Texas (west of the city of Andrews). Conditional ERCOT interconnection approval up to 100 MW; targeted energization H1/Q2 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline. Cipher rebranded from Cipher Mining to Cipher Digital during its pivot to hyperscale HPC/AI hosting. Coordinates approximate (Andrews, TX geocode; exact parcel not confirmed). Cipher Mining was renamed Cipher Digital.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DCD — Cipher acquires Stingray, 250 acres in Andrews County (west of Andrews), 100 MW front-of-the-meter, energize Q2 2026","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/"}],"updated":"2026-07-25","url":"https://www.compute-atlas.com/facilities/cipher-stingray-andrews-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-287c95829fb0bb5f","lat":38.17,"location_precision":"approximate","lon":-87.32,"name":"Project Zora","operator":"Undisclosed","source_notes":"Developer and end user are not named; the developer said it expects to identify the end user by the end of 2026. Commissioners reportedly said the site is 'south of Lynnville' but did not know its exact location, so the coordinates are a rough approximation. No vote, NDA or approval has occurred.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Warrick County Commissioners schedule special meeting on data center zoning","publisher":"WFIE 14 News","retrievedAt":"2026-10-16","url":"https://www.14news.com/2026/07/31/warrick-county-commissioners-schedule-special-meeting-data-center-zoning/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/project-zora-warrick-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Louisville","confidence":"medium","contains_osm":true,"id":"compute_atlas-2897095bf36a6c12","lat":38.2044592,"location_precision":"approximate","lon":-85.8420564,"name":"Dermody Properties Kramers Lane Data Center","operator":"Dermody Properties (DPIF4 KY 6 KRAMERS, LLC)","source_notes":"Dermody Properties received approval in May 2024 to develop this 20-acre site as a 350,000 sq ft distribution warehouse; the building remains vacant and the revised plan would convert it to a data center, repurposing the tractor-trailer loading dock area for generator equipment and adding an on-site electrical substation, perimeter fencing and guard shacks. The plans do not name the technology company that would operate the facility, and no capacity figure has been published. Distinct from the PowerHouse/Poe Camp Ground Road campus already tracked, which is about 1.5 km away in the same council district. Coordinates are a geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/dermody-kramers-lane-louisville-jefferson-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"medium","id":"compute_atlas-28ce6c86e744b64d","lat":35.05,"location_precision":"approximate","lon":-106.54,"name":"Sandia National Laboratories 725E High-Performance Computing Data Center","operator":"Sandia National Laboratories (U.S. Department of Energy / NNSA)","source_notes":"Federal HPC data center housing the Astra and Vanguard systems. The cited source does not state floor area or IT power capacity, so capacity and land area are omitted. Coordinate is an approximate anchor on Sandia's Albuquerque campus at Kirtland AFB, not a building-level point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/sandia-725e-hpc-data-center-albuquerque-nm"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Southfield","confidence":"medium","id":"compute_atlas-296ae75e09cc5c0a","lat":42.4477475,"location_precision":"approximate","lon":-83.2562243,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-mi04-southfield-mi","value":0.25}],"name":"US Signal MI04 Detroit Data Center","operator":"US Signal","source_notes":"Multi-tenant colocation in Southfield, distinct from US Signal MI05 (Auburn Hills). Operator's facility page (retrieved 2026-09-09) states: generator 800 kW at 2N, UPS 250 kW at 2N, utility 1,500 kVA, HVAC 160 tons N+1, Tier 2, 99.995% uptime SLA, building constructed 1972 and renovated 2017 and 2024, seven on-net carriers. As of October 2026 the same page also gives a critical IT workload of 250 kW, which is recorded as the operational capacity; the generator, UPS and utility figures are electrical-plant ratings. Cooling medium not stated. Coordinates geocoded from the street address on the operator's page; parcel not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-mi04-southfield-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"high","contains_osm":true,"id":"compute_atlas-29850725bd3a9089","lat":39.0259023,"location_precision":"exact","lon":-77.4144697,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-nva1-nva2-nva3-sterling-va","value":48.0}],"name":"CyrusOne NVA1, NVA2 & NVA3 (Sterling)","operator":"CyrusOne","source_notes":"Confirmed 14-acre enterprise-class campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/435324552","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/435324552"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cyrusone-nva1-nva2-nva3-sterling-va"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/701930919","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/701930919"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cyrusone-nva8-sterling-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/435324552"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-nva1-nva2-nva3-osmway-435324552"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/435324552"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701930919"}],"state":"Virginia","status":"operating"},{"ai_classification":"likely","city":"Moncks Corner","confidence":"medium","id":"compute_atlas-29b2b45959714a46","lat":33.072101,"location_precision":"approximate","lon":-80.039105,"name":"Google Berkeley County Data Center (Moncks Corner)","operator":"Google","source_notes":"Google's flagship South Carolina data center in the Mount Holly / Moncks Corner area of Berkeley County — one of Google's first U.S. data centers, operational since 2007, expanded since. Google states $13B+ invested in South Carolina since 2007 (a statewide figure spanning Berkeley + the Dorchester County sites, not site-specific). Distinct from the Google Ridgeville (Project Dawson) and St. George (Winding Woods) campuses, which are in Dorchester County and tracked separately as of September 2026. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of a disclosed campus address. As of 2026-09-10, Google's own current data-center site still describes the Berkeley County/Moncks Corner facility as one of Google's active South Carolina facilities, consistent with the record being listed as operational. No new capacity, water/cooling, street address, land acreage, jobs, subsidies, or community data was found for this specific site in targeted checks of Santee Cooper's newsroom, generation-projects, board-meetings, IRP, and economic-development pages; Berkeley County's own government site (not retrievable as of September 2026); SC Governor's newsroom; SC Commerce newsroom; scbiz.com; and Google's own site (no per-site address/capacity breakdown -- Google groups all three SC facilities under one page). Santee Cooper's board-meetings page appears to render minutes/agendas via a JS document-management widget, so as of September 2026 its content had not been checked.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google signs 225MW solar energy deal with Sol Systems for North & South Carolina","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/google-signs-225mw-solar-energy-deal-with-sol-systems-for-north-south-carolina/"},{"kind":"press","label":"S.C. Governor Henry McMaster — Google grows South Carolina footprint with new Dorchester County operations, expansion in Berkeley County","retrievedAt":"2026-07-25","url":"https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/google-moncks-corner-sc"}],"state":"South Carolina","status":"operating"},{"ai_classification":"confirmed","city":"New Albany","confidence":"medium","id":"compute_atlas-29cbbc01f8b4778b","lat":40.10608,"location_precision":"exact","lon":-82.81578,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-columbus-new-albany-oh","value":24.0}],"name":"Edged Columbus","operator":"Edged (an Endeavour company)","source_notes":"Operational since its September 10-11, 2025 grand opening. 206,000 sq ft, two-story, 14-acre site with 24 MW of critical (IT) capacity per Edged's own release. Purpose-built for AI training and inference; supports up to 70 kW/rack air-cooled and 200 kW/rack liquid-cooled. Uses the ThermalWorks waterless cooling system (design PUE ~1.15). Adjacent parcel 222-001945 (7270 New Albany-Condit Rd, commercial vacant land) is future expansion land, not part of this operational record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New Albany welcomes $246 million Edged Data Center promising water, energy efficiency","publisher":"Columbus Dispatch (syndicated)","retrievedAt":"2026-07-18","url":"https://bluewaterhealthyliving.com/news/national-news/ohio/new-albany-welcomes-246-million-edged-data-center-promising-water-energy-efficiency/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/edged-columbus-new-albany-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"medium","contains_osm":true,"id":"compute_atlas-29de6b6909e7ce3c","lat":41.4999095,"location_precision":"approximate","lon":-93.8098423,"name":"Microsoft Project Ruthenium Data Center","operator":"Microsoft","source_notes":"Planned 6th Microsoft hyperscale campus in the WDM area - along Veterans Parkway at Woodland Ave, 'just west of Osmium.' Would be Microsoft's first Madison County site (4th distinct county for Microsoft in the WDM area, after Polk/Dallas/Warren). Widely-reported $210M phase-1 investment / 113 MW / 245,000 sq ft first building figures (businessrecord.com, AOL/Yahoo condensed versions) had not been independently confirmed from a direct read as of August 2026 (businessrecord.com and DCD could not be retrieved) and are not recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Microsoft Ruthenium Data Center - Go West Des Moines","publisher":"Go West Des Moines (city economic development)","retrievedAt":"2026-08-08","url":"https://gowestdesmoines.com/portfolio-works/microsoft-ruthenium-data-center/"}],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/microsoft-ruthenium-west-des-moines-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-2a21b45b51635d38","lat":39.8895,"location_precision":"approximate","lon":-111.862,"name":"DCPC Data Center Campus (north of Mona)","operator":"DCPC","source_notes":"Large two-building data center of about 1 million sq ft, north of Mona, per the applicant (Jon Jensen). Parcels XB00-1436-1 and XB00-1436-2 are in Section 5, T11S R1E. The coordinates are approximated from the PLSS section. This record is not confirmed to be related to Data Center Power Company's Summit Ridge project in Santaquin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Public Hearing Notice: Conditional Use Permit made by DCPC","publisher":"Juab County","retrievedAt":"2026-10-13","url":"https://juabcounty.gov/notice-public-hearing-notice-conditional-use-permit-made-by-dcpc/"},{"kind":"permit","label":"Juab County Planning Commission Minutes, Nov 19, 2025","publisher":"Juab County","retrievedAt":"2026-10-13","url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/dcpc-mona-juab-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Floydada","confidence":"medium","contains_osm":true,"id":"compute_atlas-2a373ed404f76a57","lat":33.983972,"location_precision":"approximate","lon":-101.3344603,"name":"Amazon Data Services Floydada Data Center","operator":"Amazon Data Services, Inc.","source_notes":"The investment figure covers this one TDLR-registered building. Trade coverage describes a multi-building 'Horizon Junction' campus on County Road 241, but those added buildings were not read on a primary page. A TDLR registration does not confirm construction has begun. Coordinates are the Floydada city point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/amazon-floydada-floyd-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Cedar Rapids","confidence":"medium","id":"compute_atlas-2a48c9f41a0d2048","lat":41.932,"location_precision":"approximate","lon":-91.718,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-cedar-rapids-ia","value":1050.0}],"name":"QTS Cedar Rapids Data Center Campus","operator":"QTS Data Centers","source_notes":"Coordinates approximate for Big Cedar Industrial Center; parcel is adjacent to Google's campus in the same 1,391-acre industrial park. $10B investment is total planned across 7 phases over up to 25 years; minimum $250M per phase, each requiring a 300,000 sq ft building. 7 buildings planned at full build-out. Permanent jobs figure is minimum per phase. QTS Co-CEO Tag Greason stated the completed seven-building campus will ultimately draw about 1,050 MW of power from Alliant Energy (planned, full build-out). QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City of Cedar Rapids, Alliant Energy, and QTS Collaborate on New Data Center Campus","publisher":"City of Cedar Rapids","retrievedAt":"2026-07-06","url":"https://cedar-rapids.org/news_detail_T6_R2180.php"},{"kind":"press","label":"QTS breaks ground on data center campus in Iowa","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/qts-breaks-ground-on-data-center-campus-in-iowa/"},{"kind":"press","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/qts-cedar-rapids-ia"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Avondale","confidence":"medium","id":"compute_atlas-2a68a2c269f032be","lat":33.44,"location_precision":"approximate","lon":-112.35,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prime-avondale-az","value":240.0}],"name":"Avondale Campus","operator":"Prime Data Centers","source_notes":"5-building, 66.5-acre campus; groundbreaking on first 3 buildings May 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prime Data Centers breaks ground on three buildings at its 240MW Phoenix campus, advancing $3 billion investment in Avondale","publisher":"Prime Data Centers","retrievedAt":"2026-09-10","url":"https://primedatacenters.com/news/prime-data-centers-breaks-ground-on-three-buildings-at-its-240mw-phoenix-campus-advancing-3billion-dollar-investment-in-avondale/"},{"kind":"other","label":"Prime Data Centers PHX01 tech sheet — spec table: 'UTILITY PROVIDER SRP', 'ACRES 66.5', 'CRITICAL IT LOAD 240MW'; 'a closed-loop cooling system engineered for zero process water use during operations'","retrievedAt":"2026-08-31","url":"https://primedatacenters.com/wp-content/uploads/2025/10/PDC_Phoenix_TechSheet_PHX01_04.pdf"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/prime-avondale-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"likely","city":"Abernathy","confidence":"medium","id":"compute_atlas-2a6a0b865ab8ab5d","lat":33.84,"location_precision":"approximate","lon":-101.84,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/","value":540.0}],"name":"Aligned Data Centers Project Caprock","operator":"Aligned Data Centers","source_notes":"Six facilities totaling 1.65 million sq ft across 313 acres. Largest data center groundbreaking in West Texas at time of announcement. TeraWulf separately targeting a data center campus in Abernathy for Fluidstack. Coordinates corrected: Abernathy TX is at approximately 33.84°N, 101.84°W; original record had longitude −101.55 which is ~15 miles east of the city.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Aligned breaks ground on Project Caprock 540 MW campus in Hale County","publisher":"Aligned Data Centers","retrievedAt":"2026-07-06","url":"https://aligneddc.com/press-release/aligned-breaks-ground-on-project-caprock/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aligned-project-caprock-hale-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Akron","confidence":"medium","id":"compute_atlas-2afa03142c70cfd5","lat":41.0876,"location_precision":"approximate","lon":-81.5183,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cogent-akron-summit-county-oh","value":5.0}],"name":"Cogent Data Center Akron","operator":"Cogent Communications","source_notes":"Located in the Cascade Valley neighborhood. Capacity (5.0 MW total / 4.41 MW usable) is press-sourced (Avison Young sale/lease listing via Data Center Dynamics/SDxCentral, Feb 2025), not disclosed on Cogent's own operator page. The facility was marketed for sale/lease as of Feb 2025 (asking $44.1M -- a real-estate listing price, not a capex investment figure) but was confirmed not part of Cogent's June 2026 10-facility sale to I Squared Capital; Cogent's own site continues to advertise active colocation service here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Where 7 data centers operate in Summit County and why it matters","publisher":"Signal Akron","retrievedAt":"2026-08-02","url":"https://signalakron.org/where-7-data-centers-operate-in-summit-county-and-why-it-matters/"}],"updated":"2026-08-02","url":"https://www.compute-atlas.com/facilities/cogent-akron-summit-county-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Tulsa","confidence":"medium","id":"compute_atlas-2b0f0820c6528f47","lat":36.1512,"location_precision":"approximate","lon":-95.9903,"name":"Tulsa Technology Exchange","operator":"Facility Gateway Corporation","source_notes":"Downtown Tulsa carrier/colocation exchange at 509 South Boston Avenue. Single-sourced. Coordinates are an approximate geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/tulsa-technology-exchange-tulsa-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Rocky Mount","confidence":"medium","id":"compute_atlas-2b26b307e9415c51","lat":35.941,"location_precision":"approximate","lon":-77.734,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/energy-storage-solutions-kingsboro-edgecombe-county-nc","value":900.0}],"name":"Kingsboro AI Data Center Campus","operator":"Energy Storage Solutions","source_notes":"$19.2B, 900 MW AI data-center campus on ~155 acres in Kingsboro Business Park between Rocky Mount and Tarboro, Edgecombe County. County cleared the way in Nov 2025 by amending its development ordinance; buildout planned across ~24 phases over 3-5 years. Twin campus announced for Fayetteville.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","publisher":"Data Center Knowledge","retrievedAt":"2026-08-15","url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/energy-storage-solutions-kingsboro-edgecombe-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Modesto","confidence":"medium","id":"compute_atlas-2b3322206636d8a2","lat":37.6517569,"location_precision":"approximate","lon":-121.0209601,"name":"1200 Graphics Drive Data Center (reported NorthPoint Development inquiry)","operator":"NorthPoint Development (reported)","source_notes":"Former FMC barium plant site off Highway 99, north of Kansas Avenue. NorthPoint reportedly lobbied councilmembers. An inquiring developer had 25–50 MW in mind, but the article does not confirm that was NorthPoint. City officials said no plans had been submitted, and Modesto zoning currently prohibits data centers.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/northpoint-1200-graphics-drive-modesto-ca"}],"state":"California","status":"planned"},{"ai_classification":"likely","city":"Greensboro","confidence":"medium","id":"compute_atlas-2b56054c035faddf","lat":36.0726,"location_precision":"approximate","lon":-79.792,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/impactdata-greensboro-nc","value":20.0}],"name":"ImpactData Greensboro","operator":"ImpactData","source_notes":"20 MW facility in Greensboro, Guilford County, targeting mid-2026 completion. Single-tracker source → confidence reported. Coordinates are the Greensboro centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/impactdata-greensboro-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Parsippany","confidence":"medium","id":"compute_atlas-2b6e5ea4094dce19","lat":40.859636,"location_precision":"approximate","lon":-74.423348,"name":"Cologix NNJ3","operator":"Cologix","source_notes":"Described by the operator as a 'next-generation standalone data center' in Parsippany, NJ — one of Cologix's four current New Jersey sites (with NNJ2 and NNJ4 nearby in Cedar Knolls, recorded as a separate combined record as of September 2026). Coordinates are the Parsippany-Troy Hills township centroid (Wikipedia), not a confirmed parcel geocode for 200 Webro Road — marked approximate. Power capacity and square footage are not stated on the operator's current page; a since-superseded third-party listing cited 15 MW / 120,000 sq ft, but that figure had not been independently confirmed by the cited sources as of September 2026, so it is omitted rather than reported.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"New Jersey Data Centers & Disaster Recovery Facilities","publisher":"Cologix","retrievedAt":"2026-10-09","url":"https://cologix.com/data-centers/new-jersey/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/cologix-nnj3-parsippany-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","contains_osm":true,"id":"compute_atlas-2b7923fd9e7be8b4","lat":37.3796338,"location_precision":"approximate","lon":-121.9307551,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-orchard-parkway-san-jose-ca","value":97.8}],"name":"Microsoft San Jose Data Center Campus (SJ04)","operator":"Microsoft","source_notes":"Distinct from the Microsoft Alviso campus already tracked: separate parcel (APNs 101-02-019 and 101-02-020 at 2515 Orchard Parkway, about 4 km from 1657 Alviso-Milpitas Road) and a separate CEC docket (22-SPPE-02 vs 19-SPPE-04). Still under CEC review as of the July 2025 fourth revised project description.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Microsoft Fourth Revised Project Description — SJ04 (docket 22-SPPE-02, TN 264764)","publisher":"California Energy Commission e-filing","retrievedAt":"2026-09-21","url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=264764&DocumentContentId=101543"},{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/microsoft-orchard-parkway-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"confirmed","city":"Ashland","confidence":"medium","id":"compute_atlas-2b8822264dcd28a9","lat":38.4042,"location_precision":"approximate","lon":-82.79,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/terawulf-muskie-eastpark-ky","value":1000.0}],"name":"TeraWulf Muskie Data Campus (EastPark)","operator":"TeraWulf","source_notes":"TeraWulf's second Kentucky campus (alongside the Justified/Hawesville campus, tracked separately as of July 2026). TeraWulf (Nasdaq: WULF), historically a bitcoin miner, repositioning toward HPC/AI. Muskie is a 285-acre site at EastPark Industrial Park (a 1,000-acre former strip mine). Planned 1+ GW phased: initial 500 MW ramp H2 2028, additional 500 MW targeted H2 2030. County discrepancy: local TV cites Boyd County, but Wikipedia places EastPark at the junction of Boyd, Greenup and Carter counties, with most of the park in Greenup County; Greenup used, city Ashland retained as the regional reference. Investment omitted: the $4B figure came from a Boyd County official, not TeraWulf's investor PR or 8-K. Sources give different long-term job figures: a WCHS report cites around 300 long-term positions, while TeraWulf told a community meeting reported by the Herald-Dispatch that it expects to employ up to 100 workers once the campus is online, with tenants possibly creating about 100 more jobs; both are estimates or ceilings, so no permanent job count is recorded. TeraWulf stated it will pay the full standard industrial tariff with no subsidies. Coordinates are the EastPark park centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Boyd County leaders on the economic impact of the proposed data center","publisher":"WCHS-TV","retrievedAt":"2026-07-07","url":"https://wchstv.com/news/local/boyd-county-leaders-counting-the-economic-impact-of-proposed-data-center"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/terawulf-muskie-eastpark-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-2bb8a41239a31c0a","lat":37.4256515,"location_precision":"approximate","lon":-121.9639616,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://sanjosespotlight.com/is-google-hiding-a-data-center-project-in-north-san-jose/","value":250.0}],"name":"Google 5079–5087 Disk Drive Compute Campus (North San José)","operator":"Google LLC","source_notes":"Classification caveat: Google and the City of San José describe an internal R&D/compute-lab facility, while PG&E's CPUC filing describes it as a 250 MW data center load. Recorded as a data center on the strength of the regulatory filing; Google submitted its interconnection application 2025-03-03.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CPUC Draft Resolution E-5455 (2026-07-16): PG&E exceptional-case agreement to energize a new 250 MW data center load for Google LLC at 5079 Disk Drive, San Jose (230 kV)","publisher":"California Public Utilities Commission","retrievedAt":"2026-09-21","url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M607/K718/607718746.PDF"},{"kind":"press","label":"Is Google hiding a data center project in North San Jose? (2026-07)","publisher":"San José Spotlight","retrievedAt":"2026-09-21","url":"https://sanjosespotlight.com/is-google-hiding-a-data-center-project-in-north-san-jose/"},{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"Sept. 17 CPUC voting meeting results — Draft Resolution E-5455 (Google 250 MW San Jose) held to 2026-10-08 (2026-09-18)","publisher":"California Regulatory Intelligence","retrievedAt":"2026-09-21","url":"https://www.calregulatory.com/sept-17-cpuc-voting-meeting-results-banked-recs-regional-markets-tribal-land-transfers/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/google-disk-drive-alviso-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Wheatland","confidence":"medium","id":"compute_atlas-2bf2be1e998231b3","lat":42.1,"location_precision":"approximate","lon":-104.71,"name":"Site Layer 4 Goshen Hole Data Center Campus","operator":"Site Layer 4, LLC","source_notes":"Site is on the Lazy V Six Ranch in Goshen Hole, northeast of Wheatland near the Platte-Goshen county line and roughly 13 miles east of Interstate 25. Permanent jobs were reported as a 250-300 range; the low end is recorded here. No megawatt figure has been published. Coordinates are a geocode from that published description and are not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Platte County Commissioners Push Back, Then OK Industrial Zoning For Data Center","publisher":"Cowboy State Daily","retrievedAt":"2026-10-17","url":"https://cowboystatedaily.com/2026/09/02/platte-county-commissioners-push-back-then-ok-industrial-zoning-for-data-center/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/site-layer-4-goshen-hole-platte-county-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"confirmed","city":"Vicksburg","confidence":"medium","id":"compute_atlas-2c11c18e78ecf9f1","lat":32.3526,"location_precision":"approximate","lon":-90.8779,"name":"AWS Project Steamboat – Warren County Data Center Campus","operator":"Amazon Web Services","source_notes":"Warren County site, distinct from the Madison County aggregate record AWS Project Atlas – Madison County Mega Site (Canton), whose notes cite the Warren County $3B only as part of Amazon's $25B statewide total. Codename 'Project Steamboat'. MPB reports the announcement was made in downtown Vicksburg and other coverage places the campus 'near the new Port of Vicksburg', but no cited source discloses the parcel, road, or acreage; coordinates are a Vicksburg city centroid, an approximate pin. The record is listed as proposed rather than under construction: Amazon's own page still calls it a 'planned investment' and MPB says construction was 'slated to begin in 2026'; no cited source confirms ground has been broken as of 2026-09-09. Jobs: 'at least 200 new jobs at the Amazon data center campus' plus 'more than 300 additional full-time equivalent positions in the Warren County community' — only the 200 direct figure is recorded. No cited source gives a dollar figure for the subsidy, so none is recorded; MPB reports the incentives 'can extend for up to 30 years if AWS keeps meeting investment and job thresholds' and that a portion of Amazon's payments in lieu of property taxes would flow to the Vicksburg Warren School District. The Entergy record Vicksburg Advanced Power Station is the 754 MW gas station on the old Baxter Wilson site in the same county.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/aws-project-steamboat-warren-county-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Louisa","confidence":"medium","id":"compute_atlas-2c3883de5d86bf0e","lat":38.04763641638,"location_precision":"approximate","lon":-77.81682351474,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-lake-anna-technology-campus-louisa-va","value":600.0}],"name":"Lake Anna Technology Campus (LATC)","operator":"Amazon Web Services","source_notes":"One of two AWS campuses in Louisa's Technology Overlay District (approved by BOS April 2023, ~$11B combined investment across both). Up to seven data center buildings (~1.7M sq ft), two 300MW substations. First DC targeted online late 2025/early 2026. A third AWS Louisa campus proposal (1,370 acres near Northeast Creek Reservoir) was withdrawn/cancelled by AWS in July 2025 — not included per do-not-fabricate rule (cancelled, not net-new). Capacity corrected to 600 MW (two 300 MW substations per Louisa County reporting; a prior 420 MW figure was unsourced). Land-disturbance + VA DEQ stormwater permits issued; grading underway. Landowner: REB Investment Company, LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Louisa County land-disturbance permit + VA DEQ stormwater permit (reported via county-sourced local coverage)","publisher":"Tammy Purcell / Engage Louisa (citing Louisa County permitting records)","retrievedAt":"2026-09-21","url":"https://tammypurcell.substack.com/p/aws-preparing-to-start-work-at-lake"},{"kind":"press","label":"AWS files for 1.7M sq ft data center campus in Louisa County, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/amazon-files-for-17-million-sq-ft-data-center-campus-in-louisa-county-virginia/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"infoCville — Amazon to invest $11 billion in Louisa County","retrievedAt":"2026-07-26","url":"https://infocville.com/2023/09/02/amazon-to-invest-11-billion-in-louisa-county/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/aws-lake-anna-technology-campus-louisa-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-2c59fc7966951f81","lat":37.3714713,"location_precision":"exact","lon":-121.9696826,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/csquare-sfo1-ca","value":34.5}],"name":"Csquare SFO1","operator":"Csquare","source_notes":"Csquare's own Silicon Valley directory confirms SFO1 as an operational facility at 2401 Walsh Avenue, Santa Clara, CA (per third-party listings corroborating address).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/38305568","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/38305568"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/csquare-sfo1-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460159928"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/csquare-sfo1-osmway-460159928"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/38305568"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460159928"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Hillsville","confidence":"medium","id":"compute_atlas-2c5cc3da8ae4d077","lat":36.7631399,"location_precision":"approximate","lon":-80.8440807,"name":"Project Lightning (Wildwood Commerce Park)","operator":"Undisclosed (Blue Ridge Crossroads Economic Development Authority site)","source_notes":"Investment is 'north of $11 billion' per the Grayson County Administrator. The end user is undisclosed. Wildwood is a joint Carroll–Grayson–Galax park off I-77 (Coulson Church Rd). The coordinates are an approximate point on Coulson Church Road, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/project-lightning-wildwood-commerce-park-carroll-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"St. Cloud","confidence":"medium","id":"compute_atlas-2c7eecb1b6980294","lat":45.5405392,"location_precision":"exact","lon":-94.2023528,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vaultas-st-cloud-mn","value":0.6}],"name":"Vaultas St. Cloud","operator":"Vaultas","source_notes":"Modular edge-computing facility with a starting capacity of 0.5-0.6MW, expandable by stacking additional nodes. As of Feb 2026 construction had not yet begun despite a stated 2026 opening target.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-24","url":"https://www.compute-atlas.com/facilities/vaultas-st-cloud-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"confirmed","city":"Miami","confidence":"medium","id":"compute_atlas-2cef2d739d5b81e6","lat":25.79,"location_precision":"approximate","lon":-80.41,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://ainews.miami/metrobloks-mia-a1-is-quietly-becoming-miami-s-next-ai-data-center/","value":15.2}],"name":"Metrobloks MIA-A1 (MB01)","operator":"Metrobloks","source_notes":"500 NW 137th Avenue, Miami-Dade County (Airport West submarket, near Miami International Airport). Land acquisition closed March 31, 2025; targeting operations by end of 2026, but as of August 2026 no permit or construction-start source had been located, so the status is proposed rather than under construction. Capacity is disputed between the operator's own two pages: 15.2 MW at the press-release/land-acquisition stage (independently corroborated by Cushman & Wakefield) vs. 16.8 MW critical IT on the current site page, which separately claims ~40,500 sq ft of total whitespace across two 15,200 sq ft halls (an internal arithmetic inconsistency on the operator's own page). The better-corroborated 15.2 MW figure is recorded. The operator's site page states ~21ms round-trip latency to the NAP of the Americas and Uptime Tier III design intent with liquid cooling to 150kW/rack. As of August 2026, no confirmed total-building square footage or jobs figure had been located, so neither is recorded; Miami AI News (August 2026) cites a Miami Herald report of a 112,900-square-foot data center. The recorded $150 million investment is the figure Miami-Dade Beacon Council CEO Rodrick T. Miller gave in the operator's March 2025 press release; Miami AI News describes the same amount as the purchase price of the 4.05-acre site. As of August 2026, no opposition or permit coverage was found; Airport West is a commercial/industrial submarket. Coordinates are an approximate Airport West-area estimate, not a parcel-confirmed geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Metrobloks MIA-A1 Is Quietly Becoming Miami's Next AI Data Center","publisher":"Miami AI News","retrievedAt":"2026-09-21","url":"https://ainews.miami/metrobloks-mia-a1-is-quietly-becoming-miami-s-next-ai-data-center/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/metrobloks-mia-a1-miami-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"likely","city":"Reston","confidence":"high","contains_osm":true,"id":"compute_atlas-2cff142d8bd19d22","lat":38.9506059,"location_precision":"exact","lon":-77.3645496,"name":"CoreSite VA1 - Reston, VA","operator":"CoreSite","source_notes":"Confirmed exact match: 12100 Sunrise Valley Drive, Reston, VA 20191. AI/HPC (likely): CoreSite offers liquid cooling capabilities at VA1 (Northern Virginia).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite facility directory","publisher":"CoreSite","retrievedAt":"2026-07-22","url":"https://www.coresite.com/data-center/va1-reston-va"},{"kind":"osm","label":"OpenStreetMap way/79298926","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/79298926"},{"kind":"other","label":"CoreSite AI/HPC — CoreSite offers liquid cooling capabilities at VA1 (Northern Virginia)","publisher":"coresite.com","retrievedAt":"2026-07-23","url":"https://www.coresite.com/data-center/va3-reston-va"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/coresite-va1-reston-va-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite facility directory","publisher":"CoreSite","retrievedAt":"2026-07-22","url":"https://www.coresite.com/data-center/va3-reston-va"},{"kind":"osm","label":"OpenStreetMap way/79818498","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/79818498"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/coresite-va3-reston-va-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/79298926"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/79818498"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1134104431"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Annapolis Junction","confidence":"medium","id":"compute_atlas-2d5e49945c826eba","lat":39.12389,"location_precision":"approximate","lon":-76.79194,"name":"Microsoft Annapolis Junction Data Center Campus","operator":"Microsoft","source_notes":"Microsoft bought the Annapolis Junction Business Park site in 2020. Microsoft's director of government affairs described 'remaining phases of this project', and the Banner says the campus has generated millions in county tax dollars. An aggregator lists 8201, 8211, 8221 and 8321 Dorsey Run Road; that is not verified from a primary source. The pin is the Annapolis Junction place point (approximate). Some buildings may already be operating; the status reflects ongoing phased construction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Maryland County Downgrades Potential Data Center Ban to Pause","publisher":"GovTech (Capital Gazette / Tribune Content Agency)","retrievedAt":"2026-10-22","url":"https://www.govtech.com/policy/maryland-county-downgrades-potential-data-center-ban-to-pause"},{"kind":"other","label":"Maryland Data Centers: 26 Sites Tracked (2026)","publisher":"Kadoa","retrievedAt":"2026-10-22","url":"https://www.kadoa.com/datacenter/state/maryland"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-annapolis-junction-campus-md"}],"state":"Maryland","status":"under construction"},{"ai_classification":"unknown","city":"Lysite","confidence":"medium","id":"compute_atlas-2d82a85b30a8aff4","lat":43.285,"location_precision":"approximate","lon":-107.636,"name":"ETC DC OpCo Lysite Data Center (\"1 MW DC Site\")","operator":"ETC DC OpCo LLC","source_notes":"Site is about three miles east-northeast of Lysite in unincorporated eastern Fremont County, near the Lost Cabin Gas Plant. The application documents label the project the \"1 MW DC Site\"; the DEQ analysis does not explain whether that designation is the anticipated electrical demand or another measure, so no capacity is recorded here. Footprint, acreage and water use are not disclosed in available records. Coordinates are a geocode from the published distance-and-bearing description and are not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Details emerge on Lysite data center","publisher":"Riverton Ranger","retrievedAt":"2026-09-14","url":"https://rivertonranger.com/news/details-emerge-on-lysite-data-center/article_c9aadf9d-dfc5-4675-a01e-ae14b0c944e5.html"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/etc-dc-opco-lysite-fremont-county-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Englewood","confidence":"high","contains_osm":true,"id":"compute_atlas-2db7ee517b8b5bbd","lat":39.560952,"location_precision":"approximate","lon":-104.865649,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-den1-englewood-co","value":2.0}],"name":"DataBank DEN1 - Englewood","operator":"DataBank","source_notes":"DataBank's Denver page lists DEN1 at 393 Inverness Parkway, with 24,180 IT sq ft and 2 MW of critical IT load. This is a separate site from the DEN2 and DEN5 Centennial campus, which is already tracked. Coordinates are a Census geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/databank-den1-englewood-co"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/82150598"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Northlake","confidence":"medium","id":"compute_atlas-2dc4d0eedd95e8ca","lat":41.9310571,"location_precision":"approximate","lon":-87.9145933,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/t5-chicago-iii-northlake-il","value":36.0}],"name":"T5 @ Chicago III (Northlake)","operator":"T5 Data Centers","source_notes":"Third T5 site in the Chicago market, distinct from the tracked T5 Chicago II (Elk Grove Village) and T5 Chicago IV (Grayslake). Subsidy value is the state's estimated tax benefit on a $252,000,000 investment commitment. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (T5@Chicago III, LP, Northlake, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/t5-chicago-iii-northlake-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Spotsylvania","confidence":"medium","id":"compute_atlas-2dfed8422940db39","lat":38.213,"location_precision":"approximate","lon":-77.482,"name":"Hunters Ridge South Data Center Campus","operator":"American Real Estate Partners (AREP)","source_notes":"Applicant AREP SOF III HRS LLC (an American Real Estate Partners entity; \"HRS\" = Hunters Ridge South). ~73 acres at the southern end of Cosner Drive; up to ~2.278M sq ft of data center space. Spotsylvania Planning Commission recommended approval Aug 11 2025; Board of Supervisors approved the rezoning (Rural + Mixed-Use → Industrial) 5-2 on Aug 27 2025 — an expansion beyond the earlier \"original Hunters Ridge\" project. Amazon Web Services participated as an applicant/end-user in the county's Sept 23 2025 joint session, so AWS is the anticipated tenant. Distinct from AWS Cosner (ST23-0031) and PowerHouse 95 (AREP/Harrison Street, ~38.17/-77.66), tracked separately as of July 2026. Coordinates approximate (Cosner Drive geocode; parcels not GIS-confirmed as of July 2026).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fredericksburg Free Press — Spotsylvania Board of Supervisors approve potential 2.2M sq ft data center campus (Hunters Ridge South, 5-2 vote, Aug 27 2025)","publisher":"Fredericksburg Free Press","retrievedAt":"2026-07-17","url":"https://www.fredericksburgfreepress.com/2025/08/27/spotsylvania-board-of-supervisors-approve-potential-2-2-million-square-foot-data-center-campus/"},{"kind":"press","label":"Fredericksburg Free Press — Spotsylvania Planning Commission recommends approval of 2.2M sq ft data center campus (Aug 11 2025)","publisher":"Fredericksburg Free Press","retrievedAt":"2026-07-17","url":"https://www.fredericksburgfreepress.com/2025/08/11/spotsylvania-planning-commission-recommends-approval-of-2-2-million-square-foot-data-center-campus/"},{"kind":"press","label":"The Free Lance-Star — Spotsylvania approves Hunter's Ridge data center project","publisher":"The Free Lance-Star (fredericksburg.com)","retrievedAt":"2026-07-17","url":"https://fredericksburg.com/news/local/article_db51f74a-c54f-4ee9-92c1-60273b3bf2f7.html"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/hunters-ridge-south-data-center-campus-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Boca Raton","confidence":"medium","id":"compute_atlas-2e2d7246a8bea0c6","lat":26.4075552,"location_precision":"approximate","lon":-80.097877,"name":"3EX Hosting Data Center — Boca Raton","operator":"3EX Hosting","source_notes":"15,000 sq ft of colocation capacity; up to 17 kW per high-density rack; dual power feeds to every cooling system per operator. Facility-wide MW not stated by the operator (third-party listings cite 5 MW; not recorded).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"3EX Hosting — Data Center","publisher":"3EX Hosting","retrievedAt":"2026-09-21","url":"https://www.3exhosting.com/data-center/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/3ex-hosting-boca-raton-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Fairfield","confidence":"medium","id":"compute_atlas-2e73599530bdb19c","lat":38.2898329,"location_precision":"approximate","lon":-121.9607882,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/northpoint-fairfield-data-center-solano-ca","value":150.0}],"name":"NorthPoint Fairfield Data Center (Vanden Road Industrial Campus)","operator":"NorthPoint Development","source_notes":"300-acre industrial campus between Vanden Road and North Gate Road in northeast Fairfield, near the Vacaville border. The Fairfield Planning Commission approved a master development permit for a 4.6-million-sq-ft industrial park here in 2023; the 150 MW data-center figure comes from developer/broker (Jones Lang LaSalle and NorthPoint) presentation materials for a data center within that park, and no data-center-specific application had been filed as of this reporting. Canon Partners (itself controlled by Andrews Lando & Associates and Stroud Properties) is also named as a co-developer. PG&E began an infrastructure/engineering cost study around Q3 2025 and issued an engineering agreement in December 2025. A public hearing would still be required before any data-center-specific approval. Coordinates are geocoded to Vanden Road in Fairfield only (no confirmed parcel or street address), so treat the pin as a rough area marker.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/northpoint-fairfield-data-center-solano-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Milford","confidence":"medium","id":"compute_atlas-2ef8755d9b35c22e","lat":38.3936,"location_precision":"approximate","lon":-113.0111,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/blusky-ai-milford-ut","value":9.3}],"name":"BluSky AI Milford Campus","operator":"BluSky AI Inc.","source_notes":"BluSky AI's first secured modular 'SkyMod' site, distinct from its Nephi (Juab County) and Delta (Millard County) sites already/also tracked; 51.6 acres leased from Wild Mustang Ventures LLC. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. BluSky AI's own SEC-filed Form 8-K and the underlying Ground Lease with Option to Purchase (Wild Mustang Ventures, LLC, June 30, 2025) were read directly and contain no property-tax, abatement, tax-increment-financing, or PILOT provisions. Neither Milford City (four active public bodies, none a CRA/RDA) nor Beaver County has a Community Reinvestment Agency or Redevelopment Agency; Milford City's own \"Economic Development\" link points off-site to a county tourism page, not an incentive program. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/blusky-ai-milford-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Ashville","confidence":"medium","id":"compute_atlas-2f488d5ed6efe0a6","lat":39.72,"location_precision":"approximate","lon":-83.03,"name":"Ashville Campus","operator":"EdgeConneX","source_notes":"680 acres north of SR-752; 1.8GW substation plus a 200MW gas turbine energy center planned. Facing local opposition/criticism. The adjacent Ashville Energy Center (PowerConneX) OPSB filing now specifies up to 800 MW of generating capacity on ~110 acres, up from the 200 MW gas-turbine figure previously noted here — this is the power plant's nameplate generation, not a confirmed data-center IT load; at least one press aggregator miscalls this \"the data center's capacity,\" but the primary OPSB filing does not support that reading.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Proposed EdgeConneX data center in Pickaway County, Ohio facing criticism","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/proposed-edgeconnex-data-center-in-pickaway-county-ohio-facing-criticism/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/edgeconnex-ashville-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"mixed_use","city":"Kansas City","confidence":"medium","id":"compute_atlas-2f635907745125b5","lat":39.247,"location_precision":"approximate","lon":-94.705,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.diodeventures.com/projects/gptp","value":750.0}],"name":"Meta Kansas City Northland","operator":"Meta","source_notes":"Located at Golden Plains Technology Park (Diode Ventures development), 801 NW 128th Street, at the northwest corner of I-435 and US-169. Three data center buildings + warehouse, 1.4M sq ft total. Meta's first Missouri data center. Coordinates are approximate for the Golden Plains Technology Park area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta opens $1 billion Kansas City data center","publisher":"KCUR","retrievedAt":"2026-07-06","url":"https://www.kcur.org/housing-development-section/2025-08-23/meta-kansas-city-data-center-northland"},{"kind":"other","label":"Golden Plains Technology Park - Diode Ventures","publisher":"Diode Ventures","retrievedAt":"2026-09-10","url":"https://www.diodeventures.com/projects/gptp"},{"kind":"permit","label":"Kansas City Ordinance 210841 - Golden Plains Technology Park Zone 3 preliminary plat","publisher":"Kansas City, MO City Clerk","retrievedAt":"2026-09-10","url":"https://clerk.kcmo.gov/LegislationDetail.aspx?ID=5140162&GUID=B4B56878-A985-43D7-A86E-1C499DF6EC99"},{"kind":"press","label":"KC Council sets stage for $8.2 billion in Golden Plains Tech Park incentives","publisher":"Ingram's","retrievedAt":"2026-09-10","url":"https://ingrams.com/article/kc-council-approval-could-deliver-8-2b-for-golden-plains-technology-park-project/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-kansas-city-northland-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"confirmed","city":"Fort Wayne","confidence":"medium","id":"compute_atlas-2fa4d5d7a3328fec","lat":40.99,"location_precision":"approximate","lon":-85.056,"name":"Google Fort Wayne Data Center (Project Zodiac)","operator":"Google","source_notes":"Site near East Tillman Road and Adams Center Road, SE Fort Wayne (Allen County). 700+ acres, multi-building campus explicitly optimized for Gemini AI platform and machine learning. Google STAR workforce program launched with Ivy Tech Community College. Coordinates are approximate site area; exact parcel centroid not verified from public permit records. Previous inkfreenews.com source replaced with WANE 15 which confirmed the same Dec 11 2025 operational story.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Gov. Holcomb announces Google is building a $2B Data Center in Northeast Indiana","publisher":"State of Indiana","retrievedAt":"2026-07-06","url":"https://events.in.gov/event/gov-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana"},{"kind":"press","label":"Google announces $2bn data center campus in Fort Wayne, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/google-announces-2bn-campus-in-fort-wayne-indiana/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-fort-wayne-in"}],"state":"Indiana","status":"operating"},{"ai_classification":"unknown","city":"Henderson","confidence":"medium","id":"compute_atlas-2fbab9340111f6be","lat":36.3085,"location_precision":"approximate","lon":-78.4709,"name":"Natelli Vance County Campus (proposed)","operator":"Natelli Investments","source_notes":"Vance County commissioners approved (6-1, 2026-04-20) a rezoning of ~113 acres across three parcels along US-158 Business near Henderson, tied to developer Natelli Investments. The developer has not confirmed the end use; local and trade press report a potential data-center campus — end use unconfirmed, hence rumored confidence.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Officials in North Carolina county give ok for rezoning, potential data center incoming (DCD)","publisher":"DataCenterDynamics","retrievedAt":"2026-07-16","url":"https://www.datacenterdynamics.com/en/news/officials-in-north-carolina-county-give-ok-for-rezoning-potential-data-center-incoming/"}],"updated":"2026-07-18","url":"https://www.compute-atlas.com/facilities/natelli-vance-county-henderson-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-2fc219f11e1ee648","lat":37.3663437,"location_precision":"approximate","lon":-121.945885,"name":"Martin Data Center","operator":"Martin Avenue Properties, LLC","source_notes":"Single-source on the substance (the CEC project page), hence confidence \"reported\". The owner of record is a single-purpose LLC; no ultimate operator is asserted because none was confirmed in a fetched source. Building square footage and data-hall count circulated in secondary summaries are deliberately omitted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/martin-data-center-santa-clara-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Bend","confidence":"medium","contains_osm":true,"id":"compute_atlas-2fead1c5ce96b693","lat":44.0474593,"location_precision":"approximate","lon":-121.3285495,"name":"Fort Rock Data Center","operator":"Fort Rock Data Center","source_notes":"The operator describes a purpose-built, enterprise-grade, SOC 2 Type 1 facility in Bend's high desert with redundant power and cooling. Size and MW are not published. This site is distinct from the tracked US Signal OR01 Bend.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/fort-rock-data-center-bend-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Baltimore","confidence":"medium","id":"compute_atlas-2ff233e502d6d76d","lat":39.275776951529,"location_precision":"exact","lon":-76.625636130534,"name":"TierPoint Baltimore (Russell Street)","operator":"TierPoint","source_notes":"Coordinates confirmed via US Census geocoder (exact match on 1401 Russell St, Baltimore, MD 21230). This is a distinct TierPoint facility from the existing TierPoint Baltimore - BWI record (813 Pinnacle Drive, Linthicum Heights) -- the Maryland Department of Commerce's own release on the Linthicum Heights opening explicitly frames it as TierPoint's 'second Maryland facility,' confirming this Baltimore City site as the first/other one. TierPoint's own site states 28,000+ total sq ft (14,000+ sq ft raised floor) and 'two 1.5 MW redundant generators with a minimum of 48 hours runtime'; no capacity is recorded because that figure describes backup generator/runtime capacity, not a stated IT load or site power total. No AI classification is recorded: no source names AI/GPU/HPC use at this site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TierPoint Expands to Second Maryland Facility","publisher":"Maryland Department of Commerce","retrievedAt":"2026-09-13","url":"https://business.maryland.gov/news/tierpoint-expands-to-second-maryland-facility/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/tierpoint-russell-street-baltimore-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Hermiston","confidence":"medium","id":"compute_atlas-2ffdfe3038174be3","lat":45.8404101,"location_precision":"approximate","lon":-119.28946,"name":"Charlestown Data Center and Battery Energy Storage System","operator":"Copia Power","source_notes":"Copia Power (founded by Carlyle and bought by EQT in 2026) filed to site a data center and battery storage project on 106 acres of Bureau of Land Management land near Hermiston in Umatilla County. It would be the first data center proposed on federal public land in Oregon. The OPB lede gives about 100 acres; the body text and The Registry give 106. No MW figure or timeline has been reported, and Copia declined to comment. The coordinates are Hermiston's town centroid from OpenStreetMap, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Copia Power Seeks 106 Acres of BLM Land Near Hermiston for Oregon's First Federal-Land Data Center","publisher":"The Registry Pacific Northwest","retrievedAt":"2026-10-12","url":"https://news.theregistryps.com/copia-power-seeks-106-acres-of-blm-land-near-hermiston-for-oregons-first-federal-land-data-center/"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/copia-charlestown-data-center-hermiston-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Pittsford","confidence":"medium","id":"compute_atlas-3040b28d8b887f01","lat":43.090959,"location_precision":"approximate","lon":-77.515298,"name":"Rochester Colo","operator":"Rochester Colo (James Salviski)","source_notes":"Carrier-neutral colocation facility on Pittsford Victor Road in Pittsford (Rochester metro), Monroe County, operating since 2008; as of 2026-09-13 the site's own contact page does not list a specific street number, and the company's homepage describes N+1 power with 96-hour outage protection but no MW/sq ft figures. Third-party aggregator listings (not independently confirmed from a direct source as of September 2026, when datacentermap.com could not be retrieved) describe the building as a converted ~36,000 sq ft former Voplex automotive facility with ~7,000 sq ft of white space and 1 MW live capacity, expandable to 15,000 sq ft / 4 MW; these figures are not recorded pending confirmation from a direct source. Coordinates are the Town of Pittsford centroid (OSM Nominatim) -- both the US Census geocoder and OSM Nominatim failed to resolve the street address without a confirmed house number, so this is a disclosed city/town-level pin, not parcel-level precision. No capacity, investment, or AI-use figure had been found in a directly consulted source as of 2026-09-13, so none is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Contact Us - Rochester Colo Data Center","publisher":"Rochester Colo","retrievedAt":"2026-09-13","url":"https://rochestercolo.com/"},{"kind":"other","label":"Home - Rochester Colo Data Center","publisher":"Rochester Colo","retrievedAt":"2026-09-13","url":"https://rochestercolo.com/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/rochester-colo-pittsford-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"St. Georges","confidence":"medium","id":"compute_atlas-3092bcdf492fa6ef","lat":39.5593065,"location_precision":"approximate","lon":-75.6542782,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/parkway-gravel-st-georges-de","value":300.0}],"name":"St. Georges Business Park & Lighthouse Farms","operator":"Parkway Gravel Inc.","source_notes":"Confidence is rumored rather than reported because sources disagree on whether the ultimate use will be a data center: county filings and press describe a mixed-use industrial park (distribution/fulfillment/warehouse) for which Delaware zoning also happens to permit data centers, and coverage attributes to the developer's engineering firm only that 'the developer may be planning to build a data center' — not a confirmed data-center project. A Delmarva Power internal project list obtained via FOIA (Technical.ly) separately lists a 300 MW 'St. Georges/Frightland Area' project 'pending cluster study analysis'. That project is treated here as the same site given the shared name and geography, though the FOIA-based list does not itself name Parkway Gravel Inc., so the 300 MW planned figure carries that caveat. The square footage progression (2.5M sq ft → 3.2M sq ft) is not recorded separately because it describes the broader mixed-use park, not a confirmed data-center footprint. The pin is approximate: it is geocoded to the unincorporated place of St. Georges, DE (OSM); some press coverage instead characterizes the site as 'in Middletown' given proximity. The specific parcel south of the C&D Canal off US Route 13 did not resolve via geocoding.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Three sites across New Castle explore data center conversions (Parkway Gravel plans for close to 1,500 acres at St. Georges Business Park / Lighthouse Farms)","publisher":"Delaware Business Times","retrievedAt":"2026-10-01","url":"https://delawarebusinesstimes.com/news/three-sites-data-center-conversions/"}],"updated":"2026-10-01","url":"https://www.compute-atlas.com/facilities/parkway-gravel-st-georges-de"}],"state":"Delaware","status":"planned"},{"ai_classification":"likely","city":"Goodyear","confidence":"medium","contains_osm":true,"id":"compute_atlas-30b61cd4d7845a84","lat":33.4194907,"location_precision":"exact","lon":-112.3599883,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az","value":280.0}],"name":"Stream Data Centers PHXA (Phoenix I-VII, Goodyear Campus)","operator":"Stream Data Centers","source_notes":"Operator's own Phoenix page names this campus 'PHXA (Phoenix I-VII)' at 2950 S. Litchfield Road, Goodyear, AZ 85338, Maricopa County. 157-acre, 7-building planned campus; 2 of 7 buildings currently operational, remaining 5 under development, so campus-level status is mixed-build but the entity is live/operational overall. Site markets '100% AI-ready infrastructure' but, as of July 2026, no confirmed GPU/HPC tenant or workload was found, so the AI classification is marked likely rather than confirmed -- marketing language alone is not workload evidence. Note the official name differs from OSM tag 'PHX-1'; corrected to operator's own 'PHXA'. AI/HPC (likely): Stream's own Phoenix/Goodyear campus page carries a facility-specific '100% AI-Ready' key-stat badge alongside its 280 MW critical capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/468707940","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/468707940"},{"kind":"press","label":"DataCenterDynamics — \"Stream Data Centers opens Phoenix I facility in Goodyear, Arizona\"","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/stream-data-centers-opens-phoenix-i-facility-goodyear-arizona/"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/stream-data-centers-phxa-phoenix-i-vii-goodyear-campus-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"likely","city":"Sioux Falls","confidence":"medium","id":"compute_atlas-30e70d32a5a369a6","lat":43.583,"location_precision":"approximate","lon":-96.685,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/","value":500.0}],"name":"Sioux Falls Technology Park (Gemini Data Center)","operator":"Gemini Data Center SD LLC","source_notes":"The AI classification is likely (not confirmed): Gemini is the land developer, no tenant is signed, and only developer aspiration to attract a hyperscale/AI/neocloud tenant is on record. Capacity (500 MW) and acreage per SiouxFalls.Business; an earlier report cited 160 acres. Coordinates are approximate for the northeast Sioux Falls site. As a developer land project with no signed tenant, its water, subsidy, investment, and job figures remain developer projections only (South Dakota has no state income tax and rejected data-center incentive bills); none of them is recorded pending a confirmed tenant.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Hyperscale data center seeking city approvals to build northeast of Sioux Falls","publisher":"SiouxFalls.Business","retrievedAt":"2026-07-06","url":"https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/"},{"kind":"press","label":"Sioux Falls data center developers detail next steps","publisher":"SiouxFalls.Business","retrievedAt":"2026-07-06","url":"https://siouxfalls.business/sioux-falls-data-center-developers-detail-next-steps/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/gemini-data-center-sioux-falls-sd"}],"state":"South Dakota","status":"planned"},{"ai_classification":"unknown","city":"Stockton","confidence":"medium","id":"compute_atlas-310ea1cbf02556f5","lat":37.9633,"location_precision":"approximate","lon":-121.3681,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://nautilusdt.com/stockton-data-center/","value":6.5}],"name":"Nautilus Stockton 1 Data Center","operator":"Nautilus Data Technologies","source_notes":"6.5 MW of critical IT load across four vaults (1.0–2.5 MW each) in roughly 13,000 sq ft of vault space. Coordinates are the project coordinates printed on the CEQA Notice of Determination (37°57'48\"N 121°22'5\"W), not a surveyed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Stockton Data Center — Nautilus Data Technologies","publisher":"Nautilus Data Technologies","retrievedAt":"2026-09-21","url":"https://nautilusdt.com/stockton-data-center/"},{"kind":"press","label":"Stockton residents push back on data centers. The city already relies on one","publisher":"Stocktonia News","retrievedAt":"2026-09-14","url":"https://stocktonia.org/news/local-government/2026/09/02/stockton-residents-push-back-on-data-centers-the-city-already-relies-on-one/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/nautilus-stockton-1-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Little Chute","confidence":"medium","contains_osm":true,"id":"compute_atlas-311a72c5b9ff928b","lat":44.2965755,"location_precision":"approximate","lon":-88.2938896,"name":"Heartland Business Systems Little Chute Data Center","operator":"Heartland Business Systems, LLC","source_notes":"Colocation and cloud data center at HBS's northeast Wisconsin headquarters in the Little Chute Industrial Park. Fills a gap in the Fox River Valley, where Compute Atlas currently tracks only Ark Data Centers Green Bay (Harrison) and Netsonic Green Bay. No MW or square footage figure is published by the operator, so none is asserted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/heartland-business-systems-little-chute-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"confirmed","city":"Hawesville","confidence":"medium","id":"compute_atlas-3134abedacd7dc7a","lat":37.8999,"location_precision":"approximate","lon":-86.7569,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack","value":401.0}],"name":"Justified Data Campus","operator":"TeraWulf","source_notes":"Brownfield redevelopment of former Century Aluminum smelter. Site acquired February 2026 from Century Aluminum subsidiary; acquisition price reported by multiple outlets as $200M cash plus a 6.8% minority equity interest in TeraWulf (not confirmed in the official press release text as of July 2026). Lease entity: TeraWulf's Raylan Data LLC to Anthropic PBC. The ~$19B is contracted lease revenue over the 20-year term — not capex; not recorded as an investment figure. TeraWulf indicated a $3B–$4B construction investment for two data center buildings (range, not a firm single figure; not recorded as an investment figure). Site has ~480 MW of existing power availability; 401 MW is the Anthropic lease capacity. Total site ~750 acres per news sources; TeraWulf's official PR cited 'over 250 buildable acres.' Coordinates are approximate (Hawesville town center). The Fluidstack/Abernathy JV is a separate unrelated transaction and is not part of this record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TeraWulf Announces Anthropic Lease at Justified Data Campus","publisher":"TeraWulf Inc.","retrievedAt":"2026-07-07","url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"},{"kind":"filing","label":"Big Rivers Electric Corporation — PSC Retail Service Agreement Filing for Justified Data Project","publisher":"Kentucky Public Service Commission","retrievedAt":"2026-07-07","url":"https://psc.ky.gov/trf4/uploadedFiles/900_Big_Rivers_Electric_Corporation/04142026121035/Cover_Letter_Redacted.pdf"},{"kind":"press","label":"TeraWulf signs 20-year Anthropic lease for 401 MW at Kentucky data campus","publisher":"Blockspace","retrievedAt":"2026-07-07","url":"https://blockspace.media/insight/terawulf-signs-anthropic-lease-sells-abernathy/"},{"kind":"press","label":"Anthropic signs $19bn, 20-year lease for Kentucky data center with TeraWulf","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/anthropic-signs-19bn-20-year-lease-for-kentucky-data-center-with-terawulf/"},{"kind":"press","label":"Kentucky PSC Approves 482 MW Power Agreement for TeraWulf's Justified Data Campus","publisher":"TeraWulf Inc.","retrievedAt":"2026-09-15","url":"https://investors.terawulf.com/news-events/press-releases/detail/145/kentucky-psc-approves-482-mw-power-agreement-for-terawulfs-justified-data-campus"},{"kind":"press","label":"Data centers need massive power. They're eyeing Kentucky's idle industrial sites to get it. (Century Aluminum smelter site, Hancock County, 482 MW, wholesale power via the MISO market)","publisher":"Hoptown Chronicle / Kentucky Lantern","retrievedAt":"2026-09-15","url":"https://hoptownchronicle.org/data-centers-need-massive-power-theyre-eyeing-kentuckys-idle-industrial-sites-to-get-it"},{"kind":"filing","label":"Big Rivers Electric Corporation filing: Justified DataPower LLC / TeraWulf Inc. Retail Electric Service Agreement, PSC Case 2026-00115 (April 14, 2026)","publisher":"Big Rivers Electric Corporation / Kentucky Public Service Commission","retrievedAt":"2026-09-22","url":"https://psc.ky.gov/pscscf/2026%20cases/2026-00115/20260414_Big%20Rivers%20Electric%20Corporation%20Contract%20Filing.pdf"},{"kind":"press","label":"KY utility regulator OKs electricity contract for TeraWulf's Hancock County data center project","publisher":"WEKU","retrievedAt":"2026-10-22","url":"https://www.weku.org/the-commonwealth/2026-08-21/ky-utility-regulator-oks-electricity-contract-for-terawulfs-hancock-county-data-center-project"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/terawulf-hawesville-ky"}],"state":"Kentucky","status":"under construction"},{"ai_classification":"mixed_use","city":"Unknown","confidence":"medium","id":"compute_atlas-314d527cb6663395","lat":39.55139,"location_precision":"approximate","lon":-81.64944,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cipher-digital-hashworks-waterford-washington-oh","value":200.0}],"name":"HashWorks Powered Land — Waterford Site","operator":"HashWorks Powered Land Waterford LLC (land entity tied to Cipher Digital / Sabre 56)","source_notes":"HashWorks Powered Land Waterford LLC has assembled just over 500 acres in Waterford Township and filed for a 25 MGD Muskingum River surface-water withdrawal; local reporting ties the leasing LLCs to Sabre 56 and Cipher Digital for a potential 200MW crypto-mining/HPC/AI facility, but Washington County commissioners stated no deal has been finalized and Cipher's ownership stake is undocumented -- confidence kept at rumored. Distinct site from the Center Township/Morgan County 'Ulysses' project.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"WOUB: Waterford resident calls for trustee to step down over data center land deals","publisher":"WOUB Public Media","retrievedAt":"2026-08-26","url":"https://woub.org/2026/05/22/waterford-resident-calls-trustee-step-down-data-center-development/"},{"kind":"press","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","retrievedAt":"2026-09-21","url":"https://athensindependent.com/data-centers-across-appalachian-ohio/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cipher-digital-hashworks-waterford-washington-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Manning","confidence":"medium","contains_osm":true,"id":"compute_atlas-317d706ab337640f","lat":33.6382891,"location_precision":"approximate","lon":-80.2708259,"name":"Potential Data Center, Ram Bay Industrial Park (Clarendon County)","operator":"Undisclosed data center company","source_notes":"An existing Santee Electric-owned building in Ram Bay Industrial Park, Manning. The pin is Ram Bay Road, not the building. Third-party trackers list a 15 MW 'Project 59 (Clarendon County Industrial Park)' that probably refers to this site, but neither the name nor the 15 MW was confirmed in the cited sources, so both are omitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Public Notice: Potential Data Center - Addressing Concerns, Answering Questions (as of Aug. 19, 2026)","publisher":"Clarendon County","retrievedAt":"2026-10-27","url":"https://media-002-us.cdn.govstack.com/clarendoncountygov-us/media/xqjbymc5/public-notice-data-center-project-august-19-2026.pdf"},{"kind":"press","label":"Clarendon County rushes to close zoning loophole as first data center heads to industrial park","publisher":"WIS","retrievedAt":"2026-10-27","url":"https://www.wistv.com/2026/08/25/clarendon-county-rushes-close-zoning-loophole-first-data-center-heads-industrial-park/"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/clarendon-county-ram-bay-data-center-manning-sc"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-31eefa8987233a0c","lat":35.618,"location_precision":"approximate","lon":-97.567,"name":"MIDCON Recovery Solutions Data Center","operator":"MIDCON Recovery Solutions","source_notes":"~60,000 sq ft Tier IV colocation/disaster-recovery facility in the Quail Springs Business Park. Coordinates are approximate to the Quail Springs area of northwest Oklahoma City; no street address is given in the cited sources.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/midcon-recovery-solutions-oklahoma-city-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"mixed_use","city":"Granger","confidence":"medium","id":"compute_atlas-320018ba430bbb21","lat":41.73,"location_precision":"approximate","lon":-86.13,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-granger-in","value":1000.0}],"name":"Microsoft Granger Data Center","operator":"Microsoft","source_notes":"Former St. Joe Farm, near Bittersweet Road and Currant Road, Granger IN (St. Joseph County). 939 acres; 5-6 buildings planned; ~1 GW power load estimated by county officials. Microsoft not seeking local tax incentives. WSBT reported on February 18, 2026 that a formal site plan had not been submitted and that many project details still had to be worked out before construction could begin; WNDU March 2026 MOU covers pre-development evaluation only. WVPE reported on May 30, 2026 that construction was underway, with water trucked in for dust suppression. The record is marked reported. Coordinates are approximate Granger unincorporated community area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft buys 900-acre St. Joe Farm, Indiana, for data center build","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-buys-900-acre-st-joe-farm-indiana-for-data-center-build/"},{"kind":"press","label":"Granger meeting draws crowd for update on large Microsoft data center planned","publisher":"WSBT CBS South Bend","retrievedAt":"2026-07-06","url":"https://wsbt.com/news/local/town-hall-held-for-900-acre-microsoft-granger-data-center-capital-avenue-cleveland-road-construction-st-joe-farm-development-power-cost-water-usage-traffic-environmental-concerns-economic"},{"kind":"press","label":"Microsoft data center project moves forward in Granger","publisher":"95.3 MNC","retrievedAt":"2026-10-16","url":"https://www.953mnc.com/2026/03/19/microsoft-data-center-project-moves-forward-in-granger/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/microsoft-granger-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"confirmed","city":"Mesa","confidence":"medium","id":"compute_atlas-323a1dfcc0ec8020","lat":33.3764,"location_precision":"approximate","lon":-111.6199,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/google-redhawk-mesa-az","value":400.0}],"name":"Google Redhawk Mesa Data Center Campus","operator":"Google","source_notes":"Three-phase campus through 2030; originally filed anonymously as Project Red Hawk via LLC Stone Applications. Phase 1 operational July 2025. Phase 2 under construction. Coordinates at Elliot and Sossaman roads, SE Mesa. 2019 development agreement requires >=$600M capex by 2025, >=$1B by 2029, 750,000 sq ft built by 2030, and a >=$65,000 average full-time data-center salary; construction workforce has been cited around 1,200 (an estimate, not a permanent-jobs count). Status reflects Phase 1 (Redhawk 1), operational since July 2025; Phases 2 and 3 remain under construction, which is why Google's own US locations index still lists Mesa under sites in development.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google breaks ground on Mesa data center campus in Arizona","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/google-breaks-ground-on-mesa-data-center-campus-in-arizona/"},{"kind":"press","label":"Mesa Council approves $1bn Google data center, with $16m in tax breaks","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/mesa-council-approves-1bn-google-arizona-data-center-16m-tax-breaks/"},{"kind":"subsidy","label":"City of Mesa resolution authorising a development agreement and lease with Stone Applications, LLC for ~187 acres at S Sossaman Rd and E Elliot Rd (approved 1 July 2019)","retrievedAt":"2026-08-31","url":"https://mesa.legistar.com/View.ashx?M=F&ID=7431552&GUID=F48E7DF7-C483-4237-8F54-83D08F5E1935"},{"kind":"subsidy","label":"City of Mesa Office of Economic Development study-session presentation, 27 June 2019 — GPLET term: ~$32,967,000 excise payable over 25 years vs ~$48,916,134 ad valorem otherwise","retrievedAt":"2026-08-31","url":"https://mesa.legistar.com/View.ashx?M=F&ID=7431554&GUID=560CC2A3-8A23-4144-8CCB-CB9D273698B2"},{"kind":"filing","label":"Executed Development Agreement with exhibits, City of Mesa and Stone Applications, LLC (matter 19-0809)","retrievedAt":"2026-08-31","url":"https://legistar1.granicus.com/Mesa/attachments/e2e1b966-a066-4ba7-b9a6-ec11167a332d.pdf"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/google-redhawk-mesa-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"St. George","confidence":"medium","id":"compute_atlas-3279cad85344bb1e","lat":37.10988,"location_precision":"approximate","lon":-113.58321,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/valorc3-st-george-ut","value":4.0}],"name":"ValorC3 Saint George Data Center","operator":"ValorC3","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. St. George's FY2025-26 Redevelopment Agency budget itemizes every currently active project area by name (Central Business District CDA, Dixie Center EDA, Ft. Pierce CDA #1, Ft. Pierce CDA #2, Millcreek CDA, and Tech Ridge CDA — formerly the St. George Airport Community Development Project Area), none covering the Tonaquint corridor at 1108 West 1600 South; the facility instead sits within Tonaquint Business Park, a privately developed park built by the site's own developer to attract tech companies, not a public redevelopment district. No city or state filing names Valor C3. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 sales-tax exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"press","label":"New data center project in Utah — the facility was built by Kay Traveller of Tonaquint Development on land within the privately developed Tonaquint Business Park","publisher":"Data Center Knowledge","retrievedAt":"2026-09-08","url":"https://www.datacenterknowledge.com/business/new-data-center-project-in-utah"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/valorc3-st-george-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"compute_atlas-3292218906682f40","lat":41.098,"location_precision":"approximate","lon":-104.815,"name":"Orchard Hills Data Center","operator":"Trammell Crow Company","source_notes":"Two data center buildings are planned on 162 acres west of South Greeley Highway and south of West College Drive, adjacent to the Apple Street / York Avenue intersection. The coordinates are approximate, placed from that described location. As of October 2026, the outcome of the Oct 12 council vote had not been found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cheyenne council coverage noting the 162-acre Orchard Hills item with final votes Oct 12","publisher":"Cowboy State Daily","retrievedAt":"2026-10-17","url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/trammell-crow-orchard-hills-cheyenne-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Lisle","confidence":"high","contains_osm":true,"id":"compute_atlas-32b7d72871fd7da6","lat":41.8023406,"location_precision":"approximate","lon":-88.0948856,"name":"Centersquare ORD4 (Lisle)","operator":"Centersquare (Csquare)","source_notes":"Operator lists ORD4 at 66,875 sq ft of raised floor. No capacity is recorded: the operator's page gives 88.9MW against ORD4 while other trade listings give figures an order of magnitude lower for the same building, so the number is not asserted here. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (4513 Western Avenue LLC (CenterSquare ORD4), Lisle, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/centersquare-ord4-lisle-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/530024353"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/centersquare-lisle-ord4-data-center-osmway-530024353"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/530024353"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Daly City","confidence":"medium","id":"compute_atlas-32f8c6d92e7d40a6","lat":37.7061821,"location_precision":"approximate","lon":-122.4202102,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","value":10.0}],"name":"Cow Palace Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","source_notes":"Exploratory only — no lease, application or approval reported; recorded as rumored. San Francisco Supervisor Shamann Walton cited the Cow Palace pitch (bordering District 10) in proposing a citywide data center moratorium.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amid rising fear over data centers, an S.F. supervisor quietly plans a moratorium (2026-09-10)","publisher":"Mission Local","retrievedAt":"2026-09-21","url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/global-stack-cow-palace-daly-city-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"San Angelo (Tankersley area, unincorporated)","confidence":"medium","id":"compute_atlas-3302a6f46bf68ef6","lat":31.335,"location_precision":"approximate","lon":-100.478,"name":"Westline Site / Dove Creek Technology Campus","operator":"Beacon Data Centers (via Westline TX Holdings)","source_notes":"Anchored to TCEQ Air Quality Permit application #184380 filed by Westline TX Holdings (Beacon Data Centers). Site is ~1,240 buildable acres near the FM 2335 / US-67 South junction along Spring Creek, Precinct 4, Tom Green County. County commissioners rejected a proposed 12-month data-center moratorium 2026-06-02, citing litigation risk — an implicit but real signal the project is proceeding through the county's process. No MW capacity or investment figure disclosed in any source reviewed; left null per zero-fabrication rule. Coordinates are an approximate geocode of the named road junction (Tankersley, TX), not a parcel centroid — recommend verifying against the TCEQ permit's exact site description if available. Single-source (Concho Observer reporting a TCEQ air-quality permit application); recorded reported-tier pending a second corroborating primary.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TCEQ Air Quality Permit No. 184380 application (Westline TX Holdings)","publisher":"Texas Commission on Environmental Quality (reported via The Concho Observer)","retrievedAt":"2026-07-17","url":"https://conchoobserver.com/data-center-permits-detail-proposed-air-quality-footprint/"},{"kind":"press","label":"Tom Green County Commissioners Reject Data Center Moratorium","publisher":"SanAngeloLIVE","retrievedAt":"2026-09-21","url":"https://sanangelolive.com/news/county/2026-06-02/tom-green-county-commissioners-reject-data-center-moratorium"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/beacon-westline-dove-creek-san-angelo-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Big Beaver","confidence":"medium","id":"compute_atlas-3307b7e740e9eacf","lat":40.75,"location_precision":"approximate","lon":-80.33,"name":"Big Beaver Campus","operator":"Switch","source_notes":"382-acre campus, approximately 40 miles NW of Pittsburgh near the Ohio border.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Switch announces plans for data center campus outside Pittsburgh, Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/switch-announces-plans-for-data-center-campus-outside-pittsburgh-pennsylvania/"},{"kind":"press","label":"Big turnout and big voices at Big Beaver data center meeting — Beaver County Radio","retrievedAt":"2026-07-25","url":"https://beavercountyradio.com/news/big-turnout-and-big-voices-at-big-beaver-data-center-meeting/"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/switch-big-beaver-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Marshfield","confidence":"medium","contains_osm":true,"id":"compute_atlas-334262d2f9a5a6c4","lat":44.632178,"location_precision":"approximate","lon":-90.1734887,"name":"Aventus 715 Data Center","operator":"Aventus Data Centers","source_notes":"20,000 sq ft central-Wisconsin colocation facility with carrier-neutral connectivity, hierarchical local/cloud hybrid storage and backup replication to a facility 100 miles away. Same operator as Aventus Lakes in Milwaukee but a separate site. The geocode resolved to \"East Commerce Drive, Mill Creek Business Park, Marshfield\" rather than the exact street number the operator publishes (901 Commerce Dr.), so the pin is street-level within the business park and should be treated as approximate, not parcel-confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Aventus 715 — operator facility page (901 Commerce Dr., Marshfield, WI 54449; 20,000 sq ft)","publisher":"Aventus Data Centers","retrievedAt":"2026-09-13","url":"https://aventusdatacenters.com/aventus-715/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/aventus-715-marshfield-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Cedar City","confidence":"medium","id":"compute_atlas-33c9ff8aa13254c0","lat":37.6775,"location_precision":"approximate","lon":-113.0619,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/pronghorn-antelope-cedar-city-ut","value":1500.0}],"name":"Antelope Data Center (Project Antelope)","operator":"Pronghorn Development LLC","source_notes":"West of Cedar City along Antelope Springs Road; permit deemed vested ahead of the county's 180-day data center moratorium; development planned in phases over 8-10 years; up to 6.75M sq ft at full buildout. Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy. Iron County Planning Commission minutes for the 4 June 2026 conditional-use approval state \"This CUP is not tied to any tax incentives or reimbursements\", and no Iron County community-reinvestment project area was found covering this site, which lies in unincorporated Iron County outside Cedar City's municipal limits. The applicant's consultant told the commission their tax-revenue estimate was modelled both \"with the Inland Port incentives and without\", which is a future incentive being contemplated by the developer, not an awarded one.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Proposed Data Center Information — Iron County","publisher":"Iron County, Utah","retrievedAt":"2026-08-25","url":"https://ironcountyut.gov/planning/data-center-projects"},{"kind":"press","label":"Planning commission considers AI data center near Cedar City","publisher":"KSL.com","retrievedAt":"2026-09-01","url":"https://www.ksl.com/article/51463149/planning-commission-considers-ai-data-center-near-cedar-city"},{"kind":"subsidy","label":"Iron County Planning Commission minutes, 4 June 2026 — Antelope data campus conditional use permit","publisher":"Iron County","retrievedAt":"2026-09-04","url":"https://secure.utah.gov/pmn-admin/files/1431597.pdf"}],"updated":"2026-09-04","url":"https://www.compute-atlas.com/facilities/pronghorn-antelope-cedar-city-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"confirmed","city":"Claude","confidence":"medium","id":"compute_atlas-33e00e612fc63ff4","lat":34.973,"location_precision":"approximate","lon":-101.367,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/google-armstrong-county-tx","value":933.0}],"name":"Goodnight Campus","operator":"Google / Crusoe","source_notes":"Campus name: Goodnight, near the town of Claude, TX (known address: 10001 Lima Rd, Claude, TX 79019). Coordinates approximate (county parcel area). Developed by Crusoe Energy via entity GN DC1, LLC (Delaware LLC, 255 Filmore St., Denver, CO 80206); Google is the hyperscale tenant/customer, confirmed publicly November 2025. Tax abatement agreement was signed with GN DC1, LLC in late 2024 without publicly naming the tenant. Google confirmed the Crusoe partnership but had not signed an offtake agreement for the on-site gas plant as of early 2026; negotiations on power amounts still ongoing per Google spokesperson. Planned IT capacity: Phase 1 described in tax abatement agreement as 'anticipated to consume up to 530 MW,' 4 buildings each with 4 x 25 MW data halls, on approximately 350 acres; Phase 2 (possible additional 3+ buildings) reported at up to ~500 MW additional; combined full build-out reported as 1 GW+ — all capacity figures are 'up to' ceilings from permit and abatement documents, not firm contracted amounts. Project was scaled back from an original 7-building plan (October 2025 local reporting); 4 buildings with construction permits from TDLR as of early 2026; Crusoe described 3-4 buildings as likely; grading on additional parcels suggests total program may reach 5+ buildings. First phase expected online 2026; initial county PILOT payment expected June/July 2026. The $40B Google Texas investment is a statewide commitment through 2027 covering multiple sites (Armstrong County, Haskell County, Ellis County) with no site-specific investment figure disclosed by Google. A $29B campus investment figure appeared in Aterio/Crusoe reporting — this is a projected ceiling, not a firm committed amount, so it is not recorded as an investment figure. Distinct from Google's separate Haskell County TX site and Red Oak (Ellis County) TX sites — do not conflate. Building 3 is scheduled for completion 2026-08-01; Building 4 is due March 2027. Nothing at the campus is yet described as operational.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google commits $40bn to expand cloud and AI infrastructure in Texas through 2027","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/google-commits-40bn-to-expand-cloud-and-ai-infrastructure-in-texas-through-2027/"},{"kind":"press","label":"Google to Use Natural Gas to Power Massive Data Center in Texas","publisher":"Yale Environment 360","retrievedAt":"2026-08-16","url":"https://e360.yale.edu/digest/google-natural-gas-data-center"},{"kind":"press","label":"How a Crusoe-Google campus became Texas' co-location test case","publisher":"Latitude Media","retrievedAt":"2026-07-07","url":"https://www.latitudemedia.com/news/how-a-crusoe-google-campus-became-texas-co-location-test-case/"},{"kind":"press","label":"Armstrong County AI data center project scaled back from original plan","publisher":"NewsChannel 10 (Amarillo)","retrievedAt":"2026-07-07","url":"https://www.newschannel10.com/2025/10/18/armstrong-county-ai-data-center-project-scaled-back-original-plan/"},{"kind":"press","label":"Crusoe Plans $1B Texas AI Data Center Expansion, Pursues Nuclear Power","publisher":"The Energy Mag","retrievedAt":"2026-07-31","url":"https://theenergymag.com/news/2026-07-31/crusoe-texas-ai-data-center-goodnight"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-armstrong-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"confirmed","city":"Southaven","confidence":"medium","contains_osm":true,"id":"compute_atlas-33f43db57efc97ad","lat":34.9935,"location_precision":"exact","lon":-90.0342,"name":"MACROHARDRR (xAI Southaven)","operator":"xAI","source_notes":"The City of Southaven's Mayor's Report of 2026-01-07 says this building \"will become the home of their 3rd data center in the metropolitan area and the 2nd facility in Mississippi along with the renovated power plant at 2875 Stanton Road.\" It is distinct from xAI's power plant at 2875 Stanton Road (per the DeSoto Times and the Mayor's Report). MACROHARDRR retrofits an 810,000 sq ft former warehouse at 2400 Stateline Road. The Mayor's Report identifies it as the building formerly used by GXO; the DeSoto Times and Mississippi Free Press give the same 810,000 sq ft figure. The pin is the centroid of the OpenStreetMap building named \"xAI Macrohardrr\" on Stateline Road West, whose mapped outline measures roughly 810,000 sq ft (derived from the mapped OSM outline), matching the reported size; OpenStreetMap tags it with a Memphis, Tennessee address, which conflicts with the Mississippi address in every source. The DeSoto Times reports that Elon Musk broke the news of the building purchase on X on Dec. 30 (2025). Gov. Tate Reeves' office announced on 2026-01-08 a corporate investment \"exceeding $20 billion\" that \"will create hundreds of permanent jobs throughout DeSoto County\". The Governor's release announcing this data center says the Mississippi Development Authority \"has approved xAI for its Data Center Incentive\" (a sales and use tax exemption \"for all computing and equipment software used by companies certified as data centers by the agency\") and that the City of Southaven and DeSoto County \"are also supporting xAI's projects through fee-in-lieu agreements\". The Mississippi Free Press reports the data center \"will initially employ 145 people\"; the Governor's release says \"hundreds of permanent jobs throughout DeSoto County\". The release ties the exceeding-$20-billion investment to the Southaven project without breaking it down, so no investment figure is recorded for this building. The DeSoto Times reports that xAI purchased two pieces of property (47 and 58 acres) near its power plant at 2875 Stanton Road; that acreage is not clearly attributable to this building's own site, so the land area is omitted here rather than guessed. The Governor's release says that upon completion \"the Southaven data center will increase the company's computing power to nearly 2 gigawatts\", which is a company-wide total, and Musk's post (DeSoto Times) refers to xAI's training compute (\"Will take @xAI training compute to almost 2GW.\"). Neither gives this building's own capacity, so no capacity is recorded. The Governor's release says the company \"expects to begin data center operations in Southaven in February 2026.\" The January 2026 release also says xAI \"has purchased and is retrofitting a building to house the new data center operations\", so the record is under construction. No primary source reports the building operating, so operational is not claimed. Earlier versions of this site listed this building twice; as of October 2026, those entries are combined here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tech leader xAI investing more than $20 billion in Southaven","publisher":"Office of Governor Tate Reeves","retrievedAt":"2026-09-13","url":"https://governorreeves.ms.gov/tech-leader-xai-investing-more-than-20-billion-in-southaven/"},{"kind":"press","label":"xAI buys building and additional land in Southaven for data center","publisher":"DeSoto Times","retrievedAt":"2026-09-13","url":"https://www.desototimes.com/news/xai-buys-building-and-additional-land-in-southaven-for-data-center/article_99b4eb95-e5b1-4cd0-8f36-9ab0021b9cb5.html"},{"kind":"press","label":"Mayor's Report — xAI SOUTHAVEN (Continued Expansion)…, January 7, 2026","publisher":"City of Southaven, Mississippi","retrievedAt":"2026-09-09","url":"https://southaven.org/Blog.aspx?IID=227"},{"kind":"osm","label":"OSM building 'xAI Macrohardrr' (way 1077131079), Stateline Road West","publisher":"OpenStreetMap contributors","retrievedAt":"2026-10-21","url":"https://www.openstreetmap.org/way/1077131079"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/xai-macrohardrr-southaven-ms"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"compute_atlas-33f5d4a2692bd76b","lat":38.53,"location_precision":"approximate","lon":-77.8,"name":"SAMX Data Centers","operator":"SAMX Data LLC","source_notes":"Honest intake: application on hold awaiting a second county submission — recorded as status=proposed with the hold explicitly noted, per prompt guidance to intake real filings with an honest 'on hold' note rather than drop. Fauquier planning-database roundup; application on hold awaiting resubmission.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-07-17","url":"https://www.compute-atlas.com/facilities/samx-data-centers-remington-fauquier-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Orem","confidence":"medium","id":"compute_atlas-33feb79ff2024934","lat":40.27619,"location_precision":"exact","lon":-111.67595,"name":"Fibernet Orem Data Center","operator":"Fibernet","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Orem's RDA minutes record only one project area active as of 2019 (Project 90-08), and current FY2026-27 RDA activity is concentrated entirely in the University Place CDA at the mall redevelopment roughly 200m west of Fibernet's 1145 South 800 East site — outside that project area's described boundary by street-corridor cross-reference, not a parcel-level GIS check. No source names Fibernet in any Orem RDA record. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/fibernet-orem-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"likely","city":"McCarran","confidence":"high","contains_osm":true,"id":"compute_atlas-3426f53653b2f392","lat":39.5115198,"location_precision":"exact","lon":-119.4833058,"name":"Switch Tahoe Reno 3 (The Citadel Campus)","operator":"Switch","source_notes":"Named explicitly in Switch's groundbreaking press release for 2nd/3rd Tahoe Reno buildings.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1320683840","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1320683840"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/switch-tahoe-reno-3-the-citadel-campus-nv"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1116775094"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1116775095"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1320683840"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1494498031"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1494498032"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Troy","confidence":"medium","id":"compute_atlas-342fd51caa4ff3ae","lat":38.719,"location_precision":"approximate","lon":-89.913,"name":"Cloverleaf Troy Data Center Campus","operator":"Cloverleaf Infrastructure","source_notes":"Four data center buildings plus substation, office and warehouse proposed on farmland off Formosa Road near Collinsville Road. Cloverleaf is a powered-land developer; no end tenant has been named. A permanent-jobs estimate of 100-200 was given as a range and is not recorded as a single value; Cloverleaf's estimate of about 1,000 construction jobs is likewise approximate and not recorded. Coordinates are derived from the mapped road intersection and are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cloverleaf-troy-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Bend","confidence":"high","contains_osm":true,"id":"compute_atlas-3452ae85742e2d62","lat":44.086105,"location_precision":"exact","lon":-121.2830411,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-or01-bend-or","value":0.9}],"name":"US Signal OR01 Bend","operator":"US Signal","source_notes":"LEED-certified Tier 3 colocation facility with a 2,000 kW N+1 generator, 2500 kVA utility feeds, 256-ton N+1 HVAC and 2N UPS. As of October 2026, US Signal's facility page gives a critical IT workload of 900 kW, 30,000 total sq ft and 5,000 sq ft of whitespace; the operational capacity records the 900 kW critical IT workload, not the generator rating.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-or01-bend-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/653416730"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/us-signal-or01-bend-osmway-653416730"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/653416730"}],"state":"Oregon","status":"operating"},{"ai_classification":"confirmed","city":"Grayslake","confidence":"medium","id":"compute_atlas-347d8ad554df4ced","lat":42.3442,"location_precision":"approximate","lon":-88.0417,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/t5-chicago-iv-grayslake-il","value":1200.0}],"name":"T5 Chicago IV (CHI IV)","operator":"T5 Data Centers","source_notes":"CHI IV in Grayslake, Lake County (~40 mi north of Chicago): up to 1.2 GW IT capacity with 1.6 GW secured ComEd power; envisions 20 × 60 MW buildings, Phase 1 (3 × 60 MW) targeted Q4 2027. Earthmoving had started on the first piece of the site by May 2026 (Hoodline), and the record is listed as under construction. The Village of Grayslake's FAQ, updated August 18, 2026, says the approved campus is located on 473 acres in the Peterson Road corridor; T5's May 2024 announcement described a 160-acre site supporting up to 480 MW of critical IT capacity, which is a planned figure, not capacity in operation. Distinct from T5's Palmetto, GA campus. Coordinates are the Grayslake area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"T5 plans five gigawatt-scale data center campuses, announces Chicago campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/t5-plans-five-gigawatt-scale-data-center-campuses-announces-chicago-campus/"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report — T5@Chicago IV, LP, Grayslake (2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-25","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"},{"kind":"other","label":"Correction source","retrievedAt":"2026-10-15","url":"https://t5datacenters.com/resources/t5-data-centers-announces-further-expansion-into-chicago-suburbs-with-new-480-mw-data-center-campus/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/t5-chicago-iv-grayslake-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-3524c5e0fffd46cf","lat":40.06965,"location_precision":"exact","lon":-82.77165,"name":"QTS New Albany III","operator":"QTS Data Centers","source_notes":"Third QTS campus in the New Albany International Business Park, on Babbitt Rd (Franklin County) — 3 buildings, ~1.1M sq ft on 78 acres, announced December 2023 alongside the Miller Rd (IV) site as part of QTS's ~$4.4B New Albany expansion (aggregate across III + IV; no reliable per-site investment split disclosed, so no investment figure is recorded). Franklin County auditor use-class is \"data center\" (an assessed data-center structure exists); construction status is not independently confirmed operational by press, so recorded conservatively as under construction. Distinct from QTS New Albany I & II (Beech Rd SW). No site-specific IT-load MW disclosed. QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS Invests $4.4 Billion in New Data Centers (Dec 2023)","publisher":"New Albany Company","retrievedAt":"2026-07-18","url":"https://newalbanybusiness.org/news/2023/12/qts-invests-4-4-billion-in-new-data-centers/"},{"kind":"press","label":"New data center megaproject planned for New Albany","publisher":"Columbus/Central Ohio Building & Construction Trades Council","retrievedAt":"2026-07-18","url":"https://columbusconstruction.org/new-datacenter-megaproject-planned-for-new-albany/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/qts-new-albany-3-franklin-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Wood Dale","confidence":"high","contains_osm":true,"id":"compute_atlas-353712726a81a59d","lat":41.9757324,"location_precision":"exact","lon":-87.9646913,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://elementcritical.com/data-centers/chicago-one/","value":7.0}],"name":"Element Critical Chicago One","operator":"Element Critical","source_notes":"Confirmed via operator's own facility page. Address 711 N. Edgewood Avenue, Wood Dale, IL. Operator markets '30 years never down' track record. Distinct site from Chicago Two.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Element Critical facility directory","publisher":"Element Critical","retrievedAt":"2026-09-21","url":"https://elementcritical.com/data-centers/chicago-one/"},{"kind":"osm","label":"OpenStreetMap way/384690290","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/384690290"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/element-critical-chicago-one-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Element Critical facility directory","publisher":"Element Critical","retrievedAt":"2026-09-21","url":"https://elementcritical.com/data-centers/chicago-data-center/"},{"kind":"osm","label":"OpenStreetMap way/377212693","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/377212693"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/element-critical-chicago-two-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/384690290"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/element-critical-ch1-osmway-384690290"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377212693"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/384690290"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Sterling Forest (Town of Warwick)","confidence":"medium","id":"compute_atlas-355797b0a86f3f99","lat":41.19592,"location_precision":"approximate","lon":-74.255576,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/watchtower-sterling-forest-warwick-ny","value":8.75}],"name":"Sterling Forest Business Resiliency Services Center (former IBM/Kyndryl Sterling Forest data center)","operator":"Watchtower Bible and Tract Society of New York (acquired from Kyndryl, June 2026)","source_notes":"Long-standing enterprise/resiliency data center (IBM, then Kyndryl after the 2021 spin-off). Watchtower says the property 'will provide additional flexibility' for its internal databases and JW.ORG platform but specific plans 'remain unevaluated'; treat current use as continuing data-center operation pending confirmation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Jehovah's Witnesses Buy Data Center in Warwick (Kyndryl Sterling Forest sale, June 26 2026)","publisher":"Rockland County Business Journal","retrievedAt":"2026-09-21","url":"https://rcbizjournal.com/2026/07/06/jehovahs-witnesses-buy-data-center-in-warwick-religious-order-continues-to-expand-footprint-in-hudson-valley/"},{"kind":"permit","label":"NYSDEC ENB — Town of Warwick, KYNDRYL INC – STERLING FOREST, 300 Long Meadow Rd: water-withdrawal application for chilled water / mechanical-draft cooling towers","publisher":"NYS Department of Environmental Conservation","retrievedAt":"2026-09-21","url":"https://dec.ny.gov/news/environmental-notice-bulletin/2023-11-22/completed-application/town-of-warwick-kyndryl-inc-sterling-forest"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/watchtower-sterling-forest-warwick-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"San Jose (Alviso)","confidence":"medium","id":"compute_atlas-360b8b9b78487409","lat":37.428,"location_precision":"approximate","lon":-121.977,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/microsoft-alviso-san-jose-ca","value":48.0}],"name":"Microsoft Alviso Data Center Campus","operator":"Microsoft","source_notes":"Microsoft's first self-owned/operated data center in San Jose. Groundbreaking June 10, 2026, target completion 2028. 64-acre site (1657 Alviso-Milpitas Rd), two-building campus. Distinct from the already-tracked Prologis San Jose records.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft breaks ground on Alviso data center campus in San Jose, California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-alviso-data-center-campus-in-san-jose-california/"},{"kind":"press","label":"Microsoft breaks ground on data center in Alviso","publisher":"SV Daily","retrievedAt":"2026-07-17","url":"https://svdaily.com/2026/06/23/microsoft-breaks-ground-on-data-center-in-alviso/"},{"kind":"press","label":"Connect CRE — Microsoft Breaks Ground on Long-Planned North San Jose Data Center Site","retrievedAt":"2026-07-25","url":"https://www.connectcre.com/stories/microsoft-breaks-ground-on-long-planned-north-san-jose-data-center-site/"},{"kind":"press","label":"HITT Contracting breaks ground on Microsoft Alviso datacenter","publisher":"HITT Contracting","retrievedAt":"2026-09-14","url":"https://www.hitt.com/news-hub/hitt-breaks-ground-microsoft-alviso-datacenter/"},{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-10-19","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"'Full-on Backlash' Against Data Centers Occurring as San José Courts Them","publisher":"KQED","retrievedAt":"2026-09-29","url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/microsoft-alviso-san-jose-ca"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-362085c329a40785","lat":39.1517,"location_precision":"approximate","lon":-79.4913,"name":"Ridgeline Data Center","operator":"Fundamental Data LLC","source_notes":"Proposed between the towns of Davis and Thomas, Tucker County. Reported acreage varies by source and is not recorded as a structured field: a 2024 purchase-and-sale agreement covered approximately 290 acres, other reporting describes a '500-acre' data center and power plant, a Country Roads News report describes a roughly 300-acre site, and West Virginia Highlands Conservancy describes 'potentially thousands of acres' for the full buildout -- these are not reconciled here. See the co-located power generation record, Ridgeline Power Plant, for the natural-gas plant that would exclusively serve this data center. No public capacity, investment, or job figures for the data center building itself (as distinct from the power plant) were found as of 2026-09-10.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"WV advocates want to know who owns the land proposed for data center development in Tucker County","publisher":"West Virginia Watch","retrievedAt":"2026-09-10","url":"https://westvirginiawatch.com/2026/07/20/wv-advocates-want-to-know-who-owns-the-land-proposed-for-data-center-development-in-tucker-county/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/fundamental-data-ridgeline-datacenter-tucker-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Faribault","confidence":"medium","id":"compute_atlas-363909845725751a","lat":44.3654972,"location_precision":"approximate","lon":-93.2871543,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.archerdatacenters.com/news-resources/archer-acquires-land-in-faribault-minnesota-for-120mw-data-center-campus-g68bg","value":120.0}],"name":"Archer Datacenter Faribault","operator":"Archer Datacenter","source_notes":"Up to 500,000 sq ft across six one-story buildings, south of 150th Street West and east of Acorn Trail, north of the Daikin plant. Land acquired 2024; no formal application yet submitted to the city as of the source date. Project on hold pending redo of the city's environmental review after a June 2026 Minnesota Court of Appeals ruling found it non-compliant.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Archer Datacenters — \"Archer acquires land in Faribault, Minnesota, for 120MW data center campus\": 84.3 acres, up to 500,000 sq ft","publisher":"Archer Datacenters","retrievedAt":"2026-09-18","url":"https://www.archerdatacenters.com/news-resources/archer-acquires-land-in-faribault-minnesota-for-120mw-data-center-campus-g68bg"},{"kind":"press","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","retrievedAt":"2026-10-13","url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/archer-datacenter-faribault-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Spartanburg","confidence":"medium","contains_osm":true,"id":"compute_atlas-363c3006cd63d8ea","lat":34.923066,"location_precision":"approximate","lon":-81.851905,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://cleanenergy.org/press-archive/residents-sue-over-data-center-permits-seek-utility-regulator-scrutiny-of-natura/","value":450.0}],"name":"NorthMark Strategies Spartanburg High-Performance Computing Center","operator":"Valara Holdings (NorthMark Strategies)","source_notes":"Adaptive reuse of the former Kohler manufacturing facility in Spartanburg County, developed by NorthMark Strategies through its subsidiary Valara Holdings. This is a DIFFERENT Spartanburg County site from the tracked Greenidge record at 300 Jones Road. Coordinates are an approximate geocode of the South Pine Street address reported in local coverage; no parcel-level source was retrieved. Subsidies checked 2026-09-10: Spartanburg County Council approved a tax incentive package for the project, but the article does not give a FILOT dollar figure or program name -- only projected resulting property-tax revenue ($10.5M in 2026 rising to $15M/yr 2029-2045). Not filing a structured subsidies entry since no incentive amount is stated; flagging for a follow-up pass that can find the actual FILOT ordinance.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Spartanburg data center requests additional equipment for larger power capacity","publisher":"Spectrum News 1 South Carolina","retrievedAt":"2026-08-26","url":"https://spectrumlocalnews.com/sc/south-carolina/news/2026/04/23/south-carolina-news-data-center-power-generation-scdes"},{"kind":"permit","label":"Air - Construction Permit (Modification), Submission HQJ-32R0-VR9VC — Valara Holdings High Performance Compute Center","publisher":"SC Department of Environmental Services","retrievedAt":"2026-09-13","url":"https://des.sc.gov/sites/des/files/Documents/BAQ/Valara/Application.pdf"},{"kind":"press","label":"What the Drafts Let Us See (Valara development agreement drafts)","publisher":"Carolina Ecology (Sam Harrelson)","retrievedAt":"2026-10-27","url":"https://www.carolinaecology.com/p/what-the-drafts-let-us-see"},{"kind":"permit","label":"Fact Sheet: Valara Holdings High Performance Compute Center Air Quality Construction Permits","publisher":"SC Department of Environmental Services","retrievedAt":"2026-10-27","url":"https://des.sc.gov/sites/des/files/2026-06/Valara%20Fact%20Sheet.pdf"},{"kind":"press","label":"Residents sue over data center permits, seek utility regulator scrutiny of natural gas plant","publisher":"Southern Alliance for Clean Energy","retrievedAt":"2026-10-27","url":"https://cleanenergy.org/press-archive/residents-sue-over-data-center-permits-seek-utility-regulator-scrutiny-of-natura/"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/northmark-valara-spartanburg-sc"}],"state":"South Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Wilmington","confidence":"medium","id":"compute_atlas-36828e0d370960d6","lat":39.4453393,"location_precision":"approximate","lon":-83.8285375,"name":"AWS Wilmington Data Center Campus","operator":"Amazon Web Services","source_notes":"Nine data center buildings totaling about 1.92 million sq ft on a 471-acre parcel on the south side of Wilmington. AWS is funding $25+ million in shared public infrastructure (sewer trunk lines, water main, a 1 million-gallon water tower, and road work on U.S. 68 and SR 730). A separate, later rezoning added roughly 500 more acres in the city for a second, different developer's project.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center FAQs — Clinton County","publisher":"Choose Clinton County","retrievedAt":"2026-09-09","url":"https://www.chooseclintoncountyoh.org/news/data-center-faqs"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/aws-wilmington-clinton-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Columbus","confidence":"high","contains_osm":true,"id":"compute_atlas-368ca2fd44c7e281","lat":40.1178254,"location_precision":"approximate","lon":-83.0007799,"name":"Cologix COL4 (Columbus)","operator":"Cologix","source_notes":"Single-source (operator site), so the record is marked reported. Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/cologix-col4-columbus-oh"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/551387747"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1462886682"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567781259"}],"state":"Ohio","status":"operating"},{"ai_classification":"likely","city":"North Las Vegas","confidence":"medium","id":"compute_atlas-369cf8a4d5f5b604","lat":36.329138,"location_precision":"approximate","lon":-114.9277774,"name":"Switch Apex Industrial Park Land Position","operator":"Switch","source_notes":"This is a land position, not an announced facility. Switch declined to describe its development strategy and reporting indicates North Las Vegas had received no plans or applications for the Apex parcels. The investment figure is the combined recorded land price ($85.5M plus $95M), not a project capex. Apex Industrial Park sits about 25 miles northeast of the Las Vegas Strip near the I-15 / U.S. 93 interchange. Recorded so the site is trackable if a project is filed. Distinct from the Novva 205-acre Apex holding the tracker carries as of September 2026. Public reception as of 2026-09-10: the Las Vegas Review-Journal article (2026-09-10) on the $95M/140-acre land purchase covers the transaction and general Southern Nevada water-usage context but includes no direct quotes from residents, community groups, or elected officials about this specific purchase. No public hearing or reaction is documented in this source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/switch-apex-industrial-park-north-las-vegas-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"compute_atlas-369ddef15b67af7d","lat":41.8763329,"location_precision":"approximate","lon":-87.6314808,"name":"CoreSite CH1","operator":"CoreSite","source_notes":"Downtown Chicago colocation facility adjacent to the Board of Trade; CoreSite's page states \"180,000+\" sq ft. Coordinates geocoded from the published street address. CoreSite, L.P. holds a 2020 Illinois Data Center Investment Program MOU for a Chicago site, but the state report does not say which of CoreSite's two Chicago facilities it covers, so no subsidy figure is attributed to this record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (Coresite, L.P., Chicago, 2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-08-31","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/coresite-ch1-chicago-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-36cf76527a063271","lat":37.3308869,"location_precision":"approximate","lon":-121.8906767,"name":"Westbank 180 Park Avenue Data Center (Park Habitat site, downtown San José)","operator":"Westbank / Urban Community","source_notes":"Former Park Habitat office site; demolition began in 2022 and excavation halted after an archaeological find. Plans shifted from office to residential-plus-data-center in August 2025 per SF YIMBY.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"New renderings for BIG-designed tower in downtown San Jose (2025-12-12)","publisher":"San Francisco YIMBY","retrievedAt":"2026-09-21","url":"https://sfyimby.com/2025/12/new-renderings-for-big-designed-tower-in-downtown-san-jose.html"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/westbank-180-park-avenue-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Auburn Hills","confidence":"medium","id":"compute_atlas-36d1399461403764","lat":42.6529314,"location_precision":"approximate","lon":-83.2148612,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-mi05-auburn-hills-mi","value":4.0}],"name":"US Signal MI05 Detroit Data Center","operator":"US Signal","source_notes":"Largest of US Signal's five Michigan sites. Operator's facility page (retrieved 2026-09-09) states: generators 6,000 kW N+1, UPS 4,000 kW at 2N, utility feeds 4,000 kVA, HVAC 480 tons N+1, Tier 3, 99.999% uptime SLA, VESDA plus clean-agent suppression. Year built not stated. The page describes it as a 'large-scale, AI-ready facility with room to scale power' serving the Auburn Hills automotive-technology cluster; that is a forward-looking marketing claim, so no AI classification is recorded. As of October 2026 the same page also gives a critical IT workload of 4,000 kW, which is recorded as the operational capacity; the generator, UPS and utility figures are electrical-plant ratings. Cooling medium not stated. Coordinates geocoded from the street address on the operator's page; parcel not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-mi05-auburn-hills-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-37064cf5f45dca62","lat":39.0179257,"location_precision":"exact","lon":-77.4595164,"name":"Cologix ASH1","operator":"Cologix","source_notes":"455K sqft Cologix-owned Scalelogix hyperscale facility at 21745 Beaumeade Circle, Ashburn VA; confirmed operational via official facility page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1188715510","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1188715510"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cologix-ash1-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1188715510"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cologix-ash1-osmway-1188715510"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188715510"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560827027"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Garland","confidence":"medium","contains_osm":true,"id":"compute_atlas-371d253045913390","lat":32.9810371,"location_precision":"exact","lon":-96.6563775,"name":"NTT Global Data Centers Dallas TX1","operator":"NTT Global Data Centers","source_notes":"NTT's Dallas-market campus is located in Garland, TX (2008 Lookout Drive), not Plano; Lambda/Aligned DFW-04 is a different operator ~5.8km away and not the same site. As of October 2026, Stream Data Centers' DFW VII, a different operator's separate 22.6-acre site in Garland, is tracked about 0.35 km from this pin. This OpenStreetMap building outline is treated as the anchor for NTT's single Dallas-area campus; as of October 2026, OpenStreetMap shows three other building outlines tagged as NTT data centers within about 260 m of this pin, and they are treated as parts of the same campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/671637259","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/671637259"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/ntt-global-data-centers-dallas-tx1-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Wellington","confidence":"medium","id":"compute_atlas-372a62691deb8e56","lat":37.29,"location_precision":"approximate","lon":-97.4,"name":"Cormor / Data Shelter Wellington Data Center","operator":"Cormor and Data Shelter","source_notes":"Proposed for the north end of Wellington; coordinates are approximate. The city runs two generation plants (~40 MW combined) and would sell power to the facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Wellington officials to discuss proposed data center, power agreement","publisher":"KWCH","retrievedAt":"2026-10-21","url":"https://www.kwch.com/2026/03/17/wellington-officials-discuss-proposed-data-center-power-agreement/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/cormor-data-shelter-wellington-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"confirmed","city":"Bowling Green","confidence":"medium","id":"compute_atlas-373565554d121403","lat":41.432,"location_precision":"approximate","lon":-83.701,"name":"Meta Bowling Green (Project Accordion)","operator":"Meta","source_notes":"715,000 sq ft facility on State Route 582 between SR-25 and I-75, Middleton Township, Wood County OH. Meta's 28th global and 2nd Ohio data center. The Apollo gas plant (OPSB Case No. 25-973-EL-BGN) operates behind-the-meter serving Liames LLC (Meta shell company); not grid-connected. Full capacity from Apollo expected late 2027. Coordinates are approximate Middleton Township centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta to develop data center campus outside Toledo, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-outside-toledo-ohio/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-middleton-township-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Moreland","confidence":"medium","id":"compute_atlas-378464e6fdc0177d","lat":33.2868748,"location_precision":"approximate","lon":-84.7679526,"name":"Bridgeport Data Center Campus","operator":"Undisclosed developer (Bridgeport Industrial Park)","source_notes":"Six data center buildings with substations proposed on 1,063.9 acres along U.S. 27/29 near Interstate 85, spanning unincorporated Coweta County and Moreland. The applicant is represented by Steven Jones of the McKagen Jones Law Firm; the original 2015 industrial-park developer was listed as P&L Bridgeport 1 and P&L Bridgeport 2, and current control of the data center proposal is not publicly stated, so no operator is asserted. The reported campus valuation is a $3-5 billion range and is therefore not recorded as a single investment figure. Coordinates are approximate to Moreland.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/bridgeport-data-center-campus-coweta-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Richland","confidence":"medium","id":"compute_atlas-378c9e58933a60ec","lat":46.36,"location_precision":"approximate","lon":-119.325,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/atlas-agro-richland-data-center-campus-wa","value":320.0}],"name":"Atlas Agro Richland Data Center Campus","operator":"Atlas Agro North America","source_notes":"Swiss fertilizer developer Atlas Agro offered the City of Richland just under $24 million for 275 acres in the Northwest Advanced Clean Energy Park, adjacent to its planned zero-carbon nitrate fertilizer plant. The campus would comprise five data center buildings of roughly 500,000 sq ft each, with construction targeted to begin in 2027. Columbia Riverkeeper's February 2026 report puts the campus's power requirement at at least 320 MW. Power would come via a Bonneville Power Administration line serving both the data center and the fertilizer plant. Atlas Agro's North American president describes the data center as 'a partner that helps us build the necessary power and utility infrastructure.' Coordinates are an approximate geocode of the stated address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/atlas-agro-richland-data-center-campus-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"likely","city":"Conyers","confidence":"medium","id":"compute_atlas-37a6e3a4b3f68090","lat":33.66,"location_precision":"approximate","lon":-84.02,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dcblox-atlanta-east-conyers-ga","value":216.0}],"name":"DC BLOX Atlanta East Hyperscale Data Center Campus","operator":"DC BLOX","source_notes":"Coordinates approximate; physical address is 1726 Farmer Road NW, Conyers GA 30012. Land: 72 acres acquired per press release; Georgia EPD permit SAS-2024-00075 references 52.84-acre development footprint with three 40MW buildings. Capacity: 216MW total committed by Georgia Power per utility agreement and DRI filing; DC BLOX facility page cites 154 critical/IT MW (1 × 10MW + 3 × 48MW buildings = 154MW IT load). Phase 1 targeted Q4 2025 delivery (hyperscale anchor + 160,000 sq ft available to additional tenants); non-water-quality construction began December 2025; water-quality permitted work may begin October 2026 with full build taking ~1 year. Dark fiber metro ring planned around Atlanta connecting Atlanta East and Atlanta West campuses and continuing to Myrtle Beach cable landing station. AI/ML applications explicitly cited in press materials as key driver of Atlanta hyperscale demand. DISTINCT from DC BLOX Atlanta West campus in Douglas County (Lithia Springs, ~55 acres, 180MW). Investment amount not publicly disclosed. Job counts not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DC Blox files for data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/dc-blox-files-for-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/dcblox-atlanta-east-conyers-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Shady Spring","confidence":"medium","contains_osm":true,"id":"compute_atlas-3834495c92bd10da","lat":37.7020095,"location_precision":"approximate","lon":-81.0855214,"name":"Shady Spring Data Center Campus (Greenbrier Land Company rezoning)","operator":"Undisclosed end user (rezoning sought by Greenbrier Land Company)","source_notes":"Rezoning of more than 700 acres of residential land in Shady Spring, sought by property owner Greenbrier Land Company so an unnamed company (under NDA) could build a multi-building data center campus. The commission tabled the request on 2024-01-09; WOAY reported that the vote was to table the decision indefinitely, and the commission president said the commission had not completely abandoned future development of the property. As of October 2026, no later action on the request has been found. As of October 2026, the 727-acre figure comes from WVVA's December 2023 report on a Raleigh County Planning and Zoning Board public meeting, which also says the company's proposal shows eight buildings within the 700-acre area and that the project could create up to 600 jobs (an upper bound, not recorded as a jobs figure); WVVA's January 2024 report on the tabling gives 'more than 700 acres'.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/shady-spring-data-center-campus-raleigh-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"high","contains_osm":true,"id":"compute_atlas-383e4ca6e396998d","lat":41.9936612,"location_precision":"exact","lon":-87.973521,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/skybox-chicago-i-il","value":30.0}],"name":"Skybox Chicago I","operator":"Skybox Datacenters","source_notes":"30MW, 190,000 SF, LEED Silver, operational/available now. As of July 2026, no AI/HPC-specific evidence was found on the facility page, so no AI classification is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/383545769","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/383545769"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/skybox-chicago-i-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/383545769"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/skybox-chicago-i-osmway-383545769"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/383545769"}],"state":"Illinois","status":"operating"},{"ai_classification":"likely","city":"McCarran","confidence":"medium","id":"compute_atlas-384f62879bd389c7","lat":39.5602824,"location_precision":"approximate","lon":-119.4990959,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-reno-storey-county-nv","value":65.0}],"name":"PowerHouse Reno Campus","operator":"PowerHouse Data Centers","source_notes":"Three two-story powered-shell buildings totalling 900,000 sq ft on 49 acres, developed with parent American Real Estate Partners (AREP). The 65 MW figure is the campus figure in PowerHouse's own groundbreaking release; PowerHouse's own Reno campus page separately lists 200 MW of power for the site as of October 2026. The two figures are not reconciled, and the 65 MW figure is the one recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"PowerHouse Reno campus page (49 acres, 900,000 SF, Power: 200 MW)","publisher":"PowerHouse Data Centers","retrievedAt":"2026-10-28","url":"https://www.powerhousedata.com/data-center/powerhouse-reno"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/powerhouse-reno-storey-county-nv"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Lower Mount Bethel Township","confidence":"medium","id":"compute_atlas-39265455259594f6","lat":40.8015773,"location_precision":"approximate","lon":-75.1572603,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lower-mount-bethel-tech-center-northampton-pa","value":1200.0}],"name":"Lower Mount Bethel Tech Center","operator":"Peron Development / J.G. Petrucci Co.","source_notes":"About 450 acres near Martins Creek Belvidere Highway and Gravel Hill Road. No end user. Jobs and investment are developer estimates. The pin is the township centroid. Distinct from the Slate Belt Holdings campus in Upper Mount Bethel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/lower-mount-bethel-tech-center-northampton-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"compute_atlas-394cd289736ecc0e","lat":33.7515,"location_precision":"approximate","lon":-84.7477,"name":"CyrusOne Douglasville Data Center Campus","operator":"CyrusOne","source_notes":"In 2017 the state announced a $200M investment over seven years and 9 CyrusOne jobs, at Riverside West Industrial Park in Douglasville. The 44-acre campus is listed as operating and phased. Coordinates are the Douglasville city centroid. Distinct from CyrusOne's Project Peach (Coweta County), which is already tracked.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Deal: CyrusOne to invest more than $200 million in Douglas County","publisher":"Office of the Governor of Georgia","retrievedAt":"2026-10-14","url":"https://nathandeal.georgia.gov/press-releases/2017-12-19/deal-cyrusone-invest-more-200-million-douglas-county/"},{"kind":"other","label":"Every Data Center in Georgia: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","retrievedAt":"2026-10-14","url":"https://insidethedatacenter.com/articles/georgia-data-centers/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/cyrusone-douglasville-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Papillion","confidence":"medium","contains_osm":true,"id":"compute_atlas-3965537d542741dc","lat":41.1655405,"location_precision":"approximate","lon":-96.083617,"name":"Fidelity Investments Papillion Data Center (Project Photon)","operator":"Fidelity Investments","source_notes":"First user of Nebraska Advantage Act's 'Tier 2 Plus - Large Data Center' provision (min. $200M investment and 30 jobs); 30-35 employees expected; designed to qualify for LEED. Current operating status rests on a third-party tracker listing, not a primary source; no opening announcement had been retrieved as of October 2026. Coordinates are an OSM building tagged 'Fidelity' on Cornhusker Road, consistent with the tracker's street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"US Datacenter Tracker — Nebraska (FIDELITY INVESTMENTS DATA CTR, 11050 Cornhusker Rd, Papillion, operational)","publisher":"Kadoa","retrievedAt":"2026-10-12","url":"https://www.kadoa.com/datacenter/state/nebraska"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/fidelity-papillion-data-center-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"mixed_use","city":"Smithfield","confidence":"medium","id":"compute_atlas-3977ffd849e4c267","lat":41.867,"location_precision":"approximate","lon":-71.527,"name":"Hanton City Business Park (data center anchor)","operator":"Hanton City Investments LLC","source_notes":"No megawatt capacity has been publicly disclosed, so no capacity is recorded. The $59M figure cited in coverage is projected town tax revenue over 30 years, not facility investment, so it is not recorded as investment. Additional coverage (Rhode Island Current, ecoRI News) could not be retrieved as of July 2026 and is not cited; as of October 2026, the cited press coverage is the Ocean State Media and Valley Breeze articles. Coordinates are approximate Smithfield-area coordinates.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Smithfield to defend decision to ban data center (Oct 1, 2026)","publisher":"The Valley Breeze","retrievedAt":"2026-10-26","url":"https://www.valleybreeze.com/news/smithfield-to-defend-decision-to-ban-data-center/article_835489a3-e09c-49ca-9bb0-bd860de9c280.html"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/hanton-city-smithfield-ri"}],"state":"Rhode Island","status":"planned"},{"ai_classification":"confirmed","city":"Altoona","confidence":"medium","id":"compute_atlas-3998c7b10f8bff5b","lat":41.6459,"location_precision":"approximate","lon":-93.4696,"name":"Meta Altoona Data Center Campus","operator":"Meta","source_notes":"Operational since 2013; 5M+ sq ft after seven expansions — Meta's largest cloud campus. Meta's engineering blog documents Altoona as a GenAI infrastructure / LLaMA training site. INVESTMENT: 'more than $2.5 billion' is a cumulative multi-year figure across all expansions, recorded as the campus investment. Meta says more than 400 people work on-site in data center operations each day, and its info sheet lists \"400+\" operational jobs supported; the recorded permanent-job figure of 400 is that stated floor. As of October 2026, no cited source states the campus's operational capacity; ~350 MW per a third-party index is not recorded. Coordinates are the Altoona town centroid. Meta cites a cumulative capital investment of 'more than $2.5 billion' across seven Altoona expansions since 2013 (Data Center Frontier); the 2019 Building 5 phase was ~$400M (IEDA). Meta's Altoona info sheet lists '$2.5B+' as data center investment in Iowa. The recorded investment is the cumulative figure for the whole campus; the ~$400M figure covers the 2019 Building 5 phase alone and is not recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Building Meta's GenAI Infrastructure","publisher":"Engineering at Meta","retrievedAt":"2026-07-07","url":"https://engineering.fb.com/2024/03/12/data-center-engineering/building-metas-genai-infrastructure/"},{"kind":"press","label":"Meta signs 225MW wind PPA in Iowa","publisher":"Data Center Dynamics","retrievedAt":"2026-07-08","url":"https://www.datacenterdynamics.com/en/news/meta-signs-225mw-wind-ppa-in-iowa/"},{"kind":"press","label":"How much water do Iowa data centers use","publisher":"KDSM17 (CBS Iowa)","retrievedAt":"2026-07-08","url":"https://kdsm17.com/news/local/how-much-water-do-iowa-data-centers-use"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/meta-altoona-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Beloit","confidence":"medium","id":"compute_atlas-3a0d83193a7adb43","lat":42.5843885,"location_precision":"approximate","lon":-89.0215921,"name":"Project Cornmaze Data Center (Town of Beloit)","operator":"Panattoni","source_notes":"430 acres at an existing gravel pit on the northeast side of the Town of Beloit, along Town Line Road, South Prairie Avenue and East Philhower Road; property currently owned by Rock Road Companies Inc. Very preliminary — a sewer and water study is underway, no site plans or applications filed, land not yet purchased. The town's pre-development agreement is with Cambrin LLC, a Delaware entity; DNR filings share a contact name and email with Degas LLC, the entity Meta used for Beaver Dam, and as of August 2026 Meta has not confirmed involvement. WUWM reported in June 2026 that the Town of Beloit administrator learned in April that Panattoni had taken over the project, and Panattoni's Cornmaze page names Panattoni Development Company as the developer, so the operator is recorded as Panattoni Development Company. Coordinates geocode Town Line Road.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"The Rock County data center fight — Cambrin/Beloit quarry site","publisher":"608 Scanner","retrievedAt":"2026-08-18","url":"https://608scanner.com/the-rock-county-data-center-fight-janesvilles-three-proposals-and-the-vote-that-could-decide-them/"},{"kind":"press","label":"Citizens push back on possible data center in Town of Beloit","publisher":"WUWM","retrievedAt":"2026-10-28","url":"https://www.wuwm.com/citizens-push-back-on-possible-data-center-in-town-of-beloit"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/cambrin-project-cornmaze-town-of-beloit-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"medium","contains_osm":true,"id":"compute_atlas-3a23b5550e12ed07","lat":37.4892338,"location_precision":"approximate","lon":-77.2474761,"name":"QTS Richmond 1 DC1 (RIC1, White Oak Technology Park)","operator":"QTS Data Centers","source_notes":"Confirmed per DCD/BizSense reporting and QTS's own Richmond-1 page: RIC1 campus includes DC1-DC3 at 6000 Technology Blvd, Sandston VA (former Qimonda fab site).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/13685576464","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/13685576464"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/qts-richmond-1-dc1-ric1-white-oak-technology-park-va"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Baltimore","confidence":"medium","id":"compute_atlas-3a6626a94be4e307","lat":39.291652966378,"location_precision":"exact","lon":-76.619738877727,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-bwi1-baltimore-md","value":1.5}],"name":"DataBank BWI1 (Downtown Baltimore Data Center)","operator":"DataBank","source_notes":"Coordinates confirmed via US Census geocoder (exact match on 300 W Lexington St, Baltimore, MD 21201) -- same carrier hotel building as the separately-recorded AiNET One Market Center facility; the two are distinct commercial colocation operations sharing one address, so the shared pin is disclosed rather than a duplicate. DataBank's own datasheet states 1.5MW site power total (600kW critical power, N+1 design), 10,000 sq ft raised floor, Tier III design, multi-tenant. No cited source states an operational date; status is inferred operational from the datasheet's present-tense description of an active, staffed facility. No AI classification is recorded: no source names AI/GPU/HPC use at this site.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/databank-bwi1-baltimore-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"high","id":"compute_atlas-3a9aff2f58a46adc","lat":38.4064243,"location_precision":"approximate","lon":-77.4216174,"name":"Accokeek Center","operator":"Falmouth Tech LLC","source_notes":"Two two-story buildings totaling 590,000 sq ft plus a substation pad of up to 8 acres. The site is 121 acres between U.S. 1 and I-95, about 2,500 ft north of Eskimo Hill Road, near the Rappahannock Regional Jail. The $2B investment is from documents submitted to the county (FOX 5), and the 64 jobs are a staff estimate. The coordinates are the jail (OSM) as a nearby reference point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/falmouth-tech-accokeek-center-stafford-va"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/accokeek-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ames","confidence":"medium","id":"compute_atlas-3abd58416a0b90a6","lat":42.0020484,"location_precision":"exact","lon":-93.6351121,"name":"Global Reach Ames Data Center","operator":"Global Reach Internet Productions","source_notes":"Business Record records 14 acres, 48,000 sq ft (25,000 sq ft of additional capacity possible), in service since 2017, assessed valuation $7.3 million. Coordinates geocoded from the operator's published address to the OpenStreetMap building at 2321 North Loop Drive in the ISU Research Park. This is a small enterprise/hosting facility, not a hyperscale site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/global-reach-ames-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Goodyear","confidence":"medium","id":"compute_atlas-3aff4dec6af30744","lat":33.4354446,"location_precision":"approximate","lon":-112.3756856,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://azbigmedia.com/business/economic-development/compass-datacenters-will-build-225-acre-goodyear-campus/","value":350.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/compass-goodyear-campus-az","value":72.0}],"name":"Compass Datacenters Goodyear Campus","operator":"Compass Datacenters","source_notes":"225-acre campus at the northwest corner of Bullard Avenue and Yuma Road in Goodyear; eight data centers and over 1.8 million sq ft at full build-out, capable of 350 MW, with a 144 MW first master-plan series and a 72 MW opening phase. Distinct from the tracked Vantage Phoenix (Goodyear), Stream PHXA (Goodyear) and Microsoft Goodyear campuses — different operator and different parcel. Coordinates are the cited Bullard Avenue / Yuma Road intersection from OpenStreetMap; the campus lies to the northwest, so the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Compass Datacenters will build 225-acre Goodyear campus","publisher":"AZ Big Media","retrievedAt":"2026-09-10","url":"https://azbigmedia.com/business/economic-development/compass-datacenters-will-build-225-acre-goodyear-campus/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/compass-goodyear-campus-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Galva","confidence":"medium","id":"compute_atlas-3b3aae860ea4efaf","lat":42.5069289,"location_precision":"approximate","lon":-95.4172221,"name":"PathOne Ida County Data Center (Galva site)","operator":"PathOne Data Centers","source_notes":"PathOne described a 10-25 MW facility of about 40,000 sq ft on 5-25 acres costing $100-150 million; because those are ranges rather than single figures, capacity, land acreage and investment are not recorded. The pin is at the Galva option (the shuttered Quad County ethanol plant, which PathOne named specifically); the alternative site near Arthur is about 20 km south and no selection has been made. Distinct from the tracked PathOne Sioux County (Hull) site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Arthur residents question PathOne's data center plans","publisher":"KTIV","retrievedAt":"2026-09-16","url":"https://www.ktiv.com/2026/08/25/arthur-residents-ask-questions-pathones-data-center-meeting/"},{"kind":"press","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/pathone-ida-county-galva-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Forest Park","confidence":"medium","id":"compute_atlas-3be86058ec8263e7","lat":33.622,"location_precision":"approximate","lon":-84.3691,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digital-realty-fort-gillem-forest-park-ga","value":212.0}],"name":"Digital Realty Fort Gillem Data Center Campus","operator":"Digital Realty","source_notes":"Two mission-critical facilities on ~97 acres at the former Fort Gillem Army base in Forest Park: ~1.9M sq ft and ~212 MW initial IT load. About $3B total proposed, including >$100M for remediation. First phase expected early 2028. Digital Realty projects 60–75 permanent jobs after phase 1. All figures are subject to change, per Digital Realty. Coordinates are the Forest Park city centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fort Gillem data center project","publisher":"Digital Realty","retrievedAt":"2026-10-14","url":"https://www.digitalrealty.com/about/projects/fort-gillem"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/digital-realty-fort-gillem-forest-park-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"mixed_use","city":"Gainesville","confidence":"medium","contains_osm":true,"id":"compute_atlas-3c11367738aad864","lat":29.672262,"location_precision":"approximate","lon":-82.3013842,"name":"University of Florida Data Center (East Campus, HiPerGator)","operator":"University of Florida","source_notes":"The Alligator reports that HiPerGator is housed in the UF Data Center on East Campus. Whiting-Turner describes 10,000 sq ft of computing space, split between a Tier 3 data center and 5,000 sq ft of data center research space, plus 4,400 sq ft of standby administrative space. The building has 2.5 MW of generator capacity and an on-site central utility plant. UF's Board of Trustees approved a $24M HiPerGator upgrade in December 2024; the system costs about $6M a year to operate. That $24M is a hardware upgrade, not facility investment. Classed as mixed-use because the building also hosts general enterprise and research computing alongside the NVIDIA AI supercomputer. The building's exact street address is not confirmed, so coordinates are the East Campus centroid and approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fourth generation of UF supercomputer, HiPerGator, approved with sustainability in mind","publisher":"The Independent Florida Alligator","retrievedAt":"2026-10-02","url":"https://www.alligator.org/article/2025/04/hipergator-fourth-generation-in-motion"},{"kind":"press","label":"The fourth-gen model of UF's HiPerGator, available to users in June, is built to reshape AI education and research","publisher":"University of Florida News","retrievedAt":"2026-10-02","url":"https://news.ufl.edu/2025/05/the-fourth-generation-model-of-ufs-hipergator/"},{"kind":"osm","label":"University of Florida East Campus (OSM relation)","publisher":"OpenStreetMap","retrievedAt":"2026-10-02","url":"https://www.openstreetmap.org/relation/11768589"}],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/university-of-florida-data-center-gainesville-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Maysville","confidence":"medium","contains_osm":true,"id":"compute_atlas-3c3aa43af3d93733","lat":38.6856147,"location_precision":"approximate","lon":-83.8517119,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/mason-county-hyperscale-campus-maysville-ky","value":1200.0}],"name":"Mason County Data Center Campus","operator":"Undisclosed (Fortune 100 end user; rezoning sought through Mason County officials)","source_notes":"Reported campus of six data center buildings plus three substations, office space and parking on land rezoned outside Maysville. The end user has not been publicly named; outlets describe it variously as a Fortune 100 and a Fortune 50 US technology company. Capacity figures conflict across sources: the Kentucky Lantern project tracker reports 1.2 GW (recorded here) while WVXU reports 2.2 GW — this is not settled. Construction-jobs figures also conflict (WCPO reports 1,000, LEX18 reports more than 1,500), so only the 400 permanent positions both report are recorded. LEX18 names Eastern Kentucky Power as the utility and WVXU references a Duke Energy Woodsdale substation expansion; because those two accounts are inconsistent, no energy record is asserted. Coordinates are a geocode of Big Pond Pike (reported as the site road, near KY-3056) and are approximate — the parcel boundaries are not published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"EPIC Report No. 2026-001, Data Centers in Kentucky (§I.B lists Mason County among counties with projects under consideration)","publisher":"Kentucky Energy Planning and Inventory Commission","retrievedAt":"2026-09-15","url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf"},{"kind":"press","label":"Meta revealed as partner in 2,000-acre NKY data center as residents push back","publisher":"FOX19","retrievedAt":"2026-10-22","url":"https://www.fox19.com/2026/10/16/meta-revealed-partner-2000-acre-nky-data-center-residents-pushback/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/mason-county-hyperscale-campus-maysville-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Tonopah","confidence":"medium","id":"compute_atlas-3c5e388aca521777","lat":33.508197,"location_precision":"approximate","lon":-112.9369267,"name":"Balterra","operator":"Arizona Land Consulting","source_notes":"593-acre master plan on the east side of 411th Avenue near Tonopah, immediately across from the same applicant's Camelback Creek site. Approved uses include data centers alongside an amusement park, indoor theme park, hotel, restaurant, retail, multifamily and a film production studio, so the data center share of the site is not yet defined. Coordinate is the OSM 411th Avenue / Camelback Road intersection on the site's western edge.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Dual Plans Will Create Massive W. Valley Mixed-Use","publisher":"AZBEX","retrievedAt":"2026-09-23","url":"https://azbex.com/planning-development/tonopah-mixed-use-development-rezoning/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/arizona-land-consulting-balterra-tonopah-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Tampa","confidence":"high","contains_osm":true,"id":"compute_atlas-3c7a922f74759c9e","lat":28.0738698,"location_precision":"exact","lon":-82.3683619,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-tampa-north-tpa03-fl","value":3.0}],"name":"Flexential Tampa - North (TPA03)","operator":"Flexential","source_notes":"8350 Parkedge Dr.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential facility directory","publisher":"Flexential","retrievedAt":"2026-09-21","url":"https://www.flexential.com/data-centers/fl/tampa/north-data-center"},{"kind":"osm","label":"OpenStreetMap way/1085608797","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1085608797"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-tampa-north-tpa03-fl"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1085608797"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-tampa-north-osmway-1085608797"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1085608797"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Bow","confidence":"medium","id":"compute_atlas-3c7f35584b9c9d3f","lat":43.1411,"location_precision":"approximate","lon":-71.4692,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.concordmonitor.com/2026/09/01/bow-ai-data-center-talks/","value":350.0}],"name":"Merrimack Station Data Center (proposed, Bow)","operator":"Granite Shore Power (site owner; end developer not publicly identified)","source_notes":"This is the former Merrimack Station coal plant site, which stopped coal generation in 2025; its two small kerosene combustion turbines are still listed as active. Granite Shore Power owns 343 acres there, in an industrial zone. That is the owner's site holding, not a confirmed data-center footprint, so no land area is recorded. The FERC agreement says only 'a 350 MW facility' and never says data center. The data-center use comes from a Bow town official confirming high-level talks, as reported by NHPR and the Concord Monitor. As of October 2026, the end developer has not been named and no application has been filed with the town, so the record is marked reported. Coordinates are the EIA plant point, so precision is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"PSNH/Eversource FERC filing (Accession 20260423-5055, filed 2026-04-23): Viability Assessment Agreement VSA-PSNH-001 with Granite Shore Power, LLC for a potential 350 MW load interconnection","publisher":"Federal Energy Regulatory Commission filing (hosted by Concord Monitor)","retrievedAt":"2026-10-08","url":"https://www.concordmonitor.com/wp-content/uploads/2026/09/Eversource-connection-for-data-center.pdf"},{"kind":"press","label":"Bow in talks over AI data center at Merrimack Station","publisher":"Concord Monitor","retrievedAt":"2026-10-08","url":"https://www.concordmonitor.com/2026/09/01/bow-ai-data-center-talks/"},{"kind":"press","label":"'Please, do not allow this to happen': Residents call for proactive steps to prevent data center in Bow","publisher":"Concord Monitor","retrievedAt":"2026-10-08","url":"https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/granite-shore-merrimack-station-bow-nh"}],"state":"New Hampshire","status":"planned"},{"ai_classification":"unknown","city":"Merrillville","confidence":"medium","id":"compute_atlas-3cae50f19aa892a9","lat":41.4828,"location_precision":"approximate","lon":-87.3328,"name":"Wylie Capital Broadway Data Center","operator":"Wylie Capital","source_notes":"A 1.2 million sq ft data center at Broadway, 93rd Avenue and Georgia Street in Merrillville, described as an early-stage proposal. Merrillville adopted a data center moratorium running 2026-06-01 through 2027-05-31.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/wylie-capital-broadway-merrillville-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"high","contains_osm":true,"id":"compute_atlas-3caf10ce118ad782","lat":37.4820177,"location_precision":"approximate","lon":-77.2337105,"name":"Meta Henrico Data Center (White Oak Technology Park)","operator":"Meta Platforms","source_notes":"Five-building 'H' campus of about 2.4–2.5M sq ft at full build-out, investment of over $1B (DPR), at 6200 and 7301 Technology Blvd. In 2022 a Meta-tied entity (Scout Development LLC) bought 475 acres at 3951 Portugee Road to the south for two more data centers ('Project Tropical'); the status of that expansion is not covered here. Coordinates are from the OSM feature 'Meta Henrico Data Center'.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/meta-henrico-white-oak-sandston-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/762116506"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-henrico-data-center-osmway-762116506"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/762116506"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1030970564"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1132541700"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Chattanooga","confidence":"medium","id":"compute_atlas-3ce501d174cca43c","lat":35.0759,"location_precision":"approximate","lon":-85.184553,"name":"MCA Technology Solutions Data Center (6048 Century Oaks Drive)","operator":"MCA Technology Solutions (Mike Collins & Associates)","source_notes":"Small commercial data center inside an IT-services firm's facility; renovation required no special permits. Identified by the Times Free Press as one of 12 data centers in operation or development in its coverage area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Where are data centers in Chattanooga region? Facilities vary widely. (Chattanooga Times Free Press, Aug 23, 2026; archived copy)","publisher":"Chattanooga Times Free Press","retrievedAt":"2026-09-21","url":"https://web.archive.org/web/20260824174431/https://www.timesfreepress.com/news/2026/aug/23/where-are-data-centers-in-chattanooga-region/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/mca-technology-solutions-chattanooga-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Akron","confidence":"medium","id":"compute_atlas-3ced3e7388a04156","lat":41.0387819,"location_precision":"approximate","lon":-86.0282647,"name":"Decennial Group Akron Data Center","operator":"Decennial Group","source_notes":"Developer says the project would require roughly 300 acres and $100–150 million of infrastructure improvements (roads, bridges, water system), with an unnamed hyperscale end user. Those are stated requirements, not a secured site or a total project investment, so neither a land area nor an investment figure is asserted. Coordinates are the town of Akron; no parcel has been identified publicly.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developer unveils data center plan in Akron amid resident concerns","publisher":"ABC57","retrievedAt":"2026-09-13","url":"https://www.abc57.com/news/developer-unveils-data-center-plan-in-akron-amid-resident-concerns"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/decennial-akron-fulton-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Franklin","confidence":"high","contains_osm":true,"id":"compute_atlas-3d481c4b5c16d401","lat":35.9204203,"location_precision":"exact","lon":-86.8155401,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-nashville-franklin-tn","value":6.0}],"name":"Flexential Nashville - Franklin","operator":"Flexential","source_notes":"6MW facility per DataCenterMap, distinct from Cool Springs (also in Franklin, TN).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/942604537","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/942604537"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-nashville-franklin-tn"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/942604537"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-nashville-franklin-osmway-942604537"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/942604537"}],"state":"Tennessee","status":"operating"},{"ai_classification":"likely","city":"Bessemer","confidence":"medium","id":"compute_atlas-3d8c7585b9bf2d1e","lat":33.44,"location_precision":"approximate","lon":-86.97,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al","value":1200.0}],"name":"QTS Bessemer (Project Marvel)","operator":"QTS Data Centers","source_notes":"Codename: Project Marvel. 18-building hyperscale campus on Red Ridge near I-459 and I-20/59 interchange in Bessemer (Jefferson County). Announced capacity: up to 1,200 MW at full build-out — reported as a planned ceiling, roughly 9% of Alabama Power's current generating capacity; recorded as a planned capacity of 1,200 MW (an announced 'up to' full-build-out ceiling, consistent with how the dataset records other announced full-build-out figures). Investment: TPA Group's Adam Rashid told the Bessemer City Council in November 2025 that the overall capital investment is expected to be $14.5 billion (WBRC), and that figure is recorded as the investment figure; other reports put it at about $14–14.4B (Logistics Land Investment anticipated 'close to $14.4B'; DCD reported ~$14B), and QTS's own July 2026 statement gives no dollar amount. Land: ~1,607.42 acres total after two rezoning rounds (initial ~700 acres November 2025 + 914-acre expansion April 2026). QTS affiliate purchased land from TPA Group affiliate for $431.73M. Chapter 9B statutory eligibility would have provided a 30-year abatement estimated at $500M+; QTS committed not to seek local property tax incentives (per WBRC July 2026) — no subsidy is recorded, as eligibility does not equal award and QTS renounced pursuit. Full buildout timeline: 7+ years. Birmingham Business Alliance estimated ~$4B net benefit over 30 years; Bessemer City Schools projected ~$25M/year. AI framing not officially confirmed by QTS or the city as of July 2026 — size and scale (hyperscale, cloud/AI demand framing in QTS statement) support an AI classification of likely. Coordinates are approximate for the Red Ridge parcel area. Jobs: ~1,000 construction and ~330 permanent are projected figures for the proposed (not-yet-built) campus (WBRC, Nov 2025), and are recorded as the construction and permanent jobs figures. QTS Data Centers is owned by Blackstone (2021 take-private). Status: Bessemer approved land-use rezonings for this campus in November 2025 and again (914 acres) in April 2026, which, if a rezoning approval is treated as permitted, could argue for permitted rather than proposed. Status is kept at proposed because the cited source dated 2026-07-02 postdates both rezonings and still describes the campus as proposed, and no building permit or site-preparation start was found in any cited source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Purported Developer of $14bn Project Marvel Data Center in Bessemer Unveiled as QTS","publisher":"Construction Review Online","retrievedAt":"2026-07-07","url":"https://constructionreviewonline.com/purported-developer-of-14bn-project-marvel-data-center-in-bessemer-alabama-unveiled-as-qts/"},{"kind":"press","label":"Bessemer approves rezoning of 914 acres for Project Marvel data center","publisher":"ABC 3340","retrievedAt":"2026-07-07","url":"https://abc3340.com/news/local/alabama-bessemer-approves-rezoning-of-914-acres-for-project-marvel-data-center-april-2026"},{"kind":"press","label":"Alabama's planned $14bn Project Marvel data center could double in size","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/alabamas-planned-14bn-project-marvel-data-center-could-double-in-size/"},{"kind":"press","label":"QTS Data Centers behind Bessemer Project Marvel plans","publisher":"ABC 3340","retrievedAt":"2026-09-09","url":"https://abc3340.com/news/local/qts-data-centers-behind-bessemer-project-marvel-plans"},{"kind":"press","label":"How Will Project Marvel Affect Bessemer And Surrounding Areas?","publisher":"Tuscaloosa Thread","retrievedAt":"2026-07-07","url":"https://tuscaloosathread.com/bessemer-data-center-concerns/"},{"kind":"press","label":"Bessemer Residents Are Speaking Out Against AI Data Center Development","publisher":"Community Sentinel","retrievedAt":"2026-07-07","url":"https://communitysentinel.media/2026/02/18/bessemer-residents-are-speaking-out-against-ai-data-center-development/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/qts-marvel-bessemer-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"confirmed","city":"Ridgeland","confidence":"medium","id":"compute_atlas-3d98b9496fe8586c","lat":32.400198,"location_precision":"approximate","lon":-90.1818699,"name":"AWS Costas Property Campus (Ridgeland)","operator":"Amazon Web Services","source_notes":"Independent evidence indicates Canton and Ridgeland are two distinct AWS campuses, not a single project under two names. Mississippi Free Press (2026-08-19), reporting Madison County's denial of AWS's tax-valuation appeal, states directly: 'The county has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland' -- i.e., Madison County's own tax/incentive administration treats these as two separate FILOT agreements, not one. Magnolia Tribune (2024-07-24) gives the physical distinction: the Madison County Mega Site is '927 acres ... located off Highway 22 and Nissan Parkway in Canton,' while the Costas Property is 'an additional 786 acres in Ridgeland ... located along the southern tip of Madison County near Tougaloo College, on the corner of Highland Colony Parkway and West County Line Road' -- roughly 20 miles apart. Both sites are within Madison County (Ridgeland is not a separate county), so the 'Madison County' framing of the aggregate record AWS Project Atlas – Madison County Mega Site (Canton) is not wrong on that count, but it previously combined two separately-incentivized campuses; that record was narrowed to Canton on 2026-09-10. Coordinates are the OSM-tagged traffic-signal node at the actual Highland Colony Parkway / West County Line Road intersection (confirmed against current OpenStreetMap data, not an estimate), not a confirmed parcel boundary -- an approximate pin. Capacity, investment and jobs are not recorded, because every figure found for this project (the $10B investment, the combined MW target, job counts) is stated for the two-site project as a whole; no cited source apportions any of these by site, and apportioning by acreage share would be a fabricated estimate, not a sourced fact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon's venture into Mississippi: A detailed overview","publisher":"Magnolia Tribune","retrievedAt":"2026-09-10","url":"https://magnoliatribune.com/2024/07/24/amazons-venture-into-mississippi-a-detailed-overview/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/aws-costas-ridgeland-ms"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Delta","confidence":"medium","id":"compute_atlas-3dd6aa3246345c31","lat":39.3502,"location_precision":"approximate","lon":-112.5766,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/blusky-ai-delta-millard-county-ut","value":50.0}],"name":"BluSky AI Delta Data Center","operator":"BluSky AI Inc.","source_notes":"A specific 25-acre BluSky AI parcel and building within the already-tracked Creekstone Energy Delta Gigasite campus — as of August 2026, tracked separately because it is a distinct operator/tenant with its own land agreement, consistent with how this tracker distinguishes co-located operators elsewhere. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Millard County Commissioner Bill Wright is on the record (Utah Business, Nov 2025) extending the county's standing \"no special treatment\" statement to name Creekstone Energy's Delta Gigasite — where BluSky AI holds a 50 MW agreement — specifically: \"the county did not give either development any special treatment or incentives to bring the historic data centers to the area.\" Delta City's own Boards and Commissions page lists no Community Reinvestment Agency or Redevelopment Agency among its active public bodies. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Boards and Commissions — Delta City (no Community Reinvestment Agency or Redevelopment Agency listed)","publisher":"Delta City","retrievedAt":"2026-09-05","url":"https://delta.utah.gov/bc"}],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/blusky-ai-delta-millard-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Independence","confidence":"medium","id":"compute_atlas-3dded56437c0475f","lat":41.360599,"location_precision":"exact","lon":-81.632511,"name":"Ark Data Centers Independence (fka Involta)","operator":"Ark Data Centers (formerly Involta)","source_notes":"7300 E Pleasant Valley Rd, Independence, Cuyahoga County (Cleveland metro). Rebranded from Involta to Ark Data Centers May 15, 2024 (Carlyle-backed). Fiber-ring-connected to the company's Akron facilities for real-time twinned services, per the City of Independence's own economic development page (independent of operator marketing). A single third-party directory cites 1.5MW capacity, uncorroborated elsewhere as of July 2026 — not recorded as capacity rather than stated as fact. No source supports a Tier rating or 2N+ UPS claim for this specific site (an unrelated \"Cleveland\" line item on the operator's own rollup page does not reconcile with this facility's known footprint), so no Tier or redundancy rating is recorded. As of July 2026, no AI/HPC-specific marketing had been found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Involta expands data center in Independence, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/involta-expands-data-center-in-independence-ohio/"},{"kind":"press","label":"Business Journal Daily — \"Involta to Build Data Center in Independence\"","retrievedAt":"2026-07-25","url":"https://businessjournaldaily.com/involta-to-build-independence-data-center/"},{"kind":"subsidy","label":"Signal Akron — \"$4.5 million tax credit will help data center expand in Akron\"","retrievedAt":"2026-07-25","url":"https://signalakron.org/4-5-million-tax-credit-will-help-data-center-expand-in-akron/"}],"updated":"2026-07-25","url":"https://www.compute-atlas.com/facilities/ark-data-centers-independence-cuyahoga-county-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Janesville","confidence":"medium","contains_osm":true,"id":"compute_atlas-3de72d88548369ca","lat":42.7158171,"location_precision":"approximate","lon":-89.1216592,"name":"Town of Janesville Data Center Inquiry (Polzin/Fenric Roads)","operator":"Undisclosed (approached through a San Diego-based consulting firm)","source_notes":"The third of three Rock County data center proposals: the other two are the City of Janesville / former GM site (Viridian Acquisitions), tracked separately as of September 2026 as APECS Data Center Campus (Former GM Assembly Plant), and the Town of Beloit quarry campus, tracked separately as of September 2026 as Project Cornmaze Data Center (Town of Beloit); as of October 2026, Panattoni Development Company's project page names Panattoni as the developer of the Cornmaze campus in the Town of Beloit and the Town of Turtle. This is in the unincorporated TOWN of Janesville, not the city. The end user has never been named; one leaked email referenced an entity called IGNIS, which, as of September 2026, no source consulted corroborates, so only what is verifiable is recorded as the operator. Coordinates are a street-level geocode of North Polzin Road, not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Rock County sees third data center proposal request","publisher":"Spectrum News 1 Wisconsin","retrievedAt":"2026-09-13","url":"https://spectrumnews1.com/wi/milwaukee/news/2026/05/13/town-of-janesville--data-center--rock-county--paul-terpstra--petition"},{"kind":"press","label":"The Rock County data center fight: Janesville's three proposals and the vote that could decide them","publisher":"608 Scanner","retrievedAt":"2026-09-13","url":"https://608scanner.com/the-rock-county-data-center-fight-janesvilles-three-proposals-and-the-vote-that-could-decide-them/"},{"kind":"other","label":"Cornmaze Proposed Data Center Development, Town of Beloit and Town of Turtle, Wisconsin","publisher":"Panattoni Development Company","retrievedAt":"2026-10-28","url":"https://www.panattoni.com/cornmaze/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/town-of-janesville-data-center-rock-county-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Little Rock","confidence":"medium","contains_osm":true,"id":"compute_atlas-3ee8f4736c09cdf2","lat":34.7445,"location_precision":"approximate","lon":-92.274234,"name":"Mainstream Technologies Little Rock Data Center","operator":"Mainstream Technologies","source_notes":"A downtown Little Rock colocation and hosting facility (SOC 2 Type 2). It sits in a multi-tenant building, and the coordinates are the building's address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap: 325 West Capitol Avenue, Little Rock","publisher":"OpenStreetMap","retrievedAt":"2026-09-29","url":"https://www.openstreetmap.org/way/837008389"}],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/mainstream-technologies-little-rock-data-center-ar"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"Morris","confidence":"medium","id":"compute_atlas-3f1df01619e64c8a","lat":41.36,"location_precision":"approximate","lon":-88.43,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-morris-technology-park-il","value":1000.0}],"name":"Morris Technology Park","operator":"Tract","source_notes":"343-acre master-planned data center campus in Morris (Grundy County), IL, developed by Tract as powered land/shell infrastructure. Fully zoned and entitled, with an executed Transmission Security Agreement (TSA) with Commonwealth Edison (ComEd) to support 1 GW (1,000 MW) of planned power at full build-out across ~2.9M sq ft.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Frequently Asked Questions – Morris (Tract)","publisher":"City of Morris / Tract","retrievedAt":"2026-10-15","url":"https://morrisil.org/wp-content/uploads/2026_General-FAQs_Morris-Tract.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/tract-morris-technology-park-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","id":"compute_atlas-3f269536322c5a8d","lat":37.177,"location_precision":"approximate","lon":-77.418,"name":"TWG Data Halifax Road Campus (former Collier Yard)","operator":"Warrenton Group (TWG Data)","source_notes":"Six data center buildings on a 175-acre site — the former CSX Collier Yard property, now city-owned. Developed through Warrenton Group's TWG Data arm, with engineering by Timmons Group. No capacity or investment figure published. Coordinates are an approximate geocode of the cited street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/warrenton-group-halifax-road-petersburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Waterloo","confidence":"medium","id":"compute_atlas-3f7b26502f6e7580","lat":42.4429861,"location_precision":"approximate","lon":-92.4006906,"name":"Wahawk Power Data Center","operator":"Wahawk Power, LLC","source_notes":"80,000 sq ft edge/colocation data center proposed on a 12-acre city-owned parcel (with a right to purchase 10-12 more acres within 5 years) sold to the developer for $1; Waterloo City Council approved a development agreement Dec 15, 2025, but Planning Commission and Council site-plan approval were still pending as of June 2026, and the Council is weighing a 3-month moratorium (discussion set for September 2026) amid resident opposition.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-21","url":"https://www.compute-atlas.com/facilities/wahawk-power-waterloo-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"mixed_use","city":"Hebron","confidence":"medium","id":"compute_atlas-3fa890cb31fe10e6","lat":40.01,"location_precision":"approximate","lon":-82.5,"name":"Microsoft Hebron Data Center","operator":"Microsoft","source_notes":"223 acres west of Ohio 79, between North High Street and Canyon Road, Hebron OH 43025. Six-data-center campus planned. Part of Microsoft's $1B Licking County commitment; individual site investment not separately disclosed. Coordinates are approximate Hebron village area. The $1B figure is Microsoft's three-campus Licking County commitment (not disaggregated); an 'up to $3B' Hebron figure appears only in a secondary blog and is not a committed capital-expenditure figure.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft to invest $1bn in data center campuses in Central Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-to-invest-1bn-in-data-center-campuses-in-central-ohio/"},{"kind":"press","label":"Ohio data centers exploit tax break","publisher":"Signal Ohio","retrievedAt":"2026-07-07","url":"https://signalohio.org/ohio-data-centers-tax-breaks/"},{"kind":"press","label":"Understanding Microsoft datacenters in Licking County","publisher":"Microsoft Local","retrievedAt":"2026-07-07","url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-licking-county/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-hebron-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Cedar Knolls","confidence":"medium","id":"compute_atlas-3fff7fd170b89f0c","lat":40.81995,"location_precision":"representative_multi_site","lon":-74.427986,"name":"Cologix Cedar Knolls Campus","operator":"Cologix","source_notes":"Two Cologix-branded buildings in the Cedar Knolls section of Hanover Township, Morris County, per the operator's own site: NNJ2 at 9 Wing Drive ('purpose-built, freestanding data center') and NNJ4 at 16 Wing Drive ('New Jersey Disaster Recovery Facility'). Combined with a third New Jersey site (NNJ3, recorded separately at Parsippany as of September 2026) into 'more than 200K sq ft of usable floor space' across Cologix's New Jersey footprint per the same page, which does not break out power capacity or square footage per individual building. Represented as one record, with the pin at a representative point for a multi-site project, because no source gave a distinguishable street-level geocode for 9 Wing Drive vs. 16 Wing Drive; location used is the Hanover Township centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"New Jersey Data Centers & Disaster Recovery Facilities","publisher":"Cologix","retrievedAt":"2026-09-12","url":"https://cologix.com/data-centers/new-jersey/"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/cologix-cedar-knolls-campus-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Leola","confidence":"medium","id":"compute_atlas-407676ee272860e9","lat":45.704374067105,"location_precision":"approximate","lon":-99.035447087942,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/leola-data-center-mcpherson-county-sd","value":50.0}],"name":"Leola Data Center","operator":"Leola Data Center, LLC","source_notes":"Site is legally described as Section 28 (part E1/2), Township 126N, Range 68W, McPherson County -- a 20-acre parcel adjacent to Montana-Dakota Utilities' Leola Substation, at the SW corner of 358th Avenue (Highway 17) and 116th Street, about 5 miles southwest of Leola. The CUP application itself lists 11641 358th Avenue, Leola, SD 57456 as the site's general area/street address, which is what was geocoded here (US Census geocoder); precision is approximate because this is a street-level geocode, not a confirmed parcel-corner survey point. As of 2026-09-13 no final CUP decision had been located in the sources checked.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Leola Data Center -- McPherson County Conditional Use Permit Application & Supplemental Information","publisher":"McPherson County, SD (via South Dakota PUC docket EL24-027)","retrievedAt":"2026-09-13","url":"https://puc.sd.gov/commission/dockets/electric/2024/EL24-027/CondUsePermit.pdf"},{"kind":"press","label":"McPherson County Postpones Approval Of Leola Data Center Conditional Use Permit","publisher":"Aberdeen Insider","retrievedAt":"2026-09-13","url":"https://aberdeeninsider.com/mcpherson-county-postpones-approval-of-leola-data-center-conditional-use-permit/"},{"kind":"press","label":"McPherson County Approves Moratorium On Data Centers, Enacts 1 Mile Setback","publisher":"Aberdeen Insider","retrievedAt":"2026-09-13","url":"https://aberdeeninsider.com/mcpherson-county-approves-moratorium-on-data-centers-enacts-1-mile-setback/"},{"kind":"permit","label":"August 11th Notice of Hearing (Conditional Use Permit 26-CUP-04, posted July 22, 2026)","publisher":"McPherson County, SD","retrievedAt":"2026-10-30","url":"https://mcpherson.sdcounty.gov/august-11th-notice-of-hearing/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/leola-data-center-mcpherson-county-sd"}],"state":"South Dakota","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"high","contains_osm":true,"id":"compute_atlas-4082d101413f9858","lat":45.5564226,"location_precision":"approximate","lon":-122.9122077,"name":"EdgeConneX POR01/POR02 (Hillsboro campus)","operator":"EdgeConneX","source_notes":"Official page lists POR01 and POR02 as operational (POR03 planned) on this campus; OSM point likely maps to one or both existing operational buildings. Codes POR01/POR02, Tier-3, ENERGY STAR + UL 2799 certified.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1019812125","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1019812125"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/edgeconnex-por01-por02-hillsboro-campus-or"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1019812125"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-40d8fe3f56f2e832","lat":39.64,"location_precision":"approximate","lon":-89.84,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-sangamon-talkington-township-il","value":630.0}],"name":"CyrusOne Sangamon County Data Center Campus","operator":"CyrusOne","source_notes":"Sited at the northwest corner of Thayer and Clark roads in unincorporated Talkington Township, about 14 miles southwest of Springfield. Building program shifted between filings: six 250,000 sq ft buildings at application, four 450,000 sq ft buildings as reported in June 2026. Construction was expected to start summer 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sangamon County approves data center","publisher":"Illinois Times","retrievedAt":"2026-08-17","url":"https://www.illinoistimes.com/news/sangamon-county-approves-data-center/"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/cyrusone-sangamon-talkington-township-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Clear Brook","confidence":"medium","id":"compute_atlas-40e37a1ef28869e7","lat":39.2564912,"location_precision":"approximate","lon":-78.096111,"name":"Virginia Technology Park","operator":"Equus Capital Partners","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/virginia-technology-park-clear-brook-frederick-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Vacaville","confidence":"medium","id":"compute_atlas-410ced6f308d1b5d","lat":38.3839859,"location_precision":"approximate","lon":-121.9499907,"name":"California Department of Technology Vacaville Data Center (1020 Vaquero Circle)","operator":"California Department of Technology","source_notes":"State government data center leased by CDT, with DGS as lead agency. Coordinates are the OSM centroid of Vaquero Circle (street-level), not the building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Vacaville Data Center-1020 Vaquero Circle (SCH 2026020164), Notice of Exemption","publisher":"CEQAnet / Department of General Services","retrievedAt":"2026-09-29","url":"https://ceqanet.lci.ca.gov/2026020164"}],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/cdt-vacaville-data-center-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Dallesport","confidence":"medium","contains_osm":true,"id":"compute_atlas-41485bdde134d611","lat":45.6173426,"location_precision":"approximate","lon":-121.179515,"name":"Lakeside Industries Dallesport Data Center (proposed)","operator":"Lakeside Industries","source_notes":"Seattle-based asphalt paving company; did not respond to requests for comment. Location is the Dallesport community point, not the parcel. Partner Avison Young named by the Spokesman-Review but not independently confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/lakeside-industries-dallesport-data-center-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Durham","confidence":"high","contains_osm":true,"id":"compute_atlas-415397faf8267b4d","lat":43.1436204,"location_precision":"approximate","lon":-70.9524471,"name":"University of New Hampshire Data Center (1 Leavitt Lane)","operator":"University of New Hampshire","source_notes":"An enterprise/university data center building mapped in OSM at 1 Leavitt Lane, Durham, on the edge of the UNH campus. DC Hub labels it under the Portsmouth market. No capacity was published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way 79056848 (telecom=data_center, operator=University of New Hampshire)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-10-26","url":"https://www.openstreetmap.org/way/79056848"},{"kind":"other","label":"University of New Hampshire (data center listing, Leavitt Lane)","publisher":"DC Hub","retrievedAt":"2026-10-26","url":"https://dchub.cloud/facilities/university-of-new-hampshire-university-of-new-hampshire-19cf0d94"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/unh-data-center-durham-nh"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/79056848"}],"state":"New Hampshire","status":"operating"},{"ai_classification":"likely","city":"Roswell","confidence":"medium","id":"compute_atlas-418d71223f917b5b","lat":33.14,"location_precision":"approximate","lon":-104.52,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/zenith-volts-roswell-chaves-county-data-center-nm","value":1240.0}],"name":"Zenith Volts Roswell / Chaves County Data Center","operator":"Zenith Volts Corp.","source_notes":"Approximately 20 miles south of Roswell. Chaves County Commission approved; 300-acre initial footprint within an 8,500-acre approved site. On-site solar, gas, geothermal, and battery storage. Targets November 2027 operational; approximately 140 FTE jobs.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Chaves County (chavescounty.net)","retrievedAt":"2026-07-26","url":"https://www.chavescounty.net/news/p/item/64481/county-approves-permit-for-data-center-solar-facility"},{"kind":"press","label":"Pacifico, Zenith Volts and Fermi America propose gigawatt-scale energy solutions with BESS to feed US data centres","publisher":"Energy-Storage.news","retrievedAt":"2026-09-21","url":"https://www.energy-storage.news/pacifico-zenith-volts-and-fermi-america-propose-gigawatt-scale-energy-solutions-with-bess-to-feed-us-data-centres/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/zenith-volts-roswell-chaves-county-data-center-nm"}],"state":"New Mexico","status":"planned"},{"ai_classification":"unknown","city":"East Wenatchee","confidence":"high","contains_osm":true,"id":"compute_atlas-419f4d34da2f4abf","lat":47.407164,"location_precision":"exact","lon":-120.1875239,"name":"Sabey Intergate.Columbia Building B","operator":"Sabey Data Centers","source_notes":"The Intergate.Columbia campus is tracked per building (the projection already carries Building A). Building B is the multi-tenant building that Ecology's 2010 second-tier review describes as housing three independently owned data centers - VMware's leased space plus the separately permitted Blackrock and Sabey halls (approval orders 10AQ-C153 and 10AQ-C152). Those tenant-level halls are deliberately not emitted as separate facilities: they are the same site. The 70 MW figure on Sabey's page is campus-wide and is therefore not recorded on this building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 460167186 - 'Intergate Columbia B', telecom=data_center, operator=Sabey Data Centers, 4405 B Grant Road East Wenatchee 98802","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/460167186"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/sabey-intergate-columbia-building-b-wa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1071774674"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/intergate-columbia-d-osmway-1071774674"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460167186"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460167187"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1071774674"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Aurora","confidence":"high","contains_osm":true,"id":"compute_atlas-422ae04237b0b5be","lat":39.6610488,"location_precision":"approximate","lon":-104.8488321,"name":"Flexential Denver - Aurora (DEN03)","operator":"Flexential","source_notes":"Address ~11900 E Cornell Ave, Aurora, CO. Distinct from QTS Aurora-Denver (DEN1) which is a different operator's campus 12km away.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential official facility page (corroborated by DataCenterJournal DEN03 listing)","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/co/denver/aurora-data-center"},{"kind":"osm","label":"OpenStreetMap node/12112270180","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112270180"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-denver-aurora-den03-co"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112270180"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-denver-aurora-osmnode-12112270180"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112270180"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"West Valley City","confidence":"medium","id":"compute_atlas-422bc72278befd56","lat":40.69679,"location_precision":"approximate","lon":-111.9867,"name":"Syringa Networks West Valley","operator":"Syringa Networks","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. West Valley City's Fund 22 (Redevelopment Agency) adopted budget itemizes every currently active RDA/CRA project area by name with no boundary or line item tying it to 1385 W 2200 S, and no city filing or state record names Syringa Networks. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/syringa-networks-west-valley-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"West Chester Township","confidence":"high","contains_osm":true,"id":"compute_atlas-4233840dca13bd61","lat":39.3159313,"location_precision":"approximate","lon":-84.4494638,"name":"Flexential Cincinnati (CIN01/02)","operator":"Flexential","source_notes":"Address 5307 Muhlhauser Rd, West Chester, OH 45011. Distinct from Prologis Project Mila (different operator).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/12112201416","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112201416"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-cincinnati-cin01-02-oh"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112201416"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-cincinnati-osmnode-12112201416"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112201416"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Nephi","confidence":"medium","id":"compute_atlas-42bc3eb4d0d7fa7d","lat":39.71023,"location_precision":"approximate","lon":-111.83632,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/blusky-ai-nephi-ut","value":4.0}],"name":"BluSky AI Nephi SkyMod Site","operator":"BluSky AI Inc.","source_notes":"Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy found. Nephi City's Community Reinvestment Agency fund is tied to a hotel project area rather than this site, and no CRA participation agreement naming this project was located. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing. Recorded as no-evidence-found rather than a fully closed absence: the Nephi project-area budget PDF did not return readable text on retrieval.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"filing","label":"BluSky AI Inc. Form 8-K Exhibit 99.1 — Letter of Intent for Nephi, UT Site","publisher":"SEC EDGAR","retrievedAt":"2026-10-13","url":"https://www.sec.gov/Archives/edgar/data/1416090/000149315225014760/ex99-1.htm"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/blusky-ai-nephi-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Dallas","confidence":"medium","id":"compute_atlas-4324addc1f5ad90f","lat":32.7762719,"location_precision":"approximate","lon":-96.7968559,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crow-holdings-cleanarc-stemmons-dallas-tx","value":245.0}],"name":"Crow Holdings Stemmons Corridor Data Center Campus","operator":"Crow Holdings (developed and leased by CleanArc Data Centers)","source_notes":"Roughly 40 acres along the Stemmons Corridor that Crow Holdings has owned for decades, currently vacant. First building is 70 MW with delivery targeted for late 2027. The exact parcel address is not disclosed in the announcement, so coordinates are a Dallas city-level geocode rather than a parcel point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/crow-holdings-cleanarc-stemmons-dallas-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Social Circle","confidence":"medium","id":"compute_atlas-43679d91d3f861f7","lat":33.6562,"location_precision":"approximate","lon":-83.7182,"name":"Social Circle Technology Park","operator":"TPA Group (developer; end tenant undisclosed)","source_notes":"Nine buildings, 2.56 million sq ft near I-20/SR-11 intersection. Construction planned to begin 2028; first phase operational target 2031. Formerly filed as Newton County Technology Park; renamed after jurisdictional ambiguity surfaced. Coordinates corrected to Social Circle city centroid (33.6562°N, 83.7182°W); original record had 33.5912°N which is approximately 4.5 miles south of the actual city center per multiple geocoding sources.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Another 2.5 million sq ft data center campus proposed outside Atlanta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/another-25-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/"},{"kind":"press","label":"Social Circle officials clear way for second data center","publisher":"Monroe Local News","retrievedAt":"2026-07-06","url":"https://news.monroelocal.org/social-circle-officials-clear-way-for-second-data-center/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tpa-social-circle-technology-park-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Prospect","confidence":"medium","id":"compute_atlas-4379c2803db3d22d","lat":40.8079,"location_precision":"approximate","lon":-80.0558,"name":"Misty Hollow Energy and Data Campus","operator":"Prospect RD LLC","source_notes":"Two lots totalling about 274 acres (232.4 + 41.9) at 614 Prospect Road and an adjacent parcel, with a 416,000 sq ft future expansion area. Developer targets final approvals in early 2027 and completion as early as mid-2029. Capacity (MW), investment, jobs and tenant were not disclosed. Coordinates are the geocoded street address, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Massive data center proposed in Forward Township","publisher":"Butler Eagle","retrievedAt":"2026-10-15","url":"https://www.butlereagle.com/20260918/massive-data-center-proposed-in-forward-township/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/prospect-rd-misty-hollow-forward-township-butler-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Merrillville","confidence":"medium","id":"compute_atlas-446121e7735e6348","lat":41.46,"location_precision":"approximate","lon":-87.29,"name":"Merrillville Technology Park","operator":"The Province Group","source_notes":"A 1 million sq ft campus near Colorado Street and Harms Road, close to the Hobart border, developed by Newport Beach, California-based Province Group at up to $500 million, with reported salaries up to $175,000. Distinct from the same developer's Bristol Innovation Park proposal in Elkhart County.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/province-group-merrillville-technology-park-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Covington","confidence":"medium","id":"compute_atlas-447af4d001ee980f","lat":33.5968,"location_precision":"approximate","lon":-83.8602,"name":"Serverfarm Covington Data Center (Hazelbrand Road)","operator":"Serverfarm","source_notes":"Serverfarm data center campus on Hazelbrand Road in Covington, Newton County, powered by an adjacent VoltaGrid on-site natural-gas plant. Georgia EPD issued an air-quality permit for the data center and 37 diesel emergency generators on 2026-06-29, but issued Notices of Violation on 2026-07-02 because construction began before the required permits were obtained. Coordinates are an approximate Covington geocode, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-07-28","url":"https://www.compute-atlas.com/facilities/serverfarm-covington-hazelbrand-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-44c252957217b26c","lat":34.68,"location_precision":"approximate","lon":-92.296,"name":"AVAIO Digital Leo Campus","operator":"AVAIO Digital Partners","source_notes":"Location: off Interstate 530 near 145th Street, Pulaski County; coordinates are approximate for the I-530 corridor south of Little Rock. Named after the Leo constellation. Initial $6B investment may grow to $21B through full build-out. First phase completion targeted June 2027. Campus sits near long-haul fiber routes connecting Dallas, Atlanta, and Memphis. A Q1 2026 construction start was planned as of announcement. As of October 2026, AVAIO's development page says AVAIO \"has broken ground\" on the campus, while at a July 13, 2026 community meeting AVAIO's project manager said construction was expected to begin in early 2027, with the permits needed to start earthworks in hand (Arkansas Times); the record is listed as proposed. The 760-acre land area is the site size given in the January 2026 announcement and the July 2026 Arkansas Times account; as of October 2026, AVAIO's development page describes a 296-acre project located about 7.7 km from the map pin, which stays approximate. The January 2026 announcement says AVAIO anticipates power demand of up to 1 GW as the facility grows; that is a ceiling on power demand, not IT capacity, so no planned capacity is recorded. The energy source is mixed rather than on-site gas. The 150 MW figure is the Entergy Arkansas grid supply contract, not on-site generation, and as of July 2026 on-site gas capacity was unquantified in sources. The recorded 500 MW of on-site generation is from AVAIO's development page for the campus, which lists \"500 MW Total Baseload BTM\" (behind the meter) alongside \"570 MW Total Grid Power\" and \"1,070 MW Total Baseload Power\"; as of October 2026, the page does not name the fuel for the behind-the-meter capacity. Arkansas's data-center sales-and-use tax exemption (Act 819 of 2023, expanded by Act 548 of 2025) likely applies given the investment scale. AVAIO's development page states that \"the State of Arkansas offers substantial Sales and Use Tax incentives for data center tenants, reducing total cost of ownership on qualifying capital expenditures\", but as of October 2026 names no award or amount; as of July 2026 no AVAIO-specific incentive award had been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AVAIO Digital Announces New Large-Scale AI-Ready Data Center and Power Campus in Little Rock, Arkansas","publisher":"Arkansas Economic Development Commission","retrievedAt":"2026-07-06","url":"https://www.arkansasedc.com/news-events/newsroom/detail/2026/01/12/avaio-digital-announces-new-large-scale-ai-ready-data-center-and-power-campus-in-little-rock--arkansas"},{"kind":"press","label":"Entergy re-submits AVAIO power agreement to Arkansas Public Service Commission","publisher":"Arkansas Democrat-Gazette","retrievedAt":"2026-09-15","url":"https://www.arkansasonline.com/news/2026/sep/09/entergy-re-submits-avaio-power-agreement-to/"},{"kind":"press","label":"Giga-what?! AVAIO comes clean about big plans in Wrightsville","publisher":"Arkansas Times","retrievedAt":"2026-09-15","url":"https://arktimes.com/arkansas-blog/2026/08/28/giga-what-avaio-comes-clean-about-big-plans-in-wrightsville"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/avaio-digital-leo-little-rock-ar"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"The Plains","confidence":"medium","id":"compute_atlas-4511174f9bcc242e","lat":39.3700911,"location_precision":"approximate","lon":-82.1323674,"name":"Saadia Holding Athens–Dover Township Data Center","operator":"Saadia Holding LLC","source_notes":"A roughly 250,000 sq ft facility proposed on nearly 300 acres across six parcels fronting U.S. 33 along the Athens–Dover township line, across from Athens High School. Land is owned by NML Gallia LLC. No formal development application had been filed as of late July 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"(Updated) NY company exploring Athens County data center","publisher":"Athens County Independent","retrievedAt":"2026-09-09","url":"https://athensindependent.com/possible-athens-data-center/"},{"kind":"press","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","retrievedAt":"2026-09-09","url":"https://athensindependent.com/data-centers-across-appalachian-ohio/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/saadia-holding-athens-dover-township-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Pembroke Park","confidence":"medium","contains_osm":true,"id":"compute_atlas-4519e7c33088d74f","lat":25.9954554,"location_precision":"approximate","lon":-80.1795761,"name":"Cogent Hollywood, FL Data Center","operator":"Cogent Communications","source_notes":"Cogent groups this site with its Miami market as the 'Hollywood, FL' data center at 3924 Pembroke Rd, Pembroke Park. The operator page publishes no size or power. Coordinates are an OSM address interpolation and approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/cogent-hollywood-pembroke-park-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-455bd54f7bbabb4a","lat":39.0010841,"location_precision":"exact","lon":-77.4772014,"name":"Digital Realty IAD38","operator":"Digital Realty","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official Northern Virginia directory — IAD38, 44100 Digital Loudoun Plaza (Bldg J)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia"},{"kind":"osm","label":"OpenStreetMap way/597970813","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/597970813"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-iad38-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad14"},{"kind":"osm","label":"OpenStreetMap way/300969614","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/300969614"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-iad14-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969614"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969616"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969617"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969619"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597970806"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597970809"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597970811"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597970813"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Dorr Township","confidence":"medium","id":"compute_atlas-4566e57f152a631f","lat":42.64,"location_precision":"approximate","lon":-85.652,"name":"Microsoft Dorr Township Data Center","operator":"Microsoft","source_notes":"Land next to US-131 in Dorr Township, ~20 miles from Microsoft's separate Gaines Township site (Microsoft Gaines Township Data Center). Acreage reported inconsistently across outlets: 'more than 200 acres' per one report, 'nearly 270 acres' per county property maps per another; purchased in 2024. Microsoft's own statement: project plans, capital investment, and employee numbers are not yet finalized. Township Supervisor (Dec 2025): officials still waiting on Microsoft to submit a development plan; company had hoped to start construction spring 2026. Community concern centers on water and electricity use. Coordinates are an approximate Dorr Township / US-131 estimate, not parcel-geocoded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Dorr Twp. approves 12-month moratorium on data centers","publisher":"Wilcox Newspapers","retrievedAt":"2026-09-09","url":"https://wilcoxnewspapers.com/dorr-twp-approves-12-month-moratorium-on-data-centers/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/microsoft-dorr-township-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Boardman","confidence":"medium","id":"compute_atlas-46292d7f9002cbab","lat":45.81556,"location_precision":"approximate","lon":-119.81621,"name":"AWS PDX 154 (Boardman Airport Campus)","operator":"Amazon Web Services","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/aws-pdx154-boardman-airport-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"confirmed","city":"Cheyenne","confidence":"medium","id":"compute_atlas-463d7e4ef5d53791","lat":41.09,"location_precision":"approximate","lon":-104.79,"name":"Microsoft Cheyenne Mega-Campus Expansion","operator":"Microsoft","source_notes":"Described by Microsoft as a 'multi-gigawatt multi-decade ecosystem.' The 400 MW initial-target figure that appeared in the prior record was not found in either cited source and has been removed pending a citable source (neither the Microsoft newsroom announcement nor Cowboy State Daily mentions a specific MW figure). Separate from existing Cheyenne campus (since 2012) and the HR Ranch Road construction underway 2025-2026. Coordinates approximate for Bison Business Park / SE Cheyenne area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft Announces Intent to Expand Datacenter Operations in Cheyenne","publisher":"Microsoft","retrievedAt":"2026-09-21","url":"https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/"},{"kind":"press","label":"Cheyenne is 3,500 acres larger after approving controversial Microsoft annexation","publisher":"County 17","retrievedAt":"2026-07-22","url":"https://county17.com/2026/07/14/cheyenne-passes-microsoft-data-center-land-annexation-after-more-than-5-hours-of-discussion/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-cheyenne-expansion-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","id":"compute_atlas-46d135ee67bc7a67","lat":56.8125,"location_precision":"approximate","lon":-132.9556,"name":"Greensparc Petersburg Data Center (former Ocean Beauty cannery)","operator":"Greensparc","source_notes":"Micro-scale facility in a roughly 1,500 sq ft net-shed-style building beside the pier on the former Ocean Beauty Seafoods property on Petersburg's downtown waterfront. Mazzella Alaska LLC (Andrew Mazzella) owns the property; Greensparc is the prospective tenant. The coordinates are an approximate downtown-waterfront point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/greensparc-petersburg-ak"}],"state":"Alaska","status":"planned"},{"ai_classification":"confirmed","city":"Afton","confidence":"medium","id":"compute_atlas-46e0e132317efcf0","lat":33.72,"location_precision":"approximate","lon":-100.84,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/galaxy-helios-dickens-county-tx","value":1630.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/galaxy-helios-dickens-county-tx","value":200.0}],"name":"Galaxy Helios Data Center Campus","operator":"Galaxy Digital","source_notes":"Built by Argo Blockchain as a ~180 MW Bitcoin-mining facility in 2022; sold to Galaxy Digital in Dec 2022 amid the crypto-market downturn. Galaxy converted the site to AI/HPC hosting for CoreWeave under a 15-year lease signed March 28, 2025. CoreWeave is the anchor tenant using the campus for large-scale AI model training. Phase I (133 MW critical IT load / 200 MW gross) is complete and operational; further phases toward the 1.63 GW approved total remain under construction. Location is near Afton, Dickens County (West Texas). Original site was 160 acres; campus has since expanded to 2,200+ acres across multiple phases. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Galaxy secures 1.6 GW ERCOT approval at Helios campus in Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/galaxy-secures-approval-for-more-than-800mw-at-helios-campus-in-texas/"},{"kind":"press","label":"CoreWeave locks in 800 MW at Galaxy Helios campus in Texas","publisher":"Converge Digest","retrievedAt":"2026-07-06","url":"https://convergedigest.com/coreweave-locks-in-800-mw-at-galaxys-helios-campus-in-texas/"},{"kind":"other","label":"Galaxy Digital Helios Renovation — 133MW liquid-cooled build","publisher":"Clayco","retrievedAt":"2026-07-06","url":"https://claycorp.com/project/galaxy-digital-helios-renovation"},{"kind":"press","label":"Sale of Helios to Galaxy Digital Holdings","publisher":"Argo Blockchain","retrievedAt":"2026-07-10","url":"https://www.argoblockchain.com/news-room/2022-december-helios-sale-to-galaxy"},{"kind":"press","label":"Galaxy Digital Delivers First 200MW Phase to CoreWeave Under 15-Year Lease","publisher":"CryptoBriefing","retrievedAt":"2026-07-10","url":"https://cryptobriefing.com/galaxy-digital-coreweave-200mw-helios-lease/"},{"kind":"press","label":"Galaxy Digital Closes $1.4bn Debt Facility for Helios Data Center Campus in Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/galaxy-helios-dickens-county-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"confirmed","city":"Maysville","confidence":"medium","id":"compute_atlas-46e79397a26a9f55","lat":34.2527233,"location_precision":"approximate","lon":-83.5613446,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/northern-data-maysville-jackson-ga","value":120.0}],"name":"Northern Data Maysville Data Center","operator":"Northern Data Group","source_notes":"Sited in the Maysville Industrial Park in Jackson County (Maysville straddles the Jackson/Banks county line). Investment figures circulating in regional coverage could not be retrieved from a primary page as of September 2026 and are not recorded. The planned capacity is from Northern Data Group's December 2024 announcement, which states the 63-acre site \"will deliver 120MW, with capacity to expand to 180MW\" and gives no investment figure. Coordinates are approximate to Maysville.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Maysville rezoning controversy just got more controversial","publisher":"97.5 Glory FM (WGTJ)","retrievedAt":"2026-09-10","url":"https://wgtjradio.com/maysville-rezoning-controversy-just-got-more-controversial/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/northern-data-maysville-jackson-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Covington","confidence":"medium","id":"compute_atlas-4720443e97459319","lat":33.5968,"location_precision":"approximate","lon":-83.8602,"name":"AWS Covington Data Center (Alcovy Road)","operator":"Amazon Web Services","source_notes":"About 430 acres along Alcovy Road near I-20 in Covington, bought in January 2024 for $36M in three transactions. AWS has not disclosed size, power or a construction timeline. Coordinates are the Covington city centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/aws-covington-alcovy-road-newton-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"LaGrange","confidence":"medium","id":"compute_atlas-474eab65d7c67cab","lat":33.039291,"location_precision":"approximate","lon":-85.0313269,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/google-lagrange-ga","value":400.0}],"name":"Google LaGrange Data Center","operator":"Google","source_notes":"Announced by Google in 2026 as a planned new Georgia data center. No capacity, investment figure, or construction timeline has been published. Coordinates are the LaGrange city centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google files to expand LaGrange data center campus (DRI for PRL2, filed by KDC)","publisher":"iRecruit","retrievedAt":"2026-09-23","url":"https://www.irecruit.co/insights/google-files-expand-lagrange-data-center-campus"},{"kind":"press","label":"Google announces new data center in LaGrange","publisher":"Atlanta News First","retrievedAt":"2026-10-14","url":"https://www.atlantanewsfirst.com/2026/04/21/google-build-new-data-center-lagrange/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/google-lagrange-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Quincy","confidence":"high","contains_osm":true,"id":"compute_atlas-477dd0710c15bcf8","lat":47.237888,"location_precision":"approximate","lon":-119.8875891,"name":"Microsoft MWH Data Center","operator":"Microsoft Corporation","source_notes":"A Microsoft Quincy campus distinct from the Columbia Data Center: Ecology permits them separately (22AQ-E035 for MWH, 25AQ-E009 for Columbia) and gives MWH its own address. Formerly permitted under the name 'Oxford'. Coordinates are the centroid of the OSM industrial-landuse polygon named for the facility. No IT-load capacity is asserted - the permit states emergency-generator ratings, which are not the same thing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Approval Order No. 22AQ-E035, Microsoft Corporation MWH Data Center (Notice of Construction, renewable diesel)","publisher":"Washington State Department of Ecology","retrievedAt":"2026-09-21","url":"https://ecology.wa.gov/getattachment/36d0e87e-dfce-44fc-b067-ed5760976950/20220927MicrosoftMWH.pdf"},{"kind":"permit","label":"Data centers - air quality permits index (Quincy: Microsoft MWH, formerly Oxford)","publisher":"Washington State Department of Ecology","retrievedAt":"2026-09-17","url":"https://ecology.wa.gov/air-climate/air-quality/data-centers"},{"kind":"osm","label":"OSM way 700001774 - 'Microsoft MWH Data Center', landuse=industrial, industrial=data_centre, operator=Microsoft","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/700001774"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/microsoft-mwh-quincy-wa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/694493128"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-osmway-694493128"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"compute_atlas-47b0dc8052c8ffd5","lat":39.029784,"location_precision":"approximate","lon":-77.4744148,"name":"Bridgefield Tech Center","operator":"Amazon Web Services","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS looks to build 800,000 sq ft data center campus at GWU site in Ashburn, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-08-26","url":"https://www.datacenterdynamics.com/en/news/aws-looks-to-build-800000-sq-ft-data-center-campus-at-gwu-site-in-ashburn-virginia/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/amazon-bridgefield-tech-center-ashburn-loudoun-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Bristol","confidence":"medium","id":"compute_atlas-480279b8d599d159","lat":41.670002,"location_precision":"approximate","lon":-72.934109,"name":"ReNew Riverside Micro Cloud Technology Center (234 Riverside Avenue)","operator":"ReNew Developers","source_notes":"Small edge/'micro cloud' data center on a 1.62-acre remediated brownfield (former Dodge Village dealership) beside the Pequabuck River. Building size varies across sources: the city says ~15,000 sq ft, the Siting Council staff report is referenced in press as ~15,000 gross sq ft over two stories, and The Bristol Edition reported 27,000 sq ft (April 2026) and 14,000 sq ft (August 2026); no single figure is recorded. The Siting Council's Petition 1540 approval (2022-12-08, construction extension 2025-09-19) covers only the fuel-cell plant; the data-center building still needs Bristol land-use and building approvals. In August 2026 the Zoning Commission took up an amendment to drop the 5,001–250,000 sq ft data-center category and require special permits, and the mayor urged limiting data centers over 15,000 sq ft; together these could block the project at its current size. The 4 MW is the on-site fuel-cell rating, not IT load, so no IT capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City of Bristol — Data Center Overview from the Mayor (Riverside Avenue micro cloud building, 4 MW fuel cell, approvals timeline)","publisher":"City of Bristol, CT","retrievedAt":"2026-09-30","url":"http://www.bristolct.gov/m/newsflash/Home/Detail/1683"},{"kind":"press","label":"Inland Wetlands approves permit for Riverside Avenue data center","publisher":"The Bristol Edition","retrievedAt":"2026-09-30","url":"https://bristoledition.org/2026/04/09/inlands-wetlands-approves-permit-for-riverside-venue-data-center/"},{"kind":"press","label":"Zoning Commission to take up vape shops, data center at special meeting","publisher":"The Bristol Edition","retrievedAt":"2026-09-30","url":"https://bristoledition.org/2026/08/17/zoning-commission-to-take-up-vape-shops-data-center-at-special-meeting/"},{"kind":"press","label":"Mayor's column: Let's talk about data center","publisher":"The Bristol Edition","retrievedAt":"2026-09-30","url":"https://bristoledition.org/2026/04/20/mayors-column-lets-talk-about-data-center/"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/renew-riverside-bristol-ct"}],"state":"Connecticut","status":"planned"},{"ai_classification":"unknown","city":"Martinsburg","confidence":"medium","contains_osm":true,"id":"compute_atlas-4811b6811ec582b0","lat":39.4160546,"location_precision":"approximate","lon":-77.9110265,"name":"VA Capital Region Readiness Center (Martinsburg VAMC Data Center)","operator":"U.S. Department of Veterans Affairs","source_notes":"66,000-sf Tier III data center on the VA Medical Center campus. Backup power is three 2.25 MW generators fed from two 20,000-gallon fuel tanks (per the builder). As of October 2026, the design-builder's project page is the only source for the facility itself (the other cited source is a map geocode used for the pin), and current operational status was not independently confirmed, hence the record is marked reported. The pin is the OSM point for the VAMC campus, not the data-center building. No IT capacity is published, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Capital Region Readiness Center (CRRC), VAMC Martinsburg — 66,000-sf standalone Tier III data center","publisher":"HITT Contracting","retrievedAt":"2026-10-11","url":"https://www.hitt.com/projects/capital-region-readiness-center-vamc-martinsburg/"}],"updated":"2026-10-11","url":"https://www.compute-atlas.com/facilities/va-capital-region-readiness-center-martinsburg-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-487051450aedb61f","lat":64.6657,"location_precision":"approximate","lon":-147.1015,"name":"Eielson Air Force Base AI Data Center Enhanced Use Lease Site","operator":"U.S. Department of the Air Force (lessor; developer not selected)","source_notes":"Five potential sites in the Eielson area: one near southeast North Pole, two across the Richardson Highway, one mid-installation and one on the north side. Coordinates are approximate (base location). The multi-installation acreage total is not attributed to this site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"USAF Offers Land for AI Data Centers on Three Alaska Bases","publisher":"Air & Space Forces Magazine","retrievedAt":"2026-10-18","url":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/usaf-eielson-ai-data-center-eul-ak"}],"state":"Alaska","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-4871c2e33ebd5a82","lat":32.65,"location_precision":"approximate","lon":-96.36,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-kaufman-county-tx","value":200.0}],"name":"Prometheus Hyperscale Kaufman County Campus","operator":"Prometheus Hyperscale","source_notes":"Four liquid-cooled buildings on ~500 acres west of Dallas between Talty and Post Oak Bend City, Kaufman County; behind-the-meter Jenbacher J620 gas generation plus an Engie North America battery storage tie-in. Distinct operator/site from the Flexential Talty campus in the same county. First facility targeted for 2026 operation.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-kaufman-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Sparks","confidence":"medium","id":"compute_atlas-48a25391466c9bef","lat":39.517683,"location_precision":"approximate","lon":-119.479421,"name":"Amazon Data Services Reno Data Center Campus","operator":"Amazon Web Services","source_notes":"Located in the Tahoe-Reno Industrial Center approximately 15 miles east of Reno, in all or portions of Sections 10, 11, 14 and 15, T19N R22E, MDB&M. NNDA states the project sits at Switch's Citadel Campus; as of September 2026, it is tracked separately here because Amazon Data Services, Inc. holds its own air permit, address and buildings. Coordinates are a street-level approximation from OpenStreetMap's Peru Drive geometry - no parcel-confirmed point was published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"NDEP Notice of Proposed Action - Amazon Data Services, Inc., Class I Air Quality OPTC AP7374-4768, 3800 Peru Drive, Sparks NV","publisher":"Nevada Division of Environmental Protection","retrievedAt":"2026-09-11","url":"https://ndep.nv.gov/uploads/documents/ap7374-4768-proposed-action.pdf"},{"kind":"press","label":"NNDA press release: Hiring Event and Economic Opportunity for Amazon Data Center, Storey County (March 6, 2026)","publisher":"Northern Nevada Development Authority","retrievedAt":"2026-09-11","url":"https://cdn.prod.website-files.com/68aeb708d74bf84e3f77d2c6/69ab0bd143dbba8b5dc76824_NNDA%20Announces%20Hiring%20Event%20and%20Economic%20Opportunity%20for%20Amazon%20Data%20Center%202026.pdf"},{"kind":"press","label":"NV Energy seeks large-load approvals for AWS, Prologis, Novva and Fleet data centers","publisher":"New Project Media","retrievedAt":"2026-09-11","url":"https://newprojectmedia.com/origination-nv-energy-seeks-large-load-approvals-for-aws-prologis-novva-and-fleet-data-centers/"}],"updated":"2026-09-11","url":"https://www.compute-atlas.com/facilities/amazon-data-services-reno-storey-county-nv"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Des Moines","confidence":"medium","id":"compute_atlas-48b6117aa851594e","lat":41.5868,"location_precision":"approximate","lon":-93.625,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","value":5.0}],"name":"Oppidan Des Moines Data Center","operator":"Oppidan","source_notes":"60,000 sq ft, 5 MW LEED-certified data center delivered design-build by The Weitz Company for developer Oppidan. Construction started summer 2023 and completed May 2024. Oppidan's first data center in Iowa, and the model for its larger Cedar Rapids project. A street address (5900 Thornton Ave) appears in third-party listings but, as of August 2026, had not been confirmed on a page retrieved, so it is not recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Another data center is in the works for Cedar Rapids (reports Oppidan's completed 60,000 sq ft / 5 MW Des Moines data center)","publisher":"The Gazette","retrievedAt":"2026-08-14","url":"https://www.thegazette.com/news/local/3rd-cedar-rapids-data-center-ready-for-construction/article_e0973e26-383e-4896-bebc-a4c085b8d4a5.html"},{"kind":"press","label":"Building permit issued for new Cedar Rapids data center","publisher":"Corridor Business Journal","retrievedAt":"2026-09-16","url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/oppidan-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-48ffcd33962ade83","lat":42.5971324,"location_precision":"approximate","lon":-113.2361093,"name":"TerraVolt Southeast Idaho Data Center Campus (Raft River)","operator":"TerraVolt Infrastructure, Inc. (subsidiary of CalEthos, Inc.)","source_notes":"Location: the SEC filings say only 'Southeast Idaho on the Northwest Natural Gas Pipeline'. The Raft River siting comes from Idaho legislators quoted by BoiseDev (March 2026); the governor's office referred BoiseDev's questions to Cassia County's economic development agency. The pin is the OpenStreetMap 'Raft River' locality node near I-84/I-86 in Cassia County. It is a representative point only; no parcel has been disclosed. According to the 10-Q, TerraVolt has only a preliminary joint-venture agreement with a landowner. It expects land-use and conditional zone-change approvals by year-end 2026 and construction approvals in Q2 2027. No capacity is recorded because the only stated figure is a 200-240 MW range for the power plant. This is unrelated to the separate CalEthos Lithium Valley record in California.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CalEthos, Inc. Form 8-K Exhibit 99.1: TerraVolt natural gas supply agreement for planned Southeast Idaho data center campus (May 11, 2026)","publisher":"CalEthos, Inc. (SEC EDGAR)","retrievedAt":"2026-10-04","url":"https://www.sec.gov/Archives/edgar/data/1174891/000149315226022148/ex99-1.htm"}],"updated":"2026-10-04","url":"https://www.compute-atlas.com/facilities/terravolt-raft-river-cassia-county-id"}],"state":"Idaho","status":"planned"},{"ai_classification":"likely","city":"Lithia Springs","confidence":"medium","id":"compute_atlas-4968318264969ad2","lat":33.7943,"location_precision":"approximate","lon":-84.6602,"name":"Aligned Data Centers ATL-01","operator":"Aligned Data Centers","source_notes":"Capacity intentionally omitted: a 100 MW figure appears in third-party directories but is not stated on any cited page.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/aligned-atl-01-lithia-springs-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"mixed_use","city":"Delaware City","confidence":"medium","id":"compute_atlas-496f95a694d29b1c","lat":39.578,"location_precision":"approximate","lon":-75.593,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/starwood-digital-project-washington-de","value":1200.0}],"name":"Project Washington (Starwood Digital Ventures)","operator":"Starwood Digital Ventures","source_notes":"Largest proposed data center in Delaware history. 11 two-story buildings, 5 substations, 1 switch station, 516 emergency diesel generators on 580 acres. CZA permit denied February 4, 2026; denial unanimously upheld by Coastal Zone Industrial Control Board March 26, 2026. Appeal to Delaware Superior Court anticipated. Delaware Building Trades Council exclusive union labor agreement in place. Original $9.7B investment figure removed — not confirmed in any cited source. Coordinates approximate for Delaware City area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DNREC Coastal Zone Status Decision — Starwood Digital Ventures (CZA-448SD)","publisher":"Delaware DNREC","retrievedAt":"2026-07-06","url":"https://dnrec.delaware.gov/public-notices/cce20260043/"},{"kind":"press","label":"Delaware City data center environmental denial upheld by state board","publisher":"Spotlight Delaware","retrievedAt":"2026-07-06","url":"https://spotlightdelaware.org/2026/03/26/delaware-city-data-center-environmental-denial-upheld-by-state-board/"},{"kind":"press","label":"Starwood files to develop 1.2GW, 11-building data center campus in Delaware","publisher":"DataCenterDynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/starwood-files-to-develop-12gw-11-building-data-center-campus-in-delaware/"},{"kind":"press","label":"Proposed Delaware City data center could use between 10 to 20 million gallons of water a year","publisher":"WHYY","retrievedAt":"2026-07-06","url":"https://whyy.org/articles/data-centers-water-usage/"},{"kind":"permit","label":"DNREC Coastal Zone Status Decision, Project Washington (Feb 3, 2026)","publisher":"Delaware DNREC","retrievedAt":"2026-10-20","url":"https://documents.dnrec.delaware.gov/Admin/Public-Notices/CCE20260043/Status-Decision.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/starwood-digital-project-washington-de"}],"state":"Delaware","status":"planned"},{"ai_classification":"confirmed","city":"McCarran","confidence":"medium","id":"compute_atlas-49c9dc0509e792ce","lat":39.5311,"location_precision":"approximate","lon":-119.5904,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-nv1-storey-county-nv","value":224.0}],"name":"Vantage Data Centers NV1","operator":"Vantage Data Centers","source_notes":"Located in Tahoe Reno Industrial Center (TRIC), Storey County, NV — same industrial park as Google, Apple, Microsoft, and Switch (CITADEL tracked separately as of July 2026). Four multi-story buildings, 1M+ sq ft. Designed for AI densities 360W–720W per sq ft. Vantage's eighth North American market. Coordinates are approximate TRIC centroid. Primary press release states more than 1,200 individuals employed 'across the construction and ongoing operations' — combined construction + permanent total; that release does not split construction from permanent jobs. As of October 2026, no permanent-jobs figure is recorded: a November 2024 Nevada Governor's Office of Economic Development release projects approximately 10 jobs within five years for a Vantage data center in Storey County, a five-year projection that does not name NV1.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage Data Centers Invests $3 Billion to Deliver AI Campus in Nevada","publisher":"Vantage Data Centers","retrievedAt":"2026-10-14","url":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"Data center plans to invest $254 million and generate $76 million in tax revenue","publisher":"Nevada Governor's Office of Economic Development","retrievedAt":"2026-10-14","url":"https://goed.nv.gov/newsroom/data-center-plans-to-invest-254-million-and-generate-76-million-in-tax-revenue/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/vantage-nv1-storey-county-nv"}],"state":"Nevada","status":"under construction"},{"ai_classification":"likely","city":"New Albany","confidence":"medium","id":"compute_atlas-49fdd25d6499dc95","lat":40.07,"location_precision":"approximate","lon":-82.8,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-nal01-new-albany-oh","value":60.0}],"name":"STACK Infrastructure NAL01 (New Albany)","operator":"STACK Infrastructure","source_notes":"STACK's New Albany wholesale data center (NAL01), 40 acres, 60 MW, operational — an established site missing from the tracked New Albany operator list. Confirmed on STACK's own New Albany location page (which does not state a street address, so no street is recorded). Coordinates approximate (New Albany). County recorded as Franklin (New Albany's core incorporated county), but note the New Albany cluster straddles the Franklin/Licking line and STACK's page does not state the county.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/stack-nal01-new-albany-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Hershey","confidence":"medium","id":"compute_atlas-4a1b9c01a285e5fa","lat":41.1192566,"location_precision":"approximate","lon":-101.0024485,"name":"Limitless North Platte Data Center (near Hershey)","operator":"Limitless North Platte LLC","source_notes":"The public tracker lists this as proposed, with capacity and footprint undisclosed. It attributes the listing to North Platte Telegraph reporting, which is paywalled and could not be fetched. The tracker says the details have not been verified against the source. The coordinates are the tracker's reference point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Limitless North Platte Data Center (Hershey), NE: tracker listing","publisher":"More Than Just Parks Data Center Tracker","retrievedAt":"2026-10-30","url":"https://morethanjustparks.com/data-center-tracker/limitless-north-platte-data-center-hershey-ne--5b41804f-bc44-43fe-86b0-ba9eeb8bfb15"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/limitless-north-platte-hershey-lincoln-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"unknown","city":"Stennis Space Center","confidence":"medium","id":"compute_atlas-4a1e2b9960d1c4ad","lat":30.3776388,"location_precision":"approximate","lon":-89.5978312,"name":"Navy DoD Supercomputing Resource Center","operator":"U.S. Navy (DoD High Performance Computing Modernization Program)","source_notes":"Navy DSRC at NASA's John C. Stennis Space Center in Hancock County. The cited report states Nautilus has peak performance of 8.2 petaflops, supports up to 4,000 users, and that with its addition DOD scientists 'now have a total of six supercomputers' available through the center. No power, water or floor-area figures are published in the cited source, so none is recorded. Coordinates are the OpenStreetMap point for John C. Stennis Space Center, not the specific DSRC building — the pin is approximate. navy.mil pages could not be retrieved as of September 2026 and are therefore not cited.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Navy's powerful new supercomputer — Nautilus — is officially open for DOD use","publisher":"DefenseScoop","retrievedAt":"2026-09-14","url":"https://defensescoop.com/2023/04/27/navys-powerful-new-supercomputer-nautilus-is-officially-open-for-dod-use/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/navy-dsrc-stennis-space-center-ms"}],"state":"Mississippi","status":"operating"},{"ai_classification":"unknown","city":"Stilesboro","confidence":"high","id":"compute_atlas-4a66b71dea92f0af","lat":34.096532,"location_precision":"approximate","lon":-84.911951,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/taurus-digital-realty-project-bunkhouse-stilesboro-ga","value":1300.0}],"name":"Project Bunkhouse (Digital Realty Data Center Campus)","operator":"Digital Realty","source_notes":"Applicant of record is Taurus DC SPE LLC (Bartow County rezoning case Z-25-00020); no source reviewed names a parent company for that entity. Operator: Bartow County's August 2026 policy statement refers to the campus as \"Digital Realty's investment in the Stilesboro area\". The county's minutes of the June 4, 2025 hearing, summarizing the presentation by the applicant's attorney, Scott Peters, record: \"This is a Digital Realty project. It is not a Crypto center.\", and Andrew Alves of Digital Realty appeared as part of the Project Bunkhouse team at the May 19, 2025 planning commission hearing (Daily Tribune). Digital Realty has not announced the project in its own press releases. Property owner per the DRI filing: Gaines Family Land LLC; the DRI's developer field names Brian B. West of Kimley-Horn (engineering consultant). Site: Taff Road south of GA Hwy 113, south of Georgia Power's Plant Bowen, also bordering Floyd Creek Church Road; tax parcels 0032-1184-001, 0032-1122-001, 0032a-003-002 and 0032b-003-006; Raccoon Creek runs along the property. Coordinates are the point stated in the DRI filing, not a surveyed site centroid. Size: the DRI filing states 8,675,000 sq ft; the approved rezoning caps total building area at 8,300,000 sq ft. Capacity: Bartow County's August 2026 data-center policy statement says \"Digital Realty's investment in the Stilesboro area, planned for approximately 1.3 gigawatts of computing capacity, has indicated a total build-out capital investment on the order of eighteen billion dollars,\" and that Digital Realty \"forecasts total employment in excess of 800 jobs once the campus is complete\"; the 1.3 GW is recorded as planned capacity. Earlier, a site plan obtained by the Atlanta Journal-Constitution (April 2025) put the project's power needs at 1,830 MW with three on-site substations; the DRI filing's energy-demand field is blank. The same county statement says Bartow County has granted no tax abatements, PILOT or comparable arrangement to these data center facilities. Value: the DRI filing states an estimated build-out value of $19 billion and projected annual property tax of at least $40-50 million, with build-out estimated for 2035. Incentives: the DRI filing said the project was \"in the process of incentive negotiations\" with the Bartow-Cartersville Joint Development Authority; the county's economic development director, Melinda Lemmon, said that was \"mistakenly included in the DRI filing\" and that the authority \"is not negotiating incentives with the data center calling themselves Project Bunkhouse or any other data center\" (Daily Tribune, April 2, 2025). No bond validation, PILOT or abatement for the project has been found. Rezoning conditions include: an 8,300,000 sq ft cap; buffers required before occupancy; primary access from Taff Road only; distribution, manufacturing, warehousing, outdoor storage, towers, laboratories and retail prohibited; water-efficient HVAC required. Other DRI figures: about 8,588 average daily vehicle trips, about 29% impervious surface, wetlands, floodplain and historic resources present on site (impacts not expected per the filing). No building permits or site work have been reported since the rezoning.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Minutes, Public Meeting, Bartow County Commissioner, June 4, 2025 — rezoning case Z-25-00020 (Taurus DC SPE LLC)","publisher":"Bartow County Commissioner's Office","retrievedAt":"2026-09-30","url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/MINUTES.PUBLIC_MEETING_6-4-2025.pdf"},{"kind":"filing","label":"Development of Regional Impact #4433, Project Bunkhouse — initial form (location, owner, size)","publisher":"Georgia Department of Community Affairs","retrievedAt":"2026-09-30","url":"https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4433"},{"kind":"press","label":"Application filed for 8.6 million sq ft data center project outside Atlanta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/application-filed-for-86-million-sq-ft-data-center-project-outside-atlanta-georgia/"},{"kind":"press","label":"Bartow Planning Commission recommends approval of data center near Stilesboro","publisher":"Coosa Valley News","retrievedAt":"2026-07-17","url":"https://coosavalleynews.com/2025/05/bartow-planning-commission-recommends-approval-of-data-center-near-stilesboro/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Data Centers — Bartow County Policy Statement (August 2026)","publisher":"Bartow County Commissioner's Office","retrievedAt":"2026-09-30","url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/PUBLIC%20RELATIONS_DATA%20CENTERS_BARTOW%20COUNTY%20POLICY%20STATEMENT_8-2026.pdf"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/taurus-digital-realty-project-bunkhouse-stilesboro-ga"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/application-filed-for-86-million-sq-ft-data-center-project-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-bunkhouse"}],"state":"Georgia","status":"planned"},{"ai_classification":"mixed_use","city":"Tulsa","confidence":"medium","id":"compute_atlas-4a8e288048ba9e00","lat":36.154,"location_precision":"approximate","lon":-95.9928,"name":"Isocentric Networks Tulsa Data Center","operator":"Isocentric Networks","source_notes":"Single fetched source. Coordinates are a Tulsa centroid approximation; street address is as published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/isocentric-networks-tulsa-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"confirmed","city":"Colorado City","confidence":"medium","id":"compute_atlas-4ab17d025be3a37d","lat":32.3954,"location_precision":"approximate","lon":-100.8687,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cipher-barber-lake-colorado-city-tx","value":300.0}],"name":"Cipher Barber Lake Campus","operator":"Cipher Digital","source_notes":"587-acre Barber Lake site near Colorado City, Mitchell County; ~300 MW HPC/AI under a Fluidstack/Google lease; Phase I targeted Sept 2026. Coordinates are the Colorado City area centroid. Cipher Mining was renamed Cipher Digital.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cipher Mining acquires more than 500 acres across two sites in Texas for crypto and HPC use","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/cipher-barber-lake-colorado-city-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-4aeeeccfb1b2d9eb","lat":42.388,"location_precision":"approximate","lon":-90.67,"name":"Karis Dubuque County Data Center","operator":"Karis","source_notes":"Coordinates are approximate: the point sits on the Olde Davenport Road corridor between Feeney Road and Laudeville Road in unincorporated Dubuque County, the location described in reporting. No parcel has been identified publicly and no formal site plan or development agreement has been presented. Acreage, capacity, investment and job figures were not disclosed by the company.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Potential Dubuque data center could require 3 million gallons of water, city seeks public input","publisher":"KCRG-TV9","retrievedAt":"2026-09-16","url":"https://www.kcrg.com/2026/07/10/potential-dubuque-data-center-could-require-3-million-gallons-water-city-seeks-public-input/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/karis-dubuque-county-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"likely","city":"Okmulgee","confidence":"medium","id":"compute_atlas-4b05643e98491826","lat":35.6231,"location_precision":"approximate","lon":-95.9605,"name":"Fluidstack Okmulgee County Data Center","operator":"Fluidstack","source_notes":"First tenant is reported to be Jane Street. Fluidstack states it is not seeking local property-tax incentives and has committed to a voluntary 60 dB noise limit at property lines; Fluidstack and Jane Street jointly committed $7 million for local education. Capacity has not been publicly disclosed. Coordinates are an Okmulgee town-centroid approximation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Okmulgee residents raise concerns during Fluidstack data center open house","publisher":"KRMG 102.3","retrievedAt":"2026-08-19","url":"https://krmg.com/2026/07/21/okmulgee-residents-raise-concerns-during-fluidstack-data-center-open-house/"},{"kind":"press","label":"What's happening about data centers (Okmulgee County commissioners approve Fluidstack site)","publisher":"Oklahoma Energy Today","retrievedAt":"2026-08-19","url":"https://okenergytoday.com/2026/08/whats-happening-about-data-centers/"},{"kind":"press","label":"Data center developer seeks to change impressions at sole Okmulgee public info event","publisher":"KJRH","retrievedAt":"2026-10-16","url":"https://www.kjrh.com/news/local-news/data-center-developer-seeks-to-change-impressions-at-sole-okmulgee-public-info-event"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/fluidstack-okmulgee-county-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"likely","city":"Jackson","confidence":"medium","id":"compute_atlas-4b0cee825ae8dc15","lat":33.2946,"location_precision":"approximate","lon":-83.9663,"name":"AWS Butts County Data Center Campus","operator":"Amazon Web Services","source_notes":"Deliberately no site-level investment or job figure: the $11B and the \"at least 550 new high-skilled jobs\" in Amazon's release are entity-level totals covering BOTH the Butts County and Douglas County projects, and cannot be attributed to either site alone.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/aws-butts-county-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Daleville","confidence":"medium","id":"compute_atlas-4b76d251596fe04b","lat":37.42,"location_precision":"approximate","lon":-79.89,"name":"Google Botetourt Center at Greenfield Data Center Campus","operator":"Google","source_notes":"Google purchased approximately 312 acres for $14,055,406 in June 2025 and committed a further $4 million in grants to county initiatives over five years — a land-and-grant figure (the county's project page calls the $18,055,406.37 combined sum \"the total investment\" in its land-purchase and grant summary), not a disclosed facility capex, so the record intentionally carries no investment figure. Three data center buildings are planned in the Botetourt Center at Greenfield, the only site in the county zoned for data centers. Coordinates are an approximate geocode of the Greenfield industrial park near Daleville, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Google Data Center — Botetourt County, VA (county project page)","publisher":"Botetourt County, Virginia","retrievedAt":"2026-08-27","url":"https://www.botetourtva.gov/1021/Google-Data-Center"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-botetourt-greenfield-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Flint","confidence":"medium","id":"compute_atlas-4b940729389129ec","lat":43.043131,"location_precision":"approximate","lon":-83.6880801,"name":"Buick City Data Center","operator":"Hillwood-Sterling","source_notes":"The address '902 East Leith Street, Flint, MI' for the broader former Buick City complex is independently confirmed by two sources: Genesee County View's 2023-05-25 piece on Ashley Capital's adjacent 'Flint Commerce Center' redevelopment ('The site address provided in the article is: 902 E. Leith St. in Flint'), and EPA's own 2023-11-01 press release on the Flint Commerce Center LLC prospective-purchaser agreement for 'roughly 330 acres of the former Buick City manufacturing facility.' Leith Street is independently documented (via a non-cited Wikipedia cross-check, used only to sanity-check geography, not as a source) as the street that divides the ~413-acre Buick City site into northern and southern sections, and the chosen Leith Street road segment (of several OpenStreetMap-tagged segments) falls within the site's other documented boundary streets (E Pierson Rd to the north, N Saginaw St/Industrial to the west, E Hamilton Ave to the south, James P Cole Blvd to the east -- all geocoded to confirm the bounding box). This is the general Buick City site address, not a confirmed parcel boundary for Hillwood-Sterling's specific ~200-acre sub-parcel within it (Ashley Capital, not Hillwood-Sterling, is RACER Trust's direct purchaser of the larger site; Hillwood-Sterling's deal, per Gander Newsroom, is reported as a ~200-acre interest within the broader former Buick City footprint) -- the approximate pin reflects both the geocode-not-parcel caveat and this sub-parcel uncertainty. The record is marked reported, not rumored: Gander Newsroom (updated 2026-09-03) names a specific developer ('Hillwood-Sterling, a joint venture backed by Dallas-based real estate developer Ross Perot Jr.') and a specific acreage under contract, which is more than an unsourced rumor, though it still falls short of a permit or filed site plan -- as of September 2026, none exists yet because the moratorium blocks the city from accepting one. The record is listed as proposed: Gander Newsroom states 'it's still unclear who the end user would be for a potential Flint project -- or what size and investment it would involve,' and the moratorium (in effect since 2026-06-08) means 'no permit applications, site plans, or construction for data centers will be accepted or processed by the city of Flint' -- so, as of September 2026, no site-plan or rezoning application can exist yet by design, not by omission. No megawatt capacity, investment figure, or job count appears in any source consulted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-10","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"},{"kind":"other","label":"Buick City redevelopment moves ahead with $300 million investment","publisher":"Genesee County View","retrievedAt":"2026-09-10","url":"https://geneseecountyview.com/articles/burtonview/buick-city-redevelopment-moves-ahead-with-300-million-investment/"},{"kind":"other","label":"EPA Reaches Agreement with Flint Commerce Center LLC Regarding Redevelopment of a Portion of the Former Buick City Site","publisher":"U.S. Environmental Protection Agency","retrievedAt":"2026-09-10","url":"https://www.epa.gov/newsreleases/epa-reaches-agreement-flint-commerce-center-llc-regarding-redevelopment-portion-former"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/hillwood-sterling-buick-city-flint-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Kapolei","confidence":"medium","contains_osm":true,"id":"compute_atlas-4bea1c5ef1e44ec2","lat":21.35761,"location_precision":"approximate","lon":-158.05734,"name":"Google Cable Landing Station at UH West Oʻahu","operator":"Google","source_notes":"Google is to design, build, operate and maintain a cable landing station on about four acres of the UH West Oʻahu campus under a long-term lease. It will serve three new trans-Pacific subsea cables, part of a $1B system; that is a program-level figure, not this site's investment. The cables land at Barbers Point Beach Park and run about 5.3 miles underground in public roads to the campus. Permits for the project: DLNR FONSI (September 2025), Army Corps Nationwide Permit 57 (October 2025), BLNR CDUA and easement with an immediate construction right-of-entry (April 2026), and Honolulu SMA Major Permit (Resolution 26-165, Committee Report 212(26), adopted 2026-08-12). The permit applicants are Starfish Infrastructure Inc. and Humuhumu Services, LLC; their corporate tie to Google is not stated in the fetched documents. The applicant told the Council the building will occupy about 2 acres of the 4-acre site, and that it is 'used for the transport of subsea cables, and is not a data center containing servers that process and store vast amounts of digital data.' It is tracked as a cable landing station, like other CLS records. Status is held at proposed because no source confirmed construction has started at the campus building; the permits mainly cover the beach and submerged-land segments. This is a different site from the Hawaiki CLS expansion at Kahe (Kapolei Cable Landing Station). Coordinates are the OSM campus pin; where the station sits on campus is not public.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"UH West Oʻahu campus proposed gateway for Google's $1B global fiber system","publisher":"University of Hawaiʻi News","retrievedAt":"2026-10-02","url":"https://www.hawaii.edu/news/2025/07/09/uh-west-oahu-google-global-fiber-system/"},{"kind":"permit","label":"Committee Report 212(26), Resolution 26-165: SMA Major Permit for the Oʻahu Subsea Cable Telecommunications Project","publisher":"Honolulu City Council, Committee on Zoning & Planning","retrievedAt":"2026-10-02","url":"https://hnldoc.ehawaii.gov/hnldoc/document-download?id=28669"},{"kind":"permit","label":"BLNR submittal D-7: Grant of easement to Humuhumu Services, LLC and Starfish Infrastructure, Inc. for submarine communication cables off Kapolei","publisher":"State of Hawaii Department of Land and Natural Resources","retrievedAt":"2026-10-02","url":"https://dlnr.hawaii.gov/wp-content/uploads/2026/04/D-7.pdf"}],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/google-uh-west-oahu-cable-landing-station-kapolei-hi"}],"state":"Hawaii","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-4c1b6d9fbfe63f6f","lat":35.2762,"location_precision":"approximate","lon":-84.785,"name":"Project MidSpan Data Center (Hiwassee River Industrial Park, behind Walker Valley High School)","operator":"SDCL Tennessee Propco LLC","source_notes":"About 306 acres in the Hiwassee River Industrial Park near I-75 Exit 33, bought for $19,904,950 according to the lawsuit. Most of the property was zoned I-1 before the county's April 2026 rules. The coordinates are those of Walker Valley High School, which the site sits directly behind, so they are approximate. Reported as separate from Project River.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lawsuit: Company behind Project MidSpan sues Bradley County over data center rules","publisher":"NewsChannel 9 (WTVC)","retrievedAt":"2026-10-27","url":"https://newschannel9.com/news/local/lawsuit-company-behind-project-midspan-sues-bradley-county-over-data-center-rules-sdcl-tennessee-propco-project-midspan-walker-valley-high-school-data-center-bradley-county-lawsuit-zoning"},{"kind":"press","label":"New Bradley County data center proposal would sit behind Walker Valley High School","publisher":"NewsChannel 9 (WTVC)","retrievedAt":"2026-10-27","url":"https://newschannel9.com/news/local/new-bradley-county-data-center-proposal-would-sit-behind-walker-valley-high-school-project-midspan-walker-valley-high-school-gary-davis-data-center-lawsuit-bradley-county-zoning"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/sdcl-project-midspan-bradley-county-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-4c1f28cf9156e189","lat":33.2122041,"location_precision":"approximate","lon":-81.6223727,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/srs-ai-data-center-savannah-river-site-sc","value":1000.0}],"name":"Savannah River Site AI Data Center (Amentum)","operator":"Amentum","source_notes":"NNSA (DOE) announced 2026-07-20 that Amentum was selected to enter negotiations for a phased lease to build a ~1 GW AI data center at the Savannah River Site, paired with ~2 GW of dedicated on-site generation (companion record: Savannah River Site Energy Generation Project (Amentum)). SRS spans Aiken, Barnwell, and Allendale counties, SC. NNSA's solicitation for the site identified 10 tracts totaling 3,103 acres for AI infrastructure projects; as of October 2026 none of the cited sources designates a specific tract, county, or parcel for this project. Coordinates are the SRS site centroid, not a specific tract — precision approximate. The county shown is the one containing that centroid (Barnwell County, per the US Census geocoder, October 2026); it is not a designated project county. Selection for negotiation is not a final lease award; subject to successful negotiation, permitting, and federal safety/security review.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NNSA Selects Amentum for AI Data Center and Energy Project at Savannah River Site","publisher":"U.S. Department of Energy / NNSA","retrievedAt":"2026-10-27","url":"https://www.energy.gov/nnsa/articles/nnsa-selects-amentum-ai-data-center-and-energy-project-savannah-river-site"},{"kind":"press","label":"NNSA Seeks Proposals for AI Data Centers, Energy Projects at Savannah River Site","publisher":"U.S. Department of Energy / NNSA","retrievedAt":"2026-10-28","url":"https://www.energy.gov/nnsa/articles/nnsa-seeks-proposals-ai-data-centers-energy-projects-savannah-river-site-0"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/srs-ai-data-center-savannah-river-site-sc"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-4c26a40d49b1afbe","lat":37.381800835839,"location_precision":"exact","lon":-121.915780681274,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prologis-326-charcot-avenue-san-jose-ca","value":99.0}],"name":"Prologis 326 Charcot Avenue Data Center (North San José)","operator":"Prologis","source_notes":"514,000 sq ft data center plus 30,000 sq ft office at the corner of Zanker Road and Charcot Avenue. This is a separate site from Prologis STEM Park (city-owned land in Alviso) and from Prologis's Silver Creek Valley Road and Rue Ferrari projects. Coordinates come from the US Census geocoder address match.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/prologis-326-charcot-avenue-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Bluffdale","confidence":"medium","id":"compute_atlas-4c658f156dad8a0c","lat":40.429,"location_precision":"approximate","lon":-111.9327,"name":"NSA Utah Data Center (Bumblehive)","operator":"National Security Agency","source_notes":"On Camp Williams (National Guard reservation) in Bluffdale. About 1M sq ft campus with about 100,000 sq ft of data center space and a 65 MW power capacity. Reported cost figures conflict ($1.5B per NSA via DCK vs about $3B per CLUI), so investment is omitted. The coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NSA Utah Data Center, Utah","publisher":"Center for Land Use Interpretation","retrievedAt":"2026-10-13","url":"https://clui.org/ludb/site/nsa-utah-data-center"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/nsa-utah-data-center-bluffdale-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"likely","city":"City of Industry","confidence":"medium","id":"compute_atlas-4c8de773bf8234b9","lat":34.0051077,"location_precision":"approximate","lon":-117.8333142,"name":"Grand Crossing South - Building 10","operator":"Raeden","source_notes":"December 2025: Raeden Inc. proposed leasing 'Building 10' (110 Marcellin Drive) within Majestic Realty's 290-acre Grand Crossing South business park for a data center, requesting up to 30 MVA (an apparent-power unit, not converted to a MW figure since no source discloses one). No lease is confirmed executed; City of Industry directed consultants to plan the site as a future data center 'whether with Raeden or another tenant.' An AI classification of likely is recorded on the strength of Raeden's company-wide AI/HPC/neocloud-focused business model (150kW+/rack, liquid cooling, GPU-cloud tenants), though no site-specific tenant or spec has been disclosed yet. Investment/acreage/jobs not disclosed for this specific building (Grand Crossing South's 290 acres covers the whole multi-building park, not this parcel alone) and are omitted. ZIP 91789 spans both City of Industry and Diamond Bar - jurisdiction resolved to City of Industry via the city government body actively considering this project, not postal city alone. Distinct from the unrelated Puente Hills Mall/MARICI battery-storage project in the same city (rezoned for battery storage, not a data center, in Feb 2026). Coordinates are an approximate representative point within the Grand Crossing master-planned development (the specific private road 'Marcellin Drive' is not indexed in OpenStreetMap), not a parcel-confirmed point. Proposed tenant; developer: Majestic Realty.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"City of Industry discussed data center sites months before zoning vote","publisher":"Investigate LA","retrievedAt":"2026-08-02","url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/"},{"kind":"press","label":"Nobody is really paying attention: City of Industry zoning and energy moves raise data center concerns","publisher":"Investigate LA","retrievedAt":"2026-08-02","url":"https://investigatela.org/2026/02/11/nobody-is-really-paying-attention-city-of-industry-zoning-and-energy-moves-raise-data-center-concerns/"},{"kind":"press","label":"How to Stop A Data Center in Your Backyard","publisher":"L.A. TACO","retrievedAt":"2026-08-02","url":"https://lataco.com/stop-sgv-data-center-building"},{"kind":"other","label":"Raeden data centers overview","publisher":"Raeden Inc.","retrievedAt":"2026-08-02","url":"https://raeden.com/data-centers/"}],"updated":"2026-08-02","url":"https://www.compute-atlas.com/facilities/raeden-grand-crossing-south-city-of-industry-ca"}],"state":"California","status":"planned"},{"ai_classification":"likely","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-4c90d6e770458f90","lat":39.0144996,"location_precision":"exact","lon":-77.4799874,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/sabey-intergate-ashburn-building-a-va","value":54.0}],"name":"Sabey Intergate.Ashburn (Building A)","operator":"Sabey Data Centers","source_notes":"Per June 2025 Business Wire release, Building A (21735 Red Rum Drive) broke ground as the final phase of the Ashburn campus expansion; expected operational 2026, will be Sabey's first 3-story DC at 54MW total campus capacity. AI/HPC (likely): Sabey's own Ashburn page markets Building A as air/liquid/hybrid-cooled and '>100 kW per Rack - Capable of handling high-density deployments' with liquid cooling enabled.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/793888427","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/793888427"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/sabey-intergate-ashburn-building-a-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/793888427"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sabey-intergate-ashburn-building-a-osmway-793888427"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/708916484"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793888427"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560817803"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Massaponax","confidence":"medium","id":"compute_atlas-4ce313d66b808a76","lat":38.1869,"location_precision":"approximate","lon":-77.5505,"name":"Massaponax Tech Campus","operator":"Lavue Lane Owner LLC","source_notes":"Distinct NEW campus, not a dup of tracked Cosner or PowerHouse 95. County case R25-0004; the 4th-submission Voluntary Proffer Statement (county DocumentCenter PDF, parsed locally) names Applicant 'Lavue Lane Owner LLC' (a Delaware LLC), Owner per Exhibit A, and 12 tax parcels (37-A-41, 37-A-41G, 37-A-44, 36-5-A1, 36-5-B1, 51-A-1A, 51-A-3, 37-A-41H, 37-A-42, 37-A-46, 37-A-45, 36-5-A) totaling 588.5564 acres, rezoning RU->I-2 for up to ~6.1M sq ft of data-center buildings (Phase 1 ~1.5M, Phase 2 ~4.5M) off Massaponax Church Rd / Mills Rd (US-17), Berkeley voting / Lee Hill magisterial district. ","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/lavue-massaponax-tech-campus-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","contains_osm":true,"id":"compute_atlas-4cf063e302f6b525","lat":35.6117012,"location_precision":"approximate","lon":-97.6485485,"name":"Paycom Headquarters Data Centers (Oklahoma City)","operator":"Paycom Software, Inc.","source_notes":"Enterprise (single-tenant) data centers. The 10-K says Paycom houses two fully redundant data centers at its Oklahoma City headquarters and a third at its Grapevine, TX facility, all owned and managed by Paycom, which is the only tenant. The HQ campus is about 500,000 sq ft on over 150 acres; that describes the whole campus, not the data centers, so it is not recorded as the land area. No capacity has been published. The coordinates are OSM's Paycom point for the HQ address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/paycom-headquarters-oklahoma-city-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"high","contains_osm":true,"id":"compute_atlas-4cf6263b220da9e2","lat":45.5594805,"location_precision":"exact","lon":-122.9382011,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-3-or","value":36.0}],"name":"Flexential Portland - Hillsboro 3","operator":"Flexential","source_notes":"5419 NE Starr Blvd, 36MW, distinct site adjacent to Hillsboro 4/5.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/918873142","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/918873142"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-3-or"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/860433344","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/860433344"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Flexential Hillsboro press release (via search) — flexential.com resources/press-release","retrievedAt":"2026-07-24","url":"https://www.flexential.com/resources/press-release/flexential-acquires-prime-property-hillsboro-plans-new-data-center"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-4-pdx04-or"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-5-or"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/860433344"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/918873142"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1080170579"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"compute_atlas-4cfa0c87ebfea000","lat":38.4735,"location_precision":"approximate","lon":-77.96,"name":"EdgeCore Culpeper Data Center Campus","operator":"EdgeCore Digital Infrastructure","source_notes":"120 acres inside the 690-acre Culpeper Technology Zone, about 60 miles from Ashburn. The planned capacity records the initial 216 MW critical IT load; the 432 MW figure is a potential expansion, not a committed build. Distinct from the Red Ace Data Center in Culpeper County (different operator and site) and from EdgeCore's Shannon Hill campus in Louisa County, both tracked separately as of August 2026. Coordinates are an approximate geocode of the Culpeper Technology Zone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"EdgeCore Digital Infrastructure Announces New Hyperscale Data Center Market in Culpeper, Virginia","publisher":"EdgeCore Digital Infrastructure","retrievedAt":"2026-08-27","url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-new-hyperscale-data-center-market-in-culpeper-virginia"}],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/edgecore-culpeper-tech-zone-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Franklin Township (Somerset)","confidence":"medium","contains_osm":true,"id":"compute_atlas-4d263d8190a4f5e8","lat":40.5375265,"location_precision":"exact","lon":-74.5555236,"name":"Digital Realty Somerset (650 Randolph Road)","operator":"Digital Realty","source_notes":"Reputable trade-press corroboration (Digital Realty POD Architecture facility); no direct operator directory page found for this specific building, exact facility code not resolved.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/460182337","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/460182337"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-somerset-650-randolph-road-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-4d2daeb524be4157","lat":37.2673552,"location_precision":"approximate","lon":-121.7935875,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/oppidan-rockpoint-865-embedded-way-san-jose-ca","value":18.0}],"name":"865 Embedded Way Data Center (Oppidan / Rockpoint)","operator":"Oppidan (with Rockpoint Group)","source_notes":"Rockpoint Group bought the parcel in 2022; Oppidan is the applicant. Site is next to Coyote Creek, ~1.3 miles from PG&E's Santa Teresa substation per The Real Deal.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-10-19","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"Rockpoint, Oppidan swap manufacturing plans for 152,676 SQFT data center in South San Jose (2026-08-13)","publisher":"The Registry","retrievedAt":"2026-09-21","url":"https://news.theregistrysf.com/rockpoint-oppidan-swap-manufacturing-plans-for-152676-sqft-data-center-in-south-san-jose/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/oppidan-rockpoint-865-embedded-way-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Indianapolis","confidence":"medium","id":"compute_atlas-4d6fa726c168ec1f","lat":39.7975,"location_precision":"approximate","lon":-86.1197,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/metrobloks-martindale-brightwood-indianapolis-in","value":75.0}],"name":"Metrobloks Martindale-Brightwood Data Center","operator":"Metrobloks","source_notes":"$500M (two phases; first ~$150M), 75 MW data center on the 14-acre former Sherman Drive-In site at 2505 N Sherman Dr, Indianapolis. ~168,000 sq ft with 36 backup generators. MDC approved rezoning 6-2 on 2026-04-01. Coordinates approximate from the cited street address (pending parcel-precise geocode).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Metrobloks pitches $500m data center in Indianapolis, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-20","url":"https://www.datacenterdynamics.com/en/news/metrobloks-pitches-500m-data-center-in-indianapolis-indiana/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/metrobloks-martindale-brightwood-indianapolis-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Fort Pierce","confidence":"medium","contains_osm":true,"id":"compute_atlas-4d9fb7e00f96c67c","lat":27.3742,"location_precision":"approximate","lon":-80.4104,"name":"Willow Lakes Data Center (West Midway Road)","operator":"Willow Lakes LLC (end operator undisclosed)","source_notes":"Willow Lakes LLC filed a rezoning application in June 2026 to convert 174 of a 203-acre parcel at West Midway Road and I-95 from its current designation to light industrial for a data center (the remaining 26 acres would go general commercial for retail/hotel/gas station uses; the article's 174 and 26 acres add to 200, three fewer than the 203 acres it gives for the owner's land). The application states intent to bring in an unnamed partner company to develop and operate the facility; it cites existing FPL transmission lines crossing the site and an existing man-made lake floated as a potential closed-loop cooling source. Scheduled before the St. Lucie Planning and Zoning Board on September 17, 2026 as of the article date. The parcel was previously entitled for the since-abandoned Koa Bay Surf Park. No capacity, investment, or job figures were stated in the source. Coordinates corrected 2026-09-10: an earlier draft shared a pin with Sentinel Grove Technology Park (Project Jarvis) that sat about 10 km from this parcel. This pin is the West Midway Road / I-95 crossing the source names, derived from OpenStreetMap geometry (Midway Road runs east-west at latitude 27.3742 and I-95 crosses it at longitude -80.4104); the pin is approximate because no parcel or house number was published. Distinct from Atlas Compute AI Data Center Campus, which lies roughly 8 km northeast: Atlas Compute announced land and utilities already secured in November 2025, whereas this application states the applicant has yet to name or agree terms with a partner company as of August 2026, and this parcel was previously entitled for the abandoned Koa Bay Surf Park rather than sited in Midway Industrial Park.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/willow-lakes-west-midway-fort-pierce-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"confirmed","city":"Rosemount","confidence":"medium","id":"compute_atlas-4df1faca54989eea","lat":44.74,"location_precision":"approximate","lon":-93.115,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-rosemount-mn","value":75.0}],"name":"Meta Rosemount Data Center","operator":"Meta","source_notes":"Site is 280 acres of UMore Park (former WWII smokeless powder facility, then Univ. of Minnesota agricultural research land) in Rosemount. Meta's 19th US data center. Coordinates approximate for northern UMore Park area. Additional parcels purchased Feb 2025 via Jimnist LLC for potential expansion; no current build plan on those parcels.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta Picks Rosemount for $800M Data Center","publisher":"Twin Cities Business","retrievedAt":"2026-07-06","url":"https://tcbmag.com/meta-picks-rosemount-for-800m-data-center/"},{"kind":"other","label":"Governor Walz Announces Meta Will Build New Data Center in Rosemount — MN DEED","publisher":"Minnesota DEED","retrievedAt":"2026-07-06","url":"https://mn.gov/deed/newscenter/press-releases/?id=1045-614051"},{"kind":"press","label":"Meta buys more land in Rosemount, Minnesota, for data center project","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-buys-more-land-in-rosemount-minnesota-for-data-center-project/"},{"kind":"press","label":"Governor Walz Announces Meta Will Build New Data Center in Rosemount","publisher":"Office of Governor Tim Walz","retrievedAt":"2026-08-24","url":"https://mn.gov/governor/newsroom/press-releases/?id=1055-614120"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-rosemount-mn"}],"state":"Minnesota","status":"under construction"},{"ai_classification":"unknown","city":"Franklin","confidence":"medium","contains_osm":true,"id":"compute_atlas-4e0f71a5dab60947","lat":42.8631424,"location_precision":"exact","lon":-87.9778759,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/expedient-mke1-milwaukee-franklin-wi","value":1.6}],"name":"Expedient MKE1 (Milwaukee/Franklin)","operator":"Expedient","source_notes":"4777 W Ironwood, Franklin, WI 53132. 1.6MW critical IT load, 27,000 sq ft, 2N UPS. Confirmed via Expedient's own directory listing Milwaukee metro (facility physically in Franklin, WI).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/664938835","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/664938835"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/expedient-mke1-milwaukee-franklin-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Hoover","confidence":"medium","id":"compute_atlas-4e1a146d69519d29","lat":33.3749483,"location_precision":"approximate","lon":-86.7962283,"name":"AT&T Hoover Data Center","operator":"AT&T","source_notes":"An existing AT&T data center that received a $40M, roughly 20-month upgrade announced in 2008. The case study lists 1876 Data Drive, Hoover and a 2019 completion. The coordinates are a street-level geocode of Data Drive from OSM Nominatim. Capacity is not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$60M in Alabama Data Center Development (June 2, 2008)","publisher":"Data Center Knowledge","retrievedAt":"2026-10-18","url":"https://www.datacenterknowledge.com/data-center-construction/-60m-in-alabama-data-center-development"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/att-hoover-data-center-al"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-4e2b2c7b4adac0d6","lat":40.106767,"location_precision":"exact","lon":-82.758644,"name":"Microsoft New Albany Data Center (Beech Road)","operator":"Microsoft","source_notes":"This is the third of Microsoft's original Licking County campuses (alongside the tracked Heath and Hebron sites). Building size and capacity are not published in the sources read.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"ABC6: Microsoft land purchases incl. 184 acres at 3287 Beech Rd NW for $56,984,510","publisher":"ABC6 / WSYX","retrievedAt":"2026-10-14","url":"https://abc6onyourside.com/news/local/microsoft-buys-over-nearly-300-acres-in-pataskala"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/microsoft-new-albany-beech-road-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Palmetto","confidence":"medium","id":"compute_atlas-4e8a716c56a4de27","lat":33.5178907,"location_precision":"approximate","lon":-84.6696549,"name":"Microsoft Palmetto Data Center","operator":"Microsoft","source_notes":"Microsoft's own July 2024 community update gives an April 2024 construction start and a target completion at the beginning of October 2025. None of the cited sources confirms the site is in service, so status is left at under construction rather than promoted. Secondary reporting cites a 250,000 sq ft building, a $420m Development Authority of Fulton County bond and a $14m ten-year abatement; none of those is confirmed on a cited page, so they are omitted. Coordinates are the Palmetto city centroid (OSM Nominatim); the site is reported as roughly two miles northeast of the city.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Understanding Microsoft datacenters in South Fulton County","publisher":"Microsoft Local","retrievedAt":"2026-09-23","url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-fulton-county/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/microsoft-palmetto-fulton-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"confirmed","city":"Point Pleasant","confidence":"medium","id":"compute_atlas-4e8f1f63f7bb6b63","lat":38.87,"location_precision":"approximate","lon":-82.1,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nscale-monarch-mason-county-wv","value":2000.0}],"name":"Monarch Compute Campus","operator":"Nscale","source_notes":"Nscale backed by $2B NVIDIA investment. Microsoft LOI covers 430,000 Vera Rubin NVL72 GPUs in multi-year framework agreement. 8 GW ceiling for full site; the planned capacity reflects 2028 phase target of 2 GW. Acquired from AIPCorp (Fidelis New Energy / 8090 Industries). Coordinates are approximate for north of Point Pleasant, Mason County. As of September 2026, no PILOT or county tax-abatement agreement was found in any source checked; the project is instead reported as making community donations ($450,000 combined to Mason County Sheriff's Dept, EMS and the Economic Development Authority in April 2026; $500,000 to Mason County Schools reported August 2026) rather than receiving incentives. As of September 2026, no precise street address could be resolved. Multiple sources place the site 'north of Point Pleasant along WV-62 near Camp Conley' in Mason County, but no source gives a house number or parcel ID, so no street address is recorded rather than one approximated from a road name.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nscale acquires 8GW Monarch Compute Campus; Microsoft signs on for 1.35GW","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/nscale-acquires-8gw-monarch-compute-campus-microsoft-signs-on-for-135gw-of-compute/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Second Certified Data Center Announced For Mason County — \"Nscale will use a closed-loop water system to minimize water use\"","publisher":"West Virginia Public Broadcasting","retrievedAt":"2026-10-28","url":"https://wvpublic.org/story/energy-environment/second-certified-data-center-announced-for-mason-county/"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/nscale-monarch-mason-county-wv"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Clarksdale","confidence":"medium","id":"compute_atlas-4e93bffb9d206fab","lat":34.2006,"location_precision":"approximate","lon":-90.5702,"name":"Clarksdale Hyperscale Data Center Project","operator":"Undisclosed","source_notes":"The site is between the Sunflower River, U.S. 278, Tallahatchie Street and the Roundyard neighborhood. The developer is not named; the city's FAQ calls it a multi-billion-dollar project and estimates \"more 1,000 jobs during the construction phase\" (read here as more than 1,000, the recorded construction figure). For permanent jobs the FAQ gives \"200-300\" in one answer and \"approximately 250\" in another, so no permanent job count is recorded. As of March 23, 2026 no development application had been filed. The coordinates are the OSM centroid of Clarksdale, not the site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Proposed Hyperscale Data Center Project, Clarksdale, MS: Frequently Asked Questions","publisher":"City of Clarksdale","retrievedAt":"2026-10-07","url":"https://www.cityofclarksdale.org/wp-content/uploads/2026/03/City-of-Clarksdale-Data-Center-Frequently-Asked-Questions-_FAQ_.pdf"},{"kind":"press","label":"Clarksdale passes motion that allows rezoning for potential data center","publisher":"Action News 5","retrievedAt":"2026-10-07","url":"https://www.actionnews5.com/2026/03/24/clarksdale-passes-motion-that-allows-rezoning-potential-data-center/"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/clarksdale-hyperscale-data-center-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"likely","city":"Phoenix","confidence":"medium","contains_osm":true,"id":"compute_atlas-4eb221d5fb700935","lat":33.6590546,"location_precision":"exact","lon":-112.1111595,"name":"Aligned PHX-01/02/03","operator":"Aligned Data Centers","source_notes":"Confirmed operational via Aligned's Phoenix directory page; 55-acre Union Hills campus, PHX-01/02/03/05 buildings. AI/HPC (likely): Phoenix hosts Aligned Advanced Cooling Lab; DeltaFlow supports highest-density GPUs.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/155739337","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/155739337"},{"kind":"press","label":"DCD — Phoenix data center will have 63MW on-site generation","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/phoenix-data-center-will-have-63mw-on-site-generation/"},{"kind":"press","label":"Aligned — Power Reliability is a Big Driver for Aligned Data Centers in Phoenix","retrievedAt":"2026-07-24","url":"https://aligneddc.com/press-release/power-reliability-is-a-big-driver-for-aligned-data-centers-in-phoenix/"}],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/aligned-phx-01-02-03-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"likely","city":"Clinton","confidence":"medium","id":"compute_atlas-4ebc5e5bdfe1fb41","lat":32.3415,"location_precision":"approximate","lon":-90.3218,"name":"AWS Clinton Data Center","operator":"Amazon Web Services","source_notes":"Hinds County site, distinct from the aggregate record AWS Project Atlas – Madison County Mega Site (Canton), whose own notes name only the two Madison County complexes (Madison County Mega Site near Canton and the Costas Property in Ridgeland) and cite the Hinds County $1B figure only as part of Amazon's $25B statewide total — as of September 2026 it was not otherwise recorded as a facility. Site is the long-vacant former Delphi auto-parts plant in the Clinton Industrial Park, mostly empty since 2009; AWS describes it as the first time it has retrofitted an existing industrial building into a data center at this scale. Coordinates are a geocode of Clinton, MS (city centroid), not of the site; WLBT gives the street address as 1001 Industrial Park Dr., and as of September 2026 no source found gave the industrial-park parcel. As of September 2026, no source found states IT capacity in MW or acreage. WLBT describes the building as a 690,000 square foot facility; an earlier WLBT report gives the structure as 730,000 square feet, according to LoopNet. The Fee-in-Lieu of Taxes agreement, approved by the Clinton Board of Aldermen and the Hinds County Board of Supervisors at special meetings on January 15, 2026, is recorded from WLBT's account of its terms. As of September 2026, no source found gave a dollar value for it: WLBT reports that the city attorney was unaware of a dollar amount, and the City of Clinton page states only that the investment will 'generate millions of dollars in new revenue'. The record is listed as under construction rather than operational: a ribbon-cutting was held 2026-06-12 but Entergy's account describes the project as under development and not yet operational, and a separate groundbreaking was also reported — the sources conflict on whether it has begun serving traffic. Water/cooling: as of September 2026, no source was found for reporting that the Clinton building will not use water. Mississippi Today, republished by DeSoto County News, reports Amazon saying the facility will have a minimal water footprint because it will be air-cooled, using air-cooled chillers, and the water notes record that.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City of Clinton Celebrates $1 Billion AWS Investment","publisher":"City of Clinton, Mississippi","retrievedAt":"2026-09-09","url":"https://clintonms.org/awsdatacenter/"},{"kind":"press","label":"Where do Amazon's data centers in Mississippi stand? Company offers details on project status, water and energy footprint","publisher":"DeSoto County News (republishing Mississippi Today, 2026-06-09)","retrievedAt":"2026-09-14","url":"https://desotocountynews.com/mississippi-news/where-do-amazons-data-centers-in-mississippi-stand-company-offers-details-on-project-status-water-and-energy-footprint/"},{"kind":"press","label":"Who's building the data center in Clinton? Records provide details","publisher":"WLBT","retrievedAt":"2026-10-24","url":"https://www.wlbt.com/2026/03/04/whos-building-data-center-clinton-records-provide-details/"}],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/aws-clinton-hinds-ms"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"San Francisco","confidence":"medium","contains_osm":true,"id":"compute_atlas-4ecc71f6db128150","lat":37.7236272,"location_precision":"exact","lon":-122.3979543,"name":"Digital Realty SFO10","operator":"Digital Realty","source_notes":"200 Paul Avenue, San Francisco CA. Distinct and unrelated to the divested 360 Spear Street site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/289620443","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/289620443"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/digital-realty-sfo10-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Moncure","confidence":"medium","contains_osm":true,"id":"compute_atlas-4f07f2c126a06058","lat":35.6224994,"location_precision":"approximate","lon":-79.0783143,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://chathamjournal.com/2026/04/25/developer-sues-chatham-county-the-data-center-pause-that-may-define-ncs-ai-era/","value":750.0}],"name":"Triangle Innovation Point West Data Center Campus","operator":"Eco TIP West LLC","source_notes":"Eco TIP West LLC was founded in 2020 by Kirk J. Bradley, chairman/CEO of Lee-Moore Capital Company; the wider Triangle Innovation Point park is a Lee-Moore / Samet joint venture. Coordinates are the Moncure community centroid, not a parcel-confirmed pin — the sources place the ~400-acre heavy-industrial tract in Moncure without giving a street address. The $11M figure reported in coverage is the developer's own predevelopment spend, not a site investment, so no investment figure is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developer sues Chatham County: the data center pause that may define NC's AI era","publisher":"Chatham Journal Newspaper","retrievedAt":"2026-09-24","url":"https://chathamjournal.com/2026/04/25/developer-sues-chatham-county-the-data-center-pause-that-may-define-ncs-ai-era/"},{"kind":"other","label":"North Carolina Data Center Moratorium Map & Tracker — Chatham County entry (Eco TIP West, 750 MW)","publisher":"GPU Lease Index","retrievedAt":"2026-09-24","url":"https://gpuleaseindex.com/readiness/nc-data-center-moratoriums"},{"kind":"filing","label":"Eco TIP West LLC v. Chatham County, 26CV000456-180: Order Granting Plaintiff's Motion for Summary Judgment","publisher":"Chatham County Superior Court (via Carolina Journal)","retrievedAt":"2026-10-15","url":"https://www.carolinajournal.com/wp-content/uploads/2026/09/chatham-data-center-091726.pdf"},{"kind":"press","label":"Chatham County faces lawsuit over data center moratorium","publisher":"North State Journal","retrievedAt":"2026-10-15","url":"https://nsjonline.com/article/2026/05/chatham-county-faces-lawsuit-over-data-center-moratorium/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/eco-tip-west-moncure-chatham-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Allen","confidence":"high","contains_osm":true,"id":"compute_atlas-4f0eb0ea7ed40418","lat":33.1379102,"location_precision":"exact","lon":-96.657329,"name":"TierPoint Dallas-Allen","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page (Texas - Dallas-Allen), 840 Allen Commerce Pkwy, Allen TX. Distinct from osm_id 465042594 (TierPoint Dallas proper) — different city/address, not a duplicate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/483307714","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/483307714"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-dallas-allen-tx"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/483307714"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-dallas-allen-osmway-483307714"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/483307714"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Phoenix","confidence":"medium","id":"compute_atlas-4f1ae16857200924","lat":33.4165398,"location_precision":"approximate","lon":-112.0116833,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/phoenixnap-phx02-phoenix-az","value":50.0}],"name":"phoenixNAP PHX02","operator":"phoenixNAP","source_notes":"Second phoenixNAP data center, on a 6.54-acre parcel at 3221 E. Elwood St., across the street from the operator's 2010 facility. AZBEX reports 530,000 sq ft, roughly 15,000 racks at about 44 kW density, and initial capacity of 30 MW with potential to increase to 50 MW. Coordinates are geocoded from the cited street address (Nominatim and US Census geocoder agree to ~10 m); they are not parcel-confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New Data Center Planned in South Phoenix","publisher":"AZBEX","retrievedAt":"2026-09-10","url":"https://azbex.com/planning-development/new-data-center-planned-in-south-phoenix/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/phoenixnap-phx02-phoenix-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"medium","id":"compute_atlas-4f1bb1c0972fa7c9","lat":34.0473298,"location_precision":"exact","lon":-118.2575439,"name":"Digital Realty LAX10 (600 West 7th Street)","operator":"Digital Realty","source_notes":"Downtown LA building of 489,500 sq ft. Coordinates are the OSM building 'DRT LAX10'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty LAX10 data center","publisher":"Digital Realty","retrievedAt":"2026-10-19","url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax10"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/digital-realty-lax10-los-angeles-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Winston","confidence":"medium","id":"compute_atlas-4f44149d09c4b305","lat":33.725108,"location_precision":"approximate","lon":-84.8249382,"name":"Winston Data Center (Waldrop Farms)","operator":"TC Atlanta Development","source_notes":"Two data center buildings and one substation on the former Waldrop Farms property in the Winston community between Douglasville and Villa Rica; part of a 165-acre site was amended from suburban-living / parks-recreation-conservation to commerce-center land use. County analysis projects $2.4m in annual tax revenue rising to $96m over ten years — a revenue projection, not an investment figure, so no investment figure is recorded. Coordinates are the Winston community centroid (OSM Nominatim), not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"County approves data center against planner’s recommendation","publisher":"Douglasville Sentinel","retrievedAt":"2026-10-28","url":"https://www.douglascountysentinel.com/douglasville_sentinel/county-approves-data-center-against-planner-s-recommendation/article_7e94e50c-504b-52da-9f3f-1e624fd51801.html"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/tc-atlanta-development-winston-douglas-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Cartersville","confidence":"medium","id":"compute_atlas-4f49aab0b15f1a20","lat":34.1651,"location_precision":"approximate","lon":-84.7996,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-indo-cartersville-ga","value":200.0}],"name":"DataBank Project Indo","operator":"DataBank","source_notes":"Project Indo: a 200 MW campus on 69 acres at 218 Industrial Park Rd, Cartersville, Bartow County (~288 MW grid connection filed); DRI submitted, first phase targeted 2032. Coordinates are the Cartersville area centroid. Public-reception check (2026-09-10): Checked a DCD-sourced writeup (2026-09-10, DCD's own page could not be read directly) covering the Development of Regional Impact filing (69 acres, 200MW, $2.4B at full build-out, first phase possibly 2032). No public hearing, resident reaction, or official statement of support/opposition documented in this source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DataBank files for 200MW data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/databank-indo-cartersville-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Tonawanda","confidence":"medium","id":"compute_atlas-4f4b2ad27dd07a37","lat":43.037,"location_precision":"approximate","lon":-78.887,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://hudsonvalleypost.com/ai-data-centers-new-york/","value":300.0}],"name":"Riverview Innovation & Technology Campus","operator":"Riverview Innovation & Technology Campus","source_notes":"Site: former Tonawanda Coke Corporation coke-manufacturing plant (operated 1917-2018; TCC bankruptcy), 3875 & 3800 River Road, Town of Tonawanda, Erie County NY - 140 acres. Brownfield developer Jon M. Williams completed acquisition Oct. 10, 2019 and has led an estimated $100M remediation; Honeywell (successor to Allied Chemical/TCC predecessor) also involved. 500,000 sq ft facility proposed. Coordinates are approximate for the River Road parcel. Note: one source names 'Niagara County' but Buffalo News, BTPM, and WBEN independently and consistently identify this as the Town of Tonawanda, Erie County (distinct from the separate City of North Tonawanda in Niagara County) - Erie County used here per majority/independent-source cross-check. No status change. As of June 2026 the SEQRA/site-plan review was paused pending NYISO and National Grid results; no permit or construction approval exists. Remains proposed. Confirmed absence (as of 2026-09-10, reporting dated 2026-07): the Riverview project had not requested any IDA subsidy as of this reporting, and Erie County's executive has said he would not support the county IDA granting it tax breaks.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"River Road data center on hold amid outcry from residents scarred by Tonawanda Coke fight","publisher":"Buffalo News","retrievedAt":"2026-07-09","url":"https://buffalonews.com/news/local/article_ffa822d3-0899-4379-9924-44f8167b4e75.html"},{"kind":"press","label":"Data center project at former Tonawanda Coke site 'on hold'","publisher":"Buffalo Toronto Public Media (BTPM NPR)","retrievedAt":"2026-09-09","url":"https://www.btpm.org/local/2026-06-03/data-center-project-at-former-tonawanda-coke-site-on-hold"},{"kind":"press","label":"Residents pack meeting to oppose proposed data center at Tonawanda Coke site","publisher":"Buffalo Toronto Public Media (BTPM NPR)","retrievedAt":"2026-09-21","url":"https://www.btpm.org/local/2026-06-04/residents-pack-meeting-to-oppose-proposed-data-center-at-tonawanda-coke-site"},{"kind":"press","label":"Former coke plant near Buffalo eyed for 300MW data center","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/former-coke-plant-near-buffalo-eyed-for-300mw-data-center/"},{"kind":"press","label":"Where In New York AI Data Centers Are Being Discussed","publisher":"Hudson Valley Post","retrievedAt":"2026-09-14","url":"https://hudsonvalleypost.com/ai-data-centers-new-york/"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/riverview-innovation-tech-campus-tonawanda-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Bryan","confidence":"medium","id":"compute_atlas-4f4be6140ccebf94","lat":30.6013,"location_precision":"approximate","lon":-96.3589,"name":"RELLIS Data and Research Center","operator":"ThisWay Global, Inc.","source_notes":"$700M data center on Texas A&M System-owned land at the RELLIS Campus in Bryan; originally developed as RELLIS Campus Data and Research Center LLC starting 2021 (delayed by bankruptcy and Winter Storm Uri fallout), tax abatement and project ownership transferred to ThisWay Global, Inc. on 2026-08-18 (Brazos County 4-0) after Texas A&M System Regents and City of Bryan approvals. WTAW reporting describes the site as already under construction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Brazos County commissioners approve new owner for RELLIS data center","publisher":"KBTX","retrievedAt":"2026-08-25","url":"https://www.kbtx.com/2026/08/18/brazos-county-commissioners-approve-new-owner-rellis-data-center-heres-what-it-means-your-wallet/"}],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/rellis-data-research-center-bryan-brazos-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"compute_atlas-4f70cc2b7a6e74df","lat":38.53,"location_precision":"approximate","lon":-77.8,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/pointone-remington-technology-park-fauquier-va","value":600.0}],"name":"Remington Technology Park","operator":"PointOne Holdings Inc.","source_notes":"Strongest of the Fauquier speculative cluster: approved status (not merely filed/on-hold). The record is marked reported. Fauquier planning-database roundup; long-standing (2018-approved) Remington Technology Park.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"PointOne Receives Approval for Remington Technology Park Fuel Cell Equipment Yard (July 9, 2026)","publisher":"PointOne Data Centers","retrievedAt":"2026-10-28","url":"https://www.pointonecorp.com/news/pointone-receives-approval-for-remington-technology-park-fuel-cell-equipment-yard"},{"kind":"other","label":"Remington Tech Park Developer Plans a Permanent Gas Fuel Cell Power Plant (updated July 10, 2026)","publisher":"Piedmont Environmental Council","retrievedAt":"2026-10-28","url":"https://www.pecva.org/region/fauquier/remington-tech-park-developer-plans-a-permanent-gas-fuel-cell-power-plant/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/pointone-remington-technology-park-fauquier-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-4f713e248cf222f3","lat":33.5685,"location_precision":"approximate","lon":-112.3703,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/takanock-project-baccara-maricopa-county-az","value":700.0}],"name":"Project Baccara","operator":"Takanock, LLC","source_notes":"Unincorporated Maricopa County near Surprise, AZ, north of Luke AFB. Construction targeted Q3 2026, first building online 2028. Coordinates are approximate. Coordinates corrected 2026-08-31 to the filed parcel (501-43-016A) in the southwest quarter of Section 28, Township 3 North, Range 1 West. The previously stored point fell roughly 8.2 miles NNW, in a different township. The 160-acre parcel holds the turbine yard, the data center buildings and the APS substation together, so a single approximate point represents the whole campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Arizona Corporation Commission February 4, 2026 Open Meeting Highlights — Certificate of Environmental Compatibility for Project Baccara","publisher":"Arizona Corporation Commission","retrievedAt":"2026-08-28","url":"https://www.azcc.gov/news/home/2026/02/06/february-4--2026-open-meeting-highlights"},{"kind":"press","label":"Massive data center approved near Luke Air Force Base despite opposition","publisher":"Arizona's Family (AZFamily)","retrievedAt":"2026-09-10","url":"https://www.azfamily.com/2026/05/07/massive-data-center-approved-near-luke-air-force-base-despite-opposition/"},{"kind":"press","label":"'Very disappointed': Maricopa County supervisors approve controversial data center","publisher":"ABC15 Arizona","retrievedAt":"2026-09-23","url":"https://www.abc15.com/news/local-news/very-disappointed-maricopa-county-supervisors-approve-controversial-data-center"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/takanock-project-baccara-maricopa-county-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Lufkin","confidence":"medium","id":"compute_atlas-4f8ade0a9a64e212","lat":31.3383,"location_precision":"approximate","lon":-94.7292,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hyperdatagrid-lufkin-angelina-county-tx","value":20.0}],"name":"HyperDataGrid Lufkin Data Center (Former Timber Mill Site)","operator":"HyperDataGrid","source_notes":"Sited on a former timber-mill parcel on Highway 103 West / Ben Dunn Road; land clearing underway, electrical and water agreements reportedly secured, ~12-month timeline to operational status. Closed-loop liquid, direct-to-chip cooling planned.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/hyperdatagrid-lufkin-angelina-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Vint Hill","confidence":"medium","id":"compute_atlas-4fa05e4ef2d2924c","lat":38.752287510948115,"location_precision":"approximate","lon":-77.67347422456572,"name":"CyrusOne Vint Hill Campus","operator":"CyrusOne","source_notes":"47 acres, 870,000 sq ft; site plan submitted; grandfathered from prior PCID zoning.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/cyrusone-vint-hill-fauquier-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Hanford","confidence":"medium","id":"compute_atlas-4fa4002e8d157766","lat":36.3174744,"location_precision":"approximate","lon":-119.6346519,"name":"Kings County Fairgrounds Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","source_notes":"Global Stack LLC (incorporated in Santa Ana, March 2026, no prior construction history) targets ~70 California fairgrounds by 2030. Capacity stated only as a range (8–10 MW per site) and so is not recorded. Location is the fairgrounds centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Kings Fairground CEO: New project is not a 'traditional' data center (2026-07-21)","publisher":"Hanford Sentinel","retrievedAt":"2026-09-21","url":"https://hanfordsentinel.com/business/agriculture/kings-fairground-ceo-new-project-is-not-a-traditional-data-center/article_90b4f45c-e98e-4077-a585-6e5416581ac3.html"},{"kind":"press","label":"Global Stack studies leasing 2 to 5 acres at Kings, Tulare fairgrounds for emergency site","publisher":"KMPH FOX26","retrievedAt":"2026-10-19","url":"https://kmph.com/news/local/global-stack-studies-leasing-2-to-5-acres-at-kings-tulare-fairgrounds-for-emergency-site"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/global-stack-kings-county-fairgrounds-hanford-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Seattle","confidence":"medium","contains_osm":true,"id":"compute_atlas-4fc12e60168e651f","lat":47.5807667,"location_precision":"approximate","lon":-122.3359179,"name":"Starbucks Center Data Center (2401 Utah Ave S, SoDo)","operator":"Colossus Data Center Advisors","source_notes":"Would occupy about 20,000 sq ft of the six-story building and 25,600 sq ft of the nine-story main building at the Starbucks Center. Exterior power and cooling equipment would go in the west parking area. The owners describe it as a feasibility study with no tenant secured. No MW figure is given beyond staying under 20 MVA.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Small data center proposed at SODO Starbucks HQ building","publisher":"Connect CRE","retrievedAt":"2026-10-30","url":"https://www.connectcre.com/stories/small-data-center-proposed-at-sodo-starbucks-hq-building/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/colossus-starbucks-center-sodo-seattle-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"compute_atlas-4fda9d353601bfb9","lat":39.0781,"location_precision":"approximate","lon":-77.5575,"name":"Cross Mill Center","operator":"JK Land Holdings","source_notes":"Up to 556,746 sq ft of data center use on 22 acres at the intersection of Sycolin Road and Crosstrail Boulevard near Leesburg Executive Airport; the approval alternatively permits up to 416,000 sq ft of warehouse/distribution or 218,000 sq ft of industrial use. Proffers bury lower-voltage distribution lines, keep high-voltage transmission above ground and bar an on-site substation. PEC records Cross Mill Center as one of two data center rezonings the Board approved in the past year.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/jk-land-cross-mill-center-leesburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Charlotte","confidence":"medium","id":"compute_atlas-503602a52fc8b19b","lat":35.2422,"location_precision":"approximate","lon":-80.9562,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digital-realty-charlotte-nc","value":400.0}],"name":"Digital Realty Moores Chapel Data Center Campus","operator":"Digital Realty","source_notes":"12899 Moores Chapel Road, 12 miles west of downtown Charlotte. Two two-story buildings totaling 3 million sq ft across two phases. Site acquired November 2024 for $160 million. If built, would be largest data center in North Carolina. Mecklenburg County Park and Recreation to receive greenway on site. Coordinates are approximate Moores Chapel Road area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Digital Realty files to develop 400MW data center campus in Charlotte, North Carolina","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/digital-realty-files-to-develop-400mw-data-center-campus-in-charlotte-north-carolina/"},{"kind":"press","label":"Pushback Grows as Data Centers Proliferate in Charlotte Metro — Queen City Nerve","publisher":"Queen City Nerve","retrievedAt":"2026-07-06","url":"https://qcnerve.com/charlotte-data-centers/"},{"kind":"subsidy","label":"Data Centers Sales & Use Tax Exemptions — EDPNC","publisher":"Economic Development Partnership of North Carolina","retrievedAt":"2026-07-06","url":"https://edpnc.com/incentives/data-centers-sales-use-tax-exemptions/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/digital-realty-charlotte-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"West Valley City","confidence":"medium","id":"compute_atlas-5051e4e2a8494261","lat":40.71498,"location_precision":"approximate","lon":-112.05576,"name":"Aligned SLC-04","operator":"Aligned Data Centers","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. West Valley City's Fund 22 (Redevelopment Agency) adopted budget itemizes every currently active RDA/CRA project area by name (5600 West Gateway, East 3500 A, North Central, Jordan River, Willow Wood, Hercules Hill A, Hercules Hill B, Decker Lake, Northwest, Granger Crossing, Southwest, South Redwood Road, Fairbourne/Market St, City Center) with no per-recipient breakout, and none is named for Beagley Road; no city or state filing names Aligned. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Aligned Data Centers — Salt Lake City data centers (SLC-04, 6368 W Beagley Rd)","publisher":"Aligned Data Centers","retrievedAt":"2026-09-02","url":"https://aligneddc.com/salt-lake-city-data-centers/"},{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/aligned-west-valley-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-50b0991c9e9adea4","lat":40.61889,"location_precision":"approximate","lon":-80.69611,"name":"Project Astralus (Yellow Creek Township)","operator":"Zuharis","source_notes":"Owner Tony Sharma's figures (500 MW + 500 MW phases, $3.5–4.5B investment, 2,000–5,000 permanent IT jobs) are company claims at a public meeting and are not independently verified, so they are kept here rather than in structured fields. Coordinates are the Yellow Creek Township centroid. The site is near 16 School Road and the SR 7 corridor near the Jefferson County line.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/zuharis-project-astralus-yellow-creek-columbiana-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Tonganoxie","confidence":"medium","id":"compute_atlas-50c3e013edbf53a4","lat":39.1097,"location_precision":"approximate","lon":-95.0877,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloverleaf-bluestem-tonganoxie-ks","value":1200.0}],"name":"Project Bluestem","operator":"Cloverleaf Infrastructure","source_notes":"Proposed hyperscale data center campus on the former Tailgate Ranch in unincorporated Leavenworth County, south of Tonganoxie and south of the Tonganoxie Business Park, near the Tonganoxie/Eudora interchange on I-70. Reported as roughly 1,000 acres (KSHB; the Lawrence Journal-World writes \"more than 1,000 acres\" and the community lead that flagged the site claimed 1,100 acres; as of September 2026, no source found states 1,100, so 1,000 is recorded and the discrepancy is noted here). KSHB reports 330 acres set aside for permanent land conservation. The planned capacity recorded here is the reported ceiling: a revised proposal submitted after Leavenworth County's data center moratorium expired in August 2026 roughly doubled the project's electricity demand to \"up to 1.2 gigawatts\" and added an on-site gas power plant; a lower figure appears in one Journal-World reference (\"600-watt data center\", evidently a units error in the source) and is not used. Location precision is approximate: as of September 2026, no source found states coordinates, a street address or a parcel, so the pin is the Tonganoxie town centroid (OpenStreetMap/Nominatim) and the actual footprint lies some distance south of it. Cloverleaf Infrastructure, a Houston-based developer founded by former Microsoft energy executives, describes itself as a site-preparation developer that will introduce an end user later; no hyperscale tenant has been named. Cloverleaf's own site describes a \"multi-billion-dollar taxable investment\" but states no dollar figure, so no investment figure is recorded. As of 2026-09-23 the project is conceptual: Cloverleaf's FAQ states no formal applications have been submitted to local jurisdictions, and the county's data center planning and zoning regulations are not finalized.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Home - Project Bluestem","publisher":"Cloverleaf Infrastructure","retrievedAt":"2026-09-23","url":"https://bluestemdatacenter.com/"},{"kind":"other","label":"FAQs - Project Bluestem","publisher":"Cloverleaf Infrastructure","retrievedAt":"2026-09-23","url":"https://bluestemdatacenter.com/faqs/"},{"kind":"press","label":"Tonganoxie neighbors brace as data center plan doubles its power demand","publisher":"Hoodline","retrievedAt":"2026-09-23","url":"https://hoodline.com/2026/09/tonganoxie-neighbors-brace-as-data-center-plan-doubles-its-power-demand/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/cloverleaf-bluestem-tonganoxie-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-51252214d07d4fc7","lat":33.2187858,"location_precision":"approximate","lon":-98.1580978,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-jack-county-tx","value":144.0}],"name":"CyrusOne Jack County Data Center","operator":"CyrusOne (C1 Jack 1 LLC)","source_notes":"The site is in southeastern Jack County next to the Vistra power plant. Coordinates are the Jacksboro county-seat point, used as a representative location, not the parcel. Local press reported the county was weighing a reinvestment zone and abatement, but no final vote was found.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/cyrusone-jack-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Cromwell","confidence":"medium","contains_osm":true,"id":"compute_atlas-512d61d395fdb67e","lat":41.6260009,"location_precision":"approximate","lon":-72.6611602,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/global-common-cromwell-ct","value":300.0}],"name":"Global Common Fuel-Cell Data Center (Geer Street)","operator":"Global Common LLC","source_notes":"About 1.2 million sq ft of data center space proposed on the ~159-160 acre Geer Street site, replacing a sand-and-gravel operation. Coordinates are the street centroid, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/global-common-cromwell-ct"}],"state":"Connecticut","status":"planned"},{"ai_classification":"likely","city":"Wiscasset","confidence":"medium","id":"compute_atlas-5143e4608fffcf66","lat":44.0015,"location_precision":"approximate","lon":-69.6553,"name":"Wiscasset Data Center (Old Ferry Road Site)","operator":"Unnamed developer (NDA with town)","source_notes":"Coordinates are approximate, based on Wiscasset area near former Maine Yankee site. Developer identity remains undisclosed per NDA. As of March 2026 Lincoln County reallocated ARPA funds to Waldoboro and Newcastle. Land remains undeveloped. The $5 billion investment figure is press-reported, not confirmed. As of October 2026, the Portland Press Herald (13 May 2026) states that \"plans to build a $5 billion data center were made public in September of 2025\". Maine Morning Star (secondary source) could not be consulted as of July 2026. The operator is listed as 'Unnamed developer (NDA with town)' as that is the factual status.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Wiscasset Loses ARPA Funding After Data Center Proposal, Confusion","publisher":"Central Maine","retrievedAt":"2026-07-06","url":"https://www.centralmaine.com/2025/11/03/wiscasset-loses-arpa-funding-after-data-center-proposal-confusion/"},{"kind":"press","label":"As Data Centers Look to Rural New England, Maine Considers a Moratorium","publisher":"Maine Morning Star","retrievedAt":"2026-07-06","url":"https://mainemorningstar.com/2026/02/23/as-data-centers-look-to-rural-new-england-maine-considers-a-moratorium/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"How a data center derailed $240K for affordable housing in rural Maine","publisher":"Portland Press Herald (Daily Yonder)","retrievedAt":"2026-10-22","url":"https://www.pressherald.com/2026/05/13/how-a-data-center-derailed-240k-for-affordable-housing-in-rural-maine/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/wiscasset-proposed-me"}],"state":"Maine","status":"planned"},{"ai_classification":"confirmed","city":"Santa Clara","confidence":"medium","id":"compute_atlas-51896083209e2e22","lat":37.354,"location_precision":"approximate","lon":-121.955,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.businesswire.com/news/home/20260421198659/en/ECL-35MW-FlexGrid-Powered-Data-Center-in-Santa-Clara-Builds-Atop-On-Grid-Power-for-High-Density-AI-Delivery","value":35.0}],"name":"ECL CSC-1 FlexGrid AI Data Center","operator":"ECL","source_notes":"Exact street address not publicly disclosed. Coordinates are Santa Clara city centroid (approximate). Announced April 21, 2026. First phase targets Q4 2026 delivery. ECL CEO Yuval Bachar stated the project addresses SVP grid capacity constraints that have forced other data center developers into multi-year interconnection queues. Project targets AI training and inference workloads.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"ECL 35MW FlexGrid-Powered Data Center in Santa Clara Builds Atop On-Grid Power for High-Density AI Delivery","publisher":"BusinessWire","retrievedAt":"2026-07-06","url":"https://www.businesswire.com/news/home/20260421198659/en/ECL-35MW-FlexGrid-Powered-Data-Center-in-Santa-Clara-Builds-Atop-On-Grid-Power-for-High-Density-AI-Delivery"},{"kind":"press","label":"ECL Plans 35MW Data Center in California That Will Use Some Hydrogen Power","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/ecl-plans-35mw-data-center-in-california-that-will-use-some-hydrogen-power/"},{"kind":"press","label":"ECL Unveils 35MW FlexGrid Data Center in Santa Clara to Tackle AI Power Constraints","publisher":"Converge Digest","retrievedAt":"2026-09-29","url":"https://convergedigest.com/ecl-unveils-35mw-flexgrid-data-center-in-santa-clara-to-tackle-ai-power-constraints/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/ecl-csc1-santa-clara-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Clarion","confidence":"medium","id":"compute_atlas-51cc3c7bddce1f38","lat":41.210335,"location_precision":"approximate","lon":-79.37146,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/miles-brothers-glassworks-data-campus-clarion-pa","value":700.0}],"name":"Glassworks Data Campus (former Owens-Illinois glass plant)","operator":"Miles Brothers, LLC","source_notes":"49 South Sheridan Drive, Clarion Borough. Phase 1 is about 100 acres with four two-story buildings (1.6M+ sq ft), plus 85 acres for a later phase. Clarion Borough adopted a data center ordinance Jan. 20, 2026. Depends on securing a tenant. The pin is a census geocode near the site.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/miles-brothers-glassworks-data-campus-clarion-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Fairbanks","confidence":"medium","id":"compute_atlas-51d91a504db1238f","lat":64.859,"location_precision":"approximate","lon":-147.843,"name":"UAF Butrovich Data Center","operator":"University of Alaska","source_notes":"A 12,000 sq ft, 24x7 staffed facility in the Butrovich Building on the UAF campus. It hosts the university's system-wide business systems and the Research Computing Systems' high-performance computing clusters. N+1 redundant HVAC and UPS. Rack hosting is limited to UA/UAF users. Coordinates are approximate (campus building).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"2024 Butrovich Data Center facility upgrades","publisher":"University of Alaska","retrievedAt":"2026-10-18","url":"https://www.alaska.edu/news/it/2024-butrovich-datafacility-upgrades.php"},{"kind":"other","label":"Data Center Rack Management (Butrovich Data Center service description)","publisher":"University of Alaska","retrievedAt":"2026-10-18","url":"https://service.alaska.edu/TDClient/39/Portal/Requests/Service/336/Data-Center-Rack-Management"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/uaf-butrovich-data-center-fairbanks-ak"}],"state":"Alaska","status":"operating"},{"ai_classification":"likely","city":"Rome","confidence":"medium","id":"compute_atlas-52b3e31584ae79e4","lat":34.27,"location_precision":"approximate","lon":-85.16,"name":"Microsoft Data Center Campus – Rome, GA","operator":"Microsoft","source_notes":"Data Center Dynamics reports that the Rome Floyd County Development Authority (RFCDA) announced a '$1 billion' campus; AllOnGeorgia's account of the announcement says Microsoft is 'investing over $1,000,000,000'. The recorded investment of $1 billion is therefore a floor (AllOnGeorgia's wording is 'over'), not a final cost. Completion targeted 2027–2028. Site is 347 acres on Huffaker Road, east of Fouche Gap Road, in unincorporated Floyd County, adjacent to Georgia Power-owned land; land purchased at $40,000/acre (~$13.9M). Microsoft stated site selection was driven by 'Rome and Floyd County's industrial zoning and strong infrastructure.' Microsoft committed to covering all costs for additional infrastructure (power, water, roads) so ratepayers and taxpayers are not burdened. Part of Microsoft's broader East US 3 Georgia cloud build-out; announced to bolster Azure cloud services. Floyd County enacted an 80-day moratorium on new data center permits (2025) but explicitly noted previously filed projects including Microsoft's can proceed. Capacity MW not disclosed. Coordinates are approximate; actual parcel is on Huffaker Road in unincorporated Floyd County.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft to develop 350-acre data center campus in Rome, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/"},{"kind":"press","label":"$1 Billion Microsoft Data Center Campus Coming to Northwest Georgia","publisher":"The Georgia Sun","retrievedAt":"2026-07-07","url":"https://thegeorgiasun.com/business-economy/1-billion-microsoft-data-center-campus-coming-to-northwest-georgia/"},{"kind":"press","label":"Microsoft to invest $1 Billion in Rome, GA Data Center Campus","publisher":"AllOnGeorgia","retrievedAt":"2026-07-07","url":"https://allongeorgia.com/chattooga-local-news/microsoft-to-invest-1-billion-in-rome-ga-data-center-campus/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/microsoft-firecracker-rome-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Milwaukee","confidence":"high","contains_osm":true,"id":"compute_atlas-52d612e3e740f906","lat":43.0097937,"location_precision":"approximate","lon":-87.9610932,"name":"TierPoint Milwaukee","operator":"TierPoint","source_notes":"Confirmed on TierPoint's own directory: Wisconsin - Milwaukee, 3701 W Burnham St.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/9721703993","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/9721703993"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-milwaukee-wi"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9721703993"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-milwaukee-osmnode-9721703993"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9721703993"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Goodyear","confidence":"high","contains_osm":true,"id":"compute_atlas-52fa2acfee2d66ca","lat":33.4463027,"location_precision":"exact","lon":-112.3738867,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-phoenix-campus-goodyear-az-az","value":176.0}],"name":"Vantage Phoenix Campus (Goodyear, AZ)","operator":"Vantage Data Centers","source_notes":"45 S Bullard Ave, Goodyear AZ 85338; campus of buildings AZ11-AZ14, 176MW planned, per datacentermap/datacenters.com cross-check.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1283734104","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1283734104"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/vantage-phoenix-campus-goodyear-az-az"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1283734104"}],"state":"Arizona","status":"operating"},{"ai_classification":"confirmed","city":"Jeffersonville","confidence":"medium","id":"compute_atlas-52fc2be08b971703","lat":38.33,"location_precision":"approximate","lon":-85.715,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-jeffersonville-in","value":407.0}],"name":"Meta Jeffersonville Data Center","operator":"Meta","source_notes":"River Ridge Commerce Center, Jeffersonville IN (Clark County, across Ohio River from Louisville KY). ~700,000 sq ft; AI-native design with liquid cooling from the start. Coordinates are approximate River Ridge Commerce Center area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta Building New $800 Million AI-Focused Data Center in Indiana","publisher":"Bloomberg","retrievedAt":"2026-07-06","url":"https://www.bloomberg.com/news/articles/2024-01-25/meta-building-new-800-million-ai-focused-data-center-in-indiana"},{"kind":"press","label":"Meta to develop data center campus in Jeffersonville, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-08-05","url":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-in-jeffersonville-indiana/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-jeffersonville-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"likely","city":"Niles / Weathersfield Township","confidence":"medium","id":"compute_atlas-53214fa6699dcae0","lat":41.19,"location_precision":"approximate","lon":-80.77,"name":"Whitetail Creek Data Center","operator":"Bitdeer","source_notes":"1047 Belmont Ave, former Ohio Edison power plant site, straddling Weathersfield Township and Niles. Bitdeer's own business is described as 'cryptocurrency and AI cloud infrastructure.' Distinct from Bitdeer's existing tracked Clarington, OH facility. Coordinates are approximate. Operated via subsidiary Whitetail Creek LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Business Journal Daily — \"Bitdeer Eyes 'Energization' for Weathersfield Project in 2029\"","retrievedAt":"2026-07-24","url":"https://businessjournaldaily.com/bitdeer-eyes-energization-for-weathersfield-project-in-2029/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/bitdeer-whitetail-creek-trumbull-county-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Urbandale","confidence":"medium","id":"compute_atlas-5351fd9e9a7ff395","lat":41.6275758,"location_precision":"exact","lon":-93.7672535,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ip-pathways-urbandale-ia","value":5.0}],"name":"IP Pathways Urbandale Data Center","operator":"IP Pathways","source_notes":"Operator-published figures: 5,817 sq ft white space, 5,000 kW critical power, up to 17.2 kW per rack, SOC 2 Type II and HIPAA compliant, carrier-neutral with a meet-me room. Coordinates geocoded from the operator's published street address to an OpenStreetMap building-level match. IP Pathways also operates data centers in Omaha, NE and Kansas City, MO; only the Iowa site is recorded here.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/ip-pathways-urbandale-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"confirmed","city":"West Memphis","confidence":"medium","id":"compute_atlas-5367597222d3b7c3","lat":35.156,"location_precision":"approximate","lon":-90.175,"name":"Google West Memphis Data Center Campus","operator":"Google","source_notes":"Campus on Bolliger Road, West Memphis. Coordinates approximate for the Bolliger Road industrial area. $4B is Phase 1 through 2027; total planned investment is $10B, which would be the largest private capital investment in Arkansas history. Five data center buildings on 920-acre campus footprint within a 1,178-acre site (per U.S. Army Corps of Engineers filing). A 5,000 construction-jobs figure, unsourced as of July 2026, is not recorded: AEDC states only 'thousands'. The facility draws from Entergy Arkansas, so the energy source is the grid; Arkansas Cypress Solar is a companion renewable project. The site area is 1,178 acres per the Army Corps filing, not 1,200.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google Locating New Data Center in West Memphis, Arkansas with Multi-Billion Dollar Investment","publisher":"Arkansas Economic Development Commission","retrievedAt":"2026-07-06","url":"https://www.arkansasedc.com/news-events/newsroom/detail/2025/10/02/google-locating-new-data-center-in-west-memphis--arkansas-with-multi-billion-dollar-investment"},{"kind":"press","label":"Google, state and local officials mark start of $4 billion AI data center in West Memphis","publisher":"Arkansas Advocate","retrievedAt":"2026-07-06","url":"https://arkansasadvocate.com/2025/10/02/google-state-and-local-officials-mark-start-of-4-billion-ai-data-center-in-west-memphis/"},{"kind":"press","label":"Lawmakers discuss the data center industry in Arkansas","publisher":"Arkansas Democrat-Gazette","retrievedAt":"2026-09-29","url":"https://www.arkansasonline.com/news/2026/sep/15/lawmakers-discuss-the-data-center-industry-in/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-west-memphis-ar"}],"state":"Arkansas","status":"under construction"},{"ai_classification":"unknown","city":"St. Louis","confidence":"medium","id":"compute_atlas-539af11f8955f95a","lat":38.636,"location_precision":"approximate","lon":-90.237,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/armory-innovation-district-st-louis-mo","value":120.0}],"name":"Armory Innovation District Data Center","operator":"Contour / TerraWatt (with Steadfast City, THO Investments, ARCO, Lewis Rice)","source_notes":"St. Louis Board of Public Service approved the conditional use permit 5-0 on 2026-04-22; the Board of Adjustment upheld/amended it on 2026-07-30. No tenant has been named as of August 2026; targeted for full operation by end of 2028. Officially branded the 'Armory Innovation District.'","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/armory-innovation-district-st-louis-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"likely","city":"Aurora","confidence":"medium","id":"compute_atlas-53e8adee87d7e665","lat":39.7113,"location_precision":"approximate","lon":-104.7241,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-aurora-co","value":177.0}],"name":"QTS Aurora-Denver Data Center Campus (DEN1)","operator":"QTS Data Centers","source_notes":"1160 N. Gun Club Rd, Aurora, CO 80018; eastern Aurora near E-470. Former JPMorgan data center site. Four-building campus on 67 acres. Colorado's first hyperscale facility at this scale. Coordinates based on Gun Club Rd address. Investment amount and specific job counts (previously $1B, 500 construction, 77 permanent) removed — not confirmed by cited sources. QTS Data Centers is owned by Blackstone (2021 take-private). As of 2026-07-08, one of the campus's three buildings is complete, a second is nearly finished, and site work has begun on the third. A July 2025 permit application seeks 98 additional diesel backup generators on top of the existing 40.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS plans Denver build-out at 177MW Aurora campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/qts-plans-15m-sq-ft-expansion-at-henrico-virginia-campus-and-denver-build-out/"},{"kind":"press","label":"Denver Data Center Market Capturing Growing Interest","publisher":"Mile High CRE","retrievedAt":"2026-07-06","url":"https://milehighcre.com/denver-data-center-market-capturing-growing-interest/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/qts-aurora-co"}],"state":"Colorado","status":"under construction"},{"ai_classification":"unknown","city":"Sterling","confidence":"high","contains_osm":true,"id":"compute_atlas-54319b2b4de8e0da","lat":39.024356,"location_precision":"exact","lon":-77.4341,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-nva5-sterling-va","value":81.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-nva5-sterling-va","value":116.0}],"name":"CyrusOne NVA5 (Sterling)","operator":"CyrusOne","source_notes":"Part of the NVA5-NVA7 campus per operator directory; distinct building from NVA7.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/435817145","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/435817145"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cyrusone-nva5-sterling-va"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/983627455","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/983627455"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cyrusone-nva7-sterling-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/435817145"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Kokomo","confidence":"medium","id":"compute_atlas-54550d95bdd62497","lat":40.54,"location_precision":"approximate","lon":-86.13,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digital-realty-kokomo-howard-county-in","value":1500.0}],"name":"Digital Realty Kokomo Data Center Campus (Industrial Park North)","operator":"Digital Realty","source_notes":"Three-building campus of about 3 million sq ft on ~476 acres at Industrial Park North, near U.S. 31 and County Road 400 North. Projected $1.3B-$1.7B taxable value; the city says no tax abatement. Completion projected 2033. The 1,500 MW figure is the developer's stated power requirement at full build-out. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/digital-realty-kokomo-howard-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"confirmed","city":"St. Francisville","confidence":"medium","id":"compute_atlas-545ffcb06280d4e6","lat":30.79,"location_precision":"approximate","lon":-91.38,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hut8-river-bend-west-feliciana-la","value":330.0}],"name":"Hut 8 River Bend AI Data Center Campus","operator":"Hut 8","source_notes":"River Bend campus on 611 acres in West Feliciana Parish. Fluidstack (backed by Google) is primary tenant; Anthropic also signed a long-term lease. Phase I: two 450,000 sq ft facilities. Phase II (additional facilities) targeted by end of 2026. Coordinates approximate St. Francisville area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Planned Hut 8 data center in West Feliciana Parish gets green light","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/planned-hut-8-data-center-in-west-feliciana-parish-louisiana-gets-green-light/"},{"kind":"press","label":"Hut 8 selects Entergy, Southeast Louisiana for $10 billion artificial intelligence data center","publisher":"Entergy","retrievedAt":"2026-08-26","url":"https://www.entergy.com/news/hut-8-selects-entergy-southeast-louisiana-for-10-billion-artificial-intelligence-data-center"},{"kind":"press","label":"River Bend | Hut 8","publisher":"Hut 8","retrievedAt":"2026-09-15","url":"https://www.hut8.com/data-centers/river-bend"},{"kind":"press","label":"Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus","publisher":"Hut 8","retrievedAt":"2026-10-17","url":"https://canada.hut8.com/resources/press-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-usd7-0-billion"},{"kind":"press","label":"Hut 8 water upgrades in West Feliciana","publisher":"Technical.ly","retrievedAt":"2026-10-17","url":"https://technical.ly/entrepreneurship/hut-8-water-upgrades-west-feliciana/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/hut8-river-bend-west-feliciana-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"confirmed","city":"Lucin","confidence":"medium","id":"compute_atlas-547e1d13f159bbc8","lat":41.5,"location_precision":"approximate","lon":-113.5,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stratos-box-elder-ut","value":9000.0}],"name":"Stratos AI Data Center Campus","operator":"O'Leary Digital","source_notes":"Hansel Valley and Locomotive Valley, western Box Elder County near Lucin, UT. The project area was about 40,000 acres as approved in spring 2026 (Utah News Dispatch); on June 4, 2026, O'Leary wrote that the company would remove 19,430 acres in and around the Locomotive Springs area and another 620 acres, cutting the area roughly in half (KUER). As of October 2026, no current total area is recorded. 60 planned data centers on initial 10,000-acre phase. 9GW is full-buildout figure; Phase 1 ~3GW. Total cost projected $100B+ at full buildout; only $20M invested as of mid-2026. Designed by Gensler. Environmental permitting via Utah DEQ expected to take ~2 years. MIDA oversight provides state-level approval authority. Coordinates are approximate for western Box Elder County; exact site boundaries unpublished. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Box Elder County's own Stratos Project Fact Sheet states directly: \"No County funds are required to build the project. All funds will come from the developers and private investors.\" A May 2026 MIDA interlocal agreement covers land-use and permitting review governance (a development review committee, subdivision/site-plan requirements), not a tax-increment or abatement arrangement, and MIDA's own project-area records — which could confirm or rule out a tax-increment component — were unreachable when checked in September 2026 (mida.utah.gov redirected to an unrelated login page). Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Stratos Project Fact Sheet — Box Elder County","publisher":"Box Elder County, UT","retrievedAt":"2026-07-06","url":"https://www.boxeldercountyut.gov/647/Stratos-Project-Fact-Sheet"},{"kind":"press","label":"Renderings show Stratos data center but permits could take years","publisher":"Utah News Dispatch","retrievedAt":"2026-07-06","url":"https://utahnewsdispatch.com/2026/05/19/renderings-show-massive-data-center-box-elder-utah-permits-could-take-years/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Kevin O’Leary says he’ll shrink the Box Elder data center by 20,000 acres","publisher":"KUER","retrievedAt":"2026-10-28","url":"https://www.kuer.org/business-economy/2026-06-04/kevin-oleary-shrinks-project-stratos-box-elder-data-center-20000-acres"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/stratos-box-elder-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Cordova","confidence":"medium","id":"compute_atlas-552941dbeb05fbee","lat":60.6099,"location_precision":"approximate","lon":-145.644,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/greensparc-cordova-ak","value":0.17}],"name":"Greensparc Cordova Data Center (Humpback Creek Hydro)","operator":"Greensparc","source_notes":"Small edge data center. CleanTechnica reports 170 kW of computing capacity. The pin is the OSM centroid of Humpback Creek, not the plant's footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New data center launched at CEC hydro plant","publisher":"The Cordova Times","retrievedAt":"2026-09-28","url":"https://thecordovatimes.com/2024/04/29/new-data-center-launched-at-cec-hydro-plant-bringing-data-hosting-cloud-service-opportunities-to-community/"},{"kind":"press","label":"Greensparc Brings Reliable, Powerful Computing Infrastructure to Cordova","publisher":"Alaska Business Magazine","retrievedAt":"2026-10-18","url":"https://www.akbizmag.com/industry/telecom-tech/greensparc-brings-reliable-powerful-computing-infrastructure-to-cordova/"},{"kind":"press","label":"In Alaska, a Data Center Inside a Power Plant, Inside a Microgrid","publisher":"CleanTechnica","retrievedAt":"2026-09-28","url":"https://cleantechnica.com/2026/03/09/in-alaska-a-data-center-inside-a-power-plant-inside-a-microgrid/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/greensparc-cordova-ak"}],"state":"Alaska","status":"operating"},{"ai_classification":"unknown","city":"Underwood","confidence":"medium","id":"compute_atlas-55409f3676bc170d","lat":47.377,"location_precision":"approximate","lon":-101.157,"name":"Coal Creek Data Center Park (Rainbow Energy)","operator":"Rainbow Energy Center","source_notes":"McLean County rezoned ~800 acres next to Coal Creek Station from agricultural to commercial in June 2025. Rainbow's plans for the area include data centers with \"as much as 300 megawatts of electricity demand\" (Bismarck Tribune, July 2025); that is a ceiling on demand, not a firm capacity, so no capacity figure is recorded. No tenant or specific project had been announced. This record is the planned park, not the existing 200-megawatt data center that Rainbow already powers at the plant per the same article, which is deliberately not recorded here. Coordinates are approximate, near Coal Creek Station.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/rainbow-energy-coal-creek-data-center-park-nd"}],"state":"North Dakota","status":"planned"},{"ai_classification":"unknown","city":"Newark","confidence":"medium","id":"compute_atlas-557460692b1b29c2","lat":39.6828358,"location_precision":"approximate","lon":-75.7515682,"name":"White Clay Corporate Center Data Center Redevelopment","operator":"Shelbourne","source_notes":"Reported square footage differs across filings and coverage as plans evolved: 676,000 sq ft (Spotlight Delaware, plans filed early Dec 2025) vs. 847,000 sq ft (Newark Post, later filing). Both are recorded rather than resolved to one figure. Capacity in MW is explicitly 'undetermined' per Delmarva Power's internal project list obtained via FOIA and reported by Technical.ly, so no capacity is recorded. The pin is approximate: it is Newark, DE's city centroid (OSM). The specific parcel on White Clay Center Drive (near the Ogletown Road/Del. 273 and CarMax intersection) did not resolve via US Census or OSM Nominatim geocoding; the bare street name, a structured street+city+state query, and the 'CarMax Newark DE' landmark all returned no match.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center complex proposed near Newark","publisher":"Newark Post","retrievedAt":"2026-09-12","url":"https://www.newarkpostonline.com/news/data-center-complex-proposed-near-newark/article_25f31b5b-71d7-4975-9ace-213c3dbf35ff.html"},{"kind":"press","label":"County councilman says Newark data center plan paused after deal","publisher":"Newark Post / Spotlight Delaware","retrievedAt":"2026-09-12","url":"https://www.newarkpostonline.com/spotlight_delaware/county-councilman-says-newark-data-center-plan-paused-after-deal/article_55cac45c-ba8c-4349-9944-d1dbbdedfbfb.html"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/shelbourne-white-clay-newark-de"}],"state":"Delaware","status":"planned"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"compute_atlas-55c8cabd3e6f768e","lat":39.72057,"location_precision":"approximate","lon":-82.68839,"name":"Google Lancaster Data Center","operator":"Google","source_notes":"Whiley Rd, Lancaster. Fairfield County records place the 2021 purchase of about 120 acres (121.545 acres, sold August 2021 for $3,914,240) at 17 Whiley Rd, a separate parcel from the 105 Whiley Rd address that some sources give for the site (59.149 acres, with an adjoining 3.608-acre parcel; county records show both with a March 2025 sale at $3,600,000, all three parcels under one owner entity, Table Mountain Industries LLC). As of October 2026, the pin is approximate and has not been matched to a building footprint. The site is distinct from Google's New Albany and Lima \"Project BOSC\" Ohio facilities. No site-specific investment figure is disclosed; Google has only published cumulative bundled totals across its New Albany+Lancaster+Columbus Ohio campuses ($1.7B Aug 2023, +$2.3B June 2024, ~$4.4B+ cumulative since 2019). No IT-load MW figure publicly disclosed. One 2024 article notes future buildings will \"support Google's artificial intelligence innovation,\" but this is generic AI-as-one-of-many-workloads boilerplate rather than facility-specific AI/HPC/GPU marketing — no AI classification is recorded. Coordinates are an approximate geocode.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Google Data Centers — Ohio","publisher":"Google","retrievedAt":"2026-07-10","url":"https://datacenters.google/locations/ohio/"},{"kind":"press","label":"Google plans $1bn New Albany data center expansion, acquires 618 acres for more data centers","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/google-plans-1bn-new-albany-data-center-expansion-acquires-618-acres-for-more-data-centers/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-lancaster-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"likely","city":"De Soto","confidence":"medium","id":"compute_atlas-55f8a34fcf00e584","lat":38.966,"location_precision":"approximate","lon":-94.967,"name":"Beale Project Pilot (De Soto)","operator":"Beale Infrastructure","source_notes":"Developer (Mount Sunflower Properties LLC / Beale Infrastructure, backed by Blue Owl) has pre-leased the entire campus to an unnamed large technology company. Attorney described the tenant as among 'the strongest, most financially profitable companies in the world.' Four buildings of 285,000 sq ft each (1.14M sq ft total); full build-out in 7–9 years. Kansas's first announced hyperscale data center. Permanent job figure of 100 is sourced from Johnson County Post ('over 100 long-term jobs paying six figures'); DCD separately cited 50 operational jobs for the first phase only. Coordinates are De Soto city centroid; exact site is at NW corner of 103rd St and Edgerton Rd.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"De Soto advances $3.1B data center project near Panasonic plant","publisher":"Johnson County Post","retrievedAt":"2026-07-06","url":"https://johnsoncountypost.com/2025/08/26/de-soto-advances-3-1-billion-data-center-project-near-panasonic-plant-267209/"},{"kind":"press","label":"Beale targets two campuses outside Kansas City, Kansas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/beale-targets-two-campuses-outside-kansas-city-kansas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/beale-project-pilot-de-soto-ks"}],"state":"Kansas","status":"under construction"},{"ai_classification":"unknown","city":"Statesboro","confidence":"medium","id":"compute_atlas-56500e7ab356b83e","lat":32.4049295,"location_precision":"approximate","lon":-81.7440222,"name":"Burkhalter Road Data Center (4AM Development)","operator":"4AM Development, LLC (developer; operator undisclosed)","source_notes":"Two-story building of roughly 230,000 sq ft plus a 3/4-acre reserved Georgia Power substation site. The concept plan describes 40-90 MW and the developers applied to Georgia Power for a maximum of 99 MW; no single figure is asserted here. Owners named as Bobby Bagwell and Charles C. Way; the site is being zoned speculatively. No investment figure is recorded. The Statesboro Herald reports a developer-funded fiscal-impact analysis by Economic Impact Group LLC for the Development Authority of Bulloch County that \"suggested a $1.2 billion total 10-year investment\", under the subheading \"Supposed $1.2B project\"; developer Way said private investment would depend on the ultimate design but would be \"somewhere in the high hundreds of millions of dollars\". Coordinates are approximate to Burkhalter Road pending parcel confirmation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Eleven citizens and nonprofit group file legal challenge to Statesboro data center rezoning","publisher":"Statesboro Herald","retrievedAt":"2026-09-23","url":"https://www.statesboroherald.com/local/eleven-citizens-and-nonprofit-group-file-legal-challenge-to-statesboro-data-center-rezoning/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/4am-development-burkhalter-road-statesboro-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Bear","confidence":"medium","id":"compute_atlas-566489cb536aeb1a","lat":39.64975,"location_precision":"approximate","lon":-75.656095,"name":"JPMorgan Chase Core Data Center 1 (CDC1), Bear","operator":"JPMorgan Chase Bank, N.A.","source_notes":"Enterprise data center. The DNREC permit covers twelve diesel emergency generators: six at 19.6 MMBtu/hr, two at 19.8 and four at 20.3, each described in the DNREC memo as 3,058 HP. The original permit applications date to May 28, 2003. The 2021 amendment removed SCR systems from generators 5–8 and capped each generator at 124 hours/year. DNREC's public notice gives the address as Newark, while the permit itself says Bear. No IT capacity is published, so no capacity is recorded. dcmap.us shows an 'estimated' 34.934 MW that comes from no primary source and is not used. The latest primary evidence of operation is the December 2021 permit action. Coordinates are a US Census geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DNREC Division of Air Quality: draft permit APC-2003/0285-OPERATION (SM)(NSPS)(A5), twelve emergency generators, JP Morgan Data Center CDC1, 501 Bear Christiana Road (Dec 2021)","publisher":"Delaware DNREC","retrievedAt":"2026-10-20","url":"https://docs.dnrec.delaware.gov/render/2446576/c1b1b6791dc007b72fdca01fd2ea9fa568f551cf506d18581b522a1ea65cf5e667aa6b87b38cb1b1246515c1c0b04ca1/"},{"kind":"permit","label":"Title V Synthetic Minor Permit Applications: JP Morgan (501 Bear Christiana Road), public notice Dec 12, 2021","publisher":"Delaware DNREC","retrievedAt":"2026-10-01","url":"https://dnrec.delaware.gov/public-notices/title-v-synthetic-minor-permit-applications-jp-morgan/"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/jpmorgan-chase-cdc1-bear-de"}],"state":"Delaware","status":"operating"},{"ai_classification":"likely","city":"El Mirage","confidence":"medium","id":"compute_atlas-56731614cde4b845","lat":33.5695,"location_precision":"approximate","lon":-112.3204,"name":"Microsoft El Mirage Data Center Campus","operator":"Microsoft","source_notes":"The investment figure is land-purchase cost only; total campus investment is higher. PHX-83 is the fifth building on existing El Mirage campus. Coordinates are El Mirage city centroid; site is at SE corner of Dysart Rd and Olive Ave. Arizona's Sec. 41-1519 sales/use-tax exemption applies by statute but no campus-specific certified award was found; published job figures cover the combined West Valley (El Mirage/Goodyear) campus, not El Mirage alone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft acquires nearly 300 acres for data center growth in El Mirage","publisher":"Arizona Technology Council","retrievedAt":"2026-07-06","url":"https://www.aztechcouncil.org/microsoft-buys-land-el-mirage-data-center/"},{"kind":"press","label":"Microsoft files to expand El Mirage data center campus in Arizona","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-el-mirage-data-center-campus-in-arizona/"},{"kind":"other","label":"Microsoft — Greater Phoenix, Arizona datacenter community","publisher":"Microsoft","retrievedAt":"2026-08-08","url":"https://local.microsoft.com/communities/americas/greater-phoenix/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-el-mirage-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"high","contains_osm":true,"id":"compute_atlas-5691c7a304dc3a61","lat":38.9608537,"location_precision":"exact","lon":-77.4913983,"name":"Digital Realty IAD44","operator":"Digital Realty","source_notes":"43704 Efficiency Drive, Sterling VA 20166. Distinct from Google Arcola (different operator, 3.5km away).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44"},{"kind":"osm","label":"OpenStreetMap way/1317733642","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1317733642"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-iad44-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1317733642"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1543296494"}],"state":"Virginia","status":"operating"},{"ai_classification":"confirmed","city":"Warrenton","confidence":"medium","id":"compute_atlas-56ab9f4e15ade5d6","lat":38.8125,"location_precision":"approximate","lon":-91.1432,"name":"Crusoe Warrenton Campus","operator":"Crusoe","source_notes":"Coordinates approximate. Site address: 22151 NW Service Road, Warrenton MO; north of NW Service Road, west of Hwy. W. Two 805,000 sq ft data center buildings + 40,000 sq ft administration building + 621,250 sq ft Ameren-owned switch yard + 603,200 sq ft Crusoe-owned electrical substation. Crusoe described as its 'fifth campus' in its national AI data center portfolio as of June 2026 per the Crusoe newsroom. Meta signed agreement with Crusoe in June 2026 for approximately 1.6GW of AI computing capacity split across Childress TX and Warrenton MO campuses — per-site split not disclosed; confirms Warrenton as AI anchor customer site (MLQ.ai). The conditional use permit and site plan are approved; land disturbance review and construction permits are still outstanding before groundbreaking. Crusoe committed publicly to seek no real property tax or gross receipt tax abatements; would pursue state incentives only (Mid Rivers Newsmagazine). Developer projected annual property taxes of about $80M, with about $44M to local schools (Mid Rivers Newsmagazine). Construction jobs projected at about 2,500 over a three-year build and permanent tech jobs at about 100 (developer estimates reported by Mid Rivers Newsmagazine, not firm contractual commitments). Crusoe historically used on-site flared natural gas but divested those operations; Warrenton campus is grid-connected via Ameren Missouri — no on-site gas generation reported here. Distinct from the Google/Crusoe 'Goodnight' campus in Armstrong County TX.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Crusoe data center could be built west of St. Louis, Missouri","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/crusoe-data-center-could-be-built-west-of-st-louis-missouri/"},{"kind":"press","label":"Warrenton aldermen approve data center site plan near I-70","publisher":"Fox 2 Now","retrievedAt":"2026-07-07","url":"https://fox2now.com/news/missouri/warrenton-aldermen-approve-data-center-site-plan-near-i-70/"},{"kind":"press","label":"Meta signs 1.6GW capacity deal with Crusoe spanning Texas and Missouri campuses","publisher":"MLQ.ai","retrievedAt":"2026-07-07","url":"https://mlq.ai/news/meta-signs-16gw-capacity-deal-with-crusoe-spanning-texas-and-missouri-campuses/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/crusoe-warrenton-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"West Valley City","confidence":"medium","id":"compute_atlas-56ba2e38c6fb714b","lat":40.69679,"location_precision":"approximate","lon":-111.9867,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edgeconnex-west-valley-city-ut","value":2.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edgeconnex-west-valley-city-ut","value":1.0}],"name":"EdgeConneX SLC01","operator":"EdgeConneX","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. West Valley City's Fund 22 (Redevelopment Agency) adopted budget itemizes every currently active RDA/CRA project area by name with no boundary description resolving to 2302 S President's Dr, and no line item, city filing, or state record names EdgeConneX. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"other","label":"EdgeConneX Salt Lake City SLC01 Data Sheet","publisher":"EdgeConneX","retrievedAt":"2026-10-13","url":"https://edgeconnex.com/wp-content/uploads/2024/09/Salt-Lake-City-Data-Sheet.pdf"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/edgeconnex-west-valley-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"likely","city":"Kansas City","confidence":"medium","id":"compute_atlas-56d34eb416597c58","lat":39.0997,"location_precision":"approximate","lon":-94.5786,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/patmos-kansas-city-mo","value":35.0}],"name":"Patmos KC Star Building Campus","operator":"Patmos Hosting","source_notes":"~$1B redevelopment of the former Kansas City Star building into a ~35 MW data center, Jackson County. Distinct (downtown KC, Jackson County) from the Lambda/Google/Meta Kansas City sites. Single-tracker source → confidence reported. Coordinates are the Kansas City centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Patmos Receives $100M C-PACE Loan for Redevelopment of Kansas City Star Building into Data Center","publisher":"REBusinessOnline","retrievedAt":"2026-08-24","url":"https://rebusinessonline.com/patmos-receives-100m-c-pace-loan-for-redevelopment-of-kansas-city-star-building-into-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/patmos-kansas-city-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Kentwood","confidence":"medium","id":"compute_atlas-57004a964c58e69e","lat":42.87690347654,"location_precision":"approximate","lon":-85.563698606365,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-mi01-kentwood-mi","value":2.2}],"name":"US Signal MI01 Grand Rapids Data Center","operator":"US Signal","source_notes":"Multi-tenant colocation. Operator's facility page (retrieved 2026-09-09) states: generators 3,000 kW at 2N, UPS 2,200 kW at 2N, utility feeds 3,000 kVA, HVAC 550 tons N+1, Tier 3, built 2014 with a 2016 expansion, 99.999% uptime SLA. As of October 2026, the page also gives a critical IT workload of 2,200 kW, 40,000 total sq ft and 25,000 sq ft of whitespace; the operational capacity records the 2,200 kW critical IT workload, not the generator rating. Cooling medium not stated (tonnage only), so no cooling type is recorded. No investment, jobs, or incentive figures are stated on the operator's page. Coordinates from the US Census geocoder for the street address on the operator's page; parcel footprint not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-mi01-kentwood-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Bayonne","confidence":"medium","contains_osm":true,"id":"compute_atlas-570a3bd1c59c1967","lat":40.6565644,"location_precision":"approximate","lon":-74.0944372,"name":"69-71 New Hook Road Data Center (Constable Hook)","operator":"Undisclosed","source_notes":"The site was rezoned at an applicant's request to allow a data center; no site plan filing has been reported. Reporting says the site would draw power directly from the adjacent Bayonne Energy Center, with no capacity figure given. On Aug 12, 2026 the City Council voted 5-0 to ban data centers in all zones citywide. The business administrator said projects on previously approved sites are unlikely to advance because they need further approvals. The record stays listed as proposed because, as of October 2026, no source states this project was withdrawn or cancelled. Coordinates are an OSM street-level point on New Hook Road next to Bayonne Energy Center, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bayonne data center at 69-71 New Hook Road: rezoning and council response","publisher":"GatherGov","retrievedAt":"2026-10-09","url":"https://gathergov.com/articles/bayonne-data-center"},{"kind":"press","label":"Bayonne bans data centers citywide in unanimous council vote","publisher":"HudPost","retrievedAt":"2026-10-09","url":"https://hudpost.com/bayonne-bans-data-centers-citywide-in-unanimous-council-vote/"},{"kind":"press","label":"Bayonne mayoral candidates spar over data center vote","publisher":"New Jersey Globe","retrievedAt":"2026-10-09","url":"https://newjerseyglobe.com/campaigns/bayonne-mayoral-candidates-spar-over-data-center-vote/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/new-hook-road-data-center-bayonne-nj"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","contains_osm":true,"id":"compute_atlas-570a9a21f29aee5a","lat":39.0112123,"location_precision":"exact","lon":-77.4604251,"name":"CloudHQ LC3","operator":"CloudHQ","source_notes":"44631 Waxpool Rd, Ashburn. CloudHQ's own LC Campus page states LC3 (and LC4) are 'currently under construction'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CloudHQ facility directory","publisher":"CloudHQ","retrievedAt":"2026-07-22","url":"https://cloudhq.com/campus/lc-campus/"},{"kind":"osm","label":"OpenStreetMap way/1443187163","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1443187163"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/cloudhq-lc3-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Bentonville","confidence":"medium","id":"compute_atlas-570e6d6439d3a79c","lat":36.364241,"location_precision":"approximate","lon":-94.182712,"name":"Walmart Bentonville Data Center","operator":"Walmart","source_notes":"Walmart's East Data Center, on the David Glass Technology Center campus (DGTC) at 805 SE Moberly Ln, Bentonville. Identity, owner, address, county and coordinates are from the Arkansas DEQ Permit Data System facility record AFIN 04-01474, which names the site \"WAL-MART DGTC/ISD #9280\" with alternate name \"EAST DATA CENTER\", owner WALMART INC, status Active. Coordinates are ADEQ's own (36.364241, -94.182712; NAD83, ADEQ photo interpolation, measured 2013-02-04), which supersede the earlier US Census street geocode they sit ~87 m from. The pin remains approximate: the campus holds several buildings and the specific data-hall footprint is not established. No capacity is recorded: the aggregator figures disagree (10-25 MW vs 12.884 MW) and neither is a primary source. datacenter.fyi additionally states the site \"connects to the El Paso Electric power grid\"; El Paso Electric serves only West Texas and southern New Mexico and has no Arkansas service territory, so that field is a data-quality error in that source and nothing from it is relied on beyond corroborating the site's existence.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Facility AFIN 04-01474 — \"WAL-MART DGTC/ISD #9280\", alternate name \"EAST DATA CENTER\", 805 Moberly Lane, Bentonville (Benton County); owner WALMART INC; status Active","publisher":"Arkansas Division of Environmental Quality — Permit Data System","retrievedAt":"2026-09-14","url":"https://adeq.state.ar.us/home/pdssql/p_facil_details.aspx?AFINDash=04-01474&AFIN=0401474"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/walmart-bentonville-data-center-ar"}],"state":"Arkansas","status":"operating"},{"ai_classification":"likely","city":"Charlotte","confidence":"medium","id":"compute_atlas-579a7d0b52a53618","lat":35.2271,"location_precision":"approximate","lon":-80.8431,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-charlotte-nc","value":300.0}],"name":"PowerHouse Charlotte Campus","operator":"PowerHouse Data Centers","source_notes":"120-acre, ~300 MW campus in Charlotte, Mecklenburg County. Distinct operator/parcel from the separately-tracked Digital Realty Charlotte site. Coordinates are the Charlotte centroid. A 2023 Yahoo News report says PowerHouse wanted to build on \"more than 130 acres\", while the Data Center Dynamics headline says it acquired 120 acres; the record carries 120 acres, and as of October 2026 no readable source explains the difference. Partner: American Real Estate Partners (AREP).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"PowerHouse acquires 120 acres in Charlotte, North Carolina, for 300MW campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/powerhouse-acquires-120-acres-in-charlotte-north-carolina-for-300mw-campus/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Charlotte Approves 150-Day Pause On New Data Center Projects (June 8, 2026)","publisher":"Bisnow","retrievedAt":"2026-10-28","url":"https://www.bisnow.com/news/charlotte/data-center-community-relations/charlotte-approves-150-day-pause-data-center-development-134903"},{"kind":"press","label":"Charlotte extends its data center moratorium for 11 months (October 27, 2026)","publisher":"WFAE","retrievedAt":"2026-10-28","url":"https://www.wfae.org/energy-environment/2026-10-27/charlotte-extends-its-data-center-moratorium-for-11-more-months"},{"kind":"press","label":"Halfway through the Charlotte data center moratorium, the city still has questions (August 21, 2026)","publisher":"WFAE","retrievedAt":"2026-10-30","url":"https://www.wfae.org/energy-environment/2026-08-21/halfway-through-the-charlotte-data-center-moratorium-the-city-still-has-questions"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/powerhouse-charlotte-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Quinlan","confidence":"medium","id":"compute_atlas-57b214a21411db83","lat":32.911,"location_precision":"approximate","lon":-96.138,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/core-scientific-quinlan-tx","value":430.0}],"name":"Telios Quinlan Campus","operator":"Core Scientific","source_notes":"Acquisition of Telios Quinlan One LLC completed 2026-05-05; ~260 acres; utility Farmers Electric Cooperative; future data-center site. Primary-sourced from SEC 10-Q subsequent-events.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/core-scientific-quinlan-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"confirmed","city":"Niagara Falls","confidence":"medium","id":"compute_atlas-57bf8ccc1920577b","lat":43.0628,"location_precision":"approximate","lon":-79.0175,"name":"9LDG Niagara AI Data Center","operator":"9 Lives Digital Group (9LDG)","source_notes":"Coordinates are approximate (3807 Highland Ave, Niagara Falls NY). 9LDG stated it will collaborate with an existing data center developer rather than build independently. Company president Michael Bagley leads a three-person partnership; partners not publicly identified. No prior data center development experience disclosed. As of September 2026, no coverage later than the 2024 acquisition coverage had been found for this specific project (3807 Highland Ave / Globe Metallurgical) in 2025-2026: no permit, no site plan, no construction. 2026 Niagara Falls data-center news is dominated by the separate Niagara Falls Redevelopment / Urbacon 'Niagara Digital Campus' on Falls Street, which is tracked as a different record as of September 2026. As of September 2026, no capacity, water or subsidy figure could be sourced for the 9LDG site. The energy source is recorded as hydro because Data Center Dynamics reports that the site was selected for its availability of electricity, hydropower and water for cooling.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"9LDG Plans AI Data Center at Niagara Falls","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/9ldg-plans-ai-data-center-at-niagara-falls/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/9ldg-niagara-falls-ny"}],"state":"New York","status":"planned"},{"ai_classification":"confirmed","city":"Endicott","confidence":"medium","id":"compute_atlas-57c9e1f75d269efd","lat":42.0987,"location_precision":"approximate","lon":-76.0494,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/global-ai-endicott-ny","value":100.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/global-ai-endicott-ny","value":16.0}],"name":"Global AI Endicott Data Center","operator":"Global AI","source_notes":"Company-reported figures: 16 MW of initial critical IT load at Endicott, with a stated ramp to 100 MW through 2026. The same article gives 250 MW for 2027 and 1 GW of critical capacity by the end of 2029 without naming a site, so those targets are not recorded here. The Unite.AI articles are credited to an AI-generated research agent; every figure is the company's own. The coordinates are at village level; the street address was not confirmed from a fetched source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Global AI Secures $441M Senior Secured Credit Facility to Expand Sovereign AI Data Centers","publisher":"Unite.AI","retrievedAt":"2026-10-26","url":"https://www.unite.ai/global-ai-closes-first-debt-raise-to-expand-sovereign-ai-data-centers/"},{"kind":"press","label":"Global AI $441M credit facility (Endicott: 16 MW initial critical IT load, ramp to 100 MW)","publisher":"Unite.AI","retrievedAt":"2026-10-26","url":"https://www.unite.ai/global-ai-closes-first-debt-raise-to-expand-sovereign-ai-data-centers/"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/global-ai-endicott-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Franklin Park","confidence":"medium","id":"compute_atlas-57dfdf9e0b21045e","lat":41.9283705,"location_precision":"approximate","lon":-87.8592552,"name":"Digital Realty ORD12","operator":"Digital Realty","source_notes":"110,000 sq ft single-storey building on Digital Realty's 40-acre master-planned Franklin Park campus. Distinct from the four tracked Digital Realty IL records, which are in Elk Grove Village (CH1, CH2) and Chicago (ORD10 at 350 E Cermak, ORD11 at 600 S Federal) — none in Franklin Park. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty ORD12 — 9333 Grand Avenue, Franklin Park","publisher":"Digital Realty","retrievedAt":"2026-08-31","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord12"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/digital-realty-ord12-franklin-park-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty ORD13 — 9355 Grand Avenue, Franklin Park, IL 60131 (224,500 sq ft)","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord13"},{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report (Digital Realty Franklin Park campus addresses incl. 9355 West Grand Avenue)","publisher":"Illinois DCEO","retrievedAt":"2026-09-25","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/digital-realty-ord13-franklin-park-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty ORD14 — 9377 Grand Avenue, Franklin Park, IL 60131 (130,500 sq ft)","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord14"},{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report (Digital Realty Franklin Park campus addresses incl. 9377 West Grand Avenue)","publisher":"Illinois DCEO","retrievedAt":"2026-09-25","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/digital-realty-ord14-franklin-park-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Amherst","confidence":"medium","contains_osm":true,"id":"compute_atlas-582ece36293d07c2","lat":43.0432075,"location_precision":"approximate","lon":-78.7493887,"name":"BlackRock Data Center, Amherst (CrossPoint Business Park)","operator":"BlackRock, Inc.","source_notes":"This is an enterprise data center. The 10-K gives 43,000 sq ft; the 2015 plan described a 31,000 sq ft building in Uniland's CrossPoint Business Park. The 2015 report called it an '$80 million data center construction project', but its itemized costs (about $16M build, $1.3M land, over $16M equipment) total about $33M. No investment figure is recorded because of that unreconciled gap. The same report cites about $6.8M in sales-tax, $2.15M in property-tax and about $165K in mortgage-recording-tax savings. Those figures are not recorded as subsidies because the fetched article does not name the granting agency or confirm final approval. No MW figure is published. No street address was found in a fetched source. Coordinates are the OSM centroid of Crosspoint Parkway, not the building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Report: BlackRock's New York State Data Center Construction Set to Start (Jan 2015)","publisher":"Data Center Knowledge","retrievedAt":"2026-10-09","url":"https://www.datacenterknowledge.com/data-center-construction/report-blackrock-s-new-york-state-data-center-construction-set-to-start"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/blackrock-amherst-ny"}],"state":"New York","status":"operating"},{"ai_classification":"confirmed","city":"Kuna","confidence":"medium","id":"compute_atlas-58316e27fd3fee6d","lat":43.491,"location_precision":"approximate","lon":-116.418,"name":"Meta Kuna Data Center","operator":"Meta","source_notes":"960,000 sq ft campus (Meta's 15th US data center). Originally Project Peregrine. Construction paused December 2022, restarted October 2023 with AI-optimized architecture; new design 31% cheaper and half the build time. Peak construction employed 1,400 workers. Expected operational end of 2026. Water infrastructure cost sourced to CEG ($70M) but Idaho Business Review cites $100M — discrepancy unresolved; use CEG figure as primary. Coordinates are Kuna city centroid; exact site is west of city center. As of December 2025, the campus was in the \"final stages\" of construction; local reporting notes power demand will not be clear until the site comes online.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta Resumes Construction of Idaho Data Center with New AI Design","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-resumes-construction-of-texas-and-idaho-data-centers-with-new-ai-design/"},{"kind":"press","label":"Meta's Mega Data Center in Kuna On Track (completion later revised to 2026)","publisher":"Idaho Business Review","retrievedAt":"2026-07-06","url":"https://idahobusinessreview.com/2024/10/25/metas-mega-data-center-in-kuna-on-track-to-be-completed-by-2025/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Meta opens new AI data center in Kuna, hopes to become water positive","publisher":"Idaho News 6 (KIVI)","retrievedAt":"2026-10-04","url":"https://idahonews.com/news/local/meta-opens-new-ai-data-center-in-kuna-hopes-to-become-water-positive"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-kuna-id"}],"state":"Idaho","status":"operating"},{"ai_classification":"unknown","city":"Lincoln","confidence":"medium","contains_osm":true,"id":"compute_atlas-5838eec0ef85ce11","lat":40.8120852,"location_precision":"exact","lon":-96.7022622,"name":"Nebraska Colocation Centers — Lincoln (Sharp Building)","operator":"Nebraska Colocation Centers","source_notes":"Carrier-neutral colocation across floors of the 1929 Sharp Building at 206 S. 13th Street in downtown Lincoln, opened October 2013. Coordinates are the OpenStreetMap building match for that address (display name \"Sharp, 206, South 13th Street, Downtown, Lincoln, Lancaster County, Nebraska, 68508\"), not a recalled geocode. Operationally interconnected with the operator's Omaha carrier hotel at 1623 Farnam, which this tracker already carries as a separate site — this is the Lincoln site, not a duplicate of it. Capacity, floor area and utility feeds are not asserted: the source describes redundant UPS, four Lincoln Electric System circuits and redundant CRAC cooling but publishes no MW or square-footage figure. Operator name is as printed in the source; the 1623 Farnam site is marketed under Nebraska Data Centers, so verify the current corporate name before publishing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nebraska Colocation Centers — A Defining Moment in Technology for Lincoln, Nebraska","publisher":"Strictly Business Magazine","retrievedAt":"2026-09-16","url":"https://strictly-business.com/cover-story/nebraska-colocation-centers-defining-moment-technology-lincoln-nebraska/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/nebraska-colocation-centers-lincoln-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-58733d580b5aae49","lat":40.06378,"location_precision":"exact","lon":-82.75793,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-new-albany-1-franklin-county-oh","value":144.0}],"name":"QTS New Albany 1","operator":"QTS Data Centers","source_notes":"1225-1235 Beech Road SW, New Albany — in the Licking County section of the New Albany Business Park, the same submarket as CyrusOne's and Vantage's Licking County sites nearby. First of two adjacent QTS buildings (see also QTS New Albany 2); 885,600 sq ft. Combined QTS New Albany 1+2 investment ~$1.5B, enabled by a New Albany City Council Community Reinvestment Area tax agreement. 144MW is planned capacity; no operational MW disclosed. No AI/HPC-specific marketing found — QTS materials describe generic hyperscale/enterprise colo (\"QTS Freedom Design\"). QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS plans four-building data center campus in New Albany, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/"}],"updated":"2026-07-18","url":"https://www.compute-atlas.com/facilities/qts-new-albany-1-franklin-county-oh"},{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS plans four-building data center campus in New Albany, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/"}],"updated":"2026-07-18","url":"https://www.compute-atlas.com/facilities/qts-new-albany-2-franklin-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"high","id":"compute_atlas-58ac69334af5b613","lat":38.00820612043225,"location_precision":"approximate","lon":-77.49262214339025,"name":"Bull Church Data Center","operator":"NRD Retail, LLC","source_notes":"Case referenced in local press as a long-pending 'zombie' rezoning (originally filed 2024, still active through March 2025 BOS agenda). No anchor tenant/operator beyond the landowner applicant is publicly named — speculative land rezoning, not yet an operator-committed campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/bull-church-data-center-caroline-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://co.caroline.va.us/DocumentCenter/View/9793/RZ-04-2024--Bull-Church-Data-Center"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bull-church-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Amarillo","confidence":"medium","id":"compute_atlas-58c7530311e62704","lat":35.396,"location_precision":"approximate","lon":-101.543,"name":"Project Matador","operator":"Fermi America","source_notes":"11GW is the long-term ceiling for the HyperGrid campus; near-term company targets include 1GW by end of 2026 and 2.3GW first-phase delivery — these are company goals, not firm commitments. Land acreage reported variously (5,769 acres per DCD July 2025 and 5,855 acres per other sources; later company materials cite 7,570 acres on 7,570 acres); using 5,769 as the earliest confirmed figure, sourced from the gas turbine acquisition announcement. Coordinates approximate (seed-provided; site in Carson County ~12 miles NE of Amarillo, adjacent to DOE Pantex Plant). Fermi America co-founded January 2025 by former Texas Governor and U.S. Energy Secretary Rick Perry, Toby Neugebauer (CEO, departed April 2026 after being fired 'without cause'), and Griffin Perry. IPO raised $682M on Nasdaq under ticker FRMI (October 2025), valuing company at ~$19B at opening; market cap collapsed to ~$3.4B by April 2026 after leadership exits and loss of anchor tenant ($150M LOI canceled December 2025). Company organized as a REIT; had zero revenue at IPO. Investment: equipment financing commitments exceed $600M ($500M MUFG turbine warehouse + $200M Keystone/Cape facility); projected total project cost $70–90B is a range/projection, not a firm figure — not recorded as an investment figure. Jobs: 50,000+ projected across campus lifetime — projection only, not recorded as a job count. Nuclear campus name in NRC COLA filings: 'President Donald J. Trump Advanced Energy and Intelligence Campus'; publicly marketed as Project Matador / HyperGrid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fermi America acquires 600MW of gas turbines for 11GW AI mega campus in Amarillo, Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas/"},{"kind":"press","label":"Fermi America looks to go public as NRC accepts COLA for AP1000s","publisher":"ANS Nuclear Newswire","retrievedAt":"2026-07-07","url":"https://www.ans.org/news/2025-09-10/article-7357/fermi-america-looks-to-go-public-as-nrc-accepts-cola-for-ap1000s/"},{"kind":"press","label":"Financially struggling, AI power startup Fermi loses its CEO and CFO for '2.0' reset","publisher":"Fortune","retrievedAt":"2026-07-07","url":"https://fortune.com/2026/04/20/financially-struggling-ai-power-startup-fermi-loses-ceo-reset/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/fermi-matador-amarillo-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"compute_atlas-58ec011c88ca7c3e","lat":36.0865,"location_precision":"approximate","lon":-86.74893,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dcblox-nashville-grassmere-tn","value":50.0}],"name":"DC BLOX Nashville (Grassmere Park)","operator":"DC BLOX","source_notes":"As of 2026-09-09, the status is unchanged: proposed. Metro Council authorised eminent domain on 2026-08-04, DC BLOX sued on 2026-08-11, and as of that check no ruling on its preliminary-injunction request had been reported; two zoning challenges are not heard until at least December 2026. The recorded $700 million investment is the company's estimate as reported by WPLN News (July 2026), that the project will total more than $700 million, so it is a lower bound. As of October 2026, DC BLOX's own project page, which describes a single-story, 69,200 sq ft, 10 MW building, lists capital investment of \"$380 Million+\" as a project estimate. $23 million is the land purchase price, not the project investment.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DC BLOX Sues Metro Over Blocked Data Center Project Near Nashville Zoo","publisher":"Williamson Source","retrievedAt":"2026-08-14","url":"https://williamsonsource.com/dc-blox-sues-metro-over-blocked-data-center-project-near-nashville-zoo/"},{"kind":"press","label":"Nashville Zoo Data Center Proposal Gets Even Bigger (Nashvegas.com): second building >200,000 sq ft / 40 MW; 24 acres at 648 Grassmere Park","publisher":"Nashvegas.com","retrievedAt":"2026-09-21","url":"https://nashvegas.com/nashville-zoo-data-center-proposal-gets-even-bigger/"},{"kind":"press","label":"Why Nashville will struggle to block the DC BLOX data center near zoo (WPLN News, July 9, 2026): 'more than $700 million', 24 acres, ~$23M land purchase, building permit filed","publisher":"WPLN News","retrievedAt":"2026-09-21","url":"https://wpln.org/post/why-nashville-will-struggle-to-block-the-dc-blox-data-center-near-zoo/"},{"kind":"press","label":"DC BLOX closes on $23M property for proposed data center near Nashville Zoo, records show (FOX 17, July 21, 2026): 648 and 650 Grassmere Park Drive","publisher":"FOX 17 Nashville","retrievedAt":"2026-10-27","url":"https://fox17.com/news/local/dc-blox-closes-on-property-proposed-data-center-near-nashville-zoo-grassmere-park-ai-data-center-artificial-intelligence-23-million-georgia-based-marketstreet-mayor-freddie-oconnell-eminent-domain-push-metro-council-davidson-county-tennessee"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/dcblox-nashville-grassmere-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"confirmed","city":"Kenilworth","confidence":"medium","id":"compute_atlas-5956fbc007b8b77a","lat":40.6762,"location_precision":"approximate","lon":-74.2913,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/","value":250.0}],"name":"CoreWeave NEST Campus","operator":"CoreWeave","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"CoreWeave begins $1.8B data center project in Kenilworth — Real Estate NJ","publisher":"Real Estate NJ","retrievedAt":"2026-09-21","url":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/"},{"kind":"press","label":"AI Data Center Under Construction in Kenilworth draws mixed reactions — News 12 NJ","publisher":"News 12 New Jersey","retrievedAt":"2026-07-05","url":"https://newjersey.news12.com/ai-data-center-under-construction-in-kenilworth-draws-mixed-reactions-from-residents"},{"kind":"press","label":"AI data center under construction in Kenilworth draws mixed reactions from residents — News 12 New Jersey","publisher":"News 12 New Jersey","retrievedAt":"2026-07-06","url":"https://newjersey.news12.com/2026/04/20/ai-data-center-under-construction-in-kenilworth-draws-mixed-reactions-from-residents/73qGMUnu1BjBupokxeSIjG"},{"kind":"press","label":"CoreWeave acquires NEST data center for $322m at life-sciences campus in New Jersey — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/coreweave-acquires-nest-data-center-for-322m-at-life-sciences-campus-in-new-jersey/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/coreweave-kenilworth-nj"}],"state":"New Jersey","status":"under construction"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"high","contains_osm":true,"id":"compute_atlas-595afad65656e171","lat":41.9945332,"location_precision":"exact","lon":-87.9577513,"name":"Digital Realty CH2","operator":"Digital Realty","source_notes":"Confirmed via official page: 2299 Busse Road, Elk Grove Village, IL 60007. Distinct from Lambda/EdgeConneX AI Factory nearest-tracked (30km away, different operator).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch2"},{"kind":"osm","label":"OpenStreetMap way/713433204","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/713433204"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-ch2-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ch1"},{"kind":"osm","label":"OpenStreetMap way/128499684","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/128499684"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-chicago-ch1-il"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/128499684"}],"state":"Illinois","status":"operating"},{"ai_classification":"confirmed","city":"Andover","confidence":"medium","id":"compute_atlas-5a0c9cd1c65086ae","lat":41.0419,"location_precision":"approximate","lon":-74.7381,"name":"Andover HPC Data Center (former Newton Airport Site)","operator":"Andover HPC Development","source_notes":"Coordinates are approximate for Andover Township, Sussex County; exact parcel at 248 Stickles Pond Road. Former Newton Airport closed 2013. No capacity MW disclosed. PILOT estimate of $4.5-5.2M annual revenue cited by mayor. Town moving to ban all data centers as of May 2026, but no project has been formally cancelled since no application was filed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/andover-hpc-development-nj"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Montvale","confidence":"medium","contains_osm":true,"id":"compute_atlas-5a11f5b6a5ecc549","lat":41.0474026,"location_precision":"approximate","lon":-74.0694211,"name":"Montvale KPMG Site Data Center (3 Chestnut Ridge Road)","operator":"S. Hekemian Group (settlement party: SHG Montvale MB VI, LLC)","source_notes":"The data center is an option in Montvale's fourth-round affordable-housing settlement for the KPMG property, not a filed site plan. Food & Water Watch gives the size as 322,822 sq ft and calls it hyperscale; no MW figure is published. The two sources disagree on acreage (34 vs 44 acres), so no land area is recorded. The mayor calls a data center an already-permitted use and says state and county officials are helping facilitate a project. KPMG still occupies one building on the site. Coordinates are the OSM point for Building 1 at 3 Chestnut Ridge Road, not a data center footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center option at former KPMG site? Montvale's mayor, affordable housing group clash","publisher":"Pascack Press (The Press Group)","retrievedAt":"2026-10-09","url":"https://thepressgroup.net/data-center-option-at-former-kpmg-site-montvales-mayor-affordable-housing-group-clash/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/hekemian-montvale-kpmg-site-data-center-nj"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Lewis Center","confidence":"medium","id":"compute_atlas-5a4e3c587a278e78","lat":40.1533067,"location_precision":"approximate","lon":-82.9614584,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://expedient.com/data-centers/columbus/","value":7.0}],"name":"Expedient CMH3 (Lewis Center)","operator":"Expedient","source_notes":"102,000 sq ft total with 39,600 sq ft raised floor; 7 MW critical IT load and 10 MW total generator capacity. The street number would not geocode, so coordinates are a road-level geocode of E. Powell Road in Orange Township — approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Expedient Columbus data centers — CMH3 at 281 E. Powell Road","publisher":"Expedient","retrievedAt":"2026-08-27","url":"https://expedient.com/data-centers/columbus/"}],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/expedient-cmh3-lewis-center-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Kline Township","confidence":"medium","id":"compute_atlas-5ab80bdf3c423c9d","lat":40.8699957,"location_precision":"approximate","lon":-76.0215859,"name":"AWS Kline Township Data Center Campus","operator":"Amazon Web Services","source_notes":"Nine two-story data center buildings plus an administration building, a water building and a security building, totalling about 2.1-2.2 million sq ft, off Lofty Road near Route 309 and Interstate 81, across from van Hoekelen Greenhouses. Buildings stated as 'probably less than 80 feet' tall; first building completion expected 2028. Lofty Road is to be realigned near Route 309 with a new traffic light at Amazon's cost. Stated wages for the ~500 permanent roles are $80,000-$100,000, with about 90% requiring an associate degree or certificate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Kline supervisors grant extension for consideration of Amazon data center plans","publisher":"The Shenandoah Sentinel","retrievedAt":"2026-09-12","url":"https://shensentinel.com/news/kline-supervisors-grant-extension-for-consideration-of-amazon-data-center-plans/"},{"kind":"press","label":"Amazon Rep: Schuylkill County Data Centers Only Need Cooling Water 4% of the Year","publisher":"Coal Region Canary","retrievedAt":"2026-09-12","url":"https://coalregioncanary.com/2026/06/21/amazon-web-services-reps-discuss-planned-data-center-project-schuylkill-county-kline-township/"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/aws-kline-township-schuylkill-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Exeter","confidence":"medium","contains_osm":true,"id":"compute_atlas-5abfcc2fe8f5d1b0","lat":42.9820886,"location_precision":"approximate","lon":-70.9505947,"name":"Phillips Exeter Academy Information Technology Data Center","operator":"Phillips Exeter Academy","source_notes":"A small enterprise (school) data center building mapped in OSM on the Exeter campus. DC Hub lists it as operational with a reported capacity band under 10 MW, with no exact figure, and files it under the Portsmouth market.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way 589070714 (building=data_center, name=Information Technology Data Center, operator=Phillips Exeter Academy)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-10-26","url":"https://www.openstreetmap.org/way/589070714"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/phillips-exeter-academy-data-center-exeter-nh"}],"state":"New Hampshire","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-5b3be1e0cbcc10f2","lat":30.8981,"location_precision":"approximate","lon":-102.8779,"name":"Amazon Pecos County Data Center Campus","operator":"Amazon Data Services, Inc.","source_notes":"Three buildings (A, B, C), 189,060 sq ft / $300M each ($900M total this phase), at 6000 TX-18, ~11 miles north of Fort Stockton; construction planned Aug-Dec 2026. To be powered initially off-grid by Pacifico Energy's 'GW Ranch' gas plant (as of August 2026, already tracked as GW Ranch; Construction Review Online reports that Amazon confirmed it acquired the GW Ranch site and plans to draw power directly from the plant, and, as of October 2026, no cited source says how far this campus's address is from the plant) with a path to future grid interconnection; distinct facility/operator from that record and from Microsoft's and Core Scientific's separate campuses at Pecos, in Reeves County. The map point is an approximate Fort Stockton-area point, not the campus site, which reporting places about 11 miles north of the city.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon's planned data center campus in Pecos County, Texas: Read Amazon's statement","publisher":"About Amazon","retrievedAt":"2026-08-25","url":"https://www.aboutamazon.com/news/company-news/amazon-pecos-county-texas-data-center-clean-energy-jobs"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/amazon-pecos-county-data-center-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Garland","confidence":"high","contains_osm":true,"id":"compute_atlas-5b42dab1eff7a7a0","lat":32.9836243,"location_precision":"exact","lon":-96.6542632,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stream-data-centers-dfwa-dfw-vii-tx","value":43.0}],"name":"Stream Data Centers DFWA (DFW VII)","operator":"Stream Data Centers","source_notes":"Operator's own Dallas page lists DFWA (DFW VII) at 1813 Lookout Drive, Garland, TX 75044, status 'Fully Leased' (i.e. operational), 43 MW / 275,000 SF. Official name uses 'DFWA'/'DFW VII', not the OSM tag 'DFWA' alone -- matches.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1300765126","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1300765126"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/stream-data-centers-dfwa-dfw-vii-tx"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1300765126"}],"state":"Texas","status":"operating"},{"ai_classification":"confirmed","city":"Plano","confidence":"medium","id":"compute_atlas-5b73897a0e23594a","lat":33.0198,"location_precision":"approximate","lon":-96.6989,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lambda-aligned-plano-tx","value":100.0}],"name":"Lambda Plano AI Data Center (Aligned DFW-04)","operator":"Lambda","source_notes":"Lambda to occupy the ~$700M Aligned DFW-04 data center under construction in Plano, Collin County; 2026 target. Distinct from Lambda's Chicago and Kansas City sites. Coordinates are the Plano area centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/lambda-aligned-plano-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Philadelphia","confidence":"medium","id":"compute_atlas-5b910e4ffb1617cb","lat":39.892327,"location_precision":"approximate","lon":-75.166546,"name":"TierPoint Philadelphia Data Center (PHI)","operator":"TierPoint","source_notes":"25,000+ sq ft total, 11,000+ sq ft raised floor, three 1.5 MW redundant generators (generator capacity, not IT load). The pin is the census geocode of the address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/tierpoint-philadelphia-phi-league-island-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Villa Ridge","confidence":"medium","id":"compute_atlas-5b9b9a3b26198b96","lat":38.484,"location_precision":"approximate","lon":-90.85,"name":"Diamond Farms (Gateway Digital Campus)","operator":"Provident Data Centers","source_notes":"Franklin County Planning & Zoning Commission recommended approval 5-4 on 2026-04-21/23. On 2026-09-15 the Franklin County Board of Commissioners unanimously approved rezoning for this project (reported by Spectrum News as the 'Gateway Digital Campus', planned near the Shaw Nature Reserve along I-44) and for a second, separate project. Spectrum reports that a developer has contacted the county to proceed and that the county still has to review board regulations not yet sent to it, so rezoning is not construction approval. Also marketed by the developer as 'Gateway Digital Campus.' The companion Crooked Creek (Beltline Energy) proposal in the same county was reported withdrawn on 2026-08-07; the 2026-09-16 Spectrum report describes a Beltline Energy Project south of Pacific as also rezoned, which this dataset has not reconciled and does not include here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Franklin County Planning and Zoning Commission backs one data center, rejects another","publisher":"KSDK","retrievedAt":"2026-08-24","url":"https://www.ksdk.com/article/news/politics/franklin-county-planning-and-zoning-commission-backs-one-data-center-diamond-farms-rejects-another-crooked-creek/63-89185f2a-d50e-4ac5-bfe9-f5e8209fa9e0"},{"kind":"press","label":"Franklin County Planning and Zoning Approves Diamond Farms Data Center Project","publisher":"The Missouri Times","retrievedAt":"2026-08-24","url":"https://themissouritimes.com/franklin-county-planning-and-zoning-approves-diamond-farms-data-center-project/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/diamond-farms-gateway-digital-villa-ridge-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"mixed_use","city":"Adamstown","confidence":"medium","id":"compute_atlas-5bda82de20694298","lat":39.265,"location_precision":"approximate","lon":-77.394,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/rowan-digital-frederick-md","value":300.0}],"name":"Rowan Digital Infrastructure Frederick Campus (Bauxite I)","operator":"Rowan Digital Infrastructure","source_notes":"Rowan (Quinbrook Infrastructure Partners + Birch Infrastructure JV) serves as AWS hyperscale host at Quantum Frederick. Three campuses planned on-site total; Bauxite I is Phase 1 at 300MW. 777,150 sq ft total campus footprint. Coordinates approximate for same Quantum Frederick campus area as the Aligned Data Centers record there (as of August 2026). The city is given as Adamstown per the more recent, project-specific Frederick News-Post coverage (2025-11-11, via Yahoo Finance); the 2021 Maryland Dept. of Commerce announcement had said \"near Buckeystown\". AWS is the confirmed tenant of Bauxite I on this former Alcoa Eastalco Works site — AWS's first Maryland data center. The record is listed as under construction. Rowan's CEO message of December 23, 2025 says the company \"successfully energized and turned over\" Bauxite I; Nature Forward's overview of the park, published June 26, 2026, states \"As of June 2026, none of Quantum Frederick data centers are yet operational\".","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Rowan secures $1.2bn for Maryland data center campus build-out","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/rowan-secures-12bn-for-maryland-data-center-campus-build-out/"},{"kind":"press","label":"Rowan Digital Infrastructure is building AWS's Maryland availability zone at Quantum Frederick Campus","publisher":"The Tech Capital","retrievedAt":"2026-07-06","url":"https://thetechcapital.com/rowan-digital-infrastructure-is-building-awss-maryland-availability-zone-at-the-quantum-frederick-campus/"},{"kind":"press","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3 — AWS BWI (Rowan Bauxite I): 151 acres, four buildings, 300 MW","publisher":"Nature Forward","retrievedAt":"2026-08-26","url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/"},{"kind":"press","label":"Five Years In — A message from Rowan CEO Charley Daitch","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-10-06","url":"https://rowan.com/five-years-in-a-message-from-rowan-ceo-charley-daitch/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/rowan-digital-frederick-md"}],"state":"Maryland","status":"under construction"},{"ai_classification":"likely","city":"Maiden","confidence":"high","contains_osm":true,"id":"compute_atlas-5bf30856f8bd2394","lat":35.588607,"location_precision":"approximate","lon":-81.256686,"name":"Apple Maiden Data Center (iCloud)","operator":"Apple","source_notes":"Apple's flagship U.S. iCloud data center on Startown Rd near Maiden, Catawba County — Apple's first company-owned data center, operational since 2010, with a large adjacent solar array. Apple's Feb 2025 newsroom names North Carolina among the states where it will 'continue expanding data center capacity' as part of its Apple Intelligence buildout. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Startown Rd address (~183 ac per public reporting); a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Apple will spend more than $500 billion in the U.S. over the next four years — names NC among states for continued data-center capacity expansion (Apple Intelligence)","publisher":"Apple Newsroom","retrievedAt":"2026-07-19","url":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/"},{"kind":"other","label":"North Carolina data center is part of Apple's $500 billion expansion plan across the US","publisher":"Catawba County Economic Development Corp","retrievedAt":"2026-07-19","url":"https://www.catawbaedc.org/post/north-carolina-data-center-is-part-of-apple-s-500-billion-expansion-plan-across-the-us"},{"kind":"press","label":"Apple's 20-megawatt solar farm near NC data center gets NCUC approval (9to5Mac)","retrievedAt":"2026-07-24","url":"https://9to5mac.com/2012/05/17/apples-20-megawatt-solar-farm-near-nc-data-center-gets-ncuc-approval/"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/apple-maiden-nc"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/14593270"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/apple-maiden-data-center-osmrelation-14593270"}],"state":"North Carolina","status":"operating"},{"ai_classification":"likely","city":"Madison","confidence":"medium","id":"compute_atlas-5c10072d570b4aa9","lat":38.82,"location_precision":"approximate","lon":-85.4,"name":"Jefferson Proving Ground Data Center","operator":"Undisclosed","source_notes":"Proposed hyperscale campus of nine buildings totaling ~7.2 million sq ft on 549 acres of the former Jefferson Proving Ground airfield, on land owned by the Ford family (Daniel Ford); the end-user/operator has not been publicly disclosed. Reported to draw hundreds of megawatts and be roughly 78% larger than Meta's Lebanon campus; projected 300-450 permanent jobs and ~$60M in annual county tax revenue. Coordinates are an approximate geocode of the former proving-ground airfield north of Madison. As of 2026-09-10, no official capacity, utility partner, or anchor-company figure has been released for this site. Independent, unofficial estimates cited in the same article range widely: one expert (Chien) says 9 GW 'is not unreasonable' for a power-dense AI training facility, while another (Inskeep) is 'very confident' it will need at least 1 GW. Neither is a project-stated figure, so no capacity is recorded. The site is 549 acres of the former Jefferson Proving Grounds Army base, ~8 miles north of Madison, IN.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/jefferson-proving-ground-data-center-jefferson-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Dallas","confidence":"medium","contains_osm":true,"id":"compute_atlas-5cab57bcba7d1541","lat":32.8079818,"location_precision":"exact","lon":-96.8573889,"name":"TierPoint Dallas","operator":"TierPoint","source_notes":"Confirmed on TierPoint's own directory listing Texas - Dallas.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/465042594","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/465042594"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-dallas-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Orangeburg","confidence":"medium","id":"compute_atlas-5cb60d334449fa78","lat":41.036652,"location_precision":"approximate","lon":-73.986828,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bloomberg-orangeburg-ny","value":50.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bloomberg-orangeburg-ny","value":4.0}],"name":"Bloomberg LP Data Center","operator":"Bloomberg LP","source_notes":"155 Corporate Drive, Orangeburg, NY (Town of Orangetown, Rockland County). 131,805 sq ft total, two data halls totaling 39,058 sq ft with 42\" raised floor and 26' clear height, 4.0 MW power system, 1,200-ton cooling capacity — all per an authoritative SEC EDGAR CMBS filing (2014). Construction cost was $123.2M ($935/sq ft) per that same filing, with Bloomberg contributing $39.0M toward construction; recorded here as the investment figure rather than the frequently-cited $710M figure, which represents total lease payments over a 15-year term (expiring March 2029), not construction capital — those are not comparable numbers and conflating them would overstate the capital investment. Dedicated single-tenant enterprise facility built to Bloomberg's spec for its financial data/analytics terminals (not shared colocation), built/topped-off 2013-2014. As of July 2026, no expansions since 2014 were found, but absence of news is not proof of none. Coordinates are a town-level geocode, not a confirmed parcel pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"WFRBS Commercial Mortgage Trust 2014-C20 FWP (Bloomberg Orangeburg facility disclosure)","publisher":"SEC EDGAR","retrievedAt":"2026-07-10","url":"https://www.sec.gov/Archives/edgar/data/1603578/000153949714000486/n306_premktx1.htm"},{"kind":"press","label":"Bloomberg Tops Off New Datacenter","publisher":"Rockland County Times","retrievedAt":"2026-07-10","url":"https://rocklandtimes.com/2013/06/27/bloomberg-tops-off-new-datacenter/"},{"kind":"press","label":"Topping off of Orangeburg data center (Bloomberg, 155 Corporate Drive)","publisher":"Pearl River Patch","retrievedAt":"2026-10-26","url":"https://patch.com/new-york/pearlriver/topping-off-orangeburg-data-center"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/bloomberg-orangeburg-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Starkville","confidence":"medium","id":"compute_atlas-5ccb25e56b95f4cd","lat":33.4709294,"location_precision":"approximate","lon":-88.7927699,"name":"C Spire Starkville Data Center","operator":"C Spire","source_notes":"Multi-tenant colocation and managed-hosting facility on a 6.5-acre site in the Thad Cochran Research, Technology and Economic Development Park. C Spire's release describes a 23,800 sq ft initial phase with a $23 million price tag and generators plus multiple independent power feeds that 'will produce 1.5 megawatts of power'; the 1.5 MW figure is that stated electrical capacity, not a measured IT load. Data Center Knowledge gives the built size as 24,000 sq ft. Both sources note C Spire operates two further Mississippi data centers, in Ridgeland and downtown Jackson; neither source gives siting detail for those, so they are not recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"C Spire Opens Tier III Mississippi Data Center","publisher":"Data Center Knowledge","retrievedAt":"2026-09-14","url":"https://www.datacenterknowledge.com/business/c-spire-opens-tier-iii-mississippi-data-center"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/cspire-starkville-ms"}],"state":"Mississippi","status":"operating"},{"ai_classification":"likely","city":"Owasso","confidence":"medium","id":"compute_atlas-5d2a84901689e72b","lat":36.28,"location_precision":"approximate","lon":-95.83,"name":"Project Clydesdale","operator":"Beale Infrastructure","source_notes":"Unincorporated Tulsa County near Owasso (Whirlpool Dr & E 76th St N, adjacent to Cherokee Industrial Park). Formerly known as 'Project Clydesbank.' 4 phases; electric service via PSO. End-tenant ('major data center operator' per a Quartz Mountain Properties LLC affiliate) unnamed. Coordinates are approximate. End-user unnamed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project Clydesdale: $1 billion data center in Tulsa breaks ground","publisher":"Construction Review Online","retrievedAt":"2026-09-10","url":"https://constructionreviewonline.com/project-clydesdale-1-billion-data-center-in-tulsa-breaks-ground/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/beale-project-clydesdale-tulsa-county-ok"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-5dec732ec2ac1a5a","lat":39.0183033,"location_precision":"exact","lon":-77.472611,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-ashburn-va5-data-center-va","value":32.0}],"name":"NTT Ashburn VA5 Data Center","operator":"NTT Global Data Centers","source_notes":"32MW, became operational 2020, fifth of nine on the 224MW campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/793888429","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/793888429"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-ashburn-va5-data-center-va"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/13154826378","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/13154826378"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-ashburn-va7-data-center-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/793888429"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ntt-ashburn-va5-data-center-osmway-793888429"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Ransom Township","confidence":"medium","id":"compute_atlas-5e08f0e83a258cec","lat":41.440033,"location_precision":"approximate","lon":-75.704129,"name":"Scranton Materials Data Center Campus (819 Newton Road quarry)","operator":"Scranton Materials LLC","source_notes":"Six data center buildings proposed at the company's stone quarry. This is a separate site and application from the Mudiita Land Venture property (as of October 2026, tracked separately as cancelled); the 'no plans' quote in the July article refers to Mudiita, not Scranton Materials. The pin is the census geocode of the address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/scranton-materials-ransom-township-data-center-lackawanna-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Kearney","confidence":"high","id":"compute_atlas-5e134e3c8940864c","lat":40.6994,"location_precision":"approximate","lon":-99.0817,"name":"Sequitor Edge Kearney Data Center","operator":"Sequitor Edge","source_notes":"Shamrock Data LLC is developing an approximately 40,000 sq ft facility on roughly 16 acres inside Kearney's TechONE Crossing tech park for Sequitor Edge; facility design by Morrissey Engineering (Omaha). Developer targets operation in early 2027. Distinct from the former Compute North / MARA crypto-mining site elsewhere in the same tech park.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Approved Site For Next Generation Data Center in Kearney Nebraska","publisher":"Sequitor Edge","retrievedAt":"2026-08-21","url":"https://sequitoredge.com/press/approved-site-for-next-generation-data-center-in-kearney-nebraska/"},{"kind":"press","label":"Kearney secures new data center after city's deal with Sequitor Edge","publisher":"News Channel Nebraska","retrievedAt":"2026-08-21","url":"https://metro.newschannelnebraska.com/story/53099125/kearney-secures-new-data-center-after-citys-deal-with-sequitor-edge"}],"updated":"2026-08-21","url":"https://www.compute-atlas.com/facilities/sequitor-edge-kearney-ne"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/sequitor-edge-to-build-data-center-on-16-acre-land-parcel-in-kearney-nebraska/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sequitor-edge-kearney-ne-pg"}],"state":"Nebraska","status":"planned"},{"ai_classification":"unknown","city":"Mountain Lake","confidence":"medium","id":"compute_atlas-5e1f704b097cc16e","lat":43.941966,"location_precision":"approximate","lon":-94.9150665,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aaim-data-centers-mountain-lake-mn","value":10.0}],"name":"AAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park)","operator":"C-MN Data Centers Inc. / AAIM Data Centers","source_notes":"The city specified AI only, with no bitcoin or cryptocurrency mining. It sits next to Milk Specialties and Balzer in the industrial district. In July 2026 the city said construction would likely start in September. That start is not confirmed, so status stays permitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Mountain Lake City Council Minutes, November 17, 2025 (CUP Resolution #19-25)","publisher":"City of Mountain Lake","retrievedAt":"2026-10-13","url":"https://cityofmountainlakemn.gov/wp-content/uploads/11-17-25-City-Council-Minutes.pdf"},{"kind":"permit","label":"Mountain Lake City Council Minutes, October 7, 2024","publisher":"City of Mountain Lake","retrievedAt":"2026-10-13","url":"https://cityofmountainlakemn.gov/wp-content/uploads/10-7-24-City-Council-Minutes.pdf"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/aaim-data-centers-mountain-lake-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Homestead","confidence":"medium","contains_osm":true,"id":"compute_atlas-5eabb274f22bd592","lat":25.5525391,"location_precision":"approximate","lon":-80.3947082,"name":"ReadySetFundGrow FishBowl AI Edge Micro-Datacenter","operator":"ReadySetFundGrow (subsidiary of Farrington Capital Group)","source_notes":"The planned 10-rack micro-datacenter (the 'FishBowl') would sit in a 2,295 sq ft building on a 20,000 sq ft parcel fronting US-1. It is part of a campus that also includes a tech incubator, a virtual office hub and a 15-port EV charging hub. Development depends on closing $1,000,000 in senior secured financing, followed by a phased buildout of about 9 months. The March 20 release cites 1,600-amp power capacity. All figures are self-reported by the company. Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/readysetfundgrow-fishbowl-homestead-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"confirmed","city":"San Marcos","confidence":"medium","id":"compute_atlas-5ebd7ebb7da562fd","lat":29.88,"location_precision":"approximate","lon":-97.94,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloudburst-san-marcos-tx","value":1200.0}],"name":"CloudBurst San Marcos GigaCenter","operator":"CloudBurst Data Centers","source_notes":"706-acre campus spanning Hays and Guadalupe counties; coordinates use San Marcos city area as centroid. Developed with Evolve Holdings as construction manager. 10-12 hyperscale buildings totaling ~3 million sq ft planned. Tenant not publicly confirmed. Investment total not confirmed in available sources; $14.5B figure removed as unsupported. Guadalupe County commissioners rejected a $500M abatement 3-2 on Feb 24, 2026, then approved a revised abatement on April 21, 2026; county records peg total campus investment at $14.5B (Hays County, home to 77.5 of the 220 abated acres, took no abatement action).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CloudBurst breaks ground on gigawatt-scale data center campus in Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/cloudburst-breaks-ground-on-gigawatt-scale-data-center-campus-in-texas/"},{"kind":"press","label":"CloudBurst and Evolve break ground on 1.2 GW flagship AI campus in Central Texas","publisher":"eVOLVE Inc.","retrievedAt":"2026-07-06","url":"https://evolveincorporated.com/company-news/cloudburst-and-evolve-break-ground-on-1-2gw-flagship-ai-data-center-campus-incentral-texas"},{"kind":"press","label":"Cloudburst secures incentives for $14B central-Texas data center","publisher":"The Real Deal","retrievedAt":"2026-07-06","url":"https://therealdeal.com/texas/2026/05/01/cloudburst-secures-tax-breaks-for-central-texas-data-center/"},{"kind":"press","label":"Guadalupe County commissioners vote down $500M tax cut for proposed data center","publisher":"Community Impact","retrievedAt":"2026-10-14","url":"https://communityimpact.com/san-antonio/government/guadalupe-county-commissioners-vote-down-500m-tax-cut-for-proposed-data-center-in-new-braunfels/"},{"kind":"press","label":"706-acre data center approved for development outside San Antonio, Texas (Internet Archive snapshot of DCD)","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-08-26","url":"https://web.archive.org/web/20260819033742/https://www.datacenterdynamics.com/en/news/706-acre-data-center-approved-for-development-outside-san-antonio-texas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/cloudburst-san-marcos-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Ione","confidence":"medium","contains_osm":true,"id":"compute_atlas-5edd0b6ef8b180f3","lat":38.2782244,"location_precision":"approximate","lon":-120.9115886,"name":"Buena Vista AI Factory","operator":"NewYork GreenCloud","source_notes":"About $4 million had been spent on plant renovation as of July 2026, with roughly $171 million planned for modernisation and data center construction; a soft operational test of the repowered plant was targeted for August 2026. Recorded as a data center rather than power generation because the generation is dedicated to the co-located compute; no IT capacity figure has been published, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Biomass-fueled data center project planned in Amador County","publisher":"myMotherLode.com","retrievedAt":"2026-09-21","url":"https://mymotherlode.com/news/local/11078052/biomass-fueled-data-center-project-planned-in-amador-county.html"},{"kind":"press","label":"NewYork GreenCloud acquires Buena Vista Biomass Power facility to launch first carbon-negative AI factory","publisher":"Biomass Magazine","retrievedAt":"2026-09-14","url":"https://biomassmagazine.com/articles/newyork-greencloud-acquires-buena-vista-biomass-power-facility-to-launch-first-carbon-negative-ai-factory"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/nygc-buena-vista-ai-factory-ione-ca"}],"state":"California","status":"planned"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-5f2c8c50474eb722","lat":69.84,"location_precision":"approximate","lon":-148.5,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stak-energy-north-slope-ak","value":3000.0}],"name":"Stak Energy North Slope Data Center","operator":"Stak Energy","source_notes":"Preliminary state land lease approval covers 715.4 acres (corrected from 640; one square mile = 640 acres exactly but the approved lease footprint is 715.4 acres per Alaska Beacon). Campus is approximately 26 miles south of Deadhorse/Prudhoe Bay off the Dalton Highway (corrected from 25 miles). Supports AI training, cloud computing, and HPC. 3 GW is the project's claimed ultimate potential; $500M is Phase 1 capital. Coordinates estimated (~26 miles south of Prudhoe Bay 70.2N/148.5W); exact site not publicly disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Alaska's North Slope Proposed as Home for Massive AI Data Center","publisher":"Alaska Public Media","retrievedAt":"2026-07-06","url":"https://alaskapublic.org/news/economy/energy/2026-05-26/alaskas-north-slope-proposed-as-home-for-massive-ai-data-center"},{"kind":"press","label":"A Huge Data Center Could Rise on Alaska's North Slope","publisher":"Anchorage Daily News","retrievedAt":"2026-07-06","url":"https://www.adn.com/business-economy/2026/05/18/a-huge-data-center-could-rise-on-alaskas-north-slope/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"permit","label":"STAK Energy Corporation ADL 422741 Preliminary Decision (Director's Decision, May 12, 2026)","publisher":"Alaska Department of Natural Resources, Division of Oil and Gas","retrievedAt":"2026-09-28","url":"https://aws.state.ak.us/OnlinePublicNotices/Notices/Attachment.aspx?id=161957"},{"kind":"other","label":"STAK Energy Campus: What the State's Lease Documents Reveal About Scale, Risk, and Unanswered Questions","publisher":"Northern Alaska Environmental Center","retrievedAt":"2026-10-18","url":"https://northern.org/news/stak-energy-campus-what-the-states-lease-documents-reveal-about-scale-risk-and-unanswered-questions/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stak-energy-north-slope-ak"}],"state":"Alaska","status":"planned"},{"ai_classification":"unknown","city":"Eagle Mountain","confidence":"medium","id":"compute_atlas-5f4615fecae909a8","lat":40.30935,"location_precision":"approximate","lon":-112.01198,"name":"Google Eagle Mountain Site","operator":"Google","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Every Eagle Mountain Community Reinvestment Area with a data-center purpose (Sweetwater #2, #3, #4, and Triple Tail) has a named beneficiary and none is Google — Sweetwater #2/#3 are QTS's, Sweetwater #4 is Meta's, and Triple Tail is Tract's — and a same-week rewrite of the SLTrib incentives story names only Meta and QTS as recipients of Eagle Mountain's data-center tax breaks, not Google. Google's October 2021 land purchase also predates by roughly 2.5 years the only geographically plausible project area (Triple Tail, whose drafting the Agency did not authorize until April 2024). Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","retrievedAt":"2026-08-14","url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/google-eagle-mountain-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Altoona","confidence":"medium","id":"compute_atlas-5f8588217c8c9f66","lat":41.6439,"location_precision":"approximate","lon":-93.4649,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-altoona-ia","value":1000.0}],"name":"Tract Altoona Technology Park","operator":"Tract","source_notes":"Master-planned data center land campus — Tract acquires and entitles land, then delivers it to hyperscale and other data center operators rather than operating the halls itself. Fully entitled as of the September 2025 announcement (annexation, rezoning and development agreement complete). No end tenant, investment figure, job count or construction timeline has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tract Brings 450-Acre Data Center Campus to Altoona, Iowa","publisher":"Altoona Now (Altoona Area Chamber / economic development)","retrievedAt":"2026-08-14","url":"https://altoonanow.org/tract-brings-450-acre-data-center-campus-to-altoona-iowa/"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/tract-altoona-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-5fa65c592439dd27","lat":37.397572,"location_precision":"exact","lon":-121.980963,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/csquare-sfo2-ca","value":43.2}],"name":"Csquare SFO2","operator":"Csquare","source_notes":"Csquare's own directory confirms SFO2 as an operational facility at 4700 Old Ironsides Drive, Santa Clara, CA 95054. Address/details cross-referenced via datacenters.com listings for SFO2.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/54119665","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/54119665"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/csquare-sfo2-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/54119665"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/csquare-sfo2-osmway-54119665"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54119665"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54119667"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Miami","confidence":"medium","id":"compute_atlas-5fbd2401840217b3","lat":25.782359,"location_precision":"approximate","lon":-80.1930886,"name":"Equinix MI1 (NAP of the Americas)","operator":"Equinix","source_notes":"Formerly Terremark's \"NAP of the Americas\"; acquired by Equinix from Verizon in a 29-facility, $3.6B portfolio deal that closed May 1, 2017. Equinix's own technical spec sheet reports 296,775 sq ft of colocation space (255,512 sq ft in MI1-1&2, 41,263 sq ft in MI1-3) -- distinct from the widely-repeated but unsourced 750,000 sq ft gross-building figure. No single headline MW capacity is disclosed by the operator (spec sheet lists standby/UPS power per floor rather than a total IT-load figure); aggregators report conflicting, unconfirmed estimates in the 17-28 MW range. No AI/HPC-specific marketing found for this facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Equinix Completes Acquisition of 29 Data Centers from Verizon","publisher":"Equinix Investor Relations","retrievedAt":"2026-08-02","url":"https://investor.equinix.com/news-events/press-releases/detail/288/equinix-completes-acquisition-of-29-data-centers-from"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/equinix-mi1-nap-of-the-americas-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Palo Alto","confidence":"high","contains_osm":true,"id":"compute_atlas-5ff6540fd6de43a1","lat":37.4458951,"location_precision":"exact","lon":-122.160786,"name":"Equinix SV8","operator":"Equinix","source_notes":"529 Bryant Street, Palo Alto.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/132746406","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/132746406"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-sv8-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/132746406"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/equinix-sv8-osmway-132746406"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/132746406"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Mount Orab","confidence":"medium","id":"compute_atlas-608659de00dd4c28","lat":39.0275659,"location_precision":"approximate","lon":-83.919652,"name":"Mount Orab Mega-Site Data Center Campus","operator":"DB Stu LLC","source_notes":"More than 1,000 contiguous acres at the southeast corner of Mount Orab village were sold to DB Stu LLC, a Delaware LLC whose Ohio tax-mailing address runs through Vorys, Sater, Seymour and Pease in Columbus. Capacity, investment and the end user remain undisclosed under NDAs; reported capacity figures circulating publicly are not confirmed by any filing read here, so none is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Mt. Orab council member takes steps to stop possible data center construction","publisher":"Brown County Press","retrievedAt":"2026-09-09","url":"https://www.browncountypress.com/news/19046/mt-orab-council-member-takes-steps-to-stop-possible-data-center-construction"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/db-stu-mount-orab-brown-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","id":"compute_atlas-6099108633d0ad1b","lat":37.3725693,"location_precision":"approximate","lon":-121.9736589,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-santa-clara-i-ca1-ca","value":77.0}],"name":"Vantage Santa Clara I (CA1)","operator":"Vantage Data Centers","source_notes":"Campus of six buildings (CA11-CA16) totaling 335,000 sq ft; marketed as the largest LEED Platinum-certified data center campus in North America. Figures here are campus-wide aggregates, matching how, as of September 2026, Vantage Santa Clara II (CA2) is recorded in this dataset as a single campus entry rather than per-building.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/vantage-santa-clara-i-ca1-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-618bbdecc83e7c06","lat":37.2503404,"location_precision":"approximate","lon":-121.7944434,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/menlo-equities-great-oaks-parkway-san-jose-ca","value":100.0}],"name":"5601 Great Oaks Parkway Data Center (Menlo Equities, Charlotte Drive)","operator":"Menlo Equities","source_notes":"Proposed on Charlotte Drive between Lexington Avenue and Raleigh Road, industrial-zoned land within Western Digital's tech campus; The Real Deal reports the project would require nearly 100 MW once complete. Coordinates are a street-level geocode of Great Oaks Parkway (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/menlo-equities-great-oaks-parkway-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Denver","confidence":"medium","id":"compute_atlas-61b471a194907fab","lat":39.745646,"location_precision":"approximate","lon":-104.995336,"name":"CoreSite DE1 (910 15th Street)","operator":"CoreSite","source_notes":"The operator's Denver market page lists DE1 at 910 15th St. with more than 152,000 sq ft, and shows it as an operating facility. The page gives no MW figure, so capacity is omitted. This is a separate building from CoreSite DE3 at 4900 Race St., which is already tracked. It is also separate from the 1500 Champa St. carrier hotel. Coordinates are a Census geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Colocation Data Centers in Denver","publisher":"CoreSite","retrievedAt":"2026-09-30","url":"https://www.coresite.com/data-center-locations/denver"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/coresite-de1-denver-co"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Denver data center generators draw noise complaints in Elyria-Swansea (read via Internet Archive)","publisher":"Denverite / CPR News","retrievedAt":"2026-08-26","url":"https://denverite.com/2026/07/21/denver-data-center-noise-coresite/"},{"kind":"press","label":"What's the status of massive data centers in Colorado? (read via Internet Archive)","publisher":"The Colorado Sun","retrievedAt":"2026-08-26","url":"https://coloradosun.com/2026/06/18/colorado-data-center-update-pollution-protests-moratoriums/"},{"kind":"other","label":"CoreSite DE3 FAQ","publisher":"CoreSite","retrievedAt":"2026-10-30","url":"https://www.coresite.com/hubfs/-website-documents/Fact%20Sheets/CoreSite_FAQ_DE3.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/coresite-de3-denver-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Beacon Falls","confidence":"medium","id":"compute_atlas-61b5fb48bdf2659e","lat":41.442318,"location_precision":"approximate","lon":-73.064334,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://agencycre.com/properties/one-of-the-northeasts-most-significant-planned-ai-digital-infrastructure-developments-beacon-falls-data-center/","value":100.0}],"name":"Beacon Falls Data Center Campus (1 Lopus Road)","operator":"O&G Industries","source_notes":"O&G Industries (master developer) is marketing a 44+/49-acre former gravel-pit site off Lopus Road beside Route 8 for a 294,000 sq ft data center campus: 100 MW ultimate capacity (listing specs say 112.5 MW), sold as AI/cloud capacity and powered by utility service plus Class I fuel cells (33 fuel cells, per the Courant) with carbon capture. As of 2026-09-21 no formal application had been filed with the town. Residents approved a 32 MW data center on the same property in 2022, but it never materialized. No AI classification is recorded: the AI framing comes from a marketing listing, not a committed tenant.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Beacon Falls Data Center — 1 Lopus Road, 294,000 SF, 100 MW campus (marketing listing)","publisher":"The Agency CRE","retrievedAt":"2026-09-30","url":"https://agencycre.com/properties/one-of-the-northeasts-most-significant-planned-ai-digital-infrastructure-developments-beacon-falls-data-center/"},{"kind":"other","label":"Correction source","retrievedAt":"2026-10-07","url":"https://www.fuelcellenergy.com/"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/og-industries-beacon-falls-ct"}],"state":"Connecticut","status":"planned"},{"ai_classification":"likely","city":"Wheatfield","confidence":"medium","id":"compute_atlas-623def7f6eeb4886","lat":41.1955,"location_precision":"approximate","lon":-87.0586,"name":"AWS Wheatfield Campus (Project Rise)","operator":"Amazon Web Services","source_notes":"Codename Project Rise. Nine-building campus on 304 acres of NIPSCO-owned land ~0.5 mi from the R.M. Schahfer Generating Station; part of AWS's $15B Northern Indiana commitment. Capacity omitted: data-center IT load not disclosed; the 400 MW figure is NIPSCO's new gas peaker plant, not the facility's load. DCD reports AWS is 'estimating an investment of around $7 billion'; after the June 17, 2026 county approval, Northwest Indiana Business Magazine reported 'Amazon will invest $7 billion in the community, including $98 million paid in advance.' The record carries the $7 billion figure. Northwest Indiana Business Magazine reported 'The facility is expected to create 250 jobs.' That source does not say the jobs are permanent and the figure is a projection, so no jobs figure is recorded. AWS commits to restore 425 acres of Kankakee River watershed habitat and provide $25M for Wheatfield Township water access; AWS committed $1.25B to offset NIPSCO ratepayer impacts across the broader buildout. Coordinates are the Wheatfield centroid. Distinct from Project Rainier (New Carlisle) and the Hobart IN campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon plans nine-building data center campus in Wheatfield, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/amazon-plans-nine-building-data-center-campus-in-wheatfield-indiana/"},{"kind":"press","label":"Officials approve Jasper County Amazon data center","publisher":"Northwest Indiana Business Magazine","retrievedAt":"2026-07-07","url":"https://nwindianabusiness.com/industries/professional-services/information-technology/officials-approve-jasper-county-amazon-data-center/78353/"},{"kind":"press","label":"Amazon gets greenlight for $7 billion data center bringing 250 jobs to NW Indiana","publisher":"NWI Times","retrievedAt":"2026-07-07","url":"https://nwitimes.com/news/local/article_54c53d5c-d0d8-4910-97a7-87b9d5391664.html"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aws-wheatfield-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Oakland","confidence":"medium","id":"compute_atlas-6265e3f53d97926a","lat":37.8086782,"location_precision":"approximate","lon":-122.267477,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.kqed.org/news/12095308/developer-councilmember-say-proposed-oakland-data-center-isnt-what-you-might-think","value":20.0}],"name":"Behring 415 20th Street Data Center (former LBNL supercomputing building)","operator":"Behring Companies","source_notes":"Developer says the building previously housed an LBNL supercomputer and may not need new entitlements if the use conforms to prior operations; part of a larger Behring plan including a 39-story residential tower above the 19th Street BART station.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developer, councilmember say proposed Oakland data center isn't what you might think (2026-08-15)","publisher":"KQED","retrievedAt":"2026-09-21","url":"https://www.kqed.org/news/12095308/developer-councilmember-say-proposed-oakland-data-center-isnt-what-you-might-think"},{"kind":"press","label":"Data center moratorium sought by Oakland Councilmember Carroll Fife (2026-09-11)","publisher":"The Oaklandside","retrievedAt":"2026-09-21","url":"https://oaklandside.org/2026/09/11/data-center-temporary-moratorium-oakland-carroll-fife/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/behring-415-20th-street-oakland-ca"}],"state":"California","status":"planned"},{"ai_classification":"mixed_use","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-627475734eed4e63","lat":35.4676,"location_precision":"approximate","lon":-97.5164,"name":"RACK59 Data Center","operator":"RACK59","source_notes":"No capacity is recorded: the operator's own site advertises 175 MW while third-party listings report ~40 MW, and no filing reconciles the two. Coordinates are an Oklahoma City centroid approximation; the street address is exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"RACK59 Data Center — operator site","publisher":"RACK59","retrievedAt":"2026-09-21","url":"https://rack59.com/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/rack59-oklahoma-city-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Southfield","confidence":"medium","id":"compute_atlas-629b8eac10778e64","lat":42.474,"location_precision":"approximate","lon":-83.293,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/","value":100.0}],"name":"Metrobloks Southfield Data Center","operator":"Metrobloks","source_notes":"217,030-230,000 sq ft, two-story building on ~12.19 acres of vacant land along Inkster Road north of 11 Mile Road, Southfield's northwest corner. Los Angeles-based developer Metrobloks (as of August 2026, already tracked elsewhere in MO/IN/FL) has not completed a data center build anywhere yet per reporting. City of Southfield's own statement explicitly says the facility is not intended as 'an artificial intelligence repository' -- an AI classification is omitted here rather than defaulting to likely AI-specific. City Council approved the site plan 5-2 on Dec 16, 2025; the city notes 'Approval of the proposal does not remove City oversight' -- still subject to further permitting. A named IT-engineer public commenter said the real target may be closer to 150 MW by groundbreaking; unconfirmed beyond that public comment. Closed-loop cooling planned, city says 'minimal long-term water use.' Coordinates are an approximate Inkster/11 Mile intersection estimate, not parcel-geocoded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City of Southfield Statement Regarding Proposed Data Center","publisher":"City of Southfield, Michigan","retrievedAt":"2026-08-08","url":"https://www.cityofsouthfield.com/news/city-southfield-statement-regarding-proposed-data-center"},{"kind":"permit","label":"Southfield City Council approves data center site plan","publisher":"C & G Newspapers","retrievedAt":"2026-09-09","url":"https://www.candgnews.com/articles/government-news/southfield-city-council-approves-data-center-site-plan/"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted. — \"LA-based developer Metrobloks LLC has received site plan approval from the Southfield City Council for a 100-megawatt data center\"","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"},{"kind":"press","label":"Southfield data center proposal: City council to hear public input Monday (developer: 'Ours is 100')","publisher":"FOX 2 Detroit","retrievedAt":"2026-10-24","url":"https://www.fox2detroit.com/news/southfield-data-center-proposal-city-council-hear-public-input-monday"}],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/metrobloks-southfield-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Hopkinsville","confidence":"medium","contains_osm":true,"id":"compute_atlas-62a9f4d7dc389cd9","lat":36.8657852,"location_precision":"approximate","lon":-87.489412,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/","value":50.0}],"name":"North Campbell Land Co. Hopkinsville 50 MW Data Center","operator":"North Campbell Land Co. (Sphere 3D)","source_notes":"A proposed second Hopkinsville facility, separate from the operator's existing ~15 MW bitcoin mine at the Holland Substation. The location, footprint, construction cost and development schedule have not been disclosed, so the coordinates are the Hopkinsville city centroid and are approximate only — the actual site is unknown. A draft Hopkinsville zoning amendment developed after this proposal surfaced would prohibit 'hyper-scale' facilities of 75 MW or more and set setbacks by size class; a special-called public hearing was held July 27, 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Hopkinsville weighs limits on data centers as crypto mine proposes expansion","publisher":"Hoptown Chronicle","retrievedAt":"2026-09-21","url":"https://hoptownchronicle.org/hopkinsville-weighs-limits-on-data-centers-as-crypto-mine-proposes-expansion/"},{"kind":"press","label":"Sphere 3D Plans 50 MW Kentucky Data Center as City Weighs Zoning Rules","publisher":"The Energy Mag","retrievedAt":"2026-10-22","url":"https://theenergymag.com/news/2026-07-31/sphere-kentucky-data-center"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/north-campbell-land-hopkinsville-50mw-christian-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"confirmed","city":"Manassas","confidence":"medium","id":"compute_atlas-62b501e62d1745bc","lat":38.7509,"location_precision":"approximate","lon":-77.4753,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digital-realty-aurora-ai-factory-manassas-va","value":96.0}],"name":"Aurora AI Factory","operator":"Digital Realty","source_notes":"Nvidia's 'Aurora AI factory', built by Digital Realty on an existing Digital Realty site near Nokesville Road and Prince William Parkway. Billed as the first facility built to a new industry certification for flexible power, developed by Nvidia with Emerald AI, EPRI and grid operator PJM, and deploying Emerald AI's Emerald Conductor software to shift AI workloads in response to grid conditions. Operator is recorded as Digital Realty (owner/builder); Nvidia is the named tenant. The record is listed as under construction because, as of September 2026, no source consulted confirms it has entered service, only that operations were 'slated for' the first half of 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nvidia to deploy Emerald AI's orchestration software at 96MW Aurora data center in Manassas, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260215011608/https://www.datacenterdynamics.com/en/news/nvidia-to-deploy-emerald-ais-orchestration-software-at-96mw-aurora-data-center-in-manassas-virginia/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/digital-realty-aurora-ai-factory-manassas-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"compute_atlas-62dbc8149642abb3","lat":33.2468,"location_precision":"approximate","lon":-84.2641,"name":"Spalding Investments Data Center Campus (High Falls Road)","operator":"Spalding Investments, LLC (developer; end user undisclosed)","source_notes":"Six two-story buildings totalling 1.42 million sq ft plus a power transfer station, on 127.45 acres bounded by High Falls Road, South McDonough Road and Highway 16 / Arthur K. Bolton Parkway. Build-out dated 2030; estimated local tax revenue at build-out $22.9M.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/spalding-investments-high-falls-road-campus-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"mixed_use","city":"Heath","confidence":"medium","id":"compute_atlas-6306a923f16c2d69","lat":40.015,"location_precision":"approximate","lon":-82.46,"name":"Microsoft Heath Data Center","operator":"Microsoft","source_notes":"Site at 975 Thornwood Dr SW, Heath OH 43056; 227 acres. Part of Microsoft's $1B Licking County three-campus investment alongside Hebron and New Albany. Coordinates are approximate Heath city centroid; exact Thornwood Dr parcel not pinned. The $1B is Microsoft's three-campus Licking County commitment; no Heath-specific capital-investment figure is published (do not derive by subtraction).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Heath breaks ground on Microsoft data center expected to bring hundreds of jobs","publisher":"ABC 6 WSYX Columbus","retrievedAt":"2026-07-06","url":"https://abc6onyourside.com/news/local/heath-columbus-ohio-break-ground-microsoft-data-center-expected-bring-hundreds-jobs-tech-technology-ai-artificial-intelligence-cloud-computing-digital-services"},{"kind":"press","label":"Ohio data centers exploit tax break","publisher":"Signal Ohio","retrievedAt":"2026-07-07","url":"https://signalohio.org/ohio-data-centers-tax-breaks/"},{"kind":"press","label":"Understanding Microsoft datacenters in Licking County","publisher":"Microsoft Local","retrievedAt":"2026-07-07","url":"https://local.microsoft.com/blog/understanding-microsoft-datacenters-in-licking-county/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-heath-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"San Angelo","confidence":"medium","id":"compute_atlas-6355397d493358f0","lat":31.5290977,"location_precision":"approximate","lon":-100.3212098,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate","value":1000.0}],"name":"Cipher Colchis Campus","operator":"Cipher Digital","source_notes":"1-GW HPC/AI development site in Tom Green County, northeast of San Angelo near AEP's Red Creek 345-kV substation (~2,500 ft east of the Skybox San Angelo campus). In November 2025 Cipher purchased a majority interest in a JV (Colchis LLC) to develop the site, with options to buy ~620 acres of land adjacent to the existing substation; Cipher expects ~95% equity subject to final lease/development terms. Coordinates are the NE-San-Angelo / Red Creek substation area centroid (approximate) pending a parcel-level GIS lookup. Investment and jobs figures undisclosed -> omitted. County pinned via local press (San Angelo LIVE); the SEC 10-K discloses only \"West Texas.\". Cipher Mining was renamed Cipher Digital.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cipher Mining Provides Third Quarter 2025 Business Update — formation of JV to develop 1-GW Colchis site in West Texas","publisher":"Cipher Mining Inc.","retrievedAt":"2026-07-17","url":"https://investors.cipherdigital.com"},{"kind":"press","label":"San Angelo May End Up With a Data Center It Can't Regulate — Cipher Digital Colchis in Tom Green County, near AEP Red Creek substation","publisher":"San Angelo LIVE","retrievedAt":"2026-07-17","url":"https://sanangelolive.com/news/politics/2026-06-02/san-angelo-may-end-data-center-it-cant-regulate"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cipher-colchis-tom-green-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Eagan","confidence":"medium","id":"compute_atlas-6376fb916bfb9f8e","lat":44.8375194,"location_precision":"approximate","lon":-93.1454144,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-east-twin-cities-eagan-mn","value":5.0}],"name":"DataBank East Twin Cities Data Center (MSP2)","operator":"DataBank","source_notes":"48,860 IT square feet; FedRAMP-certified multi-tenant carrier-hotel facility with 21 onsite carriers. Distinct from the DataBank Brooklyn Park Campus, tracked separately as of September 2026 — this is DataBank's separate Eagan site. DataBank's own MSP3-qualification release states MSP2 (this facility) previously qualified for Minnesota's DEED-certified data-center sales tax exemption; no amount or certification date disclosed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/databank-east-twin-cities-eagan-mn"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Marshalltown","confidence":"medium","id":"compute_atlas-6392949a8e14f0ec","lat":42.056,"location_precision":"approximate","lon":-92.897,"name":"Swarm Systems Marshalltown Data Center","operator":"Swarm Systems","source_notes":"Building size is reported inconsistently: the Times Republican account of the Aug. 26, 2026 council presentation says 125,000 sq ft, while Business Record reports 150,000 sq ft. Jobs were described as a 50-60 permanent range; the lower bound is recorded. No MW capacity was stated. Coordinates are approximate — the point sits at the JBS Marshalltown industrial site, next to which the Edgewood Industrial Park city-owned parcels lie; no specific parcel has been identified publicly.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Iowa communities grapple with regulating data centers as development spreads","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/iowa-communities-grapple-with-regulating-data-centers-as-development-spreads/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/swarm-systems-marshalltown-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Boydton","confidence":"medium","id":"compute_atlas-644c998060a094ce","lat":36.6674,"location_precision":"approximate","lon":-78.3897,"name":"Microsoft Panhandle Road Campus (AVC17 expansion)","operator":"Microsoft","source_notes":"New campus on 490 acres south of Highway 58 and east of Panhandle Road, adjacent to the existing AVC17 campus and able to 'utilize nearby existing data center infrastructure' per the application. Three one-story data center buildings plus access roads, an on-site electrical substation and a water storage facility, to be built in two phases. Size and capacity were not disclosed. Application cites the southern Virginia Regional Network Group, where DCD reports existing data centers are outgrowing design capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft files to expand data center campus in Mecklenburg County, Virginia","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260819033426/https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-data-center-campus-in-mecklenburg-county-virginia/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/microsoft-panhandle-road-mecklenburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-64662b8f16e4dd35","lat":45.7770659,"location_precision":"approximate","lon":-120.8128216,"name":"Energizer Data Center (BPA L0493 / L0497)","operator":"Savion (Shell Energy subsidiary), per BPA application documents","source_notes":"Savion said preliminary feasibility work is underway. The location is a road-segment point, not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)","publisher":"The Goldendale Sentinel","retrievedAt":"2026-10-12","url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/energizer-data-center-hoctor-road-klickitat-wa"},{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Goldendale Sentinel: More data centers possible for county (Sep 2, 2026)","publisher":"The Goldendale Sentinel","retrievedAt":"2026-10-30","url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/energizer-ii-data-center-goodnoe-hills-klickitat-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"likely","city":"Cheyenne","confidence":"medium","id":"compute_atlas-64816a5d9ab39ba5","lat":41.12,"location_precision":"approximate","lon":-104.82,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tallgrass-project-jade-cheyenne-wy","value":2700.0}],"name":"Project Tembo","operator":"Google","source_notes":"Switchgrass Industrial Park, Hwy 85 south of Cheyenne, Laramie County - geographically distinct from Meta (Project Cosmo) and Microsoft's Cheyenne campuses. 716-acre campus. Originally announced at 1.8GW as 'Project Jade' with an undisclosed hyperscale client (Crusoe Energy as builder); Crusoe exited June 2026. On 2026-07-08, Google was publicly revealed as owner/operator via subsidiary Jupiter Star Holdings, and the project was renamed 'Project Tembo'; capacity confirmed at 2.7GW with an ultimate ceiling of up to 10GW. The Cheyenne Power Hub on-site natural-gas plant supplies power (Tallgrass Energy; Black Hills Energy co-invested). ~$50B total project figure remains a projection. Completion targeted 2031.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Crusoe gets go-ahead for 1.8GW data center campus and power plant in Cheyenne, Wyoming","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/crusoe-gets-go-ahead-for-18gw-data-center-campus-and-power-plant-in-cheyenne-wyoming/"},{"kind":"press","label":"Black Hills Corp. executes definitive agreements to serve Google's planned data center in Cheyenne, Wyoming","publisher":"Black Hills Corp. (press release via Finviz)","retrievedAt":"2026-10-17","url":"https://finviz.com/news/399523/black-hills-corp-executes-definitive-agreements-to-serve-googles-planned-data-center-in-cheyenne-wyoming"},{"kind":"press","label":"'Mind-Boggling': With No Zoning, Fremont County In The Dark On $66B Data Center Plan (cites Project Tembo at $17B)","publisher":"Cowboy State Daily","retrievedAt":"2026-10-17","url":"https://cowboystatedaily.com/2026/10/08/mind-boggling-fremont-county-coming-to-grips-with-66b-data-center-project/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/tallgrass-project-jade-cheyenne-wy"}],"state":"Wyoming","status":"under construction"},{"ai_classification":"unknown","city":"Upper Arlington","confidence":"medium","id":"compute_atlas-64b88d0df7ac5261","lat":40.0578366,"location_precision":"approximate","lon":-83.078426,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/expedient-cmh1-upper-arlington-oh","value":1.6}],"name":"Expedient CMH1 (Upper Arlington)","operator":"Expedient","source_notes":"21,591 sq ft total with 9,300 sq ft raised floor; 1.6 MW critical IT load and 3.5 MW total generator capacity. The recorded capacity is the critical IT load, not generator capacity. Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Expedient Columbus data centers — CMH1, CMH2, CMH3","publisher":"Expedient","retrievedAt":"2026-08-27","url":"https://expedient.com/data-centers/columbus/"}],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/expedient-cmh1-upper-arlington-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"confirmed","city":"Hobart","confidence":"medium","id":"compute_atlas-64c5cc4042420d85","lat":41.517,"location_precision":"approximate","lon":-87.263,"name":"AWS Hobart Campus","operator":"Amazon Web Services","source_notes":"One of AWS's Northwest Indiana campuses (part of a $15B NW Indiana / 2.4 GW umbrella; distinct from Amazon Project Rainier and the separate Wheatfield IN campus). Capacity omitted: the 2.4 GW figure is the NW Indiana total, not Hobart-specific. Investment omitted: $15B is the NW Indiana total, no Hobart-specific figure. Up to 25 buildings ('Hobart Tech Park'), per the mayor's statement to NBC Chicago. As of October 2026 no land area is recorded: the only acreage figure found is a resident's remark quoted by NBC Chicago (\"if we think this is going to stop at 725 acres\"), not an official or operator figure; shell entities include Hobart Devco, Hobart Owner LLC, TUHAUS LLC/Wylie Capital. ~400 permanent jobs ($37-44/hr) are projections (noted here, not recorded as a jobs figure). $47M upfront community payment is city revenue, not facility capex. Coordinates estimated from 61st Ave/Colorado St. Active litigation: 'No Data Centers Hobart Indiana' sought a TRO on the fill permit (unresolved).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS data center coming to Hobart, Indiana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/aws-data-center-coming-to-hobart-indiana/"},{"kind":"press","label":"Hobart reaches agreement with Amazon for next-gen data center","publisher":"21Alive News","retrievedAt":"2026-07-07","url":"https://www.21alivenews.com/2025/11/25/hobart-reaches-agreement-with-amazon-next-gen-data-center/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aws-hobart-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Franklin","confidence":"medium","contains_osm":true,"id":"compute_atlas-64e84144eeed01fc","lat":42.8618895,"location_precision":"approximate","lon":-87.982841,"name":"CyberLynk Franklin Data Center (MKE1)","operator":"CyberLynk Network, Inc.","source_notes":"SOC 2-certified colocation facility in the Franklin Business Park, marketed both as CyberLynk MKE1 and under the MilwaukeeColo brand, with RFID/biometric access, IP camera monitoring, and peering with Cogent, Lumen, NTT, AT&T, Everstream and Spectrum. This is not the Expedient MKE1 facility, tracked separately as of September 2026: Expedient's Milwaukee facility is a separate building at 4777 W. Ironwood, Franklin, WI 53132 (1.6 MW critical load, 27,000 sq ft), verified in September 2026. Two operators in the same municipality both use the \"MKE1\" label.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/cyberlynk-franklin-mke1-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Charleston","confidence":"medium","contains_osm":true,"id":"compute_atlas-651d6d19d2c7988a","lat":38.3521647,"location_precision":"approximate","lon":-81.6413397,"name":"Citynet Charleston Data Center","operator":"Citynet, LLC","source_notes":"Downtown Charleston colocation facility with fully redundant HVAC and dual high-capacity power feeds. No MW, square footage or certification figure is published by the operator. Geocode matched the exact house number.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Citynet — Data Centers & Colocation (facility locations)","publisher":"Citynet, LLC","retrievedAt":"2026-09-22","url":"https://www.citynet.net/network-services/data-center-colocation/"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/citynet-charleston-kanawha-county-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Saint Cloud","confidence":"medium","contains_osm":true,"id":"compute_atlas-6565c0f1992b89b3","lat":28.1896418,"location_precision":"approximate","lon":-81.2783896,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/la-rosa-holdings-saint-cloud-fl","value":1.5}],"name":"La Rosa Holdings Tier III AI Data Center — St. Cloud","operator":"La Rosa Holdings Corp.","source_notes":"Small enterprise/AI facility: up to 10,000 sq ft at Tier III with roughly 1.5 MW of IT load. The transaction is conditional — the company's own filing states there can be no assurance the acquisition is consummated, and it carried a 75-day due diligence exit. The $675,000 in the 8-K is the land purchase price, not a facility investment, so an investment figure is deliberately omitted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/la-rosa-holdings-saint-cloud-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-657747af85d5bdc7","lat":32.2700221,"location_precision":"approximate","lon":-86.5128035,"name":"Project Red Clay","operator":"Cloverleaf Infrastructure","source_notes":"Subsidy: no formal abatement request had been filed as of 24 July 2026, according to Yellowhammer News, which reports that the granting body would be the Lowndes County Commission. Under legislation signed by Gov. Kay Ivey in April 2026, an abatement approved before 1 January 2027 could run up to 30 years; after that date the maximum is 20 years. In October 2026 the Lowndes County Commission voted 3-2 to approve the tax abatements and project agreement; AL.com, republished by GovTech, reports the county granted \"more than $1.1 billion in tax abatements\", including 50% of the county non-educational property tax and the construction and server equipment refresh sales and use tax. No named tenant: Yellowhammer describes Cloverleaf as a Houston- and Seattle-based speculative developer assembling land for an unnamed future operator; the AI classification is therefore likely, not confirmed. Investment is \"$1.5 billion\" per WSFA and Route Fifty (\"at least $1.5 billion in the development stage\"), which is the floor recorded. The developer's own site, which said \"Over a $1 billion taxable investment in Lowndes County\" in September 2026, states no investment figure as of October 2026. Jobs: as of October 2026 the developer's site says the project will employ \"more than 1,000 construction workers\" and that full-time roles \"will grow from 225 initially to over 300 at full scale\"; the recorded figures are those floors (more than 1,000 construction jobs, over 300 full-time jobs at full scale). Other coverage that could not be retrieved as of September 2026 cites 1,000-1,500 construction and over 200 permanent jobs. Footprint: \"more than 800 acres in northeast Lowndes County\" and \"2.88 million square feet\" (Yellowhammer). Zoning: reporting notes Cloverleaf could buy and develop here because Lowndes County has no planning or zoning authority. Coordinates are the OSM-confirmed U.S. 80 / AL 21 junction that WSFA names as the site vicinity, not a parcel boundary; the actual footprint is somewhere in northeast Lowndes County near that junction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Home - Project Red Clay (developer's project site)","publisher":"Cloverleaf Infrastructure","retrievedAt":"2026-09-09","url":"https://redclaydatacenter.com/"},{"kind":"press","label":"Proposed Data Centers Could Use More Electricity Than All Alabama Homes Combined, Analysis Shows. Who Will Pay?","publisher":"Inside Climate News","retrievedAt":"2026-09-22","url":"https://insideclimatenews.org/news/19082026/alabama-power-proposed-data-centers-utility-bills/"},{"kind":"press","label":"Lowndes County, Ala., approves $1.1B in data center tax breaks","publisher":"GovTech (via AL.com)","retrievedAt":"2026-10-18","url":"https://www.govtech.com/artificial-intelligence/lowndes-county-ala-approves-1-1b-in-data-center-tax-breaks"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cloverleaf-red-clay-lowndes-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"DeKalb","confidence":"medium","id":"compute_atlas-65954bfe007e44dd","lat":41.878256,"location_precision":"approximate","lon":-88.753784,"name":"Edged DeKalb Campus (Project Vector)","operator":"Edged (Endeavour Energy)","source_notes":"Four data center buildings plus two electrical substations on both sides of Illinois Route 23, north of Keslinger Road and west of Crego Road, immediately south of Meta's DeKalb data center. Land is largely owned by ChicagoWest Business Center; petitioner of record is JJK 343 LLC. Coordinates are the IL-23 / Keslinger Road intersection (OSM), the site's southern edge, not a parcel centroid. No megawatt figure has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of DeKalb Zoning & Development Projects list as of 7/15/2026 — JJK 343 LLC / Edged (Project Vector), Rt. 23 and Keslinger Rd, 560 acres, approved 12/8/25","publisher":"City of DeKalb","retrievedAt":"2026-09-25","url":"https://www.cityofdekalb.com/DocumentCenter/View/21222/Development-Projects-List-7-15-26-"},{"kind":"permit","label":"City of DeKalb Zoning & Development Projects list as of 3/18/2026","publisher":"City of DeKalb","retrievedAt":"2026-09-25","url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/edged-dekalb-project-vector-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"confirmed","city":"Robstown","confidence":"high","id":"compute_atlas-65b886acb080036c","lat":27.7897,"location_precision":"approximate","lon":-97.6689,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hut8-beacon-point-robstown-tx","value":352.0}],"name":"Hut 8 Beacon Point AI Campus","operator":"Hut 8","source_notes":"1 GW site near Robstown, Nueces County; Phase 1 = a 15-year, 352 MW IT lease. The $9.8B base-term contract value is revenue, not capex. Delivery targeted Q3 2027. Coordinates are the Robstown area centroid. Hut 8 declined to confirm any tax abatement and the Nueces County Judge said the county's abatement policy was out of date, so none could have been granted; no subsidy is recorded. The investment figure records the $4.25B non-recourse project-bond financing for Phase 1 construction (352 MW + substation), distinct from the $9.8B lease contract value; the ~$17B combined Phase 1-2 figure is a projection.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/hut8-beacon-point-robstown-tx"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/hut-8-signs-352mw-data-center-lease-in-texas-with-investment-grade-tenant/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/beacon-point-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Commack","confidence":"medium","contains_osm":true,"id":"compute_atlas-65c4e437a34d1429","lat":40.8242092,"location_precision":"approximate","lon":-73.2929267,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/365-data-centers-commack-ny","value":6.0}],"name":"365 Data Centers Long Island (Commack)","operator":"365 Data Centers","source_notes":"24,000 sq ft across two pods, Tier III, constructed 2016. The acquisition announcement states 3 MW immediately available out of 6 MW total utility power and generator capacity; the recorded operational capacity is that 6 MW figure, which is utility-plus-generator capacity rather than a measured IT load. Coordinates are a street-address geocode (two OSM address points exist at this address ~110 m apart), hence the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Commack — 365 Data Centers (operator facility page, 500 Commack Rd, Commack, NY 11725)","publisher":"365 Data Centers","retrievedAt":"2026-09-14","url":"https://365datacenters.com/commack/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/365-data-centers-commack-ny"}],"state":"New York","status":"operating"},{"ai_classification":"confirmed","city":"Max Meadows","confidence":"medium","id":"compute_atlas-65db83cd7ae1d61f","lat":36.958,"location_precision":"approximate","lon":-80.899,"name":"Solis Arx Progress Park Data Center Campus","operator":"Solis Arx","source_notes":"Solis Arx (owner-operator; AI-compute tenant reported as Fluidstack) plans a phased AI data center campus on a 99-acre tract in Wythe County's Progress Park, ~15 minutes from Wytheville, served by Appalachian Power and Wytheville water. Coordinates are an approximate geocode of Progress Park (Max Meadows / Fort Chiswell area off I-81), not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"County explains Solis Arx data center plans as residents voice concerns","publisher":"Southwest Virginia Sun","retrievedAt":"2026-09-21","url":"https://swvasun.com/county-explains-solis-arx-data-center-plans-as-residents-voice-concerns-p14890-10.htm"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/solis-arx-progress-park-wythe-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Bridgeport","confidence":"medium","contains_osm":true,"id":"compute_atlas-6674a5de893e43b5","lat":39.2763943,"location_precision":"approximate","lon":-80.2721692,"name":"Citynet Bridgeport Data Center","operator":"Citynet, LLC","source_notes":"Purpose-built colocation facility inside Citynet's corporate headquarters, with fully redundant HVAC and dual high-capacity power feeds with backup generators. No MW, square footage or certification figure is published. Pin came from a STREET-level geocode match (Platinum Drive, the prior name/adjacent street for this parcel), not a building-level match, so treat it as approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Citynet — Data Centers & Colocation (facility locations)","publisher":"Citynet, LLC","retrievedAt":"2026-09-22","url":"https://www.citynet.net/network-services/data-center-colocation/"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/citynet-bridgeport-harrison-county-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"confirmed","city":"Dowagiac","confidence":"medium","id":"compute_atlas-667da2fe5092054d","lat":41.984,"location_precision":"approximate","lon":-86.109,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hyperscale-data-dowagiac-mi","value":340.0}],"name":"Hyperscale Data Dowagiac Campus","operator":"Hyperscale Data, Inc.","source_notes":"Former manufacturing site at 415 East Prairie Ronde Street, Dowagiac; converting from Bitcoin-mining infrastructure toward AI/HPC colocation use, branded by the company as its 'Michigan AI Data Center.' The company's August 2026 strategic outlook presentation describes approximately 30 MW of power energized at the campus, a power figure rather than IT capacity, stated while Bitcoin mining was still running there. The first 20 MW of AI compute capacity under its customer agreement is targeted for operational status in Q4 2026 (TFTC, September 2026). The company is targeting 340 MW. A company release of September 2, 2026 says all Bitcoin miners were turned off effective September 1, 2026 as the site is prepared for AI data center operations, so the AI classification is confirmed rather than mixed-use. Recently completed a 48.5-acre acquisition, bringing the campus to ~83 acres total. Publicly traded company (Hyperscale Data, Inc.) sold ~100 BTC and opened a bitcoin-backed credit facility to fund construction, per its own reporting. Cass County passed a resolution urging more development transparency after resident noise complaints. Coordinates are an approximate Dowagiac city estimate, not parcel-geocoded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Hyperscale Data's Michigan AI Data Center Doubles its Land Holdings","publisher":"DBusiness","retrievedAt":"2026-08-08","url":"https://www.dbusiness.com/daily-news/hyperscale-datas-michigan-ai-data-center-doubles-its-land-holdings/"},{"kind":"press","label":"Hyperscale Data Targets Full Buildout of 340 MW Michigan AI Data Center Campus in 2029","publisher":"Hyperscale Data, Inc. (press release via Seeking Alpha)","retrievedAt":"2026-09-09","url":"https://seekingalpha.com/pr/20171525-hyperscale-data-targets-full-buildout-of-340-mw-michigan-ai-data-center-campus-in-2029"},{"kind":"press","label":"TFTC — Hyperscale Data kills bitcoin mining at Dowagiac, converts 617K-sq-ft site to AI (address 415 East Prairie Ronde Street; mining ended 2026-09-01)","publisher":"TFTC","retrievedAt":"2026-09-21","url":"https://www.tftc.io/hyperscale-data-bitcoin-mining-shutdown-dowagiac-ai-data-center"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/hyperscale-data-dowagiac-mi"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"Clifton","confidence":"medium","id":"compute_atlas-669fc0f9b6f7042b","lat":40.862137,"location_precision":"representative_multi_site","lon":-74.160393,"name":"Digital Realty Clifton Campus","operator":"Digital Realty","source_notes":"Two Digital Realty buildings in Clifton, NJ, both confirmed via the operator's own site pages: EWR20 at 100 Delawanna Avenue (183,000 sq ft, 7 stories, N+1 power/cooling, operator states it is 100% renewable-energy powered) and EWR21 at 2 Peekay Drive (215,000 sq ft, 3 stories, N+1 UPS, onsite substation with 2N utility redundancy, LEED Platinum, ~37 miles from Manhattan). Represented as a single record (with the pin at a representative point for a multi-site project) because neither operator page gave a distinguishable parcel-level geocode for the two buildings and, as of September 2026, no independent source was fetched to separate them; location used is Clifton's town center. Both buildings carry SOC2/SOC3/PCI-DSS/ISO 9001/ISO 14001/ISO 27001 certification per the operator.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty New Jersey EWR20","publisher":"Digital Realty","retrievedAt":"2026-09-12","url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr20"},{"kind":"other","label":"Digital Realty New Jersey EWR21","publisher":"Digital Realty","retrievedAt":"2026-09-12","url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr21"},{"kind":"other","label":"Digital Realty — New York metro data centers","publisher":"Digital Realty","retrievedAt":"2026-09-12","url":"https://www.digitalrealty.com/data-centers/americas/new-york"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/digital-realty-clifton-campus-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","contains_osm":true,"id":"compute_atlas-66d290c8f005b712","lat":39.1675448,"location_precision":"approximate","lon":-94.4651703,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-kansas-city-mo","value":26.0}],"name":"Edged Kansas City","operator":"Edged Data Centers","source_notes":"26 MW critical capacity. Address 3420 North Arlington Avenue per Ingram's. Nominatim could not resolve the house number, so coordinates are the OSM point on North Arlington Avenue in the Hunt Midwest Business Center area (approximate). Distinct operator and parcel from the tracked Google Hunt Midwest campus nearby.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Edged Data Centers opens new data center in Kansas City, investing more than $143 million","publisher":"Missouri Department of Economic Development","retrievedAt":"2026-10-13","url":"https://ded.mo.gov/press-room/edged-data-centers-opens-new-data-center-kansas-city-investing-more-143-million"},{"kind":"press","label":"Edged Kansas City $143M data center opens near North KC","publisher":"Ingram's","retrievedAt":"2026-10-13","url":"https://ingrams.com/article/edged-kansas-city-143m-data-center-opens-near-north-kc/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/edged-kansas-city-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"confirmed","city":"Hanover","confidence":"medium","id":"compute_atlas-6736986580ae51f5","lat":47.111,"location_precision":"approximate","lon":-101.426,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-3-oliver-nd","value":430.0}],"name":"Applied Digital Polaris Forge 3","operator":"Applied Digital Corporation","source_notes":"Distinct 3rd North Dakota site (not the Ellendale or Harwood campuses), south of Hanover near the Hwy 25/31 junction. MDU Resources power deal finalized June 23, 2026. Approximately 200 FTE jobs planned; groundbreaking targeted summer 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Montana-Dakota Utilities Announces Electric Service Agreement with Applied Digital for Proposed AI Factory","publisher":"MDU Resources via PR Newswire","retrievedAt":"2026-10-26","url":"https://www.prnewswire.com/news-releases/montana-dakota-utilities-announces-electric-service-agreement-with-applied-digital-for-proposed-ai-factory-302806791.html"},{"kind":"press","label":"Applied Digital Breaks Ground on Polaris Forge 3, a ~300MW HPC Campus in Oliver County, North Dakota","publisher":"NextDC","retrievedAt":"2026-10-26","url":"https://www.nextdcx.com/blog/applied-digital-north-dakota-oliver-county-data-center"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-3-oliver-nd"}],"state":"North Dakota","status":"under construction"},{"ai_classification":"unknown","city":"Waco","confidence":"medium","id":"compute_atlas-67506f291b05b60c","lat":31.474088,"location_precision":"approximate","lon":-96.96261,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/","value":500.0}],"name":"Cipher McLennan HPC Data Center","operator":"Cipher Digital","source_notes":"Cipher's McLennan HPC/AI data center site in central Texas (McLennan County, the Waco area). Targeted capacity up to 500 MW; estimated energization 2028. Cipher entered an option agreement in October 2024 and exercised the option to acquire the special-purpose entity in February 2026. Part of Cipher's ~3.4 GW / 8-site HPC pipeline (Cipher Digital, formerly Cipher Mining). Coordinates approximate (McLennan County / Waco geocode; specific parcel not disclosed). Cipher Mining was renamed Cipher Digital.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Waco Bridge — 'Second Waco-area data center proposal troubles residents' (citing McLennan County clerk records)","retrievedAt":"2026-08-16","url":"https://wacobridge.org/2026/05/27/waco-data-center-cipher-riesel-mclennan-county/"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/cipher-mclennan-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Columbus","confidence":"medium","id":"compute_atlas-67659fcbaa1a6342","lat":39.995882740484,"location_precision":"approximate","lon":-82.855483773389,"name":"CeraNet Data Center (Morrison Road)","operator":"CeraNet, Inc.","source_notes":"CeraNet's primary colocation/hosting facility; the operator describes it as 'located just outside of Columbus, Ohio's I-270 outer belt with quick access to Port Columbus' and lists 826 Morrison Road as its company address. Operator in business since 1996; colocation space from single servers up to multi-rack enclosures 'up to 15,000 sq ft' (operator spec page, not a building-size figure, so not recorded). No power capacity is published. The operator also says it has data center services in Dublin and Westerville, but gives no addresses for them and does not say it operates those sites itself, so they are not included in this record. Coordinates: US Census geocoder match for '826 MORRISON RD, COLUMBUS, OH, 43230' (address-range interpolation, not a rooftop match), hence the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CeraNet — Contact (826 Morrison Road, Columbus, Ohio 43230)","publisher":"CeraNet, Inc.","retrievedAt":"2026-10-15","url":"https://www.cera.net/contact/"},{"kind":"other","label":"CeraNet — Service Locations & Colo Space (Gahanna near the airport, Dublin, Westerville)","publisher":"CeraNet, Inc.","retrievedAt":"2026-10-15","url":"https://www.cera.net/ohio-colocation-data-centers/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/ceranet-morrison-road-columbus-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Lordstown","confidence":"medium","id":"compute_atlas-67c6ec40b0399c90","lat":41.18,"location_precision":"approximate","lon":-80.87,"name":"Bristolville 25","operator":"Bristolville 25 Developer LLC / BHGH Properties","source_notes":"133 acres of industrial land near the former GM plant in Lordstown/Bristolville. The village enacted a data-center ban; the developer petitioned the Ohio Supreme Court for a writ of mandamus. Distinct from the already-tracked Stargate-Lordstown facility (different site/operator).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developers petition Ohio Supreme Court in Lordstown data center project","publisher":"Business Journal Daily","retrievedAt":"2026-07-17","url":"https://businessjournaldaily.com/developers-petition-ohio-supreme-court-in-lordstown-data-center-project/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/bristolville-25-lordstown-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Cedar Falls","confidence":"medium","id":"compute_atlas-67da7be68629f4e2","lat":42.5347,"location_precision":"approximate","lon":-92.4453,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cologix-cedar-falls-ia","value":1.0}],"name":"Cologix DSM2 (Cedar Falls)","operator":"Cologix","source_notes":"Edge colocation facility at 1205 Technology Parkway, Cedar Falls; acquired from Connect Des Moines June 2024 alongside DSM1. Owned/operated by Cologix (not a tenancy). Confirmed via Cologix's own DSM2 facility page: 24,000 sq ft facility with 6,000 sq ft colocation currently built out, 1MW site capacity via (3) 750kW generator+UPS, with room to add another 10,000 sq ft / 1MW later (not counted here — reporting live capacity only).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cologix-cedar-falls-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Sharon","confidence":"medium","id":"compute_atlas-684cf4b0f899e6bc","lat":37.2486335,"location_precision":"approximate","lon":-98.4206316,"name":"Google Data Center (Project Helium)","operator":"Google","source_notes":"1.7 million sq ft facility near Sharon, ~8 miles east of Medicine Lodge. County materials estimate roughly $327.5M in total ad valorem tax revenue over 20 years (~$138.4M to Barber County) once the project's Kansas data-center tax exemption period lapses; that is a projected tax-revenue figure, not an investment or subsidy amount, and is not recorded as such here. Construction targeted for early 2027; initial operations 2030.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Barber County, Kansas — Data Center","publisher":"Barber County, Kansas","retrievedAt":"2026-10-04","url":"https://barber.ks.gov/data-center.html"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/google-project-helium-sharon-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Russell","confidence":"medium","contains_osm":true,"id":"compute_atlas-68787fa113ce9223","lat":38.5173028,"location_precision":"approximate","lon":-82.6976631,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/rubix-ashland-works-russell-greenup-ky","value":2000.0}],"name":"Rubix Ashland Works Data Center Campus","operator":"Rubix Data Centers (Submer Group)","source_notes":"Proposed on roughly 425 acres of the former AK Steel Ashland Works brownfield (now Cleveland-Cliffs property) along the Ohio River; reporting says the majority of the project area falls inside the City of Russell in Greenup County, with the remainder in Boyd County. Rubix Data Centers is a subsidiary of Barcelona-based Submer Group. Infrastructure investment is reported as a range of $8–12 billion, so no single investment figure is asserted. The company says construction would employ thousands and the operating facility 200 people at an average salary of $125,000, and that Russell could expect tens of millions of dollars in local property tax revenue. Coordinates are the Russell city centroid and are approximate — the mapped Ashland Works footprint extends east into Boyd County, roughly 3 km from this pin. Separate from, and roughly twice the size of, the TeraWulf Muskie campus at EastPark in the same corner of the state, tracked separately as of September 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data centers need massive power. They're eyeing Kentucky's idle industrial sites to get it. (AK Steel mill, Boyd and Greenup counties, 2 GW, Spain-based developer)","publisher":"Hoptown Chronicle / Kentucky Lantern","retrievedAt":"2026-09-15","url":"https://hoptownchronicle.org/data-centers-need-massive-power-theyre-eyeing-kentuckys-idle-industrial-sites-to-get-it"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/rubix-ashland-works-russell-greenup-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Severn","confidence":"medium","id":"compute_atlas-687d26087d10529c","lat":39.1328,"location_precision":"approximate","lon":-76.694,"name":"Sandy Farms Data Center (Severn)","operator":"GI Partners (owner; single unnamed tenant)","source_notes":"The Banner describes an existing 109,455 sq ft 'Sandy Farms Data Center' south of BWI in Severn, whose expansion is exempt from Anne Arundel's moratorium. A sale record gives the address, a 2023 build year and 49.61 acres, and lists a Dec. 2025 sale from Harrison Street to GI Partners. The tenant is unnamed; the sale listing titles it 'Amazon Data Center', but that is unconfirmed. Treating the Banner's facility and GI Partners' Severn acquisition as one site relies on the sale record. The pin is the Severn CDP point (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"GI Partners Acquires Two Baltimore-Area Data Centers","publisher":"GI Partners","retrievedAt":"2026-10-22","url":"https://www.gipartners.com/news/gi-partners-acquires-two-baltimore-area-data-centers"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/gi-partners-sandy-farms-severn-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Piedmont","confidence":"medium","id":"compute_atlas-6882fe345e72be67","lat":35.74394,"location_precision":"approximate","lon":-97.81183,"name":"Beltline Energy Piedmont Site","operator":"Beltline Energy","source_notes":"321-acre rezoning filed via BLE Holdings LLC / BLE Landholdings LLC, SW/4 of Section 26, Township 15N, Range 6W, Kingfisher County — legal descriptions and Kingfisher County parcel numbers 0000-26-15N-06W-3-000-00, -3-001-00, -3-002-00, -3-003-00 (plus an adjacent 5th parcel, -4-000-00) per the city's own PUD filing. Bounded by E 870 Rd (N), N 2920 Rd (E), Azalea St NW (S), N 2910 Rd (W). The Planning Commission deferred the vote on June 1, 2026, and in early October 2026 sent the master design plan to the City Council without approving it; no final decision was found as of October 2026. This is a distinct, separate, competing site from Cloverleaf's 630-acre 'Project Open Sky' proposal also in Piedmont (different parcels, different developer, different acreage) — despite sharing a host city, do not conflate the two (both independently confirmed as separate projects via direct source verification). As of July 2026, no primary-sourced capacity or investment figure was found for this specific site — omitted rather than guessed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Data Center Transparency Portal","publisher":"City of Piedmont, OK","retrievedAt":"2026-07-11","url":"http://www.piedmont-ok.gov/323/Data-Center-Transparency-Portal"},{"kind":"press","label":"Commission urges council to deny Cloverleaf plan; Beltline Energy vote delayed for review","publisher":"OKCFOX","retrievedAt":"2026-09-14","url":"https://okcfox.com/news/local/commission-urges-council-to-deny-cloverleaf-plan-beltline-energy-vote-delayed-for-review"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/beltline-piedmont-kingfisher-county-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Goldendale","confidence":"medium","id":"compute_atlas-68c728d28c0b4526","lat":45.8213,"location_precision":"approximate","lon":-120.8217,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-infrastructure-goldendale-data-center-wa","value":958.0}],"name":"STACK Infrastructure Goldendale Data Center","operator":"STACK Infrastructure","source_notes":"Identified via a 2022 Puget Sound Energy interconnection filing describing a 958MW STACK data center in 'study phase,' sited on a portion of a 700-acre former aluminum smelter (ex-Lockheed Martin) near the John Day Dam. STACK has not publicly confirmed its involvement.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stack-infrastructure-goldendale-data-center-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-692ddfefb6ab00da","lat":39.4572167,"location_precision":"approximate","lon":-119.5157991,"name":"Google  Data Center","operator":"Google","source_notes":"Built in 2021 in the Tahoe Reno Industrial Center area; Google began powering the campus with geothermal energy in 2023. Google reports more than $6 billion invested in Nevada since this campus was built. Google publishes no street address — the coordinate is the Storey County centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Google Data Centers — Storey County, Nevada","publisher":"Google","retrievedAt":"2026-08-08","url":"https://datacenters.google/locations/storey-county-nevada/"},{"kind":"other","label":"Storey County, Nevada — Google Data Center Location","publisher":"Google","retrievedAt":"2026-08-14","url":"https://datacenters.google/locations/storey-county-nevada/"},{"kind":"press","label":"Google Plans to Invest in Nevada This Year","publisher":"Nevada Governor's Office of Economic Development","retrievedAt":"2026-08-14","url":"https://goed.nv.gov/newsroom/google-plans-to-invest-in-nevada-this-year/"}],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/google-storey-county-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"likely","city":"Social Circle","confidence":"medium","id":"compute_atlas-696e9126fc37a970","lat":33.6551,"location_precision":"approximate","lon":-83.7182,"name":"Meta Newton Data Center (Stanton Springs)","operator":"Meta Platforms","source_notes":"970,000 sq ft as described by Meta. As of August 2026, the only source is operator-primary, so the record is marked reported rather than confirmed; the campus has since been reported as expanded, but no expansion figure is asserted here.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/meta-stanton-springs-newton-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"likely","city":"Kenosha","confidence":"medium","id":"compute_atlas-6996e5f6a32941ae","lat":42.537,"location_precision":"approximate","lon":-87.89,"name":"Microsoft Kenosha Data Center Campus","operator":"Microsoft","source_notes":"Coordinates approximate for NW quadrant of I-94/Hwy 142 intersection, Kenosha County. Land was already properly zoned for data center operations per DCD; Navix Engineering filed November 2024 permit application for four-building campus. Site is 6 miles south of Microsoft's Mount Pleasant facility; part of Microsoft's broader Wisconsin investment commitment. No building permit issued as of Jan 2025.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft acquires 240 acres in Kenosha, Wisconsin, for data center development","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-acquires-240-acres-in-kenosha-wisconsin-for-data-center-development/"},{"kind":"press","label":"Microsoft Plans Kenosha, Wisconsin, Data Center Operations","publisher":"Area Development","retrievedAt":"2026-07-06","url":"https://www.areadevelopment.com/newsItems/2-1-2025/microsoft-kenosha-wisconsin.shtml"},{"kind":"press","label":"Area Development — Microsoft Plans Kenosha, Wisconsin, Data Center Operations","retrievedAt":"2026-07-25","url":"https://www.areadevelopment.com/newsitems/2-1-2025/microsoft-kenosha-wisconsin.shtml"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-kenosha-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-69f13346f4548dbb","lat":40.2,"location_precision":"approximate","lon":-112.93,"name":"CyrusOne Dugway Proving Ground Data Center","operator":"CyrusOne","source_notes":"Conditionally selected, currently in exclusive negotiations with the US Army (not finalized); expected completion ~2029. Would be CyrusOne's first Utah facility, developed in partnership with Carlyle. Framed as AI-driven Army infrastructure ('AI is a strategic asset... force multiplier' per the Army Secretary) rather than marketed as a standalone AI-brand product. Coordinates are approximate. In exclusive negotiations with the US Army as of the cited source. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. — structural, not merely unresearched: Dugway Proving Ground is U.S. Army-owned federal land in unincorporated Tooele County, which sits outside any county/municipal property-tax roll, so a Title 17C Community Reinvestment Agency increment or abatement is not possible here regardless of county policy. Any public-sector instrument would be a federal Army real-estate arrangement, not a local or state subsidy, and the site remains in exclusive negotiations, not a finalized agreement. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Army reaches conditional agreement with private industry for hyperscaled data centers","publisher":"Army.mil","retrievedAt":"2026-07-09","url":"https://www.army.mil/article/291360/army_reaches_conditional_agreement_with_private_industry_for_hyperscaled_data_centers"},{"kind":"press","label":"US Army taps Carlyle and CyrusOne to develop data centers on Army-owned land","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/us-army-taps-carlyle-and-cyrusone-to-develop-data-centers-on-army-owned-land/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/cyrusone-dugway-proving-ground-tooele-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Stowe","confidence":"medium","id":"compute_atlas-6a834cea68422529","lat":44.459088647285,"location_precision":"approximate","lon":-72.693229676105,"name":"Power Shift Stowe Server Co-location (571 South Main Street)","operator":"Power Shift","source_notes":"A small, locally focused hosting and co-location operation run from Power Shift's offices in Stowe's lower village. The operator does not publish capacity, so none is recorded. The coordinates come from a third-party tracker geocode and are approximate. This is not an AI facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Power Shift – Business Services (shared and co-located server hosting; 571 South Main Street, Stowe, VT 05672)","publisher":"Power Shift","retrievedAt":"2026-10-29","url":"https://www.pshift.com/business"},{"kind":"other","label":"Power Shift StoweVT Data Center – Data Center Tracker listing (Operating, Lamoille County)","publisher":"More Than Just Parks","retrievedAt":"2026-10-29","url":"https://morethanjustparks.com/data-center-tracker/power-shift-stowevt-data-center-vt--c84d8caf-7a0f-4c4c-a458-1c6cc47de14c"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/power-shift-stowe-vt"}],"state":"Vermont","status":"operating"},{"ai_classification":"likely","city":"Chester","confidence":"high","id":"compute_atlas-6adb0ff32e97d7a3","lat":37.3554,"location_precision":"approximate","lon":-77.4416,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-chirisa-chester-va","value":120.0}],"name":"Chirisa Technology Park — Richmond (Chester)","operator":"PowerHouse Data Centers","source_notes":"Chester, Chesterfield County — first phase of a Blue Owl / Chirisa / PowerHouse JV: initial 50 MW (2025) → 120 MW facility, with a ~1 GW eventual plan. $600M construction loan closed. Distinct parcel from Google's Midlothian (Chesterfield) campus. Coordinates are the Chester area centroid. The $600M is a construction loan (financing) and the $5B is the multi-site JV total - neither is this campus's capex -> no investment figure is recorded. 800-1,200 jobs projected over 5-7 years spanning construction and operations -> no job count is recorded. Virginia law bars per-company data-center subsidy disclosure -> no subsidy is recorded. Joint venture with Chirisa Technology Parks and Blue Owl Real Estate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/powerhouse-chirisa-chester-va"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-drive-hyperscale-chesterfield-va-pg"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-6b20409f21dcd668","lat":40.122997,"location_precision":"exact","lon":-82.746475,"name":"Karis Critical Smart Farms Data Center Campus (New Albany)","operator":"Karis Critical (owner of record Karis Critical CMH Smart LLC)","source_notes":"Karis is a land/infrastructure developer that does not operate facilities, so the eventual operator is unknown. Third-party listings suggest an end user, but that is unconfirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Nearby Data Centers: Karis Critical 'Smart Farms' campus, eight buildings ~1.6M sq ft, Ohio EPA wetland fill request (Jan 2026)","publisher":"Nearby Data Centers","retrievedAt":"2026-10-14","url":"https://nearbydatacenters.org/projects/oh-new-albany-karis-smart-farms/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/karis-critical-smart-farms-new-albany-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Dayton","confidence":"medium","id":"compute_atlas-6b3e8415d947b576","lat":39.7602255,"location_precision":"approximate","lon":-84.1953733,"name":"DataYard Dayton Data Center","operator":"DataYard","source_notes":"Locally-owned downtown Dayton colocation provider, self-described as operating a Dayton data center continuously since 1995 (current facility is their 'fourth iteration'). Address confirmed on DataYard's own site; no MW/sq ft publicly disclosed, so capacity is omitted. Coordinates approximate. Included for Montgomery County coverage.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"DataYard official contact page: 130 W Second St, Suite 250, Dayton, OH 45402","publisher":"DataYard","retrievedAt":"2026-08-05","url":"https://www.datayard.us/contact/"},{"kind":"other","label":"DataYard colocation page: downtown Dayton facility operating since 1995 (current is 'fourth iteration')","publisher":"DataYard","retrievedAt":"2026-09-21","url":"https://www.datayard.us/data-center-co-location/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/datayard-dayton-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"confirmed","city":"Ridgeland","confidence":"medium","id":"compute_atlas-6b68406aee49ce1a","lat":32.4282,"location_precision":"approximate","lon":-90.132,"name":"Prado AI / PraCon Global AI Industrial Campus","operator":"PraCon Global Investment Group","source_notes":"Speculative; the record is marked rumored. A proposed AI/semiconductor industrial campus with its own private power plant, before the Mississippi PSC. The developer refused to state capacity MW, investment, acreage, site parcel or timeline, so none is recorded. Prado told Mississippi Today he declined to give the PSC more detail because 'making that information available to the utility companies would take away the project's competitive advantage,' and Prado AI 'is still working on securing all the funding it would need for a project of this size'; the only figure attached to it is Prado's stated long-term goal of 'over $25 billion', which is an aspiration, not an announced investment, and is therefore not recorded as an investment figure. Location: the March PSC filing named Ridgeland, but Prado has since said only 'the Jackson metro area' and declined to say where. The coordinates are a Ridgeland city geocode from the filing and the pin is approximate. The Mississippi Today article is cited via a Wayback snapshot. The project is docketed at the PSC and formally opposed by both of the state's major utilities, which is more than a press rumour. A separate facility, Traceview Advanced Power Station, is also in Ridgeland and is unrelated.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Mississippi developer plans to move forward with data center plans, even as state declines to give ruling (Wayback snapshot 2026-08-19)","publisher":"Mississippi Today","retrievedAt":"2026-09-09","url":"https://web.archive.org/web/20260819033622/https://mississippitoday.org/2026/06/01/mississippi-ddata-center-plans/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/prado-ai-jackson-metro-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Mapleton","confidence":"medium","id":"compute_atlas-6b8cc7c6c72c847d","lat":46.8919,"location_precision":"approximate","lon":-97.0498,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://kfgo.com/2026/09/30/2nd-fargo-area-data-center-would-use-double-the-power-of-harwood-site/","value":540.0}],"name":"Harmony Energy Park (Geronimo Power data center)","operator":"Geronimo Power","source_notes":"Proposed powered data park in Section 15 of Harmony Township, about seven miles northeast of Casselton and north of Mapleton, near the Bison Substation (off 32nd St SE and 160th Ave SE). It would have two main buildings set at least a mile from any home on a ~640-acre footprint, about 80% of which is expected to stay green space. Construction would take two to four years. No end user is named. Coordinates are the Mapleton town point (approximate). Geronimo also holds a land option in neighboring Durbin Township; it is not recorded separately because no project there has been filed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"2nd Fargo-area data center would use double the power of Harwood site (North Dakota Monitor via KFGO)","publisher":"KFGO / North Dakota Monitor","retrievedAt":"2026-10-26","url":"https://kfgo.com/2026/09/30/2nd-fargo-area-data-center-would-use-double-the-power-of-harwood-site/"},{"kind":"press","label":"Minnkota plans gas-fired power plant in Cass County, adding to energy development","publisher":"Valley News Live","retrievedAt":"2026-10-26","url":"https://www.valleynewslive.com/2026/10/07/minnkota-plans-gas-fired-power-plant-cass-county-adding-energy-development/"},{"kind":"press","label":"Cass County residents learn more about proposed Harmony Energy Park data center","publisher":"Valley News Live","retrievedAt":"2026-10-26","url":"https://www.valleynewslive.com/2026/10/14/cass-county-residents-learn-more-about-proposed-harmony-energy-park-data-center/"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/geronimo-harmony-energy-park-cass-county-nd"}],"state":"North Dakota","status":"planned"},{"ai_classification":"unknown","city":"Waukee","confidence":"medium","id":"compute_atlas-6ba0f027d9754c36","lat":41.6118485,"location_precision":"approximate","lon":-93.8845129,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-ia01-waukee-ia","value":2.0}],"name":"US Signal IA01 Des Moines Data Center (Waukee)","operator":"US Signal","source_notes":"Tier 3 colocation facility opened in 2009. Operator lists 5,000 kVA of utility feeds, 2,000 kW of UPS at 2N redundancy, 3,000 kW of generation at N+1 and 550 tons of HVAC at N+1. As of October 2026 the operator's page also gives a critical IT load of 2,000 kW, which is recorded as the operational capacity; the generator, UPS and utility figures are electrical-plant ratings. Built and operated by OneNeck IT Solutions (then a Telephone and Data Systems company); US Signal acquired OneNeck's data centers in 2024, so the current operator is US Signal, not OneNeck. The street address is documented but the coordinate is a city-level approximation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"US Signal to Acquire OneNeck, Expanding Nationwide Data Center Footprint","publisher":"US Signal","retrievedAt":"2026-09-04","url":"https://ussignal.com/press-releases/us-signal-to-acquire-oneneck-expanding-nationwide-data-center-footprint-it-infrastructure-network/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-ia01-waukee-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Maiden","confidence":"medium","id":"compute_atlas-6bacf68d43513401","lat":35.5845,"location_precision":"approximate","lon":-81.2255,"name":"Microsoft Maiden Data Center","operator":"Microsoft","source_notes":"Distinct site from the Apple Maiden campus already tracked (different operator, different parcel north of W. Maiden Rd.). No per-site capacity or investment disclosed; the $1B figure is Microsoft's county-wide 10-year commitment.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Joint statement on Microsoft data center development in Catawba County","publisher":"Catawba County, NC","retrievedAt":"2026-08-15","url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/microsoft-maiden-catawba-county-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-6c0ffe3e2450daa0","lat":32.42,"location_precision":"approximate","lon":-97.78,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/fort-spunky-pacifico-energy-hood-county-tx","value":100.0}],"name":"Fort Spunky","operator":"Pacifico Energy","source_notes":"862 acres, across the Brazos River from the Pecan Plantation community. Water draw up to 20,000 gal/day. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"KBTX: Eight data centers threaten to transform this small Texas county (Fort Spunky name, 862 acres, 100MW grid request, water-permit lawsuit)","retrievedAt":"2026-07-24","url":"https://www.kbtx.com/2026/06/02/eight-data-centers-threaten-transform-this-small-texas-county-local-officials-say-they-have-no-power-stop-them/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/fort-spunky-pacifico-energy-hood-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","contains_osm":true,"id":"compute_atlas-6c53c7f8abf178ba","lat":39.1009164,"location_precision":"exact","lon":-94.5812414,"name":"Netrality 1102 Grand (Kansas City)","operator":"Netrality Data Centers","source_notes":"Multi-tenant carrier hotel ('Missouri Carrier Hotel') in the Bryant Building. The operator claims 120+ on-net network providers (counts vary on the page: 120+, 121+, 140+). The page lists '110,000k Sq. Ft.', likely meaning 110,000 sq ft. No MW stated on the operator page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Kansas City, Missouri Data Center 1102 Grand","publisher":"Netrality","retrievedAt":"2026-10-13","url":"https://netrality.com/data-center/1102-grand-kansas-city/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/netrality-1102-grand-kansas-city-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"confirmed","city":"Eagle Mountain","confidence":"medium","id":"compute_atlas-6cb5b1a66b534329","lat":40.3155,"location_precision":"approximate","lon":-111.9847,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ut","value":200.0}],"name":"QTS Eagle Mountain Data Center Campus","operator":"QTS Data Centers","source_notes":"Groundbreaking was October 2025; the third of three initial buildings topped out (structural completion) on 2026-04-20. Not yet operational; no delivery date confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"QTS begins construction on new datacenter campus in Eagle Mountain — Eagle Mountain City","publisher":"Eagle Mountain City","retrievedAt":"2026-07-05","url":"https://eaglemountain.gov/qts-begins-construction-on-new-datacenter-campus-in-eagle-mountain/"},{"kind":"press","label":"Eagle Mountain 193-acre data center campus set to be done this year — Utah News Dispatch","publisher":"Utah News Dispatch","retrievedAt":"2026-07-05","url":"https://utahnewsdispatch.com/2026/04/17/eagle-mountain-193-acre-data-center-campus-is-set-to-be-done-this-year-with-big-water-promises/"},{"kind":"press","label":"Questions grow over water use at massive QTS Data Center in Eagle Mountain — KUTV","publisher":"KUTV (CBS Utah)","retrievedAt":"2026-07-06","url":"https://kutv.com/news/utah-water/questions-grow-over-water-use-at-massive-qts-data-center-in-eagle-mountain"},{"kind":"press","label":"To power Utah's data center boom, companies are turning to fossil fuels — Grist","publisher":"Grist","retrievedAt":"2026-08-16","url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/"},{"kind":"press","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","retrievedAt":"2026-10-13","url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ut"}],"state":"Utah","status":"under construction"},{"ai_classification":"confirmed","city":"Lithia Springs","confidence":"medium","id":"compute_atlas-6cf8bf6ca8aef13c","lat":33.7882,"location_precision":"approximate","lon":-84.6608,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dc-blox-atlanta-west-ga","value":120.0}],"name":"DC BLOX Atlanta West (ATL1)","operator":"DC BLOX","source_notes":"Initial 120 MW phase (Building A); site plan includes additional 80 MW Building B (delivery early 2028) and 80 MW Building C (early 2029) totaling 200+ MW. The investment figure reflects green loan construction financing announced August 11, 2025. Located adjacent to Microsoft Douglasville campus, 2.5 miles from Google facility. Coordinates are Lithia Springs area centroid. The original DCD source URL was no longer available as of July 2026 and was replaced with the DC BLOX official press release, which supports all claims. The $98M Douglasville abatement was granted for the campus in the Riverside West Business Park (New River Road); city/authority filings cite 25 permanent jobs (~$130k average) and up to 500 construction jobs over five years — projections, not confirmed headcounts.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/dc-blox-atlanta-west-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-6d2ae54da48211ae","lat":37.3757986,"location_precision":"exact","lon":-121.9551844,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/csquare-sfo4-ca","value":43.1}],"name":"Csquare SFO4","operator":"Csquare","source_notes":"Csquare's own directory confirms SFO4 as an operational facility at 1500 Space Park Drive, Santa Clara, CA 95054.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/209073658","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/209073658"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/csquare-sfo4-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1344376231"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/csquare-sfo4-osmway-1344376231"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073658"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344376231"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Kearneysville","confidence":"medium","contains_osm":true,"id":"compute_atlas-6d78fb7abe0591ea","lat":39.3953774,"location_precision":"approximate","lon":-77.9139105,"name":"U.S. Coast Guard Operations Systems Center","operator":"U.S. Coast Guard","source_notes":"Per a 2019 senator's release, this is where all U.S. Coast Guard IT systems and computer servers are housed and maintained. The 2014 building cost about $13M and then housed 292 employees. The 2014 building was described as being in the Burr Business Park; the pin is the OSM point for the OSC on Coast Guard Drive. No power or capacity figures are published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sen. Capito, U.S. Coast Guard commandant visit Panhandle (Operations Systems Center houses all USCG IT systems and servers)","publisher":"Office of U.S. Sen. Shelley Moore Capito","retrievedAt":"2026-10-11","url":"https://www.capito.senate.gov/news/in-the-news/sen-capito-us-coast-guard-commandant-visit-panhandle"}],"updated":"2026-10-11","url":"https://www.compute-atlas.com/facilities/uscg-operations-systems-center-kearneysville-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Eloy","confidence":"medium","id":"compute_atlas-6d9ae55013a57354","lat":32.7783292,"location_precision":"approximate","lon":-111.6023,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/","value":400.0}],"name":"Southwest Crossing Data Park","operator":"Ryan Companies US, Inc.","source_notes":"122 acres at the southeast corner of Houser and Estrella roads east of Interstate 10; three buildings totalling more than 855,000 sq ft at 400 MW. The $687.5M figure is stated as construction cost for this site specifically. Coordinate derived from the OSM geometries of Houser Road and Estrella Road.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Ryan Companies 2MSF Industrial Plan Pivots to $687M Data Center","publisher":"AZBEX","retrievedAt":"2026-09-23","url":"https://azbex.com/planning-development/ryan-companies-2msf-industrial-plan-pivots-to-687m-data-center/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/ryan-companies-southwest-crossing-data-park-eloy-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Sheridan","confidence":"medium","id":"compute_atlas-6daa0b4803ee2628","lat":34.3100971,"location_precision":"approximate","lon":-92.4013484,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://arktimes.com/arkansas-blog/2026/07/21/worldwide-company-has-eye-on-data-center-plan-for-grant-county","value":800.0}],"name":"Sheridan Data Center (Clean Cloud Energy, Grant County)","operator":"Clean Cloud Energy (Sheridan Data Center LLC)","source_notes":"753-acre site outside Sheridan. Estimated cost is $8-12B (range only, so no investment figure is recorded). EdgeConneX is in due diligence as a potential buyer. Coordinates are the Sheridan town centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Worldwide company has eye on data center plan for Grant County","publisher":"Arkansas Times","retrievedAt":"2026-10-18","url":"https://arktimes.com/arkansas-blog/2026/07/21/worldwide-company-has-eye-on-data-center-plan-for-grant-county"},{"kind":"press","label":"Same developer, same playbook? Clean Cloud's track record in three states","publisher":"Mahomet Daily","retrievedAt":"2026-10-18","url":"https://mahometdaily.com/same-developer-same-playbook-clean-clouds-track-record-in-three-states/"},{"kind":"press","label":"Word gets out about second Grant County data center - despite NDAs","publisher":"Arkansas Times","retrievedAt":"2026-10-18","url":"https://arktimes.com/arkansas-blog/2026/10/16/word-gets-out-about-second-grant-county-data-center-despite-ndas"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/clean-cloud-energy-sheridan-data-center-grant-county-ar"}],"state":"Arkansas","status":"planned"},{"ai_classification":"mixed_use","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-6dcf42baac6306ed","lat":35.4676,"location_precision":"approximate","lon":-97.5164,"name":"TierPoint Oklahoma City (OKC / OKC2)","operator":"TierPoint","source_notes":"Recorded as one campus record: TierPoint lists OKC (4121 Perimeter Center Place) and OKC2 (4114 Perimeter Center Place) as two facilities across the street from each other. Distinct from the tracked TierPoint Tulsa - Archer record. Coordinates are an Oklahoma City centroid approximation.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/tierpoint-oklahoma-city-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Fort Lauderdale","confidence":"high","contains_osm":true,"id":"compute_atlas-6dda7638714adf67","lat":26.1900857,"location_precision":"exact","lon":-80.1932967,"name":"Flexential Fort Lauderdale (FLL01/02)","operator":"Flexential","source_notes":"5301 NW 33rd Ave, 64,164 sqft, hurricane-resistant facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential facility directory","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/fl/fort-lauderdale/data-center"},{"kind":"osm","label":"OpenStreetMap way/741629998","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/741629998"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-fort-lauderdale-fll01-02-fl"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/741629998"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-fort-lauderdale-osmway-741629998"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/741629998"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"medium","contains_osm":true,"id":"compute_atlas-6e530568f589e903","lat":38.7897826,"location_precision":"approximate","lon":-104.7932145,"name":"Project Primestone (Vineyards Research Park) GPU Test Facility","operator":"Broadstone Net Lease (developer/owner); operations partner Emergent Data Centers; tenant undisclosed","source_notes":"Two 110,000 sq ft buildings for GPU burn-in, benchmarking and reliability testing for an unnamed 'Fortune 20' technology tenant. The developer's project statement says it is 'not a data center' because it does not sell compute. It is tracked here as a GPU compute facility. The Pikes Peak Bulletin reports a 100 MW initial building with an option to reach 200 MW, but The Gazette attributes the 100 MW figure to T5's 2013 plans, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"High-tech graphics card testing facility eyeing former golf course, vineyard for $303M development","publisher":"The Gazette (Colorado Springs)","retrievedAt":"2026-10-19","url":"https://gazette.com/2026/08/10/high-tech-graphics-card-testing-facility-eyeing-former-golf-course-vineyard-for-303m-development/"},{"kind":"press","label":"Project Primestone isn't a data center – it will just look and feel like one","publisher":"Pikes Peak Bulletin","retrievedAt":"2026-10-19","url":"https://pikespeakbulletin.org/news/project-primestone-isnt-a-data-center/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/broadstone-project-primestone-colorado-springs-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"compute_atlas-6e87e9c355185067","lat":41.8639696,"location_precision":"approximate","lon":-87.6749686,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://medp.io/projects/","value":53.0}],"name":"Metro Edge IMD1","operator":"Metro Edge Development Partners","source_notes":"Operator's current project page states \"4 story, 174,900 SF\" and \"53 MW in total power from ComEd, 28 MW initial phase\"; the 2022 announcement described a 21MW five-storey building, so the design grew. Status is the weakest link here — neither operator page states a live date, and confidence is set to reported accordingly. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Metro Edge Development Partners Secures Land in Chicago for 21MW Data Center","publisher":"Metro Edge Development Partners","retrievedAt":"2026-08-31","url":"https://medp.io/news/metro-edge-development-partners-secures-land-in-chicago-for-21mw-data-center"},{"kind":"other","label":"Metro Edge projects — IMD1 data center","publisher":"Metro Edge Development Partners","retrievedAt":"2026-08-31","url":"https://medp.io/projects/"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (MEDP Mission Critical Facility, LLC dba Metro Edge, Chicago, 2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/metro-edge-imd1-chicago-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"likely","city":"Hallam","confidence":"medium","id":"compute_atlas-6e94263026d0f566","lat":40.545,"location_precision":"approximate","lon":-96.7992,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/sagebrush-hallam-hyperscale-campus-lancaster-ne","value":1700.0}],"name":"Sagebrush Hallam Hyperscale Campus (proposed)","operator":"Sagebrush Infrastructure Partners","source_notes":"Land assemblage only — memorandums of purchase agreement with 13 landowners along Southwest 58th Street just west of Hallam, giving exclusivity windows of roughly six months to four years. Sagebrush Infrastructure Partners LLC was acquired by Tel Aviv-based Stark Power in June 2026 as part of a reported 5.6 GW US development pipeline; the Hallam site is one of five planned hyperscale campuses targeting MISO and SPP territory. Coordinates are an approximation of the reported SW 58th Street assemblage west of Hallam; no parcel map has been published. Distinct from the separate 35 MW Monolith/Crusoe proposal inside the Village of Hallam's zoning jurisdiction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Hallam landowners face stark choice on data center","publisher":"Nebraska Public Media","retrievedAt":"2026-09-04","url":"https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/sagebrush-hallam-hyperscale-campus-lancaster-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"likely","city":"San Jose","confidence":"medium","id":"compute_atlas-6e9d9d747fff7588","lat":37.25,"location_precision":"approximate","lon":-121.79,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://sfyimby.com/2026/07/large-data-center-proposed-to-fill-vacant-site-at-5977-silver-creek-valley-road-in-san-jose.html","value":99.0}],"name":"Prologis Silver Creek Valley Road Data Center","operator":"Prologis","source_notes":"5977 Silver Creek Valley Road, South San Jose. Three-story facility, 516,000 sq ft. Permit filed July 2026; ~2-year buildout once approved. Prologis states it will self-fund substation/transmission costs. Distinct from Prologis's already-tracked Project Sail, Project Cardinal, and Project Mila entries. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prologis files to build 99MW data center in San Jose, California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/prologis-files-to-build-99mw-data-center-in-san-jose-california/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Large data center proposed to fill vacant site at 5977 Silver Creek Valley Road in San Jose","publisher":"San Francisco YIMBY","retrievedAt":"2026-09-14","url":"https://sfyimby.com/2026/07/large-data-center-proposed-to-fill-vacant-site-at-5977-silver-creek-valley-road-in-san-jose.html"},{"kind":"press","label":"'Full-on Backlash' Against Data Centers Occurring as San José Courts Them","publisher":"KQED","retrievedAt":"2026-09-29","url":"https://www.kqed.org/news/12099195/full-on-backlash-against-data-centers-occurring-as-san-jose-courts-them"},{"kind":"permit","label":"City of San José – Data Center and Large Energy-Use Projects (SP26-016), archived 2026-08-13","publisher":"City of San José","retrievedAt":"2026-10-19","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/prologis-silver-creek-valley-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Farmington","confidence":"medium","id":"compute_atlas-6ecd879f8ce927f3","lat":44.606,"location_precision":"approximate","lon":-93.152,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-farmington-technology-park-mn","value":708.0}],"name":"Farmington Technology Park (Tract)","operator":"Tract","source_notes":"Denver-based land developer Tract's speculative hyperscale campus at the former Fountain Valley Golf Club (2830 220th St W) plus adjacent Farmington school-district land, Dakota County. Final plat/PUD unanimously approved by Planning Commission Nov 12, 2024; City Council approved final plat/PUD Nov 18, 2024 and a development contract Dec 2, 2024. Tract closed on the golf-course land purchase Feb 10, 2026 ($18M, per a Tract exec, injecting ~$3,000/student into the school district). City Council split the Technology Park into two phases in April 2026; recording deadline for the final plat extended to May 18, 2026. As of August 2026, no source found discloses the end user — Tract builds speculative 'powered shell' campuses for undisclosed hyperscale tenants, so the listed operator is the developer, not a confirmed end user. Two lawsuits pending (Castle Rock Township + Farmington residents) over water use, noise, and setbacks; judge denied the city's motion to dismiss in November 2025/2026. Facility scope: up to 12 buildings, 2.5M+ sq ft, plus 2 admin buildings. Coordinates are an approximate estimate for 220th St W south of downtown Farmington — not geocoded. Operating entities: MNLCO Farmington LLC / MNLCO Farmington Two LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tract speaks about updated Farmington Technology Park","publisher":"Sun Thisweek / Dakota County Tribune (hometownsource.com)","retrievedAt":"2026-08-08","url":"https://www.hometownsource.com/sun_thisweek/community/dakota_county/tract-speaks-about-updated-farmington-technology-park/article_43acd923-b4d8-42ee-a192-b34612835e02.html"},{"kind":"press","label":"Mayor breaks silence on data center, litigation","publisher":"Sun Thisweek / Dakota County Tribune (hometownsource.com)","retrievedAt":"2026-08-08","url":"https://www.hometownsource.com/sun_thisweek/community/dakota_county/mayor-breaks-silence-on-data-center-litigation/article_a768aecf-31bc-4f8c-b81c-8fc1fe7ece22.html"}],"updated":"2026-09-18","url":"https://www.compute-atlas.com/facilities/tract-farmington-technology-park-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-6ee5e5ebbeafa2af","lat":37.247993,"location_precision":"approximate","lon":-121.778138,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prologis-rue-ferrari-san-jose-ca","value":49.0}],"name":"Prologis 5853 Rue Ferrari","operator":"Prologis","source_notes":"Site Development Permit Amendment converting an existing ~300,000 sq ft warehouse (Parcel #678-05-057, City file H21-006/HA21-006-01) into server-ready R&D space, adding backup generators, transformers, and evaporative cooling chillers. Approved Dec 10 2025 via a Mitigated Negative Declaration w/ Addendum (no significant environmental impacts found); Notice of Determination posted Dec 18 2025. No tenant named yet — next steps are leasing, tenant-improvement permits, and utility interconnection before server halls activate. 140 jobs projected (not delivered) — no job count is recorded. Distinct from the Prologis Silver Creek Valley Road Data Center and Prologis STEM Park records, both tracked as of July 2026 — different parcels.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/prologis-rue-ferrari-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"medium","id":"compute_atlas-6efd569ba46eafc2","lat":34.0478871,"location_precision":"approximate","lon":-118.2555541,"name":"CoreSite LA1 (One Wilshire)","operator":"CoreSite","source_notes":"This record represents only CoreSite's leased footprint (35 suites since 2007) inside One Wilshire, a 30-story, 300+-tenant carrier-hotel building built in 1966. The building is owned by GI Partners' TechCore fund (a CalPERS-backed real-estate vehicle), not by CoreSite - GI Partners acquired it for $437.5M in 2013. No capacity (MW) disclosed by CoreSite for its LA1 suites; an aggregator-only ~32MW whole-building figure is not attributed to CoreSite and is omitted, consistent with this dataset's treatment of other multi-tenant carrier hotels (see the NY1/60 Hudson Street record). No AI/HPC-specific marketing found - generic high-density/connectivity language only. Distinct from CoreSite's LA2 (900 N. Alameda Street, a former mail facility). Coordinates are an approximate building geocode, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite LA1 facility spec sheet","publisher":"CoreSite","retrievedAt":"2026-08-02","url":"https://www.coresite.com/spec-sheets/los-angeles-la1-facility-spec-sheet"},{"kind":"press","label":"GI Partners refinances One Wilshire carrier hotel in Los Angeles","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/gi-partners-refinances-one-wilshire-carrier-hotel-in-los-angeles/"}],"updated":"2026-08-02","url":"https://www.compute-atlas.com/facilities/coresite-la1-los-angeles-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Lynnwood","confidence":"low","contains_osm":true,"id":"compute_atlas-6f0d28e069656e10","lat":47.841809,"location_precision":"exact","lon":-122.3016653,"name":"Centersquare Lynnwood SE1","operator":"Centersquare","osm_derived":true,"source_notes":"Single-sourced, hence the record is marked reported. Centersquare is the entity formed when Cyxtera and Evoque merged; the facility has traded under the Evoque and Cyxtera brands, so it may appear elsewhere under those names. No capacity asserted: colocation marketplaces quote figures ranging from 4 MW to 20 MW for this building and none had been read from a primary source as of September 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 396296733 - 'Centersquare Lynnwood SE1', telecom=data_center, operator=Centersquare, ref=SE1, CLLI LYWDWAJG, 17300 Highway 99 Lynnwood 98037","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/396296733"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/centersquare-lynnwood-se1-wa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/396296733"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/centersquare-lynnwood-se1-osmway-396296733"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/396296733"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Knightstown","confidence":"medium","id":"compute_atlas-6f1de4b4a4a621b1","lat":39.822,"location_precision":"approximate","lon":-85.533,"name":"Henry County Technology Park","operator":"Surge Development LLC","source_notes":"Northwest corner of the I-70 / State Road 109 interchange near Knightstown. Phase one is described as an 800,000 sq ft data center with an electrical generation station. No tenant was named. Developers committed to drilling no on-site wells. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Henry County data center approved by last commissioners vote","publisher":"Indiana Public Radio","retrievedAt":"2026-10-16","url":"https://indianapublicradio.org/news/2026/01/henry-county-data-center-approved-at-last-commissioners-vote/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/surge-henry-county-technology-park-knightstown-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Wilmington","confidence":"medium","id":"compute_atlas-705e2178b4f830c6","lat":39.4453393,"location_precision":"approximate","lon":-83.8285375,"name":"Ardent Technologies Wilmington Data Center","operator":"Ardent Technologies","source_notes":"Second Wilmington data center rezoning, bringing the city's total data-center-zoned land to roughly 1,000 acres. Capacity, investment and job figures were not disclosed in the reporting. Distinct from the AWS campus on the city's south side.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/ardent-technologies-wilmington-clinton-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Linthicum Heights","confidence":"high","contains_osm":true,"id":"compute_atlas-706f092015e8818d","lat":39.213455,"location_precision":"exact","lon":-76.682834,"name":"TierPoint Baltimore - BWI","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page; address 813 Pinnacle Drive, Linthicum Heights, MD.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/610845529","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/610845529"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-baltimore-bwi-md"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/610845529"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Vidalia","confidence":"medium","id":"compute_atlas-70704489e5b359f6","lat":31.5654441,"location_precision":"approximate","lon":-91.4259495,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://listenupyall.com/2026/09/22/vidalia-approves-occupational-license-for-proposed-data-center/","value":50.0}],"name":"Vidalia Data Center (former Fruit of the Loom building)","operator":"Fortalis Vidalia, LLC","source_notes":"Fortalis plans to buy the roughly 900,000 sq ft former Fruit of the Loom building and use about one-third of it for data center operations. The initial phase needs about 50 MW from Vidalia's municipal electric system (about 104 MW available against about 22 MW used). The company indicated about 65–70 permanent jobs, which the mayor said are not yet in a written agreement. Coordinates are the town centroid from an OSM geocode; the building's exact point was not sourced.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vidalia Approves Occupational License for Proposed Data Center","publisher":"Listen Up Y'all","retrievedAt":"2026-10-17","url":"https://listenupyall.com/2026/09/22/vidalia-approves-occupational-license-for-proposed-data-center/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/fortalis-vidalia-data-center-concordia-parish-la"}],"state":"Louisiana","status":"planned"},{"ai_classification":"confirmed","city":"Tulsa","confidence":"medium","id":"compute_atlas-70902d380c5bec4a","lat":36.154,"location_precision":"approximate","lon":-95.9928,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/host-digital-northeast-oklahoma-ok","value":43.0}],"name":"Host Digital Northeast Oklahoma Data Center","operator":"Host Digital Infrastructure LLC","source_notes":"Location unconfirmed: both cited sources place the facility only in 'northeast Oklahoma' and do not name a city; the coordinates recorded here are a provisional approximation for the Tulsa metro and are not parcel- or address-confirmed. Lease terms: ~$1.25bn over a 15-year base take-or-pay term, ~$3.2bn if all renewals are exercised, tenant backstopped by a US investment-grade technology company.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/host-digital-northeast-oklahoma-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"mixed_use","city":"Papillion","confidence":"medium","id":"compute_atlas-70983ad4c378b5df","lat":41.11,"location_precision":"approximate","lon":-96.046,"name":"TierPoint Omaha - Midlands Data Center","operator":"TierPoint","source_notes":"Multi-tenant colocation facility at 11425 South 84th Street, Papillion (Sarpy County): 63,000+ total sq ft with 15,000+ sq ft of raised floor, A-side/B-side power distribution and a 100% uptime SLA. It holds LEED Gold and Energy Star certifications alongside SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, and ITAR / Data Privacy Framework registration. Capacity is omitted: the only published power figure is 'two 2.25 MW redundant generators', which is backup nameplate rather than IT load. A distinct site from TierPoint's Bellevue facility roughly 8 miles east, with a separate address, size and certifications. Coordinates are a street-address approximation. The record is marked reported (single source, the operator's own page).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/tierpoint-omaha-midlands-papillion-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"unknown","city":"Des Moines","confidence":"medium","id":"compute_atlas-70b4cdce3bfb3f82","lat":41.5868,"location_precision":"approximate","lon":-93.625,"name":"Cologix DSM1 (Financial Center)","operator":"Cologix","source_notes":"Carrier-hotel / interconnection facility inside the downtown Financial Center building at 666 Walnut Street; Cologix acquired it (and DSM2, see separate record) from Connect Des Moines in June 2024. Cologix owns/operates the space; this is not a colo tenancy. Small (4,000 sq ft) and telecom/peering-focused (26 networks in the Meet-Me-Room, DesMoinesIX exchange) rather than AI-compute-oriented. Cologix's June 2024 acquisition announcement gives 600kW of power for the 4,000 sq ft space and describes an additional 10,000 sq ft of expansion capacity with 1.0 MW of power. These are power figures, not a stated IT capacity, and the announcement does not say how much of the capacity is live, so no operational or planned capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cologix Expands U.S. Footprint with Acquisition of Two Data Centers in Iowa, Including Des Moines Carrier Hotel","publisher":"Cologix","retrievedAt":"2026-08-08","url":"https://cologix.com/news/cologix-expands-footprint-acquisition-two-data-centers-iowa-including-des-moines-carrier-hotel/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cologix-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Philadelphia","confidence":"medium","id":"compute_atlas-70e902a4010cd0da","lat":39.956476,"location_precision":"approximate","lon":-75.196035,"name":"365 Data Centers Philadelphia (University City)","operator":"365 Data Centers","source_notes":"The operator page lists no square footage or MW. 365's other Philadelphia site, at 1500 Spring Garden St (a multi-tenant building), is not included here. The pin is the census geocode of the address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"365 Data Centers: Philadelphia","publisher":"365 Data Centers","retrievedAt":"2026-10-15","url":"https://365datacenters.com/philadelphia/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/365-data-centers-philadelphia-university-city-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Shelbyville","confidence":"medium","id":"compute_atlas-70efc3f7db8e205e","lat":39.5214,"location_precision":"approximate","lon":-85.7769,"name":"Prologis Shelbyville Data Center Campus","operator":"Prologis","source_notes":"Roughly 429 acres near State Road 44 annexed into Shelbyville for a multi-phase development of up to eleven data center buildings, at an estimated $2 billion investment. No tenant has been identified.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Shelbyville city council advances data center plan","publisher":"FOX59","retrievedAt":"2026-10-16","url":"https://fox59.com/news/shelbyville-city-council-advances-data-center-plan/amp/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/prologis-shelbyville-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Northlake","confidence":"medium","id":"compute_atlas-710ba6a403d34029","lat":41.9196689,"location_precision":"approximate","lon":-87.9129266,"name":"Digital Realty ORD23","operator":"Digital Realty","source_notes":"186,500 sq ft single-story building. The operator's index page prints the address as 3505 North Railroad Avenue while the ORD23 detail page prints 505 North Railroad Avenue; the detail page value is used here and the discrepancy is unresolved.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty ORD23 — 505 North Railroad Avenue, Northlake, IL 60164 (186,500 sq ft)","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord23"},{"kind":"other","label":"Digital Realty Chicago metro data center index","publisher":"Digital Realty","retrievedAt":"2026-09-25","url":"https://www.digitalrealty.com/data-centers/americas/chicago"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/digital-realty-ord23-northlake-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"compute_atlas-7111a98be2bcd25f","lat":39.008,"location_precision":"approximate","lon":-77.523,"name":"Spring Valley Technology Park","operator":"Active Infrastructure","source_notes":"Application LEGI-2024-0074. Ten data center buildings up to 100 feet tall, three electrical substations and a backup power storage facility on the east side of Evergreen Mills Road south of Watson Road, in Loudoun's Transition Policy Area near Goose Creek. Rezoning sought from Transitional Residential-10 to Industrial Park. Sources give different footprints — Loudoun Now reports 325 acres and 3.25 million sq ft; Loudoun Wildlife Conservancy reports 362 acres and up to 3.5 million sq ft — so no land area is recorded here rather than picking between them. The southern half comprises 13 parcels of the Spring Valley subdivision with existing single-family homes; one parcel holds an 1880s house and a family cemetery.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Spring Valley Technology Park (LEGI-2024-0074)","publisher":"Loudoun Wildlife Conservancy","retrievedAt":"2026-09-09","url":"https://loudounwildlife.org/2026/07/spring-valley-technology-park/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/active-infrastructure-spring-valley-tech-park-loudoun-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-724889252693ced3","lat":40.11064,"location_precision":"exact","lon":-82.74301,"name":"QTS New Albany IV","operator":"QTS Data Centers","source_notes":"Fourth QTS campus in the New Albany International Business Park, on Miller Rd (Licking County) — 5 buildings, ~2.1M sq ft on 161 acres, announced December 2023 alongside the Babbitt Rd (III) site as part of QTS's ~$4.4B New Albany expansion (aggregate across III + IV; no reliable per-site investment split disclosed). Auditor use-class \"Industrial Vacant Land\" (no structure assessed yet) is consistent with a permitted/pre-construction stage. Distinct from QTS New Albany I & II (Beech Rd SW). No site-specific IT-load MW disclosed. QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS Invests $4.4 Billion in New Data Centers (Dec 2023)","publisher":"New Albany Company","retrievedAt":"2026-07-18","url":"https://newalbanybusiness.org/news/2023/12/qts-invests-4-4-billion-in-new-data-centers/"}],"updated":"2026-07-25","url":"https://www.compute-atlas.com/facilities/qts-new-albany-4-licking-county-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"Meridian","confidence":"medium","id":"compute_atlas-727effb505342e1e","lat":32.3644,"location_precision":"approximate","lon":-88.7037,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://mississippi.org/news/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","value":500.0}],"name":"Compass Datacenters Lauderdale County Hyperscale Campus","operator":"Compass Datacenters","source_notes":"Eight-data-center campus over an eight-year buildout at the I-20/59 Industrial Park, Meridian. Groundbreaking Jan 28 2025 (under construction). Mississippi Power to supply ~500 MW via a dedicated substation. Investment omitted: the widely cited $10B is a projected full-occupancy total including future tenants' IT equipment ('an investment of $10 billion, including future tenants' information technology equipment'), not a firm Compass outlay. 'Thousands of jobs' is a projection. The recorded 1,000 construction jobs come from Lauderdale County's July 2026 statement that construction of the campus \"will employ more than 1,000 Mississippi workers\". First confirmed tenant: Corderill LLC ($100M equipment, 20 jobs, April 2026). Coordinates are the Meridian centroid (no parcel coordinates published).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Compass Datacenters Project Generates $10B Investment in Lauderdale County","publisher":"Mississippi Development Authority","retrievedAt":"2026-09-09","url":"https://mississippi.org/news/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/"},{"kind":"filing","label":"Compass Datacenters Project Generates $10B Investment - Governor's Office","publisher":"Office of Governor Tate Reeves","retrievedAt":"2026-07-07","url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/"},{"kind":"press","label":"Compass to develop $10 billion data center campus in Mississippi","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/compass-to-invest-10-billion-in-mississippi-data-center-campus/"},{"kind":"press","label":"Mississippi's Data Center Boom","publisher":"Mississippi Independent","retrievedAt":"2026-07-07","url":"https://msindy.org/p/mississippis-data-center-boom-and"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"COVER STORY: Data Center Boom Comes to Mississippi — Mississippi Power to supply 'about 500 megawatts of power to the site'","publisher":"Site Selection Magazine","retrievedAt":"2026-09-22","url":"https://siteselection.com/cover-story-data-center-boom-comes-to-mississippi/"},{"kind":"press","label":"Compass Datacenters to Invest $10 Billion in Lauderdale County","publisher":"Mississippi Business Journal","retrievedAt":"2026-10-07","url":"https://msbusinessjournal.com/compass-datacenters-to-invest-10-billion-in-lauderdale-county/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/compass-lauderdale-meridian-ms"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Jacksonville","confidence":"medium","contains_osm":true,"id":"compute_atlas-72a6da11fca3f8f9","lat":30.3314298,"location_precision":"exact","lon":-81.6624257,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cologix-jax1-fl","value":0.74}],"name":"Cologix JAX1","operator":"Cologix","source_notes":"11K sqft colocation hub at 421 West Church Street, Jacksonville FL central business district. Distinct from Cologix's other Jacksonville facility JAX2 (4800 Spring Park Road). Confirmed operational via official facility page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Cologix facility directory","publisher":"Cologix","retrievedAt":"2026-10-20","url":"https://cologix.com/data-centers/jacksonville/jax1/"},{"kind":"osm","label":"OpenStreetMap way/497151852","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/497151852"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/cologix-jax1-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Vinita","confidence":"medium","id":"compute_atlas-72cebeda806ac573","lat":36.6408372,"location_precision":"approximate","lon":-95.156363,"name":"CORE Data Center (Vinita)","operator":"Northeast Oklahoma Electric Cooperative","source_notes":"Wholly owned, operated and managed by Northeast Oklahoma Electric Cooperative and co-located at its Vinita headquarters. Houses head-end equipment for BOLT Fiber Optic Services plus colocated business customers, with redundant fiber to multiple providers. Street address is the cooperative's Vinita headquarters, taken from its own contact page; coordinates are the town of Vinita, since the address did not resolve in OSM. Square footage (5,000 sq ft) and the 2014 build year come from the News on 6 inventory and are recorded in the notes rather than as structured capacity.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/noec-core-data-center-vinita-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","contains_osm":true,"id":"compute_atlas-734cb5edec7ef05a","lat":33.7555186,"location_precision":"approximate","lon":-84.3914814,"name":"Digital Realty Atlanta ATL13","operator":"Digital Realty","source_notes":"Address 56 Marietta Street, Atlanta, GA 30303; confirmed operational on operator's own site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/atlanta/atl13"},{"kind":"osm","label":"OpenStreetMap node/8109664813","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/8109664813"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-atlanta-atl13-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Dothan","confidence":"medium","id":"compute_atlas-7387e7b9881a0612","lat":31.2237285,"location_precision":"approximate","lon":-85.3934375,"name":"Construction Partners Corporate Headquarters and Data Processing Center","operator":"Construction Partners, Inc.","source_notes":"Enterprise data-processing facility built as part of the company's own headquarters campus rather than a merchant or colocation data center; it centralises data processing for operations across eight Sunbelt states. The $20 million figure is the whole headquarters investment, not a data-hall-only cost, and no MW, square footage, completion date or site address has been disclosed - the coordinate is the city of Dothan and is marked approximate. Single-source record from the state commerce department's announcement page.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/construction-partners-dothan-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Turkey","confidence":"medium","id":"compute_atlas-745bd0f9e1d25162","lat":34.394,"location_precision":"approximate","lon":-100.8954,"name":"QTS–Lancium Hall County Data Center Campus","operator":"QTS Data Centers / Lancium","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS and Lancium Announce Data Center Campus in Hall County, Texas","publisher":"QTS Data Centers","retrievedAt":"2026-09-08","url":"https://q.com/news/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/"}],"updated":"2026-09-08","url":"https://www.compute-atlas.com/facilities/qts-lancium-hall-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Frederick","confidence":"medium","id":"compute_atlas-7477c9108440deeb","lat":39.347656,"location_precision":"approximate","lon":-77.493847,"name":"Quantum Frederick","operator":"TPG Real Estate Partners / Catellus Development Corporation","source_notes":"This record is the master-planned 2,100-acre park itself (the former Alcoa Eastalco Works site), not a duplicate of any single tenant building. The individual tenant campuses tracked separately in this dataset as of September 2026 -- Aligned Data Centers IAD-04 Frederick and IAD-06 Frederick, and Rowan Digital Infrastructure Frederick Campus (Bauxite I), Bauxite II and Bauxite III -- sit on parcels within this same park, so their acreage overlaps this record's. Original developer Quantum Loophole, Inc. was removed from active management/development of the project in a December 2024 dispute settlement with its financial partner TPG Real Estate; TPG now serves as Manager and its affiliate Catellus Development Corporation as Developer, per Catellus's own statement ('TPG Real Estate and Quantum Loophole, Inc. have resolved their dispute over management and development of the 2,100-acre data center campus... Quantum Loophole will no longer have any active involvement in managing or developing the Project.'). The Frederick County Council separately created a Critical Digital Infrastructure Overlay Zone in January 2026 that expanded the area eligible for data-center development around this site by nearly 1,000 acres, but that is a zoning designation, not confirmed additional owned/developed acreage, so it is not included in the recorded acreage. Catellus's own statement and Quantum Loophole's own statement are both dated 2024-12-23; the settlement included a mutual dismissal of the litigation between TPG and Quantum Loophole. As of 2026-09-13, no further operator or ownership change was found; TPG Real Estate / Catellus Development Corporation remain the manager/developer of record, and no new litigation was found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Statement from TPG Real Estate and Catellus Development Corporation on the Quantum Frederick Project","publisher":"Catellus Development Corporation","retrievedAt":"2026-09-10","url":"https://www.catellus.com/updates/statement-from-tpg-real-estate-and-catellus-development-corporation-on-the-quantum-frederick-project"},{"kind":"press","label":"Quantum Loophole Plans to Develop Data Center Campus in Maryland","publisher":"Maryland Department of Commerce","retrievedAt":"2026-09-10","url":"https://business.maryland.gov/news/quantum-loophole-plans-develop-data-center-campus-maryland/"},{"kind":"other","label":"Quantum Frederick, Frederick County, MD: Maryland Data Center Series, Pt. 3","publisher":"Nature Forward","retrievedAt":"2026-09-10","url":"https://natureforward.org/quantum-frederick-frederick-county-md-maryland-data-center-series-pt-3/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/quantum-frederick-campus-md"}],"state":"Maryland","status":"under construction"},{"ai_classification":"likely","city":"Sand Springs","confidence":"medium","id":"compute_atlas-750d1c677081c8ef","lat":36.256,"location_precision":"approximate","lon":-96.11,"name":"Project Spring (Sand Springs)","operator":"Google","source_notes":"Google is identified as the interested purchaser/end-user by Tulsa Flyer, DCD and Public Radio Tulsa, but as of July 2026 there is no standalone Google announcement for this site (developer White Rose Partners is titleholder) - hence the record is marked reported. County: physical property is in Osage County (per the official project site and Osage News); the annexing City of Sand Springs is primarily Tulsa County, and the annexation lawsuit moved from Osage to Tulsa County court. Capacity: trackers allege 500+ MW but no primary source confirms it - omitted. Google's $9B Oklahoma commitment (Aug 2025) is a statewide figure, not project-specific. Up to 3 data-center buildings + one office building; construction targeted 2027, completion 2029 (developer). Jobs are developer projections and the developer's statements differ: as of October 2026 the project website says up to one thousand temporary construction jobs at peak and cites a Virginia study of approximately 50 full-time employees per building in normal operations, while KGOU reported in June 2026 that a White Rose Partners managing partner said at a February 2026 Osage Minerals Council meeting that the project will create 1,000 full-time jobs, so no jobs figure is recorded. A ~$100M/25yr PILOT was cited by the city manager but no executed agreement is confirmed. Coordinates estimated from the site description (near HWY 97 / Rock School Rd), not verified against a parcel record. As of October 2026, the developer's stated address, 5615 OK-97, could not be matched to the pin, so the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google connected to Sand Springs data center project","publisher":"Tulsa Flyer","retrievedAt":"2026-07-07","url":"https://tulsaflyer.org/2026/01/15/government/post/google-connected-sand-springs-data-center-project/"},{"kind":"press","label":"Sand Springs, Oklahoma, to consider Project Spring data center proposal","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/sand-springs-oklahoma-to-consider-project-spring-data-center-proposal/"},{"kind":"press","label":"Google gets greenlight for data center in Tulsa, Oklahoma","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/google-gets-greenlight-for-data-center-in-tulsa-oklahoma/"},{"kind":"press","label":"Proposed Sand Springs Data Center raises water and sovereignty concerns","publisher":"Osage News","retrievedAt":"2026-07-07","url":"https://osagenews.org/proposed-sand-springs-data-center-raises-water-and-sovereignty-concerns/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-spring-sand-springs-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Centennial","confidence":"medium","contains_osm":true,"id":"compute_atlas-7551cbf22ec63404","lat":39.5812368,"location_precision":"approximate","lon":-104.8426192,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/expedient-centennial-co","value":2.5}],"name":"Expedient Denver (Centennial) Data Center","operator":"Expedient","source_notes":"The street address comes from directory listings and the OSM building record (Building C), not the launch article. The facility was previously associated with Digital Fortress.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Expedient Opens Denver-Area Data Center","publisher":"Built In Colorado","retrievedAt":"2026-10-19","url":"https://www.builtincolorado.com/articles/expedient-opening-denver-data-center-hiring"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/expedient-centennial-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Shreveport","confidence":"medium","id":"compute_atlas-756eb5dfb4c70d08","lat":32.5135356,"location_precision":"approximate","lon":-93.7477839,"name":"Amazon Web Services Shreveport Campus (Resilient Technology Park)","operator":"Amazon Web Services","source_notes":"Third and separately announced Amazon campus in northwest Louisiana, sited at the Resilient Technology Park in west Shreveport. Distinct from the two campuses already under construction in rural Caddo and Bossier parishes. 499 indirect jobs also cited.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon announces $6B data center investment in Shreveport","publisher":"The Hayride","retrievedAt":"2026-08-26","url":"http://thehayride.com/2026/08/amazon-announces-6b-data-center-investment-in-shreveport/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/aws-resilient-technology-park-shreveport-la"}],"state":"Louisiana","status":"planned"},{"ai_classification":"unknown","city":"Tonopah","confidence":"medium","id":"compute_atlas-7575b36e762d1a3d","lat":33.472,"location_precision":"approximate","lon":-112.911,"name":"Wintersburg 313","operator":"313 Wintersburg LLC and Wintersburg Four LLC","source_notes":"Northwest corner of Encanto Boulevard and Wintersburg Road in the Tonopah area. Data center use is established by the zoning conditions themselves, which set data-center-specific loading (1 space per 250,000 sq ft) and parking (1 space per 5,000 sq ft) standards. Conditions also require at least 20 acres preserved for commercial development and an archaeological/historical review filed with the Arizona State Historic Preservation Office before ground disturbance. Total acreage is not stated in the agenda text; recorded status reflects the commission recommendation, not a confirmed Board vote.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/wintersburg-313-tonopah-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Phoenix","confidence":"medium","id":"compute_atlas-757656bba26eee2e","lat":33.4644344,"location_precision":"approximate","lon":-111.994808,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-phoenix-2-az","value":210.0}],"name":"QTS Phoenix 2","operator":"QTS Data Centers","source_notes":"Five-building campus at 1200, 1250, 1400, 1450 and 1500 N 40th Street, Phoenix. The '210 MW+' figure is the campus's stated critical power at full build, recorded as planned rather than operational because the operator does not say how much is energized today. Note that qtsdatacenters.com now redirects to q.com. Coordinates geocoded from 1400 N 40th St via Nominatim.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-phoenix-2-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"mixed_use","city":"La Porte","confidence":"medium","id":"compute_atlas-7591afb00d2ca3d4","lat":41.595,"location_precision":"approximate","lon":-86.735,"name":"Microsoft La Porte Data Center","operator":"Microsoft","source_notes":"Radius Industrial Park, La Porte IN (La Porte County, NW Indiana). Initial plan 245,000 sq ft on 489 acres; expanded to 17 buildings with adjacent rezoning sought. First-phase six data centers plus substation. Microsoft stated 'Community-First AI Infrastructure' principles. Coordinates are approximate Radius Industrial Park area. Announcement date corrected from 2024-09 to 2024-06 per IEDC press release dated June 4, 2024.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Gov. Holcomb announces plans for new $1B Microsoft Data Center in Northwest Indiana","publisher":"City of La Porte, IN","retrievedAt":"2026-07-06","url":"https://cityoflaporte.com/news/gov-holcomb-announces-plans-for-new-1b-microsoft-data-center-in-northwest-indiana"},{"kind":"press","label":"Microsoft expands plans for La Porte, Indiana, data center campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-expands-plans-for-la-porte-indiana-data-center-campus/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-laporte-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Lexington","confidence":"medium","contains_osm":true,"id":"compute_atlas-75c33f593614e74e","lat":38.0747519,"location_precision":"approximate","lon":-84.4876212,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://smileypete.com/business/dartpoints-acquires-lexington-data-center-campus/","value":70.0}],"name":"DartPoints Lexington Data Center Campus","operator":"DartPoints","source_notes":"Acquired in May 2026 for $29 million; roughly 343,000 sq ft of campus including about 81,000 sq ft of existing raised-floor data center space, fully zoned for data center use, with rack densities up to 200 kW planned. DartPoints describes a path to approximately 20–30 MW in an initial phase with longer-term expansion potential to 70 MW — the 70 MW build-out figure is the planned capacity recorded here. As of June 2026 the company was still finalizing a ready-for-service date and no operations date had been announced, so this is recorded as proposed rather than operational; Lexington declined to provide city incentives. Coordinates are a geocode of the street address, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DartPoints Acquires Lexington Data Center Campus for $29 Million","publisher":"Smiley Pete Publishing","retrievedAt":"2026-09-15","url":"https://smileypete.com/business/dartpoints-acquires-lexington-data-center-campus/"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/dartpoints-lexington-fayette-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"compute_atlas-75d8ce9d28db81be","lat":41.145,"location_precision":"approximate","lon":-104.92,"name":"Cox Ranch Data Center","operator":"Skybox Datacenters / ViaWest Group","source_notes":"West of Roundtop Road near Happy Jack Road and the North Range Business Park. The concept plan shows two to three data center buildings, with construction expected to take 5-7 years. The coordinates are approximate, placed from the described location and the Cheyenne LEADS map pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data Center Critics Angry As Cheyenne Council OKs Another Data Center Annexation","publisher":"Cowboy State Daily","retrievedAt":"2026-10-17","url":"https://cowboystatedaily.com/2026/09/29/cheyenne-approves-another-annexation-for-data-center-during-contentious-meeting/"},{"kind":"other","label":"Cheyenne LEADS Data Center Locations map (updated Aug 4, 2026): Planned S. ViaWest/SkyBox - Happy Jack","publisher":"Cheyenne LEADS","retrievedAt":"2026-10-17","url":"https://cheyenneleads.org/wp-content/uploads/2026/08/LC-Data-Centers_8.4.2026.pdf"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/skybox-viawest-cox-ranch-cheyenne-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Indiantown","confidence":"medium","id":"compute_atlas-75fb0e70a23cf45f","lat":27.0400025,"location_precision":"approximate","lon":-80.517281,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/silver-fox-606-indiantown-fl","value":1000.0}],"name":"Silver Fox 606 AI Data Center Campus","operator":"Silver Fox 606 LLC","source_notes":"A roughly 2-million-sq-ft AI data center campus proposed in the Village of Indiantown. The applicant withdrew its master site plan application in April 2026; a revised plan was presented at a public open house in September 2026. Separate from FPL's Tesoro Groves PUD on Kanner Highway, which FPL states is \"a planning framework for future development, not a specific project\" and, as of September 2026, is therefore not tracked here as a facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Indiantown's data center war escalates as developer takes village to court","publisher":"CBS12 (WPEC)","retrievedAt":"2026-10-20","url":"https://cbs12.com/news/local/data-center-developer-sues-indiantown-alleges-village-is-illegally-blocking-25m-project-indiantown-martin-county-data-center-silver-fox-606-llc-data-center-lawsuit-25-million-project-village-of-indiantown-village-council-planning-board-data"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/silver-fox-606-indiantown-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Verona","confidence":"medium","id":"compute_atlas-7604a443a8073c5e","lat":42.98,"location_precision":"approximate","lon":-89.562,"name":"Epic Hosting Verona Data Center","operator":"Epic Hosting, LLC (Epic Systems)","source_notes":"One of only four data centers certified for Wisconsin's qualified-data-center sales and use tax exemption (alongside Microsoft/Mount Pleasant, Degas LLC/Beaver Dam and Oracle America Cloud Services/Port Washington). Certification in a county over 100,000 population requires a plan to invest at least $150 million over five years; that threshold is not recorded as an investment figure because the certified plan amount is not published. The record is listed as permitted because state certification is the only sourced fact; as of September 2026, no source found establishes that the facility is built or operating. No subsidy dollar amount is published. Coordinates are a campus-level locator for Epic's Milky Way address in Verona.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/epic-hosting-verona-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Durant","confidence":"medium","contains_osm":true,"id":"compute_atlas-762f349697022087","lat":33.9740644,"location_precision":"approximate","lon":-96.3991907,"name":"Choctaw Nation Data Center & Emergency Operations Center","operator":"Choctaw Nation of Oklahoma","source_notes":"A 14,500 sq ft dual-purpose tribal data center and Emergency Operations Center on the perimeter of the Choctaw Nation headquarters campus in Durant. It supports all buildings on the campus. It is hardened to withstand 250 mph winds, and backup generators sustain IT and emergency operations for 48 hours. No capacity has been published. The coordinates are OSM's HQ campus point, not the building footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Choctaw Nation Data Center (project page)","publisher":"FSB Architecture & Engineering","retrievedAt":"2026-10-16","url":"https://fsb-ae.com/project/choctaw-nation-data-center/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/choctaw-nation-data-center-durant-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"compute_atlas-763f201cefd683ae","lat":41.8716062,"location_precision":"exact","lon":-87.6430697,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/menlo-digital-chicago-exchange-il","value":8.0}],"name":"Menlo Digital Chicago Exchange (601 West Polk)","operator":"Menlo Digital (Menlo Equities)","source_notes":"Converted brick warehouse; owner page cites one 2.5 MW utility-owned substation plus two 2.5 MW building-owned unit substations and 8 MW installed capacity. Menlo Equities is the owner; Block Club names Menlo Digital as the operating brand.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Block Club Chicago data center map — Menlo Digital Chicago, 601 W. Polk St., open","publisher":"Block Club Chicago","retrievedAt":"2026-09-25","url":"https://blockclubchicago.org/2026/08/12/data-centers-are-popping-up-everywhere-in-chicago-heres-where-and-why-theyre-controversial/"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/menlo-digital-chicago-exchange-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Manassas","confidence":"high","contains_osm":true,"id":"compute_atlas-7678560886fcdf3d","lat":38.7772373,"location_precision":"exact","lon":-77.5459965,"name":"Iron Mountain VA-2","operator":"Iron Mountain","source_notes":"Confirmed operational at 11660 Hayden Road, Manassas, VA 20109; achieved DCOS Maturity Level 3.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Iron Mountain facility directory","publisher":"Iron Mountain","retrievedAt":"2026-07-22","url":"https://resources.ironmountain.com/solution-guides/d/data-centers-northern-virginia-va-2"},{"kind":"osm","label":"OpenStreetMap way/996723585","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/996723585"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/iron-mountain-va-2-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Iron Mountain facility directory","publisher":"Iron Mountain","retrievedAt":"2026-07-22","url":"https://www.ironmountain.com/data-centers/locations/na/northern-virginia"},{"kind":"osm","label":"OpenStreetMap way/1283698132","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1283698132"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/iron-mountain-va-3-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Iron Mountain facility directory","publisher":"Iron Mountain","retrievedAt":"2026-07-22","url":"https://www.ironmountain.com/data-centers/locations/na/northern-virginia"},{"kind":"osm","label":"OpenStreetMap way/1287260556","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1287260556"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/iron-mountain-va-4-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996723585"}],"state":"Virginia","status":"operating"},{"ai_classification":"confirmed","city":"Temple","confidence":"medium","id":"compute_atlas-7688f130ebf31b1e","lat":31.0982,"location_precision":"approximate","lon":-97.3428,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://rowan.com/portfolio/temple/","value":300.0}],"name":"Rowan Project Temple","operator":"Rowan Digital Infrastructure","source_notes":"300 MW campus in Temple, Bell County; operations targeted 2027. Distinct from Rowan's Frederick, MD campus, tracked separately as of July 2026. Coordinates are the Temple area centroid. Rowan's January 5, 2026 announcement states a minimum $700M investment and projects approximately 600 construction jobs and more than 40 permanent positions.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Temple residents raise concerns over proposed Rowan data center expansion","publisher":"KXXV","retrievedAt":"2026-07-08","url":"https://www.kxxv.com/news/local-news/temple-residents-raise-concerns-over-proposed-rowan-data-center-expansion"},{"kind":"press","label":"Temple — 300 MW Hyperscale Data Center Campus (operator portfolio page)","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-09-08","url":"https://rowan.com/portfolio/temple/"},{"kind":"press","label":"Rowan Digital Infrastructure seeks approval for 6th and final data center in Temple","publisher":"KWTX","retrievedAt":"2026-09-08","url":"https://www.kwtx.com/2026/08/12/rowan-digital-infrastructure-seeks-approval-6th-final-data-center-temple/"},{"kind":"press","label":"Rowan Powers Texas Growth as Construction Begins on 300 MW Temple Data Center","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-10-14","url":"https://rowan.com/rowan-powers-texas-growth-as-construction-begins-on-300-mw-temple-data-center/"},{"kind":"press","label":"Rowan portfolio: Temple, Texas (300 MW, minimum $700M investment, 700 acres)","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-10-14","url":"https://rowan.com/portfolio/temple/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/rowan-temple-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Chester","confidence":"medium","id":"compute_atlas-76add4020645330d","lat":37.33798175,"location_precision":"exact","lon":-77.39493747,"name":"Bermuda Hundred Data Center (Old Bermuda Hundred Road)","operator":"Undisclosed (landowner: Washington Single Family Fund3)","source_notes":"Proposed data center on ~89 acres at 1931 Old Bermuda Hundred Rd, Chester (Bermuda District), Chesterfield County. Land owned by Washington Single Family Fund3 (acquired 2023 for $462,000); the data-center developer is undisclosed. Under the pre-2026 I-2 zoning it was by-right; the 2026 ordinance made data centers conditional-use. The planning director found no vested right and the BZA unanimously upheld that denial 2026-06-03, so a CUP is now required. Recorded as proposed (not cancelled) with community=litigation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Zoning appeals board rejects challenge to permit requirement for data center project in Chester","publisher":"Richmond BizSense","retrievedAt":"2026-07-17","url":"https://richmondbizsense.com/2026/06/04/zoning-appeals-board-rejects-challenge-to-permit-requirement-for-data-center-project-in-chester/"},{"kind":"other","label":"Chesterfield County official Address Points GIS layer — 1931 Old Bermuda Hundred Rd, parcel GPIN 8046474181","retrievedAt":"2026-07-18","url":"https://opengisdata.chesterfield.gov/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","retrievedAt":"2026-10-14","url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/bermuda-hundred-data-center-chesterfield-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Richardson","confidence":"high","contains_osm":true,"id":"compute_atlas-76bb59d69394c805","lat":32.9948122,"location_precision":"exact","lon":-96.7524974,"name":"Flexential Dallas - Richardson","operator":"Flexential","source_notes":"3010 Waterview Pkwy, 100,807 sqft, enterprise-class facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/548184239","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/548184239"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-dallas-richardson-tx"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/548184239"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-dallas-richardson-osmway-548184239"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/548184239"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Augusta","confidence":"medium","id":"compute_atlas-76c6614aa9c94844","lat":33.3699,"location_precision":"approximate","lon":-81.9645,"name":"Nixon Technology Center","operator":"3 G Investments, LLC (DRI applicant; end user confidential)","source_notes":"3.34M sq ft of data center space on 388 acres next to Augusta Regional Airport. The land is owned by the Nixon Trusts (represented by Trotter Jones). The planning commission previously approved heavy-industrial rezoning for part of the site. Target go-live is 2028–2029. Coordinates approximate the airport vicinity, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/nixon-technology-center-augusta-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","contains_osm":true,"id":"compute_atlas-771daa3219970034","lat":33.7559857,"location_precision":"approximate","lon":-84.3911712,"name":"CoreSite AT1 - Atlanta, GA","operator":"CoreSite","source_notes":"Confirmed via CoreSite official directory.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite facility directory","publisher":"CoreSite","retrievedAt":"2026-07-22","url":"https://www.coresite.com/data-center/at1-atlanta-ga"},{"kind":"osm","label":"OpenStreetMap node/12331366645","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12331366645"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/coresite-at1-atlanta-ga-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"mixed_use","city":"Prineville","confidence":"medium","id":"compute_atlas-771f701a81f40ed1","lat":44.3042,"location_precision":"approximate","lon":-120.8515,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-prineville-or","value":400.0}],"name":"Meta Prineville Data Center Campus","operator":"Meta","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Meta 2023 Sustainability Report","publisher":"Meta","retrievedAt":"2026-07-05","url":"https://sustainability.atmeta.com/2025-sustainability-report/"},{"kind":"other","label":"Meta's Prineville Data Center (fact sheet)","publisher":"Meta","retrievedAt":"2026-09-14","url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Metas-Prineville-Data-Center.pdf"},{"kind":"press","label":"Prineville doubles down on water conservation with tech giant-backed project — The Bulletin","publisher":"The Bulletin (Bend, OR)","retrievedAt":"2026-07-06","url":"https://bendbulletin.com/2024/05/09/prineville-doubles-down-on-water-conservation-with-tech-giant-backed-project/"},{"kind":"press","label":"Prineville Wants More Out of Its Next Data Center Deal — The Source Weekly","publisher":"The Source Weekly (Bend, OR)","retrievedAt":"2026-07-06","url":"https://www.bendsource.com/news/localnews/prineville-wants-more-out-of-its-next-data-center-deal/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/meta-prineville-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Bellingham","confidence":"medium","contains_osm":true,"id":"compute_atlas-7750bc7f342a57ec","lat":48.7591358,"location_precision":"approximate","lon":-122.5035003,"name":"Lunavi Bellingham Data Center","operator":"Lunavi","source_notes":"N+1 UPS, diesel backup generators, 1.92–4.88 kW per cabinet standard. Formerly a Green House Data site. Small enterprise colocation facility; total MW not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/lunavi-bellingham-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Hermiston","confidence":"medium","id":"compute_atlas-77a2abd4526f9985","lat":45.84041,"location_precision":"approximate","lon":-119.28946,"name":"AWS Hermiston Data Center Campuses","operator":"Amazon Web Services","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Small eastern Oregon city could be next hotspot for big data centers — enumerates Amazon's Umatilla County footprint as of Sept 2023: two existing data centers in Umatilla and two more under construction there plus two with tax-break agreements; one operating data center in unincorporated Umatilla County near Hermiston, one under construction within Hermiston city limits, and two further Hermiston projects with negotiated tax deals","publisher":"The Bulletin (Bend, OR)","retrievedAt":"2026-08-14","url":"https://bendbulletin.com/2023/09/15/small-eastern-oregon-city-could-be-next-hotspot-for-big-data-centers/"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/aws-hermiston-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Warren Township","confidence":"medium","id":"compute_atlas-77b035783f5ea45e","lat":39.78,"location_precision":"approximate","lon":-86.05,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dc-blox-warren-township-marion-county-in","value":78.0}],"name":"DC BLOX Warren Township Data Center","operator":"DC BLOX","source_notes":"Three-building campus, scaled back from an original 28MW-larger plan. Capex breakout: $700-800M construction + $1.3-1.4B in 'servers, networking equipment, and AI hardware' per the developer's own figures. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DC Blox data center in eastern Indianapolis receives recommendation for approval","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/dc-blox-data-center-in-eastern-indianapolis-receives-recommendation-for-approval/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/dc-blox-warren-township-marion-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"King George","confidence":"medium","id":"compute_atlas-77cd7bab18a939d9","lat":38.250254083928,"location_precision":"approximate","lon":-77.29011580291154,"name":"King George Technology Center","operator":"Green Energy Ventures","source_notes":"352 acres (40 already industrial-zoned) in the Route 3 West Settlement Area, bordering Stafford; rezoning pending.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Green Energy Ventures presents King George Technology Center","publisher":"Fredericksburg Advance","retrievedAt":"2026-09-21","url":"https://www.fxbgadvance.com/p/green-energy-ventures-presents-its"},{"kind":"filing","label":"King George Technology Center Voluntary Proffer Statement (Dec 12, 2025)","publisher":"Green Energy Ventures / J2 Engineers","retrievedAt":"2026-08-26","url":"https://kinggeorgetechnologycenter.com/wp-content/uploads/2026/01/12.12.25-Clean-Proffers-GEV.pdf"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/green-energy-ventures-king-george-technology-center-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-782336fa14ed1efc","lat":37.3666621,"location_precision":"approximate","lon":-121.9628653,"name":"Prime Santa Clara (Silicon Valley campus)","operator":"Prime Data Centers","source_notes":"Prime Data Centers operates 5 distinct addressed facilities in Santa Clara/Silicon Valley (SJC01 26415 Corporate Ave-operational, SJC02 1111 Comstock-powered shell, SJC03 2215 Martin-development, SJC04 1231 Comstock-development, SJC06 6580 Via del Oro-operational), confirmed via https://primedatacenters.com/locations/silicon-valley/ and corroborated by datacentermap.com/datacenters.com listings. This OSM candidate has no address to disambiguate which specific SJC0x site it is; kept as a generic corroborated Prime Santa Clara presence but should be geocoded against SJC0x addresses in a follow-up GIS pass rather than assumed distinct from the other two candidates below.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/12437277166","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12437277166"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/prime-santa-clara-silicon-valley-campus-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12437277166"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"North Las Vegas","confidence":"high","contains_osm":true,"id":"compute_atlas-78a3b9c8214eac3c","lat":36.2481633,"location_precision":"exact","lon":-115.1012553,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-las-vegas-north-las04-nv","value":9.0}],"name":"Flexential Las Vegas - North (LAS04)","operator":"Flexential","source_notes":"3330 E Lone Mountain Rd, 111,000+ sqft, 9MW.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/746278786","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/746278786"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-las-vegas-north-las04-nv"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/746278786"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-las-vegas-north-osmway-746278786"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/746278786"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Williston","confidence":"medium","id":"compute_atlas-78e88702aa100f54","lat":48.147,"location_precision":"approximate","lon":-103.618,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/critical-data-house-fighting-pike-williston-nd","value":455.0}],"name":"Project Fighting Pike (Critical Data House, Northstar Center)","operator":"Critical Data House, LLC","source_notes":"Multi-building campus planned on the former Northstar Center Subdivision north of Williston, along US Highways 2/85 a few miles west of Love's. It is focused on cloud computing rather than crypto mining. The plan has three phases: phase one targeted by end of 2026 and full build-out by 2031 (KFYR, March 2025). The Williston Herald (May 2026) reports a planned $10B investment, which the developer splits into construction and IT hardware. The city notes that approved documents do not guarantee the facility will be built. No construction start is confirmed. Coordinates are the Williston town point (approximate). This is a separate project from the existing Atlas Power site west of Williston.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Williston commissioners approve plans for a data center north of town","publisher":"KFYR-TV","retrievedAt":"2026-10-26","url":"https://www.kfyrtv.com/2025/03/26/williston-commissioners-approve-plans-data-center-north-town/"},{"kind":"press","label":"Williston protesters demand more transparency, regulation surrounding data centers","publisher":"Williston Herald","retrievedAt":"2026-10-26","url":"https://www.willistonherald.com/news/local/williston-protesters-demand-more-transparency-regulation-surrounding-data-centers"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/critical-data-house-fighting-pike-williston-nd"}],"state":"North Dakota","status":"planned"},{"ai_classification":"unknown","city":"White Hall","confidence":"medium","id":"compute_atlas-78ff3de86cafb262","lat":39.4211977,"location_precision":"approximate","lon":-80.1825815,"name":"Hog Lick Aggregates Data Center / Microgrid Proposal","operator":"Hog Lick Aggregates","source_notes":"Very early-stage: Hog Lick Aggregates, which owns a 277-acre site in White Hall, Marion County (adjacent to the I-79 High Tech Park), launched a feasibility study (reported 2026-05-05/06) into a microgrid-powered data center on the property, explicitly with 'no timeframe for development' and expected to take 'several years before yielding actionable results' per company president Brian Redmond. The site is pitched partly as potential support capacity for the NOAA supercomputing facility at the adjacent I-79 High Tech Park. No capacity, investment, or job figures were disclosed. Coordinates are a White Hall community-level pin, not a parcel-level location, since no street address was given.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/hog-lick-aggregates-white-hall-marion-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Fort Pierce","confidence":"medium","id":"compute_atlas-79c8156d5e2669bc","lat":27.44,"location_precision":"approximate","lon":-80.33,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/atlas-compute-ai-data-center-campus-fort-pierce-fl","value":240.0}],"name":"Atlas Compute AI Data Center Campus","operator":"Atlas Compute (infrastructure by Penguin Solutions)","source_notes":"Land and utilities secured. Targeting operational Q4 2026-Q1 2027. Up to 1 GW expansion capacity. Distinct from the withdrawn Sentinel Grove/Project Jarvis project in the same county.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/atlas-compute-ai-data-center-campus-fort-pierce-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Piketon","confidence":"medium","id":"compute_atlas-7a1bafb4780357f7","lat":39.06,"location_precision":"approximate","lon":-83.02,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/new-day-ports-technology-campus-piketon-oh","value":10000.0}],"name":"PORTS-Pike Technology Campus","operator":"SB Energy","source_notes":"Officially \"PORTS-Pike Technology Campus\"; formerly tracked under the pre-announcement Ohio entity New Day Data Centers LLC, a name that appears nowhere in the SEC S-1 or SB Energy’s own announcements. Developer/operator is SB Energy (SoftBank-controlled); the DOE lease was signed 2026-02-26 by its subsidiary Pike County Portsmouth DC LLC. Capacity: three distinct figures: 8.0 GW-IT of contracted compute (8,024 MW-IT; NVIDIA guarantees the initial 4.25 GW-IT with an option on the remaining 3.78 GW-IT), 10 GW of gross power load (the planned capacity recorded here), and 9.2 GW of new gas generation. Offtake: on 2026-08-17 SB Energy subsidiaries signed 17 twenty-year triple-net leases with OpenAI, with rent commencement conditioned on interconnection and generation being available; NVIDIA provided a residual-value guaranty capped at $105B and separately bought $1.5B of non-voting stock. Land: the land area is not recorded - the DOE lease covers 189 acres (Batch 1) on which \"one data center building is expected to be constructed\", while the S-1 places the buildings \"across several thousand acres of private property\"; the widely-cited 3,700/3,777 acres is the whole federal reservation, which also hosts the separately tracked Oklo Aurora project, Centrus and the DUF6 plant. Investment: no investment figure is recorded - $10B (DOE, March) and $30-40B (project site) describe the same ~800 MW first phase and cannot both be right, the $67.2B total appears only as one trade outlet’s unattributed rollup, and the S-1 states no total capex. Subsidies: none awarded - the Ohio Tax Credit Authority minutes record no award, no JobsOhio award was found as of September 2026, and Ohio paused new data-centre tax exemptions in May 2026; a county PILOT is under negotiation because the leased federal land yields no property tax. Status: early civil works began after the 2026-03-20 groundbreaking, though the S-1 lists construction as not started, with first capacity in 2028 and full buildout 2032. Distinct from the Oklo Aurora Powerhouse on the same broader site. A March 2026 U.S. Department of Energy fact sheet states more than 2,000 operational jobs, while the developer's project site lists 2,500 operating jobs.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Piketon set to become ground zero for new energy megasite","publisher":"Scioto Valley Guardian","retrievedAt":"2026-07-17","url":"https://sciotovalleyguardian.com/2026/03/20/piketon-set-to-become-ground-zero-for-new-energy-megasite/"},{"kind":"press","label":"NVIDIA Guarantees SB Energy's PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute","publisher":"NVIDIA","retrievedAt":"2026-09-01","url":"https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute"},{"kind":"press","label":"A data center proposed at site of former uranium enrichment plant near Piketon","publisher":"WOUB Public Media","retrievedAt":"2026-09-01","url":"https://woub.org/2025/12/02/data-center-proposed-site-former-uranium-enrichment-plant-near-piketon/"},{"kind":"other","label":"PORTS Technology Campus (official site): SoftBank Group / SB Energy, 10 GW data center incl. 9.2 GW gas generation, first 800 MW phase construction 2026","publisher":"PORTS Technology Campus / SB Energy","retrievedAt":"2026-10-14","url":"https://portscampus.com/"},{"kind":"filing","label":"OPSB Case 26-0426-EL-BTX: AEP Ohio TransCo Baku - Gavin 765 kV Transmission Line Project (docket)","publisher":"Public Utilities Commission of Ohio / Ohio Power Siting Board (DIS)","retrievedAt":"2026-10-15","url":"https://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=26-0426-EL-BTX"},{"kind":"other","label":"Piketon Area Improvements Project (Baku-Gavin, Hanging Rock-Baku, Pike/Ross/Pickaway feasibility study)","publisher":"AEP Transmission","retrievedAt":"2026-10-15","url":"https://aeptransmission.com/ohio/PiketonArea/"},{"kind":"filing","label":"OPSB case-tracking map data, case 26-0746-EL-BGN (PORTS Energy Center (Piketon))","publisher":"Ohio Power Siting Board (case-tracking map data)","retrievedAt":"2026-10-28","url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-0746-EL-BGN%27&outFields=*&f=html"},{"kind":"filing","label":"OPSB case-tracking map data, case 26-1070-EL-BGN (PORTS-Pike Energy Center II (Piketon))","publisher":"Ohio Power Siting Board (case-tracking map data)","retrievedAt":"2026-10-28","url":"https://maps.puco.ohio.gov/arcgis/rest/services/opsb/OPSB_Natural_Gas_Generation_Projects/MapServer/0/query?where=CTS_DISCaseNumber%3D%2726-1070-EL-BGN%27&outFields=*&f=html"},{"kind":"filing","label":"OPSB Case 26-0746-EL-BGN: Portsmouth Gas DevCo, LLC (docket)","publisher":"Public Utilities Commission of Ohio / Ohio Power Siting Board (DIS)","retrievedAt":"2026-10-28","url":"https://dis.puc.state.oh.us/CaseRecord.aspx?CaseNo=26-0746-EL-BGN"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/new-day-ports-technology-campus-piketon-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"confirmed","city":"Vernon","confidence":"medium","id":"compute_atlas-7a2accb212bdac48","lat":34.0014335,"location_precision":"approximate","lon":-118.2303092,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://primedatacenters.com/news/prime-opens-los-angeles-data-center/","value":33.0}],"name":"Prime Data Centers LAX01","operator":"Prime Data Centers","source_notes":"Opened November 14, 2024; 33MW of critical IT power at full build-out across six data halls, 100% leased at opening to two initially-unnamed AI companies. Lambda was named as a tenant via a separate press release approximately one year later (November 13, 2025), leasing 21MW of the 33MW total for NVIDIA Blackwell-based AI infrastructure - these are two distinct announcements, not one event. One of at least three independent data-center developments in Vernon (a small, ~200-resident, all-industrial city), alongside a separate Digital Realty land purchase (4400 Pacific Blvd) and the DataBank/Goodman Group 'Vernon LA Campus' - driven by Vernon Public Utilities offering industrial power at roughly half the rate of neighboring investor-owned utilities.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prime opens Los Angeles data center","publisher":"Prime Data Centers","retrievedAt":"2026-08-02","url":"https://primedatacenters.com/news/prime-opens-los-angeles-data-center/"},{"kind":"press","label":"Lambda partners with Prime Data Centers in Southern California","publisher":"Lambda","retrievedAt":"2026-08-02","url":"https://lambda.ai/blog/prime-data-centers-and-lambda-partner-to-power-the-next-era-of-superintelligence-with-ai-optimized-infrastructure-in-southern-california"},{"kind":"press","label":"Prime launches 33MW data center in Vernon, California","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/prime-launches-33mw-data-center-in-vernon-california/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/prime-lax01-vernon-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Becker","confidence":"medium","id":"compute_atlas-7b309d3ee2eb88cd","lat":45.3931821,"location_precision":"approximate","lon":-93.8768904,"name":"Microsoft Becker Data Center","operator":"Microsoft","source_notes":"Microsoft bought ~295 acres from Xcel Energy near the Sherco coal plant in Becker for ~$17.7M (closed 2024-02-12) 'with the intent' to build a data center. As of Oct 2025 no formal plans had been submitted to the city. Distinct site/operator from the already-tracked, suspended Amazon Becker project (~348 acres, same area; locally nicknamed 'Core Ridge') — not a duplicate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-24","url":"https://www.compute-atlas.com/facilities/microsoft-becker-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Chester","confidence":"high","id":"compute_atlas-7ba59e40dd7c3ec2","lat":37.34629075,"location_precision":"approximate","lon":-77.29960686,"name":"Project Peanut","operator":"Google","source_notes":"Part of Google's 3-campus $9B Chesterfield County trio, alongside Project Skye and Project Loch. Distinct from a separately tracked Google Midlothian, VA proposed record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Chesterfield Report — Chesterfield Residents Seek Clarity on Data Center Expansion Plans","retrievedAt":"2026-07-26","url":"https://chesterfieldreport.com/story/google-to-invest-9b-in-three-chesterfield-data-center-campuses.html"},{"kind":"press","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","retrievedAt":"2026-10-14","url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/google-project-peanut-chester-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-virginia-data-centers-plans-new-campus-in-chesterfield-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-peanut"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"compute_atlas-7c297e82c183aaa4","lat":41.8628,"location_precision":"approximate","lon":-87.6413029,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/coresite-ch2-chicago-il","value":18.0}],"name":"CoreSite CH2","operator":"CoreSite","source_notes":"CoreSite's page states \"168,000+\" sq ft and \"18 MW\". Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/coresite-ch2-chicago-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Mason City","confidence":"medium","id":"compute_atlas-7c84580c2f6d375e","lat":43.11,"location_precision":"approximate","lon":-93.215,"name":"Mason City South Side Data Center Site (43rd Street SW)","operator":"Undisclosed developer","source_notes":"Roughly 380 acres (mayor's estimate; 'nearly 400 acres') of farmland on the south side of Mason City along 43rd Street SW. KIMT (Sep 2026) reports sources confirmed QTS has expressed interest and a data center company submitted designs, but the city says it has not entered negotiations with any company, so the operator is left undisclosed. Coordinates are an approximate south-side placement, not a parcel point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/mason-city-south-side-data-center-site-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"likely","city":"Concord","confidence":"medium","id":"compute_atlas-7c907491b3043d72","lat":43.2441282,"location_precision":"approximate","lon":-71.5460077,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/locke-road-micro-data-center-concord-nh","value":15.0}],"name":"Locke Road Micro Data Center","operator":"Granite Municipal Manufacturing & Sales, LLC","source_notes":"Northpoint Engineering, LLC is the applicant. Granite Municipal Manufacturing & Sales, LLC owns the land and is developing it; it bought the land in 2024. The parcel is nearly 21 acres, of which about 9.3 are buildable. About 54,780 sq ft of wooded buffer was cleared beforehand. No power capacity or investment figure has been published. The coordinates match the OSM address point for 52 Locke Road; the Census geocoder puts it about 600 m away. Precision is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Concord Planning Board defers decision on 'micro' data center proposal","publisher":"New Hampshire Public Radio","retrievedAt":"2026-10-26","url":"https://www.nhpr.org/nh-news/2026-10-26/concord-board-defers-decision-micro-data-center-proposal"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/locke-road-micro-data-center-concord-nh"}],"state":"New Hampshire","status":"planned"},{"ai_classification":"unknown","city":"Rome","confidence":"medium","id":"compute_atlas-7c90e3b07172d4a2","lat":34.257,"location_precision":"approximate","lon":-85.1647,"name":"Coosa Data Center (Project Gracie)","operator":"Atlas Development LLC","source_notes":"About 2.4–2.5 million sq ft across seven buildings, target completion December 2032; land previously owned by the Floyd County school system. Filed with the state as Project Gracie.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/atlas-coosa-project-gracie-floyd-ga"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/atlas-project-sassy-rome-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Cleveland","confidence":"medium","id":"compute_atlas-7cb65a07b2b26200","lat":35.3314339,"location_precision":"approximate","lon":-84.8686025,"name":"Project River Data Center","operator":"Wright Brothers Construction","source_notes":"The data-center tenant is not confirmed. Wright Brothers Construction CEO Mitchell Simpson told Mix 104.1 WCLE on 2026-08-26 that the power plant is certain but its offtaker is not: \"We definitely know we're developing a power plant... We don't know what it's going to power yet... It potentially could be a data center, but it very well could be something else,\" naming advanced manufacturing, robotics and semiconductor manufacturing as alternatives, before adding that with that much power \"it's very likely going to be that.\" The company's own 2026-08-26 release describes the campus as \"anchored by an on-site power plant and data center.\" The record is marked reported for that reason. Roughly 850 acres of privately-owned Wright family land west of I-75 and north of Old Lower River Road NW, along the Hiwassee River in northern Bradley County near I-75 Exit 33, submitted for rezoning and annexation into the City of Cleveland on 2026-08-25. The $11.3bn headline is the whole campus; $7.3bn is the data-center portion as itemised in press coverage. Groundbreaking is not expected until end of 2027 and the build is phased over 60 months. Coordinates are a geocode of Lower River Road NW, not the parcel; no source states lat/lon. No state or local incentive agreement is named in any of the three sources.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project River — An Industrial Energy Campus That Supplies Itself","publisher":"Wright Brothers Construction","retrievedAt":"2026-09-09","url":"https://projectriver.energy/"},{"kind":"press","label":"Proponents Of Bradley County Project With Large-Scale Data Center Cite Tax Benefits","publisher":"Chattanoogan.com","retrievedAt":"2026-09-09","url":"https://www.chattanoogan.com/2026/8/26/522510/Proponents-Of-Bradley-County-Project.aspx"},{"kind":"press","label":"$11.3B data center pitch in Bradley County comes amid growing local skepticism","publisher":"NewsChannel 9 / WTVC","retrievedAt":"2026-09-09","url":"https://newschannel9.com/news/local/bradley-county-family-proposes-113b-data-center-project-west-of-cleveland-project-river-wright-brothers-lower-river-road-forestry-jobs-utility-bills-opposition-environmental-concerns-noise-concerns-data-center-issues-midterms-political-liability-growth"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/project-river-data-center-bradley-county-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"high","contains_osm":true,"id":"compute_atlas-7cc4cc64fe8cca23","lat":33.3536663,"location_precision":"exact","lon":-111.6124114,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-phoenix-ph1-data-center-az","value":36.0}],"name":"NTT Phoenix PH1 Data Center","operator":"NTT Global Data Centers","source_notes":"10256 E Elliot Rd, Mesa; 36MW, 126,000 sqft.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1356594646","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1356594646"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-phoenix-ph1-data-center-az"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1356594646"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ntt-ph1-datacenter-osmway-1356594646"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Marietta","confidence":"high","contains_osm":true,"id":"compute_atlas-7cf3930e55edef24","lat":33.9255145,"location_precision":"exact","lon":-84.4816338,"name":"CoreSite AT2 - Marietta Data Center","operator":"CoreSite","source_notes":"Confirmed: 1130 Powers Ferry Place, Marietta, GA 30067.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite facility directory","publisher":"CoreSite","retrievedAt":"2026-07-22","url":"https://www.coresite.com/data-center/at2-atlanta-ga"},{"kind":"osm","label":"OpenStreetMap way/284044002","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/284044002"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/coresite-at2-marietta-data-center-ga"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/284044002"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coresite-at2-marietta-data-center-osmway-284044002"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/284044002"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Warren","confidence":"medium","id":"compute_atlas-7d8b955701084f24","lat":42.5155048,"location_precision":"approximate","lon":-83.0377165,"name":"General Motors Enterprise Data Center (Warren Technical Center)","operator":"General Motors","source_notes":"Enterprise (single-tenant) data center at the GM Technical Center campus in Warren, LEED Gold certified in September 2013. It was one of two Michigan data centers GM built to consolidate 23 data centers worldwide; the second was at Milford and is not included here because no current-status source was fetched. Sources describe flywheel-plus-diesel UPS instead of batteries, in-row cooling, and water chilled outdoors so that mechanical cooling runs only about a quarter of the year. The pin is the OSM centroid of the Technical Center campus, not the building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"GM Facility Among 5% of Data Centers to Earn LEED Gold Certification","publisher":"Sustainable Brands","retrievedAt":"2026-10-07","url":"https://sustainablebrands.com/read/gm-facility-among-5-of-data-centers-to-earn-leed-gold-certification"},{"kind":"press","label":"GM Data Center Goes Green for LEED","publisher":"3BL Media / General Motors","retrievedAt":"2026-10-07","url":"https://www.3blmedia.com/news/gm-data-center-goes-green-leed"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/gm-enterprise-data-center-warren-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Price","confidence":"medium","id":"compute_atlas-7dbc8244b830d152","lat":39.5994,"location_precision":"approximate","lon":-110.8107,"name":"Project Beehive","operator":"Valar Atomics","source_notes":"More than 9,000 acres of BLM land near Price, under completeness review, plus about 640 acres of state trust land in Carbon County. Non-nuclear construction is targeted as early as the end of 2026 and first reactors in 2028. The location is approximate (Price). This is separate from Valar's Ward 250 test reactor at the San Rafael Energy Lab and from its withdrawn Green River BLM application.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nuclear-powered AI data center proposed on state and federal land in central eastern Utah (KSL)","publisher":"East Idaho News / KSL","retrievedAt":"2026-10-13","url":"https://www.eastidahonews.com/2026/10/nuclear-powered-ai-data-center-proposed-on-state-and-federal-land-in-central-eastern-utah/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/valar-atomics-project-beehive-price-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-7dd6cdf94eecdb06","lat":39.0178592,"location_precision":"exact","lon":-77.4624708,"name":"Digital Realty Northern Virginia ACC4","operator":"Digital Realty","source_notes":"Address 480 Hastings Drive, Ashburn, VA 20147.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc4"},{"kind":"osm","label":"OpenStreetMap way/298126010","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/298126010"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-acc4-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official Northern Virginia facilities page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-09-21","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/acc5"},{"kind":"osm","label":"OpenStreetMap way/300162674","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/300162674"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/digital-realty-northern-virginia-acc5-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298126010"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298242335"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300162674"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300162675"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/649319778"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Greensboro","confidence":"medium","id":"compute_atlas-7e2f98ed9a255d51","lat":39.79,"location_precision":"approximate","lon":-79.92,"name":"Project Hummingbird Data Center Campus (former Robena Mine)","operator":"International Electric Power","source_notes":"The compute campus at the 1,400-acre former Robena Mine site, distinct from the tracked Project Hummingbird power plant record. IEP has been in discussions with hyperscale customers; no tenant is named. Coordinates match the sibling power-plant record for the same site and are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/iep-hummingbird-data-center-campus-greene-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Colorado Springs","confidence":"medium","id":"compute_atlas-7e659e827c36a838","lat":38.8339,"location_precision":"approximate","lon":-104.8214,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://socodigest.com/2026/07/25/project-taurus-raeden-data-center-appeals-denied-colorado-springs-2026-2/","value":50.0}],"name":"Raeden Project Taurus","operator":"Raeden","source_notes":"50 MW data center at the former Intel plant in Colorado Springs, El Paso County. Coordinates are the Colorado Springs area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"50MW data center could be built in Colorado Springs","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/50mw-data-center-could-be-built-in-colorado-springs/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"SoCoDigest","retrievedAt":"2026-07-26","url":"https://socodigest.com/2026/07/25/project-taurus-raeden-data-center-appeals-denied-colorado-springs-2026-2/"},{"kind":"press","label":"Colorado Springs administratively approves data center on Garden of the Gods Road (read via Internet Archive)","publisher":"Colorado Springs Gazette","retrievedAt":"2026-10-19","url":"https://gazette.com/2026/06/12/colorado-springs-administratively-approves-data-center-on-garden-of-the-gods-road/"},{"kind":"press","label":"Large data center may be heading to former computer chip facility in Colorado Springs (read via Internet Archive)","publisher":"Colorado Springs Gazette","retrievedAt":"2026-10-19","url":"https://gazette.com/2026/03/28/large-data-center-may-be-heading-to-former-computer-chip-facility-in-colorado-springs/"},{"kind":"press","label":"AI data center could come to Colorado Springs","publisher":"KRDO","retrievedAt":"2026-10-19","url":"https://krdo.com/news/2026/04/06/data-center-could-come-to-colorado-springs/"},{"kind":"press","label":"Data center developer says it is 'evaluating' partnership after tense Colorado Springs City Council meeting","publisher":"KRDO","retrievedAt":"2026-10-19","url":"https://krdo.com/news/2026/09/18/project-taurus-decision-postponed/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/raeden-taurus-colorado-springs-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"mixed_use","city":"Trumbull","confidence":"medium","contains_osm":true,"id":"compute_atlas-7ed633124089609f","lat":41.2407281,"location_precision":"exact","lon":-73.1474121,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cognovum-trumbull-ct","value":6.75}],"name":"CogNovum Data Center (80 Merritt Boulevard)","operator":"CogNovum","source_notes":"Existing 228,000 sq ft building at 80 Merritt Blvd, Trumbull, CT, built in 1960 (originally for Nasdaq per the operator's account); currently operated by CogNovum. Aphorio Carter acquired the property in 2024. On 2026-05-06, 365 Data Centers and Aphorio Carter announced a ~200MW AI-ready data-center pipeline across six US markets; Trumbull is named as a site 'under evaluation' for AI-focused upgrades to this existing building, with letters of intent not yet signed for it (only Aurora, CO and Simpsonville, KY had signed LOIs as of the release). The operator's CEO described the plan as upgrading an existing facility on existing power infrastructure, not new construction: \"We are simply updating an existing, historic facility to ensure we can continue serving our customers effectively, while supporting the town with local jobs and substantial tax revenue.\" No MW, investment, or job-count figures were published for the current facility. Coordinates cross-checked: US Census geocoder (41.240871, -73.146313) and the OSM building footprint (41.2407281, -73.1474121) agree within ~100m; the OSM point is used per the mapped-building preference. Flagging for awareness, not asserted as fact: OSM's building tag for this address (as retrieved 2026-09-12) reads \"Digital Realty New York HVN10,\" which is not corroborated by any 2026 source found in this search and may reflect a prior/stale ownership label rather than current fact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap building at 80 Merritt Blvd, Trumbull, CT","retrievedAt":"2026-09-12","url":"https://www.openstreetmap.org/way/122665255"},{"kind":"press","label":"Proposed Trumbull AI data center at Nasdaq site worrisome to residents (2026-07-19)","publisher":"Westfair Communications","retrievedAt":"2026-10-19","url":"https://westfaironline.com/fairfield/proposed-trumbull-ai-data-center-at-nasdaq-site-worrisome-to-residents/"},{"kind":"press","label":"Trumbull Town Council OKs moratorium on new data centers (2026-09-11)","publisher":"Westfair Communications","retrievedAt":"2026-09-30","url":"https://westfaironline.com/latest-news/trumbull-town-council-oks-moratorium-on-new-data-centers/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/cognovum-trumbull-ct"}],"state":"Connecticut","status":"operating"},{"ai_classification":"unknown","city":"Philadelphia","confidence":"medium","id":"compute_atlas-7ee4f6ce3a6aa78a","lat":39.9601,"location_precision":"approximate","lon":-75.1619,"name":"Netrality 401 North Broad","operator":"Netrality Data Centers","source_notes":"Philadelphia's principal carrier hotel: a 1.3 million sq ft building operated by Netrality with 73+ on-net network providers, 36 peering networks and 3 peering exchanges. Cabinet power density up to 20 kW; 2N UPS; N+1 generators with 30,000 gallons of fuel. Netrality's own page does not publish a facility MW total, so no capacity is recorded, rather than one taken from third-party directories.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Philadelphia Pennsylvania Data Center, 401 North Broad St","publisher":"Netrality Data Centers","retrievedAt":"2026-09-21","url":"https://netrality.com/data-center/401-north-broad-philadelphia/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/netrality-401-north-broad-philadelphia-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Clarksville","confidence":"medium","contains_osm":true,"id":"compute_atlas-7ef078803a138fa2","lat":35.4673307,"location_precision":"approximate","lon":-93.4405664,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/serverfarm-clarksville-ar","value":432.0}],"name":"Serverfarm ARK Clarksville Data Center Campus","operator":"Serverfarm","source_notes":"Coordinates are an OpenStreetMap geocode of Palmer Road in Clarksville, the road the Arkansas Democrat-Gazette identifies as the site's location ('just north of the city's water treatment plant on Palmer Road'); this is a road-level approximation, not a parcel-confirmed footprint. Reported figures diverge across sources and are not reconciled: acreage is reported as two parcels totaling 135 acres at acquisition (Nov. 2025), and a later, larger campus figure appears only in subscriber-only reporting that is not cited, so as of October 2026 no land area is recorded; investment is reported as 'at least one billion' (Nov. 2025), $6.6 billion (2026 reporting and Serverfarm's own page) and $8 billion (Arkansas Advocate, May 2026); building count is reported as four (Serverfarm's own page), five (Nov. 2025) and six (trade press). Building size is given as 300,000 sq ft each by Serverfarm and 360,000 sq ft each in trade press. The recorded investment figure is $6.6 billion, as stated on Serverfarm's own page. The Arkansas Democrat-Gazette (Nov. 2025) reports that Serverfarm is owned by Manulife Investment Management.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Mixed opinions, limited information about $6.6 billion data center in Arkansas River Valley (Arkansas Advocate reprint)","publisher":"The Arkadelphian / Arkansas Advocate","retrievedAt":"2026-09-15","url":"https://arkadelphian.com/2026/07/20/arkansas-advocate-mixed-opinions-limited-information-about-6-6-billion-data-center-in-arkansas-river-valley/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/serverfarm-clarksville-ar"}],"state":"Arkansas","status":"under construction"},{"ai_classification":"unknown","city":"Louisa","confidence":"medium","id":"compute_atlas-7efffc5e775b7ad4","lat":37.999666431819,"location_precision":"approximate","lon":-77.967415971191,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-north-creek-technology-campus-louisa-va","value":3000.0}],"name":"North Creek Technology Campus (NCTC)","operator":"Amazon Web Services","source_notes":"Preliminary estimate of at least 17 total DC buildings across both Louisa campuses combined; ~628 of the 1,444-acre assemblage held as open space, ~380 acres to be donated to the county for a public park. No formal local rezoning/SUP filing yet as of the cited meeting — status set to permitted cautiously based on land-disturbance-adjacent county process; 3GW is a stated potential ceiling from 10 substations, not a committed buildout. Status corrected to proposed: no formal permit or site plan filed as of the Nov 2024 Planning Commission buffer/landscaping discussion (still exploratory). 'Up to 3 GW' = ten 300 MW substations (a ceiling, not permitted capacity). Public-reception check (2026-09-10): North Creek Technology Campus (NCTC) is confirmed distinct from a third AWS Louisa County proposal (near Northeast Creek Reservoir/Mineral) that Amazon withdrew 2025-07-25/28 after strong resident opposition (\"Please don't Loudoun Louisa... Please say no to this additional data center,\" per a July 2025 board-of-supervisors public-comment session). NCTC itself was one of two AWS campuses approved by-right under the county's Technology Overlay District and moved to construction without the surge of documented opposition seen on the third project. No hearing/vote record specific to NCTC was found. Checked: Virginia Business, a Louisa data-center timeline site, and a local Substack covering county supervisors' meetings.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Louisa County Planning Commission buffer/landscaping plan discussion (Nov. 9, 2024) + county-sourced reporting","publisher":"Tammy Purcell / Engage Louisa (citing Louisa County Planning Commission proceedings)","retrievedAt":"2026-07-17","url":"https://tammypurcell.substack.com/p/aws-preparing-to-start-work-at-lake"},{"kind":"press","label":"Amazon files for 3.8 million sq ft data center campus in Louisa County, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/amazon-files-for-38-million-sq-ft-data-center-campus-in-louisa-county-virginia/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/aws-north-creek-technology-campus-louisa-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Dahlgren","confidence":"medium","id":"compute_atlas-7f0c57993fc31081","lat":38.3385746,"location_precision":"approximate","lon":-77.0782376,"name":"Dahlgren West Data Center Campus","operator":"Oasis Digital Properties","source_notes":"10 buildings totaling about 6.8M sq ft on the north side of James Madison Parkway. The developer projects 1,500 construction jobs and 50–60 permanent jobs per building. The site has access to 230 kV transmission. The coordinates are an approximate point on James Madison Parkway near Walnut Hill, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NoVA-based data center company building new campus near Fredericksburg","publisher":"Northern Virginia Magazine","retrievedAt":"2026-10-14","url":"https://northernvirginiamag.com/news/2025/08/21/nova-based-data-center-company-building-new-campus-near-fredericksburg/"},{"kind":"press","label":"Developer Proposes 9M SF Data Center Campus In Virginia","publisher":"Bisnow","retrievedAt":"2026-10-14","url":"https://www.bisnow.com/news/national/data-center/second-massive-data-center-campus-planned-in-king-george-county-virginia-123780"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/oasis-dahlgren-west-king-george-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"New Carlisle","confidence":"medium","id":"compute_atlas-7f1da4fc7fc4dc0f","lat":41.6978,"location_precision":"approximate","lon":-86.5117,"name":"Amazon Project Rainier","operator":"Amazon Web Services","source_notes":"No operational capacity is recorded because neither Amazon nor the utility has stated one. Measured AI estimated the first nine buildings at \"an estimated 590 MW of IT capacity\" (June 2026), and Epoch AI estimates 910 MW of IT power from satellite imagery (updated July 2026); both are outside estimates. No planned capacity is recorded either: the 2,200 MW is the full-site electricity draw reported at the October 2025 opening (\"30 buildings drawing up to 2.2 gigawatts (GW) of electricity\", Converge Digest), an upper limit on grid draw, not IT load; Measured AI later gives 32 buildings and 2.25 GW of grid draw at full build-out.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Gov. Holcomb announces AWS plans to invest $11B in Northern Indiana — IEDC","publisher":"Indiana Economic Development Corporation","retrievedAt":"2026-07-05","url":"https://iedc.in.gov/events/news/details/2024/04/25/gov.-holcomb-announces-amazon-web-services-plans-to-invest-11b-to-create-a-new-data-center-campus-in-northern-indiana"},{"kind":"press","label":"St. Joseph County leaders approve $11bn Amazon data center","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/st-joseph-county-leaders-approve-11bn-amazon-data-center-in-indiana/"},{"kind":"other","label":"AWS New Carlisle Data Center Campus: Project Rainier","publisher":"Measured AI","retrievedAt":"2026-08-16","url":"https://measuredai.substack.com/p/aws-new-carlisle-data-center-campus"},{"kind":"press","label":"AWS Activates Project Rainier Data Center Campus","publisher":"Converge Digest","retrievedAt":"2026-10-16","url":"https://convergedigest.com/aws-activates-project-rainier-data-center-campus/"},{"kind":"other","label":"Anthropic-Amazon New Carlisle | AI data centers","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/amazon-project-rainier-new-carlisle-in"}],"state":"Indiana","status":"operating"},{"ai_classification":"unknown","city":"Central City","confidence":"medium","id":"compute_atlas-7f333b7861624325","lat":42.2039,"location_precision":"approximate","lon":-91.5243,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.kcrg.com/2026/10/01/data-center-company-stays-silent-public-meeting/","value":4.0}],"name":"Aurum Elk Data Center Project (Central City)","operator":"Aurum Capital Ventures","source_notes":"About 18,000 sq ft on about 3 acres within city limits near the Linn County Fairgrounds. Reported draw is 4 MW. The city is drafting an ordinance under a moratorium.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center company stays silent at public meeting","publisher":"KCRG","retrievedAt":"2026-10-28","url":"https://www.kcrg.com/2026/10/01/data-center-company-stays-silent-public-meeting/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aurum-elk-data-center-central-city-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Greenville","confidence":"medium","id":"compute_atlas-7f33f84046ac2021","lat":34.80455191966,"location_precision":"approximate","lon":-82.342676840132,"name":"DC BLOX Greenville Data Center","operator":"DC BLOX","source_notes":"Multi-tenant colocation site in Global Business Park off I-85, described by the operator as the first multi-tenant data center in South Carolina, Uptime Institute Tier III certified (Data Hall 2). Capacity is omitted: the operator's own page gives two figures that do not cleanly separate operational from planned capacity ('8 Critical MW (Committed & Planned)' as a site total, and 'Up to 3MW critical load in phase 1; expandable up to 18MW' for one phase), so no single number can be attributed to operational capacity without guessing. Square footage: 36,493 sq ft built, up to 54,000 sq ft of data hall space, 6,700 sq ft tenant space, per the same source. Coordinates geocoded from the operator's stated street address via the US Census geocoder, not stated directly by any source as facility coordinates.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/dc-blox-greenville-sc"}],"state":"South Carolina","status":"operating"},{"ai_classification":"likely","city":"Yorkville","confidence":"medium","id":"compute_atlas-7f3b1892439f413d","lat":41.7,"location_precision":"approximate","lon":-88.461,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/project-cardinal-yorkville-il","value":1800.0}],"name":"Project Cardinal Data Center Campus","operator":"Pioneer Development LLC","source_notes":"Coordinates approximate NW of IL Rt 47 and Galena Rd in Yorkville; exact parcel spans ~1,037 acres. 14 two-story buildings at 17 million sq ft total. No confirmed hyperscale tenant named. Companion project 'Project Steel' (Prologis, 540 acres, 24 buildings) also approved in same Yorkville corridor. First data center operational target: 2029.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/project-cardinal-yorkville-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"McGregor","confidence":"medium","id":"compute_atlas-7f66636844cf7a6f","lat":31.44,"location_precision":"approximate","lon":-97.4,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/galaxy-digital-mcgregor-tx","value":3500.0}],"name":"Project Merlin (Helios II)","operator":"Galaxy Digital","source_notes":"~500MW initial phase, up to 3,500MW long-term. 500 acres NE of the SpaceX facility. Second Galaxy Digital Texas site, distinct from the tracked Afton/Dickens County Helios campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Galaxy Digital AI data center announced in McGregor, Texas","publisher":"The Energy Mag","retrievedAt":"2026-07-17","url":"https://theenergymag.com/news/2026-06-25/galaxy-digital-ai-data-center-mcgregor-texas"},{"kind":"press","label":"Galaxy Digital eyes second Texas data center site, buys land outside Waco","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-eyes-second-texas-data-center-site-buys-land-outside-waco/"},{"kind":"press","label":"KXXV — McGregor residents submit petition to recall mayor over data center water concerns","retrievedAt":"2026-07-26","url":"https://www.kxxv.com/news/local-news/in-your-neighborhood/mcgregor-residents-submit-petition-to-recall-mayor-over-data-center-water-concerns"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/galaxy-digital-mcgregor-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"confirmed","city":"Boyce","confidence":"medium","id":"compute_atlas-7f703d20616df178","lat":31.4,"location_precision":"approximate","lon":-92.65,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.kalb.com/2026/05/26/live-2-gov-landry-announces-new-multi-billion-dollar-ai-data-center-rapides-parish/","value":300.0}],"name":"Applied Digital Delta Forge 1 AI Factory Campus","operator":"Applied Digital Corporation","source_notes":"Anchor tenant is an undisclosed investment-grade U.S. hyperscaler under a $7.5B, 15-year lease. Two initial facilities totaling 300 MW across 300 acres (of 672-acre secured site). Initial operations targeted mid-2027. Applied Digital HQ in Dallas, TX.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Rapides Parish lands massive $3.6B AI data center project","publisher":"Rapides Parish Journal","retrievedAt":"2026-07-06","url":"https://rapidesparishjournal.com/2026/05/27/rapides-parish-lands-massive-3-6-billion-ai-data-center-project/"},{"kind":"press","label":"Cleco looks to fast-track new generator for data center","publisher":"KALB","retrievedAt":"2026-10-17","url":"https://www.kalb.com/2026/07/30/cleco-looks-fast-track-new-generator-data-center/"},{"kind":"press","label":"Gov. Landry announces new multi-billion-dollar Applied Digital AI data center in Rapides Parish","publisher":"KALB","retrievedAt":"2026-10-17","url":"https://www.kalb.com/2026/05/26/live-2-gov-landry-announces-new-multi-billion-dollar-ai-data-center-rapides-parish/"},{"kind":"press","label":"Applied Digital Breaks Ground on Delta Forge 1, a 430 MW AI Factory Campus in a Southern U.S. State (January 22, 2026)","publisher":"Applied Digital Corporation (investor relations)","retrievedAt":"2026-10-28","url":"https://ir.applieddigital.com/news-events/press-releases/detail/144/applied-digital-breaks-ground-on-delta-forge-1-a-430-mw-ai"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/applied-digital-delta-forge-1-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"likely","city":"Forest City","confidence":"medium","id":"compute_atlas-7fa7b2925a645ae6","lat":35.317,"location_precision":"approximate","lon":-81.826,"name":"Meta Forest City Data Center","operator":"Meta","source_notes":"Meta (Facebook) data center on Social Circle, Forest City, Rutherford County — broke ground 2010, operational ~2012, a multi-parcel campus (parcels owned by 'Andale LLC', a Meta subsidiary confirmed via Meta's SEC 10-K Exhibit 21.1 and the Menlo Park HQ mailing address), with a third facility announced 2015. Meta reports $750M+ invested in North Carolina; the 408 Social Circle parcel alone carries $176.9M assessed building value (built, not land-bank). No site-specific IT-load MW is disclosed. Coordinates are a Rutherford County GIS parcel centroid, held approximate pending a raw-geometry re-pull; a follow-up GIS pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta Forest City Data Center info sheet — broke ground 2010, $750M+ invested in North Carolina","publisher":"Meta Data Centers","retrievedAt":"2026-09-14","url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Forest-City-Data-Center.pdf"},{"kind":"other","label":"Data Center Knowledge - Study: Facebook Data Center in NC Has Massive Economic Impact (search-summary, not directly fetched)","retrievedAt":"2026-07-24","url":"https://www.datacenterknowledge.com/hyperscalers/study-facebook-data-center-in-north-carolina-has-massive-economic-impact"},{"kind":"press","label":"Data Center Knowledge — Facebook Plans North Carolina Data Center (2010)","retrievedAt":"2026-07-25","url":"https://www.datacenterknowledge.com/hyperscalers/facebook-plans-north-carolina-data-center"},{"kind":"subsidy","label":"Rutherford County Economic Development Commission — Data Centers Growing in North Carolina","retrievedAt":"2026-07-25","url":"https://rutherfordncedc.com/newsdetail_T9_R80.php"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/meta-forest-city-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"likely","city":"Alabama","confidence":"medium","id":"compute_atlas-7fb2b660c91b7e84","lat":43.0837,"location_precision":"approximate","lon":-78.3936,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://investigativepost.org/2026/03/18/subsidies-for-stamp-data-center-among-largest-ever/","value":500.0}],"name":"STREAM U.S. Data Centers at STAMP","operator":"Stream U.S. Data Centers LLC","source_notes":"Proposed three-building hyperscale campus at the Western New York Science, Technology and Advanced Manufacturing Park (STAMP), Town of Alabama, Genesee County - by capital investment the largest data center proposal found for New York as of September 2026. GCEDC states a \"$19.46 billion\" capital investment and \"$285 million in PILOT/host revenues\" for Genesee County, the Town of Alabama and the Oakfield-Alabama Central School District, with a public hearing \"Thursday, March 19 at 7 p.m. at the Town of Alabama Fire Hall, 2230 Judge Road, Basom, NY 14013.\" Investigative Post reports the incentive package as \"$1.46 billion in tax breaks for the creation of 125 jobs,\" of which \"$1.43 billion in sales tax breaks\" and \"a $31 million mortgage tax break\". The planned capacity of 500 MW records the sentence \"Stream has said it will use 500 megawatts of electricity, more than 80 percent of all the power available at the STAMP industrial park\" - this is stated electricity use, not a certified IT load or an interconnection award. Reported figures conflict: (a) acreage - Investigative Post says the campus spans \"over 90 acres at the 1,250-acre industrial park\" and the land area is set to 90; an aggregator listing gives 130 acres and had not been verified as of September 2026, so it is not used. (b) construction jobs - GCEDC's CEO is quoted at \"an additional 1,000 workers temporarily,\" while \"the agency reports on its cost-benefit analysis for the project which says construction will employ more than 16,000\"; the lower, attributed figure is recorded. (c) capital cost has moved from \"$6.3 billion a year ago\" to \"$11 billion\" to \"$19 billion\"; the GCEDC-published $19.46B is used. As of 2026-09-09, no source retrieved states a water withdrawal volume for the campus, a confirmed hydropower allocation (the Tonawanda Seneca Nation letter opposes a prospective allocation, which is not the same as one being granted), or a construction start date - so no energy source is recorded. The AI classification is recorded as likely: the project is universally described as an AI-boom data campus but as of September 2026 no retrieved source stated the workload. Coordinates are geocoded to the Town of Alabama, Genesee County, not to a confirmed parcel. The incentive figure is a requested amount, not a confirmed or awarded PILOT; On July 14, 2026 Gov. Hochul signed an executive order establishing a temporary statewide moratorium on large data centers (50 MW or more), which The Batavian reported could delay construction of the Stream campus. Reporting describes a requested package worth about $1.46bn from the Genesee County IDA for the STAMP site, not an awarded one. Subsidy entries have no granted-versus-requested distinction, so neither the package, its two components, nor the $285 million in PILOT/host revenues under the proposed agreements is recorded as a subsidy entry; doing so would present unawarded money as awarded. As of October 2026, none of the cited sources reports an executed IDA agreement; the Rochester Business Journal described the abatements in June 2026 as still being sought.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Subsidies for STAMP data center among largest ever","publisher":"Investigative Post","retrievedAt":"2026-09-21","url":"https://investigativepost.org/2026/03/18/subsidies-for-stamp-data-center-among-largest-ever/"},{"kind":"press","label":"Allies of Tonawanda Seneca Nation strongly oppose 'monstrous data center' proposed for STAMP","publisher":"Orleans Hub","retrievedAt":"2026-09-09","url":"https://orleanshub.com/allies-of-tonawanda-seneca-nation-strongly-oppose-monstrous-data-center-proposed-for-stamp/"},{"kind":"press","label":"A $19.5B data center and a statewide pause: What's at stake in Genesee County","publisher":"Rochester Business Journal","retrievedAt":"2026-09-14","url":"https://rbj.net/2026/06/15/new-york-moratorium-genesee-county-data-center/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stream-stamp-alabama-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Wixom","confidence":"medium","id":"compute_atlas-808420f83554b6a1","lat":42.518432572023,"location_precision":"approximate","lon":-83.537488801805,"name":"Wixom Road Data Center Campus","operator":"Wixom Industrial One / Sansone Group","source_notes":"Three-building complex, each building stated at more than 200,000 sq ft for a total of more than 519,000 sq ft, on vacant light-industrial land. The record is listed as proposed, and the project remains blocked by the municipal moratorium — no site-plan or rezoning approval is recorded. No megawatt figure is stated in either source, so no capacity is recorded rather than inferred from square footage. Water use is not quantified in the sources. Investment figure not stated. The source notes the site sits near a DTE Energy transmission line with natural gas service available, but no interconnection or generation arrangement is described, so no energy source is recorded. Coordinates from the US Census geocoder for the street address named in the source; parcel boundary not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Michigan Data Centers: The Weekly Download","publisher":"Civic Media","retrievedAt":"2026-09-09","url":"https://civicmedia.us/news/2026/07/20/michigan-data-centers-the-weekly-download-2"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/sansone-wixom-road-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Dickerson","confidence":"medium","id":"compute_atlas-80ef78c39e26fd5b","lat":39.2117,"location_precision":"approximate","lon":-77.4736,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/atmosphere-dickerson-montgomery-md","value":360.0}],"name":"Dickerson Data Center","operator":"Atmosphere Data Centers","source_notes":"Five-building campus proposed by California-based Atmosphere Data Centers on the site of the decommissioned Dickerson coal power plant on the Potomac River. Single-source record: the developer's own filings were not independently retrieved. As of 2026-09-10, status remains proposed. The record already captures the June 2026 six-month permit pause and July 28, 2026 18-month Council moratorium. Atmosphere also withdrew its legal appeal of Elrich's now-moot six-month executive-order moratorium after the Council's 18-month moratorium superseded it, and a separate county ordinance indefinitely prohibiting data centers was set to take effect 2026-08-17.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/atmosphere-dickerson-montgomery-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-81368be8932d287d","lat":37.81,"location_precision":"approximate","lon":-77.47,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-hanover-technology-park-va","value":2400.0}],"name":"Hanover Technology Park","operator":"Tract","source_notes":"1,211 total acres in five parcels ranging from 153 to 318 acres, north of the Town of Ashland along the I-95 corridor, zoned M-1 Limited Industrial for by-right data center use with up to 110-foot building heights. Distinct from the two Tract records already tracked: the cancelled Mountain Road Technology Park (western Hanover, denied May 2026) and Tuckahoe Technology Park in Goochland. Coordinates are an approximate geocode north of Ashland, not a parcel-confirmed point. Public-reception check (2026-09-10): Checked Tract's own project page (2026-09-10); it lists only acreage, capacity, and zoning/utility specifications with no mention of public hearings, rezoning votes, resident opposition, or support. No community-reception record found in this source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax (archived)","publisher":"Richmond BizSense","retrievedAt":"2026-08-27","url":"http://web.archive.org/web/20260724010609/https://richmondbizsense.com/2026/06/26/one-data-center-project-pulled-and-another-delayed-in-hanover-as-supervisors-reinstitute-equipment-tax/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/tract-hanover-technology-park-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Irving","confidence":"medium","contains_osm":true,"id":"compute_atlas-813eacd78dcd561c","lat":32.8972479,"location_precision":"exact","lon":-96.9826475,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-irving-1-tx","value":165.0}],"name":"QTS Irving 1","operator":"QTS Data Centers","source_notes":"Confirmed 6-building campus on Longhorn Dr, Irving, TX, 165MW+ critical capacity, 56 acres.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/526806006","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/526806006"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-irving-1-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Wise","confidence":"medium","id":"compute_atlas-8175f8920544b4cb","lat":36.987,"location_precision":"approximate","lon":-82.53,"name":"Mineral Gap Data Center","operator":"DP Facilities","source_notes":"65,000 sq ft high-security colocation facility on 22 acres of the Lonesome Pine Regional Business & Technology Park, serving federal and state government agencies and commercial clients. Physical security includes K-rated, US Department of State certified anti-ram fencing, wedge barriers, a perimeter blast berm and 24/7 armed security; the facility holds HITRUST certification. Wise County reports it employs over 20 people and is the county's second-highest source of improved real estate tax revenue. In 2023 it installed what the county describes as Virginia's first commercial-scale solar field on previously coal-mined land, a 3.6MW array.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data Centers — Wise County Economic Development","publisher":"Wise County Economic Development","retrievedAt":"2026-09-21","url":"https://elevatewisecounty.com/top-industries/data-centers/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/dp-facilities-mineral-gap-wise-va"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"New Castle","confidence":"medium","id":"compute_atlas-8179c6094e416c8f","lat":39.697868,"location_precision":"approximate","lon":-75.574992,"name":"State of Delaware Biggs Data Center (DTI)","operator":"Delaware Department of Technology and Information","source_notes":"State government data center operated by DTI in the Biggs Building on the 1901 N. DuPont Highway state campus, paired with DTI's William Penn Data Center in Dover. No capacity is published. Coordinates are a US Census geocode of the campus street address, not the Biggs Building footprint itself. The campus holds several buildings, so precision is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"DTI procedure 110304-P-025 Data Center Access: William Penn Data Center (Dover) and Biggs Data Center (New Castle)","publisher":"Delaware Department of Technology and Information","retrievedAt":"2026-10-01","url":"https://webfiles.dti.delaware.gov/pdfs/processes/Data-Center-Access.pdf"},{"kind":"filing","label":"RFP DTI230047-INTERNET Addendum 1: internet access to the data centers at Biggs Building, 1901 N Dupont Hwy, New Castle and 801 Silver Lake Blvd, Dover","publisher":"State of Delaware, DTI","retrievedAt":"2026-10-01","url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf"}],"updated":"2026-10-01","url":"https://www.compute-atlas.com/facilities/delaware-dti-biggs-data-center-new-castle-de"}],"state":"Delaware","status":"operating"},{"ai_classification":"unknown","city":"San Francisco","confidence":"medium","id":"compute_atlas-8186bb7b198b2d5e","lat":37.72315,"location_precision":"approximate","lon":-122.398467,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/","value":36.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/novva-san-francisco-400-paul-avenue-ca","value":9.0}],"name":"Novva San Francisco (400 Paul Avenue)","operator":"Novva Data Centers","source_notes":"182,000 sq ft data hall plus 56,000 sq ft office/operations building in Bayview's industrial corridor, across Paul Avenue from Digital Realty SFO10 / 200 Paul Avenue. 36 MW is planned critical load; 9 MW operational as of summer 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amid rising fear over data centers, an S.F. supervisor quietly plans a moratorium (2026-09-10)","publisher":"Mission Local","retrievedAt":"2026-09-21","url":"https://missionlocal.org/2026/09/data-center-moratorium-sf-board-of-supervisors/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/novva-san-francisco-400-paul-avenue-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Reading","confidence":"medium","id":"compute_atlas-819ad768e923a65d","lat":40.2839,"location_precision":"approximate","lon":-75.9372,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/","value":200.0}],"name":"TRON USA AI Campus (former Titus Station)","operator":"Titus Development Company / Go Energy Group","source_notes":"The Titus Station coal plant was decommissioned in 2014. Cumru Township adopted a Data Center Overlay District (Ordinance 798) covering the property in April 2026; no land development plan had been filed as of that reporting. Only the announced first phase (200 MW) is recorded — larger long-term figures circulating in developer materials were not confirmed in the cited source. Coordinates are the Cumru Township point, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Titus Station redevelopment project in Berks County planned as AI infrastructure campus","publisher":"Berks Weekly","retrievedAt":"2026-09-25","url":"https://berksweekly.com/news/titus-station-redevelopment-project-in-berks-county-planned-as-ai-infrastructure-campus/"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/tron-usa-ai-campus-titus-station-cumru-berks-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"mixed_use","city":"Marysville","confidence":"medium","id":"compute_atlas-819cc5c83931fff8","lat":40.237,"location_precision":"approximate","lon":-83.35,"name":"AWS Project Cosmos","operator":"Amazon Web Services","source_notes":"14684 Industrial Parkway, Marysville OH 43040 (Union County, ~30 mi NW of Columbus). Two-building campus totaling ~500,000 sq ft on 55 acres. Also referenced as 'Project Cosmo' (without trailing 's') in DCD. Jobs updated to 50 per Marysville city FAQ ('at least 50 full-time operational jobs'); original record stated 25 from DCD/Amazon initial filing. Construction start updated to early 2026 per city FAQ; DCD had projected August 2025 which appears delayed. Part of AWS's broader $10B+ Ohio infrastructure commitment. Coordinates are approximate Marysville Innovation Park area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS gets go-ahead for data center campus in Marysville, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/aws-gets-go-ahead-for-data-center-campus-in-marysville-ohio/"},{"kind":"other","label":"Data Center FAQs - City of Marysville, OH","publisher":"City of Marysville","retrievedAt":"2026-07-06","url":"https://marysvilleohio.org/772/Data-Center-FAQs"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/aws-project-cosmos-marysville-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Boling","confidence":"medium","id":"compute_atlas-81a55cf422a602cd","lat":29.3167,"location_precision":"approximate","lon":-96.0553,"name":"AWS Project Eagle (Wharton County)","operator":"Amazon Data Services, Inc.","source_notes":"Project Eagle: four identical 189,060 sq ft buildings ($300M each) at 240/244/258 Eaglewood Road near FM 1301/FM 442; construction planned to start Aug 1 2026, staggered completion Jan-Aug 2027.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/aws-project-eagle-boling-wharton-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Sandston","confidence":"medium","id":"compute_atlas-8224c344e179e00b","lat":37.49,"location_precision":"approximate","lon":-77.27,"name":"QTS White Oak Technology Park II (RIC5)","operator":"QTS Data Centers","source_notes":"622-acre QTS expansion in Sandston/eastern Henrico adjacent to the existing White Oak Technology Park; conceptual plans show as many as 13 data center buildings (approved development plan ~7), on ~236 developed acres with ~386 acres open space. Distinct from Iron Mountain's White Oak campus. QTS is separately advancing a ~1,100-acre / 17-building expansion of its Henrico hub.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Henrico County approves 622-acre rezoning request for data centers in Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-13","url":"https://www.datacenterdynamics.com/en/news/henrico-county-approves-622-acre-rezoning-request-for-data-centers-in-virginia/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-white-oak-technology-park-ii-henrico-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Breinigsville","confidence":"medium","id":"compute_atlas-8284bc426b51af4a","lat":40.5384,"location_precision":"approximate","lon":-75.6288,"name":"TierPoint Allentown TekPark","operator":"TierPoint","source_notes":"122,000+ sq ft of enterprise data center capacity including 96,000+ sq ft of raised floor, on a TierPoint-owned 137-acre campus at 9999 Hamilton Blvd, Breinigsville (Lehigh County). Dual redundant 'A'/'B' 69 kV utility transmission feeds; 23 generators totaling roughly 49.5 MW of standby capacity and 36+ hours of on-site fuel. No capacity is recorded: 49.5 MW is standby generator nameplate, not IT load.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/tierpoint-allentown-tekpark-breinigsville-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Talty","confidence":"medium","id":"compute_atlas-82dbe09a88628fbf","lat":32.689,"location_precision":"approximate","lon":-96.3378,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-kaufman-county-talty-tx","value":108.0}],"name":"Flexential Kaufman County Campus (Talty)","operator":"Flexential","source_notes":"Fourth and largest Flexential North Texas campus; phase 1 is a 375,000 sq ft, 36MW building with room for two more 36MW buildings (108MW full build-out). Site work targeted early 2027; first customers late 2028. Distinct site from Flexential's existing Dallas Downtown/Plano/Richardson facilities already tracked.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-kaufman-county-talty-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Manton","confidence":"medium","id":"compute_atlas-836e0ec3a5bfc00a","lat":44.4137447,"location_precision":"approximate","lon":-85.3944105,"name":"GenH Lake Billings Dam Data Services Facility","operator":"GenH","source_notes":"Boston-based GenH proposed installing a run-of-river hydropower system at the Lake Billings dam in Manton to power an adjacent modular data services facility in a 10 by 15-foot container. The city would receive rent-style payments. Presented to the Manton city commission on July 23, 2026, where several commissioners said they were not interested. No MW figure has been published. The pin is the OSM centroid of Lake Billings, not the dam. This is a separate site from GenH's tracked Morley Dam (Mecosta County) proposal.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Manton wary of Lake Billings data center proposal","publisher":"Cadillac News","retrievedAt":"2026-10-07","url":"https://www.cadillacnews.com/news/manton-wary-of-lake-billings-data-center-proposal/article_81fc6587-837e-4e89-a949-b889d28ecd35.html"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/genh-lake-billings-dam-manton-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"high","contains_osm":true,"id":"compute_atlas-83767a96912938bd","lat":36.1686438,"location_precision":"exact","lon":-115.1431445,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-las-vegas-downtown-nv","value":1.37}],"name":"Flexential Las Vegas - Downtown","operator":"Flexential","source_notes":"Address ~302-304 E. Carson Ave, Las Vegas. Distinct from Google Henderson (different operator, 15.4km away).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential official facility page","publisher":"Flexential","retrievedAt":"2026-09-21","url":"https://www.flexential.com/data-centers/nv/las-vegas/downtown-data-center"},{"kind":"osm","label":"OpenStreetMap way/1379421123","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1379421123"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-las-vegas-downtown-nv"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1379421123"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-las-vegas-downtown-osmway-1379421123"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1379421123"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Hull","confidence":"medium","id":"compute_atlas-83bd5b9be453b6e2","lat":43.1888,"location_precision":"approximate","lon":-96.1333,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.ktiv.com/2026/08/12/residents-seek-more-details-potential-sioux-county-data-center/","value":25.0}],"name":"PathOne Sioux County Data Center (Hull)","operator":"PathOne Data Centers","source_notes":"Proposed redevelopment of the former Bison Renewable Energy property at 3071 330th Street near Hull, south of the Highway 18 and 75 intersection (Perkins Corner). Built in 10 MW blocks: an initial 10 MW facility in roughly 40,000 sq ft, with PathOne asking Sioux County to cap any project at the site at no more than 25 MW. A fully developed site would occupy fewer than 30 acres. Estimated investment is a range of $100 million to $375 million, so no single investment figure is recorded. No tenant has been identified. Permanent jobs are given as a 10-20 range and are therefore recorded in prose rather than as a jobs count.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Residents seek more details on potential Sioux County data center","publisher":"KTIV","retrievedAt":"2026-08-14","url":"https://www.ktiv.com/2026/08/12/residents-seek-more-details-potential-sioux-county-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/pathone-hull-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Irvine","confidence":"medium","id":"compute_atlas-847b7ac5a47a9b22","lat":33.69137,"location_precision":"approximate","lon":-117.84036,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-sna1-irvine-ca","value":2.64}],"name":"DataBank SNA1","operator":"DataBank","source_notes":"DataBank operates two Irvine, CA facilities on Von Karman Avenue (SNA1 and SNA2), recorded here as separate entries as of September 2026. SNA1 is 36,720 IT square feet with 2.64MW critical IT load per the operator's own site. Square footage omitted (the record has no land-area or other field for IT sq ft). No AI classification is recorded: no source names AI/GPU capacity at this specific site.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/databank-sna1-irvine-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/databank-sna2-irvine-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Falmouth","confidence":"medium","id":"compute_atlas-852a87f82c0755cf","lat":38.365,"location_precision":"approximate","lon":-77.485,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-stafford-technology-campus-va","value":1100.0}],"name":"Stafford Technology Campus","operator":"STACK Infrastructure","source_notes":"523.94 acres, up to 23 buildings, 5.8-7.9M sq ft, six 300MW substations; rezoning approved Sept 2025.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"STACK plans 1GW campus in Stafford County","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/stack-plans-1gw-campus-in-stafford-county-virginia/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"The FXBG Advance — \"Stafford Supervisors Approve Stafford Technology Center\"","retrievedAt":"2026-07-26","url":"https://www.fxbgadvance.com/p/stafford-supervisors-approve-stafford"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/stack-stafford-technology-campus-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Windsor","confidence":"medium","id":"compute_atlas-8597c9bed1c70a96","lat":41.879941,"location_precision":"approximate","lon":-72.73157,"name":"Cigna Windsor Data Center (9 Griffin Road North)","operator":"Cigna","source_notes":"Existing enterprise data center in a 153,462 sq ft building built in 1982. In June 2022 Windsor's Town Council unanimously endorsed a host municipality agreement for a planned $386M renovation ($100M software, $286M taxable personal property over five years), with no local tax abatement. Per a 2026 report on a state audit, Cigna is the only company to have received Connecticut Qualified Data Center Incentive Program benefits: $863 million in qualified investments, over $17 million in credits, and 5 jobs created. The recorded investment is the $863M qualified-investment figure, which counts equipment and software purchases and is not the construction cost. No MW figure is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cigna plans $386M renovation of Windsor data center (2022-06-22)","publisher":"Hartford Business Journal","retrievedAt":"2026-09-30","url":"https://hartfordbusiness.com/article/cigna-plans-386m-renovation-of-windsor-data-center/"},{"kind":"press","label":"Approval of Connecticut tax credits for data center bypassed required review (2026-08-05)","publisher":"CT Inside Investigator","retrievedAt":"2026-09-30","url":"https://insideinvestigator.org/approval-of-connecticut-tax-credits-for-data-center-bypassed-required-review/"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/cigna-windsor-data-center-ct"}],"state":"Connecticut","status":"operating"},{"ai_classification":"unknown","city":"Tonopah","confidence":"medium","id":"compute_atlas-85c18ba7eefdfe24","lat":33.509,"location_precision":"approximate","lon":-112.962,"name":"Camelback Creek","operator":"Arizona Land Consulting","source_notes":"Northwest corner of 411th Avenue and Camelback Road near Tonopah. Mixed-use master plan with warehouse and data center emphasis; the rezoning request includes a building-height increase from 40 to 85 feet for data center clearance. No end users signed and no square footage or MW disclosed. Distinct site from the tracked Arizona Land Consulting Hassayampa Ranch parcel, which is a separate ~2,000-acre holding; reporting describes ALC holding roughly 4,000 acres across three Tonopah-corridor sites. Public-reception check (2026-09-10): Checked AZBEX's coverage (2026-09-10) of the plan-amendment/rezoning request; it reports only that 'County planning staff has recommended approval of the plan amendment and rezoning requests,' with no resident testimony, hearing record, or elected-official statement of support/opposition.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/arizona-land-consulting-camelback-creek-tonopah-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Secaucus","confidence":"medium","contains_osm":true,"id":"compute_atlas-85ece0e57ed2551f","lat":40.7842844,"location_precision":"exact","lon":-74.0652426,"name":"CoreSite NY2 - Secaucus, NJ","operator":"CoreSite","source_notes":"CoreSite's directory lists only one Secaucus facility (NY2); no separate 'NY3' or 'Secaucus Campus' facility exists per official page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CoreSite facility directory","publisher":"CoreSite","retrievedAt":"2026-10-09","url":"https://www.coresite.com/data-center/ny2-secaucus-nj"},{"kind":"osm","label":"OpenStreetMap way/714139868","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/714139868"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/coresite-ny2-secaucus-nj-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"San Diego","confidence":"medium","id":"compute_atlas-86ad053637777a3d","lat":32.59374,"location_precision":"approximate","lon":-117.08525,"name":"MDC SDG1","operator":"MDC Data Centers","source_notes":"Located near the Otay Mesa port of entry; operator markets this as a carrier-neutral border-crossing facility with redundant fiber routes to Baja California via San Ysidro and Otay Mesa. Capacity/square footage not disclosed on the operator's page — omitted rather than guessed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/mdc-sdg1-san-diego-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"high","contains_osm":true,"id":"compute_atlas-86dfa315996538c4","lat":37.3720542,"location_precision":"exact","lon":-121.9860407,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/csquare-sfo3-ca","value":8.6}],"name":"Csquare SFO3","operator":"Csquare","source_notes":"Csquare's own directory confirms SFO3 as an operational facility at 1400 Kifer Rd, Sunnyvale, CA.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/271893323","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/271893323"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/csquare-sfo3-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/271893323"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/csquare-sfo3-osmway-271893323"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/271893323"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Washington","confidence":"medium","contains_osm":true,"id":"compute_atlas-870fb33832c6fa9d","lat":38.917122,"location_precision":"approximate","lon":-77.032054,"name":"DC Government OCTO Data Center (Frank D. Reeves Municipal Center)","operator":"District of Columbia Office of the Chief Technology Officer (OCTO)","source_notes":"District government enterprise data center for OCTO and DDOT, housed in the Frank D. Reeves Municipal Center at 14th and U Streets NW. Press reports from December 2022 say the city must move its 'complex mission-critical IT' and data center functions out of the Reeves Center before redevelopment, at about $47M including decommissioning. DGS's 2021 request for space (DGS-RFS-2021-11, 'OCTO and DDOT Data Center') sought a replacement with about 500 kW of critical power or 925 kVA of utility power. That figure is a procurement requirement, not this site's measured capacity, so it is not recorded as capacity. As of February 2026 the Reeves redevelopment was still being phased with parts of the building kept operating. None of the cited sources confirms the data center has moved, so status stays operational. Address is geocoded; the 2000 14th St NW street number is the geocoded Reeves Center building address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"D.C. Issues New RFP For Long-Delayed Reeves Center Remake (Dec 5, 2022) – relocation of OCTO/DDOT data center functions out of the Reeves Center, approx. $47M","publisher":"Three60","retrievedAt":"2026-10-20","url":"https://threee60.com/d-c-issues-new-rfp-for-long-delayed-reeves-center-remake/"},{"kind":"press","label":"D.C. Starts Over On Redevelopment Of Reeves Center – mission-critical IT housed at the Reeves Center","publisher":"DCist","retrievedAt":"2026-10-20","url":"https://dcist.com/story/22/12/05/reeves-center-redevelopment-naacp-rfp-deadline/"},{"kind":"filing","label":"DC DGS Request for Space DGS-RFS-2021-11: OCTO and DDOT Data Center (relocation from Reeves), June 2021","publisher":"DC Department of General Services","retrievedAt":"2026-10-20","url":"https://dgs.dc.gov/sites/default/files/dc/sites/dgs/event_content/attachments/OCTO%20and%20DDOT%20Relocation%20from%20Reeves%20-%20RFS%20%282021.06.08%29.pdf"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/dc-octo-reeves-center-data-center-washington-dc"}],"state":"District of Columbia","status":"operating"},{"ai_classification":"likely","city":"Hillsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-872f1fa44a39300e","lat":45.5540594,"location_precision":"exact","lon":-122.9492507,"name":"Aligned PDX-01","operator":"Aligned Data Centers","source_notes":"Confirmed operational, 27-acre campus at NE 30th Ave & NE Evergreen Rd, Hillsboro, OR. AI/HPC (likely): Hillsboro PDX-01 engineered on high-density AI/HPC cooling design.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1114969101","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1114969101"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Canary Media — Oregon utility tries out a faster, cheaper way to power data centers","retrievedAt":"2026-07-24","url":"https://www.canarymedia.com/articles/data-centers/oregon-utility-tries-out-a-faster-cheaper-way-to-power-data-centers"},{"kind":"press","label":"DCD — Aligned tops out PDX-1 data center in Hillsboro, Oregon","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/aligned-tops-out-pdx-1-data-center-in-hillsboro-oregon/"}],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/aligned-pdx-01-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-873086e55c3a1b19","lat":40.474,"location_precision":"approximate","lon":-96.371,"name":"Google Nebraska AI Campus (proposed)","operator":"Google","source_notes":"Exact site is unknown and undisclosed. Tenaska has optioned over 2,600 acres across Gage, Lancaster, Otoe, and Cass Counties in SE Nebraska since December 2025. Coordinates are approximate centroid of the Otoe/Gage County search area. Reported power requirement for the data center is 1,000–3,000 MW, a range; no single planned capacity is recorded. Google has invested $3.5B in Nebraska since 2019 across existing Papillion, Omaha, and Lincoln data centers. Legislative feasibility depends on LB1261; could be operational by 2029 if approved.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google proposes Nebraska data center requiring more power than all of Lincoln","publisher":"Flatwater Free Press","retrievedAt":"2026-08-14","url":"https://flatwaterfreepress.org/google-proposes-nebraska-data-center-requiring-more-power-than-all-of-lincoln/"},{"kind":"press","label":"Google's data-center boom comes to Nebraska","publisher":"Grist","retrievedAt":"2026-08-14","url":"https://grist.org/accountability/google-data-center-carbon-capture-nebraska/"},{"kind":"press","label":"Gage County Planning and Zoning Commission recommends 18-month moratorium on data centers","publisher":"Nebraska Public Media","retrievedAt":"2026-07-06","url":"https://nebraskapublicmedia.org/en/news/news-articles/gage-county-planning-and-zoning-commission-approves-18-month-moratorium-on-data-centers/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-nebraska-ai-campus-proposed"}],"state":"Nebraska","status":"planned"},{"ai_classification":"unknown","city":"Morrisville","confidence":"high","contains_osm":true,"id":"compute_atlas-8741ef587b78c6af","lat":35.8505281,"location_precision":"approximate","lon":-78.8291431,"name":"Flexential Raleigh (RAL02/RAL03)","operator":"Flexential","source_notes":"5150 McCrimmon Pkwy, Morrisville NC (former Peak 10 facility, rebranded Flexential 2018). Second Raleigh-area facility also reported as planned expansion.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential facility directory","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/nc/raleigh/data-center"},{"kind":"osm","label":"OpenStreetMap node/12112361725","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112361725"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-raleigh-ral02-ral03-nc"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112361725"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-raleigh-osmnode-12112361725"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112361725"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Avondale","confidence":"medium","id":"compute_atlas-876828a0a336ae89","lat":33.418842,"location_precision":"approximate","lon":-112.357688,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-phx01-avondale-az","value":225.0}],"name":"STACK Infrastructure PHX01 Campus","operator":"STACK Infrastructure","source_notes":"STACK's west-valley Phoenix campus at 3001 S Litchfield Road, Avondale. The operator states 500 MW and 155 acres across its two Phoenix campuses combined; the 225 MW here is PHX01's own stated capacity and is recorded as planned because the operator does not separate energized from designed capacity. Distinct from the tracked Prime Avondale campus — different operator and parcel. Coordinates geocoded from the cited address (Nominatim and US Census geocoder agree).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/stack-phx01-avondale-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Fairfield","confidence":"medium","id":"compute_atlas-87b5730acbd7e0a8","lat":40.26217,"location_precision":"approximate","lon":-112.093,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ii-fairfield-ut","value":650.0}],"name":"QTS Eagle Mountain II","operator":"QTS Data Centers","source_notes":"Sweetwater Industrial Park Community Reinvestment Project Area #3 (Eagle Mountain Redevelopment Agency, Title 17C): 61% of Real Property Tax Increment plus 74% of Personal Property Tax Increment, reimbursed per Phase for 20 years per phase (not to exceed 40 years total), from Utah County, Alpine School District, Eagle Mountain City, Central Utah Water Conservancy District, and the Unified Fire Service Area. The signed CRA Participation Agreement's Participant is QTS Eagle Mountain I, LLC — there is no separate agreement naming \"QTS Eagle Mountain II, LLC.\" This parcel (38:707:0002, 98.043 acres) is covered by the Sweetwater CRA #3 agreement with QTS Eagle Mountain I, LLC, which explicitly includes this parcel's acreage: the Agreement's own recitals and the amended Project Area's Table 1 Parcel List define the ~193-acre Project Area, and its terms, as spanning both the QTS Eagle Mountain I parcel (38:707:0001, 95.153 acres) and the QTS Eagle Mountain II parcel by acreage. A 2nd Amendment (approved August 20, 2024) changed only the payment mechanics — allowing personal-property reimbursements to be paid directly to QTS's colocation end-clients — and did not alter the 61%/74%/20yr/40yr terms.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/qts-eagle-mountain-ii-fairfield-ut"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Midvale","confidence":"medium","id":"compute_atlas-87be59861453729c","lat":40.6111,"location_precision":"approximate","lon":-111.8994,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cirrus-data-services-midvale-ut","value":112.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cirrus-data-services-midvale-ut","value":32.0}],"name":"CirrusDS View 78 Data Center","operator":"Cirrus Data Services","source_notes":"Phase 1 (32MW, four 8MW modules) is operational and being marketed for lease; two additional phases (~80MW more) are planned. Some third-party trackers report a larger total (up to 160MW) than the operator's own site; treated as unconfirmed beyond the operator's stated 112MW total. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Midvale's RDA runs three project areas (Bingham Junction, Jordan Bluffs, Main Street); 983 W Center St falls outside Main Street's boundary, but which of the two overlapping former-Superfund redevelopment areas, Bingham Junction or Jordan Bluffs, actually contains the parcel was not resolved — the \"View 78\" campus name loosely ties to Jordan Bluffs via a nearby apartment development, but this is not confirmed. Midvale's own resolutions index lists no agreement naming Cirrus, a data center, or 983 W Center St. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Midvale, UT Data Center Campus","publisher":"Cirrus Data Services","retrievedAt":"2026-08-25","url":"https://cirrusds.com/midvale-ut-campus"}],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/cirrus-data-services-midvale-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"confirmed","city":"Victoria","confidence":"medium","id":"compute_atlas-87db66a7a95da3f0","lat":28.8053,"location_precision":"approximate","lon":-97.0036,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crusoe-blue-energy-victoria-tx","value":1500.0}],"name":"Crusoe Victoria AI Factory","operator":"Crusoe","source_notes":"Crusoe-developed AI factory campus at the Port of Victoria, powered by Blue Energy (natural-gas bridge as early as 2028, nuclear targeted ~2031). Distinct from Crusoe's Stargate Abilene campus. ~1.5 GW planned. Coordinates are the Victoria area centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/crusoe-blue-energy-victoria-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Austin","confidence":"high","contains_osm":true,"id":"compute_atlas-881d215017f48186","lat":30.3428035,"location_precision":"exact","lon":-97.6961735,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/element-critical-austin-one-tx","value":5.0}],"name":"Element Critical Austin One","operator":"Element Critical","source_notes":"Confirmed via operator's own official facility page and current brochure PDF (elementcritical.com/wp-content/uploads/2025/03/...). Address 8025 N Interstate Hwy 35, Austin, TX 78753. 5MW, 62,300 sq ft.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Element Critical facility directory","publisher":"Element Critical","retrievedAt":"2026-09-21","url":"https://elementcritical.com/data-centers/austin-data-center/"},{"kind":"osm","label":"OpenStreetMap way/384396017","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/384396017"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/element-critical-austin-one-tx"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/384396017"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/element-critical-osmway-384396017"}],"state":"Texas","status":"operating"},{"ai_classification":"mixed_use","city":"Cheyenne","confidence":"medium","id":"compute_atlas-886d42fbf968d62b","lat":41.11,"location_precision":"approximate","lon":-104.78,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lunavi-cheyenne-wy","value":8.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lunavi-cheyenne-wy","value":5.0}],"name":"Lunavi Cheyenne Data Center","operator":"Lunavi","source_notes":"Colocation facility at 340 Progress Circle, Cheyenne. 5 MW available with stated ability to expand to 8 MW; critical IT load 4 MW; average PUE 1.17, low 1.05. Formerly Green House Data. Ownership caveat: Fifteenfortyseven Critical Systems Realty markets a Cheyenne facility (CHWY1) with a matching 42,000 sq ft building and ~5 MW on-site, so the same building may be owned by 1547 and operated/marketed by Lunavi; only one record is held here to avoid a duplicate, with Lunavi named as operator on the strength of its own current first-party listing. No subsidy is recorded: the Wyoming Business Council materials describe Lunavi as a driver of the exemption's co-location amendments, not as a certified recipient. Coordinates approximate the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Cheyenne WY | CHWY1","publisher":"Fifteenfortyseven Critical Systems Realty","retrievedAt":"2026-08-19","url":"https://www.1547realty.com/data-center/cheyenne-wy-chwy1/"},{"kind":"other","label":"Lunavi's AI Launchpad: Cheyenne, Wyoming datacenter one-pager","publisher":"Lunavi","retrievedAt":"2026-10-17","url":"https://cdn.prod.website-files.com/678a60a2cfea0646ec3afd2c/69a707dc5d0a7f4963d52db8_Cheyenne%20Datacenter%201pager%20FINAL.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/lunavi-cheyenne-wy"}],"state":"Wyoming","status":"operating"},{"ai_classification":"unknown","city":"Buffalo","confidence":"medium","id":"compute_atlas-887d59ff50c5cb4d","lat":38.64411,"location_precision":"approximate","lon":-81.956511,"name":"Google Putnam County Data Center","operator":"Google","source_notes":"1,700 acres both sides of Route 62, north end of Buffalo near the Kanawha River (address disclosed as 22272 Charleston Road). Announced March 2026 as a multibillion-dollar investment with no figure stated; State Treasurer Larry Pack's September 2026 report on data center tax revenue uses an estimated $7 billion total investment for the Google project, saying the project 'lacks investment specifics at the present time', so no investment figure is recorded; still in early due diligence. As of 2026-09-10, the status was unchanged (proposed). The most recent coverage found (an update dated 2026-09-03) still describes the site as an application under review, not a permitted or under-construction project. Capacity and water/cooling type remain unconfirmed: Google's own spokesperson has not disclosed power or water figures for this site as of the 2026-09-03 update. As of October 2026, neither West Virginia Public Broadcasting's reports nor Google's project site gives a site power-demand or water-volume figure: West Virginia Public Broadcasting reports plans for generating 100% of the electricity needed and treating 120% of the water needed, and that MN8 Energy said it will provide 86 megawatts of renewable energy to Google's data centers in the region; Google's project site gives its 100% and 120% figures only as company-wide commitments (it pays for 100% of the electricity its data centers use and aims to replenish 120% more freshwater than it consumes, on average, across its data centers and offices by 2030). No job count is recorded: officials cite only non-numeric 'thousands of construction jobs and hundreds of permanent roles,' and, as of September 2026, no source found gives integer counts. No AI classification is assigned: sources describe this as a general Google data center / cloud campus, and none of the sources reviewed as of September 2026 specifically frames this site as AI-dedicated (vs. general cloud). No facility-specific incentive/abatement program was found in any source reviewed as of September 2026; HB 2014's tax-revenue split (majority to state, county keeps roughly 30%) is a distribution of taxes the facility generates, not a subsidy granted to the facility, so it is not recorded as a subsidy.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google purchases land for potential data center in Putnam County","publisher":"WSAZ","retrievedAt":"2026-07-17","url":"https://www.wsaz.com:443/2026/03/27/google-purchases-land-potential-data-center-putnam-county/"},{"kind":"other","label":"West Virginia GIS Technical Center -- WV Composite Geocoder (state PointAddress match for 22272 Charleston Rd, Buffalo, WV 25033)","retrievedAt":"2026-07-18","url":"https://services.wvgis.wvu.edu/arcgis/rest/services/Geocode/WV_Composite/GeocodeServer"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Pack releases study on expected data center tax revenue","publisher":"WV MetroNews","retrievedAt":"2026-09-10","url":"https://wvmetronews.com/2026/09/01/pack-releases-study-on-expected-data-center-tax-revenue/"},{"kind":"other","label":"Google — Buffalo, West Virginia data center project site","publisher":"Google","retrievedAt":"2026-09-15","url":"https://www.buffalowvdatacenter.com/"},{"kind":"other","label":"EEI Large Load Projects and Tariffs (October 2026)","publisher":"Edison Electric Institute","retrievedAt":"2026-10-28","url":"https://www.eei.org/-/media/Project/EEI/Documents/Issues%20and%20Policy/List%20of%20Large%20Customer%20Projects%20and%20Tariffs"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/google-putnam-county-campus-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lake Park","confidence":"medium","id":"compute_atlas-88cf240b2c0a15bf","lat":43.455556,"location_precision":"approximate","lon":-95.3207429,"name":"Great Lakes Colocation Data Center","operator":"Great Lakes Communication","source_notes":"The operator states that for security reasons the facility's exact address is not publicly disclosed, and places it in Lake Park; its corporate office is 1501 35th Ave W, Spencer. Business Record lists the data center against the Spencer corporate address (9,000 sq ft, in service 2011), so the two sources disagree on which town holds the building. Coordinates are the Lake Park municipal centroid and are approximate accordingly. Cooling type is inferred from the operator's own description of a chilled, recirculating plant, per the recirculating-circuit tie-breaker.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Contact Great Lakes: Advanced Colocation Services in Iowa","publisher":"Great Lakes Communication","retrievedAt":"2026-09-16","url":"https://greatlakescolocation.com/contact-us/"},{"kind":"other","label":"State-of-the-Art Reliability & Security - Great Lakes Colocation","publisher":"Great Lakes Communication","retrievedAt":"2026-09-16","url":"https://greatlakescolocation.com/facility/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/great-lakes-colocation-lake-park-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","id":"compute_atlas-88d3e18bf4b52442","lat":37.199,"location_precision":"approximate","lon":-77.363,"name":"Menlo Digital Richmond Virginia Data Center (Jamestown Drive)","operator":"Menlo Digital","source_notes":"Four-building campus totalling roughly 1.2 million sq ft on 74 acres, served by a planned 300 MW substation; the 104 MW figure is the reported supported IT load at full buildout, not the substation rating. Menlo's own site markets the project as 'Richmond Virginia Data Center'. Coordinates are an approximate geocode of the cited street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/menlo-digital-jamestown-drive-petersburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lewis Center","confidence":"medium","id":"compute_atlas-8a4fcee5c5b1050c","lat":40.190863,"location_precision":"exact","lon":-83.011113,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cologix-col5-orange-township-delaware-county-oh","value":75.0}],"name":"Cologix COL5","operator":"Cologix","source_notes":"Address 6787 Green Meadows Drive, Lewis Center OH 43035, southeast corner of Green Meadows Drive and Home Road, Orange Township. Power to be supplied by AEP. Phase 1 (135,000 sq ft, 25MW) construction began June 2025, targeted completion fall 2026; may expand to 75MW. Received 50%/10-year Ohio sales tax exemption (~$42.3M combined with the Licking County site) plus a 10-year 50% Delaware County property tax abatement, approved at the June 1, 2026 Ohio Tax Credit Authority meeting — the last such approval before Gov. DeWine's announced pause on new data center tax breaks. Coordinates fall within the Delaware County parcel for 6787 Green Meadows Drive (318-230-25-001-002).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Ohio Tax Credit Authority meeting action, June 1, 2026 (reported)","publisher":"Signal Cleveland / Signal Ohio","retrievedAt":"2026-09-10","url":"https://signalcleveland.org/ohio-approves-last-data-center-exemption-before-moratorium/"},{"kind":"subsidy","label":"Ohio Tax Credit Authority Meeting Minutes, June 1, 2026","publisher":"Ohio Department of Development","retrievedAt":"2026-07-17","url":"https://dam.assets.ohio.gov/image/upload/development.ohio.gov/business/stateincentives/TCA_Meeting_Minutes_6.1.2026.pdf"},{"kind":"other","label":"Denver company Cologix starts work on Lewis Center AI data center","publisher":"Delaware County Regional Planning Commission (news clipping)","retrievedAt":"2026-07-17","url":"https://regionalplanning.co.delaware.oh.us/wp-content/uploads/sites/17/2025/06/ORA-Cologix-starts-work-06.18.25.pdf"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cologix-col5-orange-township-delaware-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"likely","city":"Millersport","confidence":"medium","id":"compute_atlas-8a552b9abdeb908a","lat":39.902,"location_precision":"approximate","lon":-82.5324,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://vantagemillersportcampus.com/","value":696.0}],"name":"Vantage Data Centers OH2 (Millersport Campus)","operator":"Vantage Data Centers","source_notes":"Vantage's second Ohio campus (distinct from the tracked OH1 in Johnstown), at Lancaster-Newark Rd & Blacklick Rd near Millersport — up to 7 structures incl. 4 data-center buildings, $2.1B, powered by an adjacent natural-gas generation facility; under construction as of mid-2026. Capacity figures diverge: 696 MW on Vantage's own site (used here) vs ~800 MW / 500 acres on a project aggregator — the operator figure is used and the discrepancy flagged. Coordinates approximate (Millersport city-center, not parcel-verified). Public-reception check (2026-09-10): Checked the project's own campus microsite (2026-09-10); it covers only project description and planned economic benefits, with no documented public hearing, resident reaction, or official statement of support/opposition.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Vantage Millersport Campus official site: 352 acres, 696 MW IT capacity, 7 structures (up to 4 data centers), Lancaster-Newark Rd & Blacklick Rd, adjacent natural-gas power, $2.1B+","publisher":"Vantage Data Centers","retrievedAt":"2026-08-05","url":"https://vantagemillersportcampus.com/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/vantage-oh2-millersport-fairfield-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"West Columbia","confidence":"medium","id":"compute_atlas-8a9a8d1f01557a80","lat":38.9831343,"location_precision":"approximate","lon":-82.0634753,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/starwood-tamarack-west-columbia-mason-wv","value":2160.0}],"name":"Project Tamarack","operator":"Starwood Digital Ventures","source_notes":"Announced 2026-09-03 by Gov. Morrisey as a separate, distinct project from Nscale's Monarch Compute Campus (also Mason County, ~20 min drive south near Point Pleasant). Governor's office figure of 'approximately 2.16 gigawatts' converted directly to MW (2,160) -- exact stated figure, not a rounded estimate. Project details at projecttamarack.com (not independently retrieved as of September 2026).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Second Certified Data Center Announced For Mason County — Tamarack closed-loop cooling to minimize water use","publisher":"West Virginia Public Broadcasting","retrievedAt":"2026-09-22","url":"https://wvpublic.org/story/energy-environment/second-certified-data-center-announced-for-mason-county/"},{"kind":"press","label":"Morrisey announces $12 billion data center project in Mason County","publisher":"WV MetroNews","retrievedAt":"2026-09-22","url":"https://wvmetronews.com/2026/09/03/morrisey-announces-12-billion-data-center-project-in-mason-county/"},{"kind":"press","label":"Starwood Digital Ventures announces data center for Mason County","publisher":"WSAZ","retrievedAt":"2026-10-28","url":"https://www.wsaz.com/2026/09/03/starwood-digital-ventures-announces-data-center-mason-county/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/starwood-tamarack-west-columbia-mason-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"medium","id":"compute_atlas-8aafefa167d74227","lat":36.160035,"location_precision":"approximate","lon":-115.119051,"name":"isp.net Las Vegas Data Center (DC1)","operator":"isp.net","source_notes":"Carrier-neutral colocation facility; the operator states it runs two Las Vegas facilities connected by private fibre and licensed microwave, of which only this address is published on its site. A second site (DC2) is referenced by directories but is not recorded here because the operator does not publish its address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/isp-net-las-vegas-fremont-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Hanging Rock","confidence":"medium","id":"compute_atlas-8ae41e73745de9d4","lat":38.567639,"location_precision":"approximate","lon":-82.781751,"name":"Hanging Rock / Haverhill Data Center","operator":"Strata Expense (backed by Supermicro + Ravel)","source_notes":"At 1476 County Road 1A; land sold by the Lawrence County Economic Development Corp. Construction began around December 2025. A 5,178-signature opposition petition sparked a moratorium push in neighboring Ironton.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center project in Lawrence County, Ohio sparks calls for moratorium in neighboring city","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/data-center-project-in-lawrence-county-ohio-sparks-calls-for-moratorium-in-neighboring-city/"},{"kind":"press","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","retrievedAt":"2026-09-09","url":"https://athensindependent.com/data-centers-across-appalachian-ohio/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/strata-hanging-rock-haverhill-data-center-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Oak Brook","confidence":"medium","id":"compute_atlas-8aff86ef964dac82","lat":41.85392,"location_precision":"approximate","lon":-87.9221234,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-ord4-oak-brook-il","value":8.75}],"name":"DataBank ORD4 (Chicago Tri-State)","operator":"DataBank","source_notes":"DataBank's market page lists ORD4 at 77,510 IT sq ft and 8.75MW — its largest Illinois site. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/databank-ord4-oak-brook-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"confirmed","city":"Billings","confidence":"medium","id":"compute_atlas-8b6c60247a548021","lat":45.823,"location_precision":"approximate","lon":-108.7,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://montanafreepress.org/2026/02/12/as-ai-investors-eye-montana-for-new-data-centers-communities-brace-for-water-impacts/","value":1000.0}],"name":"Big Sky Digital Infrastructure Campus","operator":"Quantica Infrastructure","source_notes":"5,100-acre site in Yellowstone County between Broadview and Billings ('north of Billings'). Shovel-ready powered land; grid power expected 2027. Interconnection application filed May 2026 for 1,100 MW. Backed by EnCap Investments (~$2.7B under management). Construction planned to begin 2026. Coordinates approximate between Billings and Broadview.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"EnCap-backed Quantica Details Plans for 1GW Campus in Montana","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/encap-backed-quantica-details-plans-for-1gw-campus-in-montana/"},{"kind":"press","label":"Quantica Introduces Big Sky Digital Infrastructure as Its Flagship Montana Platform","publisher":"Quantica Infrastructure","retrievedAt":"2026-07-06","url":"https://quanticainfra.com/2025/08/04/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/"},{"kind":"press","label":"Agreement between data center developer and union federation thin on details","publisher":"Montana Free Press","retrievedAt":"2026-10-08","url":"https://montanafreepress.org/2026/06/17/agreement-between-data-center-developer-and-union-federation-thin-on-details/"},{"kind":"press","label":"As AI investors eye Montana for new data centers, communities brace for water impacts","publisher":"Montana Free Press","retrievedAt":"2026-10-26","url":"https://montanafreepress.org/2026/02/12/as-ai-investors-eye-montana-for-new-data-centers-communities-brace-for-water-impacts/"},{"kind":"press","label":"DEQ seeks public comment on well proposal for new data center in Yellowstone Co.","publisher":"NBC Montana","retrievedAt":"2026-10-26","url":"https://nbcmontana.com/news/local/deq-seeks-public-comment-on-well-proposal-for-new-data-center-in-yellowstone-co"},{"kind":"press","label":"Quantica files power request for Yellowstone County data center","publisher":"KULR-8","retrievedAt":"2026-10-26","url":"https://www.kulr8.com/news/quantica-files-power-request-for-yellowstone-county-data-center/article_65961adc-7dd3-4bfd-82b8-cbe6fe72f72a.html"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/quantica-bsdi-billings-mt"}],"state":"Montana","status":"planned"},{"ai_classification":"mixed_use","city":"Prichard","confidence":"medium","contains_osm":true,"id":"compute_atlas-8b9bb450e2802b49","lat":30.7387998,"location_precision":"approximate","lon":-88.0788889,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://projectgatewayal.com/","value":8.0}],"name":"Edged Prichard Data Center (Project Gateway)","operator":"Edged US","source_notes":"Developer site states verbatim: \"8MW, 57,000 SF building – roughly the size of a football field\", \"$93 million investment in the local community\", \"150–200 construction jobs supported during an approximately 18-month construction period\", \"20 permanent full-time positions upon completion\", and \"Approximately $16.7 million in projected annual economic impact, including $8.3 million supporting local schools\". The recorded construction jobs figure is the low end (150) of the stated 150-200 range rather than a midpoint. FOX10 adds the ~20 jobs pay \"over $70,000 annually\". Subsidy: no incentive or abatement is mentioned on the developer's project site or in FOX10's coverage; Prichard and Mobile County records had not been checked as of September 2026, so that is an unchecked gap, not an audited negative. The $16.7M annual economic impact and $8.3M schools figure are developer projections, not incentives, and are not recorded as subsidies. Status: the developer's own site calls the project \"proposed\" and \"being evaluated\"; no construction start is reported. Coordinates are the Prichard municipal centroid. WKRG reports that the developer wants to build on Telegraph Road, but no street address or parcel appeared in any source retrieved as of October 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project Gateway | Sustainable Data Center Development in Prichard, AL (developer's project site)","publisher":"Edged US","retrievedAt":"2026-10-18","url":"https://projectgatewayal.com/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/edged-gateway-prichard-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"likely","city":"Round Rock","confidence":"high","contains_osm":true,"id":"compute_atlas-8ba65c7a2618f9c9","lat":30.4880189,"location_precision":"exact","lon":-97.6725256,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/switch-the-rock-round-rock-tx","value":185.0}],"name":"Switch: The Rock (Round Rock)","operator":"Switch","source_notes":"Land purchase from Dell + rezoning approved per DCD and Round Rock city government release; project is Switch's 5th 'Prime' campus, not yet reported as fully operational. AI/HPC (likely): The Rock: exascale data center campus for hyperscale/high-density.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Switch facility directory","publisher":"Switch","retrievedAt":"2026-07-22","url":"https://www.datacenterdynamics.com/en/news/switch-granted-planning-permission-for-data-center-in-round-rock-texas/"},{"kind":"osm","label":"OpenStreetMap way/1493169641","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1493169641"},{"kind":"other","label":"Community Impact: ERCOT/Oncor grid capacity for Round Rock data centers","retrievedAt":"2026-07-24","url":"https://communityimpact.com/round-rock/texas-legislature/ercot-developers-detail-plans-to-manage-data-center-growth-amid-legislative-scrutiny/"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/switch-the-rock-round-rock-tx"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493169641"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-the-rock-osmway-1493169641"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493169641"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Conover","confidence":"medium","id":"compute_atlas-8bab8d53fc90839c","lat":35.7065,"location_precision":"approximate","lon":-81.2184,"name":"Microsoft Conover Data Center","operator":"Microsoft","source_notes":"One of four Microsoft campuses in Catawba County (Conover, Hickory, Maiden, Newton). The widely cited $1 billion figure is Microsoft's county-wide minimum investment commitment over a 10-year performance window across all four sites — it is not this site's investment. No per-site capacity has been disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Joint statement on Microsoft data center development in Catawba County","publisher":"Catawba County, NC","retrievedAt":"2026-10-15","url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/microsoft-conover-catawba-county-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"likely","city":"Chandler","confidence":"medium","contains_osm":true,"id":"compute_atlas-8be33874f5209b52","lat":33.2749228,"location_precision":"exact","lon":-111.8866379,"name":"Digital Realty PHX15","operator":"Digital Realty","source_notes":"Directory confirms address 2121 S Price Road, Chandler AZ; site supports high-density AI/HPC deployments per operator page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/300952513","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/300952513"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-phx15-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-8c119c5abcc76678","lat":37.375822,"location_precision":"exact","lon":-121.9533359,"name":"Digital Realty Silicon Valley SJC10","operator":"Digital Realty","source_notes":"Address 1100 Space Park Drive, Santa Clara, CA 95054; distinct address from other SJC candidates.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/209073641","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/209073641"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc10-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/209076412","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/209076412"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc11-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/209073653","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/209073653"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc16-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/209087373","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/209087373"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-silicon-valley-sjc31-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/digital-realty-sjc15-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/digital-realty-sjc29-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/digital-realty-sjc36-lafayette-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"SJC37 Data Center | 641 Walsh Ave | Digital Realty","publisher":"Digital Realty","retrievedAt":"2026-09-14","url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc37"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/digital-realty-sjc37-santa-clara-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073641"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073647"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073649"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-8cbe9e635f54361f","lat":39.0195992,"location_precision":"exact","lon":-77.4504568,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-abx-1-va","value":60.0}],"name":"PowerHouse ABX-1","operator":"PowerHouse Data Centers","source_notes":"Confirmed via PowerHouse's own site: delivered October 2023, sold in Q4 2024 to a third party. Kept as a real, distinct, currently-existing facility that PowerHouse itself still profiles in its portfolio; ownership transfer does not remove it from the map, but a future pass should confirm the new owner/name if PowerHouse's page is eventually retired.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1188715508","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1188715508"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/powerhouse-abx-1-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1188715508"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-abx-1-osmway-1188715508"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Palm Coast","confidence":"medium","id":"compute_atlas-8d1340044a790bc6","lat":29.4858163,"location_precision":"approximate","lon":-81.1959416,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://flaglerlive.com/data-center-records/","value":10.0}],"name":"DC BLOX Palm Coast Cable Landing Station","operator":"DC BLOX","source_notes":"Subsea cable landing station with colocation in Palm Coast Town Center: one approved building of 33,760 sq ft (FlaglerLive records: 34,875 sq ft incl. guard house), <10 MW at full operation per the city, Tier III design, capacity for up to six subsea cables including Google's Sol (Palm Coast–Bermuda–Azores–Spain). Initial phase expected operational Q1 2027. Original land purchase was 34 acres. DC BLOX cites >$100M potential direct investment over time (not a committed site figure, so not recorded).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Records reveal some details as construction starts on scaled down data center in Palm Coast's Town Center","publisher":"FlaglerLive","retrievedAt":"2026-09-21","url":"https://flaglerlive.com/data-center-records/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/dc-blox-palm-coast-cable-landing-station-fl"}],"state":"Florida","status":"under construction"},{"ai_classification":"unknown","city":"Centennial","confidence":"high","contains_osm":true,"id":"compute_atlas-8d4873a77387026c","lat":39.5917924,"location_precision":"exact","lon":-104.8479857,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-den2-centennial-co","value":4.0}],"name":"DataBank DEN2 — Centennial","operator":"DataBank","source_notes":"31,510 IT sq ft, 4 MW critical IT load, 10 onsite carriers. The older of the two buildings on DataBank's 11-acre Centennial Campus; campus acreage is not attributed to this single building.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/databank-den2-centennial-co"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/databank-den5-centennial-co"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/292506449"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/292506452"}],"state":"Colorado","status":"operating"},{"ai_classification":"confirmed","city":"Delta","confidence":"medium","id":"compute_atlas-8d4ef87696295781","lat":39.3527,"location_precision":"approximate","lon":-112.5777,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/creekstone-delta-ut","value":10000.0}],"name":"Creekstone Energy Delta Gigasite","operator":"Creekstone Energy","source_notes":"Claims to be world's largest planned AI data center campus at 20M sq ft. 1,143 acres owned; 13,000-acre SITLA lease for solar (largest solar lease in Utah history — record previously stated 30,000 acres, corrected to 13,000 acres per March 2026 BusinessWire announcement and multiple independent sources). Initial customer BluSky AI allocated up to 50MW. Adjacent to Intermountain Power Project. 10GW is full-buildout target; first 300MW gas delivery H1 2027. Coordinates at Delta city centroid; site is southeast of Delta.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Creekstone Energy Commits $17B to Millard County — Utah Governor's Office","publisher":"Utah Governor's Office of Economic Development","retrievedAt":"2026-07-06","url":"https://business.utah.gov/tax-credits/creekstone-energy-llc-commits-17-billion-to-millard-county-data-center-project/"},{"kind":"press","label":"Creekstone Energy Secures 13,000-Acre SITLA Solar Lease (Largest in Utah History)","publisher":"BusinessWire","retrievedAt":"2026-07-06","url":"https://www.businesswire.com/news/home/20260310800142/en/Creekstone-Energy-Secures-Largest-Solar-Lease-in-Utahs-History-and-Receives-Millard-County-Zoning-Approval-for-Over-1-GW-of-Solar-Development"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","retrievedAt":"2026-10-13","url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/creekstone-delta-ut"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Canton","confidence":"medium","id":"compute_atlas-8d5597bf56e9af54","lat":40.798546,"location_precision":"approximate","lon":-81.374951,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/corscale-midwest-digital-gateway-canton-oh","value":312.0}],"name":"Midwest Digital Gateway (Central Avenue SE, Canton)","operator":"Corscale","source_notes":"Project specifics (developer, name, 312 MW, ~162 acres, $2.9B, AWS described only as 'likely customer' with no lease confirmed) rest on a single trade-press source, hence the record is marked reported. That article also says ~163.5 acres were annexed into Canton from Canton Township; Spectrum's Jul 2026 zoning story quotes a resident on a proposed 161-acre center but does not name the project, so it corroborates scale only. Coordinates are the Nominatim centroid of the City of Canton (no street address published; the site is in SE Canton near Millerton St SE / Central Ave SE, so the pin is several km off), hence approximate. Unresolved: (1) aggregator listings attribute 'Midwest Digital Gateway' to DAMAC Digital; the Stark County Auditor record (parcel 10020089) shows DAMAC DIGITAL SOLUTION OHIO LLC bought an 8-parcel package from AIDC CANTON 2 LLC on 2025-12-31 for $36.5M, but that parcel is on Trump Ave SE, not Central Ave SE, so DAMAC's holding looks like a separate site (Spectrum mentions a data center 'being built on Trump Ave'), not this record; (2) Panattoni's 'Project Shelby' (324 MW, former Ford forge site south of Georgetown Rd NE, Aug 2026) is a different NE-Canton site and is not this record. As of October 2026, the developer/owner of the Central Ave parcel is not confirmed against Stark County Auditor transfers (buyer reportedly 'MDG-Canton Purchaser LLC').","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Midwest Digital Gateway - Canton, Ohio (project site)","publisher":"Corscale","retrievedAt":"2026-10-30","url":"https://www.mdgcanton.com/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/corscale-midwest-digital-gateway-canton-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"Joliet","confidence":"medium","id":"compute_atlas-8d591d7be6f1fe80","lat":41.432,"location_precision":"approximate","lon":-88.128,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/joliet-technology-center-il","value":1800.0}],"name":"Joliet Technology Center","operator":"HW Technology Park (Hillwood Investment Properties / PowerHouse Data Centers)","source_notes":"Coordinates approximate Jackson Township at Rowell and Bernhard Rds, south Joliet (~40 mi SW of Chicago), near Chicagoland Speedway. 24 two-story buildings planned. No confirmed hyperscale tenant as of permit date. Construction start targeted early 2027; first sub-campus by 2028. Construction jobs range reported as 7,000-10,000; permanent approximately 700.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center planned on 795 acres of farmland in south Joliet, Illinois","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/data-center-planned-on-795-acres-of-farmland-in-south-joliet-illinois/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/joliet-technology-center-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Smyrna","confidence":"high","contains_osm":true,"id":"compute_atlas-8d5a1e1df9363e16","lat":35.9934295,"location_precision":"approximate","lon":-86.4958261,"name":"Tennessee South Data Center (State of Tennessee)","operator":"State of Tennessee — Strategic Technology Solutions","source_notes":"No street address is asserted: the address circulating in directory listings (92 Weakley Lane) was not confirmed on any page retrieved as of September 2026, and the address printed on the electrical contractor's page is the contractor's own Nashville office, not this facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Tennessee South Data Center — Smyrna, TN (electrical scope: two 3,000 A services, 2N UPS, two 2,000 kW generators)","publisher":"ABEC Electric Company, LLC","retrievedAt":"2026-09-14","url":"https://www.abecelectric.com/tennessee-south-data-center"},{"kind":"other","label":"TN South Data Center, Smyrna TN — commissioning project record (State of Tennessee executive-branch computing)","publisher":"International Commissioning Engineers","retrievedAt":"2026-09-14","url":"https://iceagents.com/index.php/project/tn-south-data-centers-smyrna-tn/"},{"kind":"osm","label":"OpenStreetMap way 930226814 — 'Tennessee South Data Center', operator=State of Tennessee, telecom=data_center","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-14","url":"https://www.openstreetmap.org/way/930226814"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/tennessee-south-data-center-smyrna-tn"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/930226814"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tennessee-south-data-center-osmway-930226814"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/930226814"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Kuna","confidence":"medium","contains_osm":true,"id":"compute_atlas-8dac4073f419b0c6","lat":43.44545,"location_precision":"approximate","lon":-116.37335,"name":"Gemstone Technology Park","operator":"Diode Ventures","source_notes":"Diode Ventures (a Black & Veatch subsidiary) states on its project-updates page that Gemstone Technology Park \"would require more than $1 billion in private investment\"; recorded here as the stated investment floor, not a confirmed total. No MW capacity was disclosed in either source fetched. Diode Ventures describes the project as 'early development' with up to five buildings planned. Distinct from the existing Meta Kuna Data Center (14375 S Cole Rd), tracked separately as of September 2026. Coordinates set 2026-09-12 from the OpenStreetMap building POI at 3250 S Locust Grove Road. The US Census geocoder returns a point 1.6 km north for the same address; both agree on street and ZIP, and a mapped building beats an address-range interpolation, but for a 620-acre campus treat the pin as site-level regardless.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Kuna, Idaho, USA – Gemstone Technology Park","publisher":"Diode Ventures","retrievedAt":"2026-09-12","url":"https://www.diodeventures.com/projects/kuna-idaho-usa"},{"kind":"osm","label":"OpenStreetMap way/761896168 — 3250, South Locust Grove Road, Kuna","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-12","url":"https://www.openstreetmap.org/way/761896168"}],"updated":"2026-10-04","url":"https://www.compute-atlas.com/facilities/diode-ventures-gemstone-kuna-id"}],"state":"Idaho","status":"planned"},{"ai_classification":"unknown","city":"San Diego","confidence":"medium","id":"compute_atlas-8dc6ace938a30817","lat":32.75,"location_precision":"approximate","lon":-117.123,"name":"MDC SDG2","operator":"MDC Data Centers","source_notes":"Second San Diego facility, on University Avenue in the North Park / University Heights area. Capacity/square footage not disclosed on the operator's page — omitted rather than guessed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/mdc-sdg2-san-diego-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Kearney","confidence":"medium","id":"compute_atlas-8e20c7300aaab4aa","lat":40.728341,"location_precision":"approximate","lon":-99.045806,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.centralnebraskatoday.com/2026/08/21/421081/","value":368.0}],"name":"Project Horizon (Tech oNE Crossing)","operator":"Starwood Digital Ventures","source_notes":"Multi-phase data center campus at Tech oNE Crossing, east of Antelope Ave. and south of Tech One Blvd/Global Drive, outside Kearney city limits. 368 MW total electrical demand at full build-out. Phase 1 reuses the 100 MW of capacity at the adjacent existing crypto-mining site, which is to be decommissioned after Phase 1; Phase 3 extends onto the former mining property. That mining site is tracked separately as the MARA Kearney Facility as of October 2026; this record is the successor AI/data-center campus, not a duplicate of it. WOWT (carrying a Flatwater Free Press report) says the city acquired roughly 112 acres for the Tech oNE tech park as a whole; as of October 2026, that report gives no acreage for the campus itself. It reports first phase completion by late 2027 and full capacity around 2030; the tenant is undisclosed under NDA. Permit conditions: development must begin within two years, plus annual hazardous-materials inventory. Coordinates are approximate, borrowed from the adjacent mining site on the same Tech oNE Crossing parcel complex.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project Horizon data center CUP recommended by Kearney Planning Commission (368 MW, three phases)","publisher":"Central Nebraska Today","retrievedAt":"2026-10-12","url":"https://www.centralnebraskatoday.com/2026/08/21/421081/"},{"kind":"press","label":"Kearney City Council unanimously approves Project Horizon data center","publisher":"KSNB / Gray Media","retrievedAt":"2026-10-12","url":"https://central-ncn.producer.immergo.tv/story/363530628/kearney-city-council-unanimously-approves-project-horizon-data-center"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/starwood-project-horizon-kearney-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"unknown","city":"Woodlawn","confidence":"medium","id":"compute_atlas-8e24547ece47eaa8","lat":39.3196,"location_precision":"approximate","lon":-76.7448,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://foxbaltimore.com/news/local/data-centers-energy-woodlawn-baltimore-county-maryland","value":150.0}],"name":"1500 Woodlawn Drive Data Center Campus","operator":"Security Land and Development LP","source_notes":"Redevelopment of the 42-acre former Social Security Administration headquarters campus in Woodlawn, plus an adjacent Rodeway Inn parcel. Construction had been targeted for June/July 2026 before Baltimore County's permit moratorium. As of 2026-09-10 the status remains proposed, consistent with 'no development plan submitted as of mid-2026' elsewhere in the record. Baltimore County's yearlong data-center permit moratorium (in effect since mid-2026) is set to end January 2027, which is why the June/July 2026 construction target slipped. No further investment, water, AI-classification, or subsidy figures were found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Woodlawn Data Center, Baltimore, MD: Maryland Data Center Series Pt. 2","publisher":"Nature Forward","retrievedAt":"2026-08-26","url":"https://natureforward.org/woodlawn-data-center-baltimore-md-maryland-data-center-series-pt-2/"},{"kind":"press","label":"New data center could be coming to Woodlawn area in Baltimore County","publisher":"FOX45 Baltimore","retrievedAt":"2026-08-26","url":"https://foxbaltimore.com/news/local/data-centers-energy-woodlawn-baltimore-county-maryland"},{"kind":"press","label":"Woodlawn data center proposal meets pushback over power, water concerns","publisher":"Patch","retrievedAt":"2026-10-22","url":"https://patch.com/maryland/towson/woodlawn-data-center-proposal-meets-pushback-over-power-water-concerns"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/security-land-woodlawn-baltimore-county-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"likely","city":"Marana","confidence":"medium","id":"compute_atlas-8e6b3e73ad3d7300","lat":32.495,"location_precision":"approximate","lon":-111.198,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://news.azpm.org/p/news-articles/2026/1/8/227908-marana-town-council-approves-rezoning-for-luckett-road-project-600-acre-hyperscale-data-center/","value":1500.0}],"name":"Luckett Road Data Centers (Fremont Peak Properties)","operator":"Fremont Peak Properties LLC (Beale Infrastructure)","source_notes":"Two parcels along Luckett Road: north parcel owned by the Church of Jesus Christ of Latter-day Saints (borders Pinal County); south parcel owned by the Kai Family Trust. Fremont Peak Properties LLC (also referenced as 'Humphrey's Peak Properties' in some coverage) is a subsidiary of Beale Infrastructure, backed by Blue Owl Capital; connected to, but a distinct site from, the separately-tracked 'Project Blue' Beale/Blue Owl effort in unincorporated Pima County near Tucson, and from Beale's separately-tracked Project Pilot in De Soto, KS. Developer projects ~400 permanent and ~4,200 temporary construction jobs (Chamber of Southern Arizona estimate) - not yet delivered, so no jobs figure is recorded. No explicit AI/GPU branding found in coverage; the AI classification is likely given Blue Owl Capital's profile as a major AI-datacenter-era infrastructure investor. Coordinates are approximate for the Luckett Road parcels.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Rezoning approved for Marana data center campus","publisher":"Tucson.com / Arizona Daily Star","retrievedAt":"2026-07-09","url":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html"},{"kind":"press","label":"Marana Planning Commission backs rezoning for 600-acre data center project","publisher":"AZPM","retrievedAt":"2026-07-09","url":"https://news.azpm.org/s/102313-marana-planning-commission-backs-rezoning-for-600-acre-data-center-project/"},{"kind":"press","label":"Marana residents submit petitions to put data center project to a vote","publisher":"AZPM","retrievedAt":"2026-07-09","url":"https://news.azpm.org/p/azpmnews/2026/2/10/228403-marana-residents-submit-petitions-to-put-data-center-project-to-a-vote/"},{"kind":"press","label":"Marana Town Council approves rezoning for Luckett Road Project, 600-acre hyperscale data center","publisher":"Arizona Public Media (AZPM)","retrievedAt":"2026-08-28","url":"https://news.azpm.org/p/news-articles/2026/1/8/227908-marana-town-council-approves-rezoning-for-luckett-road-project-600-acre-hyperscale-data-center/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/fremont-peak-luckett-road-marana-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"likely","city":"West Des Moines","confidence":"medium","id":"compute_atlas-8ea27b681106af30","lat":41.551,"location_precision":"approximate","lon":-93.782,"name":"Microsoft Project Ginger West Data Center","operator":"Microsoft","source_notes":"Site at 11100 Booneville Rd area, West Des Moines (Polk County). 1.8M sq ft planned across multiple buildings. Turner Construction is general contractor; completion estimated summer 2028. Companion Ginger East campus (124 acres, 5 buildings) is a separate site in West Des Moines. Part of Microsoft's multi-billion dollar total Iowa investment since 2009. Planned MW capacity not confirmed from primary sources; 444 MW figure removed as unsupported. Iowa's Sec. 423.3(95) data-center sales-tax exemption applies, but Iowa data-center incentive awards are not publicly disclosed; no Ginger West-specific job count is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft Project Ginger West data center in West Des Moines gets planning approval","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsofts-project-ginger-west-data-center-in-west-des-moines-gets-planning-approval/"},{"kind":"press","label":"Microsoft's next data center buildings to use 'zero-water' technology","publisher":"Axios Des Moines","retrievedAt":"2026-07-07","url":"https://www.axios.com/local/des-moines/2026/01/16/microsoft-west-des-moines-data-center-water-zero"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Construction Underway on 4 New Microsoft Data Centers","publisher":"Go West Des Moines (City of West Des Moines economic development)","retrievedAt":"2026-08-21","url":"https://gowestdesmoines.com/news_article/the-city-of-west-des-moines-approved-several-permits-to-proceed-with-the-construction-of-the-data-center/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/microsoft-ginger-west-ia"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Lockport","confidence":"medium","contains_osm":true,"id":"compute_atlas-8ec2cdeb6304a98f","lat":43.16879237433895,"location_precision":"exact","lon":-78.7516290070774,"name":"H5 Data Centers Buffalo I (formerly Yahoo Lockport)","operator":"H5 Data Centers","source_notes":"5319 Enterprise Dr, Lockport, NY. Built by Yahoo in 2010 (opened at 155,000 sq ft, expanded since); campus totals 409,200 sq ft / 43 acres shared with the separate H5 Buffalo II building (~0.25 mi away — see that record). H5 Data Centers acquired both Lockport buildings from Yahoo in a sale-leaseback deal that closed Dec 30, 2024 ($49M reported); Yahoo signed a 5-year leaseback and remains a tenant on-site (140 staff retained, 15 transferred to H5). Now multi-tenant Tier III colocation, though no tenants beyond Yahoo are independently confirmed. Critical power was 16 MW as of 2014; as of July 2026, the current total post-expansion had not been independently disclosed, so no capacity is recorded rather than guessed. Coordinates fall within the building footprint mapped at 5319 Enterprise Drive in OpenStreetMap, inside the area it labels 'Yahoo! Lockport Datacenter'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"H5 Acquires New York Data Centers From Yahoo in Sale-Leaseback Deal","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/h5-acquires-new-york-data-centers-from-yahoo-in-sale-leaseback-deal/"},{"kind":"other","label":"Yahoo's Compute Coop Is Not for Chickens","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/analysis/yahoos-compute-coop-is-not-for-chickens/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Yahoo Launches Second 'Computing Coop' Data Center in New York State","publisher":"Data Center Knowledge","retrievedAt":"2026-09-09","url":"https://www.datacenterknowledge.com/build-design/yahoo-launches-second-computing-coop-data-center-in-new-york-state"},{"kind":"press","label":"NY Gov. Hochul says she wants to ban tax breaks for data centers","publisher":"Investigative Post","retrievedAt":"2026-09-10","url":"https://investigativepost.org/2026/07/21/hochul-wants-ban-on-tax-breaks-for-data-centers/"},{"kind":"osm","label":"OSM way 220024541 - building, addr 5319 Enterprise Drive, Lockport NY 14094, within the 'Yahoo! Lockport Datacenter' industrial landuse area (way 220024530)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-10-21","url":"https://www.openstreetmap.org/way/220024541"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/h5-buffalo-i-lockport-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Arlington","confidence":"high","id":"compute_atlas-8f046347645e4412","lat":45.7168,"location_precision":"approximate","lon":-120.20088,"name":"AWS Arlington Data Center Campus","operator":"Amazon Web Services","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon plans major data center expansion in tiny Eastern Oregon town — 376 acres bought for $10 million, plus 30 more acres from the Port of Arlington for $3 million; served by PacifiCorp; tax terms to be negotiated under the Strategic Investment Program because Gilliam County does not qualify for the enterprise zone program","publisher":"The Bulletin (Bend, OR)","retrievedAt":"2026-08-14","url":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/"},{"kind":"press","label":"Amazon plans major data center expansion in tiny Eastern Oregon town","publisher":"Bend Bulletin / The Oregonian","retrievedAt":"2026-10-12","url":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/aws-arlington-gilliam-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://bendbulletin.com/2025/02/16/amazon-plans-major-data-center-expansion-in-tiny-eastern-oregon-town/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-arlington-data-center-campus-or-pg"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"high","contains_osm":true,"id":"compute_atlas-8f2129685c879ec3","lat":40.7667963,"location_precision":"exact","lon":-111.9202947,"name":"Flexential Salt Lake City - Fair Park","operator":"Flexential","source_notes":"22,539 sqft, 490kW, distinct from Downtown/Millcreek SLC sites. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Flexential's Fair Park site (118 South 1000 West) sits south of North Temple, on the opposite side of the corridor from the RDA's North Temple Project Area transit-oriented redevelopment activity; the project area's own boundary-map PDF could not be retrieved as of September 2026 to confirm the exact southern boundary line, so this is a published-description exclusion, not a parcel-level GIS check. No RDA participation agreement, project-area page, or board minutes names Flexential or a Fair Park data center. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1121188409","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1121188409"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"North Temple Project Area — Redevelopment Agency of Salt Lake City","publisher":"Redevelopment Agency of Salt Lake City","retrievedAt":"2026-09-05","url":"https://rda.slc.gov/projects/north-temple-project-area/"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-fair-park-ut"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1121188409"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-salt-lake-city-fair-park-osmway-1121188409"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1121188409"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Monticello","confidence":"medium","id":"compute_atlas-8f36abc670f52e2e","lat":45.298583,"location_precision":"approximate","lon":-93.7994056,"name":"Monticello Tech Park (Monticello Tech LLC / Frattalone)","operator":"Frattalone Companies (via Monticello Tech, LLC)","source_notes":"East of Highway 25, south of 85th Street NW in Monticello's Orderly Annexation Area. Up to 3M sq ft across multiple ~300,000 sq ft buildings; estimated $2.5-5B investment across a phased, multi-year buildout. Comprehensive Plan amendment approved Feb 2026; annexation petitions filed April 2026; AUAR environmental review underway, expected complete late winter 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-24","url":"https://www.compute-atlas.com/facilities/monticello-tech-park-frattalone-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"likely","city":"Peach Bottom Township","confidence":"medium","id":"compute_atlas-8f4b89c3d734d32a","lat":39.75,"location_precision":"approximate","lon":-76.35,"name":"York 2 Energy Center Data Center","operator":"Energy Capital Partners","source_notes":"The 828 MW figure is the existing Calpine generating station's capacity, not the data center's IT load — no compute capacity has been published. The $5 billion is the announced site investment; the separately reported $90 billion figure is a statewide multi-company pledge and is not attributed here.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/ecp-york-2-energy-center-data-center-peach-bottom-york-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Madison","confidence":"medium","id":"compute_atlas-8fcbeacf6c3a2f22","lat":43.0732716,"location_precision":"approximate","lon":-89.3870807,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-wi01-madison-wi","value":0.15}],"name":"US Signal WI01 Madison","operator":"US Signal","source_notes":"Small downtown Madison colocation facility in a 1972 building renovated in 2008; Tier 3 resiliency with a 280 kW generator, 150 kW UPS, 300 kVA utility feed and 40 tons of N+1 HVAC; five on-net carriers. The operational capacity reflects installed UPS capacity — this is a small edge/POP-scale site, not a hyperscale campus. Coordinates are an address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-18","url":"https://www.compute-atlas.com/facilities/us-signal-wi01-madison-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Chandler","confidence":"high","contains_osm":true,"id":"compute_atlas-907bbec55cf84e15","lat":33.2709074,"location_precision":"approximate","lon":-111.8819248,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-chandler-phx1-phx8-az","value":169.0}],"name":"CyrusOne Chandler Campus (PHX1–PHX8)","operator":"CyrusOne","source_notes":"CyrusOne's original Phoenix-market campus, first building opened 2012; roughly 85 acres.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/cyrusone-chandler-phx1-phx8-az"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300959970"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/781370600"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/977653854"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/977653858"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/977653859"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227682824"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227684019"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227684020"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Mount Prospect","confidence":"medium","id":"compute_atlas-908277fb0d3f294d","lat":42.0771274,"location_precision":"approximate","lon":-87.9238121,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-ord3-mount-prospect-il","value":2.7}],"name":"DataBank ORD3 (Mount Prospect)","operator":"DataBank","source_notes":"DataBank's market page lists ORD3 at 28,950 IT sq ft and 2.7MW. Distinct from CloudHQ's Mount Prospect campus already tracked (different operator, different site — this is an existing suburban colocation building on Business Center Drive). Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/databank-ord3-mount-prospect-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"high","contains_osm":true,"id":"compute_atlas-910e5434eb0299e2","lat":37.4145109,"location_precision":"exact","lon":-122.0145563,"name":"Equinix SV4","operator":"Equinix","source_notes":"255 Caspian Drive, Sunnyvale.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/99813512","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/99813512"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-sv4-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/99813512"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-sv4-osmway-99813512"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/99813512"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Perry","confidence":"medium","id":"compute_atlas-914be5590df3b0ba","lat":41.76361,"location_precision":"approximate","lon":-81.14306,"name":"Province Group Perry Village Data Center Campus","operator":"Province Group","source_notes":"Coordinates are the Perry village centroid (approximate). No MW figure or approval has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cleveland 19: Perry Village residents demand answers on proposed data center (Province Group, 230 acres under purchase agreement)","publisher":"Cleveland 19 News","retrievedAt":"2026-10-14","url":"https://www.cleveland19.com/2026/04/14/perry-village-residents-demand-answers-proposed-data-center/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/province-group-perry-village-lake-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-9170f3f53b4b0967","lat":38.362,"location_precision":"approximate","lon":-77.129,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/terawulf-morgantown-charles-county-md","value":1000.0}],"name":"TeraWulf Morgantown Generating Station AI Campus","operator":"TeraWulf","source_notes":"Morgantown Generating Station is on the Potomac River near the Governor Harry W. Nice Memorial Bridge, Charles County MD. Acquisition funding and TeraWulf financial stability questioned by Maryland Office of People's Counsel (net losses $660M+ in 2025, 90% revenue from Bitcoin mining). Coordinates approximate. TeraWulf sought about $100M in Maryland state funds toward the Morgantown acquisition; the purchase price is withheld from FERC as confidential (FOIA Exemption 4), which Public Citizen is petitioning to disclose. No cooling design, water-withdrawal figure, confirmed subsidy, or job count has been publicly disclosed for the proposed AI campus. As of 2026-09-10 the overall status remains proposed. Material development after 2026-07-23: FERC ruled 2026-07-29 that the ownership transfer of Morgantown Generating Station to TeraWulf is consistent with the public interest, but the order explicitly does not authorize data-center construction, new/repowered generation, or interconnection changes -- so the status remains proposed. Purchase price was kept confidential by FERC order (no investment figure obtainable). No water, cooling or jobs figures were found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TeraWulf buys Maryland coal plant to fuel AI data centers","publisher":"Technical.ly","retrievedAt":"2026-07-06","url":"https://technical.ly/entrepreneurship/terawulf-maryland-power-plant-acquistion/"},{"kind":"press","label":"Charles County's Morgantown Plant Being Bought By Data Infrastructure Company","publisher":"The BayNet","retrievedAt":"2026-07-06","url":"https://thebaynet.com/charles-countys-morgantown-plant-being-bought-by-data-infrastructure-company/"},{"kind":"press","label":"TeraWulf Data Center, Charles County MD: Maryland Data Center Series, Pt. 1","publisher":"Nature Forward","retrievedAt":"2026-07-06","url":"https://natureforward.org/terawulf-data-center-charles-county-md-maryland-data-center-series-pt-1/"},{"kind":"press","label":"$100M in taxpayer money: Public Citizen demands TeraWulf reveal Morgantown deal","publisher":"The BayNet","retrievedAt":"2026-07-06","url":"https://thebaynet.com/100-million-in-taxpayer-money-public-citizen-demands-terawulf-reveal-morgantown-power-plant-deal/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/terawulf-morgantown-charles-county-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"confirmed","city":"Brandon","confidence":"medium","id":"compute_atlas-91783f423a19c999","lat":32.27,"location_precision":"approximate","lon":-89.99,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/avaio-taurus-brandon-ms","value":116.0}],"name":"AVAIO Digital Taurus","operator":"AVAIO Digital Partners","source_notes":"Distinct from AVAIO's 'Leo' campus in Little Rock/Pulaski County AR — do not conflate. Site: East Metropolitan Center Business and Industrial Park, Brandon. Land acreage: AVAIO's own project page and groundbreaking materials cite 329 acres; the August 19 press release cited 175 acres — 329 used as more authoritative per operator's site. Capacity: 116 MW initial via executed ESA with Entergy Mississippi (energized June 2027 per operator site); Entergy guiding an additional 420 MW of grid power available by end of 2030; access to Gulf South Pipeline for up to 500 MW of on-site behind-the-meter thermal generation starting Q2 2027 — total baseload path to over 1 GW. The 116 MW planned figure reflects the executed first-phase ESA only; full buildout remains a projection. Investment: $6B stated without 'up to' qualifier across operator, MDA, and Governor's office sources; Governor's office describes it as the third-largest economic development project in Mississippi history. Jobs: 'at least 60 direct, high-tech jobs' and 'hundreds of indirect jobs ranging from construction to other related industries' — projections, not firm figures; no construction vs permanent breakdown confirmed. Rooftop solar of 20+ MW planned (behind-the-meter). Recycled water and new sewer line extension cited by operator as water infrastructure options. Estimated $23M in ad valorem tax revenue annually per Rankin First (county economic development group). Coordinates approximate (Brandon city center, Rankin County).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Mississippi Development Authority project announcement","publisher":"Mississippi Development Authority","retrievedAt":"2026-09-14","url":"https://mississippi.org/news/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county/"},{"kind":"other","label":"Governor Reeves office announcement — third-largest project in MS history","publisher":"Office of the Governor of Mississippi","retrievedAt":"2026-07-07","url":"https://governorreeves.ms.gov/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county-campus-represents-the-third-largest-economic-development-project-in-state-history/"},{"kind":"other","label":"City of Brandon welcome announcement","publisher":"City of Brandon, MS","retrievedAt":"2026-07-07","url":"https://brandonms.org/city-of-brandon-welcomes-avaio-digitals-6-billion-investment-in-new-ai-ready-data-center-campus/"},{"kind":"other","label":"Brandon residents petition — water, power, pollution concerns","publisher":"Mississippi Today","retrievedAt":"2026-07-07","url":"https://mississippitoday.org/2025/09/03/data-center-petition-brandon-mississippi-environment-pollution-energy/"}],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/avaio-taurus-brandon-ms"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Dallesport","confidence":"medium","contains_osm":true,"id":"compute_atlas-91f4717637a99115","lat":45.6173426,"location_precision":"approximate","lon":-121.179515,"name":"Dallesport Server Farm (Webster Orchards / Williams Ranch site)","operator":"Webster Orchards (landowner; developer not selected)","source_notes":"Parcel reported as 345.96 acres in the KPUD request and 296 acres in the broker listing (sources disagree). No developer, buyer, or end user has been selected per the landowner. KPUD said it had not seen a water plan.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Goldendale Sentinel: Data center proposed for a Dallesport site (May 27, 2026)","publisher":"The Goldendale Sentinel","retrievedAt":"2026-10-30","url":"https://www.goldendalesentinel.com/news/data-center-proposed-for-a-dallesport-site/article_64ef39a5-3f41-4d4d-be45-289ea6d4b17f.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/dallesport-server-farm-webster-orchards-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Weehawken","confidence":"medium","contains_osm":true,"id":"compute_atlas-921c0d8628f9fa4c","lat":40.7618178,"location_precision":"exact","lon":-74.0250281,"name":"Digital Realty New York EWR10","operator":"Digital Realty","source_notes":"The provided digitalrealty.com/.../ewr10 URL did not display EWR10 in the current NY/NJ facility list when fetched (page may have been restructured); real and current per multiple independent industry directories, so keeping with a corroborating source rather than the operator page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"UPSTACK Marketplace listing for Digital Realty EWR10, 300 JFK Blvd E, Weehawken NJ (corroborated by Inflect, RebootMonke","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://marketplace.upstack.com/data-centers/digital-realty-data-center-new-jersey"},{"kind":"osm","label":"OpenStreetMap way/279410766","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/279410766"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr10-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"likely","city":"East Fishkill","confidence":"medium","id":"compute_atlas-921e3740eb3a889c","lat":41.534,"location_precision":"approximate","lon":-73.801,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/treetop-east-fishkill-ny","value":1000.0}],"name":"Treetop East Fishkill Data Center (proposed, no application filed)","operator":"Treetop Development","source_notes":"Low-certainty record, included because a 1,000 MW load is the largest proposed in New York found as of September 2026. The record is marked rumored and listed as proposed rather than cancelled: the town supervisor confirmed on May 11, 2025 that \"no site plan, special permit application, zoning request, or other development application has been submitted to the town for review,\" and the developer \"has never submitted a formal application for the project nor a site plan\" - yet the project was still described as under evaluation in the NYISO process when the town passed its moratorium on June 25, 2026, so it is not affirmatively dead either. Teaneck, NJ-based Treetop Development is evaluating converting land currently planned for \"a 1,161,515 SF warehouse\" (scaled down to 765,000 square feet in other reporting) into \"a 1,000-megawatt (1-gigawatt) data center.\" The planned capacity of 1000 MW is that stated figure, unconverted. As of 2026-09-09, neither cited source gives a street, parcel, acreage, square footage for the data center itself, investment, job count, water figure, utility, or subsidy agreement; secondary reporting places the site \"off of I-84 and Lime Kiln Road\" but that had not been verified in a cited source as of September 2026, so no street is recorded and coordinates are a town-level placeholder for East Fishkill, Dutchess County.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"East Fishkill Supervisor Pulls Plug On Plan to Build Big Data Center","publisher":"cicbca.org","retrievedAt":"2026-09-09","url":"https://cicbca.org/202605-east-fishkill-supervisor-pulls-plug-on-plan-to-build-big-data-center/"},{"kind":"press","label":"By Unanimous Vote, East Fishkill Town Board Passes 3 Year Moratorium On Data Centers","publisher":"A Little Beacon Blog","retrievedAt":"2026-09-09","url":"https://www.alittlebeaconblog.com/blog/by-unanimous-vote-east-fishkill-town-board-passes-3-year-moratorium-on-data-centers"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/treetop-east-fishkill-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Elk Hills","confidence":"medium","id":"compute_atlas-9245494ee621c3d4","lat":35.36,"location_precision":"approximate","lon":-119.55,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.bakersfield.com/news/crc-proposes-w-kern-data-center-with-dedicated-power-closed-loop-cooling/article_5f2d14f7-8f86-4478-958d-513b8f9de1da.html","value":275.0}],"name":"Golden Valley Technology Hub","operator":"Beacon Data Centers (w/ California Resources Corp)","source_notes":"400,000 sq ft on 100 acres, dedicated 275MW from CRC's own Elk Hills natural gas power plant, closed-loop cooling. Standalone campus on former oilfield, not a colo tenancy.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Canada's Beacon DC targets 275MW data center campus on California oil field","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/canadas-beacon-dc-targets-275mw-data-center-campus-on-california-oil-field/"},{"kind":"press","label":"CRC proposes W. Kern data center with dedicated power, closed-loop cooling","publisher":"The Bakersfield Californian","retrievedAt":"2026-09-29","url":"https://www.bakersfield.com/news/crc-proposes-w-kern-data-center-with-dedicated-power-closed-loop-cooling/article_5f2d14f7-8f86-4478-958d-513b8f9de1da.html"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"A solution to data center backlash? Put them in oil fields.","publisher":"Grist","retrievedAt":"2026-08-19","url":"https://grist.org/energy/a-solution-to-data-center-backlash-put-them-in-oil-fields/"}],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/beacon-golden-valley-ca"}],"state":"California","status":"planned"},{"ai_classification":"mixed_use","city":"Benton","confidence":"medium","id":"compute_atlas-929da4c5a7723a93","lat":32.69,"location_precision":"approximate","lon":-93.74,"name":"Bossier Parish Campus (with Amazon)","operator":"STACK Infrastructure","source_notes":"Companion site to the Blanchard/Caddo Parish campus; same ~$12,000,000,000 combined Amazon/STACK investment.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/stack-bossier-parish-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"likely","city":"Sanford","confidence":"medium","id":"compute_atlas-92c75b24573ff712","lat":35.48778,"location_precision":"approximate","lon":-79.17833,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/","value":90.0}],"name":"PointOne Lower Moncure Road Data Center (Lee County)","operator":"PointOne","source_notes":"Applicant of record Jonathon Rhine; property owned by Cary-based Helix Ventures; the campus is reported to be operated by Dallas-headquartered CyrusOne. Phase 1 is roughly 56 acres and 300,000 sq ft of the 428.85-acre application, with a 90 MW IT load. About 150 residents spoke against it at a July 2026 county commissioners meeting. The $900M figure is the reported value of the Phase 1 building, not the whole 430-acre program.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lee County to review proposal for PointOne Data Center","publisher":"Sandhills News","retrievedAt":"2026-09-10","url":"https://sandhills.news/2026/06/08/lee-county-pointone-data-center/"},{"kind":"press","label":"Data center proposed in northern Lee County","publisher":"The Rant (Sanford, NC)","retrievedAt":"2026-08-29","url":"https://rantnc.com/2026/06/08/data-center-proposed-in-northern-lee-county/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/pointone-lower-moncure-road-lee-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Washington","confidence":"medium","id":"compute_atlas-92e2fedbc92d022d","lat":38.902580481701,"location_precision":"approximate","lon":-77.029210511723,"name":"365 Data Centers – Washington, D.C.","operator":"365 Data Centers","source_notes":"Address confirmed directly from the operator's own facilities-network page, which lists 1275 K Street NW, Washington, DC among its current locations; no square footage, power capacity, tier, or floor/suite detail was published on that page. 'Operational' status is inferred from inclusion in the operator's current facilities listing rather than an explicit statement. Coordinates geocoded via the US Census geocoder for the exact numbered street address (match: '1275 K ST NW, WASHINGTON, DC, 20005'). This is the same building address as the CoreSite DC1 — Washington, D.C. record, also live as of September 2026; CoreSite's own page independently states the identical address, '1275 K St. NW, Washington, D.C. 20005'. 1275 K Street NW is a multi-tenant carrier-hotel building; CoreSite and 365 Data Centers appear to be two distinct operators leasing space in the same building, not the same facility double-counted. The pin is approximate accordingly (building-level, floor/suite unconfirmed for either tenant).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Facilities & Network - 365 Data Centers","publisher":"365 Data Centers","retrievedAt":"2026-09-12","url":"https://365datacenters.com/facilities-network/"}],"updated":"2026-10-01","url":"https://www.compute-atlas.com/facilities/365-data-centers-washington-dc"}],"state":"District of Columbia","status":"operating"},{"ai_classification":"unknown","city":"Troy","confidence":"medium","contains_osm":true,"id":"compute_atlas-9302e698f4eca6d2","lat":42.5594738,"location_precision":"approximate","lon":-83.193147,"name":"Cogent Troy Data Center (3331 W. Big Beaver Rd)","operator":"Cogent Communications","source_notes":"Cogent's own page lists a 5,624 sq ft colocation data center in Troy with 42U cabinets, backup generator, and ports up to 10GE. The pin is the OSM node tagged 'Cogent Communicatons' (sic) at the address. Michigan sites were not part of Cogent's June 2026 sale of 10 data centers to I Squared Capital.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Cogent Communications -- Detroit and Troy data centers","publisher":"Cogent Communications","retrievedAt":"2026-10-07","url":"https://cogentco.com/en/cogent-detroit"},{"kind":"osm","label":"OpenStreetMap node: Cogent Communications, 3331 West Big Beaver Road, Troy","publisher":"OpenStreetMap","retrievedAt":"2026-10-07","url":"https://www.openstreetmap.org/node/5557517226"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/cogent-troy-big-beaver-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"confirmed","city":"Lebanon","confidence":"medium","id":"compute_atlas-9326929c28f73eba","lat":40.07,"location_precision":"approximate","lon":-86.45,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-lebanon-in","value":1000.0}],"name":"Meta Lebanon (Project Domino)","operator":"Meta","source_notes":"LEAP Innovation and Research District, Lebanon IN (Boone County, ~30 mi NW of Indianapolis). 1,500 acres, 4 million sq ft total; 13 buildings. Among Meta's largest single infrastructure investments. Coordinates are approximate LEAP District area north of Lebanon.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Meta's New Data Center in Lebanon, Indiana Marks a Milestone AI Investment","publisher":"Meta (about.fb.com)","retrievedAt":"2026-07-06","url":"https://about.fb.com/news/2026/02/metas-new-data-center-lebanon-indiana-marks-milestone-ai-investment/"},{"kind":"press","label":"Details on long-expected Meta data center campus unveiled","publisher":"Indiana Capital Chronicle","retrievedAt":"2026-07-06","url":"https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/"},{"kind":"other","label":"Meta Makes Lebanon Data Center Announcement Official","publisher":"City of Lebanon, IN","retrievedAt":"2026-07-06","url":"https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-lebanon-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","contains_osm":true,"id":"compute_atlas-9338b59f06749850","lat":32.981432,"location_precision":"approximate","lon":-97.262693,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-fort-worth-ftw1-tx","value":200.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-fort-worth-ftw1-tx","value":70.0}],"name":"QTS Fort Worth 1 (FTW1)","operator":"QTS Data Centers","source_notes":"52-acre campus plus 12 adjacent acres reserved for expansion. The planned capacity is QTS's 200 MW gross campus potential. Distinct from QTS Irving 1, tracked separately as of October 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/qts-fort-worth-ftw1-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Merom","confidence":"medium","id":"compute_atlas-93789f3fc65d1885","lat":39.0694,"location_precision":"approximate","lon":-87.5108,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/heartland-industrial-park-sullivan-county-in","value":2100.0}],"name":"Heartland Industrial Park (Fluidstack Sullivan County Campus)","operator":"Fluidstack","source_notes":"One site under two names: Potentia Inc. is the site developer of the 1,000-acre Heartland Industrial Park on US 41 near the Merom Generating Station, and Fluidstack is the anchor tenant/operator building the campus (both sources describe the same 15-acre fire-station donation and the same $50M community payment). The 2.1 GW figure is the full-park planned capacity; a separately financed first phase is reported at roughly 430 MW of critical IT load. The $65 billion figure is the announced site investment, driven by tenant and partner spending rather than Potentia alone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Heartland Industrial Park — Sullivan County Indiana Energy & Data Centers","publisher":"Sullivan County Energy & Data Center Projects","retrievedAt":"2026-09-01","url":"https://sullivanenergydata.com/data-centers/heartland-industrial-park/"},{"kind":"other","label":"Sullivan County Data Center — Fluidstack project site","publisher":"Fluidstack","retrievedAt":"2026-09-01","url":"https://www.sullivanfluidstack.io/"},{"kind":"other","label":"Fluidstack's 2.1GW Indiana AI Data Center Campus","publisher":"Infor Capital","retrievedAt":"2026-09-01","url":"https://inforcapital.com/news/fluidstack-shares-details-of-planned-data-center-in-sullivan-county-indiana/"},{"kind":"other","label":"Fluidstack Sullivan County campus","publisher":"Fluidstack","retrievedAt":"2026-10-16","url":"https://www.sullivanfluidstack.io/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/heartland-industrial-park-sullivan-county-in"}],"state":"Indiana","status":"under construction"},{"ai_classification":"confirmed","city":"Tulsa","confidence":"medium","id":"compute_atlas-937b10c7bfc610e8","lat":36.14,"location_precision":"approximate","lon":-95.88,"name":"Meta Project Anthem — Tulsa","operator":"Meta","source_notes":"Codename: Project Anthem (used in TMAPC filings; Meta confirmed publicly April 21, 2026). Meta's 28th US data center and 32nd globally; first in Oklahoma and first built within Tulsa city limits. Anchor tenant at Fair Oaks Innovation Park (a 2,000-acre campus) near 11th Street and Creek Turnpike, East Tulsa. Investment stated as 'more than $1 billion' by Meta — a floor figure only; PartnerTulsa estimates construction costs at ~$800M. The recorded investment is Meta's stated floor of $1 billion; PartnerTulsa's construction-cost estimate is not recorded. Facility size: 2+ million sq ft; completion targeted 2028; general contractor Fortis Construction. No facility-specific MW capacity disclosed; Meta separately adding 1,500+ MW of clean energy to the Oklahoma grid statewide. Jobs: Meta states 'more than 1,000 construction workers will be onsite at the peak of construction' and that the data center 'will support approximately 100 jobs once operational' — approximations from press release, not firm counts; the recorded construction figure of 1,000 is Meta's stated floor, and as of October 2026 no permanent job count is recorded because Meta's 100 is approximate. Phase 2 expansion (375 additional acres west of original parcel, developer Atmoss LLC) proposed but withdrawn March 2026 before city council vote. Coordinates approximate (near 11th St & Creek Turnpike, East Tulsa).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma","publisher":"Meta (about.fb.com)","retrievedAt":"2026-07-07","url":"https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/"},{"kind":"press","label":"Meta's east Tulsa data center earns praise and protests","publisher":"Tulsa Flyer","retrievedAt":"2026-07-07","url":"https://tulsaflyer.org/2026/04/22/news/post/meta-east-tulsa-data-center/"},{"kind":"press","label":"340-acre data center campus planned in Tulsa, Oklahoma","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/340-acre-data-center-campus-planned-in-tulsa-oklahoma/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/meta-anthem-tulsa-ok"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"mixed_use","city":"Memphis","confidence":"medium","id":"compute_atlas-939fa53e4a469ab8","lat":35.0301213,"location_precision":"approximate","lon":-89.936928,"name":"5C MEM01 Memphis (former Fred's headquarters)","operator":"5C Data Centers","source_notes":"Conversion of the former Fred's discount-retail headquarters, a multi-storey warehouse and office complex bought by Olymbec in 2019. DCD (2025-05-06), citing WREG, reports plans were submitted to Shelby County in late 2024 to convert 4300 Getwell Road into a data center supporting an initial 15MW IT load in phase one; that 15 MW phase-one figure comes from a late-2024 plan and is not recorded as planned capacity: 5C's own facility table lists 20 MW for 2026, and its 64 MW (2027) and 35 MW (2029+) entries do not say whether they are cumulative or additional, so, as of October 2026, no planned total is recorded. DCD also reported that 5C's own site listed a Memphis facility, MEM01, at 20MW in 2025 and 60MW from 2027; the 60MW figure, second-hand in DCD, is not recorded as capacity. FOX13 (June 2026) reported that 5C's website gave the Memphis site a current capacity of 20 megawatts with plans to expand for 35 megawatts, and, as of October 2026, 5C's facility table lists MEM01 at 20 MW of 2026 capacity; that 20 MW is recorded as operational capacity. The 965,000 sq ft / 59-acre complex figures are Olymbec's, for the whole property, not for the data-center footprint. Quebec firms Adag Group and Hypertec are involved; 5C was subsequently acquired by Hypertec. Confidence is reported. FOX13 reported drone video from January 2026 of construction on the back side of the building, and the Daily Memphian (September 2026) reported that 5C is now operating in 200,000 square feet of the former Fred's space, which is the basis for the operational status. As of September 2026, no source found confirmed permit issuance. Separately, Memphis City Council members led by JB Smiley Jr. introduced a proposed ordinance on 2026-08-16 for a temporary moratorium on new data-center developments citywide, which is context for this site but is not stated to apply to it.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$152 Million Data Center Coming to Former Fred's Headquarters — investment, jobs and site details from the EDGE filing","publisher":"We Are Memphis (Greater Memphis Chamber)","retrievedAt":"2026-09-14","url":"https://wearememphis.com/news/152-million-data-center-coming-to-former-freds-headquarters-advancing-memphis-tech-future/"},{"kind":"other","label":"Next-Gen AI Data Centers | 5C — facilities table: Memphis, TN 20 MW (2026), 64 MW (2027), 35 MW (2029+), power source 'GRID BTM', status 'FULLY COMMITTED'","publisher":"5C","retrievedAt":"2026-09-21","url":"https://5c.ai/datacenters"},{"kind":"press","label":"The AM/DM podcast: Is Memphis at a turning point?","publisher":"Daily Memphian","retrievedAt":"2026-10-10","url":"https://dailymemphian.com/article/66232"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/5c-mem01-memphis-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"confirmed","city":"Abernathy","confidence":"medium","id":"compute_atlas-93a27576231b76e1","lat":33.84,"location_precision":"approximate","lon":-101.84,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/fluidstack-abernathy-tx","value":168.0}],"name":"Fluidstack Abernathy AI Campus","operator":"Fluidstack","source_notes":"~120-acre campus in Abernathy (Hale/Lubbock counties). Distinct from the separately-tracked Aligned 'Project Caprock' Abernathy campus (313 acres, different operator/parcel). 168 MW critical IT load (240 MW gross). Google-backed via a ~$1.3B lease obligation backstop. The frequently cited $9.5B is 25-year contracted revenue, not capex (in notes only). Note: the Anthropic lease associated with this deal is at TeraWulf's Justified/Hawesville KY campus, not Abernathy. Coordinates are the Abernathy town centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TeraWulf and Fluidstack to develop Texas data center in Google-backed deal","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/terawulf-and-fluidstack-to-develop-texas-data-center-in-google-backed-deal/"},{"kind":"press","label":"TeraWulf announces Anthropic lease at Justified Data Campus and sale of majority interest in Abernathy JV to Fluidstack","publisher":"TeraWulf Inc.","retrievedAt":"2026-07-07","url":"https://investors.terawulf.com/news-events/press-releases/detail/142/terawulf-announces-anthropic-lease-at-justified-data-campus-and-sale-of-majority-interest-in-abernathy-joint-venture-to-fluidstack"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/fluidstack-abernathy-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Tulsa","confidence":"medium","id":"compute_atlas-93aa900c1d26867a","lat":36.1516,"location_precision":"approximate","lon":-95.9903,"name":"Philcade Data Center","operator":"Kanbar Properties","source_notes":"Downtown Tulsa data center in the Philcade Building at 501 South Boston Avenue, operated by the building owner. Single-sourced. Coordinates are an approximate geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/philcade-data-center-tulsa-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Chattanooga","confidence":"medium","id":"compute_atlas-93b1e13c723a5f3d","lat":35.04572,"location_precision":"approximate","lon":-85.30949,"name":"Jailhouse Studios (former Hamilton County Jail)","operator":"Urban Story Ventures","source_notes":"Status as of 2026-09-09: no change; the record stays listed as proposed. Hamilton County commissioners approved a 35-year lease at $375,000/yr in March 2026, but a lease approval is not a construction permit and the commission capped data storage at 12,000 sq ft of the 142,000 sq ft building. An investment figure is deliberately not recorded: the only published figure is a range ($80-100M renovation estimate), which is not a single reportable value.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City's New Jailhouse Studios: The World's First Quantum-Ready Sovereign Data, Processing, and AI Center with an Integrated Creator Campus","publisher":"Urban Story Ventures","retrievedAt":"2026-09-21","url":"https://urbanstoryventures.com/citys-new-jailhouse-studios-the-worlds-first-quantum-ready-sovereign-data-processing-and-ai-center-with-an-integrated-creator-campus/"},{"kind":"press","label":"Residents rally against proposed AI data center inside old Hamilton County Jail","publisher":"NewsChannel 9 (WTVC Chattanooga)","retrievedAt":"2026-08-14","url":"https://newschannel9.com/news/local/residents-rally-against-proposed-ai-data-center-inside-old-hamilton-county-jail"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/jailhouse-studios-chattanooga-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Provo","confidence":"medium","id":"compute_atlas-93d88de403e47c5b","lat":40.23373,"location_precision":"approximate","lon":-111.65871,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/newfold-digital-provo-ut","value":3.0}],"name":"Newfold Digital Utah County Data Center","operator":"Newfold Digital","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Provo has 3 RDA and 5 CDA project areas; no participation agreement, TIF, or incentive naming Newfold Digital or Ace Data Center (the building's owner) was found in any of them. The site's East Bay-area address does not match the published prose description of the downtown-core project areas, but that exclusion rests on boundary descriptions, not a parcel-level GIS overlay. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/newfold-digital-provo-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","id":"compute_atlas-93dad04c994d99e4","lat":37.193,"location_precision":"approximate","lon":-77.376,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nuvu-county-drive-petersburg-va","value":300.0}],"name":"NuVu County Drive Data Center Campus","operator":"NuVu Real Estate","source_notes":"Three-building campus on a 75-acre undeveloped site between I-95 and County Drive, in a federal opportunity zone. An LLC tied to NuVu purchased the site in November 2025 for $4.12 million. Details came from Petersburg city documents released under FOIA. The live publisher page is bot-walled, so the cited source is the Wayback Machine capture actually retrieved. Coordinates are an approximate geocode of the cited street address, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Documents reveal details on several data center projects in Petersburg's pipeline (archived)","publisher":"Richmond BizSense","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/nuvu-county-drive-petersburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Sweetwater","confidence":"medium","id":"compute_atlas-948f44e756a6189d","lat":32.4707,"location_precision":"approximate","lon":-100.4059,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/iren-sweetwater-tx","value":2000.0}],"name":"IREN Sweetwater Campus","operator":"IREN (Iris Energy)","source_notes":"Two-site campus: Sweetwater 1 (1,400 MW, ~1,700 acres) substation energized May 1, 2026 via 345kV ERCOT connection; data centers commissioning in phases. Sweetwater 2 (600 MW, ~500 acres, Fisher County, near Hamlin TX, ~28 miles from SW1) targeted energization late 2027 per IREN (some sources cite 2028). Direct fiber loop planned between sites for single 2 GW compute hub with <10ms latency to Dallas. Coordinates are approximate (Sweetwater city center, Nolan County seat). As of October 2026, the county is not settled by the cited pages: Data Center Dynamics places both sites outside Sweetwater in Fisher County, and no cited page that names IREN places Sweetwater 1 in Nolan or Jones County. IREN's $9.7B Microsoft contract (Nov 2025) and $3.4B NVIDIA contract (May 2026) are company-wide deals currently deployed at Childress, TX campus (Horizon 1-4); the NVIDIA partnership press release specifically names Sweetwater as the flagship future deployment site for NVIDIA DSX factory architecture. No confirmed customer contracts specific to Sweetwater site as of 2026-07-07. IREN was in Sweetwater since 2022 as a Bitcoin mining site; HPC/AI pivot announced October 2024.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"IREN Business Update Jan 21, 2025 — first 1,400 MW Sweetwater announcement","publisher":"IREN investor relations","retrievedAt":"2026-07-07","url":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-business-update"},{"kind":"press","label":"IREN Secures 2.75GW for Data Centers in West Texas — Sweetwater 2 600 MW announcement (Mar 17, 2025)","publisher":"IREN investor relations","retrievedAt":"2026-07-07","url":"https://irisenergy.gcs-web.com/static-files/899b6969-7d10-4722-a259-f0ed5576bef3"},{"kind":"press","label":"IREN Secures $9.7bn AI Cloud Contract with Microsoft (Nov 3, 2025)","publisher":"IREN investor relations","retrievedAt":"2026-07-07","url":"https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-secures-97bn-ai-cloud-contract-microsoft"},{"kind":"press","label":"Iren energizes first phase of 2GW Sweetwater data center campus in Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/iren-energizes-first-phase-of-2gw-sweetwater-data-center-campus-in-texas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/iren-sweetwater-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Morley","confidence":"medium","contains_osm":true,"id":"compute_atlas-948ff970f328d17e","lat":43.490861,"location_precision":"approximate","lon":-85.443928,"name":"GenH Morley Dam Data Services Facility","operator":"GenH","source_notes":"Coordinates are a village-level geocode, not a parcel pin — the exact Frank Deyo Dam site footprint has not been published. No formal application had been filed as of the cited coverage.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-14","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/genh-morley-dam-mecosta-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Coal City","confidence":"medium","id":"compute_atlas-94d20693373f7ef3","lat":41.2575,"location_precision":"approximate","lon":-88.303,"name":"Aligned Coal City Campus","operator":"Aligned Data Centers","source_notes":"Roughly 305 acres in the Coal City industrial park near the southeast corner of Reed and Carbon Hill Roads, with Aligned Data Centers (Acquisition) PropCo, LLC as operator and The Reed Group, LLC as the local landowner/developer. Investment is described only as 'multi-billions of dollars' by the developer, so no figure is recorded. Distinct from the three tracked Aligned ORD buildings in Northlake and Elk Grove Village.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"A Multi-Billion-Dollar Data Center Takes a Step Forward in Coal City","publisher":"Obedio","retrievedAt":"2026-09-12","url":"https://hs.getobedio.com/blog/a-multi-billion-dollar-data-center-takes-a-step-forward-in-coal-city"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/aligned-coal-city-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Knoxville","confidence":"medium","id":"compute_atlas-94d5ad419a1ad205","lat":35.941272,"location_precision":"approximate","lon":-83.836066,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bitdeer-knoxville-tn","value":86.0}],"name":"Bitdeer Knoxville AI Datacenter (5101 S. National Drive)","operator":"Bitdeer","source_notes":"Existing Bitmain/Bitdeer Bitcoin mining site operational since May 2020 (property acquired 2018 via Commercial Purchase and Sale Agreement with Kemet Foil Manufacturing LLC, 9.88 acres / 77,678 sq ft industrial building). The 20-F discloses an active conversion to AI cloud use: Phase 1 (37MW) targeted Q4 2026, Phase 2 (49MW) targeted Q1 2027, against 86MW total electrical capacity in use as of 2026-03-31. Coordinates are an approximate parcel-area estimate for the South National Drive industrial corridor in Knox County (near APN 110-02627 per public tax-assessment/LoopNet listing); as of July 2026, the exact parcel centroid has not been pinned. Crypto-mining site converting to AI (Bitdeer 20-F): Phase 1 37 MW targeted Q4 2026, Phase 2 49 MW Q1 2027; zero AI capacity live today (the existing 86 MW is legacy mining load being phased out). Status as of 2026-09-09: no change. Bitdeer's own filing still describes the Knoxville AI conversion as in design/build with a Q4 2026 target, so the record stays listed as under construction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/bitdeer-knoxville-tn"}],"state":"Tennessee","status":"under construction"},{"ai_classification":"unknown","city":"Altoona","confidence":"medium","id":"compute_atlas-94d5ee7e3dcc005d","lat":41.6633344,"location_precision":"approximate","lon":-93.5030853,"name":"Cologix DSM3 Altoona","operator":"Cologix","source_notes":"Site is described as east of Northeast 56th Street and about a quarter-mile north of 25th Street Northwest, Altoona. Coordinates are approximate and sit on Northeast 56th Street near the Meta Altoona campus; the parcel itself has not been publicly platted. Distinct from the tracked Cologix DSM1 (Des Moines) and DSM2 (Cedar Falls) records.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/cologix-dsm3-altoona-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Saint Louis","confidence":"medium","contains_osm":true,"id":"compute_atlas-94f365617d032b32","lat":38.6297601,"location_precision":"approximate","lon":-90.1964208,"name":"TierPoint St. Louis - Olive","operator":"TierPoint","source_notes":"TierPoint operates three St. Louis-area sites (Millpark, Olive, Locust); OSM tag lacked a sub-name so mapped to the downtown Olive St facility as the most central/likely match. Flag: could also be Millpark or Locust — sub-location unconfirmed from OSM data alone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/253682978","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/253682978"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-olive-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"mixed_use","city":"Bristow","confidence":"medium","id":"compute_atlas-9525f5e5c050c04d","lat":38.724,"location_precision":"approximate","lon":-77.558,"name":"Amazon Devlin Technology Park","operator":"Amazon Web Services","source_notes":"$700M land purchase is among the highest ever for undeveloped land in the US. Zoning allows up to 3.5 million sq ft of data center space and three substations. Adjacent to Microsoft's Bristow campus parcel. Coordinates approximate for northwest corner of Devlin and Linton Hall roads.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon pays $700M for planned data center site in Virginia's Prince William County","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/amazon-pays-700m-for-planned-data-center-site-in-virginias-prince-william-county-report/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/amazon-devlin-tech-park-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"medium","id":"compute_atlas-95272afaf2770b59","lat":40.75962,"location_precision":"approximate","lon":-111.8868,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/unisys-salt-lake-city-ut","value":1.0}],"name":"Unisys Salt Lake City","operator":"Unisys","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. The Redevelopment Agency of Salt Lake City's FY2016 annual report and Salt Lake City Council District 2's public summary of its CRA project areas name no beneficiary matching Unisys, and no general web search surfaced an incentive award. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing. The facility's exact site is not independently confirmed (candidate address: 480 N 2200 W, Salt Lake City — corroborated by two business directories but not tied to the data centre specifically by any source).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"subsidy","label":"Redevelopment Agency of Salt Lake City — the eight active project areas; none names Unisys","publisher":"Redevelopment Agency of Salt Lake City","retrievedAt":"2026-09-08","url":"https://cra.slc.gov/project-areas/"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/unisys-salt-lake-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"confirmed","city":"Wallula","confidence":"medium","id":"compute_atlas-95399ac72c26c923","lat":46.0726,"location_precision":"approximate","lon":-118.9135,"name":"AWS Wallula Gap Campus","operator":"Amazon Web Services","source_notes":"~$4.8B campus near Wallula, Walla Walla County; operator reported (not officially confirmed) to be AWS, so the record was marked reported. Coordinates are the Wallula area centroid. Operator confirmed as Amazon Data Services when the Port of Walla Walla amended the buyer from Advance Phase LLC to Amazon Data Services (Feb 12, 2026 commission vote; >550 acres for >$36M land) — the record was then marked confirmed. The reported ~$4.8B (DCD) / ~$5B (local) campus figure is an estimate across ~4 phases, not a firm pledge, so no investment figure is recorded. Port projects ~720 direct+indirect jobs at full build-out of its four-phase, 16-building concept (projection), so no jobs figure is recorded; Amazon's FAQ for the three-building application projects 120-150 full-time positions. The application before Walla Walla County (the Amazon Attalia Data Center Campus) covers three buildings of about 220,000 sq ft each on a 134-acre parcel, smaller than the Port's concept, so the land area recorded is that parcel. As of October 2026 no cited source states a capacity figure for the campus, so no planned capacity is recorded. Eligible for Washington's rural-county server-equipment sales/use-tax exemption (RCW 82.08.986) but no DOR certificate is confirmed, so no subsidy is recorded. Amazon's August 2026 community materials describe the cooling as outside air about 93% of the year, with water-based cooling (water-soaked pads) for about 7%, and give the cooling-water source as a new non-potable Columbia River supply system being developed with the Port of Walla Walla, with potable groundwater from the utility as temporary cooling water for about a year while that system is built.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS likely behind $4.8bn data center in Walla Walla, Washington","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/aws-likely-behind-48bn-data-center-in-walla-walla-washington/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Amazon's proposed data center application deemed complete by Walla Walla County","publisher":"Elkhorn Media Group","retrievedAt":"2026-09-05","url":"https://elkhornmediagroup.com/amazons-proposed-data-center-application-deemed-complete-by-walla-walla-county/"},{"kind":"press","label":"What we know so far about Amazon's proposed data center in Walla Walla County","publisher":"Walla Walla Union-Bulletin","retrievedAt":"2026-10-30","url":"https://www.union-bulletin.com/news/local/governments/what-we-know-so-far-about-amazons-proposed-data-center-in-walla-walla-county/article_ed98d2b1-5111-4dca-8ce2-62c9340755f1.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-wallula-gap-walla-walla-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Kawaihae","confidence":"medium","id":"compute_atlas-95514d08d5a724a5","lat":20.0397244,"location_precision":"approximate","lon":-155.829133,"name":"Kawaihae Data Center","operator":"Hawaiian Telcom","source_notes":"Hawaiian Telcom's Hawaii Island colocation site, offered as geographic redundancy from Oahu; the operator's site states it sits \"beyond flood, volcanic, and evacuation zones\" and offers quarter/half/full cabinets with UPS plus a 5-day diesel generator fuel reserve. No street address is published on the cited page, and as of September 2026 a linked product-sheet PDF could not be retrieved. The pin is a Kawaihae town-level approximation (Nominatim), not a specific parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/hawaiiantel-kawaihae-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Charlotte","confidence":"medium","contains_osm":true,"id":"compute_atlas-956975fd4c9cfbc4","lat":35.221531,"location_precision":"exact","lon":-80.8358072,"name":"TierPoint Charlotte - North Myers","operator":"TierPoint","source_notes":"One of four North Carolina data centers listed on TierPoint's own site; TierPoint Charlotte - Center Park (tracked separately as of September 2026) is a different Charlotte building (1805 Center Park Drive). TierPoint publishes a combined 230,000 sq ft NC footprint but no per-site MW or square footage.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/tierpoint-charlotte-north-myers-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Kalamazoo","confidence":"medium","id":"compute_atlas-95a8e9f4989c1481","lat":42.291707,"location_precision":"approximate","lon":-85.5872286,"name":"Harbor Farmz Inference Data Center Conversion (2839 Full Circle Drive)","operator":"Harbor Farmz","source_notes":"Harbor Farmz is offering to convert its 32,850 sq ft indoor cannabis facility in the Davis Creek Business Park (zoned M2, built 2020) into an inference data center. Second Wave reports about 1 MW drawn today, potential expansion to 15 MW, and a 600 kW backup generator. No formal application had been filed as of July 2026, and Gander describes it as a marketed 4-acre site with no developer named. The city's planning department said the conversion would be a permitted use. The pin is a Kalamazoo city centroid placeholder because neither OSM nor the Census geocoder resolved the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"From cannabis to AI: Proposed Kalamazoo data center sparks questions about its future in Milwood","publisher":"Second Wave Media","retrievedAt":"2026-10-07","url":"https://secondwavemedia.com/from-cannabis-to-ai-proposed-kalamazoo-data-center-sparks-questions-about-the-future-in-milwood/"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/harbor-farmz-full-circle-drive-kalamazoo-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"medium","id":"compute_atlas-95c04e432fccdbc2","lat":40.7466,"location_precision":"approximate","lon":-111.8945,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/university-of-utah-downtown-data-center-salt-lake-city-ut","value":10.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/university-of-utah-downtown-data-center-salt-lake-city-ut","value":1.0}],"name":"University of Utah Downtown Data Center","operator":"University of Utah (UIT)","source_notes":"79,000 sq ft (including 16,000 sq ft of warehouse) in a 1938 building downtown. The site was previously scoped as a data center by MCI WorldCom. It is scalable to 10 MW, with 1 MW in use as of 2018. It hosts most CHPC production systems. The coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Downtown Data Center","publisher":"University of Utah Information Technology","retrievedAt":"2026-10-13","url":"https://it.utah.edu/node4/posts/2018/october/downtown-data-center.php"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/university-of-utah-downtown-data-center-salt-lake-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Moss Bluff","confidence":"medium","id":"compute_atlas-95cd2c08782c2294","lat":30.3398227,"location_precision":"approximate","lon":-93.2473893,"name":"Moss Bluff Data Center Site (Coffey Road)","operator":"Azimuth Renewables","source_notes":"Azimuth (David Bunge) holds an option on about 1,200 acres owned by Kenny Nichols, with 3 years to buy plus an optional 1-year extension. The data center is expected to occupy only a fraction of the roughly 1,168-acre site. The land is zoned agricultural and no rezoning or variance has been filed. Size, cost, power, AI use and any customer are undisclosed. The developer says it is not linked to the adjacent Persimmon Energy Center solar project. Coordinates are an OSM geocode of Coffey Road.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/azimuth-moss-bluff-data-center-calcasieu-parish-la"}],"state":"Louisiana","status":"planned"},{"ai_classification":"unknown","city":"Vernon","confidence":"medium","id":"compute_atlas-95d5eadee0d2b40c","lat":34.00543,"location_precision":"approximate","lon":-118.218653,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-vernon-la-ca","value":32.0}],"name":"Vernon LA Campus (with Goodman Group)","operator":"DataBank","source_notes":"Joint venture with Goodman Group; opening December 2026, phased through September 2027.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Goodman breaks ground on 49.5 MW data center in Vernon","publisher":"Connect CRE","retrievedAt":"2026-10-19","url":"https://www.connectcre.com/stories/goodman-breaks-ground-on-49-5-mw-data-center-in-vernon/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/databank-vernon-la-ca"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Round Rock","confidence":"medium","contains_osm":true,"id":"compute_atlas-95dd46bc98d3a157","lat":30.5085915,"location_precision":"approximate","lon":-97.6788056,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://sabeydatacenters.com/news/sabey-data-centers-completes-construction-at-austin-texas-data-center-site","value":84.0}],"name":"Sabey SDC Austin (Round Rock)","operator":"Sabey Data Centers","source_notes":"Up to 84 MW of critical capacity across two buildings at full build-out. Distinct from the tracked Switch 'The Rock' record in Round Rock. Coordinates are the Round Rock city point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sabey Data Centers Completes Construction at Austin, Texas Data Center Site","publisher":"Sabey Data Centers","retrievedAt":"2026-10-14","url":"https://sabeydatacenters.com/news/sabey-data-centers-completes-construction-at-austin-texas-data-center-site"},{"kind":"other","label":"Every Data Center in Texas: Operating, Under Construction, and Proposed","publisher":"Inside the Datacenter","retrievedAt":"2026-10-14","url":"https://insidethedatacenter.com/articles/texas-data-centers/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/sabey-sdc-austin-round-rock-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Waianae","confidence":"medium","id":"compute_atlas-9611e0bd2c897dc7","lat":21.54907,"location_precision":"approximate","lon":-158.238082,"name":"Keawaula Cable Landing Station","operator":"AT&T","source_notes":"Cable landing station in Keawaula Ahupuaa, Waianae District, Oahu. The landing is in Kaena State Park ('Yokohamas'), with a 285 m duct from the beach manhole to the station. The source (dated 2011) lists TPC-5, Telstra Endeavour, AAG and ASH. The original Samoa-Hawaii link of ASH was decommissioned in 2020. Coordinates come from a zoom-12 embedded map and are approximate. AT&T ownership comes from a 2011 source and was not re-verified.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Keawaula Cable Landing Station","publisher":"Submarine Networks","retrievedAt":"2026-10-21","url":"https://www.submarinenetworks.com/en/stations/north-america/usa-hawaii/keawaula"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/att-keawaula-cable-landing-station-waianae-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Vicksburg","confidence":"medium","id":"compute_atlas-96351c325c875a3d","lat":32.3019615,"location_precision":"approximate","lon":-90.8630294,"name":"ERDC DoD Supercomputing Resource Center","operator":"U.S. Army Engineer Research and Development Center (DoD High Performance Computing Modernization Program)","source_notes":"One of the DoD HPCMP's supercomputing resource centers, sited on the ERDC campus in Vicksburg. The cited HPCMP notice describes 'an HPE EX-4000 system of 277,248 AMD EPYC \"Genoa\" compute cores, 563 terabytes of memory, 5 petabytes of usable storage, including 4 PB of NVMe-based solid state storage' delivering 'an additional 9 petaFLOPs of computational capability.' No megawatt or square-footage figure is published in the cited source, so capacity is omitted. Coordinates are an OpenStreetMap geocode of ERDC's published 3909 Halls Ferry Road address; the DSRC occupies a specific building on the campus that is not separately mapped, hence the pin is approximate. ERDC's own erdc.usace.army.mil pages could not be retrieved as of September 2026 and are therefore not cited.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"New HPC Systems at the ERDC DoD Supercomputing Resource Center will Provide an Additional 9 petaFLOPS of Computational Capability","publisher":"DoD High Performance Computing Modernization Program (hpc.mil)","retrievedAt":"2026-09-14","url":"https://hpc.mil/?view=article&id=88%3Anew-hpc-systems-at-the-us-army-engineer-research-and-development-center-erdc-dod-supercomputing-resource-center-will-provide-an-additional-9-petaflops-of-computational-capability&catid=2"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/erdc-dsrc-vicksburg-ms"}],"state":"Mississippi","status":"operating"},{"ai_classification":"unknown","city":"Plano","confidence":"medium","id":"compute_atlas-9667097736b91fa6","lat":33.0136764,"location_precision":"approximate","lon":-96.6925096,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-dfw01-plano-tx","value":80.0}],"name":"STACK DFW01 (Plano)","operator":"STACK Infrastructure","source_notes":"Operator page lists DFW01 as two operational data centers totalling 80 MW with access to more than a dozen carrier networks, plus a further 48 MW of built-to-suit expansion capacity. No street address is published on the operator page, so coordinates are a city-level geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/stack-dfw01-plano-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-967641989be282d4","lat":43.53333,"location_precision":"approximate","lon":-112.94472,"name":"Deep Atomic MK60 Nuclear-Powered AI Data Center Campus (Idaho National Laboratory)","operator":"Deep Atomic","source_notes":"Proposal only. Deep Atomic submitted it to the DOE Office of Nuclear Energy in late November 2025 and it awaited DOE approval as of February 2026. The consortium includes Parker Tide, Clayco, Future-tech, Paragon Energy Solutions and Moonlite. Data-centre operations would start within 24-36 months on existing INL grid power plus solar and geothermal, while the MK60 SMR goes through design certification and commissioning; MK60 series manufacturing is targeted for the end of 2029. No data-centre IT capacity is stated. The 60 MW figure is the reactor's electrical output, so no capacity is recorded. Sources describe Deep Atomic differently: NucNet calls it Switzerland-based and NEI calls it Swiss-American. Coordinates are Wikipedia's centroid for the whole INL reservation, the same convention as the Aalo Atomics INL record. No specific parcel has been disclosed, so precision is approximate and county is omitted. This is a different operator and project from the tracked Aalo Atomics and Oklo INL records.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Swiss reactor company submits nuclear-powered data centre proposal to US DOE","publisher":"NucNet","retrievedAt":"2026-10-21","url":"https://smr.nucnet.org/news/swiss-reactor-company-submits-nuclear-powered-data-centre-proposal-to-us-doe-12-4-2025"},{"kind":"press","label":"Deep Atomic consortium proposes nuclear-powered AI data centre at INL","publisher":"Nuclear Engineering International","retrievedAt":"2026-10-21","url":"https://www.neimagazine.com/news/deep-atomic-eyes-ai-nuclear-hubs/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/deep-atomic-inl-ai-data-center-id"}],"state":"Idaho","status":"planned"},{"ai_classification":"unknown","city":"Barnard","confidence":"medium","id":"compute_atlas-967f65d025a356da","lat":40.2528,"location_precision":"approximate","lon":-94.9436,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/","value":600.0}],"name":"White Cloud Acres","operator":"Scale Microgrids","source_notes":"Scale Microgrids (acquired by EQT Transition Infrastructure, Jan 2025) proposal remains in the planning/discussion phase as of 2026-04-29 reporting; Nodaway County enacted a temporary moratorium on new data center proposals dated 2026-07-21. Organized opposition group 'Nodaway Says No' has drawn 7,000+ petition signatures. Nodaway County has no zoning ordinance, limiting regulatory oversight.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Proposed $4 Billion White Cloud Acres AI Data Center in Rural Barnard","publisher":"Nodaway County, MO","retrievedAt":"2026-08-24","url":"https://nodaway.org/6270/proposed-4-billion-white-cloud-acres-ai-data-center-in-rural-barnard/"},{"kind":"press","label":"With little public notice, data center developers consider Nodaway County","publisher":"KXCV-KRNW","retrievedAt":"2026-08-24","url":"https://www.kxcv.org/news/2026-03-11/with-little-public-notice-data-center-developers-consider-nodaway-county"}],"updated":"2026-08-24","url":"https://www.compute-atlas.com/facilities/white-cloud-acres-barnard-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"medium","id":"compute_atlas-969453f8363b8be6","lat":39.0130116,"location_precision":"exact","lon":-104.8164434,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/novva-colorado-springs-co","value":40.0}],"name":"Novva Colorado Springs Data Center","operator":"Novva Data Centers","source_notes":"Novva acquired the campus (a 190,000 sq ft data center built in 2005 with 6 MW of designed capacity, plus an industrial building) for $38.5 million, announced 2021-08-31, and committed over $200 million to expand it. The operator's current facility page lists 40 MW, 122,000 sq ft of data hall plus 55,000 sq ft of office, on a 68-acre campus with 37 acres available for expansion. The investment figure records the stated campus expansion commitment, not the acquisition price.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/novva-colorado-springs-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"high","contains_osm":true,"id":"compute_atlas-96f688ce174c956c","lat":41.9923175,"location_precision":"approximate","lon":-87.9582323,"name":"Centersquare ORD2 (Elk Grove Village)","operator":"Centersquare (Csquare)","source_notes":"Operator lists ORD2 at 111,906 sq ft of raised floor and 25.9 MW of utility power (12.7 MW of UPS capacity, 22.8 MW of generator capacity); as of October 2026, no IT capacity is stated, so none is recorded. The operating entity has changed hands and names repeatedly (Cyxtera/Evoque → Centersquare → Csquare); the DCEO MOU is held by 2425 Busse Road LLC and was amended in 2025 to add Centersquare MSA Holdings LLC. County omitted: the geocoder returns DuPage for this address while Elk Grove Village spans two counties. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (2425 Busse Road LLC (CenterSquare ORD2), Elk Grove Village, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/centersquare-ord2-elk-grove-village-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/377345296"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/centersquare-elk-grove-village-data-center-campus-ord2-osmway-377345296"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377345296"}],"state":"Illinois","status":"operating"},{"ai_classification":"likely","city":"DeKalb","confidence":"medium","id":"compute_atlas-9728af2809e8adf2","lat":41.909,"location_precision":"approximate","lon":-88.792,"name":"Meta DeKalb Data Center","operator":"Meta","source_notes":"~2.3 million sq ft hyperscale data center; broke ground 2020, brought online November 2023.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta launches data center in DeKalb, Illinois","publisher":"DatacenterDynamics","retrievedAt":"2026-08-03","url":"https://www.datacenterdynamics.com/en/news/meta-launches-data-center-in-dekalb-illinois/"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report — Goldframe LLC, DeKalb (2021 MOU, $800,000,000 commitment, 50 new jobs, underserved area)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/meta-dekalb-data-center-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-978636a6853bd4a4","lat":41.32861,"location_precision":"approximate","lon":-82.68778,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/avaio-digital-project-andromeda-oxford-township-oh","value":250.0}],"name":"Project Andromeda (Oxford Township)","operator":"AVAIO Digital","source_notes":"Coordinates are the Oxford Township centroid (Wikipedia), not the parcel. Press places the site near the EHOVE Career Center but the exact parcel was not identified. The township must lift its data center prohibition before the project can proceed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sandusky Register: 'New data center proposed in Oxford Twp.' (investment could total $5.5B)","publisher":"Sandusky Register","retrievedAt":"2026-10-14","url":"https://sanduskyregister.com/news/1176877/new-data-center-proposed-in-oxford-twp/"},{"kind":"other","label":"More Than Just Parks tracker: Project Andromeda (AVAIO Digital, Oxford Township, Erie County), proposed, 250 MW","publisher":"More Than Just Parks","retrievedAt":"2026-10-14","url":"https://morethanjustparks.com/data-center-tracker/project-andromeda-avaio-digital-oxford-township-oh--0c3d04f9-babc-4f06-be74-51278884f2f0"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/avaio-digital-project-andromeda-oxford-township-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","contains_osm":true,"id":"compute_atlas-97895de35995f2ff","lat":42.006856,"location_precision":"exact","lon":-87.9651767,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-chi01-il","value":40.0}],"name":"STACK CHI01","operator":"STACK Infrastructure","source_notes":"Confirmed via operator page: 40MW, Elk Grove Village, one of two Chicago-area campuses.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/863162822","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/863162822"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report — STACK Infrastructure, Elk Grove Village (2020 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/stack-chi01-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Vernon","confidence":"medium","contains_osm":true,"id":"compute_atlas-979ac38c690fb9cc","lat":34.0055798,"location_precision":"approximate","lon":-118.2182202,"name":"Goodman Energy Park Data Center","operator":"Goodman Group","source_notes":"Two buildings: Building 1 at 3163 East Vernon Avenue and Building 2 at 3049 East Vernon Avenue; applicant of record is GIC Vernon LLC. This shares a Vernon campus with the already-tracked DataBank/Goodman joint venture, Vernon LA Campus (with Goodman Group), at 3094 East Vernon Avenue, 32 MW. It is a separate record because the CEC filing names two buildings, at 3163 and 3049 East Vernon Avenue, under applicant GIC Vernon LLC for a facility it calls the Goodman Energy Park Data Center, and does not reference the 3094 East Vernon Avenue building; whether the two are one facility is unresolved.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/goodman-energy-park-vernon-ca"}],"state":"California","status":"planned"},{"ai_classification":"likely","city":"Scrubgrass Township","confidence":"medium","id":"compute_atlas-97da272b5c8b7e33","lat":41.2306,"location_precision":"approximate","lon":-79.8517,"name":"Scrubgrass AI/HPC Data Center Campus","operator":"Keel Infrastructure Corp. (formerly Bitfarms)","source_notes":"Planned HPC/AI redevelopment of the 650-acre Scrubgrass site, with up to about 1.3 GW of potential capacity (not secured). The existing waste-coal plant and bitcoin mining continue on site and, as of October 2026, are tracked separately as the Scrubgrass Generating Plant. Pin reuses that record's approximate point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/keel-scrubgrass-ai-campus-venango-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"confirmed","city":"Ilion","confidence":"medium","id":"compute_atlas-97e25dae8ba51854","lat":43.0119,"location_precision":"approximate","lon":-75.0357,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/turin-hoefler-ilion-ny","value":200.0}],"name":"Turin Hoefler Avenue AI Data Center (former Remington Arms plant, Site C)","operator":"Turin Hoefler Avenue LLC","source_notes":"Redevelopment of the former Remington Arms firearms plant, which ceased production in 2024. WKTV: \"Turin Hoefler Avenue LLC submitted a revised application\" to the NYSDEC \"Brownfield Cleanup Program\" in January 2026 for \"Site C,\" a \"7.837-acre parcel,\" with a \"250,000-square-foot AI data center\" as the intended post-remediation use, at \"14 Hoefler Ave., Ilion, NY\"; the site has \"widespread contamination in the soil, especially with heavy metals like arsenic, lead, and copper at levels above state cleanup standards for commercial use\" and \"15 vacant industrial buildings dating to the early 1900s,\" and the developer describes it as a \"fossil-fuel-free, 100% electric site.\" The planned capacity of 200 MW comes from the Rockefeller Institute of Government's tracker entry for the project (\"200 MW\"), not from WKTV, which states no MW figure. County discrepancy: WKTV's article says Oneida County; the Rockefeller Institute says \"Village of Ilion, Herkimer County.\" Ilion is in Herkimer County, so Herkimer is recorded and the WKTV attribution is treated as an error. The 7.837-acre figure is the Brownfield Site C parcel only; trade press describes a larger ~32-acre overall plant site and two 250,000 sq ft buildings, neither of which had been verified against a cited source as of September 2026, so neither is recorded. No permanent-jobs figure is recorded: the source says only that the project \"aims to exceed the 274 positions lost when Remington closed,\" which is an aspiration, not a count. As of 2026-09-09, neither cited source states an investment figure, water/cooling detail, utility, or IDA or PILOT agreement. Because the site is fossil-fuel-free and 100% electric per the developer, no on-site generation is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Ilion data center moratorium vote tabled","publisher":"Spectrum News","retrievedAt":"2026-10-26","url":"https://spectrumlocalnews.com/nys/central-ny/politics/2026/09/29/ilion-data-center-moratorium-vote-tabled"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/turin-hoefler-ilion-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-97f5b4c82927acba","lat":42.0039,"location_precision":"approximate","lon":-87.9703,"name":"Aligned ORD-03","operator":"Aligned Data Centers","source_notes":"Aligned's third Chicago campus and its first in Elk Grove Village (36 acres, Tier III). STATUS IS PROVISIONAL: the operator page lists the campus without a delivery or in-service date, so listing it as under construction is an inference.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report — Aligned Data Centers (EGV) PropCo, LLC, Elk Grove Village (2023 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/aligned-ord-03-elk-grove-village-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Westlake","confidence":"medium","id":"compute_atlas-980400359da1472b","lat":32.9972,"location_precision":"approximate","lon":-97.2083,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-circle-t-westlake-tx","value":300.0}],"name":"PowerHouse Circle T Data Center Campus","operator":"PowerHouse Data Centers","source_notes":"Four-building campus (300,000 sq ft each) at the NE corner of US-377 and Westport Parkway; owner of record Circle T Owner LP. Local Westlake planning-and-zoning approval obtained as of August 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-08","url":"https://www.compute-atlas.com/facilities/powerhouse-circle-t-westlake-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-981b7492c8469c50","lat":37.3762625,"location_precision":"exact","lon":-121.9706843,"name":"CoreSite SV4 (2972 Stender Way)","operator":"CoreSite","source_notes":"101,000+ sq ft, part of CoreSite's Santa Clara campus. Coordinates are the OSM 'CoreSite SV4' building.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-sv4-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-sv7-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-sv8-santa-clara-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-sv9-santa-clara-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54173383"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54173753"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54173755"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54383196"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54383197"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205846843"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1160688107"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Stowe Township","confidence":"medium","id":"compute_atlas-98463ead6b4ed455","lat":40.469,"location_precision":"approximate","lon":-80.064,"name":"Stowe Township Data Center (former railcar plant)","operator":"SunCap Industries","source_notes":"SunCap Industries is developing the former railcar plant site on Nichol Avenue in Stowe Township, Allegheny County. The zoning amendment adding data centers to permitted industrial uses was subsequently approved, which enables but does not itself authorize a specific building. No capacity, acreage or square footage was disclosed in the reviewed sources, so those fields are omitted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/suncap-stowe-township-allegheny-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Pineville","confidence":"medium","contains_osm":true,"id":"compute_atlas-98827ba696236826","lat":36.7620301,"location_precision":"approximate","lon":-83.6949176,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/murray-industries-pineville-bell-ky","value":360.0}],"name":"Murray Industries Pineville Data Center","operator":"Murray Industries","source_notes":"Lexington-based Murray Industries proposes a hyperscale data center on land along the Bell–Knox county line that its owner bought three years ago to mine coal and that retains electrical infrastructure from that use. The owner describes the investment as 'billions of dollars' (no specific figure published) and says newer closed-loop cooling would use far less water than older designs. He also says the project would bring 'more than 100 jobs' (WKYT, July 2026), a floor; the recorded 100 permanent jobs is that floor, not a projected total. As of October 2026, none of the cited sources says which cooling design this project would use. Status is recorded as proposed, not under construction: the utilities' PSC filing reports substation construction at the site, but the data center itself is subject to a two-year county moratorium. The exact parcel has not been publicly identified, so coordinates are the Pineville (county seat) centroid and are approximate only — the site may be several kilometres from this pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"See where data center developers are looking to build in Kentucky (project tracker: Bell County, Murray Industries, planned)","publisher":"Hoptown Chronicle / Kentucky Lantern","retrievedAt":"2026-09-15","url":"https://hoptownchronicle.org/see-where-data-center-developers-are-looking-to-build-in-kentucky"},{"kind":"press","label":"WKYT Investigates: Bell County family fights proposed data center","publisher":"WKYT","retrievedAt":"2026-10-22","url":"https://www.wkyt.com/2026/07/09/wkyt-investigates-bell-county-family-fights-proposed-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/murray-industries-pineville-bell-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"confirmed","city":"Honolulu","confidence":"medium","id":"compute_atlas-98a3998e9b0b51c5","lat":21.29525,"location_precision":"approximate","lon":-157.86368,"name":"UH Cancer Center Data Center – Medical AI Core (PAC-AID)","operator":"University of Hawaiʻi Cancer Center","source_notes":"UH is renovating the Cancer Center's existing garage-sized, air-conditioned, ground-floor data center room in Kakaʻako into the Medical AI Core (MedAI Core), which will provide high-performance computing for the new Pacific Center for Artificial Intelligence and Data Science in Medicine (PAC-AID). PAC-AID is funded by a $12M, five-year NIH COBRE grant, awarded 2026-06-04 and running through February 2031. About $300,000 of that money is going to renovate and equip the room. The Star-Advertiser (via GovTech) calls it a first-of-its-kind AI data center for Hawaiʻi. This is a single room in an existing building, not a campus. No MW, GPU count or cooling method was published. The investment figure covers only the ~$300K room renovation, not the $12M research grant. Coordinates are the OSM feature for the UH Cancer Center building at 701 Ilalo St, the address the Cancer Center publishes.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"University of Hawaiʻi researchers awarded $12M grant to advance AI, data science in medicine","publisher":"University of Hawaiʻi News","retrievedAt":"2026-10-02","url":"https://www.hawaii.edu/news/article.php?aId=14654"},{"kind":"press","label":"$12 million establishes PAC-AID","publisher":"University of Hawaiʻi News","retrievedAt":"2026-10-21","url":"https://www.hawaii.edu/news/2026/06/21/12-million-establishes-pac-aid/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/uh-cancer-center-medai-core-honolulu-hi"}],"state":"Hawaii","status":"under construction"},{"ai_classification":"unknown","city":"Amber","confidence":"medium","id":"compute_atlas-98b22785cb1c7b85","lat":35.1603415,"location_precision":"approximate","lon":-97.8792104,"name":"Aligned Data Centers Amber Site (Grady County)","operator":"Aligned Data Centers","source_notes":"An affiliate of Aligned Data Centers bought roughly 800 acres of rural land near Amber, northwest of Chickasha in Grady County, for more than $17 million. That $17M is the land purchase price only; it is not a project investment figure and is not recorded as an investment amount. No capacity, building count or timeline has been made public. Coordinates are the town of Amber, not a parcel. This is a separate Grady County site from the tracked Chickasha Airport Industrial Park project.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/aligned-data-centers-amber-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-98d7aadc7f02dc84","lat":41.1345,"location_precision":"approximate","lon":-75.6185,"name":"Caughbaugh Road Data Center (Pennsylvania Glacial Till site)","operator":"Pennsylvania Glacial Till LLC","source_notes":"520-acre site with active mining operations, next to the Lehigh River, surrounded by conservation land and including wetlands. Only a zoning overlay has been adopted — no land development application, capacity (MW) or tenant is public. Coordinates are a geocoded point on Caughbaugh Road, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tobyhanna Township approves second data center zoning overlay","publisher":"Fox56 / WOLF","retrievedAt":"2026-09-25","url":"https://fox56.com/news/local/tobyhanna-township-approves-second-data-center-zoning-overlay"},{"kind":"press","label":"Tobyhanna Twp. public hearing draws crowd as residents challenge zoning ordinance","publisher":"Fox56 / WOLF","retrievedAt":"2026-09-25","url":"https://fox56.com/news/local/tobyhanna-twp-public-hearing-draws-crowd-as-residents-challenge-zoning-ordinance"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/pennsylvania-glacial-till-caughbaugh-road-tobyhanna-monroe-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Latham","confidence":"medium","id":"compute_atlas-98eda2b17aff8c53","lat":39.9672,"location_precision":"approximate","lon":-89.1614,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.illinoistimes.com/news/future-uncertain-for-logan-county-data-center/","value":500.0}],"name":"Logan Prairie Data Center","operator":"Hut 8 Corp","source_notes":"AI/cloud campus proposed near Latham in Logan County; estimated up to $65M/year in property tax revenue and a project labor agreement with local trades. No land area is recorded: the operator page states 50 acres while press accounts describe roughly 200 acres of farmland. Public-reception check (2026-09-10): Hut 8's own project page documents a real community-engagement process -- a public meeting before the Logan County Board's Zoning and Economic Development Committee (2026-01-05), a local radio interview (2026-01-15), and a community open house at the Lincoln Banquet Center (2026-02-04) -- but records no resident reaction, vote outcome, or opposition/support statement from any of those events. Checked: operator project page only; Logan County meeting minutes not checked.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Future uncertain for Logan County data center","publisher":"Illinois Times","retrievedAt":"2026-10-15","url":"https://www.illinoistimes.com/news/future-uncertain-for-logan-county-data-center/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/hut8-logan-prairie-latham-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Marietta","confidence":"medium","id":"compute_atlas-992429b940cda3d2","lat":33.926145,"location_precision":"approximate","lon":-84.4857377,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prime-storage-powers-ferry-place-marietta-ga","value":18.0}],"name":"1155 Powers Ferry Place Data Center (Prime Storage conversion)","operator":"Prime Storage (Prime Group Holdings) — end user undisclosed","source_notes":"A retrofit of a portion of an existing ~90,000 sq ft Prime Storage building on roughly 11 acres, rather than new construction. Rezoning application filed 2026-05-19 and tabled in July before approval in August. Coordinates come from the geocoded street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Marietta City Council approves zoning for second data center in heated meeting","publisher":"Atlanta News First","retrievedAt":"2026-09-10","url":"https://www.atlantanewsfirst.com/2026/08/13/marietta-city-council-approves-zoning-second-data-center-heated-meeting/"},{"kind":"press","label":"Proposed data center on Powers Ferry Place in Marietta","publisher":"Atlanta Press Collective","retrievedAt":"2026-09-10","url":"https://atlpresscollective.com/2026/07/08/powers-ferry-road-marietta-data-center/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/prime-storage-powers-ferry-place-marietta-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Omaha","confidence":"high","contains_osm":true,"id":"compute_atlas-992caf6b5f90965d","lat":41.2406,"location_precision":"approximate","lon":-96.0093,"name":"Scott Data Center","operator":"Scott Data","source_notes":"Tier III colocation facility on the Scott Technology Campus in Omaha (Douglas County), adjacent to the University of Nebraska at Omaha's Peter Kiewit Institute. Unusual ownership for the dataset as of August 2026: Scott Data describes itself as a nonprofit data center founded by Walter Scott Jr. Certified/aligned to Tier III design, Energy Star, AICPA SOC and NIST; supports 60+ kW cabinets and deployments from kilowatts to multi-megawatt. As of October 2026, the operator's page lists AI and machine-learning support, GPU hosting and 60+ kW cabinets as capabilities, but names no specific AI customer or deployment at this site, so no AI classification is recorded. Capacity and square footage are omitted: as of August 2026, the widely repeated '110,000 sq ft' and '20 MW central plant' figures come from colocation directories that were not consulted, and the operator's own page publishes neither. Address discrepancy: the operator's own site gives 6825 Pine Street while third-party directories list 6805 Pine Street; the operator's figure is used. Coordinates are an approximation of the Peter Kiewit Institute / Scott Technology Campus area, not a parcel geocode. The record is marked reported (single source).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/scott-data-center-omaha-ne"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/415686896"}],"state":"Nebraska","status":"operating"},{"ai_classification":"unknown","city":"Little Rock","confidence":"high","contains_osm":true,"id":"compute_atlas-99719f0e3d97b228","lat":34.7562396,"location_precision":"exact","lon":-92.4447234,"name":"TierPoint Little Rock","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page (Arkansas - Little Rock).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/388148510","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/388148510"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-little-rock-ar"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/388148510"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-little-rock-osmway-388148510"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/388148510"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"Pensacola","confidence":"medium","contains_osm":true,"id":"compute_atlas-99af19533e5471ea","lat":30.4180951,"location_precision":"approximate","lon":-87.2092315,"name":"Cogent Pensacola Edge Data Center","operator":"Cogent Communications","source_notes":"Cogent lists this as an edge data center. Its size and power are not published. Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/cogent-pensacola-edge-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-99b7833b16d64c2b","lat":37.3616469,"location_precision":"exact","lon":-121.9439784,"name":"Digital Realty SC1","operator":"Digital Realty","source_notes":"Acquired from DuPont Fabros in 2017; 360,000 sqft, 176,200 sqft raised floor.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/358455179","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/358455179"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/digital-realty-sc1-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Pittsboro","confidence":"medium","id":"compute_atlas-99ea45555a518087","lat":39.8656,"location_precision":"approximate","lon":-86.4675,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-pittsboro-in","value":400.0}],"name":"Vantage Pittsboro Campus","operator":"Vantage Data Centers","source_notes":"Colocation campus in the northeast corner of Pittsboro, north of I-74 and west of County Road 500 East, on land annexed into the town in late 2024. Roughly 285 of the 626 rezoned acres are planned for development, in three buildings reported at 256 MW, 96 MW and 48 MW. Third-party project trackers list the campus as later withdrawn; no press confirmation of a withdrawal was located as of 2026-09-01, so the last sourced status (rezoning approved) is recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Pittsboro officials OK rezoning of 626 acre-site for proposed data center campus","publisher":"Inside INdiana Business","retrievedAt":"2026-09-01","url":"https://www.insideindianabusiness.com/articles/pittsboro-officials-ok-rezoning-of-626-acre-site-for-proposed-data-center-campus"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/vantage-pittsboro-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Liberty Lake","confidence":"medium","contains_osm":true,"id":"compute_atlas-9a1352846b43e0ce","lat":47.6719149,"location_precision":"exact","lon":-117.0959323,"name":"TierPoint Spokane","operator":"TierPoint","source_notes":"Confirmed directly on TierPoint's own facility page; physical address 23403 E Mission Ave, Liberty Lake, WA (Spokane County/metro).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/335468616","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/335468616"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/tierpoint-spokane-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"De Soto","confidence":"medium","id":"compute_atlas-9a6a7cd8b37b082d","lat":38.945,"location_precision":"approximate","lon":-94.965,"name":"Digital Realty Astra North (Project Jayhawk)","operator":"Digital Realty","source_notes":"Astra North is the first phase (about 280 acres) of the roughly 1,400-acre Astra Enterprise Park, on the former Sunflower Army Ammunition Plant near W. 103rd St and Lexington Ave. It is planned as nine buildings of about 3 million sq ft. This is a separate site from Beale's Project Pilot (103rd St & Edgerton Rd). Coordinates are approximate. Construction is expected to start in 2027.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Bringing long-term investment to De Soto","publisher":"Digital Realty","retrievedAt":"2026-10-21","url":"https://www.digitalrealty.com/about/projects/de-soto"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/digital-realty-astra-north-de-soto-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Jonesboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-9a854475c52d4316","lat":35.81538,"location_precision":"approximate","lon":-90.6893576,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ritter-communications-data-technology-center-jonesboro-ar","value":0.75}],"name":"Ritter Communications Data Technology Center","operator":"Ritter Communications","source_notes":"Neither Ritter release gives the Data Technology Center's street address; both say only 'Jonesboro.' The pin is an OpenStreetMap geocode of Ritter's published Jonesboro address, 2400 Ritter Drive (OSM now labels that point 'RightFiber', Ritter's rebranded business), used as a company-campus-level approximation. The DTC has not been confirmed to sit at that address, so no street or postal code is recorded. The two Ritter releases give different square footage (8,882 SF at groundbreaking, 8,544 SF at opening) and different rack counts (60 vs 82 full racks) - both are recorded verbatim in the status history rather than reconciled. Small (0.75 MW) carrier/colocation facility, comparable in scale to the TierPoint Little Rock record, also tracked as of September 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/ritter-communications-data-technology-center-jonesboro-ar"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"medium","id":"compute_atlas-9a86c31432164286","lat":37.4009443,"location_precision":"approximate","lon":-122.0324832,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://menlo-digital.com/portfolio/md-sv1-sunnyvale/","value":49.0}],"name":"Menlo Digital MD-SV1 (888–894 Ross Drive)","operator":"Menlo Equities / Menlo Digital (Sunnyvale Technology Partners LLC)","source_notes":"Two-story ~244,214 sq ft building with six data halls on an 8.9-acre Peery Park site; 49 MW secured power / 36 MW critical IT per Menlo Digital. Distinct from Menlo Equities' 300 Holger Way and Great Oaks Parkway proposals in San José.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CPUC Resolution E-5433 (2026-03-19): PG&E exceptional-case transmission interconnection for Sunnyvale Technology Partners LLC c/o Menlo Equities — 49 MW data center and computing lab at 888 Ross Drive","publisher":"California Public Utilities Commission","retrievedAt":"2026-09-21","url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M602/K365/602365009.pdf"},{"kind":"other","label":"Menlo Digital — MD-SV1 (Sunnyvale) portfolio page","publisher":"Menlo Digital","retrievedAt":"2026-09-21","url":"https://menlo-digital.com/portfolio/md-sv1-sunnyvale/"},{"kind":"press","label":"Menlo Equities pivots entitled Sunnyvale office site to 49MW, 244,000 SQFT data center in Peery Park (2026-06-17)","publisher":"The Registry","retrievedAt":"2026-09-21","url":"https://news.theregistrysf.com/menlo-equities-pivots-entitled-sunnyvale-office-site-to-49mw-244000-sqft-data-center-in-peery-park/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/menlo-digital-md-sv1-ross-drive-sunnyvale-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","id":"compute_atlas-9b3fc7d33721314d","lat":37.2279,"location_precision":"approximate","lon":-77.4019,"name":"Wagner Road Data Center Campus","operator":"Wagner Properties","source_notes":"Three buildings on 27 acres of a 73-acre site west of Wagner Road alongside railroad tracks; owner Joseph Wagner is working with Legacy Engineering of Fredericksburg. The land is owned by GFYA LLC, an entity tied to Potomac, Maryland real estate agent Jacob Manevich, which bought it from Wagner Properties Inc. in 2024 for $950,000. Next step is a land disturbance permit, not applied for as of late June 2026. Details come from city documents obtained by Richmond BizSense via FOIA.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Documents reveal details on several data center projects in Petersburg's pipeline","publisher":"Richmond BizSense (via Internet Archive)","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260721131420/https://richmondbizsense.com/2026/07/21/documents-reveal-details-on-data-center-projects-in-petersburgs-pipeline/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/wagner-properties-wagner-road-petersburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lenexa","confidence":"medium","id":"compute_atlas-9b6a2398e867b6c2","lat":38.951691,"location_precision":"approximate","lon":-94.789276,"name":"LightEdge Lenexa Data Center","operator":"LightEdge","source_notes":"Underground colocation facility about 125 feet below ground in a cavern, held at a steady 68°F (formerly Cavern Technologies).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/lightedge-lenexa-ks"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Carpenter","confidence":"medium","id":"compute_atlas-9b71daf9e6a00007","lat":41.0461861,"location_precision":"approximate","lon":-104.3627365,"name":"Truss Energy Carpenter Data Center","operator":"Truss Energy","source_notes":"Very early stage: as of 2026-05-18 no application had been submitted to Laramie County and Truss Energy did not respond to press inquiries. About one mile west of Carpenter, an unincorporated community roughly 35 miles east of Cheyenne; coordinates are an approximate geocode of Carpenter. No megawatt, investment or job figures have been published. Single-source, and it may not proceed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-02","url":"https://www.compute-atlas.com/facilities/truss-energy-carpenter-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Ellenwood","confidence":"medium","id":"compute_atlas-9bacbe10ae646557","lat":33.6101096,"location_precision":"approximate","lon":-84.287978,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ta-realty-east-tanners-church-ellenwood-ga","value":180.0}],"name":"TA Realty East Tanners Church Road Data Center","operator":"TA Realty","source_notes":"Abatement structured as a 50% property-tax reduction in year one rising to the full assessment after 10 years; the AJC estimated over $36 million in savings across the period against $93 million in new taxes. The authority declined to disclose the package's specific terms, so no abatement amount is recorded. About 30 full-time permanent jobs plus a roughly equal number of contractor positions were cited (an approximate figure, so no permanent-jobs figure is recorded); the authority's larger '700+ jobs' figure includes temporary construction workers and is not recorded. Coordinates are approximate to Ellenwood; a street address of 4350 E Tanners Church Road appears in directory listings that had not been retrieved as of September 2026 and is therefore not asserted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/ta-realty-east-tanners-church-ellenwood-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Orlando","confidence":"medium","id":"compute_atlas-9c98f0abd7ae568e","lat":28.424645,"location_precision":"approximate","lon":-81.121894,"name":"Cogent Orlando Data Center","operator":"Cogent Communications","source_notes":"38,654 sq ft carrier-neutral colocation facility with 42U cabinets and private cages; UPS and generator backup; port sizes up to 100GE. MW not stated by the operator.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/cogent-orlando-wewahootee-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Wall Township","confidence":"medium","contains_osm":true,"id":"compute_atlas-9d0c0debb51bd09f","lat":40.1615781,"location_precision":"exact","lon":-74.0531626,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/njfx-wall-township-nj","value":10.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://njfx.net/ecosystem-of-carriers/campus-detail/","value":12.0}],"name":"NJFX Cable Landing Station Campus","operator":"NJFX","source_notes":"64,000 sq ft Tier 3 cable-landing-station colocation campus with 12 MW, four subsea cables landing on site and 35+ active network operators. On 2 December 2025 NJFX announced a completed basis of design for a 10 MW high-density AI data hall ('Project Cool Water') with 8 MW of usable IT load, an expected 1.25 PUE and liquid-to-the-chip cooling (AFC chillers, CDUs, hot-aisle containment, fan-wall configuration), backed by an executed electric utility load letter with a $3 million deposit and power targeted by end of 2026. As of September 2026 the 10 MW hall was a design milestone, not yet built; it is recorded as planned capacity, separate from the campus's 12 MW operational figure. Coordinates are the OSM building mapped under the operator's legal name; the campus's published mailing address is 1410 Wall Church Road, which OSM records against a nearby address point, so no street value is asserted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NJFX campus detail page (64,000 sq ft, 12 MW, Tier 3, four subsea cables, 35+ network operators)","publisher":"NJFX","retrievedAt":"2026-09-14","url":"https://njfx.net/ecosystem-of-carriers/campus-detail/"},{"kind":"press","label":"NJFX press release, 'NJFX Advances Campus for AI Infrastructure', 2 December 2025","publisher":"NJFX","retrievedAt":"2026-09-21","url":"https://njfx.net/njfx-advances-campus-for-ai-infrastructure/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/njfx-wall-township-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-9d25378b720b2fa4","lat":38.1791903850787,"location_precision":"approximate","lon":-77.44283210846356,"name":"Pairmont Data Center Campus","operator":"Eagle Rock Partners","source_notes":"The dispatch listed applicant as 'Applicant TBD' — the county record now DISCLOSES it. County case R25-0014; the 3rd-submission Voluntary Proffer Statement (county DocumentCenter PDF, parsed locally) names Applicant 'Eagle Rock Partners, LLC' and Owner 'William Courtney Sheild', two tax parcels (51-A-29 and 51-A-30) totaling 99.35 acres, rezoning RU->I-2 for no more than 900,000 sq ft of data center; access is through Caroline County. Not a dup of any tracked record (distinct parcels/applicant). MW not disclosed -> omitted. Coordinates not parcel-confirmed -> omitted. Create as proposed (under","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/eagle-rock-pairmont-data-center-campus-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Upton","confidence":"medium","contains_osm":true,"id":"compute_atlas-9d6e89c59bf7ffd2","lat":40.8679786,"location_precision":"exact","lon":-72.876393,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bnl-sdcc-b725-upton-ny","value":9.6},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bnl-sdcc-b725-upton-ny","value":3.6}],"name":"Brookhaven National Laboratory Scientific Data and Computing Center (Building 725)","operator":"Brookhaven National Laboratory (U.S. Department of Energy)","source_notes":"The Computing Facility Revitalization project repurposed the former NSLS-I light-source building (Building 725) as a Tier III-class data center for the SDCC. It hosts the US ATLAS Tier-1 site, the US Belle II Tier-1 site, RHIC experiments (STAR, PHENIX, sPHENIX) and the BNL Institutional Cluster. The initial build-out supports 3.6 MW of IT load (recorded as operational) with 3.5 MW of diesel backup. The full build-out supports 9.6 MW of IT load (recorded as planned) with 14 MW of diesel backup and 478 racks. IT floor space is about 1,600 m2 (17,000 sq ft), and the design PUE target is 1.2 (a target, not a measured value). The paper's most recent data is from 2023. Coordinates are the OSM footprint centroid of building '725 - CSI'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Finalizing Transition to the New Data Center at BNL (Latif, Misawa, Zaytsev; CHEP 2023)","publisher":"Brookhaven National Laboratory / CHEP 2023","retrievedAt":"2026-10-09","url":"https://indico.jlab.org/event/459/papers/11607/files/718-CHEP-2023-BNL-Data-Center-paper.pdf"},{"kind":"osm","label":"OpenStreetMap way 471294208: '725 - CSI' building, Brookhaven National Laboratory","publisher":"OpenStreetMap","retrievedAt":"2026-10-09","url":"https://www.openstreetmap.org/way/471294208"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/bnl-sdcc-b725-upton-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"South Jordan","confidence":"medium","id":"compute_atlas-9d8b4aa8e514df39","lat":40.55849,"location_precision":"approximate","lon":-111.93671,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ebay-topaz-south-jordan-ut","value":7.2}],"name":"eBay Topaz Data Center","operator":"eBay","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. South Jordan's FY2024-25 tentative budget enumerates all 11 RDA/CDA/EDA project areas the city has ever run, active or completed, by name — none is eBay, Topaz, Daybreak, or Kennecott, and the completed pre-2008 areas predate the 2009-built Topaz campus. A separate 2022-adopted CRA (initially mislabeled \"Daybreak Commerce Park\" in a staff-report boilerplate paragraph, formally the Southwest Quadrant Urban Center Community Reinvestment Project Area) was checked and confirmed to be an unrelated greenfield transit-oriented project led by VP Daybreak Holdings/Larry H. Miller Company, not eBay. Historical state-level GOED EDTIF awards to eBay Inc. (2008 and 2011) are on the public record but are entity-level, not a South Jordan site agreement, and as of September 2026 their reported dollar figures could not be independently verified. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"To power Utah's data center boom, companies are turning to fossil fuels","publisher":"Grist","retrievedAt":"2026-08-14","url":"https://grist.org/business/ai-utah-data-center-boom-fossil-fuels-gas/"},{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"subsidy","label":"South Jordan City FY 2024-25 Tentative Budget — Redevelopment Agency section (all 11 RDA/CDA/EDA project areas)","publisher":"South Jordan City","retrievedAt":"2026-09-05","url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/sojordanut-meet-5c77a92d3b554728bf67b91e7e009dac/ITEM-Attachment-001-f0e4eafd922043329648698ba0077660.pdf"},{"kind":"subsidy","label":"South Jordan RDA — Southwest Quadrant Urban Center Community Reinvestment Project Area Plan and staff report (adopted April 5, 2022)","publisher":"South Jordan City Redevelopment Agency","retrievedAt":"2026-09-05","url":"https://mccmeetingspublic.blob.core.usgovcloudapi.net/sojordanut-meet-974b3762cc76457ba50aa12674d4a602/ITEM-Attachment-001-e60a92d2ce134faabd49b6a5ff53e5cd.pdf"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/ebay-topaz-south-jordan-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Detroit","confidence":"medium","id":"compute_atlas-9db1aa3349610202","lat":42.332695679242,"location_precision":"approximate","lon":-83.047534477833,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/raeden-one-campus-martius-detroit-mi","value":3.0}],"name":"Raeden One Campus Martius (1050 Woodward)","operator":"Raeden","source_notes":"Second Raeden Detroit site, separate from the 615 W Lafayette carrier hotel. 3 MW is described by the operator as \"scalable power\" (design capacity), so it is recorded as planned rather than operational. Single-operator sourcing — confidence held at reported. Coordinates are an address geocode, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Detroit Data Centers — RAEDEN: \"10,000 square feet of enterprise, purpose-built colocation\" with \"3MW of scalable power\" at 1050 Woodward Ave.","publisher":"Raeden","retrievedAt":"2026-09-14","url":"https://raeden.com/data-centers/detroit/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/raeden-one-campus-martius-detroit-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"likely","city":"Pahrump","confidence":"medium","id":"compute_atlas-9dc018ee1fa1577c","lat":36.1925194,"location_precision":"approximate","lon":-115.9758446,"name":"Manse Technology Campus","operator":"Manse Technology Campus LLC","source_notes":"Formerly referred to as Project Blackjack; sited on the Manse Road corridor near the southern entrance to Pahrump along Highway 160, roughly 1,100 feet from the nearest homes. Developer states $18.4 billion of capital investment at full buildout and $114 million in annual Nye County property taxes; a separate figure of $8.4 billion appeared in other reporting and had not been resolved as of August 2026, so the developer's own $18.4B is recorded. Design features include screening berms, rooftop parapets for sound reduction and a target of roughly 55 dB at the property line. No megawatt capacity has been disclosed. Construction was anticipated to begin in 2027 with a five-year buildout. On August 18, 2026, after a June 2026 county-wide moratorium on new data center applications, the Nye County Commission voted 5-0 to adopt Bill No. 2026-11, which prohibits data center development in the Pahrump Valley (Hydrographic Basin 162); Nevada Current reported that the ban was a blow to the Manse Technology Campus and would effectively prevent the development of any data centers in and around the town of Pahrump. As of October 2026, among the cited sources, none reports the developer withdrawing the project, and the developer's site still describes it as a proposed development, so the status remains proposed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"About the Project - Manse Technology Campus (capital investment, taxes, jobs, water)","publisher":"Manse Technology Campus","retrievedAt":"2026-08-29","url":"https://mansetechcampus.com/about"},{"kind":"press","label":"Understanding the proposed Pahrump data center: a closer look at the proposal","publisher":"Pahrump Valley Community News","retrievedAt":"2026-09-21","url":"https://pvc.news/understanding-the-proposed-pahrump-data-center-a-closer-look-at-the-proposal/"},{"kind":"other","label":"Manse Technology Campus - project overview (developer site), Manse Road corridor, Pahrump, Nye County","publisher":"Manse Technology Campus","retrievedAt":"2026-09-11","url":"https://mansetechcampus.com/"},{"kind":"press","label":"Nevada county totally bans data centers in over-appropriated water basin (Nevada Current syndication)","publisher":"Kiowa County Press / Nevada Current","retrievedAt":"2026-09-11","url":"https://kiowacountypress.net/content/nevada-county-totally-bans-data-centers-over-appropriated-water-basin"},{"kind":"press","label":"Pahrump data center ban passes unanimously - Nye County Bill No. 2026-11, adopted 5-0 on Aug. 18, 2026","publisher":"Pahrump Valley Times","retrievedAt":"2026-09-11","url":"https://pvtimes.com/news/data-centers-banned-in-pahrump-189671/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/manse-technology-campus-pahrump-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"confirmed","city":"Holden","confidence":"medium","id":"compute_atlas-9e03af90e4e76bb1","lat":39.1072,"location_precision":"approximate","lon":-112.165,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/joule-millard-county-ut","value":4000.0}],"name":"Joule Energy and Data Center Campus","operator":"Joule Capital Partners","source_notes":"Founders Mark McDougal and David Gray converting family 4,000-acre alfalfa farm near Holden. Described by founders as largest private project in Utah history. Partnership with Caterpillar for generator sets; MOU with EnergySolutions for nuclear feasibility study. Part of Governor Cox's Operation Gigawatt initiative. Site at 4,800+ ft elevation for cooling efficiency. Coordinates approximate for Holden, Millard County. Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy. Millard County commissioners are quoted on the record stating the county \"did not give either development any special treatment or incentives\", and no Millard County CRA/RDA public body is registered on the Utah Public Notice Website. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 sales-tax exemption is self-executing, so no site-level award document exists to find.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/joule-millard-county-ut"}],"state":"Utah","status":"under construction"},{"ai_classification":"confirmed","city":"Grand Prairie","confidence":"medium","id":"compute_atlas-9e6417730a94d829","lat":32.62,"location_precision":"approximate","lon":-97.02,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-provident-grand-prairie-tx","value":1800.0}],"name":"PowerHouse Grand Prairie Campus","operator":"PowerHouse Data Centers","source_notes":"1.8 GW DFW-area campus (Grand Prairie): 24 buildings across three phases with an on-site 1.8 GW switchyard. Grand Prairie spans Dallas/Tarrant/Ellis counties; the campus is in the Ellis County (southern) portion. Coordinates reflect the southern Grand Prairie / Ellis County zone. Provident cited 'at least $5B in direct construction impact' over the multi-year build-out (Bisnow) and ~$300M for one 360,000-sq-ft building (Dallas Innovates) - neither a confirmed campus capex pledge -> no investment figure is recorded. Ellis County adopted Chapter 312 abatement guidelines (~Oct 2025, $50M threshold); no executed abatement agreement for this campus was found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"PowerHouse and Provident to develop 1.8GW campus in DFW, Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/powerhouse-and-provident-to-develop-18gw-campus-in-dfw-texas/"},{"kind":"press","label":"DOE-funded UTA project tackles cooling costs amid AI data center demand","publisher":"Dallas Innovates","retrievedAt":"2026-07-08","url":"https://dallasinnovates.com/doe-funded-uta-project-tackles-cooling-costs-in-ai-data-center-boom/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/powerhouse-provident-grand-prairie-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"West Jordan","confidence":"high","contains_osm":true,"id":"compute_atlas-9eb0a738ba1cfea3","lat":40.6203519,"location_precision":"exact","lon":-111.986047,"name":"Flexential Salt Lake City - South Valley (SLC09)","operator":"Flexential","source_notes":"3949 S Campus View Dr, West Jordan UT 84084 (SLC09) per DataCenterJournal. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. No participation agreement, tax abatement, or incentive names Flexential, ViaWest (its predecessor brand at this site), or Consonus Technologies (the facility's original builder); West Jordan's own Redevelopment Agency page lists six named project areas by street range (Town Center, Industrial Park, Southwire, Spratling, Downtown, Briarwood), none of which covers the Campus View Drive corridor. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/355926681","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/355926681"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-south-valley-slc09-ut"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/355926681"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-salt-lake-city-south-valley-osmway-355926681"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/355926681"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Limerick Township","confidence":"medium","id":"compute_atlas-9f27a0e91a8ff4b8","lat":40.2447,"location_precision":"approximate","lon":-75.573,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/mcd7-limerick-township-montgomery-county-pa","value":750.0}],"name":"Limerick Township Data Center Campus (MCD 7)","operator":"MCD 7 LLC","source_notes":"Eight server buildings totaling about 1.4 million sq ft on roughly 192 acres across from the Philadelphia Premium Outlets, replacing a previously approved warehouse complex; projected to generate $10–20 million in tax revenue, primarily to the Spring-Ford School District. Trade press reports the project under the name 'Project Laurel' and places it within a mile of Constellation's Limerick nuclear station; neither detail was confirmed in the source cited here. The eventual occupant is under a non-disclosure agreement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Limerick Board of Supervisors vote to send a letter opposing a land swap for proposed data center","publisher":"6abc Philadelphia (WPVI)","retrievedAt":"2026-09-10","url":"https://6abc.com/post/limerick-board-supervisors-vote-send-letter-opposing-land-swap-proposed-data-center/18440961/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/mcd7-limerick-township-montgomery-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-9f96ce78d1cf8611","lat":33.0509477,"location_precision":"approximate","lon":-80.7911503,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/eagle-rock-rhodes-technology-park-colleton-county-sc","value":1000.0}],"name":"Rhodes Technology Park","operator":"Eagle Rock Partners","source_notes":"A campus of more than 1,200 acres west of I-95 off Mount Carmel Road, inside Colleton County's new overlay district. Construction is expected around 2028-2029. The pin is an approximate point on the Mount Carmel Road segment west of I-95 (checked against I-95's OSM geometry), not the parcel. Same developer and the same 1,000 MW and $6B as Project Boulder (tracked in this dataset as of October 2026), but on a different parcel: Boulder was ~859 acres at Cooks Hill Road in the ACE Basin, and an Oct. 5, 2026 settlement places that tract in a Data Center Exclusion Area. The Post and Courier reported on October 7, 2026 that Eagle Rock Partners had abandoned the plan for the data center outside Walterboro and settled on a site in the northern reaches of Colleton County, within the new digital infrastructure overlay district.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New proposed Colleton County data center campus draws residents' questions","publisher":"Live 5 News (WCSC)","retrievedAt":"2026-10-27","url":"https://www.live5news.com/2026/09/23/new-proposed-colleton-county-data-center-campus-draws-residents-questions/"},{"kind":"press","label":"Colleton County residents raise concerns over proposed data center, power plant projects","publisher":"ABC News 4 (WCIV)","retrievedAt":"2026-10-10","url":"https://abcnews4.com/news/local/colleton-county-residents-raise-concerns-over-proposed-data-center-power-plant-projects"},{"kind":"press","label":"Settlement protects sensitive ACE Basin from data center development in Colleton County (October 7, 2026)","publisher":"The Post and Courier","retrievedAt":"2026-10-30","url":"https://www.postandcourier.com/rising-waters/ace-basin-data-center-lawsuit-settled/article_07f960a7-ad73-4449-9f7e-03001bc05373.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/eagle-rock-rhodes-technology-park-colleton-county-sc"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","contains_osm":true,"id":"compute_atlas-9fe9fa72ef9cc713","lat":33.7776897,"location_precision":"exact","lon":-84.4211544,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-atlanta-1-atlanta-metro-dc1-ga","value":278.0}],"name":"QTS Atlanta 1 (Atlanta-Metro DC1)","operator":"QTS Data Centers","source_notes":"Confirmed 4-building mega campus at 1033 Jefferson St NW etc, Atlanta, GA. This is the primary Atlanta 1 campus entry; candidate 1007825570 (Atlanta DC2) is on the same campus, kept as a separate co-located building only because it's independently confirmed as a distinct 72MW building, not because it's a distinct campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS facility directory","publisher":"QTS","retrievedAt":"2026-08-16","url":"https://q.com/data-centers/atlanta-1/"},{"kind":"osm","label":"OpenStreetMap way/269847438","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/269847438"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/qts-atlanta-1-atlanta-metro-dc1-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"El Segundo","confidence":"medium","contains_osm":true,"id":"compute_atlas-9ffcb8b728157d0c","lat":33.9176631,"location_precision":"exact","lon":-118.3863556,"name":"Digital Realty LAX11 (200 North Nash Street)","operator":"Digital Realty","source_notes":"Two-level, 113,500 sq ft building. Coordinates are the OSM data center building at 200 N Nash St.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty LAX11 data center","publisher":"Digital Realty","retrievedAt":"2026-10-19","url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax11"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/digital-realty-lax11-el-segundo-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page (LAX12, 2260 E El Segundo Blvd)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/los-angeles/lax12"},{"kind":"osm","label":"OpenStreetMap way/424945852","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/424945852"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/digital-realty-lax12-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Columbus","confidence":"medium","id":"compute_atlas-a010f2619efe71b2","lat":32.5487503,"location_precision":"approximate","lon":-84.7399283,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/project-ruby-upatoi-muscogee-ga","value":600.0}],"name":"Project Ruby (Upatoi Data Center Campus)","operator":"Undisclosed end user (site pursued by Choose Columbus / Development Authority of Columbus)","source_notes":"865 acres in northeast Muscogee County (Upatoi), $5.18 billion, 600 MW — a draw exceeding current power usage for all of Columbus. Columbus Water Works is named as the treated-water supplier. The overlay-district vote is a zoning tool, not project approval. Coordinates are approximate to Upatoi.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/project-ruby-upatoi-muscogee-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"El Centro","confidence":"medium","id":"compute_atlas-a067da69db0df363","lat":32.79,"location_precision":"approximate","lon":-115.56,"name":"CalEthos Lithium Valley Data Center Campus","operator":"CalEthos, Inc.","source_notes":"First phase now ~300-420MW (expanded from an original 80-acre/300MW plan; a range, so no capacity is recorded); part of a planned 1M sq ft, 3-4 phase campus. Land purchase completed; permitting/engineering underway with American Dark Fiber. Distinct, competing developer from the Imperial Valley Computer Manufacturing (Sebastian Rucci/IVCM) project in the same county, also tracked as of July 2026. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CalEthos expands data center plans for Lithium Valley, California, with 315-acre land purchase","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/calethos-expands-data-center-plans-for-lithium-valley-california-with-315-acre-land-purchase/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/calethos-lithium-valley-imperial-county-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Arcadia","confidence":"medium","id":"compute_atlas-a0759f9df3865f02","lat":27.2236505,"location_precision":"approximate","lon":-81.8041159,"name":"DCIP DeSoto County Data Center (Roan Street)","operator":"DCIP Group (DeSoto County Industrial Park)","source_notes":"First DeSoto County data center: a 35,134 sq ft facility and office with on-site electrical generation on 34.22 acres at a decommissioned power plant site. Two further rezonings covering roughly 828 additional acres and about 8.3 million sq ft of building area (RZNE-0086-2026 and RZNE-0087-2026, filed May 2026) are pending public hearings; the developer has described an eventual footprint of roughly 1,300 acres. Recorded as one site because all three applications are the same developer on contiguous land split by Roan Street.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DeSoto County, FL — Data Center Applications portal: RZNE-0077-2025 (DCIP, 34.22 ac, 35,134 sq ft, Board approval 24 March 2026); RZNE-0086-2026 (DCIP & 3-F Ranch, 274.26 ac, 3,686,125 sq ft) and RZNE-0087-2026 (Swisher, 553.79 ac, 4,655,000 sq ft) pending hearings","publisher":"DeSoto County Board of County Commissioners","retrievedAt":"2026-09-14","url":"https://desotobocc.com/431/Data-Center-Applications"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/dcip-arcadia-roan-street-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"compute_atlas-a0771aa1cbca38a0","lat":41,"location_precision":"approximate","lon":-104.89,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-wyoming-campus-laramie-county-wy","value":480.0}],"name":"Vantage Wyoming Campus (Project Latigo)","operator":"Vantage Data Centers","source_notes":"About 12 miles south of Cheyenne along Terry Ranch Road. Starts at 480 MW with potential to scale to about 1 GW, in three to five buildings. Reported investment is $4.8B-$9.6B (a range, so it is not entered as a field). The coordinates are approximate, placed from the described Terry Ranch Road / I-25 location and the Cheyenne LEADS map pin. No parcel point was found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Cheyenne LEADS Data Center Locations map (updated Aug 4, 2026): Planned P. Project Latigo/Vantage","publisher":"Cheyenne LEADS","retrievedAt":"2026-10-17","url":"https://cheyenneleads.org/wp-content/uploads/2026/08/LC-Data-Centers_8.4.2026.pdf"},{"kind":"other","label":"Vantage Data Center (Project Latigo) tracker listing","publisher":"More Than Just Parks / Public Lands Intelligence","retrievedAt":"2026-10-17","url":"https://morethanjustparks.com/data-center-tracker/vantage-data-center-project-latigo-wy--bd62fca2-2e13-4e14-bba9-c2ba9645d2fb"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/vantage-wyoming-campus-laramie-county-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Lawrenceburg","confidence":"medium","id":"compute_atlas-a0e7bdbf2bd21521","lat":35.2423023,"location_precision":"approximate","lon":-87.3347389,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lawrenceburg-flatwoods-road-data-center-tn","value":4.9}],"name":"Flatwoods Road Data Center (Lawrenceburg)","operator":"Undisclosed","source_notes":"Developer/operator has not been publicly named in any source retrieved. Status is recorded as permitted on the strength of the completed rezoning; a site-plan review was scheduled for July 9, 2026 and its outcome was not found. Coordinates are the Lawrenceburg town point — no parcel location on Flatwoods Road has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lawrenceburg data center — rezoning, size and community response (April 21, 2026)","publisher":"Lawrenceburg Now","retrievedAt":"2026-09-14","url":"https://lawrenceburgnow.com/04212026data.html"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/lawrenceburg-flatwoods-road-data-center-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Festus","confidence":"medium","id":"compute_atlas-a13e4dadffb7258c","lat":38.2192,"location_precision":"approximate","lon":-90.399,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crg-festus-data-center-mo","value":600.0}],"name":"Festus Data Center Campus","operator":"CRG (Clayco)","source_notes":"Festus City Council approved a development-agreement ordinance 6-2 on 2026-03-30 covering a refined ~600MW, four-building conceptual plan on 360 rezoned acres (188 acres permanently preserved). Two active lawsuits seek to invalidate the rezoning/development agreement; no end-user tenant has been publicly named and construction has not started as of August 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CRG Unveils Refined Conceptual Design for Proposed Festus Data Center","publisher":"The Missouri Times","retrievedAt":"2026-08-24","url":"https://themissouritimes.com/press-release-crg-unveils-refined-conceptual-design-for-proposed-festus-data-center-launches-community-information-website/"},{"kind":"other","label":"Festus Data Center — community information site","publisher":"CRG","retrievedAt":"2026-08-24","url":"https://festusdatacenter.org/"}],"updated":"2026-08-24","url":"https://www.compute-atlas.com/facilities/crg-festus-data-center-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"confirmed","city":"Aurora","confidence":"medium","id":"compute_atlas-a15446cf43c02f7a","lat":41.79,"location_precision":"approximate","lon":-88.284,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://edged.us/news/edged-us-expands-chicagoland-campus","value":72.0}],"name":"Edged Chicago Campus — Aurora (ORD01)","operator":"Edged US","source_notes":"Address: 2835 Bilter Rd, Aurora IL (DuPage County). Total campus planned at 96 MW across three buildings. Explicitly purpose-built for high-density AI workloads. Coordinates approximate for Bilter Rd area of north Aurora; address confirmed in operator press release. A confirmed capex figure of ~$300M covers the first building (ORD01-1) only, not the ~96 MW three-building campus; construction-workforce figures (~2,000 full campus) are projections. No Illinois DCEO data-center exemption certification was found for Edged.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Edged US Expands Chicagoland Campus with Second AI Data Center Groundbreaking","publisher":"Edged US","retrievedAt":"2026-07-06","url":"https://edged.us/news/edged-us-expands-chicagoland-campus"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Edged opens high-tech, eco-friendly data centre in Aurora","publisher":"DataCenterNews US","retrievedAt":"2026-10-15","url":"https://datacenter.news/story/edged-opens-high-tech-eco-friendly-data-centre-in-aurora"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/edged-aurora-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"compute_atlas-a16ba7d18fa2b256","lat":33.2468,"location_precision":"approximate","lon":-84.2641,"name":"Wallace Jackson Data Center Campus","operator":"Wallace Jackson, LLC (developer; end user undisclosed)","source_notes":"Ten two-story buildings ranging from 297,000 to 780,000 sq ft, 4.986 million sq ft total, on roughly 190 acres along the I-75 corridor. The DRI puts value at build-out in 2035 at $3.65B with $51.656M in estimated annual local tax revenue. Acreage omitted as a precise figure — the source says \"nearly 190 acres.\"","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/wallace-jackson-data-center-campus-spalding-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"K. I. Sawyer","confidence":"medium","contains_osm":true,"id":"compute_atlas-a184e80eaf08a279","lat":46.3529764,"location_precision":"approximate","lon":-87.3915429,"name":"K.I. Sawyer Data Center (SAGE building / Greenfield Campus)","operator":"Aeris Energy (with Telkite Enterprises)","source_notes":"Marketing-stage only: no permit, no township application, no end user. Capacity tiers advertised by the promoters (25 MW / 50 MW / 500-1,000 MW, phased) are sales material, not committed capacity, and are not recorded as capacity. Press places the site in Forsyth Township; the OSM geocode for the K.I. Sawyer place resolves inside Sands Township — the former base straddles both, so only the county is asserted here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-14","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/telkite-aeris-ki-sawyer-marquette-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-a2235436537fe1ab","lat":40.9915328,"location_precision":"approximate","lon":-80.4272333,"name":"Powder Mills Data Center Campus","operator":"Stonebridge Associates","source_notes":"569-acre parcel off Route 551 (3478 Howard Drive), split between North Beaver and Mahoning Townships; 16 data-center buildings plus an electrical substation; developer cites >$15B investment and 3,000-4,000 construction/permanent jobs. Site requires environmental remediation from prior explosives manufacturing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center campus proposed at former dynamite factory site in Lawrence County, Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/data-center-campus-proposed-at-former-dynamite-factory-site-in-lawrence-county-pennsylvania/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stonebridge-powder-mills-lawrence-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Milwaukee","confidence":"medium","contains_osm":true,"id":"compute_atlas-a293da36d6a71d76","lat":43.1513247,"location_precision":"approximate","lon":-88.009665,"name":"Aventus Lakes Data Center","operator":"Aventus Data Centers","source_notes":"26,432 sq ft carrier-hotel and colocation facility in Milwaukee's Granville area, marketed as engineered for AI/GPU retrofit (415V three-phase, direct liquid cooling) alongside conventional air-cooled cabinets. Not a duplicate of any tracked Milwaukee site: distinct from Data Holdings (3135 W. Highland), TierPoint, and Expedient MKE1 (4777 W. Ironwood, Franklin).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Aventus Lakes — operator facility page (address, 26,432 sq ft, vaults, power)","publisher":"Aventus Data Centers","retrievedAt":"2026-09-13","url":"https://aventusdatacenters.com/aventus-lakes/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/aventus-lakes-milwaukee-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"North Las Vegas","confidence":"medium","id":"compute_atlas-a2de2b66a12d3e9e","lat":36.237249,"location_precision":"approximate","lon":-115.116814,"name":"Lumen Las Vegas 1","operator":"Lumen Technologies","source_notes":"Operator named as Lumen Technologies on the strength of the directory and legislative listings; the site is a legacy carrier facility, so current ownership should be re-verified before any ownership claim is published. The Nevada LCB also lists Lumen as operational in Washoe County — that separate site is not recorded here because no address for it could be retrieved.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/lumen-las-vegas-1-aerojet-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Allenwood","confidence":"medium","id":"compute_atlas-a2eb115e8f703ea1","lat":41.1161,"location_precision":"approximate","lon":-76.9011,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/pnk-great-stream-commons-gregg-township-union-pa","value":300.0}],"name":"PNK Great Stream Commons Data Center Campus (Allenwood)","operator":"PNK Group","source_notes":"Three data centers totalling roughly 1 million square feet and up to 300 MW: a conversion of a vacant warehouse at Great Stream Commons plus two new facilities. Data centers are not a listed use in the township ordinance, so a curative amendment and conditional use are required. Coordinates are a street-level geocode of Enterprise Boulevard in the industrial park.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/pnk-great-stream-commons-gregg-township-union-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Worthington","confidence":"medium","id":"compute_atlas-a33c714ec70786b0","lat":43.62,"location_precision":"approximate","lon":-95.6,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://minnesotareformer.com/2026/04/27/minnesotas-long-predicted-data-center-boom-is-on-shaky-ground/","value":400.0}],"name":"Nobles County Powered Data Park","operator":"Geronimo Power (Brookfield Asset Management subsidiary)","source_notes":"Coordinates are approximate (near Worthington, MN).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Minnesota's long-predicted data center boom is on shaky ground","publisher":"Minnesota Reformer","retrievedAt":"2026-07-09","url":"https://minnesotareformer.com/2026/04/27/minnesotas-long-predicted-data-center-boom-is-on-shaky-ground/"},{"kind":"other","label":"Nobles County Powered Data Park","publisher":"Geronimo Power","retrievedAt":"2026-07-09","url":"https://geronimopower.com/powered-data-parks/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/geronimo-nobles-county-powered-data-park-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"confirmed","city":"Council Hill","confidence":"medium","id":"compute_atlas-a3774022e5d4d3b5","lat":35.57,"location_precision":"approximate","lon":-95.65,"name":"Google Muskogee County Data Center Campuses","operator":"Google","source_notes":"Two separate campuses near Summit and Council Hill in Muskogee County. Combined into one record; site-by-site capacity and investment breakdown not publicly available. Coordinates corrected to approximate Council Hill location (35.57°N, 95.65°W); original coordinates (35.65, −95.37) fell near Muskogee city / Summit area rather than Council Hill. Summit campus is located near Muskogee city (~17 miles east). Exact parcels not disclosed. Part of Google's $9B Oklahoma investment announced August 2025.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google unveils plans for two new data center campuses in Muskogee County","publisher":"Oklahoma Business Voice","retrievedAt":"2026-07-06","url":"https://okbusinessvoice.com/2025/11/20/google-unveils-plans-for-two-new-data-center-campuses-in-muskogee-county/"},{"kind":"permit","label":"Muskogee County 'Springboard' Data Center Project Plan (June 2025)","publisher":"Board of County Commissioners of Muskogee County","retrievedAt":"2026-07-06","url":"https://muskogee.okcounties.org/media/view/springboard_data_data_center_project_plan_6-30-25_2969.pdf"},{"kind":"press","label":"Google announces 2 data center campuses in Muskogee County","publisher":"KTUL","retrievedAt":"2026-07-06","url":"https://ktul.com/news/local/google-announces-2-data-center-campuses-in-muskogee-county-summit-council-hill-electricity-grid-energy-investment-ai-cloud-workspace-search-maps-port-stephens-infrastructure-workforce-agriculture"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-muskogee-county-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"likely","city":"Lenoir","confidence":"medium","id":"compute_atlas-a3853c6922a187b1","lat":35.900163,"location_precision":"approximate","lon":-81.546892,"name":"Google Lenoir Data Center","operator":"Google","source_notes":"Google's flagship North Carolina data center in Lenoir, Caldwell County — announced 2007, operational since 2008, one of Google's earliest U.S. sites, expanded since. Per Google's own location page, the initial investment was ~$1.2B, with $4B+ invested in the region and state since. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Lynhaven Dr address; a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Duke Energy, Google team up on solar power project in N.C.","retrievedAt":"2026-07-24","url":"https://news.duke-energy.com/releases/duke-energy-google-team-up-on-solar-power-project-in-n-c"}],"updated":"2026-07-25","url":"https://www.compute-atlas.com/facilities/google-lenoir-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"high","contains_osm":true,"id":"compute_atlas-a3ca69e9afffa9f6","lat":40.685569,"location_precision":"exact","lon":-111.8850505,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-millcreek-ut","value":1.92}],"name":"Flexential Salt Lake City - Millcreek","operator":"Flexential","source_notes":"3949 South 200 East, 36,000 sqft, 2N UPS, distinct from Downtown/Fair Park SLC sites. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Millcreek's West Millcreek CRA — the one project area geographically plausible for 3949 South 200 East, with 200 East as its described eastern boundary — lists exactly three named participation agreements on record (Artesian Springs, Opus Green, The Howick), and none is Flexential or its predecessor brand ViaWest. Two other Millcreek CRAs (Millcreek Center, Woodland Avenue) were ruled out by boundary description on different cross-streets. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1056658555","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1056658555"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"West Millcreek Community Reinvestment Area — Project Area Plan","publisher":"Millcreek City","retrievedAt":"2026-09-05","url":"https://ut-millcreek.civicplus.com/DocumentCenter/View/4320/Project-Area-Plan--West-Millcreek-CRA"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-millcreek-ut"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1056658555"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-salt-lake-city-millcreek-osmway-1056658555"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1056658555"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Eau Claire","confidence":"medium","contains_osm":true,"id":"compute_atlas-a3d7d8a6f80bfcce","lat":44.811349,"location_precision":"approximate","lon":-91.4984941,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://dataholdings.com/eau-claire-data-center","value":1.0}],"name":"Data Holdings Eau Claire Data Center","operator":"Data Holdings LLC","source_notes":"4,000 sq ft raised-floor, Tier III-design colocation facility: 1 MW, 16 kW max per rack, 2N standby power (two diesel generators) and 2N cooling, with SOC 2 Type II attestation and HIPAA, PCI DSS and NDAA compliance. Sibling of the Data Holdings Milwaukee site (3135 W. Highland Ave.), tracked separately as of September 2026. Data Holdings publishes no street address, saying only that the facility is \"on the south side of Eau Claire\", so the coordinates are an approximate city-level point and are not the facility footprint. Single-source, hence the record is marked reported.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Eau Claire Data Center | SOC2 Compliant — operator facility page (4,000 SF raised floor, 1 MW, 2N cooling and standby power)","publisher":"Data Holdings","retrievedAt":"2026-09-13","url":"https://dataholdings.com/eau-claire-data-center"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/data-holdings-eau-claire-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-a3e7c260520279b5","lat":39.0088059,"location_precision":"exact","lon":-77.4582358,"name":"Digital Realty IAD41 (Building P)","operator":"Digital Realty","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"UPSTACK marketplace facility page — IAD41, 44751 Round Table Plaza (Building P), Ashburn VA","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://marketplace.upstack.com/data-centers/digital-realty-ashburn-iad41"},{"kind":"osm","label":"OpenStreetMap way/793087858","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/793087858"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-iad41-building-p-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"UPSTACK marketplace facility page — IAD42, 22124 Broderick Drive (Building R)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://marketplace.upstack.com/data-centers/digital-realty-ashburn-iad42"},{"kind":"osm","label":"OpenStreetMap way/1025002889","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1025002889"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-iad42-building-r-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/793087858"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-iad41-building-p-osmway-793087858"}],"state":"Virginia","status":"operating"},{"ai_classification":"mixed_use","city":"Unknown","confidence":"medium","id":"compute_atlas-a43ba0e515019f0b","lat":38.44,"location_precision":"approximate","lon":-77.44,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-stafford-va4-va","value":192.0}],"name":"Vantage Data Centers VA4 Stafford Campus","operator":"Vantage Data Centers","source_notes":"Vantage's fourth Virginia campus; approximately 40 miles south of Washington DC in Stafford County (Fredericksburg region). Coordinates are county-centroid approximation — specific site address not confirmed in sources. Groundbreaking held November 6, 2025; DPR Construction engaged as GC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage Data Centers to invest $2B on Stafford campus","publisher":"Virginia Business","retrievedAt":"2026-07-06","url":"https://virginiabusiness.com/vantage-data-centers-2b-stafford-campus/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/vantage-stafford-va4-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"confirmed","city":"Saline Township","confidence":"medium","id":"compute_atlas-a43c54358b7367f5","lat":42.174,"location_precision":"approximate","lon":-83.8063,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stargate-saline-township-mi","value":1400.0}],"name":"Stargate The Barn Campus","operator":"OpenAI / Oracle / Related Digital","source_notes":"The Michigan Data Center Tracker (baldorilaw.com, retrieved 2026-09-09) lists 'The Barn' campus in Saline Township as 'Under construction · 2026-04'. No site-specific incentive award has been found: Michigan's 2024 data-center sales and use tax exemptions may apply, but no source ties an award to this site, and the MPSC conditions are ratepayer protections, not subsidies.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Oracle and OpenAI start construction on Stargate campus in Saline Township, Michigan — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-05","url":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/"},{"kind":"press","label":"Stargate updates: OpenAI, Oracle building Michigan data center — CNBC","publisher":"CNBC","retrievedAt":"2026-07-05","url":"https://www.cnbc.com/2026/06/01/stargate-project-michigan-live-updates.html"},{"kind":"press","label":"A Michigan farm town voted down a giant OpenAI-Oracle data center. Weeks later, construction began","publisher":"Fortune","retrievedAt":"2026-07-06","url":"https://fortune.com/2026/05/06/ai-data-center-michigan-saline-politics-farmland/"},{"kind":"filing","label":"MPSC grants expedited approval for DTE contracts with hyperscale data center (Case U-21990)","publisher":"Citizens Utility Board of Michigan","retrievedAt":"2026-09-09","url":"https://cubofmichigan.org/blog/mpsc-grants-expedited-approval-for-dte-contracts-with-hyperscale-data-center/"},{"kind":"filing","label":"MPSC order, Case No. U-21990 — DTE Electric primary supply agreement and energy storage agreement with Green Chile Ventures LLC (a subsidiary of Oracle Corporation)","publisher":"Michigan Public Service Commission (LARA e-docket)","retrievedAt":"2026-09-14","url":"https://adms.apps.lara.state.mi.us/Mpsc/ViewCommissionOrderDocument/27397"},{"kind":"other","label":"Michigan Data Center Projects: 2026 Locations & Tracker (Stargate Saline: 1,383 MW contracted maximum load)","publisher":"Data Center News","retrievedAt":"2026-10-24","url":"https://datacenternews.org/data-center-projects/michigan-data-center-projects/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stargate-saline-township-mi"}],"state":"Michigan","status":"under construction"},{"ai_classification":"likely","city":"Clarington","confidence":"medium","id":"compute_atlas-a4803e9251054aaa","lat":39.7748,"location_precision":"approximate","lon":-80.8731,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-november-2025-production-and-operations-update","value":570.0}],"name":"Bitdeer Clarington HPC/AI Campus","operator":"Bitdeer","source_notes":"Clarington, Monroe County; 570 MW via an AEP Ohio LOA, targeted available by end of Q3 2026. Bitdeer transitioning from bitcoin mining toward HPC/AI. Coordinates are the Clarington area centroid. No Clarington-specific capex, water, or jobs figures are disclosed; Bitdeer's 2026 mining capex guidance is company-wide and excludes AI/HPC. Some cooling/jobs figures in secondary coverage describe Bitdeer's separate Shalersville (Portage County) site, not Clarington.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Bitdeer announces November 2025 production and operations update","publisher":"Bitdeer Technologies Group","retrievedAt":"2026-07-07","url":"https://ir.bitdeer.com/news-releases/news-release-details/bitdeer-announces-november-2025-production-and-operations-update"},{"kind":"filing","label":"Bitdeer Form 6-K (American Heavy Plate Solutions leasehold litigation disclosure)","publisher":"U.S. Securities and Exchange Commission","retrievedAt":"2026-07-08","url":"https://www.sec.gov/Archives/edgar/data/1899123/000121390026012756/ea0275775-6k_bitdeer.htm"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/bitdeer-clarington-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Draper","confidence":"medium","id":"compute_atlas-a4a53ef34c7ad7a0","lat":40.52478,"location_precision":"approximate","lon":-111.8628,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/fiberstate-draper-ut","value":4.0}],"name":"FiberState SLC1","operator":"FiberState","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. Draper City's Community Reinvestment Agency's FY2025-26 adopted budget itemizes six active project areas (West Freeway, Sand Hills, Crescent, East Bangerter, Frontrunner, South Mountain) with no line item for this site; the FY2022 audited financial statements (the most recent located) name only three abatement recipients citywide (Utah Steakburgers, BG Vista/Draper Holdings, Pluralsight), none a data centre. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"subsidy","label":"Draper City Community Reinvestment Agency FY2025-26 adopted budget — six active project-area divisions itemized","publisher":"Draper City","retrievedAt":"2026-09-08","url":"https://www.draperutah.gov/media/5baoyq5c/adopted-budget-cra-fy26-final.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/fiberstate-draper-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Huntington","confidence":"medium","id":"compute_atlas-a4b712ea3c293dec","lat":38.419045646836,"location_precision":"approximate","lon":-82.437058798916,"name":"Alpha Technologies Huntington Headquarters Data Center","operator":"Alpha Technologies","source_notes":"Conversion of the former Appalachian Power Company office building into a ~60,000 sq ft Tier III-quality data center, announced 2024-10-30 as Alpha Technologies' new headquarters, expanding from the company's existing South Charleston site. As of September 2026, the only dated primary source retrieved (WCHS, published 2024-10-30) reports construction starting mid-November 2024 with phase 1 targeted for completion by March 2025; unverified secondary summaries suggest the conversion may since be complete, but no dated 2025/2026 primary source confirming operational status had been retrieved, so the status remains under construction. As of October 2026, the operator's ALPHA CLOUD page lists the Huntington site as Alpha Innovations Data Center 3, at 1125 6th Avenue, but gives no opening date or operational status. As of October 2026, Downtown Huntington Partners also gives 1125 6th Avenue, as does WV MetroNews/DCD (not independently verified as of September 2026); WCHS gives 1225 Sixth Avenue, citing a news release from Huntington Mayor Steve Williams' office, and the Census geocoder resolves 1225 6th Avenue, Huntington, WV 25701 as a valid address. The recorded street address is 1125 6th Avenue; the pin was geocoded from 1225 6th Avenue and is approximate. $10M was the announced initial investment for this site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Alpha Technologies to invest $10M for data center headquarters in Huntington","publisher":"WCHS","retrievedAt":"2026-09-13","url":"https://wchstv.com/news/local/alpha-technologies-announces-new-data-center-to-be-built-in-huntington"},{"kind":"other","label":"Alpha Innovations — ALPHA CLOUD data center locations: \"1125 6th Avenue, Huntington, WV 25701\"","publisher":"Alpha Technologies / Alpha Innovations","retrievedAt":"2026-09-15","url":"https://myalphainnovations.com/alpha-cloud/"},{"kind":"press","label":"Alpha Technologies To Open New IT Data Center In Huntington — former Appalachian Power Company building at 1125 6th Avenue","publisher":"Downtown Huntington Partners","retrievedAt":"2026-09-15","url":"https://downtownhuntington.net/alpha-technologies-to-open-new-it-data-center-in-huntington/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/alpha-technologies-huntington-wv"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"compute_atlas-a4bb042db1aa4f69","lat":36.27987,"location_precision":"approximate","lon":-86.7837,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://newswire.telecomramblings.com/2025/09/radiusdc-breaks-ground-on-largest-data-center-in-nashville/","value":12.0}],"name":"RadiusDC Nashville I","operator":"RadiusDC","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"RadiusDC Breaks Ground on Largest Data Center in Nashville (press release via Telecom Ramblings, Sept 4, 2025): 12 MW critical power, 102,500 sq ft, ~12 acres, closed-loop cooling","publisher":"RadiusDC / Telecom Ramblings","retrievedAt":"2026-09-21","url":"https://newswire.telecomramblings.com/2025/09/radiusdc-breaks-ground-on-largest-data-center-in-nashville/"},{"kind":"press","label":"RadiusDC Celebrates its New Data Center with Groundbreaking (Nashville Electric Service News, Sept 17, 2025)","publisher":"Nashville Electric Service","retrievedAt":"2026-09-21","url":"https://nespowernews.com/radiusdc-celebrates-its-new-data-center-with-groundbreaking/"},{"kind":"press","label":"RadiusDC Nashville data center will use about 700 gallons of water a day","publisher":"WKRN","retrievedAt":"2026-10-27","url":"https://www.wkrn.com/news/local-news/nashville/radiusdc-nashville-data-center-will-use-about-700-gallons-of-water-a-day/amp/"},{"kind":"press","label":"A data center debate is growing in North Nashville as one facility nears completion on Brick Church Pike","publisher":"NewsChannel 5 (WTVF)","retrievedAt":"2026-10-27","url":"https://www.newschannel5.com/news/state/tennessee/north-nashville/a-data-center-debate-is-growing-in-north-nashville-as-one-facility-nears-completion-on-brick-church-pike"}],"updated":"2026-10-27","url":"https://www.compute-atlas.com/facilities/radiusdc-nashville-i-tn"}],"state":"Tennessee","status":"under construction"},{"ai_classification":"unknown","city":"Lenexa","confidence":"high","contains_osm":true,"id":"compute_atlas-a5140158473ef15a","lat":38.9406295,"location_precision":"exact","lon":-94.7552326,"name":"TierPoint Kansas City - Lenexa","operator":"TierPoint","source_notes":"Confirmed on TierPoint's own directory: Kansas - Kansas City - Lenexa, 14500 W 105th St, Lenexa KS.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/880052062","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/880052062"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/tierpoint-kansas-city-lenexa-ks"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/880052062"}],"state":"Kansas","status":"operating"},{"ai_classification":"likely","city":"Umatilla","confidence":"high","id":"compute_atlas-a542c80e3b8c016d","lat":45.919,"location_precision":"approximate","lon":-119.339,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://hermistonherald.com/2026/07/15/714000-square-foot-data-center-construction-under-way-in-umatilla/","value":150.0}],"name":"SDC Umatilla Campus","operator":"Sabey Data Centers","source_notes":"Two-building, 714,540 sq ft multi-tenant campus. Groundbreaking originally Q1 2025, revised to 2024 per DCD; in July 2026 Sabey's assistant general manager for the Umatilla campus told the Hermiston Herald that work had been going on at the site since spring. Investment figures conflicting across sources ($520M in one report, ~$950M in another); no investment figure is recorded. Coordinates are Umatilla city centroid. Planned capacity revised from 100 MW to 150 MW: the campus is described as designed to support more than 150 megawatts. Sabey's own materials give a more conservative \"120 MW+\", which is consistent rather than contradictory.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sabey Data Centers Purchases 60 Acres in Umatilla, Oregon for 100MW+ Facility","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/sabey-data-centers-purchases-60-acres-in-umatilla-oregon-for-100mw-facility/"},{"kind":"press","label":"Sabey Data Centers comes to Umatilla","publisher":"Hermiston Herald","retrievedAt":"2026-07-06","url":"https://hermistonherald.com/2023/11/07/sabey-data-centers-comes-to-umatilla/"},{"kind":"press","label":"714,000-square-foot data center construction under way in Umatilla","publisher":"Hermiston Herald","retrievedAt":"2026-07-18","url":"https://hermistonherald.com/2026/07/15/714000-square-foot-data-center-construction-under-way-in-umatilla/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"714,000-square-foot data center construction under way in Umatilla","publisher":"East Oregonian","retrievedAt":"2026-09-05","url":"https://eastoregonian.com/2026/07/15/714000-square-foot-data-center-construction-under-way-in-umatilla/"},{"kind":"press","label":"Sabey Data Centers breaks ground on 714,540-square-foot Umatilla campus","publisher":"ConstructConnect","retrievedAt":"2026-10-12","url":"https://news.constructconnect.com/sabey-data-centers-breaks-ground-on-714540-square-foot-umatilla-campus"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/sabey-umatilla-or"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sabey-umatilla-campus-or-pg"}],"state":"Oregon","status":"under construction"},{"ai_classification":"unknown","city":"San Francisco","confidence":"medium","contains_osm":true,"id":"compute_atlas-a569fc5d16d963d5","lat":37.788731,"location_precision":"exact","lon":-122.390469,"name":"Digital Realty SFO12 (365 Main Street)","operator":"Digital Realty","source_notes":"Acquired 2010 as part of 365 Main portfolio ($725M); former AboveNet-built military tank assembly plant, seismic-hardened.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/460085343","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/460085343"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-sfo12-365-main-street-ca"}],"state":"California","status":"operating"},{"ai_classification":"likely","city":"Yaphank","confidence":"medium","id":"compute_atlas-a5dc7d522e40aefc","lat":40.832188,"location_precision":"approximate","lon":-72.929969,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/wf-industrial-yaphank-ny","value":176.6}],"name":"Brookhaven Digital Infrastructure Facility (WF Industrial / Wildflower, Yaphank)","operator":"WF Industrial (Wildflower)","source_notes":"No confirmed street address found as of 2026-09-13 -- sources describe the parcel only as 'west of Sills Road, north side of the LIE North Service Road' in Yaphank. Coordinates are the Yaphank hamlet centroid (OSM Nominatim), not the parcel -- disclosed here per contract rule H; do not treat as parcel-level precision.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Proposed AI data center in Yaphank meets opposition from residents and town leaders","publisher":"News 12 Long Island","retrievedAt":"2026-09-21","url":"https://longisland.news12.com/2026/06/26/proposed-ai-data-center-in-yaphank-meets-opposition-from-residents-and-town-leaders/4dG9mouCvXwvgvC6Mjsvkr"},{"kind":"subsidy","label":"Brookhaven IDA July 15 2026 board packet — June 17 2026 minutes: WF Industrial XII, LLC proposes converting all three buildings to data centers (50 FTE); Board consensus not to support data centers","publisher":"Town of Brookhaven Industrial Development Agency","retrievedAt":"2026-09-21","url":"https://brookhavenida.org/files/7-15-26%20IDA%20Packet.pdf"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/wf-industrial-yaphank-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"compute_atlas-a606b5d762270019","lat":45.5594015,"location_precision":"approximate","lon":-122.9522867,"name":"CoreSite Hillsboro Data Campus (HI1/HI2)","operator":"CoreSite","source_notes":"Two-building phased campus totalling 547,239 sq ft on a 19.73-acre parcel; Phase 2 building HI2 is a four-storey, 92-foot data hall. Applicant of record is CoreSite Real Estate Hillsboro, LLC. No megawatt figure has been published. CoreSite has no other tracked Oregon site.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/coresite-hillsboro-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Florence","confidence":"medium","id":"compute_atlas-a63d3520569a79b1","lat":33.1477,"location_precision":"approximate","lon":-111.4733,"name":"Florence Tech Park","operator":"Ryan Companies US, Inc.","source_notes":"780 acres at the southeast corner of Judd Road and Attaway Road; concept shows five data centers, two office buildings and one general industrial building, with final counts subject to site planning. Coordinate derived from the OSM geometries of Judd Road and Attaway Road. Power demand for the three Dobson Farms cases combined approaches 1 GW; no per-site MW is stated for this parcel, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Florence Approves Data Centers on 1,619 Acres as Dobson Farms Becomes Major Tech Park","publisher":"Pinal Post","retrievedAt":"2026-09-23","url":"https://pinalpost.com/florence-approves-data-centers-on-1619-acres-as-dobson-farms-becomes-major-tech-park/"}],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/ryan-companies-florence-tech-park-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Hayward","confidence":"medium","id":"compute_atlas-a6851c65aa546863","lat":37.6281336,"location_precision":"approximate","lon":-122.1195048,"name":"STACK SVY03A","operator":"STACK Infrastructure","source_notes":"STACK's first tracked East Bay CA site, as of August 2026 (existing STACK entries STACK SVY01/San Jose and STACK SVY02/Santa Clara are both South Bay). 300,000 sq ft campus at Production Ave/Investment Blvd: 3-story primary data center building + 1-story secondary building, height 100ft (+8ft variance approved); site plan also shows frontage on Eden Landing Road, treated as the same 11.3-acre parcel, not a separate site. The on-site generation figure reflects the CEC SPPE-disclosed backup-generator capacity (28 generators across two yards, docket 23-SPPE-01) - this is not a disclosed IT/critical-load figure; no whole-facility IT MW is publicly disclosed anywhere. The 76.6 MW figure supersedes the original CEQA filing's 67.2 MW. Jobs figures (41 permanent, ~380 construction) are single-sourced to local press (Tri City Voice; Hayward Herald ran the same underlying story). Coordinates are a geocoded street-address point, not parcel-confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CEQAnet Mitigated Negative Declaration filing (SCH# 2025030999)","publisher":"California State Clearinghouse (CEQAnet)","retrievedAt":"2026-08-16","url":"https://ceqanet.lci.ca.gov/2025030999"},{"kind":"press","label":"Who approved Hayward's largest data center?","publisher":"Tri City Voice","retrievedAt":"2026-09-14","url":"https://tricityvoice.com/who-approved-haywards-largest-data-center/"},{"kind":"press","label":"Hayward data center under public scrutiny as loopholes pile up","publisher":"OpGov News","retrievedAt":"2026-08-02","url":"https://opgov.news/articles/hayward-data-center-under-public-scrutiny-as-loopholes-pile-up"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/stack-svy03a-hayward-ca"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Salem Township","confidence":"medium","id":"compute_atlas-a696ac85136b919c","lat":41.1078249,"location_precision":"approximate","lon":-76.1791155,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/four-three-glenbrook-salem-township-luzerne-pa","value":3500.0}],"name":"4-3 Glenbrook Group Salem Township Data Center Campus (Salem 3)","operator":"4-3 Glenbrook Group","source_notes":"Referred to locally as 'Salem 3'. A 39-building campus (subject to change) assembled from more than 4,000 acres across roughly 194-200 landowners, with at least 80% of the assembled land intended to remain undeveloped green space. Stated potential power demand is roughly 3.5 to 4 gigawatts; the planned capacity records the lower bound of that published range. The group describes it as 'an energy and infrastructure development, not simply a data center development', with plans for an accompanying generation facility. Land-purchase figures are reported variously as a $1.2 billion deal and $1.4 billion in land purchases; because these are land prices rather than project investment, no investment figure is recorded. Coordinate is a township-centroid geocode shared with the separate QTS 'Salem 2' record.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/four-three-glenbrook-salem-township-luzerne-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"East Wenatchee","confidence":"medium","contains_osm":true,"id":"compute_atlas-a6fc2d8af9c1b5dc","lat":47.4072423,"location_precision":"exact","lon":-120.213935,"name":"Actapio East Wenatchee Data Center","operator":"Actapio, Inc.","source_notes":"Actapio is the US subsidiary through which Yahoo! JAPAN built data centers in central Washington; Ecology's index lists a second, earlier Actapio permit in Wenatchee (08AQ-C071, formerly Yahoo CTC), which is a different site and is not this record. Coordinates are the OSM building polygon carrying the street address, inside the OSM site boundary named 'Actapio'. As of September 2026, current ownership of the operating entity had not been independently verified, so no parent company is asserted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Data centers - air quality permits index (East Wenatchee: Actapio, Approval Order No. 18AQ-C226)","publisher":"Washington State Department of Ecology","retrievedAt":"2026-09-17","url":"https://ecology.wa.gov/air-climate/air-quality/data-centers"},{"kind":"osm","label":"OSM way 813688320 - 'Actapio', telecom=data_center, operator=Actapio, website actap.io","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/813688320"},{"kind":"osm","label":"OSM way 813688319 - data-center building at 207 North United Sakura Drive, East Wenatchee 98802","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/813688319"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/actapio-east-wenatchee-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Monticello","confidence":"medium","id":"compute_atlas-a71a4c017f695189","lat":45.2914854,"location_precision":"approximate","lon":-93.8499172,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/scannell-monticello-tech-park-mn","value":150.0}],"name":"Scannell Properties Monticello Tech Park","operator":"Scannell Properties LLC","source_notes":"Located between the Otter Creek industrial park and 90th Street NW, adjacent to Bertram Chain of Lakes Regional Park. Roughly four buildings totaling ~1.3M sq ft (~320,000 sq ft each). Comprehensive Plan amendment approved May 2026; annexation petitions not yet filed as of the source date; investment amount not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","retrievedAt":"2026-10-13","url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/scannell-monticello-tech-park-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Petersburg","confidence":"medium","contains_osm":true,"id":"compute_atlas-a74231108dfe295e","lat":38.9924886,"location_precision":"approximate","lon":-79.123975,"name":"Continent 8 West Virginia DC2","operator":"Continent 8 Technologies","source_notes":"Colocation, hosting and disaster-recovery site opened in partnership with the Seneca Rocks Regional Development Authority; PCI DSS compliant, serving regulated iGaming operators. Reported elsewhere as ~10,200 sq ft, a figure the operator's own release does not state. Pin is the town centroid — no street address published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/continent-8-west-virginia-dc2-petersburg-grant-county-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"confirmed","city":"Harwood","confidence":"medium","id":"compute_atlas-a76394ad723a791c","lat":47.02,"location_precision":"approximate","lon":-97.025,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-2-harwood-nd","value":200.0}],"name":"Applied Digital Polaris Forge 2","operator":"Applied Digital Corporation","source_notes":"Two purpose-built facilities totaling more than 1.8 million sq ft. As of the August 2025 announcement, Applied Digital was in advanced negotiations with a U.S.-based investment-grade hyperscaler; no customer or lease value had been publicly confirmed at that point. In October 2025 Applied Digital announced a lease with an unnamed U.S. investment-grade hyperscaler covering 200 MW of critical IT load, approximately $5 billion in total contracted revenue over an estimated 15-year term. The August 2025 announcement described a 280 MW AI factory, and Minnkota Power Cooperative states that the data center is expected to use 280 megawatts at peak, so 280 MW is read as peak electricity demand rather than IT load; the recorded planned capacity is the initial 200 MW of critical IT load that the lease covers in two buildings. The October 2025 release also describes the campus as a 1 GW design, with the tenant holding a first right of refusal on 800 MW more; that expansion potential is not recorded as capacity. Partial operations expected end of 2026; full capacity early 2027. Coordinates are Harwood city centroid; site is approximately 900 acres near this community north of Fargo.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus","publisher":"Applied Digital Corporation","retrievedAt":"2026-09-21","url":"https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge"},{"kind":"press","label":"Data center developer looks west, backs power upgrades near Fargo","publisher":"InForum","retrievedAt":"2026-09-10","url":"https://www.inforum.com/news/north-dakota/data-center-developer-looks-west-backs-power-upgrades-near-fargo"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-2-harwood-nd"}],"state":"North Dakota","status":"under construction"},{"ai_classification":"unknown","city":"Ravenna","confidence":"medium","id":"compute_atlas-a78e8c612a1b3db4","lat":41.157557,"location_precision":"approximate","lon":-81.242047,"name":"SR-14 Data Center Proposal (Ravenna)","operator":"Ray Harner (landowner-developer)","source_notes":"Proposed on a State Route 14 parcel directly across from UH Portage Medical Center in Ravenna. Acreage, capacity and end user have not been made public; the landowner declined to comment. Distinct from Bitdeer's Shalersville Township campus elsewhere in Portage County.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Ravenna City Council rushes to block potential data center proposal","publisher":"The Portager","retrievedAt":"2026-09-09","url":"https://theportager.com/ravenna-city-council-rushes-to-block-potential-data-center-proposal"},{"kind":"other","label":"Data Center Near My Home in Ohio? Find Out for Your County — Portage County entry","publisher":"Ohio Data Centers (stopohiodatacenters.org)","retrievedAt":"2026-09-09","url":"https://stopohiodatacenters.org/data-center-near-my-home-ohio"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/harner-sr-14-ravenna-portage-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"McMinnville","confidence":"medium","id":"compute_atlas-a7a9ee20cd00bdf8","lat":35.69221,"location_precision":"exact","lon":-85.7619,"name":"Litewire McMinnville (former A.O. Smith Building)","operator":"Litewire","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Litewire, LLC to Open New Facility in Warren County","publisher":"Tennessee Department of Economic and Community Development","retrievedAt":"2026-09-09","url":"https://tnecd.com/news/litewire-llc-to-open-new-facility-in-warren-county/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/litewire-mcminnville-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-a7cc514fa8666630","lat":37.3784704,"location_precision":"exact","lon":-121.9549839,"name":"Equinix SV2","operator":"Equinix","source_notes":"1350 Duane Avenue, Santa Clara.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/37947314","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/37947314"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-sv2-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-a7d21f4c9b4183db","lat":39.0227436,"location_precision":"exact","lon":-77.4548911,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-ashburn-va1-data-center-va","value":12.6}],"name":"NTT Ashburn VA1 Data Center","operator":"NTT Global Data Centers","source_notes":"12.6MW, first of nine on the 224MW campus, confirmed operational via datacentermap.com and NTT site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/300163083","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/300163083"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-ashburn-va1-data-center-va"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/610977485","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/610977485"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-ashburn-va2-data-center-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300163083"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ntt-ashburn-va1-data-center-osmway-300163083"}],"state":"Virginia","status":"operating"},{"ai_classification":"likely","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-a7e162cdd1b3409c","lat":37.389,"location_precision":"approximate","lon":-121.974,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/coresite-bowers-santa-clara-ca","value":72.0}],"name":"CoreSite Bowers Data Center","operator":"CoreSite","source_notes":"Coordinates approximate based on 2805 Bowers Ave address. Originally a GI Partners project; CoreSite (owned by American Tower) acquired in Feb 2026 and is expected to redevelop under existing permit. CoreSite already operates a dense interconnection campus nearby in Santa Clara. No construction timeline announced as of mid-2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"GI Partners Secures Planning Permission for 72MW Data Center in Santa Clara","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/gi-partners-secures-planning-permission-for-72mw-data-center-in-santa-clara-california/"},{"kind":"press","label":"CoreSite Acquires Silicon Valley Office Property Zoned for Data Center Redevelopment","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/coresite-acquires-silicon-valley-office-property-zoned-for-data-center-redevelopment/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/coresite-bowers-santa-clara-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Davenport","confidence":"medium","id":"compute_atlas-a7e2497d77b27cf1","lat":41.5236,"location_precision":"approximate","lon":-90.5776,"name":"Meta Davenport Data Center","operator":"Meta","source_notes":"328-acre parcel at the northwest corner of Hillandale Road and Enterprise Way in northwest Davenport, held through Vemerald LLC, described in a state news release as a wholly owned subsidiary of Meta Platforms, Inc. State board documents from May 2024 said Meta would evaluate the parcel until Q1 2025, break ground by Q4 2025 and complete the data center by end of 2027. As of March 2026 the land had been purchased but construction had not started, so the record stays listed as proposed rather than under construction. Job count is 35 at $28.76/hour or more per state board documents; Davenport city documents put it at 50. Distinct site from the tracked Meta Altoona campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Meta behind plans for latest Iowa data center","publisher":"The Gazette","retrievedAt":"2026-08-14","url":"https://www.thegazette.com/news/meta-behind-plans-for-latest-iowa-data-center/article_ddf57b2e-9b35-50b7-8af7-1370978063fa.html"},{"kind":"press","label":"More than a house, less than a grocery store: how much electricity QCA data centers use (reports Meta's 328 acres purchased, construction not started)","publisher":"KWQC","retrievedAt":"2026-08-14","url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/meta-davenport-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Little Rock","confidence":"medium","id":"compute_atlas-a802b783b237d950","lat":34.746,"location_precision":"approximate","lon":-92.29,"name":"Port of Little Rock Data Center","operator":"Google","source_notes":"380 acres, 5 industrial buildings totaling 1.43M sq ft at the Port of Little Rock. Distinct from the separately tracked Google West Memphis (Crittenden County) site roughly 130 miles away. 30-year tax abatement. Via Willowbend Capital LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google's $1B Port of Little Rock data center","publisher":"Arkansas Business","retrievedAt":"2026-07-17","url":"https://www.arkansasbusiness.com/article/google-little-rock-port-data-center/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/google-port-of-little-rock-data-center-ar"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"Bettendorf","confidence":"medium","id":"compute_atlas-a810459b34cd2c80","lat":41.5245,"location_precision":"approximate","lon":-90.5157,"name":"Bluebird Quad Cities Data Center","operator":"Bluebird Network","source_notes":"Carrier-focused colocation data center in Bettendorf, acquired by Bluebird Network from ColoHub. Bluebird's own page describes three diverse utility feeds, three backup generators with 12,000-gallon diesel tanks, a dual UPS system, SOC 2 Type II certification, over 60 percent green energy, and biometric access control with 24/7 monitoring. Total square footage and MW capacity are quoted inconsistently across third-party directories (4 MW and 6 MW both appear, alongside 53,000 and 57,000 sq ft) and are not recorded here, because no fetched page states them. One of the small number of existing Quad Cities data centers, alongside the proposed Meta Davenport campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Quad Cities Data Center — operator facility page (SOC 2 Type II, 3 utility feeds, 3 generators, dual UPS, >60% green energy)","publisher":"Bluebird Network","retrievedAt":"2026-08-14","url":"https://bluebirdfiber.com/data-centers/"},{"kind":"press","label":"More than a house, less than a grocery store: how much electricity QCA data centers use (names the Bluebird Quad Cities Data Center in Bettendorf as an existing facility)","publisher":"KWQC","retrievedAt":"2026-08-14","url":"https://www.kwqc.com/2026/03/06/more-than-house-less-than-grocery-store-how-much-electricity-qca-data-centers-uses/"},{"kind":"press","label":"Meta behind plans for latest Iowa data center — 'Iowa has at least 26 data centers, including the Blue Bird Quad Cities Data Center in Bettendorf'","publisher":"The Gazette","retrievedAt":"2026-08-14","url":"https://www.thegazette.com/news/meta-behind-plans-for-latest-iowa-data-center/article_ddf57b2e-9b35-50b7-8af7-1370978063fa.html"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/bluebird-quad-cities-bettendorf-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Austin","confidence":"medium","id":"compute_atlas-a81caf5303c4b2ff","lat":30.395976,"location_precision":"approximate","lon":-97.844709,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","value":50.0}],"name":"Cosmos Technology Campus (former 3M campus)","operator":"SB Energy","source_notes":"Conversion of the former 3M campus (156 acres) by SE Cosmos LLC, an SB Energy subsidiary, which bought it on 2026-03-20. SB Energy's S-1/A lists ~50 MW critical IT under construction, ready for service in 2027, on a 15-year lease to a SoftBank affiliate for AI compute R&D. City permits issued from 2026-05 cover data-hall UPS installs. Pin: Census geocode of the address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"SB Energy Form S-1/A (Amendment No. 2): Cosmos Technology Campus, Travis County, TX, ~50 MW critical IT, under construction, ready for service 2027","publisher":"U.S. SEC (EDGAR)","retrievedAt":"2026-10-26","url":"https://www.sec.gov/Archives/edgar/data/2133037/000162828026062846/sbenergy-sx1a2.htm"},{"kind":"press","label":"SEC filings show that SB Energy is constructing a data center at former 3M site in Four Points","publisher":"Four Points News","retrievedAt":"2026-10-26","url":"https://www.fourpointsnews.com/2026/09/03/sec-filings-show-that-sb-energy-is-constructing-a-data-center-at-former-3m-site-in-four-points/?doing_wp_cron=1793631886.4931859970092773437500"},{"kind":"press","label":"KXAN: former 3M campus in Four Points, SB Energy Project Cosmos (headline per URL slug)","publisher":"KXAN","retrievedAt":"2026-10-26","url":"https://www.kxan.com/news/austins-former-3m-campus-set-for-data-center-following-1b-transformation/amp/"},{"kind":"press","label":"Community Impact: Four Points area residents discuss future of former 3M campus (headline per URL slug)","publisher":"Community Impact","retrievedAt":"2026-10-26","url":"https://communityimpact.com/lake-travis-westlake/development/four-points-area-residents-discuss-future-of-former-3m-campus/"},{"kind":"press","label":"Former 3M site will continue to be R&D site, not a data center","publisher":"Four Points News","retrievedAt":"2026-10-26","url":"https://www.fourpointsnews.com/2026/04/30/former-3m-site-will-continue-to-be-rd-site-not-a-data-center/"}],"updated":"2026-10-26","url":"https://www.sec.gov/Archives/edgar/data/2133037/000162828026062846/sbenergy-sx1a2.htm"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Denver","confidence":"high","contains_osm":true,"id":"compute_atlas-a81cba5f671d18f0","lat":39.7459702,"location_precision":"approximate","lon":-104.9941589,"name":"Flexential Denver - Downtown (Champa)","operator":"Flexential","source_notes":"Address 1500 Champa St #100, Denver CO 80202 per web search corroboration as of July 2026; distinct facility from Centennial/Englewood sites.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential facility directory","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/co/denver"},{"kind":"osm","label":"OpenStreetMap node/12112236372","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112236372"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-denver-downtown-champa-co"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112236372"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-denver-downtown-osmnode-12112236372"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112236372"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"high","id":"compute_atlas-a86b4ff31a0d10d8","lat":37.5154292,"location_precision":"approximate","lon":-77.73203,"name":"Powhatan Technology Park","operator":"Province Group (Newport Equities / LC West LLC)","source_notes":"The original 119.9-acre approval covered three detached data centers of about 1.525M sq ft. The county estimated $2.7B, the developer $3B, with 165 direct jobs (Mangum study). The 60-acre addition makes a 180-acre campus. These investment and job figures refer to the original phase, so they are not set as campus fields. The coordinates are the OSM geocode of 1318 Page Road, one of the three parcels.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Virginia's Powhatan County greenlights 180-acre data center development","publisher":"IREI","retrievedAt":"2026-10-14","url":"https://irei.com/news/virginias-powhatan-county-greenlights-180-acre-data-center-development/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/province-group-powhatan-technology-park-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/3bn-data-center-proposed-outside-richmond-in-powhatan-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/province-group-powhatan-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Marshfield","confidence":"medium","id":"compute_atlas-a87d17651e06341b","lat":37.36,"location_precision":"approximate","lon":-92.905,"name":"Marshfield Data Center (Lumon Solutions)","operator":"Lumon Solutions Marshfield, LLC","source_notes":"Lumon Solutions Marshfield, LLC (formed October 2025) is developing a 5-acre, Tier III, AI-ready facility described as eight modular units on land owned by ARY Investments LLC; building-size figures differ between the county (~14,000 sq ft) and the developer (~7,000 sq ft). Webster County has no planning-and-zoning ordinance, limiting county jurisdiction. Site preparation began without public notice, prompting community opposition and discussion of a possible county moratorium. Developer claims on water/power/noise impact are not independently verified.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Commission – Data Center Update – May 21","publisher":"Webster County, MO","retrievedAt":"2026-08-24","url":"https://webstercountymo.gov/commission-data-center-update-may-21/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/lumon-solutions-marshfield-mo"}],"state":"Missouri","status":"under construction"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-a87de39d4b33b0a8","lat":31.87,"location_precision":"approximate","lon":-102.54,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tcdc-ector-county-tx","value":250.0}],"name":"Texas Critical Data Centers (TCDC)","operator":"Sharon AI + New Era Energy & Digital (joint venture)","source_notes":"Potential to scale beyond 1GW (ceiling, not a confirmed committed figure). Power partners Thunderhead Energy Solutions and Mawgan Capital (behind-the-meter gas generation); GlobeLink providing dark fiber. Phased: first 100MW segment targeted online by December 2026, remaining 150MW roughly 6 months later. Coordinates are approximate (Odessa area).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"TCDC signs LOI to acquire an additional 203 acres for off-grid data center campus in Ector County, Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/tcdc-signs-loi-to-acquire-an-additional-203-acres-for-offgrid-data-center-campus-in-ector-county-texas/"},{"kind":"press","label":"Sharon AI: Sharon AI Completes Phase One Engineering for Flagship AI Data Center Campus JV in Texas (Thunderhead Energy Solutions 250MW behind-the-meter agreement, SB6/grid interconnection plan)","retrievedAt":"2026-07-24","url":"https://sharonai.com/press-releases/sharon-ai-completes-phase-one-engineering-for-flagship-ai-data-center-campus-joint-venture-in-texas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tcdc-ector-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"medium","id":"compute_atlas-a8a5f2be511dd7d7","lat":36.068452,"location_precision":"approximate","lon":-115.139451,"name":"TPx Las Vegas Data Center","operator":"TPx Communications","source_notes":"Colocation facility near Harry Reid International Airport, in the same corridor as the tracked DataBank LAS1, EdgeConneX EDCLAS01 and Fiberhub LAS1 records but at a distinct address and under a distinct operator.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/tpx-communications-las-vegas-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"likely","city":"Louisville","confidence":"high","id":"compute_atlas-a8acdebf5542e218","lat":38.1953,"location_precision":"approximate","lon":-85.8485,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer","value":402.0}],"name":"PowerHouse Data Centers – Louisville (Camp Ground Road)","operator":"PowerHouse Data Centers","source_notes":"Address: 6001 Camp Ground Road, Louisville, KY; near Shively and the Rubbertown industrial district, less than 1 mile from the Ohio River. 153 acres confirmed by DCD. 1.6M sq ft total campus across seven buildings. Operator discussing tenants including major hyperscalers (Google, Amazon, Microsoft named in reports). End tenant not publicly disclosed at time of research. Fix: removed unconfirmed '50-year' duration from tax exemption description — program exists per Kentucky 2024 legislation but specific term length was not confirmed by any fetched source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Planning Commission recommends approval for 1.6m sq ft planned data center in Louisville, Kentucky","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/planning-commission-recommends-approval-for-16m-sq-ft-planned-data-center-in-louisville-kentucky/"},{"kind":"other","label":"EPIC Report No. 2026-001, Data Centers in Kentucky §I.B — 335 MW initial capacity, near-term expansion to 402 MW, first 130 MW phase targeted for commercial operation late 2026, projected lifetime investment approximately $11 billion","publisher":"Kentucky Energy Planning and Inventory Commission","retrievedAt":"2026-09-15","url":"https://kentuckylantern.com/wp-content/uploads/2026/06/EPIC-REPORT-NO-2026-001-FINAL.pdf"},{"kind":"press","label":"LG&E announces first major data center electric customer","publisher":"LG&E and KU","retrievedAt":"2026-09-15","url":"https://lge-ku.com/newsroom/press-releases/2025/01/16/lge-announces-first-major-data-center-electric-customer"},{"kind":"filing","label":"EPIC Report No. 2026-001 - Data Centers in Kentucky (June 2026)","publisher":"Kentucky Energy Planning and Inventory Commission","retrievedAt":"2026-09-22","url":"https://caer.uky.edu/sites/default/files/2026-06/epic-report-no-2026-001.pdf"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/powerhouse-louisville-ky"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-plans-400mw-data-center-campus-in-louisville-kentucky/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-data-centers-2"}],"state":"Kentucky","status":"under construction"},{"ai_classification":"likely","city":"Johnstown","confidence":"medium","id":"compute_atlas-a8ca54937e7c7069","lat":40.15,"location_precision":"approximate","lon":-82.68,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/","value":800.0}],"name":"Cologix Johnstown AI-Ready Campus","operator":"Cologix","source_notes":"154 acres; up to 800 MW scalable across eight data centers / 2.0M sq ft (800 MW is a full-buildout potential). The '>$7 billion' figure is a company-wide expansion plan, not a Johnstown-specific committed amount. Coordinates are the Johnstown, Licking County area centroid. The '>$7B' figure is Cologix's company-wide expansion plan; the $1.17B commitment is combined across Johnstown + Orange Township (not split), so no investment figure is recorded. Land: ~$45M for 154 acres (Sept 2024).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cologix Expands Central Ohio Footprint with Land Acquisition for New AI-Ready 800MW Data Center Campus","publisher":"Cologix","retrievedAt":"2026-07-08","url":"https://cologix.com/news/cologix-expands-central-ohio-footprint-with-land-acquisition-for-new-ai-ready-800mw-data-center-campus/"},{"kind":"press","label":"Cologix expands in Central Ohio","publisher":"Columbus Region","retrievedAt":"2026-07-08","url":"https://columbusregion.com/press-release/cologix-expands-in-central-ohio/"},{"kind":"other","label":"Public Utilities Commission of Ohio Authorizes Tariff for AEP Ohio's Data Center Customers (client alert, July 11, 2025)","publisher":"Vorys, Sater, Seymour and Pease LLP","retrievedAt":"2026-10-28","url":"https://www.vorys.com/publication-public-utilities-commission-of-ohio-authorizes-tariff-for-aep-ohios-data-center-customers-requires-end-of-moratorium-on-new-services-for-data-centers"},{"kind":"press","label":"Regulator approves AEP Ohio's landmark data center tariff","publisher":"POWER Magazine","retrievedAt":"2026-10-28","url":"https://www.powermag.com/regulator-approves-aep-ohios-landmark-data-center-tariff/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cologix-johnstown-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Thackerville","confidence":"medium","contains_osm":true,"id":"compute_atlas-a8cf88b7e82318b0","lat":33.7955237,"location_precision":"approximate","lon":-97.1438728,"name":"Chickasaw Nation WinStar Hardened Data Center","operator":"Chickasaw Nation Department of Commerce","source_notes":"A 16,000 sq ft EF4 tornado-rated data center commissioned by the Chickasaw Nation Department of Commerce. It has 50 IT cabinets, a 1,750 kW backup generator and a 2,500 kVA transformer, houses the Nation's critical servers and is open to external businesses. Search-result summaries say it is interconnected with two other Chickasaw-owned data centers; that was not read on a fetched page, so it is not asserted here. The coordinates are the town of Thackerville, not the building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"WinStar Hardened Data Center (project page)","publisher":"Manhattan Construction Company","retrievedAt":"2026-10-16","url":"https://manhattanconstructiongroup.com/manhattan-construction-company/Projects/winstar-hardened-data-center/"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/chickasaw-nation-winstar-data-center-thackerville-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-a8e8ef6db94998a8","lat":36.99,"location_precision":"approximate","lon":-82.53,"name":"Wise Innovation Hub (OASIS)","operator":"Wise Innovation Hub Venture LLC","source_notes":"Phased technology/data-center hub planned over ~10 years at the Lonesome Pine Regional Business & Technology Park (adjacent to Lonesome Pine Regional Airport) on former mined land in Wise County — a multi-tenant cluster co-located with the existing Mineral Gap data center. Developer Wise Innovation Hub Venture LLC (branded 'OASIS') signed a 2025-12-18 LOI with Red Post Energy for dedicated power. As of July 2026, named end-users had not been disclosed. Cardinal News (February 2026) reports nine data-center buildings of about 240,000 sq ft each, each needing about 50 MW of power, with on-site gas generation that could scale to 500 or 600 MW. As of October 2026, no cited source states a total data-center capacity, so none is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center complex with gas power plant planned for Wise County","publisher":"Cardinal News","retrievedAt":"2026-08-16","url":"https://cardinalnews.org/2026/02/25/data-center-complex-with-gas-power-plant-planned-for-wise-county/"},{"kind":"press","label":"Data center developers seek on-site energy in Wise","publisher":"Virginia Business","retrievedAt":"2026-07-13","url":"https://virginiabusiness.com/wise-data-center-developers-explore-hydrogen-power/"},{"kind":"other","label":"Data Centers — Wise County Economic Development","publisher":"Wise County Economic Development","retrievedAt":"2026-07-13","url":"https://elevatewisecounty.com/top-industries/data-centers/"},{"kind":"press","label":"Wise County considers new gas infrastructure for data center project","publisher":"Appalachian Voices","retrievedAt":"2026-09-09","url":"https://appvoices.org/2026/03/13/wise-county-maverick-project/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/wise-innovation-hub-wise-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Enterprise","confidence":"medium","id":"compute_atlas-a91746503ced1e1c","lat":36.0571,"location_precision":"approximate","lon":-115.2125,"name":"Switch LAS 19","operator":"Switch","source_notes":"Approximately 56,000 sq ft data center building approved by Clark County commissioners on 17 June 2026, sited east of Edmond Street and north of Warm Springs Road in the Enterprise area of the southwest Las Vegas valley, adjacent to Switch's existing Las Vegas campus. No capacity (MW), investment or completion date has been published. Coordinates are an approximate geocode of the named intersection, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/switch-las-19-enterprise-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"mixed_use","city":"Fairmont","confidence":"medium","contains_osm":true,"id":"compute_atlas-a963cdf693a3b124","lat":39.484898,"location_precision":"approximate","lon":-80.1426539,"name":"NOAA Environmental Security Computing Center (NESCC)","operator":"National Oceanic and Atmospheric Administration","source_notes":"Federal research-computing center in the I-79 High Technology Park, Marion County. Home of NOAA's Hera HPC system; a $100M NOAA HPC system named Rhea is planned for the site to support AI/ML weather, ocean and climate modeling. NOAA's own fact sheet (noaa.gov) could not be retrieved as of September 2026, so the 54,000 sq ft and $27.6M-establishment figures reported elsewhere are not used. Pin is the city centroid — the exact park parcel is not published in the cited source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NOAA's $100M Rhea supercomputer coming to Fairmont, boosting West Virginia tech growth","publisher":"West Virginia Press Association","retrievedAt":"2026-09-22","url":"https://wvpress.org/breaking-news/noaas-100m-rhea-supercomputer-coming-to-fairmont-boosting-west-virginia-tech-growth/"},{"kind":"press","label":"Press release: $100 million for new NOAA high-performance computer system (Rhea) at NESCC Fairmont","publisher":"West Virginia High Technology Foundation (NOAA release)","retrievedAt":"2026-10-11","url":"https://wvhtf.org/press-release-biden-harris-administration-invests-100-million-in-a-new-high-performance-computer-system-to-advance-noaa-research-and-development/"}],"updated":"2026-10-11","url":"https://www.compute-atlas.com/facilities/noaa-environmental-security-computing-center-fairmont-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"high","id":"compute_atlas-aa02e3c5decaf4d3","lat":37.762,"location_precision":"approximate","lon":-77.44,"name":"Iron Horse Data Center Campus","operator":"WestDulles Properties","source_notes":"Zoning sought for data center facilities on 78 acres (rezoning from mixed use to limited industrial, plus a height waiver to 75 feet) within an overall 180-acre campus straddling the Hanover–Ashland line; the Ashland portion was approved by town council in 2024. LLCs tied to WestDulles own the campus properties. The land area recorded is the overall 180-acre campus, not the 78-acre rezoning request. Coordinates are an approximate geocode of the cited street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"One data center project pulled and another delayed in Hanover, as supervisors reinstitute equipment tax (archived)","publisher":"Richmond BizSense","retrievedAt":"2026-09-09","url":"http://web.archive.org/web/20260724010609/https://richmondbizsense.com/2026/06/26/one-data-center-project-pulled-and-another-delayed-in-hanover-as-supervisors-reinstitute-equipment-tax/"},{"kind":"press","label":"Iron Horse data center proposal deferred in Hanover County","publisher":"WWBT NBC12","retrievedAt":"2026-08-27","url":"https://www.12onyourside.com/2026/06/19/iron-horse-data-center-proposal-deferred-hanover-county/"},{"kind":"press","label":"Iron Horse data center proposal gets planning commission's backing despite public opposition","publisher":"WWBT 12 On Your Side","retrievedAt":"2026-10-14","url":"https://www.12onyourside.com/2026/08/21/iron-horse-data-center-proposal-gets-planning-commissions-backing-despite-public-opposition/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/westdulles-iron-horse-hanover-va"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/westdulles-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Johnstown","confidence":"medium","id":"compute_atlas-aa2fe4f2cf0d80cc","lat":40.100989,"location_precision":"exact","lon":-82.746359,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-oh1-new-albany-licking-county-oh","value":192.0}],"name":"Vantage Data Centers OH1","operator":"Vantage Data Centers","source_notes":"3325 Horizon Court, Johnstown — Licking County section of the New Albany International Business Park. Vantage's first Midwest campus and seventh North American market. 3 buildings, 1.5M+ sq ft total, 192MW total planned IT capacity (not yet fully operational). LEED Silver target, part of Vantage's 2030 net-zero operational carbon commitment. Vantage's own press release states OH1 \"will provide secure and reliable infrastructure for cloud technologies and artificial intelligence\" — real operator-stated AI-adjacent marketing (paired with \"cloud,\" not an exclusive/GPU-specific claim), so the AI classification is recorded as likely rather than confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage breaks ground on New Albany data center in Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-new-albany-data-center-in-ohio/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/vantage-oh1-new-albany-licking-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"likely","city":"Van Buren Township","confidence":"medium","id":"compute_atlas-ab4b192f1837a549","lat":42.23,"location_precision":"approximate","lon":-83.44,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://vbtmi.gov/departments/municipal_services/data_center_project.php","value":1000.0}],"name":"Project Cannoli","operator":"Google","source_notes":"Google confirmed evaluating the site. Coordinates are approximate. Developer: Panattoni Development Co. The township planning commission granted preliminary site plan approval in February 2026 and approved the final site plan 5-1 on October 14, 2026. As of October 2026, early construction was reported underway, and Google expects the facility to begin drawing power by late 2027. The record is listed as under construction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"permit","label":"Van Buren Township — Data Center FAQ","publisher":"Charter Township of Van Buren, Michigan","retrievedAt":"2026-09-09","url":"https://vbtmi.gov/departments/municipal_services/data_center_faq.php"},{"kind":"press","label":"Google, DTE Van Buren data center contracts: 20-year special contracts before the MPSC, decision requested by September 10, 2026","publisher":"Planet Detroit","retrievedAt":"2026-09-14","url":"https://planetdetroit.org/2026/09/google-dte-van-buren-data-center-contracts/"},{"kind":"permit","label":"Van Buren Township — Data Center Project page (1.0 GW maximum facility load; load begins Dec 2027, maximum Dec 2028; development agreement May 20, 2026)","publisher":"Van Buren Charter Township","retrievedAt":"2026-09-21","url":"https://vbtmi.gov/departments/municipal_services/data_center_project.php"},{"kind":"press","label":"Michigan regulators OK DTE contracts for Google data center","publisher":"Planet Detroit","retrievedAt":"2026-10-24","url":"https://planetdetroit.org/2026/10/dte-google-data-center-contract-approval/"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"},{"kind":"press","label":"Van Buren Township officials approve plans for controversial Google data center campus (construction already underway)","publisher":"WXYZ Detroit","retrievedAt":"2026-10-24","url":"https://www.wxyz.com/news/van-buren-township-officials-approve-plans-for-controversial-google-data-center-campus"},{"kind":"press","label":"Township vote paves way for Michigan's second hyperscale data center","publisher":"The Manchester Mirror (Bridge Michigan syndication)","retrievedAt":"2026-10-24","url":"https://themanchestermirror.com/2026/10/19/township-vote-paves-way-for-michigans-second-hyperscale-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/project-cannoli-van-buren-township-wayne-county-mi"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-ab55217d41f8bad9","lat":40.11593,"location_precision":"approximate","lon":-82.75731,"name":"AWS New Albany (Beech/Miller Road Campus)","operator":"Amazon Web Services","source_notes":"AWS's Licking-side New Albany expansion: a $3.5B, five-building, ~1.25M sq ft campus (announced Sept 2023, targeted through 2030) on the Amazon Data Services Beech Rd NW / Miller Rd NW parcel cluster (~458 ac). Two buildings were completed and staffed as of Aug 2025; the remainder are under construction. Adjacent to (but distinct from) AWS's pre-existing 2570 Beech Rd \"Ridge Two\" campus (operational since ~2017, a separate parcel not in this record). No site-specific IT-load MW is disclosed (a widely-repeated 500 MW figure is an AWS us-east-2 regional aggregate, not this campus). Amazon's 2023 Ohio Job Creation Tax Credit is a multi-site umbrella (17 facilities across Franklin/Licking/Union counties), not specific to this parcel. Distinct from the tracked AWS Cosgray Road and AWS Scioto Darby campuses (Hilliard, Franklin County, west of Columbus). As of 2026-08-08, the completion target has passed without confirmation. As of the city's 2025-08-07 update, two campus buildings were finished and staffed (as of August 2026, tracked separately as the 2550 and 3180 Beech Road records) with the remainder \"expected to be operational by the end of the year\" — i.e. end-2025. None of the cited sources confirms that happened, so this record stays listed as under construction rather than being promoted on an expectation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon Investment in New Albany Contributes $1.4 Billion to Licking County GDP","publisher":"City of New Albany","retrievedAt":"2026-07-18","url":"https://newalbanyohio.org/news/2025/08/amazon-investment-in-new-albany/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-beech-road-new-albany-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"mixed_use","city":"Unknown","confidence":"medium","id":"compute_atlas-ab8e5db6e1c4d217","lat":39.63028,"location_precision":"approximate","lon":-81.64694,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cipher-digital-ulysses-center-township-morgan-oh","value":200.0}],"name":"Cipher Digital Ulysses","operator":"Cipher Digital (formerly Cipher Mining)","source_notes":"Site publicly confirmed by Cipher (200MW, 195 acres, AEP Ohio, PJM, Q4 2027 energization) without a stated county; local reporting on a June 2026 public meeting in Center Township, Morgan County ties Cipher Digital to a proposed data center there, matching the same MW/timeline facts. Distinct from a separate Cipher-linked land assembly in Waterford Township, Washington County (see HashWorks Powered Land — Waterford Site).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/cipher-digital-ulysses-center-township-morgan-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"mixed_use","city":"La Vista","confidence":"medium","id":"compute_atlas-ac02a990f0190f91","lat":41.166,"location_precision":"approximate","lon":-96.075,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/h5-la-vista-ne","value":17.3}],"name":"H5 Data Centers Omaha (La Vista)","operator":"H5 Data Centers","source_notes":"234,500 sq ft colocation facility on 32 acres at 10917 Harry Watanabe Parkway in La Vista, Sarpy County, with 17.3 MW of N+1 critical capacity, Tier III design, N+1 chillers and N+1 cooling towers, up to 7 on-net carriers and cloud on-ramps to AWS and Azure. The structured figures come from H5's own facility page. The site is widely described in directories as the former Yahoo La Vista data center; H5 is the current operator and Yahoo the original builder. H5's page does not state the build history, so the Yahoo provenance is unconfirmed. Coordinates are a street-address approximation, not a parcel geocode. Classified as mixed use: general-purpose multi-tenant colocation, not a confirmed AI training site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DCD (archived) — names H5 among the operators active in the Omaha data center market alongside TierPoint, LightEdge, Lumen, Cogent and Google","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-08-14","url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/h5-la-vista-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"likely","city":"Troy","confidence":"medium","id":"compute_atlas-ac2de207655de5d6","lat":38.9784,"location_precision":"approximate","lon":-90.9832,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloverleaf-troy-mo","value":500.0}],"name":"Cloverleaf Troy Campus","operator":"Cloverleaf Infrastructure","source_notes":"500 MW full-buildout campus near Troy, Lincoln County (near St. Louis); construction from early 2027. Single-tracker source → confidence reported. Coordinates are the Troy area centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/cloverleaf-troy-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"mixed_use","city":"New Albany","confidence":"medium","id":"compute_atlas-ac2feb1569cc3729","lat":40.103814,"location_precision":"exact","lon":-82.813811,"name":"Discover New Albany Data Center","operator":"Discover Properties LLC (Discover Financial Services; owner of record)","source_notes":"Enterprise data center identified from the county's 'data center' land-use class with assessed building area (built). Named by owner of record; current corporate parent was not separately verified as of October 2026. The mixed-use AI classification reflects an enterprise IT facility, not an AI-specific build.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/discover-new-albany-data-center-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-ac52d7eca5c9f330","lat":35.4791,"location_precision":"approximate","lon":-97.5142,"name":"Windstream Wholesale Oklahoma City Data Center","operator":"Windstream","source_notes":"Downtown Oklahoma City carrier/wholesale facility at 825 North Broadway Avenue. Coordinates are an approximate geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/windstream-wholesale-oklahoma-city-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"West Plains","confidence":"medium","id":"compute_atlas-ac5a5911ebea6a0d","lat":47.621,"location_precision":"approximate","lon":-117.73,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/apricus-rock-point-data-center-west-plains-wa","value":1000.0}],"name":"Rock Point Data Center Project","operator":"Apricus Energy Partners","source_notes":"Conceptual-stage dual hydrogen-production-plus-data-center project; Avista's own engineering study projects only ~50MW available by 2030 (vs. the company's aspirational 1,000MW target), rising to ~650MW by 2033; no formal county application filed as of Aug 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/apricus-rock-point-data-center-west-plains-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"likely","city":"Springdale","confidence":"high","id":"compute_atlas-acbdaf18904aa523","lat":40.5425,"location_precision":"approximate","lon":-79.7844,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/allegheny-dc-springdale-cheswick-pa","value":180.0}],"name":"Springdale Data Center (former Cheswick Generating Station)","operator":"Allegheny DC Property Co., LLC","source_notes":"A 565,000 sq ft data center building plus a 200,000 sq ft cooling and facility-management building on the 47-acre former Cheswick Generating Station site in Springdale Borough. Allegheny DC Property Co., LLC is owned by investment firm Davidson Kempner. The proposal states the facility would be used largely for AI development.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Pennsylvania data center plans face delays as officials review former power station project","publisher":"BlackRidge Research","retrievedAt":"2026-08-17","url":"https://www.blackridgeresearch.com/news-releases/pennsylvania-data-center-plans-face-delays-as-officials-review-former-power-station-project-us"},{"kind":"press","label":"Springdale data center gets green light","publisher":"The Allegheny Front","retrievedAt":"2026-09-12","url":"https://www.alleghenyfront.org/springdale-allegheny-county-data-center-approval/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/allegheny-dc-springdale-cheswick-pa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://triblive.com/local/valley-news-dispatch/site-of-former-springdale-power-plant-to-be-sold-to-data-center-developer/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/springdale-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Paradise","confidence":"medium","id":"compute_atlas-acc2aab740d1330f","lat":36.07533,"location_precision":"approximate","lon":-115.20061,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/oppidan-paradise-post-road-clark-county-nv","value":5.0}],"name":"Oppidan Post Road Data Center (Paradise)","operator":"Oppidan Investment Company","source_notes":"Single-storey 61,600 sq ft building (about 6,300 sq ft of office), 29 ft tall, on 9.5 developed acres of a 12.3-acre site; battery storage and electrical rooms at the western end. Property owner of record is Post Road Capital Real Estate Fund LP. Distinct from Oppidan's separate 5 MW Reno (North Valleys) project. Single-source, hence the record is marked reported. Coordinate is interpolated between US Census-geocoded anchor addresses on the same block of W Post Road (4275, 4310, 4555, 4625) because neither Census nor Nominatim resolves 4460 directly; a plain street-centroid geocode placed it about 1 km off.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Clark County Planning Commission Approves Five-Megawatt Data Center","publisher":"NVBEX","retrievedAt":"2026-10-14","url":"https://nevbex.com/2025/03/10/oppidan-paradise-data-center-approval/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/oppidan-paradise-post-road-clark-county-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-ad0279154f581bf0","lat":43.4593323,"location_precision":"approximate","lon":-116.1412266,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/rhea-data-blacks-creek-campus-ada-county-id","value":600.0}],"name":"Rhea Data Blacks Creek Campus","operator":"Rhea Data (subsidiary of Arevia Power)","source_notes":"Proposed 4-million-sq-ft, multi-building campus on BLM-managed public land in southern Ada County, near Blacks Creek Reservoir on Kuna-Mora Road and east of Meta's Kuna data center. Transmission and electrical rights-of-way extend into Elmore County. Acreage differs by outlet: 3,226 acres (BLM spokesperson, the figure recorded here); a ~3,200-acre campus plus ~550 acres of rights-of-way (3,750 total); or ~3,700 acres. The 600 MW data-processing figure comes from a hedged statement by BLM Field Manager Jared Blades ('I think that has a 600-megawatt data processing capacity'), repeated by KIFI. Treat it as preliminary. The pin is the OpenStreetMap feature for Blacks Creek Reservoir, the landmark the sources name. It is not a parcel location; no parcel or legal description has been published. This is a different project from rPlus Energies' Blacks Creek Energy Center solar plant south of the Boise airport. Rhea Data had not responded to media requests when these articles were published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Massive data center with power plant planned for public land in Idaho","publisher":"East Idaho News","retrievedAt":"2026-10-04","url":"https://www.eastidahonews.com/2026/09/massive-data-center-with-power-plant-planned-for-public-land-in-idaho/"},{"kind":"press","label":"Idaho's newest data center could be built on public land","publisher":"Boise State Public Radio","retrievedAt":"2026-10-04","url":"https://www.boisestatepublicradio.org/politics-government/2026-09-21/idaho-data-center-blacks-creek-blm"},{"kind":"press","label":"A 3,700-Acre Data Center Is Proposed for South Boise Public Land","publisher":"KIFI Local News 8","retrievedAt":"2026-10-04","url":"https://localnews8.com/news/top-stories/2026/09/25/massive-south-boise-data-center-proposal/"}],"updated":"2026-10-04","url":"https://www.compute-atlas.com/facilities/rhea-data-blacks-creek-campus-ada-county-id"}],"state":"Idaho","status":"planned"},{"ai_classification":"confirmed","city":"Anaheim","confidence":"medium","id":"compute_atlas-ad8d602d361c02fa","lat":33.8366,"location_precision":"approximate","lon":-117.9143,"name":"Eagle Mountain Data OC1 (Anaheim Data Center)","operator":"Eagle Mountain Data Inc","source_notes":"Operator describes OC1 as \"fully energized\" and pre-leasing high-density AI GPU capacity: pre-deployed NVIDIA GB300 clusters, up to 135kW/rack (engineered for 200kW+), direct-to-chip liquid cooling, <1.15 PUE target, zero-water cooling, 100% green utility power, with direct AWS Direct Connect / Azure ExpressRoute connectivity. The operator states OC1 is the first phase of a planned 45MW multi-facility Southern California development — that 45MW figure covers the whole planned program, not this single site, so the capacity is omitted rather than misapplied. No exact street address appears in the cited sources: a datacenters.com listing for this facility exists but could not be retrieved as of September 2026 and is not used as a source. Location is city-level (Anaheim) only.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/eagle-mountain-data-oc1-anaheim-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Rancho Cordova","confidence":"medium","contains_osm":true,"id":"compute_atlas-ad9025cd8fc169ff","lat":38.5922987,"location_precision":"exact","lon":-121.27744,"name":"EdgeConneX SAC01","operator":"EdgeConneX","source_notes":"Confirmed via official page: facility code SAC01, 28,500 sq ft (6,500 sq ft raised floor), ENERGY STAR + UL 2799 certified, rooftop solar.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/933393863","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/933393863"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/edgeconnex-sac01-ca"}],"state":"California","status":"operating"},{"ai_classification":"confirmed","city":"Richland","confidence":"medium","id":"compute_atlas-ade513fddb4c4a42","lat":46.348,"location_precision":"approximate","lon":-119.279,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/pnnl-ai-data-center-richland-wa","value":2.0}],"name":"PNNL AI Data Center","operator":"Battelle Memorial Institute (Pacific Northwest National Laboratory)","source_notes":"Battelle, which operates PNNL for the Department of Energy, issued a request for information for an on-premises next-generation AI compute data center to train and operationalize large language models for scientific and national government missions. Roughly 2 MW at a possible 2028 launch, with potential future expansion to about 40 MW. This would be DOE-funded and DOE-operated, not a private operator building on federal land. No construction decision has been made — this is an RFI-stage proposal only. Coordinates are an approximate geocode of the PNNL campus in Richland. Public-reception check (2026-09-10): Checked The Spokesman-Review's coverage (2026-09-10) of this DOE Genesis Mission-linked project; it covers technical specs and funding, with no resident, community-group, or elected-official reaction documented.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/pnnl-ai-data-center-richland-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Scottsdale","confidence":"medium","contains_osm":true,"id":"compute_atlas-ae07cc714cd92fe1","lat":33.6446663,"location_precision":"approximate","lon":-111.8960985,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.ironmountain.com/data-centers/locations/na/phoenix/azs-1","value":5.8}],"name":"Iron Mountain AZS-1","operator":"Iron Mountain","source_notes":"Confirmed operational at 8521 E. Princess Drive, Scottsdale, AZ 85255 (Maricopa County); 121,000 sqft, 5.8MW, linked via dark fiber to AZP-1/AZP-2.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Iron Mountain facility directory","publisher":"Iron Mountain","retrievedAt":"2026-07-22","url":"https://www.ironmountain.com/data-centers/locations/na/phoenix/azs-1"},{"kind":"osm","label":"OpenStreetMap node/11018926315","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/11018926315"}],"updated":"2026-07-22","url":"https://www.compute-atlas.com/facilities/iron-mountain-azs-1-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"mixed_use","city":"Las Vegas","confidence":"medium","id":"compute_atlas-ae15f6965e3ab10d","lat":36.0597501,"location_precision":"exact","lon":-115.1470938,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-las1-las-vegas-nv","value":3.35}],"name":"DataBank LAS1","operator":"DataBank","source_notes":"Carrier-dense edge colocation facility with 2N power redundancy and 11 on-site carriers. The building is mapped in OpenStreetMap as 'DataBank Las Vegas LAS1' at this address, which is how the coordinates were confirmed. A general-purpose colocation site rather than a dedicated AI campus.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-29","url":"https://www.compute-atlas.com/facilities/databank-las1-las-vegas-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Wells","confidence":"medium","id":"compute_atlas-ae8bdebbd09fc5b8","lat":41.108813,"location_precision":"approximate","lon":-114.956386,"name":"BluSky AI Wells Modular Data Center","operator":"BluSky AI Inc.","source_notes":"Modular data service units on concrete pads with fencing, modular office/process facilities and underground utility connections — minimal site improvement rather than a constructed hall. The record is deliberately kept as proposed: the LOI is explicitly non-binding and, as of the Nevada LCB's May 2026 memo, the project was still at LOI stage. No capacity in MW is asserted; 2,700 kVA is the site's existing transformer capacity, not a facility load. Coordinate resolves only to Hacienda Ranch Road in Wells, not to a parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/blusky-ai-wells-elko-county-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","contains_osm":true,"id":"compute_atlas-aed65c726ded2233","lat":39.1645613,"location_precision":"approximate","lon":-94.4779496,"name":"LightEdge Kansas City (SubTropolis Technology Center)","operator":"LightEdge","source_notes":"Underground colocation facility inside Hunt Midwest's SubTropolis Technology Center (limestone mine). 45,000 sq ft after the 2020 expansion; no MW stated. Operator claims Tier III concurrent maintainability. The most recent operator source fetched is from 2020, so current operation is not independently re-confirmed for 2026. Coordinates are the OSM SubTropolis point (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"LightEdge continues to expand Kansas City data center","publisher":"LightEdge","retrievedAt":"2026-10-13","url":"https://lightedge.com/lightedge-continues-to-expand-kansas-city-data-center/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/lightedge-kansas-city-subtropolis-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Taylor","confidence":"medium","contains_osm":true,"id":"compute_atlas-aeef81aaa6039a1d","lat":30.5728854,"location_precision":"approximate","lon":-97.4141053,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/","value":60.0}],"name":"Blueprint Data Centers Taylor","operator":"Blueprint Data Centers","source_notes":"Part of Blueprint's 85 MW, two-site plan. Coordinates are the Taylor city point. The abatement jurisdiction is not named in the source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Blueprint Data Centers plans 85MW Austin expansion, energized by 2026","publisher":"Converge Digest","retrievedAt":"2026-10-14","url":"https://convergedigest.com/blueprint-data-centers-plans-85mw-austin-expansion-energized-by-2026/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/blueprint-taylor-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Lindon","confidence":"high","contains_osm":true,"id":"compute_atlas-af6c8b12c044fa57","lat":40.332648,"location_precision":"approximate","lon":-111.7278754,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-lindon-ut","value":0.57}],"name":"Flexential Salt Lake City - Lindon","operator":"Flexential","source_notes":"HIPAA/HITRUST/PCI-DSS certified facility per web search corroboration as of July 2026; distinct from South Valley/West Jordan site. Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. Lindon City's audited FY2024-25 financial statements name exactly one active RDA tax-increment project area (\"700 N CDA\") and, under the required GASB 77 tax-abatement disclosure, exactly one RDA abatement agreement citywide (Doug Smith Autoplex/KIA in the \"RDA #3\" project area near Lindon Park Drive) — neither covers 333 South 520 West. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/12112382397","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112382397"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-lindon-ut"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112382397"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-salt-lake-city-lindon-osmnode-12112382397"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112382397"}],"state":"Utah","status":"operating"},{"ai_classification":"confirmed","city":"Buffalo","confidence":"medium","id":"compute_atlas-af9244d0fb37d125","lat":42.8864,"location_precision":"approximate","lon":-78.8784,"name":"Empire AI Gamma","operator":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","source_notes":"Empire AI's permanent, full-scale computing facility. Both cited sources say \"Construction continues on Empire AI's permanent, full-scale Gamma facility at UB, which is expected to be completed by the end of 2027\" - hence the under-construction status, but the record is marked reported because neither cited source names a specific building, parcel, or campus (UB has Buffalo and Amherst campuses) and neither gives a construction start date. Coordinates are a Buffalo city-level placeholder, approximate, and not a parcel. As of 2026-09-09, neither source states an MW capacity, a dedicated investment figure for Gamma specifically, an acreage, a job count, or a site-level subsidy agreement. This is the same consortium-wide state capital commitment noted on the Empire AI Beta record -- total backing over $500M incl. private/philanthropic funds, not phase-specific. The cited article names no Gamma-specific dollar figure. The $340m Empire AI consortium-wide state capital commitment is statewide, not Gamma-specific, and the cited source names no Gamma-specific dollar figure. It is not recorded as a site-level subsidy entry, to avoid counting the same state money against two facility records.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","publisher":"Office of the Governor of New York State","retrievedAt":"2026-09-09","url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new"},{"kind":"press","label":"Empire AI Beta, housed at UB, now fully online","publisher":"University at Buffalo (UBNow)","retrievedAt":"2026-09-09","url":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/empire-ai-gamma-buffalo-ny"}],"state":"New York","status":"under construction"},{"ai_classification":"unknown","city":"Washington","confidence":"medium","contains_osm":true,"id":"compute_atlas-afea3ae378283462","lat":38.9028879,"location_precision":"approximate","lon":-77.0291491,"name":"CoreSite DC1 - Washington, D.C.","operator":"CoreSite","source_notes":"Confirmed via CoreSite official directory + dedicated facility page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/751881301","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/751881301"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"other","label":"Colocation Data Centers in Washington D.C. - CoreSite","publisher":"CoreSite","retrievedAt":"2026-10-01","url":"https://www.coresite.com/data-center-locations/washington-dc"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/coresite-dc1-washington-d-c-dc"}],"state":"District of Columbia","status":"operating"},{"ai_classification":"unknown","city":"Lusby","confidence":"medium","id":"compute_atlas-b043aa89d99fb112","lat":38.39,"location_precision":"approximate","lon":-76.435,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/natelli-appeal-digital-park-lusby-md","value":300.0}],"name":"Appeal Digital Park","operator":"Natelli Holdings","source_notes":"Four data center buildings of roughly 200,000-220,000 sq ft each, about 70 feet tall, on 133 acres of county-owned I-2 heavy industrial land — the former Dominion Cove Point laydown site — paired with a pledged $30 million regional park on a separate Dominion-donated parcel. Capacity, water and jobs figures are developer-supplied. As of the county's data center page, no site plan application has been filed, and Calvert County's six-month moratorium on data center site plan approvals takes effect Aug. 28, 2026. As of 2026-09-10, status remains proposed. Developer's own project page confirms 300 MW capacity and states timelines remain 'subject to change...dependent upon final design development, regulatory approvals, and other factors' -- i.e. no firmer status yet. As of September 2026, thebaynet.com's coverage of the $30M park and the investment cost could not be retrieved (the site was rate-limiting requests), so no investment figure or community status is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Natelli Communities — Calvert County official project page","publisher":"Calvert County Government","retrievedAt":"2026-08-26","url":"https://www.choosecalvert.com/4058/Natelli-Holdings"},{"kind":"other","label":"Appeal Digital Park FAQs and Fact Sheet","publisher":"Natelli Holdings","retrievedAt":"2026-08-26","url":"https://www.appealdigitalparkcalvertmd.com/fa-qs-and-fact-sheet/"},{"kind":"other","label":"Appeal Digital Park — proposed data center in Lusby, Calvert County, MD","publisher":"Natelli Holdings","retrievedAt":"2026-08-26","url":"https://www.appealdigitalparkcalvertmd.com/"},{"kind":"other","label":"Data Centers — Calvert County official page (no site plan applications pending; six-month moratorium effective Aug. 28, 2026)","publisher":"Calvert County Government","retrievedAt":"2026-08-26","url":"https://www.calvertcountymd.gov/3880/Data-Centers"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/natelli-appeal-digital-park-lusby-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"confirmed","city":"Fort Meade","confidence":"medium","id":"compute_atlas-b074f2859c0665e0","lat":27.7525,"location_precision":"approximate","lon":-81.8024,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stonebridge-fort-meade-fl","value":1200.0}],"name":"Florida Ecopark AI Data Center Campus","operator":"Stonebridge (via Florida Ecopark LLC; end tenant undisclosed)","source_notes":"1,300-acre former phosphate mine site; 200-acre data center footprint. 20-year development agreement approved by Fort Meade City Commission approximately April 15, 2026. Requires 1.2 GW of electricity. No identified lessee or buyer publicly disclosed. Water use reduced in plans from 140,000 to 50,000 gallons daily; Southwest Florida Water Management District approval pending separately. Florida SB 484 signed May 2026 added new state-level data center siting requirements. Coordinates are Fort Meade city centroid; actual site is former phosphate mine outside city limits. As of 2026-09-10, the record remains listed as proposed. The 20-year development agreement was unanimously approved by Fort Meade commissioners (2026-04-15), but two resident lawsuits filed 2026-05-14 seek to void that approval and block construction-permit issuance (trial scheduled November 2027), and a recall effort against three commissioners is itself now in litigation (Commissioner Matthew Taylor sued 2026-09-09 to stop the recall). No groundbreaking reported. An exact street address has not been found in public reporting (site described only as 'west of US-98' on former phosphate-mine land). The Florida Department of Commerce letter of April 15, 2026 describes the project as \"nestled off SR-17\" and within the vicinity of US 98, SR 62, and SR 64.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Florida Data Center Plan Advances Amid Local Backlash","publisher":"Propmodo","retrievedAt":"2026-07-06","url":"https://propmodo.com/florida-data-center-plan-advances-amid-local-backlash/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/stonebridge-fort-meade-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-b07c861b5d28588e","lat":30.5728854,"location_precision":"approximate","lon":-97.4141053,"name":"Iron Mountain Williamson County Data Center Campus","operator":"Iron Mountain","source_notes":"The site is south of Samsung Austin Semiconductor, off CR 404, on part of a tract previously approved for the Taylor Meadows residential project. MW is not stated. Coordinates are the Taylor city point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Iron Mountain data center plan presented to Hutto City Council (Community Impact, Mar 19, 2026)","publisher":"Community Impact","retrievedAt":"2026-10-14","url":"https://newsletter.communityimpact.com/p/new-post-b3e4"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/iron-mountain-taylor-williamson-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Jackson","confidence":"medium","id":"compute_atlas-b0eff83183edd0f3","lat":32.3705052,"location_precision":"approximate","lon":-90.1998927,"name":"Saxum Forest Avenue Data Center Site (Northwest Jackson)","operator":"Saxum Investment Company (end user undisclosed)","source_notes":"Site is along Forest Avenue / Forest Avenue Extension between Medgar Evers Boulevard and I-220 in Northwest Jackson; current owners named in the WLBT report are Gusta F. LLC and WMIW LLC. Attorney Robert Ireland represented an unnamed 'company' and no end user, capacity or investment figure was disclosed, so those fields are omitted. This is a distinct site from the Prado AI / PraCon Global AI Industrial Campus (tracked separately as of September 2026), which is a different developer on a different parcel in the Jackson metro. Coordinates are an OpenStreetMap geocode of Forest Avenue in Northwest Jackson, not a parcel footprint.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/saxum-forest-avenue-jackson-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"likely","city":"Enfield","confidence":"medium","id":"compute_atlas-b0fff76b65086877","lat":36.18,"location_precision":"approximate","lon":-77.66889,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/quiet-data-centers-enfield-halifax-county-nc","value":88.0}],"name":"Project Q — Quiet Data Centers Enfield (Halifax County)","operator":"Quiet Data Centers Halifax Inc.","source_notes":"County-owned 251-acre industrial site off Trestle Road near U.S. 301 outside Enfield; the data center campus itself is described as roughly 14–15 acres with a 90,000–100,000 sq ft building. Phase 1 about 38 MW, final about 88 MW. Minimum contractual commitment is a $250M taxable investment and 50 permanent jobs; the company said the eventual investment could approach $1 billion — that larger figure is aspirational, not committed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/quiet-data-centers-enfield-halifax-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"compute_atlas-b1206f9b43252e35","lat":39.132358,"location_precision":"approximate","lon":-94.88035,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/red-wolf-dcd-properties-project-red-wolf-ks","value":600.0}],"name":"Project Red Wolf","operator":"Red Wolf DCD Properties LLC","source_notes":"400-acre, 6-building campus west of Kansas Speedway (13000 Parallel Parkway). Zoning approval failed a vote and drew a lawsuit; contested, decision pending in 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"600MW data center campus proposed outside Kansas City, Kansas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-outside-kansas-city-kansas/"},{"kind":"press","label":"RedWolf proposes $12B data center campus in Wyandotte County, Kansas","publisher":"Construction Review Online","retrievedAt":"2026-07-17","url":"https://constructionreviewonline.com/redwolf-proposes-12b-data-center-campus-in-wyandotte-county-kansas/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/red-wolf-dcd-properties-project-red-wolf-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"likely","city":"Wisconsin Rapids","confidence":"medium","id":"compute_atlas-b13faaeca726397f","lat":44.39,"location_precision":"approximate","lon":-89.82,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/pch-wi-holdings-wisconsin-rapids-wood-county-wi","value":150.0}],"name":"Wisconsin Rapids Data Center","operator":"PCH WI Holdings LLC","source_notes":"950 Fourth Ave N, former paper mill site. Developer reportedly affiliated with PNK Group USA. Conditional use permit application filed with the city April 30, 2026. Scale/investment not yet disclosed. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Who is the developer of the proposed Wisconsin Rapids data center?","publisher":"Wausau Pilot & Review","retrievedAt":"2026-10-16","url":"https://wausaupilotandreview.com/2026/05/17/who-is-the-developer-of-the-proposed-wisconsin-rapids-data-center/"},{"kind":"press","label":"Wisconsin Rapids Data Center Faces Key Council Decision October 20","publisher":"WHSM","retrievedAt":"2026-10-16","url":"https://whsm.com/news/2026/10/15/wisconsin-rapids-data-center-faces-key-council-decision-october-20"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/pch-wi-holdings-wisconsin-rapids-wood-county-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Anchorage","confidence":"medium","id":"compute_atlas-b150f0ec52577ec2","lat":61.2163129,"location_precision":"approximate","lon":-149.894852,"name":"GCI Anchorage Data Center","operator":"GCI","source_notes":"GCI's own site describes this, without naming a street address, as Alaska's largest and most advanced data center, built on self-contained pods with isolated power and cooling and a 99.9999% uptime design. Multiple third-party directories consistently cite 6831 Arctic Blvd, Anchorage for this specific facility, but as of September 2026 no page confirming that address could be retrieved (two attempts on datacentermap.com and one on mapcarta.com were refused). The Anchorage Chamber listing instead gives 2550 Denali St Suite 1000 — likely GCI's corporate headquarters rather than this data center's site, which is why the two should not be conflated. The pin is therefore an Anchorage city-level approximation (Nominatim), not either street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"GCI | Communications - Anchorage Chamber","publisher":"Anchorage Chamber of Commerce","retrievedAt":"2026-09-12","url":"https://business.anchoragechamber.org/list/member/gci-1497"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/gci-anchorage-ak"}],"state":"Alaska","status":"operating"},{"ai_classification":"unknown","city":"Spring City","confidence":"medium","id":"compute_atlas-b1668df44ba00d7b","lat":40.193717,"location_precision":"approximate","lon":-75.560162,"name":"Pennhurst Data Center Campus","operator":"Penn Hurst Holdings","source_notes":"~1.9 million sq ft data center campus (five two-story buildings) on ~125 acres of the historic former Pennhurst State Hospital site in East Vincent Township, with a five-acre substation and an on-site 550 MW gas plant. Township denied conditional use; developer appealing in Chester County court.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Pennhurst Data Center Developers Add 600,000 Square Feet, Gas Plant in Last-Minute Revision","publisher":"PHILADELPHIA.Today","retrievedAt":"2026-07-17","url":"https://philadelphia.today/2026/03/pennhurst-data-center-plan/"},{"kind":"press","label":"East Vincent Says No to Pennhurst Data Center, But the Fight May Not Be Over","publisher":"VISTA.Today","retrievedAt":"2026-07-17","url":"https://vista.today/2026/05/east-vincent-pennhurst-data-center-rejected/"},{"kind":"press","label":"Penn Hurst Holdings Takes Data Center Fight to Chester County Court","publisher":"PHILADELPHIA.Today","retrievedAt":"2026-07-17","url":"https://philadelphia.today/2026/07/pennhurst-data-center-appeal-east-vincent/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/pennhurst-data-center-east-vincent-chester-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"compute_atlas-b17dc2932509418b","lat":39.011,"location_precision":"approximate","lon":-77.464,"name":"Quantum Park Data Center Expansion","operator":"Quantum Park LLC","source_notes":"Loudoun County application LEGI-2023-0097. Continued conversion of the former Verizon Federal Operations campus — now branded Quantum Park — between Loudoun County Parkway and Waxpool Road in Ashburn to data center use. The amendment would permit additional data center, substation and office uses; reporting describes two new data center buildings and a substation on roughly 40 acres within the office campus. The applicant lowered building heights and changed architects before the commission vote. Commissioner Dale Polen opposed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/quantum-park-data-center-ashburn-loudoun-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Kapolei","confidence":"medium","id":"compute_atlas-b19243fa2323d59c","lat":21.349388772017,"location_precision":"approximate","lon":-158.128697947756,"name":"Kapolei Cable Landing Station","operator":"Hawaiki Submarine Cable USA LLC (BW Digital)","source_notes":"Landing station for the Hawaiki trans-Pacific submarine cable (completed 2018), providing 43 terabits of carrier-neutral capacity via six fiber pairs to the US west coast, Australia, New Zealand and American Samoa. DRFortress has operated landing and colocation activities here under a long-term partnership with Hawaiki dating to 2016; 1547 Critical Systems Realty (which acquired DRFortress in 2025) lists a Kapolei facility (\"HAII1\", branded AlohaNAP-adjacent, ~10,200 sq ft expandable to 60,200 sq ft) that is treated here as the same site rather than a separate parcel, since both describe DRFortress/1547 colocation activity at the one cable landing station Hawaiki owns in Kapolei. In early 2026 the Honolulu City Council granted a Special Management Area Major Permit for an expansion project at this site to add landing capacity for Google's Taihei and Tabua cables plus BW Digital's own Hawaiki Nui cable. Coordinates are a Census TIGER-line geocode of the street address, not a confirmed parcel survey.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Kapolei HI | HAII1 | 1547 Critical Systems Realty","publisher":"1547 Critical Systems Realty","retrievedAt":"2026-09-12","url":"https://www.1547realty.com/data-center/kapolei-hi-haii1/"},{"kind":"other","label":"Hawaiki Submarine Cable Landing Station","publisher":"Bowers + Kubota","retrievedAt":"2026-09-12","url":"https://www.bowersandkubota.com/projects/hawaiki-submarine-cable-landing-station"},{"kind":"filing","label":"Final Environmental Assessment: Hawaiki Cable Landing Expansion Project","publisher":"Hawaiki Submarine Cable USA LLC / State of Hawaii Office of Planning and Sustainable Development (Environmental Review Program)","retrievedAt":"2026-10-02","url":"https://files.hawaii.gov/dbedt/erp/Doc_Library/2025-07-08-OA-FEA-Hawaiki-Submarine-Cable-Landing-Expansion-Project.pdf"}],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/hawaiki-cable-kapolei-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Old Ocean","confidence":"medium","contains_osm":true,"id":"compute_atlas-b1cd944ea0221287","lat":29.0799726,"location_precision":"approximate","lon":-95.749673,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nightpeak-old-ocean-data-center-brazoria-county-tx","value":620.0}],"name":"Old Ocean Data Center","operator":"Nightpeak Energy","source_notes":"The investment figure covers the two data centers only ($1.5B each). The $3.5B headline also includes two $250M power plants. The 158-acre site is shared with the Bulldog Power plants. Coordinates are the Old Ocean community point near Sweeny, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Houston-Area County Rejects Tax Break For $3.5B Data Center Project","publisher":"Bisnow","retrievedAt":"2026-10-14","url":"https://www.bisnow.com/news/houston/data-center-development/houston-area-county-rejects-tax-abatement-for-35b-data-center-development-133616"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/nightpeak-old-ocean-data-center-brazoria-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"medium","id":"compute_atlas-b1fed76d74684ae4","lat":40.76852,"location_precision":"exact","lon":-111.88585,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-slc1-salt-lake-city-ut","value":1.0}],"name":"DataBank SLC1 (Salt Lake City Carrier Hotel)","operator":"DataBank","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. 179 Social Hall Avenue sits within the RDA's Central Business District (CBD) project-area boundary (bounded by North Temple/500 South and 400 West/200 East) — but sitting inside a project area is not itself a subsidy. The CBD's own published list of RDA-funded participation developments names exactly four projects (Paperbox Lofts, The Aster, 150 Main, West Quarter), none at Social Hall Avenue and none a data center, and a full-text search of the RDA's FY2021 annual/audit report returned zero mentions of \"Social Hall.\" Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"subsidy","label":"Central Business District Project Area — Redevelopment Agency of Salt Lake City","publisher":"Redevelopment Agency of Salt Lake City","retrievedAt":"2026-09-05","url":"https://cra.slc.gov/projects/central-business-district/"},{"kind":"subsidy","label":"Redevelopment Agency of Salt Lake City — FY2021 Annual/Audit Report","publisher":"Redevelopment Agency of Salt Lake City","retrievedAt":"2026-09-05","url":"https://cra.slc.gov/wp-content/uploads/2021/12/SLCRDA_FY2021_FINAL.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/databank-slc1-salt-lake-city-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"City of Industry","confidence":"medium","id":"compute_atlas-b25d84c37189fa48","lat":33.9926096,"location_precision":"approximate","lon":-117.9278263,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/","value":10.0}],"name":"Puente Hills Mall Redevelopment Data Center","operator":"Puente Hills Land Venture, LLC","source_notes":"Mid-sized (10 MW) data center within a larger mall redevelopment; property sold August 2024. Location is the mall centroid (approximate). Distinct from the Raeden proposal at 110 Marcellin Drive already tracked.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"City of Industry discussed data center sites months before zoning vote (2026-03-02)","publisher":"Investigate LA","retrievedAt":"2026-09-21","url":"https://investigatela.org/2026/03/02/city-of-industry-discussed-data-center-sites-months-before-zoning-vote/"},{"kind":"press","label":"San Gabriel Valley residents unite in fight against proposed Puente Hills Mall data center (2026-03-26)","publisher":"CALÓ News","retrievedAt":"2026-09-21","url":"https://www.calonews.com/featured-topics/environmental/san-gabriel-valley-residents-unite-in-fight-against-proposed-puente-hills-mall-data-center/article_92d86ea9-a1fc-42b0-bc9f-249934fc1951.html"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/puente-hills-mall-data-center-city-of-industry-ca"}],"state":"California","status":"planned"},{"ai_classification":"mixed_use","city":"New Albany","confidence":"medium","id":"compute_atlas-b28dc0e400f2fefb","lat":40.103953,"location_precision":"exact","lon":-82.810601,"name":"TJX New Albany Data Center","operator":"TJX Companies Inc (owner of record)","source_notes":"Enterprise data center identified from the county 'data center' land-use class with assessed building area. Single-sourced. Classified mixed-use: enterprise IT, not AI-specific.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/tjx-new-albany-data-center-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"mixed_use","city":"Ashburn","confidence":"medium","id":"compute_atlas-b2ccfd814b60ef5b","lat":39.0437,"location_precision":"approximate","lon":-77.4875,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/equinix-ashburn-va","value":500.0}],"name":"Equinix Ashburn Campus (DC1–DC15)","operator":"Equinix","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Equinix IBX Sustainability Quick Reference Guide","publisher":"Equinix","retrievedAt":"2026-07-06","url":"https://www.equinix.com/about/sustainability/document-center"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/equinix-ashburn-va"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-b3078dc92accc454","lat":30.3602181,"location_precision":"approximate","lon":-103.6628596,"name":"Pacifico Energy Glass Mountains Ranch Campus","operator":"Pacifico Energy","source_notes":"Company representatives gave a $5B-$60B investment range, too wide to record. No Amazon link is reported for this site. Coordinates are the Alpine city point; the ranch is northwest of Alpine. As of October 2026, Texas Public Radio (September 2026) describes a possible data center and natural-gas power plant on the ranch, with the data center off-grid and supplied by its own gas turbines; it reports no capacity, tenant or named campus for this site.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/pacifico-glass-mountains-brewster-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Newcastle","confidence":"medium","id":"compute_atlas-b307c68eaa4ebac5","lat":37.6949,"location_precision":"approximate","lon":-113.943,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/brightnight-red-butte-newcastle-ut","value":1500.0}],"name":"Red Butte Energy and Data Center Campus","operator":"BrightNight","source_notes":"Approximately 8 miles north of Newcastle, roughly 20 miles from Cedar City; application on hold pending the county's data-center moratorium. Subsidies checked (2026-09-08): structural zero — the project is proposed and on hold under Iron County's moratorium, and no Iron County or Newcastle CRA/RDA was found to execute a pre-approval participation agreement; Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Red Butte Energy and Data Center Campus","publisher":"BrightNight","retrievedAt":"2026-08-25","url":"https://brightnightpower.com/red-butte/"},{"kind":"permit","label":"Proposed Data Center Information — Iron County","publisher":"Iron County, Utah","retrievedAt":"2026-08-25","url":"https://ironcountyut.gov/planning/data-center-projects"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/brightnight-red-butte-newcastle-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-b313a724d58bc9e2","lat":28.95,"location_precision":"approximate","lon":-95.97,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/mara-site-mat-1177-matagorda-tx","value":1000.0}],"name":"Site MAT 1177","operator":"MARA Holdings","source_notes":"~1,200 acres approximately 90 miles SW of Houston; up to 2,000MW long-term. Coordinates are a COUNTY-CENTROID approximation — exact city undisclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Marathon Digital Holdings $600M Texas AI-bitcoin campus","publisher":"Crypto Briefing","retrievedAt":"2026-07-17","url":"https://cryptobriefing.com/marathon-digital-holdings-600m-texas-ai-bitcoin-campus/"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/mara-site-mat-1177-matagorda-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"confirmed","city":"Memphis","confidence":"medium","id":"compute_atlas-b324d193c8336532","lat":35.1428067,"location_precision":"approximate","lon":-90.0500147,"name":"Neural Nexus Innovation District","operator":"Legacy Power Capital","source_notes":"Announced 2025-12-10 (per the Chamber press release dateline: 'MEMPHIS, TN. Wednesday, December 10, 2025'). Located on 'two full city blocks' in downtown Memphis described both as 'adjacent to FedExForum and Beale Street' and 'across from AutoZone Park' (Downtown Memphis Commission) -- these are the same downtown block cluster, but no street address or parcel has been published, so this pin uses the AutoZone Park landmark centroid, disclosed as approximate. Total project investment is reported as $9.4B in the Downtown Memphis Commission's headline; as of October 2026 the Chamber release states no dollar figure. That release describes a mixed-use development with office, residential and retail space and sovereign cloud computing capabilities, and as of October 2026 neither cited page mentions a hotel; a separate reported first-phase figure of ~$400M and ~70MW of power (seen in secondary aggregation, not independently fetched as of September 2026) is omitted pending verification against a primary source. Site is the former location of The Walk development on Union Avenue.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Legacy Power Capital Announces \"Neural Nexus\" Innovation District in Downtown Memphis - Greater Memphis Chamber","publisher":"Greater Memphis Chamber","retrievedAt":"2026-09-13","url":"https://memphischamber.com/blog/press-release/legacy-power-capital-announces-neural-nexus-innovation-district-in-downtown-memphis/"},{"kind":"press","label":"Downtown Memphis to Get $9.4 Billion \"Neural Nexus\" Mixed-Use Development","publisher":"Downtown Memphis Commission","retrievedAt":"2026-09-13","url":"https://downtownmemphis.com/post/downtown-memphis-to-get-94-billion-neural-nexus-mixed-use-development"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/neural-nexus-memphis-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Hayward","confidence":"medium","contains_osm":true,"id":"compute_atlas-b3693f8fb92c3fda","lat":37.631411,"location_precision":"approximate","lon":-122.119608,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hines-hayward-exchange-92-ca","value":49.0}],"name":"Hayward Exchange @92 Data Center","operator":"Hines","source_notes":"Roughly 300,000 sq ft data center building within the four-building Hayward Exchange @92 campus. The contractor's project page names Hines and MetLife Investment Management as owners and describes partial occupancy by Amazon; the city register names Hines as developer.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/hines-hayward-exchange-92-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Spartanburg","confidence":"high","contains_osm":true,"id":"compute_atlas-b3f0a817fcdd5174","lat":34.9965845,"location_precision":"exact","lon":-82.034841,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dartpoints-spartanburg-sc","value":1.6}],"name":"DartPoints Spartanburg Data Center (SPA01)","operator":"DartPoints","source_notes":"Colocation facility: 21,400 sq ft raised floor, 5 on-site network providers. Operator states 1.6 MW utility power with 0.8 MW critical IT load; the operational capacity records the 1.6 MW utility figure. Coordinates are the OSM building footprint centroid. Unrelated to the other Spartanburg County sites in this dataset as of September 2026 (Greenidge/LightHouse on Jones Road, Valara/NorthMark, TigerDC).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DartPoints — Spartanburg, SC (SPA01) data center","publisher":"DartPoints","retrievedAt":"2026-09-22","url":"https://dartpoints.com/locations/spa01-spartanburg-sc/"},{"kind":"osm","label":"OpenStreetMap way 680114725 — DartPoints Spartanburg (telecom=data_center)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-22","url":"https://www.openstreetmap.org/way/680114725"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/dartpoints-spartanburg-sc"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/680114725"}],"state":"South Carolina","status":"operating"},{"ai_classification":"likely","city":"Ruther Glen","confidence":"medium","id":"compute_atlas-b426b70fe0fd4e62","lat":37.9374,"location_precision":"approximate","lon":-77.4837,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cleanarc-ruther-glen-va","value":900.0}],"name":"CleanArc VA1","operator":"CleanArc Data Centers","source_notes":"900 MW flagship campus in Ruther Glen, Caroline County, phased into the mid-2030s (the November 2025 groundbreaking release targets the first 300 MW online in 1Q 2027; an earlier Data Center Dynamics report had said 200 MW by Q3 2026). Distinct operator/parcel from the AWS Mattermeade campus (also Caroline County). Coordinates are the Ruther Glen area centroid. The recorded investment is the confirmed $3B first-phase pledge (VEDP); the ~$8.8B full-buildout figure is a projection and is excluded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CleanArc gets green light for data center campus in Caroline County, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/cleanarc-gets-green-light-for-600mw-data-center-campus-in-caroline-county-virginia/"},{"kind":"other","label":"Submission provenance (not controlling source) — Public Evidence record for permit 74341-1","publisher":"Public Evidence Project","retrievedAt":"2026-07-30","url":"https://publicevidence.org/records/clean-arc-data-centers-va-1-campus-air-permit-74341-1"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/cleanarc-ruther-glen-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Orangeburg","confidence":"high","contains_osm":true,"id":"compute_atlas-b48250630b0049a1","lat":41.037331,"location_precision":"approximate","lon":-73.987853,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-lga3-orangeburg-ny","value":40.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-lga3-orangeburg-ny","value":20.0}],"name":"DataBank LGA3 (Orangeburg Data Center Campus)","operator":"DataBank","source_notes":"DataBank's third metro-NYC facility, described by DataBank's own site (fetched 2026-09-13) as 20 MW critical IT load operational across 110,000 IT sq ft, with the full campus planned to reach 40 MW / 200,000 sq ft across 5 data halls. Data Center Frontier's trade-press coverage states different figures for the same campus (30 MW initially available with planned expansion to 45 MW, 200,000 sq ft at full build-out) -- both figures are reported here rather than reconciled; the operator's own current site is treated as the more current figure for the operational MW. A second planned facility, LGA4, is also referenced by Data Center Frontier at 45 MW but not yet named on DataBank's own site as of September 2026 -- not listed separately since it is not yet independently confirmed as a distinct, addressable site. Data Center Frontier ties the campus's HPC/AI-oriented data-hall design to New York's Empire AI Consortium initiative, but does not name a specific AI tenant or offtaker at this site -- an AI classification is omitted rather than guessed (colocation is multi-tenant and general-purpose). Distinct from the Bloomberg LP Data Center and the JPMorgan Chase Data Center, Orangeburg, both tracked separately as of September 2026 -- three separate Orangeburg, Rockland County data-center campuses. Coordinates geocoded from the street address via US Census geocoder (address-range interpolation, not a confirmed parcel), hence approximate precision.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"A positive SEQRA declaration on DataBank's expansion plans in Orangeburg sets the stage for more rigorous environmental review (July 9, 2026)","publisher":"Rockland County Business Journal","retrievedAt":"2026-10-09","url":"https://rcbizjournal.com/2026/07/09/a-positive-seqra-declaration-on-databanks-expansion-plans-in-orangeburg-sets-the-stage-for-more-rigorous-environmental-review/"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/databank-lga3-orangeburg-ny"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1383913490"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-lga3-osmway-1383913490"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1383913490"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-b4c816f6b45d707b","lat":37.3939862,"location_precision":"exact","lon":-121.9783207,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://q.com/data-centers/santa-clara/","value":7.5}],"name":"QTS Santa Clara 1","operator":"QTS Data Centers","source_notes":"Confirmed 4-acre multi-building QTS campus at 2805 Mission College Blvd, Santa Clara, CA. Candidate 58708529 is the same campus, ~0.1km away; kept this one, dropped the other as duplicate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS facility directory","publisher":"QTS","retrievedAt":"2026-08-16","url":"https://q.com/data-centers/santa-clara/"},{"kind":"osm","label":"OpenStreetMap way/54121151","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/54121151"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/qts-santa-clara-1-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/54121151"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"medium","contains_osm":true,"id":"compute_atlas-b51a3492a8ae3d83","lat":41.5385054,"location_precision":"approximate","lon":-93.8253005,"name":"Microsoft Project Mountain Data Center","operator":"Microsoft","source_notes":"Microsoft's first Iowa data center campus (planned since 2008, construction from 2010, expanded 2011/2013) - a two-building campus at/near 8855 Grand Ave, distinct from the already-tracked 'Ginger West' campus (11100 Booneville Rd). Address sourced from a secondary aggregator search summary (not independently retrieved as of August 2026) but independently geocode-verified as a real West Des Moines / Dallas County address via OSM Nominatim. Annual property tax ~$1.6M and $10M public infrastructure investment per WDM Chamber page (not campus construction cost).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Microsoft Data Centers - West Des Moines Chamber of Commerce","publisher":"West Des Moines Chamber of Commerce","retrievedAt":"2026-08-08","url":"https://wdmchamber.org/economic-development/microsoft-data-centers/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/microsoft-mountain-west-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Hoffman Estates","confidence":"medium","id":"compute_atlas-b5427ddbb5a45611","lat":42.0770709,"location_precision":"approximate","lon":-88.2175155,"name":"Compass Datacenters Hoffman Estates Campus","operator":"Compass Datacenters","source_notes":"Five hyperscale buildings, each over 250,000 sq ft, planned on the roughly 200-acre former Sears headquarters campus. Compass closed on the property in September 2023 for a reported $194 million; the $10 billion figure is the projected total local investment at full build-out, not a single building's cost.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/compass-hoffman-estates-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"likely","city":"Raton","confidence":"medium","id":"compute_atlas-b544048c28c2bfd9","lat":36.9033,"location_precision":"approximate","lon":-104.4392,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/atterix-raton-digital-hub-nm","value":50.0}],"name":"Atterix Raton Advanced Digital Hub","operator":"Atterix LLC","source_notes":"Three-phase proposal: Phase 1 would convert a former Kmart on the south side of Raton into a data center drawing up to 5 MW, with later phases at a nearby power station and the city airport over roughly five years, totalling up to 50 MW. Nothing is approved — the feasibility study period ran to early August 2026 and the City Commission must still authorize any development. Atterix was incorporated in Colorado in December 2025.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Small northern New Mexico city postpones decision on data center moratorium","publisher":"Source New Mexico","retrievedAt":"2026-08-08","url":"https://sourcenm.com/2026/06/10/small-northern-new-mexico-city-postpones-decision-on-data-center-moratorium/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/atterix-raton-digital-hub-nm"}],"state":"New Mexico","status":"planned"},{"ai_classification":"confirmed","city":"Ypsilanti","confidence":"medium","id":"compute_atlas-b56489905768cc8f","lat":42.202962873437,"location_precision":"approximate","lon":-83.557610942093,"name":"U-M / Los Alamos Research Computing Center","operator":"University of Michigan (with Los Alamos National Laboratory)","source_notes":"144-acre site on Textile Road near Bridge Road in Ypsilanti Charter Township, far eastern Washtenaw County, near the Huron River. LANL's own announcement states the site will house two computing centers — one for Los Alamos national-security AI research and development and an adjacent academic computing center for U-M faculty, students and partner universities. They are recorded here as a single campus record because both sources describe one adjacent pair on one site. Confirmed absences: neither source states a megawatt capacity ('capacity figures: none disclosed' per LANL), a water or cooling design, or job counts — those fields are omitted rather than estimated. LANL states the funding mix was not finalised at announcement; the $1.2B total and the $100M state grant are Bridge Michigan's figures. The AI classification is confirmed — both sources describe the facility's explicit purpose as AI research. Coordinates are the US Census geocoder's match for the Textile Rd / Bridge Rd intersection named in the sources; the 144-acre parcel boundary is not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"U-M affirms Ypsilanti $1.2B computing center site; township officials vow fight","publisher":"Bridge Michigan","retrievedAt":"2026-09-09","url":"https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/"},{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/umich-lanl-research-computing-ypsilanti-township-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Berlin","confidence":"medium","id":"compute_atlas-b587f9ff6e83ba60","lat":38.3117282,"location_precision":"approximate","lon":-75.1228506,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/globalinx-fastnet-cls-ocean-city-md","value":5.0}],"name":"Globalinx Fastnet Cable Landing Station","operator":"Globalinx (GLX)","source_notes":"AWS is the anchor tenant of the Fastnet transatlantic subsea cable (Ocean City, MD to Castlefreke, County Cork, Ireland; ~320 Tbps across 16 fiber pairs); Globalinx's lease agreement was signed late 2025 with a targeted Q3 2027 ready-for-service date and Fastnet operational in 2028. No cited source states a specific street address or parcel — reporting places the site 'near Ocean City Municipal Airport' off Route 611 / Stephen Decatur Highway outside Berlin. Coordinates are therefore a disclosed representative pin at Ocean City Municipal Airport (via OSM Nominatim), not a confirmed parcel location; the location is approximate. 24,000 sq ft facility designed to support up to four subsea cable systems; the planned capacity of 5 MW reflects the reported scalable-to-5MW power capacity, not a confirmed operational figure.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Worcester County Enacts Moratorium on Data Centers and Cable Landing Stations While New Regulations Are Developed","publisher":"Worcester County, Maryland","retrievedAt":"2026-09-13","url":"https://worcestermd.gov/news/worcester-county-enacts-moratorium-data-centers-and-cable-landing-stations-while-new"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/globalinx-fastnet-cls-ocean-city-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Dover","confidence":"medium","id":"compute_atlas-b59b520fbecd854a","lat":39.171779,"location_precision":"approximate","lon":-75.536142,"name":"State of Delaware William Penn Data Center (DTI)","operator":"Delaware Department of Technology and Information","source_notes":"State government data center operated by DTI in the department's Dover headquarters building. DTI's modernization page refers to addressing 'lingering issues' at the William Penn Data Center and moving about 10 racks out of state for disaster-recovery compliance. It is paired with DTI's Biggs Data Center in New Castle. No capacity is published. Coordinates are a US Census geocode of the street address, and OSM Nominatim agrees.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"DTI procedure 110304-P-025 Data Center Access: regulates access to the William Penn Data Center located in Dover and the Biggs Data Center located in New Castle","publisher":"Delaware Department of Technology and Information","retrievedAt":"2026-10-01","url":"https://webfiles.dti.delaware.gov/pdfs/processes/Data-Center-Access.pdf"},{"kind":"filing","label":"RFP DTI230047-INTERNET Addendum 1: internet access to the data centers at Biggs Building, 1901 N Dupont Hwy, New Castle and 801 Silver Lake Blvd, Dover","publisher":"State of Delaware, DTI","retrievedAt":"2026-10-01","url":"https://bidcondocs.delaware.gov/DTI/DTI230047-INTERNET-ad1.pdf"},{"kind":"other","label":"DTI Data Center Modernization (ARPA IT modernization), references the William Penn Data Center","publisher":"Delaware Department of Technology and Information","retrievedAt":"2026-10-01","url":"https://dti.delaware.gov/arpa/it-modernization/data-center-modernization/"}],"updated":"2026-10-01","url":"https://www.compute-atlas.com/facilities/delaware-dti-william-penn-data-center-dover-de"}],"state":"Delaware","status":"operating"},{"ai_classification":"unknown","city":"Portage","confidence":"medium","id":"compute_atlas-b5c1f853228c97f5","lat":41.6090532,"location_precision":"approximate","lon":-87.170469,"name":"AWS Portage Data Center (AmeriPlex at the Port)","operator":"Amazon Web Services","source_notes":"$87M total comprises roughly $35M of building and $52M of IT equipment, in the AmeriPlex at the Port business park north of I-94 and south of Ports of Indiana-Burns Harbor. At least 10 jobs at $100,000+ were committed, and Portage reported $7.5M of property taxes over ten years under the abatement agreement — that figure is taxes payable, not an abatement amount, so no subsidy entry is asserted. This is a small AWS edge/availability-zone site, entirely separate from the New Carlisle Project Rainier campus already tracked.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/aws-portage-in"}],"state":"Indiana","status":"operating"},{"ai_classification":"likely","city":"Cumnock","confidence":"medium","id":"compute_atlas-b5c23c2310831a3e","lat":35.555,"location_precision":"approximate","lon":-79.23778,"name":"Deep River Data AI Data Center (Cumnock, Lee County)","operator":"Deep River Data","source_notes":"Deep River Data is majority-managed by HM Tech, which runs an existing bitcoin mining and ASIC repair facility in Graham, NC. The company says the North Carolina site would serve AI workloads rather than crypto mining. As of the reporting cited, the project is pre-feasibility: nothing has been approved, permitted or built, and no capacity figure has been published. Site is south of U.S. 421 near the Lee–Chatham county line; coordinates are the Cumnock community, not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Lee County: No Fracking Data Center","publisher":"Clean Water for North Carolina","retrievedAt":"2026-08-29","url":"https://cwfnc.org/nofracklee/"}],"updated":"2026-08-29","url":"https://www.compute-atlas.com/facilities/deep-river-data-cumnock-lee-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Des Moines","confidence":"medium","id":"compute_atlas-b5d709ad06b59b9b","lat":41.5880038,"location_precision":"exact","lon":-93.6310193,"name":"Aureon 616 Data Center","operator":"Aureon","source_notes":"Carrier-neutral colocation facility in downtown Des Moines: 30,000 total sq ft with 10,000 sq ft of white space, 2N electrical distribution with concurrently maintainable components, backup generators carrying 32 hours of on-site fuel, FM-200 suppression, and a structure the operator says is built to withstand an F3 tornado. Aureon was formerly Iowa Network Services.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Aureon colocation data center solutions — 616 Data Center","publisher":"Aureon","retrievedAt":"2026-09-21","url":"https://aureon.com/solutions/data-center-solutions/"},{"kind":"other","label":"South Front Networks Points of Presence — IA-DSM616 (Aureon), 616 10th St, Des Moines IA 50309","publisher":"South Front Networks","retrievedAt":"2026-09-04","url":"https://southfront.io/pop"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/aureon-616-des-moines-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Pikeville","confidence":"medium","id":"compute_atlas-b63535bbe4df33b9","lat":37.4792672,"location_precision":"approximate","lon":-82.5187629,"name":"Kentucky Enterprise Industrial Park Data Center","operator":"MD Squared Power LLC","source_notes":"City of Pikeville and Lexington-based MD Squared Power LLC signed a preliminary MOU on 2026-04-20 to explore a data center at the Kentucky Enterprise Industrial Park, with a 120-day exclusive negotiation window; either party could withdraw without penalty. No final development agreement, capacity figure, or exact parcel/address was disclosed as of the source date. Coordinates are a city-level pin (Pikeville, Pike County) since the exact parcel within the industrial park is not confirmed in the source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/md-squared-power-pikeville-pike-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-b6736e6dc5a7def7","lat":45.5473758,"location_precision":"exact","lon":-122.8973869,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-por02-or","value":24.0}],"name":"STACK POR02","operator":"STACK Infrastructure","source_notes":"One of STACK's 3 confirmed operational Portland-area campuses (POR01/02/03, 250MW total).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/328702378","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/328702378"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/stack-por02-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Ankeny","confidence":"medium","id":"compute_atlas-b73402f04117d6ed","lat":41.7297,"location_precision":"approximate","lon":-93.6058,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-energy-ankeny-ia","value":13.2}],"name":"Edged Ankeny (Des Moines) Data Center","operator":"Edged Energy","source_notes":"AI-focused colocation developer (not a Big-5 hyperscaler) building a waterless-cooled, high-density facility in Ankeny (Data Center News gives 9100 SE Four Mile Drive; Business Record's Iowa data center list gives 2701 S.E. 90th St. and \"Acres: 37\", and its council report places the 17.5-acre parcel at Southeast 90th Street and Southeast Four Mile Road; coordinates are city-level, not parcel-geocoded, so the pin is approximate). Design PUE 1.15 portfolio-wide; ThermalWorks closed-loop cooling claims >52M gal/yr water savings vs conventional. Business Record reported a $187M investment and a 105,000 sq ft building when the Ankeny City Council approved the development agreement in March 2025; third-party trade press (Site Selection Magazine, seen only in search results) cited the same two figures. A 2024 DCD article (which could not be retrieved as of August 2026, so not used as a source) described a much larger 'I-80 Commerce Center' two-building proposal (~535K + ~775K sq ft) at what looks like the same general site/intersection under 'Commerce Center LLC', possibly an earlier or future-phase master plan for the same park. This could not be verified as of August 2026, so only the confirmed Edged 13.2MW project is covered. News headlines referenced the building having since 'topped out'; as of August 2026, whether the 13.2MW figure had grown was unconfirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Ankeny council approves data center development agreement","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/ankeny-council-to-consider-data-center-development-agreement/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"},{"kind":"press","label":"Edged tops out Ankeny data centre with waterless cooling","publisher":"Data Center News (TechDay)","retrievedAt":"2026-10-30","url":"https://datacenter.news/story/edged-tops-out-ankeny-data-centre-with-waterless-cooling"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/edged-energy-ankeny-ia"}],"state":"Iowa","status":"under construction"},{"ai_classification":"confirmed","city":"Carlisle","confidence":"medium","id":"compute_atlas-b734c70b94a9347a","lat":40.2015,"location_precision":"approximate","lon":-77.1889,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-pax-carlisle-pa","value":1350.0}],"name":"PAX — Pennsylvania Digital I","operator":"PowerHouse Data Centers","source_notes":"'Pennsylvania Digital I' (PAX) in Carlisle, Cumberland County: a ~700-acre, three-campus development delivering 1.35 GW (expandable to 1.8 GW), each campus with six buildings and a 450 MW substation. The $15B is the project value across all three campuses. Near-term 300 MW by Q2 2027. Coordinates are the Carlisle area centroid. The $15B figure is the three-campus JV total, not broken out per campus -> no investment figure is recorded. Pennsylvania's data-center sales-tax exemption eligibility is likely but no confirmed award or LERTA designation was found. Partner: Pennsylvania Data Center Partners.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"PA Data Center Partners and PowerHouse launch 1.35 GW Carlisle JV","publisher":"PowerHouse Data Centers","retrievedAt":"2026-07-08","url":"https://www.powerhousedata.com/news/pennsylvania-data-center-partners-and-powerhouse-data-centers-launch-joint-venture-to-build-next-gen-1-35-gw-hyperscale-data-center-campus-in-carlisle-pennsylvania"},{"kind":"other","label":"Middlesex Township data center overlay","publisher":"Protect Cumberland County PA","retrievedAt":"2026-07-08","url":"https://protectcumberlandcountypa.org/middlesex/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/powerhouse-pax-carlisle-pa"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Burmester","confidence":"medium","id":"compute_atlas-b7c4f2d6af5c817a","lat":40.748,"location_precision":"approximate","lon":-112.674,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/zenith-tooele-valley-burmester-ut","value":500.0}],"name":"Tooele Valley Data Center Campus","operator":"Zenith Development","source_notes":"500MW on-site gas-fired data center campus (~200-600 acre portion of a larger ~600-acre Tooele Valley Public Infrastructure District development that also includes a truck stop, hotel, and warehouses near I-80); backed by Utah Inland Port Authority financing. Developer plans a reverse-osmosis plant discharging ~250,000 gallons/day of brine into Great Salt Lake wetlands, drawing significant local opposition. Subsidies checked (2026-09-08): no site-level subsidy confirmed for this parcel. A $4.875M Utah Inland Port Authority Infrastructure Bank loan was reported in April 2024 to Zenith Bolinder, LLC — the Delaware LLC that petitioned UIPA in March 2024 to create the Tooele Valley Public Infrastructure District, representing 100% of surface property owners within it, and which KSL describes as \"a partnership with longtime Utah developer Zenith Development\"; Charles Akerlow appears both as the petition's contact sponsor and as Zenith Development's managing director. The two are affiliated but are not the same legal entity, the loan terms were not confirmed against a primary document, and the district's boundary exhibit is a scanned image that could not be read — so whether that loan reaches this data-centre parcel is unresolved. UIPA's executive director stated in July 2026 that the authority's involvement covers transportation within a 600-acre portion and does not extend to the southern section planned for the data centre.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Petition Requesting the Creation of TV Public Infrastructure District (26 March 2024) — petitioner/owner Zenith Bolinder, LLC (a Delaware LLC), contact sponsor Charles Akerlow, representing 100% of surface property owners within the proposed district","publisher":"Utah Inland Port Authority","retrievedAt":"2026-09-08","url":"https://inlandportauthority.utah.gov/wp-content/uploads/Petition-for-TV-PID.pdf"}],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/zenith-tooele-valley-burmester-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"mixed_use","city":"Bellevue","confidence":"medium","id":"compute_atlas-b7d04b25636f1bc7","lat":41.153,"location_precision":"approximate","lon":-95.925,"name":"TierPoint Omaha - Bellevue Data Center","operator":"TierPoint","source_notes":"Multi-tenant colocation facility at 1001 North Fort Crook Road, Bellevue (Sarpy County): 100,000+ total sq ft with 21,000+ sq ft of raised floor, A-side/B-side power distribution, a 100% uptime SLA, and 10,000 sq ft of business-continuity seating with a 300-seat recovery space. Carrier-class, carrier-neutral, with cloud on-ramps and a 10G wave to five regional TierPoint facilities. Certified SOC 1/2 Type II, SOC 2 + HITRUST, GLBA, HIPAA, PCI-DSS, NIST SP 800-53, ISO 27001, ITAR and Data Privacy Framework registered. Capacity is omitted: the only power figure the operator publishes is 'five redundant generators totaling 5.5 MW', which is backup generator nameplate, not IT load, and recording it as facility capacity would overstate the site. Directory listings associate this address with Cosentry, the regional provider TierPoint acquired; none of the cited sources states that, so it is noted rather than asserted. Coordinates are a street-address approximation. The record is marked reported (single source, the operator's own page).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tierpoint-omaha-bellevue-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"mixed_use","city":"Albany","confidence":"medium","id":"compute_atlas-b7fcb46a8839298e","lat":42.6225,"location_precision":"approximate","lon":-73.7601,"name":"Kenwood Commons Technology Campus","operator":"Guild Ventures","source_notes":"Proposed data center inside a mixed-use redevelopment of the 76-acre former Kenwood convent / Doane Stuart School property in Albany. No capacity is recorded: \"Guild Ventures... filed an application with the New York Independent System Operator to use 180MW for the project,\" but the developer told CBS6 the 180 MW is \"a theoretical ceiling for the entire mixed-use development\" at full buildout and not the data center's expected use. Recording 180 as the facility's capacity would therefore be wrong. CBS6 reported in July 2026 that the developer has said the data center could use up to 100 MW; that is a ceiling, not a planned total, and at an August 2026 community meeting the developers said they did not yet know how many megawatts the data center would need (WAMC), so it is not recorded either. WAMC (August 2026) also reports the developers project a 250,000-square-foot data center with 125 to 175 full-time jobs and an online date of December 2028; these are developer projections and no size or job figure is recorded. The Rockefeller Institute's tracker separately describes it as \"a 180 MW data center as part of a mixed-use development\" - that reading conflicts with the developer's own clarification, which is why the record is marked reported. The developer describes the compute component as a \"boutique, edge-scale colocation center\" on \"approximately 5 acres\" of the 76-acre parcel serving hospitals, institutions, nanotech, government services and local employers - hence the mixed-use AI classification. The 76-acre figure is the whole redevelopment parcel, not the data center footprint. As of 2026-09-09, no permits had been submitted to the City of Albany per the reporting retrieved, and the May 2026 CBS6 article gives no investment figure and states no job counts, utility, or IDA/PILOT agreement. The connecting utility, National Grid, is stated in NYISO load queue #1754. Coordinates geocoded to the named Kenwood / Doane Stuart site in Albany, approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Kenwood Commons owner asks for 180MW as part of property's pitch, now includes data center","publisher":"CBS6 Albany (WRGB)","retrievedAt":"2026-09-09","url":"https://cbs6albany.com/news/local/kenwood-commons-owner-asks-for-180mw-as-part-of-propertys-pitch-now-includes-data-center-doane-stuart-school-guild-datacenter-mixeduse-hyperscale-colocation-technology-sustainability-cooling-grid-redevelopment-nanotech-infrastructure-emissions"},{"kind":"press","label":"Albany data center proposal faces new questions after Hochul's statewide moratorium (July 14, 2026)","publisher":"CBS6 Albany (WRGB)","retrievedAt":"2026-10-09","url":"https://cbs6albany.com/news/local/albany-data-center-proposal-faces-new-questions-after-hochuls-statewide-moratorium-kenwood-doane-new-york-wrgb"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/guild-ventures-kenwood-commons-albany-ny"}],"state":"New York","status":"planned"},{"ai_classification":"confirmed","city":"Snyder","confidence":"medium","id":"compute_atlas-b80a12aa90e43c87","lat":32.7138,"location_precision":"approximate","lon":-100.9112,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/energy-vault-snyder-scurry-county-tx","value":500.0}],"name":"Energy Vault Snyder AI Campus","operator":"Energy Vault, Inc.","source_notes":"Phased buildout: ~8 MW initial phase, ~25 MW phase two, with up to 500 MW long-term expansion planned. Uses Crusoe Spark modular data center units under a commercial agreement with Crusoe Cloud. Target commercial operation Q1 2027.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-08","url":"https://www.compute-atlas.com/facilities/energy-vault-snyder-scurry-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Fayetteville","confidence":"medium","id":"compute_atlas-b8ae02ebf9cd5c49","lat":35.053,"location_precision":"approximate","lon":-78.878,"name":"Energy Storage Solutions Fayetteville AI Data Center Campus","operator":"Energy Storage Solutions","source_notes":"Twin project to Kingsboro announced by Energy Storage Solutions; part of a combined ~$38B, two-site NC data-center buildout, each campus with ~a dozen 40,000 sq ft structures and 1,000+ employees. Site-specific details (parcel, acreage, exact coordinates) not yet public; location approximated to the city of Fayetteville.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Developer Forges Ahead With $38B in NC Data Centers (Data Center Knowledge)","publisher":"Data Center Knowledge","retrievedAt":"2026-07-16","url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds"}],"updated":"2026-07-16","url":"https://www.compute-atlas.com/facilities/energy-storage-solutions-fayetteville-cumberland-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","id":"compute_atlas-b9097b1302455540","lat":37.379478,"location_precision":"approximate","lon":-121.939528,"name":"Sequoia Data Center (2600 De La Cruz Boulevard)","operator":"Tishman Speyer (site acquired from CyrusOne, July 2026)","source_notes":"Pre-construction code name 'Sequoia' (CyrusOne via CI-Santa Clara LLC). Entitlement: ~703,000 sq ft, 96.5 MW backup generation. Land traded to Tishman Speyer in July 2026 ($42.4M for 2600 De La Cruz, $23M for 2750 De La Cruz); current development plan unconfirmed, hence the record is marked reported.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/sequoia-data-center-2600-de-la-cruz-santa-clara-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"high","contains_osm":true,"id":"compute_atlas-b93aa377f3eb13b9","lat":41.8743036,"location_precision":"exact","lon":-87.6299404,"name":"Digital Realty ORD11","operator":"Digital Realty","source_notes":"600 South Federal Street, Chicago IL. Distinct site from ORD10 (350 E Cermak Rd), ~0.4km apart but separate buildings.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/chicago/ord11"},{"kind":"osm","label":"OpenStreetMap way/149379943","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/149379943"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-ord11-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/149379943"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-realty-ord11-osmway-149379943"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/149379943"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Tukwila","confidence":"high","contains_osm":true,"id":"compute_atlas-ba117f2f83ea7b4d","lat":47.4934798,"location_precision":"exact","lon":-122.2904647,"name":"Sabey Intergate.East Building 3","operator":"Sabey Data Centers","source_notes":"OSM tags this building as a data center with operator Sabey Data Centers. Sabey's own real-estate marketing has at times described Building 3 as flex-tech/manufacturing space rather than purely data hall, so the share of the building in data-center use is unverified; the record is listed as operational on the strength of the OSM tagging and the campus being in service, and is marked reported. The campus's 54 MW is not attributed to this building.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 293211686 - 'Intergate Seattle East Building 3', building=data_center, telecom=data_center, operator=Sabey Data Centers, 3333 South 120th Place Tukwila 98168","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/293211686"},{"kind":"other","label":"SDC Seattle, Tukwila - 54 MW capacity, single or multi-tenant buildings, evaporative and economizer cooling","publisher":"Sabey Data Centers","retrievedAt":"2026-09-17","url":"https://sabeydatacenters.com/locations/seattle-data-center"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/sabey-intergate-east-building-3-wa"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 337126741 - 'Intergate Seattle West Building B', telecom=data_center, operator=Sabey Data Centers, 12201 Tukwila International Boulevard Tukwila 98168","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/337126741"},{"kind":"other","label":"SDC Seattle, Tukwila - Sabey's Seattle-area campus","publisher":"Sabey Data Centers","retrievedAt":"2026-09-17","url":"https://sabeydatacenters.com/locations/seattle-data-center"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/sabey-intergate-west-building-b-wa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/337126739"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/intergate-seattle-west-building-c-osmway-337126739"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205724885"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/293211683"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/293211686"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337126739"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337126741"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337126742"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"medium","id":"compute_atlas-ba2efb1517424997","lat":35.0897,"location_precision":"approximate","lon":-106.6517,"name":"Oso Grande Albuquerque Data Center","operator":"Oso Grande Technologies, Inc.","source_notes":"Downtown Albuquerque colocation facility. The operator describes redundant UPS, generator power with 40+ hours of fuel, N+1 cooling, raised flooring and SOC 2 compliance. No capacity is disclosed. Coordinates are an approximate geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/oso-grande-albuquerque-nm"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Quincy","confidence":"medium","id":"compute_atlas-babb714f1762d0a0","lat":47.2334,"location_precision":"approximate","lon":-119.8528,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-pnw1-quincy-wa","value":90.0}],"name":"CyrusOne PNW1","operator":"CyrusOne","source_notes":"Operator describes PNW1 as Washington's largest greenfield-built data center; 720,000 sq ft technical space on a 45-acre site acquired 2016; construction began 2023.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-22","url":"https://www.compute-atlas.com/facilities/cyrusone-pnw1-quincy-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Piscataway","confidence":"medium","contains_osm":true,"id":"compute_atlas-bad1d302d670eb73","lat":40.5569431,"location_precision":"exact","lon":-74.4839173,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-piscataway-1-nj","value":65.0}],"name":"QTS Piscataway 1","operator":"QTS Data Centers","source_notes":"Confirmed at 101 Possumtown Road, Piscataway, NJ 08854, 65MW+ critical power, 38-acre campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/362662493","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/362662493"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/qts-piscataway-1-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"likely","city":"Walnut Cove","confidence":"medium","id":"compute_atlas-bafec20136935b9d","lat":36.282,"location_precision":"approximate","lon":-80.1494,"name":"Project Delta Data Center – Stokes County","operator":"Undisclosed (rezoning applicant: Engineered Land Solutions)","source_notes":"Site on US Highway 311 and Tuttle Road near Belews Creek Coal Plant on Dan River. End operator/tenant not publicly identified; rezoning approved for unidentified operator per lawsuit. Rezoning voided April 14, 2026 after court challenge over statutory notice failures. Developer ELS plans to resubmit. Capacity and investment not disclosed. Coordinates are Walnut Cove city centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Walnut Cove Data Center Project Updates 2026","publisher":"Blackridge Research","retrievedAt":"2026-07-06","url":"https://www.blackridgeresearch.com/project-profiles/walnut-cove-data-center-project-location-map-status-contractors-latest-updates"},{"kind":"press","label":"Stokes County proposed data center creates backlash","publisher":"Spectrum News NC","retrievedAt":"2026-07-06","url":"https://spectrumlocalnews.com/nc/charlotte/news/2026/01/12/stokes-county-proposed-data-center-creates-backlash"},{"kind":"press","label":"Inside Stokes County's latest vote on the Project Delta data center","publisher":"WUNC","retrievedAt":"2026-10-15","url":"https://www.wunc.org/2026-09-15/inside-stokes-countys-latest-vote-on-the-project-delta-data-center"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/project-delta-walnut-cove-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-bb01e850bd98e760","lat":32.1,"location_precision":"approximate","lon":-110.75,"name":"Project Blue","operator":"Beale Infrastructure","source_notes":"Unincorporated Pima County, west of Houghton Rd, near Tucson. Construction Review Online lists \"Up to 286–600 MW (initial phases lower)\" across \"approximately 2 million square feet at full build-out\", and the Pima County Administrator's memo of September 17, 2025 describes Tucson Electric Power's proposed Energy Supply Agreement as \"supplying 286 megawatts (MW) of electricity from existing TEP capacity for the initial phase\"; no single planned total is recorded. AWS confirmed as end-customer via an NDA obtained by AZ Luminaria. Distinct site from Beale Infrastructure's Fremont Peak Properties/Luckett Road project in the Town of Marana (also AZ, and also tracked as of August 2026) - same developer family, different parcel. Coordinates are approximate. The 180 permanent jobs figure is a projection for the third year of operations in 2029, published by Pima County and by the developer. Beale's own letter of 2025-09-17 adds a qualifier the county FAQ omits: the figure \"include[s] full-time contractors and support personnel\", and at least 75 of the roles will be directly employed by the end user. Beale has also stated it \"is not asking for property tax incentives, often a necessary component of a data center project's cost competitiveness\", and the utility agreement with Tucson Electric Power carries no financial incentives or discounts, which is unusual for a project of this size. Subsidies are therefore recorded as absent rather than merely unsearched.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Pima County NDA confirms Amazon is behind Project Blue data center","publisher":"AZ Luminaria","retrievedAt":"2026-07-09","url":"https://azluminaria.org/2025/10/01/pima-county-nda-confirms-amazon-is-behind-project-blue-data-center/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/beale-project-blue-pima-county-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"East Stroudsburg","confidence":"medium","id":"compute_atlas-bb37e853a60fdbda","lat":41.0206,"location_precision":"approximate","lon":-75.1778,"name":"Smithfield Gateway Data Center","operator":"DEPG Mosier Associates LP / DEPG of Shawnee II LP","source_notes":"The conditional-use application describes a single two-story 250,000 sq ft building; a related sketch plan for Phases 1B/2A/2B shows two data center structures of 125,000 sq ft footprint each plus a power substation. Acreage and capacity (MW) are not stated in the township filing. Coordinates are a geocoded point on Route 209 (Milford Road) near the Smithfield Gateway development, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Smithfield Gateway Data Center – Conditional Use (township application page)","publisher":"Smithfield Township, Monroe County","retrievedAt":"2026-09-25","url":"https://smithfieldtownship.com/odp/gatewaydc/"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/depg-smithfield-gateway-data-center-monroe-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Salem Township","confidence":"medium","id":"compute_atlas-bb48bbc12982307e","lat":41.1078249,"location_precision":"approximate","lon":-76.1791155,"name":"QTS Salem Township Data Center Campus (Salem 2)","operator":"QTS Data Centers","source_notes":"Referred to locally as 'Salem 2'. QTS Data Centers, backed by Blackstone, with land aggregated by 4-3 Consulting LLC across about 1,700 acres bought from 96 landowners for more than $500 million. Coordinate is a township-centroid geocode; no parcel-level location has been published, and it therefore coincides with the coordinate used for the separate 4-3 Glenbrook 'Salem 3' record - the two are different land assemblages by different developers.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-salem-township-luzerne-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Brentwood","confidence":"high","contains_osm":true,"id":"compute_atlas-bb635d4f723a6c41","lat":35.9727294,"location_precision":"approximate","lon":-86.8084949,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-nashville-brentwood-nas01-04-tn","value":1.49}],"name":"Flexential Nashville - Brentwood (NAS01/04)","operator":"Flexential","source_notes":"Address 7100 Commerce Way Suite 25, Brentwood TN 37027 per DataCenterJournal (NAS01/04).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/12112295055","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/12112295055"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/flexential-nashville-brentwood-nas01-04-tn"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112295055"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Orem","confidence":"medium","id":"compute_atlas-bb9797fab089339b","lat":40.29816,"location_precision":"approximate","lon":-111.69443,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/voonami-orem-ut","value":2.0}],"name":"Voonami Orem Data Center","operator":"Voonami","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Voonami's 510 East Technology Way site sits inside the Canyon Park Technology Center, associated with Orem's Project 85-02 — but the same 2019 RDA minutes establishing only Project 90-08 remained active confirm 85-02 had already stopped collecting tax increment years before any current-year subsidy could apply, and current FY2026-27 RDA activity is entirely at the unrelated University Place CDA. No source names Voonami in any Orem RDA record. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/voonami-orem-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"compute_atlas-bc49df17e50da656","lat":39.064,"location_precision":"approximate","lon":-77.524,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/jk-land-greenlin-park-leesburg-va","value":300.0}],"name":"Greenlin Park","operator":"JK Land Holdings","source_notes":"1.4 million sq ft of data center and utility substation use on 83 acres south of Leesburg, on the west side of Sycolin Road bounded by Shreve Mill Road and the Dulles Greenway; property owned by Chuck Kuhn through JK Land Holdings. Originally proposed at 2.1 million sq ft; scaled back after opposition at a September 2024 public hearing. Approval limits power draw to 300MW for five years and building height to 55 feet, and requires upgraded generators, added screening and noise limits, stormwater mitigation, water-use restrictions, and three years of energy-use monitoring and reporting.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/jk-land-greenlin-park-leesburg-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Springfield","confidence":"medium","id":"compute_atlas-bc4e3c25819e090c","lat":39.8664,"location_precision":"approximate","lon":-83.7936,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/5c-group-vultr-prime-ohio-springfield-oh","value":150.0}],"name":"5C Group / Vultr Data Center (Prime Ohio)","operator":"5C Group (Hypertec Cloud + 5C Data Centers); tenant Vultr (The Constant Company, LLC)","source_notes":"5C Group (formed May 2025 when Hypertec Cloud acquired 5C Data Centers) owns/builds the campus in the Prime Ohio corporate park; Vultr (legal entity The Constant Company, LLC) is the AI/cloud tenant. A separate Ohio Tax Credit Authority approval (December 15, 2025) went to Crusoe Energy Systems LLC for a new data center in the City of Springfield, with a $444.5 million fixed-asset investment and 20 jobs, distinct from The Constant Company approval of October 27, 2025 for this project. As of October 2026 no cited source says whether the Crusoe project is at this campus or at another site in Springfield, so it is not combined with this record and its relationship to this project is unresolved. Capacity: 75 MW disclosed operating load at opening vs. 150 MW max design load (city FAQ) -- both real, tracked field carries the larger design figure. Investment: ~$1.3B total project cost (multi-source) vs. $901.3M JobsOhio incentive-scoped committed investment -- tracked field carries the total-project figure. 120 permanent jobs / >$14M annual payroll disclosed (WYSO); a separate JobsOhio incentive filing cites 20 committed data-infrastructure jobs (narrower, incentive-scoped count). Incentives: ~$95M city enterprise-zone abatement over 15 years; $32M+ state 10-year 50% Ohio Tax Credit Authority credit (Oct 2025) to The Constant Company. Community context: Springfield passed a 6-month moratorium on new data centers and a citizen petition to ban them was launched; Clark County (Jul 2026) restricted data centers to I-2 heavy-industrial zoning, but the county's own zoning administrator noted no I-2 parcels currently exist in county jurisdiction, and Springfield Township (where Prime Ohio sits) zones separately from the county -- this rule change may not directly bind this site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"5C Data Center FAQs","publisher":"City of Springfield","retrievedAt":"2026-08-02","url":"https://springfieldohio.gov/5c-data-center-faqs/"},{"kind":"press","label":"Hypertec Cloud acquires 5C Data Centers, forms 5C Group","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/hypertec-cloud-acquires-5c-data-centers-forms-5c-group/"},{"kind":"subsidy","label":"The Constant Company, LLC — Ohio Tax Credit Authority scope of work, City of Springfield, Clark County (approved October 27, 2025)","publisher":"Gongwer Ohio (Ohio Tax Credit Authority exhibit)","retrievedAt":"2026-10-28","url":"https://www.gongwer-oh.com/public/The_Constant_Company_LLC_Scope.pdf"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/5c-group-vultr-prime-ohio-springfield-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Piscataway Township","confidence":"high","contains_osm":true,"id":"compute_atlas-bc52dd047137e836","lat":40.5537931,"location_precision":"exact","lon":-74.4571024,"name":"Digital Realty New York EWR11","operator":"Digital Realty","source_notes":"Address 3 Corporate Place, Piscataway Township, NJ 08854.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr11"},{"kind":"osm","label":"OpenStreetMap way/204460950","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/204460950"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr11-nj"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page (verified via WebFetch)","publisher":"Digital Realty","retrievedAt":"2026-10-09","url":"https://www.digitalrealty.com/data-centers/americas/new-york/ewr12"},{"kind":"osm","label":"OpenStreetMap way/204460903","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/204460903"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/digital-realty-new-york-ewr12-nj"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204460950"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-new-york-ewr11-osmway-204460950"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460903"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460950"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Raleigh","confidence":"medium","contains_osm":true,"id":"compute_atlas-bc570378e374e30d","lat":35.8543896,"location_precision":"exact","lon":-78.595815,"name":"TierPoint Raleigh (Departure Drive)","operator":"TierPoint","source_notes":"Listed on TierPoint's own North Carolina page. Capacity deliberately unset: a third-party directory lists 10 MW for a 'Tierpoint Raleigh Data Center' but the operator publishes no per-site figure, and the two cannot be reconciled from the pages read.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/tierpoint-raleigh-departure-drive-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Plano","confidence":"medium","id":"compute_atlas-bc9a5a0dd203c709","lat":41.685,"location_precision":"approximate","lon":-88.493,"name":"Microsoft Plano Data Center Site (Eldamain Road)","operator":"Microsoft","source_notes":"About 500 acres on the west side of Eldamain Road, north of the ComEd transmission lines, annexed and rezoned by Plano. The city and Microsoft planned a 6-month HR Green study of off-site infrastructure, cost and traffic. No construction is reported. The coordinates are approximate, placed near Eldamain and Corneils roads. This is a separate site from Prologis Project Steel, which lies east of Eldamain in Yorkville.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Next steps taken for Microsoft data center in Plano","publisher":"Shaw Local (Kendall County Now)","retrievedAt":"2026-10-15","url":"https://www.shawlocal.com:443/kendall-county-now/2024/10/27/next-steps-taken-for-microsoft-data-center-in-plano/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/microsoft-plano-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"compute_atlas-bccff8c3c7adfd39","lat":32.5920798,"location_precision":"approximate","lon":-96.7561083,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-dfw02-lancaster-tx","value":500.0}],"name":"STACK DFW02 (Lancaster)","operator":"STACK Infrastructure","source_notes":"193-acre campus in south Dallas County, described by the operator as under development with up to 500 MW available; earlier reporting described a 220 MW first build of six 36 MW data centers across roughly 1.5 million sq ft off E Belt Line Road. Status is recorded as under construction on the strength of the operator's 'under development' framing and committed substation; treat as provisional. Coordinates are a city-level geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/stack-dfw02-lancaster-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"mixed_use","city":"Manassas","confidence":"medium","id":"compute_atlas-bce8139e9e9fa63b","lat":38.7196,"location_precision":"approximate","lon":-77.4982,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cloudhq-manassas-mcc-va","value":382.0}],"name":"CloudHQ Manassas MCC Campus","operator":"CloudHQ","source_notes":"Seven-building campus; 382 MW total planned critical IT load; 96 MW currently available. Coordinates sourced directly from CloudHQ website (38.71955, -77.49819). Connects via Manassas Fiber Highway to CloudHQ's MDC campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"CloudHQ MCC Campus — Manassas, Virginia","publisher":"CloudHQ","retrievedAt":"2026-07-06","url":"https://cloudhq.com/campus/mcc-campus/"},{"kind":"permit","label":"Prince William County Planning Commission — MCC-7 proffer amendment (REZ2024-00025)","publisher":"Prince William County, VA","retrievedAt":"2026-07-06","url":"https://pwcgov.granicus.com/DocumentViewer.php?file=pwcgov_c58bb783a384db5f364a5c3162dce923.pdf&view=1"},{"kind":"press","label":"Legal battle over Prince William Digital Gateway data-center campus — WJLA","publisher":"WJLA ABC7","retrievedAt":"2026-07-06","url":"https://wjla.com/news/local/prince-william-county-digital-gateway-datacenter-appeal-lawsuit-rezoning-rural-farmland-manassas-battlefield-community-opposition-judges-construction-halted-developer-qts-compass-blackstone-supreme-virginia-economy-environment-landuse"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/cloudhq-manassas-mcc-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Salt Lake City","confidence":"high","contains_osm":true,"id":"compute_atlas-bcea8a65bf58f630","lat":40.7563065,"location_precision":"exact","lon":-111.9548375,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-downtown-ut","value":2.65}],"name":"Flexential Salt Lake City - Downtown","operator":"Flexential","source_notes":"44,550 sqft, 2.65MW. Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. None of Salt Lake City's 8 RDA/CRA project areas' published boundary descriptions place 572 South Delong St inside them — it sits south of Depot District's 400 South line and east of the 9 Line corridor — but this exclusion rests on published boundary descriptions, not a parcel-level GIS overlay (Salt Lake County's parcel viewer could not be queried as of September 2026). No source names Flexential in any RDA participation agreement, project-area annual report, or board minutes. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/729696933","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/729696933"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"Project Areas — Redevelopment Agency of Salt Lake City (8 current RDA/CRA project areas)","publisher":"Redevelopment Agency of Salt Lake City","retrievedAt":"2026-09-05","url":"https://cra.slc.gov/project-areas/"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-salt-lake-city-downtown-ut"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/729696933"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-salt-lake-city-downtown-osmway-729696933"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/729696933"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Seattle","confidence":"high","contains_osm":true,"id":"compute_atlas-bd84d5f07acc86a6","lat":47.6205,"location_precision":"approximate","lon":-122.3379,"name":"H5 Data Centers Seattle","operator":"H5 Data Centers","source_notes":"293,000 sq ft carrier-hotel/colocation facility in the former Seattle Times building. Distinct building from the Westin Building Exchange (already tracked); no MW capacity disclosed on the operator's site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Seattle Data Center","publisher":"H5 Data Centers","retrievedAt":"2026-09-21","url":"https://h5datacenters.com/seattle-data-center.html"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/h5-data-centers-seattle-denny-way-wa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/231664575"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/the-seattle-times-osmway-231664575"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/231664575"}],"state":"Washington","status":"operating"},{"ai_classification":"confirmed","city":"Independence","confidence":"medium","id":"compute_atlas-bddef8d44b6d25a5","lat":39.089,"location_precision":"approximate","lon":-94.342,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nebius-independence-mo","value":1200.0}],"name":"Nebius AI Factory (Independence)","operator":"Nebius Group","source_notes":"Nebius Group's (Nasdaq: NBIS) first gigawatt-scale US data center project. Located in Eastgate Commerce Center, off Little Blue Parkway and Missouri Highway 78 in eastern Independence. Up to 10 buildings planned. Phase 1 operational target Q2 2027; full campus completion 2028–2029. Projected $30–50M annual tax revenue for Independence. Separate Nebius facility exists at former Kansas City Star printing press building ~20 miles west (a different facility). Coordinates approximate for Eastgate Commerce Center in eastern Independence. The $150.6B bond authorization is a Missouri Chapter 100 IDRB structure; bonds are privately issued and owned by Nebius — no city credit exposure.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nebius breaks ground on gigawatt-scale AI factory in Independence, Missouri","publisher":"Nebius","retrievedAt":"2026-07-06","url":"https://nebius.com/newsroom/nebius-breaks-ground-on-gigawatt-scale-ai-factory-in-independence-missouri"},{"kind":"press","label":"Nebius breaks ground on 400-acre data center campus in Independence, Missouri","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/nebius-breaks-ground-on-400-acre-data-center-campus-in-independence-missouri/"},{"kind":"press","label":"Nebius AI Factory | Independence, MO","publisher":"ARCO","retrievedAt":"2026-08-24","url":"https://www.arconational.com/nebius-independence-mo/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/nebius-independence-mo"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"high","contains_osm":true,"id":"compute_atlas-bde02109424d949f","lat":45.5496803,"location_precision":"exact","lon":-122.9373872,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-hillsboro-hi1-data-center-or","value":36.0}],"name":"NTT Hillsboro HI1 Data Center","operator":"NTT Global Data Centers","source_notes":"4050 NE Evergreen Rd; 36MW, first of a planned 5-building/126MW campus; building acquired from SunPower in 2019. Previously operated under NTT's legacy US brand, RagingWire (now retired).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/52059176","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/52059176"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/ntt-hillsboro-hi1-data-center-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/52059176"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ntt-ragingwire-dc-hillsboro-osmway-52059176"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Decatur Township","confidence":"medium","id":"compute_atlas-bde29f09bb6136de","lat":39.7,"location_precision":"approximate","lon":-86.28,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/sabey-decatur-technology-park-marion-county-in","value":250.0}],"name":"Sabey Decatur Technology Park","operator":"Sabey Data Centers","source_notes":"More than one million sq ft, 250MW over a 5-year period. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sabey targets Indianapolis for 250MW data center campus","publisher":"Data Center Dynamics","retrievedAt":"2026-08-05","url":"https://www.datacenterdynamics.com/en/news/sabey-targets-indianapolis-for-250mw-data-center-campus/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/sabey-decatur-technology-park-marion-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Atlantic City","confidence":"medium","contains_osm":true,"id":"compute_atlas-bde92936eb522aad","lat":39.3624135,"location_precision":"approximate","lon":-74.4147501,"name":"Continent 8 Atlantic City (Ocean Casino Resort)","operator":"Continent 8 Technologies","source_notes":"An online-gaming data center inside Ocean Casino Resort, opened in June 2018 as Continent 8's second Atlantic City site. It is separate from the Convention Center facility, which is tracked as Continent 8 Atlantic City (Convention Center) as of October 2026. Size and power are not published. Current operation since 2018 had not been re-verified as of October 2026. Coordinates are the OSM footprint of the casino building, not the data hall.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way 624006115: Ocean Resort Casino, 500 Boardwalk","publisher":"OpenStreetMap","retrievedAt":"2026-10-09","url":"https://www.openstreetmap.org/way/624006115"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/continent-8-atlantic-city-ocean-casino-resort-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"likely","city":"Forest Grove","confidence":"medium","id":"compute_atlas-bdfddbc85c849373","lat":45.5207,"location_precision":"approximate","lon":-123.1087,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crane-pdx01-forest-grove-or","value":76.0}],"name":"Crane PDX01","operator":"Crane Data Centers","source_notes":"PDX01 data center campus in Forest Grove, Washington County; 76 MW by 2026. Coordinates are the Forest Grove area centroid. Development cost not disclosed (partner: Principal Asset Management) -> no investment figure is recorded. No job counts disclosed -> no job count is recorded. Crane markets property-tax / enterprise-zone incentives, but no signed agreement is on record (statewide Oregon EZ moratorium eff. June 2026) -> no subsidy is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Planning commission greenlights Crane DC's Forest Grove data center in northwest Oregon, again","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/planning-commission-greenlights-crane-dcs-forest-grove-data-center-in-northwest-oregon-again/"},{"kind":"press","label":"Oregon's Forest Grove data center gets City Council approval, again","publisher":"Data Center Dynamics","retrievedAt":"2026-07-08","url":"https://www.datacenterdynamics.com/en/news/oregons-forest-grove-data-center-gets-city-council-approval-again-again/"},{"kind":"press","label":"Construction boots up on first data center in Forest Grove (air cooling; municipal utility)","publisher":"Forest Grove News-Times","retrievedAt":"2026-07-08","url":"https://forestgrovenewstimes.com/2025/08/18/construction-boots-up-on-first-data-center-in-forest-grove/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/crane-pdx01-forest-grove-or"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/crane-pdx02-forest-grove-or"}],"state":"Oregon","status":"under construction"},{"ai_classification":"unknown","city":"Clarksburg","confidence":"medium","contains_osm":true,"id":"compute_atlas-be0709d42dc571b2","lat":39.3257988,"location_precision":"approximate","lon":-80.2680771,"name":"FBI Criminal Justice Information Services (CJIS) Division Data Center","operator":"Federal Bureau of Investigation","source_notes":"The FBI's central repository for criminal justice information. Systems include NCIC, NICS, the fingerprint identification system and UCR/NIBRS (per Lockheed Martin's 2002 contract release). Nextgov (2013) describes the CJIS data center in Clarksburg as a candidate to absorb workloads consolidated from less efficient FBI data centers. No capacity, power or cooling figures are published, so those fields are omitted, as is a commissioning date. Pin is the OSM point for the CJIS campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lockheed Martin wins contract to refresh FBI West Virginia center technology (CJIS 'System of Systems')","publisher":"Lockheed Martin","retrievedAt":"2026-10-11","url":"https://news.lockheedmartin.com/2002-09-17-Lockheed-Martin-Wins-Contract-to-Refresh-FBI-West-Virginia-Center-Technology"}],"updated":"2026-10-11","url":"https://www.compute-atlas.com/facilities/fbi-cjis-division-clarksburg-harrison-county-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-be18d4da63d66b2b","lat":37.3690532,"location_precision":"exact","lon":-121.9553378,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/silicon-valley-sv1-data-center","value":16.0}],"name":"NTT Silicon Valley SV1 Data Center","operator":"NTT Global Data Centers","source_notes":"16MW, 160,000 sqft, operational since 2021, seismic base-isolation design, at 1160 Walsh Ave.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NTT facility directory","publisher":"NTT","retrievedAt":"2026-09-21","url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/silicon-valley-sv1-data-center"},{"kind":"osm","label":"OpenStreetMap way/888253616","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/888253616"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-silicon-valley-sv1-data-center-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/888253616"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ntt-silicon-valley-sv1-data-center-osmway-888253616"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/888253616"}],"state":"California","status":"operating"},{"ai_classification":"confirmed","city":"Kansas City","confidence":"medium","id":"compute_atlas-be67105e41acfb10","lat":39.33,"location_precision":"approximate","lon":-94.72,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","value":100.0}],"name":"Lambda Kansas City AI Supercomputer","operator":"Lambda","source_notes":"11155 N. Airworld Dr (former Bank of America campus, ~16.9 acres), Platte County near KCI airport. Launches early 2026 with 24 MW confirmed; >100 MW is a scale-up ceiling (planned figure). Distinct parcels from Google (Project Mica) and Meta's Kansas City sites. Eligible for the Missouri Data Center Sales Tax Exemption (eligibility only — no award amount confirmed; honest-zero). The >$500M figure is a press estimate (notes). Dedicated to a single unnamed AI customer under a multi-year agreement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AI cloud firm Lambda targets data center deployment in Kansas City, Missouri","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/ai-cloud-firm-lambda-targets-data-center-deployment-in-kansas-city-missouri/"},{"kind":"press","label":"Lambda to build a 100MW AI factory in Kansas City, MO","publisher":"Lambda","retrievedAt":"2026-07-07","url":"https://lambda.ai/blog/lambda-to-build-a-100mw-ai-factory-in-kansas-city-mo"},{"kind":"press","label":"Missouri Department of Economic Development — press release","retrievedAt":"2026-07-25","url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/lambda-kansas-city-mo"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"West Jordan","confidence":"medium","id":"compute_atlas-be67956334b7ea92","lat":40.57389,"location_precision":"approximate","lon":-112.04576,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/novva-west-jordan-ut","value":175.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/novva-west-jordan-ut","value":200.0}],"name":"Novva West Jordan Campus","operator":"Novva Data Centers","source_notes":"Subsidies checked at the municipal tier (2026-09-04): no site-level subsidy, for a structural reason rather than a search miss. West Jordan's Redevelopment Agency lists six active project areas, all bounded well east of this campus; under Title 17C an agency may only act within a designated project area, so no participation agreement is available at this location under the current project-area map. The city's own 2025 post on the expansion discusses tax value in generic terms and names no incentive or agreement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"press","label":"Utah's massive data centers seek to build new power sources","publisher":"Lehi Free Press","retrievedAt":"2026-10-13","url":"https://lehifreepress.com/2026/02/11/utahs-massive-data-centers-seek-to-build-new-power-sources/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/novva-west-jordan-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Palo","confidence":"medium","id":"compute_atlas-be6daa4e5dd2141a","lat":42.0611,"location_precision":"approximate","lon":-91.7935,"name":"Google Palo Data Center Campus","operator":"Google","source_notes":"Proposed campus of up to six buildings on land near the Duane Arnold Energy Center in unincorporated Linn County near Palo. Distinct site from Google's existing Cedar Rapids data center at the Big Cedar Industrial Center. No construction timeline set; Google shifted from county approval to annexation into the City of Palo in February 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Linn County considers exception for Google as nearby Palo passes data center regulations","publisher":"Iowa Public Radio","retrievedAt":"2026-08-14","url":"https://www.iowapublicradio.org/ipr-news/2026-07-21/palo-linn-county-google-data-center-duane-arnold-nuclear-plant"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/google-palo-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"confirmed","city":"Los Lunas","confidence":"medium","id":"compute_atlas-be729a24e5716d99","lat":34.8083,"location_precision":"approximate","lon":-106.7296,"name":"Meta Los Lunas AI Expansion","operator":"Meta","source_notes":"Reported as the first Meta facilities explicitly dedicated to AI/ML workloads. Existing campus is 750 acres. IRBs authorize tax-exempt bond financing for construction materials — the $7.5B per series is the authorized principal ceiling, not a direct cash subsidy. Meta required to invest $350M into expansion by year 10 under agreement. Operating entity: Greater Kudu LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta planning expansion of Los Lunas data center campus in New Mexico","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-planning-expansion-of-los-lunas-data-center-campus-in-new-mexico/"},{"kind":"press","label":"New Mexico utility seeks approval of hybrid BESS offtake contracts to power Meta data centres","publisher":"Energy-Storage.news","retrievedAt":"2026-09-15","url":"https://www.energy-storage.news/new-mexico-utility-seeks-approval-of-hybrid-bess-offtake-contracts-to-power-meta-data-centres/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/meta-los-lunas-ai-nm"}],"state":"New Mexico","status":"under construction"},{"ai_classification":"unknown","city":"Burns Harbor","confidence":"medium","id":"compute_atlas-be7f33427e91fcaa","lat":41.61,"location_precision":"approximate","lon":-87.12,"name":"Provident Burns Harbor Data Center Campus (Worthington Steel property)","operator":"Provident Realty Advisors","source_notes":"About 102 acres owned by Worthington Steel on the west side of Babcock Road. Initially five buildings at ~30 employees per building. Separate from Provident's withdrawn Chesterton proposal. Current status is uncertain: no 2026 action was found, and secondary trackers describe it as stalled or revised. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/provident-burns-harbor-porter-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"confirmed","city":"Beaver Dam","confidence":"medium","id":"compute_atlas-be89345e248fb68b","lat":43.457,"location_precision":"approximate","lon":-88.837,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://dailyreporter.com/2026/09/10/wi-judge-rules-on-data-center-energy-demand-secrets/","value":220.0}],"name":"Meta Beaver Dam Data Center Campus","operator":"Meta","source_notes":"Coordinates are approximate city centroid for Beaver Dam; exact site is Alliant Energy Beaver Dam Commerce Park (Wisconsin's largest certified development-ready site). 700,000+ sq ft campus. Meta's 26th US data center. AI workloads are the stated purpose.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Meta $1B Beaver Dam announcement — Wisconsin Economic Development Corporation","publisher":"WEDC","retrievedAt":"2026-07-06","url":"https://wedc.org/meta-state-and-local-officials-announce-1-billion-data-center-investment-in-beaver-dam-project/"},{"kind":"press","label":"WI judge rules on data center energy demand secrets","publisher":"The Daily Reporter","retrievedAt":"2026-09-10","url":"https://dailyreporter.com/2026/09/10/wi-judge-rules-on-data-center-energy-demand-secrets/"},{"kind":"press","label":"Meta announces $1 billion Data Center Investment in Beaver Dam, Wisconsin Project (dry cooling, water restoration, renewable match, $200M energy infrastructure)","publisher":"Alliant Energy","retrievedAt":"2026-09-13","url":"https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-beaver-dam-wi"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Summit Point","confidence":"medium","contains_osm":true,"id":"compute_atlas-bec3dd156db3ced4","lat":39.2495466,"location_precision":"approximate","lon":-77.9586082,"name":"Summit Point Data Center Site (Ryan Stuart Development)","operator":"Ryan Stuart Development","source_notes":"Land assembly stage only. The Observer reports the company \"is in the early stages of marketing the site to potential data center operators and does not yet have a specific end-user identified,\" so no operator, capacity or AI classification is asserted. Coordinates are the Summit Point community centroid; the tract is described as northwest of the village and its boundary is not published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data Center In Summit Point, Politics Not As Usual","publisher":"The Observer (WV)","retrievedAt":"2026-09-15","url":"https://observerwv.news/posts/data-center-in-summit-point-politics-not-as-usual"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/ryan-stuart-summit-point-jefferson-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Kingdom City","confidence":"medium","contains_osm":true,"id":"compute_atlas-c0071f1e5f76aa2a","lat":38.9427219,"location_precision":"approximate","lon":-91.9417153,"name":"Crusoe Callaway County Data Center (proposed)","operator":"Crusoe","source_notes":"Crusoe (Denver) proposed a data center in northern Callaway County near Kingdom City. The site is a private land transaction involving the Callaway County Chamber of Commerce, and Crusoe declined to disclose the exact location. Callaway County has no countywide planning and zoning. Distinct from the Crusoe Warrenton Campus in Warren County, tracked separately as of October 2026. Coordinates are the Kingdom City town point, approximate. Single source, so the record is marked reported.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/crusoe-callaway-county-kingdom-city-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"medium","contains_osm":true,"id":"compute_atlas-c01bec0f514c5422","lat":40.427371,"location_precision":"exact","lon":-80.0425212,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/expedient-pit1-green-tree-pittsburgh-south-pa","value":1.8}],"name":"Expedient PIT1 (Green Tree / Pittsburgh South)","operator":"Expedient","source_notes":"810 Parish St, Pittsburgh, PA 15220 (Green Tree neighborhood). Site code PIT1, 1.8MW critical IT load, 26,000 sq ft. 'Pittsburgh South' is the OSM/aggregator alias (confirmed same address on datacentermap.com) -- this is Expedient's official PIT1/Green Tree facility, distinct from PIT2/North Shore which is not among the candidates.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Expedient official Pittsburgh data center page","publisher":"Expedient","retrievedAt":"2026-07-22","url":"https://www.expedient.com/data-centers/pittsburgh/"},{"kind":"osm","label":"OpenStreetMap way/537807168","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/537807168"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/expedient-pit1-green-tree-pittsburgh-south-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Yankton","confidence":"medium","id":"compute_atlas-c0b0de77189cfa6c","lat":42.8908,"location_precision":"approximate","lon":-97.417,"name":"Midco Yankton Data Center","operator":"Midco (Midcontinent Communications)","source_notes":"5,000 sq ft Tier II, SOC 2 Type II colocation facility with dual fiber entrances, carrier neutrality and a backup generator (per a Feb 2025 archived listing). Single archived directory source, so current operation is not independently confirmed. Coordinates are a US Census geocoder match.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-10","url":"https://www.compute-atlas.com/facilities/midco-yankton-sd"}],"state":"South Dakota","status":"operating"},{"ai_classification":"likely","city":"Los Angeles","confidence":"medium","contains_osm":true,"id":"compute_atlas-c0ce0609a8a37a3e","lat":34.0584789,"location_precision":"approximate","lon":-118.2359144,"name":"CoreSite LA2 - Los Angeles, CA","operator":"CoreSite","source_notes":"Confirmed: 900 N. Alameda St, LA 90012, operational retrofit of 1940s mail facility. AI/HPC (likely): Site page: liquid cooling capabilities offered at LA2/LA3.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/13042311881","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/13042311881"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/coresite-la2-los-angeles-ca-ca"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/coresite-la3-los-angeles-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"West Greenwich","confidence":"medium","contains_osm":true,"id":"compute_atlas-c0fc5fd3ba1b8477","lat":41.6584424,"location_precision":"approximate","lon":-71.5703238,"name":"Brightstar Lottery Enterprise Data Center (West Greenwich)","operator":"Brightstar Lottery PLC","source_notes":"Brightstar Lottery PLC (formerly International Game Technology PLC) owns an enterprise data center of about 13,050 sq ft at 47 Technology Way in West Greenwich. Its FY2025 Form 20-F lists it as used for data center and network operations at 100% utilization. No power capacity is disclosed. The coordinates are an OSM street-address geocode, not a parcel-confirmed point. No AI or HPC use is named at this site, so no AI classification is recorded.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/brightstar-lottery-west-greenwich-ri"}],"state":"Rhode Island","status":"operating"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","contains_osm":true,"id":"compute_atlas-c13e44afe81d1571","lat":41.8797481,"location_precision":"exact","lon":-87.6356964,"name":"300 West Adams Data Center Conversion","operator":"Igor Gabal (affiliated ownership entity)","source_notes":"Plan to convert floors 2 through 6 of the 1927 landmarked 300 W. Adams office building into a data center, with a new ComEd vault and up to ten rooftop backup generators. Gabal says the vault would be 'no more than 50 megawatts', while the building brochure lists a 20.4 MW medium-voltage vault. These are vault figures, not IT capacity, so no capacity is recorded. Project cost is undisclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Loop data center pitched for landmarked office building","publisher":"Chicago Sun-Times","retrievedAt":"2026-10-15","url":"https://chicago.suntimes.com/real-estate/2026/08/13/loop-data-center-gabal-landmarked-office-building"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/gabal-300-west-adams-chicago-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-c13f4b1216b3efe8","lat":31.3386242,"location_precision":"approximate","lon":-94.7288558,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/amp-z-lufkin-southland-mill-angelina-county-tx","value":2100.0}],"name":"Amp Z East Texas Data Center Campus (former Southland Paper Mill)","operator":"Amp Z (Amp Z Champion Data Center Holdings LLC)","source_notes":"In unincorporated Angelina County outside Lufkin. Investment ($1.05B) and jobs come from a city of Lufkin fact sheet. The 2.1 GW is a 2029 target, not a commitment. The land is under option, not purchased. Distinct from the tracked HyperDataGrid site, which is on the former Northern Chip Mill off Ben Dunn Road. Coordinates are the Lufkin city point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AI data center planned on 1,000+ acres at former Southland Paper Mill site","publisher":"Lufkin Daily News","retrievedAt":"2026-10-14","url":"https://lufkindailynews.com/news/local/ai-data-center-planned-on-1-000-acres-at-former-southland-paper-mill-site/article_ff9e97bf-361d-5649-835b-68a75818bd94.html"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/amp-z-lufkin-southland-mill-angelina-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Massena","confidence":"medium","id":"compute_atlas-c15d28dc1f4a057f","lat":44.979,"location_precision":"approximate","lon":-74.73,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nccs-massena-reynolds-ny","value":635.0}],"name":"North Country Collocation Services Massena Data Center (former Reynolds site)","operator":"North Country Collocation Services (NCCS)","source_notes":"Possible overlap with an existing record. NCPR states \"the facility would include three buildings totaling nearly 1.5 million square feet at the former Reynolds site, about eight miles outside of the village of Massena and near the bridge to Canada. The operation would consume 635 megawatts of power. That equates to roughly 70% of the power produced at the Moses-Saunders Power Dam. The developer, North Country Collocation Services, or NCCS, presented its plan to the board.\" The former Reynolds Metals plant is the same industrial complex as the 'Alcoa East' site that the existing Coinmint (Massena East / former Alcoa Smelter) crypto-mining record sits on (that record is at 44.9777, -74.7327), and NCPR (October 7, 2026) reports that NYDIG and its affiliate NCCS want to build the data center, captioning a photo of the former Alcoa East site as \"now being acquired by NYDIG\". It is recorded as a separate proposed data center because the three buildings, the 635 MW load and the planning-board proceeding are a distinct new project with a distinct developer entity. Coordinates are an approximate placement on that industrial complex derived from the source's description, not a surveyed parcel. As of 2026-09-09, the sources retrieved stated no investment figure, no job counts, no acreage, no water-use figure, no utility, and no subsidy or IDA agreement. A North Country Public Radio report of October 7, 2026 gives the company's figures of 200 full-time jobs and an estimated 2,000 construction jobs. Reporting elsewhere describes 316 diesel generators on site and a zoning question referred to the Zoning Board of Appeals over whether a large-scale data center is a permitted use in the industrial zone; neither is recorded because, as of September 2026, neither had been verified.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/nccs-massena-reynolds-ny"}],"state":"New York","status":"planned"},{"ai_classification":"confirmed","city":"Salem Township","confidence":"medium","id":"compute_atlas-c1d788ed64dd5dd6","lat":41.0949,"location_precision":"approximate","lon":-76.1452,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-cumulus-salem-township-pa","value":960.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-cumulus-salem-township-pa","value":48.0}],"name":"AWS Cumulus Data Center Campus, Salem Township","operator":"Amazon Web Services","source_notes":"Adjacent to the 2.5GW Susquehanna Steam Electric Station. FERC blocked a proposed colocation agreement in April 2025, leading to the PPA structure instead. TeraWulf operates a separate Nautilus cryptomining facility (Nautilus) on the same property not included in this record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS Acquires Talen's Nuclear Data Center Campus in Pennsylvania","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/aws-acquires-talens-nuclear-data-center-campus-in-pennsylvania/"},{"kind":"press","label":"Talen Energy Expands Nuclear Energy Relationship with Amazon","publisher":"Talen Energy Investor Relations","retrievedAt":"2026-07-06","url":"https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-expands-nuclear-energy-relationship-amazon"},{"kind":"permit","label":"SRBC Consumptive Use Application No. 2024-056 (Amazon Cumulus) — public comment reproducing Amazon's application","publisher":"Susquehanna River Basin Commission / Three Mile Island Alert","retrievedAt":"2026-07-06","url":"https://www.tmia.com/sites/tmia.com/files/media/Amazon%20Testimony,%20(8_1_24)-2.pdf"},{"kind":"press","label":"Big money, enforced silence play roles in Pennsylvania's data-center push","publisher":"The Center Square (via Black Chronicle)","retrievedAt":"2026-07-06","url":"https://blackchronicle.com/mid-atlantic/pennsylvania/big-money-enforced-silence-play-roles-in-pennsylvanias-data-center-push/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-cumulus-salem-township-pa"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","contains_osm":true,"id":"compute_atlas-c1f5a7effaf4783a","lat":36.2156443,"location_precision":"approximate","lon":-86.7840012,"name":"BNY Mellon Tennessee Processing Center (Nashville)","operator":"BNY Mellon","source_notes":"Enterprise (non-colocation) processing centre off Brick Church Pike in North Nashville, mapped in OSM under the operating entity name 'Tennessee Processing Center LLC'. Distinct from RadiusDC Nashville I, which is also on Brick Church Pike but roughly 0.8 km north at 2902/2906 (36.2237, -86.7824).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way 776316726 — 'Tennessee Processing Center LLC', telecom=data_center","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-14","url":"https://www.openstreetmap.org/way/776316726"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/bny-mellon-tennessee-processing-center-nashville-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"confirmed","city":"Chouteau","confidence":"medium","id":"compute_atlas-c2afd917a2f264b2","lat":36.1859,"location_precision":"approximate","lon":-95.343,"name":"Lambda MidAmerica Industrial Park Data Center","operator":"Lambda","source_notes":"Lambda announced plans on 2026-09-27 for a data center in the south section of MidAmerica Industrial Park, Mayes County, within the Chouteau-Mazie Public School District tax boundary. Capacity, GPU count, acreage, street address, timeline and total cost are not stated in the sources. The park was selected through a 'reverse RFP' by MidAmerica Industrial Park; Grand River Dam Authority (GRDA) is the power provider and Lambda is to fund the upfront infrastructure needed to serve the project; Cloverleaf Infrastructure was selected by GRDA and MidAmerica to ready the site. Lambda says it will pay 100% of the facility's energy costs and plans to act as a flexible grid customer. Company-stated figures: up to 1,000 construction jobs, up to 100 permanent positions, about $500M in tax revenue over ten years at current rates. Separate from Google's existing Pryor campus, the Google Pryor Data Center Campus (Mayes County Expansion), also in Mayes County. Coordinates are the Chouteau city point (OSM Nominatim), not the site; the sources give no parcel or address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New Lambda data center in Oklahoma","publisher":"Lambda","retrievedAt":"2026-10-16","url":"https://lambda.ai/blog/new-lambda-data-center-in-oklahoma"},{"kind":"press","label":"AI cloud company plans data center in Mayes County","publisher":"KOKH FOX 25","retrievedAt":"2026-10-16","url":"https://okcfox.com/news/local/ai-cloud-company-plans-data-center-in-mayes-county"}],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/lambda-midamerica-industrial-park-chouteau-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"confirmed","city":"Bowling Green","confidence":"medium","id":"compute_atlas-c2e14e2beb3c473e","lat":38.044,"location_precision":"approximate","lon":-77.3527,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-mattermeade-caroline-va","value":770.0}],"name":"AWS Mattermeade Tech Campus","operator":"Amazon Web Services","source_notes":"1,143 acres across Caroline & Spotsylvania counties, SE of the I-95 / Mudd Tavern Rd interchange; 11 two-story data center buildings plus an office. Amazon is 'seeking to develop a minimum of 770 MW by 2027'. Recorded as proposed (federal permit application filed / public-comment stage as of early 2025). Coordinates are the Bowling Green / Woodford area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon requests permit for 11-building data center campus in Caroline County, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/amazon-requests-permit-for-11-building-data-center-campus-in-caroline-county-virginia/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aws-mattermeade-caroline-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Volo","confidence":"medium","id":"compute_atlas-c2e3d880fbf4bb7c","lat":42.3486,"location_precision":"approximate","lon":-88.1382,"name":"Volo Data Center","operator":"Chirisa Technology Parks","source_notes":"160,000 sq ft leased facility; tenant is CoreWeave, Inc. (public GPU/AI-cloud compute provider) -- every source frames this explicitly as an AI data center supporting AI computing operations. 14 MW is the disclosed power supply (the articles do not name its source), not an IT capacity figure, so no operational capacity is recorded; a planned on-site Bloom Energy fuel-cell/microgrid buildout was targeted for Q3 2025 commissioning but its MW capacity is not disclosed in any source found and is omitted (a distinct figure from the 14 MW supply, not additive to it here). Acreage (~50 acres) and the exact street address/postal code are corroborated only via a single aggregator/cached-search path (Data Center Dynamics coverage of the site's HSBC/Capital One former-tenant history could not be retrieved), so they are single-path and not independently cross-verified; treat address/acreage as approximate. Former site occupant: HSBC (built ~2007), later Capital One (acquired HSBC's US card operations, 2012), vacant and auctioned ~2023 before Chirisa's redevelopment. As of August 2026, no SEC filing or Bloom Energy investor press release had been located to corroborate, and neither is cited as a source. The investment and jobs figures are the commitments listed for Chirisa Volo LLC's 2023 agreement in the Illinois DCEO Data Center Investment Program 2025 Annual Report: a $262,000,000 investment and 20 new jobs.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bloom Energy and CoreWeave Partner to Revolutionize AI Data Center Power Solutions","publisher":"Chirisa Technology Parks","retrievedAt":"2026-08-02","url":"https://chirisatechnologyparks.com/bloom-energy-and-coreweave-partner-to-revolutionize-ai-data-center-power-solutions/"},{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — Chirisa Volo LLC, Volo, 2023 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/chirisa-volo-data-center-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Austin","confidence":"medium","contains_osm":true,"id":"compute_atlas-c2e62b5c4ad81eab","lat":30.212156,"location_precision":"exact","lon":-97.6957555,"name":"Digital Realty AUS11","operator":"Digital Realty","source_notes":"Confirmed via operator's own facility page: AUS11, 7500 Metro Center Drive, Austin, TX 78744, operational.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty facility directory","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/austin/aus11"},{"kind":"osm","label":"OpenStreetMap way/379204279","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/379204279"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-aus11-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-c2ec3fc31a08b2d0","lat":38.3800153,"location_precision":"approximate","lon":-77.4044535,"name":"Potomac Creek Campus Data Center","operator":"Undisclosed","source_notes":"99 acres south of Eskimo Hill Road near the approved Stafford Technology Campus. The applicant is not named in fetched sources. The coordinates are an approximate point on Eskimo Hill Road.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Stafford County pauses data center construction amid concerns about slave gravesite","publisher":"WJLA 7News","retrievedAt":"2026-10-14","url":"https://wjla.com/news/local/stafford-county-pauses-data-center-construction-amid-concerns-about-slave-gravesite-virginia-dominion-energy-property-value-tax-rates"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/potomac-creek-campus-stafford-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"compute_atlas-c31b6ce8864d5ed7","lat":39.147,"location_precision":"approximate","lon":-94.635,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powertransitions-project-yardbird-ks","value":200.0}],"name":"Project Yardbird","operator":"PowerTransitions","source_notes":"Converts the decommissioned Quindaro coal Power Station (BPU) in the Quindaro neighborhood of Kansas City, KS. $13.6M option to buy (May 2025), currently in due diligence.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"PowerTransitions Quindaro Data Center Opportunity","publisher":"PowerTransitions","retrievedAt":"2026-07-17","url":"https://wsp.cld.bz/PowerTransitions-Quindaro-Data-Center-Opportunity-Kansas-City"},{"kind":"press","label":"Wyandotte County, KS considering sale of former power plant for 192 MW data center development","publisher":"New Project Media","retrievedAt":"2026-10-21","url":"https://newprojectmedia.com/origination-wyandotte-county-ks-considering-sale-of-former-power-plant-for-192-mw-data-center-development/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/powertransitions-project-yardbird-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-c32faba0445fe0c2","lat":37.3640012,"location_precision":"exact","lon":-121.94689,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vantage-santa-clara-ii-ca2-ca","value":75.0}],"name":"Vantage Santa Clara II (CA2)","operator":"Vantage Data Centers","source_notes":"Confirmed on Vantage's official directory. Address 737 Mathew Street, Santa Clara, CA 95051 per datacenters.com/datacentermap cross-check.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1314010354","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1314010354"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/vantage-santa-clara-ii-ca2-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"New Richmond (Pierce Township)","confidence":"medium","id":"compute_atlas-c33d8f7bec2a5324","lat":38.992083,"location_precision":"approximate","lon":-84.29722,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/crane-data-centers-pierce-township-clermont-oh","value":300.0}],"name":"Crane Data Centers Pierce Township Campus (near Beckjord)","operator":"Crane Data Centers","source_notes":"Coordinates are those of the adjacent former Beckjord station (approximate). The site is wooded hillside north of Beckjord Road and east of US 52, and the company says it will avoid the plant's coal-ash pits. Township trustees say they are not entertaining the project and extended the moratorium.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Local 12: San Francisco company pitches 300 MW data center on ~300 acres north of Beckjord Road despite moratorium","publisher":"WKRC Local 12","retrievedAt":"2026-10-14","url":"https://local12.com/news/local/san-francisco-company-pitches-data-center-clermont-county-despite-local-moratorium-pierce-township-tech-technology-beckjord-power-plant-contaminated-soil-issues-residents-complaints-california"},{"kind":"other","label":"Walter C. Beckjord Generating Station (coordinates of adjacent landmark)","publisher":"Wikipedia","retrievedAt":"2026-10-14","url":"https://en.wikipedia.org/wiki/Walter_C._Beckjord_Generating_Station"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/crane-data-centers-pierce-township-clermont-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"East Wenatchee","confidence":"medium","id":"compute_atlas-c3404ca2e553b811","lat":47.407837,"location_precision":"approximate","lon":-120.207723,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/","value":180.0}],"name":"Microsoft East Wenatchee Data Center","operator":"Microsoft","source_notes":"Microsoft Azure data center campus on Urban Industrial Way near Pangborn Memorial Airport, East Wenatchee, Douglas County — first building operational (grand opening Dec 2022), additional buildings under construction, on ~340 acres. Under a Douglas County PUD Schedule 4 power-delivery agreement, Microsoft is contracted for up to 180 MW at full build-out (KPQ, citing the PUD agreement); the first building's permit was valued at $409M (Wenatchee World). DISTINCT from Microsoft's tracked Malaga campus, which is across the Columbia River in Chelan County (served by Chelan County PUD). Coordinates are an approximate geocode of the Urban Industrial Way corridor; a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Douglas County PUD, Microsoft Enter Power Delivery Agreement — up to 180 MW (Schedule 4), 180MW substation","publisher":"KPQ","retrievedAt":"2026-07-19","url":"https://kpq.com/douglas-county-pud-microsoft-enter-power-delivery-agreement/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/microsoft-east-wenatchee-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Frenchtown Township","confidence":"medium","id":"compute_atlas-c3d7609d54f147f0","lat":41.988,"location_precision":"approximate","lon":-83.386,"name":"Project Cherry Blossom","operator":"Cloverleaf Infrastructure","source_notes":"Proposed on the former ProMedica Hospital site off I-75 and North Dixie Highway, Frenchtown Township; site is zoned Planned Unit Development, allowing industrial use. ~200 acres; preliminary plans include a pedestrian/bike path and landscaped berms/tree buffers along North Dixie Highway. Cloverleaf's own FAQ describes it as still 'in the development phase' with a taxable investment of 'more than $1B' but does not disclose a MW capacity figure. As of October 2026, Cloverleaf was already tracked elsewhere (AL, GA, IL, KS, MO, OK, WI) as a data-center developer. Note: Cloverleaf's own FAQ page refers to the project once as 'Project Ironwood' -- unclear whether this is the same project under an earlier working name or a distinct nearby Cloverleaf site (a 'Project Ironwood' near Dundee/Milan Townships in the same county has been reported separately elsewhere); treated as one record pending disambiguation. Coordinates are an approximate Frenchtown Township / former-hospital-site estimate, not parcel-geocoded. The developer states publicly that the site's available power has not yet been determined, so no MW capacity figure exists to record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"FAQs - Project Cherry Blossom","publisher":"Cloverleaf Infrastructure","retrievedAt":"2026-09-09","url":"https://cherryblossomdatacenter.com/faqs/"},{"kind":"other","label":"Project Cherry Blossom - home","publisher":"Cloverleaf Infrastructure","retrievedAt":"2026-08-08","url":"https://cherryblossomdatacenter.com/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/cloverleaf-cherry-blossom-frenchtown-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Tonopah","confidence":"medium","id":"compute_atlas-c42392072b5995a4","lat":33.481,"location_precision":"approximate","lon":-113.134,"name":"491st Avenue and Thomas Road Data Center / Solar Site","operator":"Grandilla (Arizona) Inc. and Foot Creek Corporation","source_notes":"Northeast corner of 491st Avenue and Thomas Road near Tonopah. Concept is nine industrial buildings of roughly 250,000 sq ft each, about 2.25 million sq ft total, plus solar and BESS. No formal development plan is on file; the applicant describes phased build-out sequenced to market demand, with initial development over the southern portion of the property.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/grandilla-foot-creek-491st-thomas-tonopah-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Lebanon","confidence":"medium","id":"compute_atlas-c43e34b967b712dc","lat":43.6600753,"location_precision":"approximate","lon":-72.2430802,"name":"Dartmouth College Data Center (Etna Road)","operator":"Dartmouth College","source_notes":"The college's enterprise data center for ITC (Information, Technology & Consulting). Dartmouth's own service page describes the data center service but gives no address, so the Etna Rd location rests on two directories. The coordinates match the OSM commercial building at 56 Etna Rd. Dartmouth's separate Hanover machine rooms, listed elsewhere, are not included.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"New Hampshire data centers: Dartmouth College Data Center, 56 Etna Rd, Lebanon, operational","publisher":"Kadoa US Datacenter Tracker","retrievedAt":"2026-10-08","url":"https://www.kadoa.com/datacenter/state/new-hampshire"},{"kind":"other","label":"DARTMOUTH COLLEGE DATA CENTER, Etna Rd, Lebanon NH: active","publisher":"DC Hub","retrievedAt":"2026-10-08","url":"https://dchub.cloud/facilities/dartmouth-college-data-center-6a8fc01a"},{"kind":"other","label":"Dartmouth ITC data center service description","publisher":"Dartmouth College","retrievedAt":"2026-10-08","url":"https://services.dartmouth.edu/TDClient/1806/Portal/Requests/Service/31708/Data-Center-Services"}],"updated":"2026-10-08","url":"https://www.compute-atlas.com/facilities/dartmouth-college-data-center-lebanon-nh"}],"state":"New Hampshire","status":"operating"},{"ai_classification":"likely","city":"Yerington","confidence":"medium","id":"compute_atlas-c494e2e91f7a3f07","lat":38.9855429,"location_precision":"approximate","lon":-119.162989,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://nevbex.com/2026/08/12/monarch-data-center-lyon-county-rezoning/","value":1000.0}],"name":"Monarch Data Center","operator":"Copia Power","source_notes":"Roughly 505 acres in Mason Valley near Yerington; a 4.6 million-square-foot campus with north and south sub-campuses, a battery energy storage system, a natural gas plant, a substation and power lines across two parcels. First phase would provide 150 MW of the 1,000 MW total. Copia Power has one year to file its final PUD. Lyon County is drafting a stricter data center ordinance that will not apply retroactively to Monarch.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Lyon County Commissioners approve Monarch Data Center","publisher":"KOLO 8 News Now","retrievedAt":"2026-08-29","url":"https://www.kolotv.com/2026/08/07/lyon-county-commissioners-approve-monarch-data-center/"},{"kind":"press","label":"Massive data center in Lyon County is one step closer to being built","publisher":"Carson Now / The Nevada Independent","retrievedAt":"2026-09-11","url":"https://www.carsonnow.org/08/09/2026/massive-data-center-in-lyon-county-is-one-step-closer-to-being-built"},{"kind":"press","label":"Lyon County Commissioners approve rezoning for Monarch Data Center","publisher":"NVBEX","retrievedAt":"2026-08-29","url":"https://nevbex.com/2026/08/12/monarch-data-center-lyon-county-rezoning/"},{"kind":"press","label":"Lyon County Presses Ahead with Power Improvement District - Monarch described as eight two-story buildings plus an electrical substation","publisher":"NVBEX","retrievedAt":"2026-09-11","url":"https://nevbex.com/2026/07/15/lyon-county-new-data-center-power-district/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/monarch-data-center-yerington-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Silver Spring","confidence":"medium","id":"compute_atlas-c535116d7346ecdd","lat":39.058994201626,"location_precision":"exact","lon":-76.965681665201,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/priseda-prosperity-drive-silver-spring-md","value":35.2}],"name":"12401 Prosperity Drive Data Center","operator":"Sansone Group / Priseda","source_notes":"Coordinates confirmed via US Census geocoder (exact match on 12401 Prosperity Dr, Silver Spring, MD 20904; county is Montgomery per standard MD zip-to-county geography, not stated by either source). This is a previously-existing colocation facility (built 2009; operated historically as ByteGrid MDC1/MDC2 and later as Lincoln Rackhouse, brand retired 2024) acquired by a Sansone Group / Priseda partnership in an off-market deal reported at $28.8M (RE Business Online, announced Aug 2025); Priseda is both co-owner and operator. The property's own site states a 214,000 SF 'ultra secure' facility with ~50,000 SF of data hall available for lease and a phased power build-out to '35.2 MW gross by end of 2027' -- recorded as planned capacity since that figure is the forward target, not a confirmed current operational total (no cited source states the pre-upgrade operational MW). No AI classification is recorded: no source names AI/GPU/HPC use at this site. Distinct from and not to be confused with the existing AiNET CyberNAP Glen Burnie record (different operator, different county).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sansone Group, Priseda Acquire 214,000 SF Data Center in Metro D.C.","publisher":"REBusinessOnline","retrievedAt":"2026-09-13","url":"https://rebusinessonline.com/sansone-group-priseda-acquire-214000-sf-data-center-in-metro-d-c/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/priseda-prosperity-drive-silver-spring-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"compute_atlas-c5f4f397086abb45","lat":38.411322338680904,"location_precision":"approximate","lon":-77.4042471172777,"name":"Potomac Church Technology Center","operator":"Amazon Data Services","source_notes":"49.9 acres, 510,000 sq ft AWS campus; proffer amendment deferred June 2026. Distinct from AWS's Caroline County 'Mattermeade' campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Stafford supervisors defer Amazon data center proffer amendment","publisher":"Potomac Local","retrievedAt":"2026-07-17","url":"https://www.potomaclocal.com/2026/06/18/stafford-supervisors-defer-amazon-data-center-proffer-amendment-amid-road-damage-generator-emissions-and-water-sharing-concerns/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/amazon-potomac-church-fredericksburg-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"confirmed","city":"New York","confidence":"medium","id":"compute_atlas-c62b84206e0a4fd5","lat":40.741369,"location_precision":"exact","lon":-74.003206,"name":"Digital Realty JFK10 (111 Eighth Avenue)","operator":"Digital Realty","source_notes":"111 Eighth Avenue (the historic Union Inland Terminal #1 / \"Google Building\"; the New York City tax-lot record lists the building as built in 1931), Chelsea, Manhattan — Google owns the building; Digital Realty operates JFK10 as a colocation tenant. 111,000 sq ft (Digital Realty's own figure). A third-party estimate of ~18MW capacity is not confirmed by the operator and is omitted. Major carrier hotel with DE-CIX New York and MegaIX New York peering. As of October 2026, the coordinates fall inside New York City tax lot 1007390001 (111 8 Avenue; Block 739, Lot 1), a lot holding a single building, so the pin marks the building as a whole; the cited sources do not say where inside it JFK10 sits.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty JFK10 Data Center","publisher":"Digital Realty","retrievedAt":"2026-07-10","url":"https://www.digitalrealty.com/data-centers/americas/new-york/jfk10"},{"kind":"press","label":"OQC, Digital Realty and NVIDIA launch Quantum-AI data centre in New York","publisher":"Oxford Quantum Circuits","retrievedAt":"2026-07-10","url":"https://oqc.tech/company/newsroom/oqc-quantum-ai-data-centre"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-24","url":"https://www.compute-atlas.com/facilities/digital-realty-jfk10-manhattan-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Buckeye","confidence":"medium","id":"compute_atlas-c684bf01249aa4d7","lat":33.435,"location_precision":"approximate","lon":-112.512,"name":"Project Range","operator":"Tract","source_notes":"A Maricopa County island between Buckeye and Goodyear, on both sides of Yuma Road between Perryville Road and Jackrabbit Trail. Plan is 28 buildings across two campuses totalling about 5.6 million sq ft, individual buildings 149,000-260,000 sq ft, with roughly 100 acres set aside for parks and public uses and a 15+ year build-out. No MW figure disclosed. Distinct from Tract's tracked Buckeye Tech Corridor site, which is a separate ~1,700-acre holding inside the Buckeye city limits in the Cipriani area south of I-10 — the two neighbouring cities' formal objections to Project Range confirm it is not the campus they already entitled.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/tract-project-range-buckeye-goodyear-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Salisbury","confidence":"medium","id":"compute_atlas-c690eb97abe94b3c","lat":35.6288,"location_precision":"approximate","lon":-80.5054,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-salisbury-henderson-grove-nc","value":55.0}],"name":"Flexential Salisbury (Henderson Grove Church Road)","operator":"Flexential","source_notes":"Developed by Trammell Crow Company with Flexential named as the end user. Distinct from the three tracked Flexential NC sites (Charlotte North, Charlotte South, Raleigh).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/flexential-salisbury-henderson-grove-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"likely","city":"Silver Springs","confidence":"medium","id":"compute_atlas-c69b235fa281aafc","lat":39.373597,"location_precision":"approximate","lon":-119.2267443,"name":"Microsoft Silver Springs Data Center Campus","operator":"Microsoft","source_notes":"A distinct Microsoft site from the Victory Logistics District land in Fernley that the tracker already carries. Microsoft owns roughly 274 acres in Silver Springs, restructured into three parcels of about 223.18, 32.6 and 18.7 acres. The BLM decision notice for the 345 kV fold names NV Energy as applicant and does not mention Microsoft or a data center; the Microsoft linkage comes from the county proceedings and the Basin and Range Watch summary. No building programme, capacity figure or construction start has been sourced. Coordinates are the Silver Springs reference point, not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Planning commission recommends approval of two Microsoft substations in Silver Springs amid neighbor concerns","publisher":"Citizen Portal","retrievedAt":"2026-08-29","url":"https://citizenportal.ai/articles/7417886/nevada/lyon-county/planning-commission-recommends-approval-of-two-microsoft-substations-in-silver-springs-amid-neighbor-concerns"},{"kind":"other","label":"Data Centers - Silver Springs data center and Silver Springs 345 kV transmission line, ROW application September 2024, revised plan of development April 2026","publisher":"Basin and Range Watch","retrievedAt":"2026-08-29","url":"https://www.basinandrangewatch2.org/data-centers"},{"kind":"filing","label":"BLM issues decision for Silver Springs 345kV Fold","publisher":"U.S. Bureau of Land Management","retrievedAt":"2026-08-29","url":"https://www.blm.gov/announcement/blm-issues-decision-silver-springs-345kv-fold"}],"updated":"2026-08-29","url":"https://www.compute-atlas.com/facilities/microsoft-silver-springs-lyon-county-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"confirmed","city":"Gallatin","confidence":"medium","id":"compute_atlas-c6a79e46593996a8","lat":36.3884,"location_precision":"approximate","lon":-86.4369,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-gallatin-tn","value":300.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-gallatin-tn","value":300.0}],"name":"Meta Gallatin Data Center Campus","operator":"Meta","source_notes":"Campus coordinates are city-centroid approximation for Gallatin, TN. Up to 12 data halls planned on 900+ acres per DPR Construction (general contractor). Meta is deploying AI GPU clusters in waterproof tent structures (rapid deployment structures) at this campus to accelerate capacity ahead of permanent building construction.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta brings data centers in tents to Gallatin, Tennessee","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-brings-data-centers-in-tents-to-gallatin-tennessee/"},{"kind":"press","label":"Meta data center begins operations in Gallatin","publisher":"Tennessee Municipal League","retrievedAt":"2026-07-06","url":"https://ttc.tml1.org/2024/11/15/meta-data-center-begins-operations-gallatin"},{"kind":"press","label":"Meta expands Gallatin data center — cooling & water approach","publisher":"w.media","retrievedAt":"2026-07-06","url":"https://w.media/meta-expands-gallatin-data-center-with-nearly-1b-total-investment/"},{"kind":"press","label":"Gallatin offers a glimpse at hyperscale data center experiences","publisher":"WPLN News (Nashville Public Radio)","retrievedAt":"2026-09-09","url":"https://wpln.org/post/gallatin-offers-a-glimpse-at-hyperscale-data-center-experiences/"},{"kind":"other","label":"Meta Gallatin Data Center info sheet (PDF): $1.5B+ investment, 100+ operational jobs, TVA energy planning, water stewardship, 100% clean and renewable energy matching","publisher":"Meta","retrievedAt":"2026-09-21","url":"https://datacenters.atmeta.com/wp-content/uploads/2026/09/Meta_s-Gallatin-Data-Center.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-gallatin-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"likely","city":"Sacramento","confidence":"medium","id":"compute_atlas-c6aa17bf7d53ca0d","lat":38.671,"location_precision":"approximate","lon":-121.399,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prime-smf02-sacramento-ca","value":18.0}],"name":"Prime Data Centers SMF02","operator":"Prime Data Centers","source_notes":"Address: 2408 AK Street, McClellan Park, Sacramento, CA 95652. Coordinates approximate (McClellan Business Park). Adjacent to operational SMF01 (8MW at 2407 AK Street). Combined campus: 26MW across 215,000 sq ft on 8.6 acres. Marketed for hyperscale and AI-ready deployments. Certifications: ISO 27001, SOC 2 Type 2.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prime Breaks Ground on Latest Data Center in Sacramento, California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/prime-breaks-ground-on-latest-data-center-in-sacramento-california/"},{"kind":"press","label":"Prime Data Centers Breaks Ground on Second Sacramento Facility","publisher":"Connect CRE","retrievedAt":"2026-09-29","url":"https://www.connectcre.com/stories/prime-data-centers-breaks-ground-on-second-sacramento-facility/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/prime-smf02-sacramento-ca"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Carrollton","confidence":"medium","id":"compute_atlas-c6b66f1f7b1e6e9b","lat":38.68,"location_precision":"approximate","lon":-85.16583,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/powerhouse-poe-carrollton-industrial-campus-carroll-county-ky","value":800.0}],"name":"Carrollton Industrial Campus","operator":"PowerHouse Data Centers / Poe Companies","source_notes":"Developers (Poe Companies and PowerHouse Data Centers, the same partnership behind PowerHouse Data Centers – Louisville (Camp Ground Road), tracked separately as of September 2026) have secured purchase options and completed initial site studies but had not started construction as of the 2026-09-10 source check; 'it's unclear when construction ... will begin.' Data center footprint is reported as roughly 300 acres. WHAS11 describes a 500-acre site that includes 342 acres owned by Carrollton Utilities, adjacent to its regional wastewater treatment plant; another report puts the land under purchase option at 550 acres, and a third describes the mayor's July 2025 option contract as covering 340 acres of public land. The recorded land area uses the 500-acre figure. An economic-impact analysis projects about $93.2M in local tax revenue (Louisville Business First calls it annual), over $64M of it to Carroll County Public Schools; the developer also received $3.7 million in Kentucky Business Investment (KBI) incentive funding (year not stated in source, so it is not recorded as a subsidy).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Louisville-based developer plans $9.6B data center in Carroll County","retrievedAt":"2026-09-10","url":"https://finance.yahoo.com/technology/articles/louisville-based-developer-plans-9-144212137.html"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/powerhouse-poe-carrollton-industrial-campus-carroll-county-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Colchester","confidence":"medium","contains_osm":true,"id":"compute_atlas-c6c6a8f3654859fd","lat":41.5920812,"location_precision":"approximate","lon":-72.3379585,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/renew-amston-colchester-ct","value":10.0}],"name":"ReNew Amston Data Center Campus (42 Old Amston Road)","operator":"ReNew Developers","source_notes":"Marketed with Gray Wolf Data Centers as 'ReNew Amston 2'. WFSB: two buildings (rack space, plus a 20,000 sq ft data center) of 5 MW each. The site is 17.15 wooded acres (Hoodline).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Colchester data center plan on Old Amston Road sparks resident pushback","publisher":"Hoodline","retrievedAt":"2026-10-19","url":"https://hoodline.com/2026/10/colchester-data-center-plan-on-old-amston-road-sparks-resident-pushback/"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/renew-amston-colchester-ct"}],"state":"Connecticut","status":"planned"},{"ai_classification":"unknown","city":"Tolleson","confidence":"medium","id":"compute_atlas-c7163df4d9911d2d","lat":33.420593,"location_precision":"approximate","lon":-112.311771,"name":"QTS Phoenix 4","operator":"QTS Data Centers","source_notes":"Second QTS site in the Phoenix market, in Tolleson. The operator page is a community-partnership page and discloses no capacity, acreage or timeline, so those fields are omitted rather than estimated. Status is under construction on the strength of 'under development' plus a fixed street address. Coordinates geocoded from the cited address via the US Census geocoder.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-phoenix-4-tolleson-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Salix","confidence":"medium","id":"compute_atlas-c7229b086b9119cd","lat":42.3208,"location_precision":"approximate","lon":-96.2872,"name":"Salix Data Center Site (Midwest Capital Group)","operator":"Midwest Capital Group (MidAmerican Energy)","source_notes":"About 900 acres of farmland northeast of Salix, voluntarily annexed from Woodbury County by the Salix City Council in April 2026, being considered for a data center campus. Google confirmed on 2026-08-03 that it is exploring a future data center in the Salix area; Google said it will not pursue local real estate property tax abatements or rebates. MidAmerican stressed 'This is not a project announcement, development agreement or request for approval.' No investment, capacity or building count has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Woodbury County moves to pause data center projects for 1 year","publisher":"Iowa Public Radio","retrievedAt":"2026-08-14","url":"https://www.iowapublicradio.org/ipr-news/2026-06-17/potential-data-center-sparks-moratorium-push-in-northwest-iowa"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/salix-data-center-site-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"likely","city":"Fayetteville","confidence":"medium","id":"compute_atlas-c7c544da37c58823","lat":35.085,"location_precision":"approximate","lon":-78.97722,"name":"Terra Nexus Custer Avenue Data Center (Fayetteville)","operator":"Terra Nexus Ventures","source_notes":"Capacity is deliberately omitted: the same publisher reports this project at 200 MW in one story and 300 MW in another, and that conflict is unresolved from the sources read. Reported to include 102 diesel generators and on-site wetlands, sited near the Fayetteville Public Works Commission generation plant and the town of Eastover. Distinct from Terra Nexus's Rockingham (Richmond County) site and from the separately tracked PRSM Group and Energy Storage Solutions Cumberland County proposals.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data Centers Are Eyeing Fayetteville. Here's How to Learn More","publisher":"CityView (Fayetteville, NC)","retrievedAt":"2026-08-29","url":"https://www.cityviewnc.com/stories/how-to-learn-more-about-data-centers-in-fayetteville/"},{"kind":"press","label":"Data Center Proposal Emerges as County Holds Hearing on Moratorium","publisher":"CityView (Fayetteville, NC)","retrievedAt":"2026-08-29","url":"https://www.cityviewnc.com/stories/data-center-proposal-emerges-as-county-holds-hearing-on-moratorium/"}],"updated":"2026-08-29","url":"https://www.compute-atlas.com/facilities/terra-nexus-custer-avenue-fayetteville-cumberland-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"confirmed","city":"Ellendale","confidence":"medium","id":"compute_atlas-c81c52f6a740692a","lat":46.003,"location_precision":"approximate","lon":-98.509,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.datacenterdynamics.com/en/news/applied-digital-adds-75mw-of-capacity-at-ellendale-data-center-campus-in-north-dakota/","value":400.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-1-ellendale-nd","value":175.0}],"name":"Applied Digital Polaris Forge 1","operator":"Applied Digital Corporation","source_notes":"Campus is 400 MW fully contracted to CoreWeave under ~15-year lease agreements valued at ~$11B total revenue. Three buildings: Building 1 (100 MW) complete Dec 2025; Building 2 (150 MW) had its first 75 MW phase declared Ready for Service in a July 1, 2026 release, bringing live capacity to 175 MW; Building 3 (150 MW) expected 2027. Coordinates are Ellendale city centroid; exact site is northeast of the city. Local jobs are reported only as projections — 'as many as 85 new jobs' (Dec 2024) and up to ~110 total local workforce at full expansion — not confirmed headcounts. As of July 2026, no confirmed total campus capital-expenditure figure was public (the ~$11B CoreWeave figure is 15-year lease revenue, not capex); North Dakota's data-center sales-tax exemption applies but individual award amounts are statutorily confidential. Applied Digital's executive vice president of public affairs and real estate acquisitions said in March 2025 that the first building was about a $1.3 billion investment for the company, with another $4 billion anticipated for the buildings, transformers, chillers and mechanical equipment; because the second amount is anticipated rather than confirmed, no investment figure is recorded. The same executive put the total capital investment on the 320-acre site at about $20 billion, which additionally counts approximately $15 billion the customer was expected to invest.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Applied Digital Announces 250MW AI Data Center Lease With CoreWeave in North Dakota","publisher":"Applied Digital Corporation","retrievedAt":"2026-07-06","url":"https://ir.applieddigital.com/news-events/press-releases/detail/123/applied-digital-announces-250mw-ai-data-center-lease-with"},{"kind":"press","label":"Applied Digital completes first data center building at North Dakota campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/applied-digital-completes-first-data-center-building-at-north-dakota-campus/"},{"kind":"press","label":"A shot in the arm for Ellendale","publisher":"Northern Sentry","retrievedAt":"2026-07-07","url":"https://northernsentry.com/2024/12/19/a-shot-in-the-arm-for-ellendale/"},{"kind":"press","label":"InForum — \"Applied Digital plans to expand in Ellendale, ND\"","retrievedAt":"2026-07-25","url":"https://www.inforum.com/news/north-dakota/applied-digital-plans-to-expand-in-ellendale-nd"},{"kind":"press","label":"Applied Digital adds 75MW of capacity at Ellendale data center campus in North Dakota","publisher":"DatacenterDynamics","retrievedAt":"2026-10-10","url":"https://www.datacenterdynamics.com/en/news/applied-digital-adds-75mw-of-capacity-at-ellendale-data-center-campus-in-north-dakota/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/applied-digital-polaris-forge-1-ellendale-nd"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"compute_atlas-c876b75a278de3e0","lat":33.7514966,"location_precision":"approximate","lon":-84.7477136,"name":"Google Douglasville Data Center","operator":"Google","source_notes":"Google's first data center campus, and its longest-running. Google began its Douglas County presence in 2003 and opened the data center in 2007; a further $300 million expansion was announced in 2015. Google began using recycled industrial water for cooling here in 2012. Coordinates are the Douglasville city centroid (approximate) — Google does not publish a campus address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/google-douglas-county-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-c8bea74581d72aec","lat":42.0035588,"location_precision":"approximate","lon":-88.0037711,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/t5-chicago-v-elk-grove-village-il","value":36.0}],"name":"T5 @ Chicago V (CHI V)","operator":"T5 Data Centers","source_notes":"T5's fifth Chicago-area site and fourth in the O'Hare submarket. The coordinates are the Elk Grove Village municipal centroid: the seven-acre parcel's street address has not been published, so the pin may be a mile or more from the real footprint.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/t5-chicago-v-elk-grove-village-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Kings Mountain","confidence":"medium","id":"compute_atlas-c8c49f5544090207","lat":35.2451,"location_precision":"approximate","lon":-81.3412,"name":"HB2K AI Data Center Campus (Kings Mountain)","operator":"HB2K LLC (Honey Badger Development)","source_notes":"Both sources carry the same WJZY report, so this is single-source. The '150MW-300MW power pathway' is the developer's litigation claim, not a sourced capacity, so capacity is omitted. The land was bought from the Wright family around 2023. No visible development has been reported, and company officials did not respond. Kings Mountain has a data center moratorium; whether it applies to this project has not been clarified. Coordinates are an approximate town-level placement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"'I regret selling every day': NC couple regrets selling family land for data center project","publisher":"CBS17 (WJZY/Queen City News)","retrievedAt":"2026-10-15","url":"https://www.cbs17.com/news/north-carolina-news/i-regret-selling-every-day-nc-couple-regrets-selling-family-land-for-data-center-project/amp/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/hb2k-kings-mountain-cleveland-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Plano","confidence":"medium","id":"compute_atlas-c8d7eaf1d874c2e9","lat":41.675,"location_precision":"approximate","lon":-88.5286,"name":"Plano Skies Data Center Campus (Rock Creek Road)","operator":"Savion","source_notes":"Data center campus proposed off Rock Creek Road, north of Plano, alongside Savion's Plano Skies solar project. WSPY reports six buildings. The developer said it was not permitting yet, and any approval would go through the Plano Commission. No capacity has been disclosed. Coordinates are an approximate point on Rock Creek Road.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/savion-plano-skies-data-center-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Berkeley Springs","confidence":"medium","contains_osm":true,"id":"compute_atlas-c8db9de991fd4e75","lat":39.6267975,"location_precision":"approximate","lon":-78.2279514,"name":"Dedispec Berkeley Springs Data Center","operator":"Dedispec","source_notes":"Privately owned colocation / dedicated-server facility with UPS-conditioned power, backup generators, redundant cooling and multiple carriers (Level 3, Cogent, Hurricane Electric, Equinix Direct and others). Operator publishes no square footage, rack count or MW figure; the 1 MW / $7M numbers seen on third-party trackers are not stated by any primary source and were not adopted. Pin is the town centroid — no street address is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Dedispec: Berkeley Springs, West Virginia Data Center","publisher":"Dedispec","retrievedAt":"2026-09-22","url":"https://dedispec.com/network/"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/dedispec-berkeley-springs-morgan-county-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"likely","city":"Lima","confidence":"medium","id":"compute_atlas-c8eccab5d0e825f2","lat":40.744,"location_precision":"approximate","lon":-84.1052,"name":"Google Project BOSC (Lima)","operator":"Google","source_notes":"Google's third Ohio data center (after New Albany and Lancaster). $500M confirmed capital investment. Codename Project BOSC; pre-announcement land/permit work via Bistrozzi LLC (Delaware shell). Coordinates are the Lima city centroid; the confirmed site is in American Township ~2 mi north of Lima (North Cole Street between Beery and Irvin Roads), ~170 acres. Capacity MW not disclosed. Google's project page states construction anticipated to begin late 2026; ~50 permanent jobs projected per DCD and 'hundreds' of construction jobs - projections, so omitted from jobs. Ohio EPA air-permit application (pending March 2026) covers 115 emergency diesel generators; 36 cooling towers specified. $50M of the investment is earmarked for local road infrastructure, $13.6M for water infrastructure.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google confirmed as company behind $500m data center in Lima, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500m-data-center-in-lima-ohio/"},{"kind":"press","label":"Google to Build Data Center in Lima, Ohio with $500 Million Capital Investment","publisher":"Allen Economic Development Group","retrievedAt":"2026-07-07","url":"https://www.aedg.org/blog/google-to-build-data-center-in-lima-ohio-with-500-million-capital-investment/"},{"kind":"other","label":"Allen County Data Center - Project Overview","publisher":"Google / Allen County Data Center","retrievedAt":"2026-07-07","url":"https://www.allencountydatacenter.com/"},{"kind":"press","label":"Google officially behind data center project","publisher":"The Lima News","retrievedAt":"2026-07-07","url":"https://www.limaohio.com/top-stories/2026/03/16/google-officially-behind-data-center-project/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-bosc-lima-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Thornburg","confidence":"medium","id":"compute_atlas-c91ab88e2eb849ef","lat":38.127876,"location_precision":"approximate","lon":-77.52959,"name":"Thornburg Business Park","operator":"LID, LLC (with IWG Thornburg, LLC and JR Bluestar Thornburg, LLC)","source_notes":"County rezoning case R25-0013. Applicant/owner LID, LLC & IWG Thornburg, LLC & JR Bluestar Thornburg, LLC. Rezoning of ~200.35 acres (tax map parcels 63-12-E, 63-12-D, 63-12-C, 63-A-33, 63-A-32, 63-A-37, 76-A-5, 76-A-5A, 76-A-6) from A-2 and C-3 to I-2 to develop a Data Center and Public Utility (Light) campus of ~2,000,000 sq ft of data center buildings; SW quadrant of the Route 1 / Route 606 intersection (5630 Morris Rd / 5600 Blue Star Ln), behind the Food Lion. Filed 9/25/2025; Under Review per the March 2026 county report. Mangum Economics fiscal analysis (\"Spotsylvania Data Center Campus\", June 2025) projects county tax revenue $5.4M (year 1) rising to ~$50.4M steady, and ~216 data center operational jobs. Distinct from Thornburg Industrial Park (parcels 63-5-C/63-5-C1, S Roxbury Mill Rd) and SpotsyTech Campus (N Roxbury Mill Rd). The pin is a Morris Rd geocode; as of October 2026, it falls inside tax map parcel 63-A-37 (GPIN 7673-20-3589), one of the nine parcels in the rezoning application, in the Spotsylvania County parcel GIS.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/thornburg-business-park-data-center-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Chandler","confidence":"high","contains_osm":true,"id":"compute_atlas-c96f30a547b6a862","lat":33.2769786,"location_precision":"approximate","lon":-111.8860302,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/h5-data-centers-chandler-az","value":26.0}],"name":"H5 Data Centers Phoenix (Chandler)","operator":"H5 Data Centers","source_notes":"180,000 sq ft purpose-built colocation facility at 2600 W. Germann Road, Chandler, with 26 MW of capacity and Tier III design. Marketed as 'Phoenix' but physically in Chandler. Coordinates geocoded from the cited address; Nominatim returns an OSM feature named 'H5 Phoenix' at that address and the US Census geocoder agrees to ~20 m.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Phoenix Data Center — H5 Data Centers","publisher":"H5 Data Centers","retrievedAt":"2026-09-10","url":"https://h5datacenters.com/phoenix-data-center.html"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/h5-data-centers-chandler-az"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300959969"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-phoenix-osmway-300959969"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"DeKalb","confidence":"medium","id":"compute_atlas-c9db72a96d866c1d","lat":41.892979,"location_precision":"approximate","lon":-88.724193,"name":"KARIS DeKalb Campus (Peace and Gurler Roads)","operator":"Karis Acquisitions","source_notes":"Seven-building, 1,750,000 sq ft campus. Coordinates are the Peace Road / Gurler Road intersection (OSM); the approval describes the NE corner, so the true footprint lies north-east of this point. No megawatt figure appears in the city record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of DeKalb Zoning & Development Projects list as of 7/15/2026 — Steven Goldin and Karis Acquisitions, NE Corner of Peace and Gurler Roads, 1,750,000 sq ft data center in seven buildings, approved 7/22/24","publisher":"City of DeKalb","retrievedAt":"2026-09-25","url":"https://www.cityofdekalb.com/DocumentCenter/View/21222/Development-Projects-List-7-15-26-"},{"kind":"permit","label":"City of DeKalb Zoning & Development Projects list as of 3/18/2026 (same entry)","publisher":"City of DeKalb","retrievedAt":"2026-09-25","url":"https://www.cityofdekalb.com/DocumentCenter/View/20701/Development-Projects-List-3-18-26-"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/karis-dekalb-campus-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Eastport","confidence":"medium","id":"compute_atlas-ca1e1c766aaefc66","lat":44.9345236,"location_precision":"approximate","lon":-67.011368,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/deepgreen-western-passage-eastport-me","value":15.0}],"name":"DeepGreen Western Passage Tidal-Powered Subsea Data Center (Kendall Head, Eastport)","operator":"DeepGreen Western Passage SPV LLC","source_notes":"DeepGreen Western Passage SPV LLC (Needham, MA; managing member Louis Wolfson) filed for a 48-month FERC preliminary permit on Feb. 11, 2026. The permit is for feasibility and environmental studies only. FERC found the application deficient in July 2026 and accepted the revised filing in August 2026. Acceptance is not a construction permit; public comments were due Oct. 19, 2026. The investment was $415M in the February filing and $100M in the accepted filing, which also lists a 27-acre footprint in the bay. The pin is the OSM node for Kendall Head (node/358221168), the planned onshore landing, so precision is approximate. The developer has said feasibility is not yet determined.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"A data center. Underwater. Yes, some in this small Maine town are worried.","publisher":"The Boston Globe","retrievedAt":"2026-10-22","url":"https://www.bostonglobe.com/2026/10/13/science/underwater-data-center-eastport-maine/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/deepgreen-western-passage-eastport-me"}],"state":"Maine","status":"planned"},{"ai_classification":"unknown","city":"King George","confidence":"medium","id":"compute_atlas-ca5d24a9714b8e70","lat":38.25934134516552,"location_precision":"approximate","lon":-77.32191549954541,"name":"Birchwood Data Campus","operator":"Amazon Web Services","source_notes":"869 acres (former power-plant site), 19 buildings, 7.5M sq ft; rezoning approved Sept 2023; contested vested-rights case in circuit court. Via Birchwood Power Partners.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/aws-birchwood-data-campus-king-george-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-cacc42b508d6ed64","lat":29.1694,"location_precision":"approximate","lon":-95.431,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cleanspark-brazoria-county-tx","value":300.0}],"name":"CleanSpark Brazoria County (Second Texas) Campus","operator":"CleanSpark, Inc.","source_notes":"CleanSpark's second announced Houston-area AI/HPC campus (see also the separate Austin County campus, ~890 MW aggregate potential combined). No city or street address is disclosed in any source found as of August 2026; the coordinates are an approximate reference point at the Brazoria County seat (Angleton, TX), not a parcel location. 447 acres is disclosed as an 'up to' ceiling. An additional 300 MW (to a 600 MW total) is described as a potential future expansion, not yet ERCOT-approved or contracted. No named AI/HPC tenant or GPU lease is disclosed for this specific site (unlike CleanSpark's Sandersville, GA site), so the AI classification is likely rather than confirmed. As of August 2026, no raw SEC 8-K had been located for this transaction; it is sourced to CleanSpark's own press release and investor-relations pages, independently corroborated by trade press (DataCenterDynamics, The Energy Mag). Katten (March 2026) describes the acquisition of approximately 155 acres, with rights to acquire an additional adjacent approximate 437 acres.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CleanSpark Expands Texas Footprint (issuer IR copy)","publisher":"CleanSpark, Inc.","retrievedAt":"2026-08-02","url":"https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Expands-Texas-Footprint-with-Major-Power-Acquisition-Near-Houston-to-Support-Scaled-AI-and-HPC-Development/default.aspx"},{"kind":"press","label":"CleanSpark Releases February 2026 Operational Update","publisher":"CleanSpark, Inc.","retrievedAt":"2026-08-02","url":"https://investors.cleanspark.com/news/news-details/2026/CleanSpark-Releases-February-2026-Operational-Update/default.aspx"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/cleanspark-brazoria-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","contains_osm":true,"id":"compute_atlas-cade6c1c6e0cf564","lat":41.8728811,"location_precision":"approximate","lon":-87.63344,"name":"Netrality 717 South Wells","operator":"Netrality Data Centers","source_notes":"Netrality's sole confirmed Chicago carrier-hotel facility at 717 South Wells Street, operational with 30+ on-network providers per operator directory.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Netrality Data Centers facility directory","publisher":"Netrality Data Centers","retrievedAt":"2026-07-22","url":"https://netrality.com/locations/"},{"kind":"osm","label":"OpenStreetMap node/10537283366","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/10537283366"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/netrality-717-south-wells-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"likely","city":"Shalersville Township","confidence":"medium","id":"compute_atlas-cb2c5dddc829c1b7","lat":41.199,"location_precision":"approximate","lon":-81.245,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/bitdeer-shalersville-portage-county-oh","value":750.0}],"name":"Bitdeer Shalersville Data Center Campus","operator":"Bitdeer","source_notes":"Turnpike Commerce Center, Shalersville Township, Portage County. Not yet approved — blocked by the township's active data-center moratorium (see community field). Distinct from Bitdeer's other tracked Ohio sites (Clarington, Whitetail Creek/Niles, and Massillon). Tax revenue projections ($2.17M annual increase at phase-1 completion) are Bitdeer's own company projections, not independently confirmed. Coordinates are an approximate geocode of Shalersville Township, not a confirmed parcel pin — no source gave exact site coordinates. Development partner: Geis Development.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bitdeer looks to develop 750MW data center campus in Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/bitdeer-looks-to-develop-750mw-data-center-campus-in-ohio/"},{"kind":"press","label":"Asian crypto mining company and Geis partner to bring data center to Shalersville","publisher":"The Portager","retrievedAt":"2026-07-10","url":"https://theportager.com/asian-crypto-mining-company-and-geis-partner-to-bring-data-center-to-shalersville"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/bitdeer-shalersville-portage-county-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Frederick","confidence":"medium","id":"compute_atlas-cc129182004e1d89","lat":39.34,"location_precision":"approximate","lon":-77.515,"name":"Rowan Digital Infrastructure Bauxite II","operator":"Rowan Digital Infrastructure","source_notes":"Second phase of Rowan's three-phase Bauxite campus on the former Alcoa Eastalco site inside Quantum Frederick. Four data center buildings plus auxiliary buildings on 111.5 acres; Rowan states delivery in 2026. Per-phase MW is not stated consistently across sources, so no capacity is recorded; Rowan describes the combined three-phase campus as about 600-630 MW across 375 acres. As of 2026-09-10, status remains permitted. Beyond the Planning Commission approval article, no newer filings or status developments were found. Per-phase MW remains unstated in every source found (Rowan only quotes the combined ~600-630 MW campus figure), consistent with the absence of a recorded capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Bauxite I, II & III — Hyperscale Data Center Campus, Maryland","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-08-26","url":"http://rowan.com/portfolio/bauxite-i-ii-iii/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/rowan-bauxite-ii-frederick-md"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Bauxite I, II & III — Hyperscale Data Center Campus, Maryland","publisher":"Rowan Digital Infrastructure","retrievedAt":"2026-08-26","url":"http://rowan.com/portfolio/bauxite-i-ii-iii/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/rowan-bauxite-iii-frederick-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-ccb00c51743ba456","lat":41.7741691,"location_precision":"approximate","lon":-77.254256,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/alpha-compute-alpha-energy-01-tioga-county-pa","value":200.0}],"name":"Alpha Energy 01 Data Center Campus (Tioga County)","operator":"Alpha Compute Corp.","source_notes":"Two contiguous surface parcels (about 155 and 88 acres) plus about 1,800 net Marcellus mineral acres. The $55M purchase price covers land and minerals, not project investment. Initial 200 MW with potential expansion to 1 GW. No township is named, so the pin is the Tioga County centroid. A separate 107-acre Beaver County parcel held for future use is not included.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Alpha Compute Secures $47 Million in Seller Financing for Planned 200MW Pennsylvania AI Data Center Campus","publisher":"Alpha Compute Corp. (press release via Finviz)","retrievedAt":"2026-10-15","url":"https://finviz.com/news/390946/alpha-compute-secures-47-million-in-seller-financing-for-planned-200mw-pennsylvania-ai-data-center-campus"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/alpha-compute-alpha-energy-01-tioga-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"South Elgin","confidence":"medium","id":"compute_atlas-ccb3c074fb5201a4","lat":42.0007,"location_precision":"approximate","lon":-88.2795,"name":"Project Kilo Data Center (South Elgin)","operator":"White Rose Partners","source_notes":"A 200,000 sq ft building proposed on 20 acres at the northwest corner of Kenyon Road and Illinois Route 25, in unincorporated Elgin Township adjoining South Elgin. Managing partner Jeff Eigenbrood; the land is owned by a former Kane County Board member. No power capacity has been disclosed. Coordinates are derived from the mapped extent of Kenyon Road and are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/white-rose-project-kilo-south-elgin-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Lower Towamensing Township","confidence":"medium","id":"compute_atlas-cd0b799a202c9e28","lat":40.80481,"location_precision":"approximate","lon":-75.631467,"name":"DTA Alliance Data Center Campus (Blue Shamrock Golf Course / Alliance Sand Quarry)","operator":"DTA Alliance LLC / Murphy's Meadow LLC","source_notes":"About 700 acres, 14 buildings totaling 4.5M sq ft (per Hoodline), with about $4B projected by DTA. An affiliated DTA proposal in Bowmanstown (a 55-acre overlay with one 375,000 sq ft building) is described separately and is not included here. The pin is the geocoded 415 Golf Road address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Bowmanstown, PA Data Center Plan Sparks Zoning Fight","publisher":"Hoodline","retrievedAt":"2026-10-15","url":"https://hoodline.com/2026/10/carbon-county-data-center-proposal-tests-local-zoning-and-infrastructure-planning/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/dta-alliance-blue-shamrock-lower-towamensing-carbon-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Chillicothe","confidence":"medium","id":"compute_atlas-cd2acaad33079cc4","lat":39.3331,"location_precision":"approximate","lon":-82.9824,"name":"Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)","operator":"Aligned","source_notes":"Part of a multi-tenant redevelopment of the shuttered Pixelle paper mill (closed 2025) alongside Amphibian Aerospace Industries, U.S. Medical Glove Company, and U.S. Box Company. The $1.5B figure is the anticipated investment that the U.S. Paper Mill press release attaches to Aligned's high-performance computing campus (\"The project represents an anticipated $1.5 billion investment\", as quoted by WOSU Public Media), and the Athens County Independent reports a Ross County Chamber of Commerce press release saying that Aligned will invest $1.5 billion. WOSU's own summary instead gives $1.5 billion as the estimated investment across the whole multi-tenant buildout (Amphibian Aerospace Industries, U.S. Medical Glove Company, Aligned and U.S. Box Company), so the sources differ on whether the figure covers only the data-center campus. The developer is named only as \"Aligned\" in the press materials; on 2026-08-12 the Athens County Independent corrected its story, which had called the company Aligned Data Centers, to say \"The company involved is named Aligned, but is not Aligned Data Centers.\" As of October 2026, no cited source says which company this is, so the record carries the press release's name only. No street address specific to the data-center building has been reported; location uses the mill's mailing address as an approximate anchor.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$1.5 billion high-performance computing campus planned for former Chillicothe Paper Mill","publisher":"Scioto Valley Guardian","retrievedAt":"2026-08-27","url":"https://sciotovalleyguardian.com/2026/07/02/1-5-billion-high-performance-computing-campus-planned-for-former-chillicothe-paper-mill/"},{"kind":"press","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","retrievedAt":"2026-09-09","url":"https://athensindependent.com/data-centers-across-appalachian-ohio/"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/aligned-chillicothe-ross-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"Franklin","confidence":"medium","id":"compute_atlas-cd388845df66993f","lat":36.703,"location_precision":"approximate","lon":-86.591,"name":"TenKey LandCo Project Lionsgate – Franklin Data Center","operator":"TenKey LandCo I LLC","source_notes":"Site: 421 Steele Road (Steele Road near Exit 2 on I-65), Franklin, Simpson County, KY. Coordinates are approximate for that I-65 exit area within Franklin city limits. Three 200,000 sq ft buildings plus on-site natural gas power generation planned. End hyperscaler not publicly identified; Simpson County Judge-Executive Mason Barnes refused to sign NDA and called the pitch full of red flags. Data center opposition became a factor in May 2026 local primary elections in Simpson County. Fix: investment figure corrected from $1.6B to $4.8B — LPM confirms total project is 'nearly $5 billion'; the $1.6B figure in the original record is the per-building cost (each of three 200,000 sq ft facilities costs approximately $1.6B, totaling ~$4.8B).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tenkey-franklin-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Wharncliffe","confidence":"medium","id":"compute_atlas-cd8ddf97b9ad23fe","lat":37.6412,"location_precision":"approximate","lon":-81.9689,"name":"Adams Fork Energy Campus Data Center (Twisted Gun Golf Course, Wharncliffe)","operator":"TransGas Development Systems","source_notes":"Proposed at the former Twisted Gun Golf Course site in Wharncliffe, Mingo County, to be powered exclusively by the co-located off-grid natural-gas plant (tracked separately as of September 2026 as the Adams Fork Energy Campus Power Plant, Twisted Gun Golf Course, Wharncliffe; WV DEP permit R13-3714, approved October 2, 2025). No data-center-specific capacity, investment, or job figures distinct from the power plant were found as of 2026-09-10; reporting describes the plant and data center as a single 'energy campus' without separately quantifying the data center building. Part of TransGas's larger 'Adams Fork Energy' project alongside a proposed large natural-gas ammonia plant. The record is marked reported rather than confirmed (as of 2026-09-10): the WV DEP permit numbers and their 2025-10-02 approval are reported consistently by two independent organisations, but the permit documents themselves (R13-3714 and R13-3715) could not be retrieved from dep.wv.gov as of September 2026, so the sourcing is advocacy-group reporting rather than the primary record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Adams Fork is a Giant Waste of Energy","publisher":"Ohio River Valley Institute","retrievedAt":"2026-09-10","url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/adams-fork-wharncliffe-datacenter-mingo-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sheridan","confidence":"medium","contains_osm":true,"id":"compute_atlas-cd91ca7bb98525f7","lat":44.8284,"location_precision":"approximate","lon":-106.9711,"name":"Ptolemy Data Systems Sheridan Data Center","operator":"Ptolemy Data Systems","source_notes":"Ptolemy's own capability document states it constructed a 6,000 sq ft data center in Sheridan in 2012, including a 1,024 sq ft concrete-and-steel \"data vault\" on 480V three-phase power with racks supporting up to 15,000 W each, in-row chilling towers, APC Symmetra UPS and a 0.5 MW Generac generator with 30 hours of on-site fuel. Colocation directories list the address as 2910 Russell Drive; that address is not confirmed in a primary source, so only the street-level geocode is recorded and no street field is asserted. No facility-wide MW rating is published (the 0.5 MW figure is standby generation, not IT capacity).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"\"The Data Landscape\" — Ptolemy Data Systems capability document filed in a City of Douglas agenda packet","publisher":"City of Douglas, Wyoming","retrievedAt":"2026-09-14","url":"https://www.cityofdouglas.org/AgendaCenter/ViewFile/Item/1542?fileID=1449"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/ptolemy-data-systems-sheridan-wy"}],"state":"Wyoming","status":"operating"},{"ai_classification":"unknown","city":"Hanover Township","confidence":"medium","id":"compute_atlas-cd9fdb0ba780f2f2","lat":40.421072,"location_precision":"approximate","lon":-80.4645098,"name":"Prime Data Centers Starpointe Campus","operator":"Prime Data Centers LLC","source_notes":"About 1.8M sq ft across seven buildings on pre-graded pads in Starpointe Business Park. About 155 acres under contract from ALTIAN Development LLC. 'Several hundred million dollars' investment. The pin is the township centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/prime-data-centers-starpointe-hanover-township-washington-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Lowell Township","confidence":"high","id":"compute_atlas-cdb0a72ef562209c","lat":42.93,"location_precision":"approximate","lon":-85.352,"name":"Microsoft Lowell Township Data Center","operator":"Microsoft","source_notes":"Proposed ~$1B hyperscale campus at Covenant Business Park, Lowell Township, outside Grand Rapids. Originally filed under Franklin Lowell LLC / Franklin Partners (that application was withdrawn in Dec 2025 amid opposition); Microsoft has since publicly identified itself as the developer (named itself Jan 2026 per secondary reporting, not independently re-confirmed as of September 2026) and is pursuing a revamped proposal. Lowell Township's board rejected a proposed moratorium 2-5 and instead formed a committee to draft a data-center-specific ordinance -- i.e. the township itself stayed open to the project even as public reaction has been heavily negative at open houses. As of August 2026, only one independent outlet had been directly verified (WoodTV and Crain's Detroit coverage exist but could not be retrieved); Gander Newsroom's Michigan data-center directory (updated October 2026) now independently reports Microsoft's plan as well. Coordinates are an approximate Lowell Township estimate, not parcel-geocoded. As of September 2026, the rezoning application had been neither approved nor denied - the planning commission took no decision and continued the matter to further meetings - so the status remains proposed. Gander Newsroom gives roughly 237 acres at Covenant Business Park; as of October 2026, none of the cited sources states a megawatt, jobs or water figure. Separately, Gander Newsroom reports that the plan stalled in August 2026 when the Lowell City Council suspended negotiations with the township over water, sewer and development agreements.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-10-07","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-lowell-township-mi"},{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi-wFBVV95cUxNb1A5THZleTVCLTcxcVJFTVdQMlU0N1lyYUZlM3Q2WWdJRzJHLTVXOFRuN25heFplaWRiWmFLU05VX0ptaFB4RUhtelFpYVVXYy1NdktiLUxNLWdoeFdQQWVwdVZqd3d1NmtMU0tGQlJQTC1OY1ZjcjRFOWNqQnA1MlBORTNzZlNpMDg0UUJpV3RZY041dElfbEVLd2FVNEtUZk1zMUNfRUFlSXJ3TmFHSDdFM0Z5c2Q4MDFneW4tVldBMnJON2pFYVlzQkUwcWN1UzBJRHItOUcxWHJ3c1Q3SEwwSFlub3ZrM2FaZFVKNnBXWjg2RFZfeS1kSQ?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/microsoft-lowell-township-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"confirmed","city":"Lordstown","confidence":"medium","id":"compute_atlas-cde739c26874e2df","lat":41.1745,"location_precision":"approximate","lon":-80.8534,"name":"Stargate Lordstown Campus","operator":"OpenAI / SoftBank / Oracle","source_notes":"No capacity is recorded for this site alone: the September 2025 announcement said Lordstown and Milam County together \"can scale to 1.5 gigawatts over the next 18 months,\" and gave no Lordstown-only figure. A SoftBank spokesperson said the initial SoftBank/OpenAI data center uses \"a small part\" of the 6.2M-sq-ft site, which also hosts a Foxconn/SoftBank hub manufacturing modular data-center equipment. Crescent Dune LLC (a SoftBank affiliate) acquired the site from Foxconn for $375M (Sept 2025, Trumbull County Auditor). SoftBank's \"up to $3 billion\" is a ceiling covering both manufacturing and the data center — no data-center-only investment figure is confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","publisher":"OpenAI","retrievedAt":"2026-07-05","url":"https://openai.com/index/five-new-stargate-sites/"},{"kind":"press","label":"Documents Shed Light on Potential Expansion at Foxconn's Lordstown Plant","publisher":"Business Journal Daily","retrievedAt":"2026-07-06","url":"https://businessjournaldaily.com/documents-shed-light-on-potential-expansion-at-foxconns-lordstown-plant/"},{"kind":"press","label":"Ohio committed at least $2.3B in data-center sales-tax breaks","publisher":"Signal Ohio","retrievedAt":"2026-07-06","url":"https://signalohio.org/ohio-committed-at-least-2-3-billion-dollars-in-sales-tax-breaks-for-data-centers/"},{"kind":"press","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","publisher":"SoftBank Group","retrievedAt":"2026-10-16","url":"https://group.softbank/en/news/press/20250924"},{"kind":"other","label":"OpenAI Stargate Lordstown | AI data centers","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stargate-lordstown-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"mixed_use","city":"The Dalles","confidence":"medium","id":"compute_atlas-ce49ba9e1d38ebde","lat":45.5975,"location_precision":"approximate","lon":-121.1776,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/google-the-dalles-or","value":300.0}],"name":"Google The Dalles Data Center Campus","operator":"Google","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"The Dalles, Oregon — Google data centers (Wikipedia)","publisher":"Wikipedia","retrievedAt":"2026-07-05","url":"https://en.wikipedia.org/wiki/The_Dalles,_Oregon#Google_data_centers"},{"kind":"other","label":"Google's water use is soaring in The Dalles, records show","publisher":"WaterWatch of Oregon","retrievedAt":"2026-08-14","url":"https://waterwatch.org/googles-water-use-is-soaring-in-the-dalles-records-show-with-two-more-data-centers-to-come-2/"},{"kind":"other","label":"The Dalles, Oregon — Google Data Center Location (Google's own site page)","publisher":"Google","retrievedAt":"2026-09-05","url":"https://datacenters.google/locations/oregon/"},{"kind":"press","label":"Google touts $1.8 billion investment in Oregon data center","publisher":"NBC16 / The Oregonian","retrievedAt":"2026-10-12","url":"https://nbc16.com/news/local/google-touts-18-billion-investment-in-oregon-data-center"},{"kind":"press","label":"Avangrid Signs Agreement With Google To Power Data Centers","publisher":"Gorge Radio","retrievedAt":"2026-10-12","url":"https://gorgeradio.com/avangrid-sings-agreement-with-google-to-power-data-centers/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/google-the-dalles-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Augusta","confidence":"medium","id":"compute_atlas-ce4f03c31e933192","lat":33.4735,"location_precision":"approximate","lon":-82.0105,"name":"QTS Project Eisenhower","operator":"QTS Data Centers","source_notes":"Project Eisenhower in Augusta, Richmond County — 6 buildings across ~170 acres, $2B+ project. Rezoned 2024-25 with preliminary grading underway. Estimated 300-500 MW (not officially disclosed — omitted from capacity). Coordinates are the Augusta area centroid. The ~$2B figure was stated by the applicant's attorney at a June 2024 zoning hearing (building permits not yet issued) and is recorded as the investment figure. QTS projects ~1,000 construction and ~160-220 permanent jobs (projections), so no job count is recorded. Georgia's high-technology data-center sales-tax exemption and an Augusta EDA bond/PILOT are available programs, but as of July 2026 no confirmed award for this campus was found, so no subsidy is recorded. QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/qts-eisenhower-augusta-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"confirmed","city":"Santa Teresa","confidence":"medium","id":"compute_atlas-ce6d12088485c941","lat":31.8636,"location_precision":"approximate","lon":-106.6895,"name":"Stargate Project Jupiter","operator":"OpenAI / Oracle / STACK Infrastructure","source_notes":"No planned data-center capacity is recorded. A 1,000 MW figure for the site describes generation, not data-center capacity: when the county approved the bonds, developers said the microgrid \"would produce 700 to 900 megawatts of power in its first phase, ranging up to one gigawatt\" (Albuquerque Journal, December 2025). Epoch AI models the campus at 2.2 GW of planned capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"New Mexico's Project Jupiter data center part of larger Stargate AI initiative — El Paso Matters","publisher":"El Paso Matters","retrievedAt":"2026-07-05","url":"https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/"},{"kind":"press","label":"Groups sue to stall data center project in Doña Ana County, New Mexico — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-05","url":"https://www.datacenterdynamics.com/en/news/groups-sue-to-stall-data-center-project-in-do%C3%B1a-ana-county-new-mexico/"},{"kind":"press","label":"Secretive New Mexico Data Center Plan Races Forward Despite Community Pushback","publisher":"Truthout","retrievedAt":"2026-07-06","url":"https://truthout.org/articles/secretive-new-mexico-data-center-plan-races-forward-despite-community-pushback/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"NM Project Jupiter data center developers announce new plans for generating power","publisher":"Source New Mexico","retrievedAt":"2026-08-08","url":"https://sourcenm.com/2026/04/27/nm-project-jupiter-data-center-developers-announce-new-plans-for-generating-power/"},{"kind":"other","label":"OpenAI Stargate: where the US sites stand","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stargate-project-jupiter-dona-ana-nm"}],"state":"New Mexico","status":"under construction"},{"ai_classification":"unknown","city":"Bluffdale","confidence":"high","contains_osm":true,"id":"compute_atlas-cea978ee2c2262e8","lat":40.48568,"location_precision":"approximate","lon":-111.90016,"name":"DataBank Granite Point Campus (SLC2-SLC6)","operator":"DataBank","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. Bluffdale's RDA runs three project areas — Gateway Redevelopment Area and Eastern Bluffdale EDA on the Redwood Road/Bangerter Highway corridor, and Jordan Crossing CRA along the Jordan River near the Utah County border — and DataBank's Granite Point campus on Pony Express Road falls outside all three by street-corridor and section/township/range legal-description cross-reference, not a parcel-level GIS overlay. The Jordan Crossing CRA's own draft plan names four illustrative development sites and none is Granite Point, DataBank, or Pony Express Road; no RDA board minutes or agenda mentions either. DataBank's own marketing blog names only the statewide sales-tax exemption on data-center equipment as an incentive for its Salt Lake-area sites — an entity-level, self-executing state exemption, not a Bluffdale-specific award. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Operating Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"},{"kind":"subsidy","label":"Jordan Crossing Community Reinvestment Project Area — Draft Plan","publisher":"Bluffdale City","retrievedAt":"2026-09-05","url":"https://www.bluffdale.gov/DocumentCenter/View/3522/Jordan-Crossing-CRA-Draft-Plan-PDF"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/databank-granite-point-bluffdale-ut"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/592488661"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714070441"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714072077"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/971762036"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530196328"}],"state":"Utah","status":"operating"},{"ai_classification":"confirmed","city":"Delhi vicinity","confidence":"medium","id":"compute_atlas-cf075f05e3745e51","lat":32.4442,"location_precision":"approximate","lon":-91.4906,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-hyperion-richland-parish-la","value":2000.0}],"name":"Meta Hyperion","operator":"Meta","source_notes":"A second, larger Meta data center development at the same Richland Parish complex is in progress under the internal name 'Project Evest' (Evest LLC, a Meta subsidiary and Laidley affiliate), the subject of a new, not-yet-docketed LPSC certification application (Direct Testimony of Laura K. Beauchamp on behalf of Entergy Louisiana, filed March 2026, public-redacted version). The testimony states Evest 'seeks to develop adjacent to Laidley's data center in Richland Parish, Louisiana, that was the subject of the proceedings in LPSC Docket No. U-37425' (i.e., the already-tracked Hyperion project). To serve Evest, Entergy is seeking certification of seven new 754 MW 1x1 CCCT generators (four near the Richland Parish site, three sited near the existing Big Cajun site in Pointe Coupee Parish) plus battery storage co-located at the Bogalusa West Solar and Cypress Harvest Solar facilities -- on top of the three CCCTs (Franklin Farms 1&2, Waterford 5) already approved for Hyperion itself. Investigative coverage (The Lens, 2026-04-14) puts the combined Hyperion+Evest generation build at 10 new gas plants, 7,000+ MW, and $16B+ in new fossil-fuel infrastructure serving this one customer, and reports the underlying Entergy-Meta commercial agreements are not fully public. As of September 2026, Evest's own docket number and site-specific coordinates were not yet public.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Richland Parish Data Center","publisher":"Meta","retrievedAt":"2026-09-15","url":"https://datacenters.atmeta.com/richland-parish-data-center/"},{"kind":"press","label":"Meta's $10 billion Louisiana data center is getting $3.3 billion in tax breaks","publisher":"Fortune","retrievedAt":"2026-07-06","url":"https://fortune.com/2026/05/14/meta-data-center-tax-break-hyperion-louisiana/"},{"kind":"press","label":"Entergy Louisiana receives LPSC approval for major infrastructure investments to support Meta's data center","publisher":"Entergy","retrievedAt":"2026-08-26","url":"https://www.entergy.com/news/entergy-louisiana-receives-lpsc-approval-for-major-infrastructure-investments-to-support-metas-data-center-and-improve-reliability"},{"kind":"filing","label":"Direct Testimony of Laura K. Beauchamp, Entergy Louisiana (Project Evest), March 2026 — seven additional 754 MW CCCTs and 400 MW of battery storage","publisher":"Louisiana Public Service Commission","retrievedAt":"2026-08-26","url":"https://lpscpubvalence.lpsc.louisiana.gov/portal/PSC/ViewFile?fileId=kt5JixLAYFY%3D"},{"kind":"press","label":"Teachers and Local Businesses Win as Meta Expands Louisiana Data Center","publisher":"Meta","retrievedAt":"2026-09-03","url":"https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/meta-hyperion-richland-parish-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"Owings Mills","confidence":"medium","contains_osm":true,"id":"compute_atlas-cf3ded4b79424dd9","lat":39.4273178,"location_precision":"approximate","lon":-76.8115503,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/expedient-bwi1-owings-mills-md","value":0.8}],"name":"Expedient BWI1 (Owings Mills)","operator":"Expedient","source_notes":"Confirmed via official Expedient directory: 11155 Red Run Blvd, Suite 200, Owings Mills, MD 21117. 800kW critical IT load, 22,000 sq ft. Distinct from the Tidepoint facility in Baltimore city.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/11167641842","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/11167641842"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/expedient-bwi1-owings-mills-md"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-cf679648020803b0","lat":40.104251,"location_precision":"exact","lon":-82.805143,"name":"Compugen New Albany Data Center","operator":"Compugen (owner of record Compugen Real Estate Holdings Inc)","source_notes":"Identified from the county 'data center' land-use class with assessed building area. Single-sourced.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/compugen-new-albany-data-center-oh"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"compute_atlas-cfbdee1bf7e1f04d","lat":45.5472442,"location_precision":"approximate","lon":-122.8910057,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-6-or","value":27.0}],"name":"Flexential Portland - Hillsboro 6","operator":"Flexential","source_notes":"Planned sixth Flexential building in Hillsboro: 350,000 sq ft, two storeys, 27 MW. Coordinates are a street-level approximation of NE Aloclek Place; the exact parcel has not been geocoded. Local reporting places the project inside the City of Hillsboro's 120-day data-center land-use moratorium adopted 27 July 2026. Public-reception check (2026-09-10): Checked the operator's own acquisition press release (2026-09-10); it covers only market positioning, infrastructure advantages, and financial backing. No community reaction, hearing, or official statement of support/opposition documented in this source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-6-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-cfe928977639c2f9","lat":41.1278561,"location_precision":"approximate","lon":-96.145074,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/travelers-data-center-sarpy-ne","value":4.0}],"name":"Travelers Data Center (Project Oasis)","operator":"The Travelers Companies","source_notes":"Enterprise data center for Travelers, code-named Project Oasis and announced September 2013 as a $200 million project. Travelers bought a 140-acre tract and built on a 41-acre parcel, keeping 92 acres for future development. OPPD bought a 5-acre parcel and built an on-site substation. Incentives: Nebraska DED Site and Building Development funds and Customized Job Training funds, plus shared road and sewer costs with Sarpy County. Distinct from Google's Papillion campus (northwest of Highway 50 and Schram Rd) and from Meta's Springfield campus. Coordinates are an OSM building tagged 'Travelers Insurance'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Mystery Company Behind Project Oasis is Travelers Insurance","publisher":"Data Center Knowledge","retrievedAt":"2026-10-12","url":"https://www.datacenterknowledge.com/business/mystery-company-behind-project-oasis-is-travelers-insurance"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/travelers-data-center-sarpy-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"confirmed","city":"Montgomery","confidence":"medium","id":"compute_atlas-cffe23be87568753","lat":32.185,"location_precision":"approximate","lon":-86.273,"name":"Meta Montgomery Data Center","operator":"Meta","source_notes":"Located off I-65 in southern Montgomery County across from Hyundai Motor Manufacturing Alabama (HMMA) plant (Hope Hull area, approximately I-65 Exit 164). The pin (~32.185 N, ~86.273 W) is approximate and does not mark the site, which the governor's announcement places off Interstate 65 \"across from the Hyundai automotive assembly plant\". Originally announced as $800M, expanded September 2025 to $1.5B with 1.3M sq ft footprint. Expected online end of 2026. Meta's 24th global data hub and 20th in the US. Subsidies: no subsidy is recorded for any of the seven Alabama records, not just this one, for a statewide reason. Alabama's Data Processing Center incentive program has no per-company reporting requirement, and neither the state nor its agencies publish which data center operators receive abatements or in what amount. Meta is named as a beneficiary of the sales-tax exemption but no dollar figure attaches to it. This is a disclosure gap, not a GASB 77 audited negative: no municipal ACFR tax-abatement note was obtained, so it does not establish that a particular city has no agreement with a particular operator. Any future subsidy entry for an Alabama site will most likely have to come from a city or county resolution rather than from a state source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Ivey Announces Meta Plans to Build $800 Million Data Center in Montgomery","publisher":"Office of the Governor, Alabama","retrievedAt":"2026-07-06","url":"https://governor.alabama.gov/newsroom/2024/05/governor-ivey-announces-meta-plans-to-build-800-million-next-generation-data-center-in-montgomery/"},{"kind":"press","label":"Meta to expand Montgomery data center, upping local investments to $1.5 billion","publisher":"Alabama Reporter","retrievedAt":"2026-07-06","url":"https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/meta-montgomery-al"}],"state":"Alabama","status":"under construction"},{"ai_classification":"confirmed","city":"Memphis","confidence":"high","id":"compute_atlas-d04fa9281b8c489a","lat":34.997983,"location_precision":"approximate","lon":-90.0348672,"name":"Colossus 2 (Whitehaven)","operator":"xAI","source_notes":"Second, physically separate xAI Memphis site, distinct from the Colossus campus at 3231 Paul R Lowry Road in Boxtown. DCD (2025-03-10) reports xAI affiliate CTC Properties bought three parcels at 5400 Tulane Road in Whitehaven for $80m: an existing 1 million sq ft warehouse plus two adjacent sites totalling 100 acres. The $80m figure is the land purchase price recorded in property records, not total project investment. 5400 Tulane Road (DCD) is the property-record address for the three-parcel, 100-acre assemblage; 5420 Tulane Road (Wikipedia) is the warehouse building itself. No operational capacity is recorded. An S-1 filing describes the first cluster as \"approximately 110,000 GB200 processors, approximately 210 megawatts of compute power\", as quoted by Epoch AI; the figure is stated as approximate, the filing does not define the term, and Epoch AI says it believes \"compute power\" corresponds to GPU server power. Larger figures are stated intentions, not recorded capacity: Memphis Light Gas and Water was asked for a system-impact study for up to 260 MW, xAI's Brent Mayo said the site could host up to 350,000 GPUs, and the widely quoted 1 GW and 2 GW figures are unconfirmed. The gas-turbine power plant reported to serve this site is on Stanton Road in Southaven, Mississippi, and, as of October 2026, is tracked separately as Colossus 2 power station. The pin is the centroid of the OpenStreetMap building tagged \"xAI Macrohard Colossus 2\" (operator xAI, 5420 Tulane Road). It is a crowd-sourced footprint, not a parcel-confirmed point, so its precision is approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Colossus 2 | AI data centers","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/data/ai-data-centers/directory/colossus-2"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/xai-colossus-2-memphis-tn"},{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/colossus-2-epoch"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Davenport","confidence":"medium","id":"compute_atlas-d05124d246e8935e","lat":41.5477099,"location_precision":"exact","lon":-90.620859,"name":"South Front Networks IA-Davenport Interconnection Facility","operator":"South Front Networks","source_notes":"Carrier-neutral 'carrier motel' and interconnection facility serving eastern Iowa and the Quad Cities; the operator publishes no square footage or power rating for the site. Small interconnection facility rather than a compute campus — recorded for completeness of the Iowa colocation footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"South Front Networks Points of Presence — IA-Davenport, 2814 N Clark St, Davenport IA 52804","publisher":"South Front Networks","retrievedAt":"2026-09-04","url":"https://southfront.io/pop"},{"kind":"other","label":"South Front Networks — carrier-neutral middle-mile and interconnection, Upper Midwest","publisher":"South Front Networks","retrievedAt":"2026-09-12","url":"https://southfront.io/"}],"updated":"2026-09-04","url":"https://www.compute-atlas.com/facilities/south-front-networks-davenport-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"mixed_use","city":"Tulsa","confidence":"medium","id":"compute_atlas-d0cc8d0a102a4348","lat":36.154,"location_precision":"approximate","lon":-95.9928,"name":"TulsaConnect Downtown (DC-5)","operator":"TulsaConnect","source_notes":"No street address published on the operator's overview page, so location is a Tulsa centroid approximation only. Distinct from DC-3 in east Tulsa.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/tulsaconnect-downtown-dc5-tulsa-ok"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/tulsaconnect-east-dc3-tulsa-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Wolcott","confidence":"medium","id":"compute_atlas-d10856220214f225","lat":40.7581,"location_precision":"approximate","lon":-87.0281,"name":"Wolcott Data Center","operator":"Blue Ladder Development","source_notes":"Campus south of U.S. Highway 24 next to N 1100 W in Mid-America Commerce Park: four data center buildings of 327,612 sq ft each, plus a 50,000 sq ft office, a 100,000 sq ft warehouse and two substations. The developer states it seeks no incentives, abatements or subsidies and pays for its own electric infrastructure; full build-out is projected for 2029.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"White County data center plans move forward with community open house","publisher":"InkFreeNews via AOL","retrievedAt":"2026-09-01","url":"https://www.aol.com/articles/white-county-data-center-plans-183828000.html"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/blue-ladder-wolcott-white-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"likely","city":"Waukee","confidence":"medium","id":"compute_atlas-d11d6dfdf34d7608","lat":41.6193799,"location_precision":"approximate","lon":-93.9258365,"name":"Apple Waukee Data Center","operator":"Apple","source_notes":"Apple data center near the intersection of Hickman Rd and S Avenue, Waukee, Dallas County — announced by Tim Cook in 2017; first building became operational in October 2024 on a 2,000-acre site, a $1.3B investment (AppleInsider). Apple's Feb 2025 newsroom names Iowa among states for continued data-center capacity expansion. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode; a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Seven years on, Iowa's Apple data center finally opens — $1.3B, 2,000 acres, first building operational Oct 2024, announced 2017","publisher":"AppleInsider","retrievedAt":"2026-07-19","url":"https://appleinsider.com/articles/24/10/16/seven-years-on-iowas-apple-data-center-finally-opens"},{"kind":"press","label":"Apple $500B U.S. investment release — names Iowa among states for continued data-center capacity expansion","publisher":"Apple Newsroom","retrievedAt":"2026-07-19","url":"https://www.apple.com/newsroom/2025/02/apple-will-spend-more-than-500-billion-usd-in-the-us-over-the-next-four-years/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Apple's next US data center will be built in Iowa (Apple Newsroom)","publisher":"Apple Newsroom","retrievedAt":"2026-08-14","url":"https://www.apple.com/newsroom/2017/08/apples-next-us-data-center-will-be-built-in-iowa/"},{"kind":"press","label":"Growth of data centers in Iowa","publisher":"Business Record","retrievedAt":"2026-09-16","url":"https://www.businessrecord.com/growth-of-data-centers-in-iowa/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/apple-waukee-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Allen Township","confidence":"medium","id":"compute_atlas-d122d6b69ccd2493","lat":40.7017264,"location_precision":"approximate","lon":-75.4801064,"name":"Prologis Allen Township Data Center (2500 Liberty Drive)","operator":"Prologis","source_notes":"Retrofit of an existing 1 million sq ft Prologis warehouse at 2500 Liberty Drive, about half a mile east of the Northampton borough line. The Lehigh Valley Planning Commission's comprehensive planning committee asked the developer for more information on operations, water and electricity use, cooling systems and emergency response plans before the full commission vote in April 2026. Coordinate is an OSM address geocode.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Allen Township warehouse could become Lehigh Valley's first hyperscale data center","publisher":"Lehigh Valley Public Media","retrievedAt":"2026-09-12","url":"https://www.lehighvalleypublicmedia.org/news/local/allen-township-warehouse-could-become-lehigh-valleys-first-hyperscale-data-center/"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/prologis-allen-township-northampton-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"confirmed","city":"Chicago","confidence":"medium","id":"compute_atlas-d15bd372b6cc02ed","lat":41.846546,"location_precision":"approximate","lon":-87.6254598,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/hydravault-chicago-il","value":20.0}],"name":"HydraVault Chicago","operator":"HydraVault","source_notes":"Purpose-built for AI training/inference and low-latency trading, at densities up to 200kW per rack. Subsidy value is the state's estimated tax benefit on a $270,000,000 investment commitment. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (HydraVault LLC, Chicago, 2025 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/hydravault-chicago-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Altoona","confidence":"medium","id":"compute_atlas-d193a316005b07e3","lat":41.6433,"location_precision":"approximate","lon":-93.4627,"name":"LightEdge Altoona Data Center Campus","operator":"LightEdge Solutions","source_notes":"Two-building purpose-built colocation campus on Northridge Circle, Altoona (Des Moines metro): 1435 Northridge Circle and 1401 Northridge Circle, both confirmed on LightEdge's own site. Owns/operates the buildings, not a tenancy. An MW or exact sq-ft figure could not be confirmed on any page read directly (the LightEdge page references 'critical IT capacity'/'total square feet' fields without rendering values, and a linked PDF spec sheet exceeded fetchable size). Third-party listings (not independently confirmed) cite ~73,000 SF total and N+1 cooling redundancy; no capacity is recorded rather than guessing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Des Moines, IA Colocation Data Centers | Lightedge","publisher":"LightEdge Solutions","retrievedAt":"2026-08-08","url":"https://lightedge.com/data-centers/des-moines-data-center/"}],"updated":"2026-08-08","url":"https://www.compute-atlas.com/facilities/lightedge-solutions-altoona-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Mona","confidence":"medium","id":"compute_atlas-d1aa1eb936e2fd51","lat":39.8605,"location_precision":"approximate","lon":-111.909,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/setsquare-nebo-north-mona-juab-county-ut","value":750.0}],"name":"Nebo North Data Center Campus (Project Nebo)","operator":"SetSquare Capital Group (Nebo North LLC)","source_notes":"Up to 10 single-story buildings of about 300,000 sq ft each (about 3M sq ft) on about 361 acres of agricultural land off Goshen Road, near the town of Mona. The CUP covers Sections 13 and 14, T11S R1W. The coordinates are approximated from those PLSS sections and are not parcel-confirmed. SetSquare co-founder Jonathan Vanica is quoted by Deseret News.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Notice of Public Hearing: Nebo North LLC Conditional Use Permit","publisher":"Juab County","retrievedAt":"2026-10-13","url":"https://juabcounty.gov/notice-of-public-hearing-nebo-north-llc-conditional-use-permit/"},{"kind":"press","label":"Mona residents against data center","publisher":"ABC4","retrievedAt":"2026-10-13","url":"https://www.abc4.com/news/central-utah/mona-residents-against-data-center/amp/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/setsquare-nebo-north-mona-juab-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-d234e2c18278025f","lat":37.3832941,"location_precision":"approximate","lon":-121.9624766,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://edgecore.com/locations/silicon-valley-data-center","value":72.0}],"name":"EdgeCore Silicon Valley Campus (Laurelwood Data Center)","operator":"EdgeCore Digital Infrastructure","source_notes":"Two data center buildings totalling over 540,000 sq ft. The CEQA filing gives the site as 13 acres between Juliette Lane and Laurelwood Road; the operator's page says 12 acres — neither is recorded as the land area because the two sourced figures disagree.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Silicon Valley Data Centers — EdgeCore","publisher":"EdgeCore Digital Infrastructure","retrievedAt":"2026-09-14","url":"https://edgecore.com/locations/silicon-valley-data-center"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/edgecore-silicon-valley-santa-clara-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Reston","confidence":"high","contains_osm":true,"id":"compute_atlas-d245e34bf19f5d72","lat":38.9484941,"location_precision":"exact","lon":-77.3273071,"name":"Digital Realty VA3","operator":"Digital Realty","source_notes":"780/1780 Business Center Drive, Reston VA 20190. Listed on official NoVA directory table.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/northern-virginia/va3"},{"kind":"osm","label":"OpenStreetMap way/79158387","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/79158387"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-va3-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/79158387"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1568619392"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Boardman","confidence":"medium","contains_osm":true,"id":"compute_atlas-d258e9625987466e","lat":45.8408,"location_precision":"approximate","lon":-119.654,"name":"AWS Boardman — Rippee Road Campus (PDX4)","operator":"Amazon Web Services","source_notes":"AWS campus on Rippee Road south of the Port of Morrow industrial park: OSM maps six AWS data-center buildings (refs PDX4, PDX52, PDX55, PDX58/61 and two unlabelled) at 78531–79539 Rippee Road, owner Vadata Inc. IT capacity not published. Coordinates are the centroid of the mapped buildings. Distinct from the Lewis and Clark Drive campuses ~2 km northeast and from the proposed Threemile 'Exascale' record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 460070144 — Amazon Web Services data center 'PDX4', 79539 Rippee Road, Boardman (owner Vadata Inc)","publisher":"OpenStreetMap","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/460070144"},{"kind":"osm","label":"OSM way 592171280 — Amazon Web Services data center 'PDX52', 79536 Rippee Road, Boardman","publisher":"OpenStreetMap","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/592171280"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-boardman-rippee-road-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"confirmed","city":"Rincon","confidence":"medium","id":"compute_atlas-d2be7869813f6a81","lat":32.296,"location_precision":"approximate","lon":-81.2354,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/openai-project-camellia-effingham-ga","value":3200.0}],"name":"Project Camellia (OpenAI Effingham County Campus)","operator":"OpenAI","source_notes":"Four data center buildings on roughly 1,400 acres inside the 2,600-acre Savannah Gateway Industrial Hub near Rincon. Effingham County values the project at $20B; OpenAI's VP of Compute Strategy has said full build-out will exceed $30B. Permanent staffing is described as ~400 at the 2028 opening rising to about 1,000 by 2032. Part of OpenAI's Stargate program.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$20 billion OpenAI data center to open in Effingham County","publisher":"The Current","retrievedAt":"2026-09-10","url":"https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/"},{"kind":"press","label":"As Effingham County data center plan advances, next step is state evaluation process","publisher":"The Current","retrievedAt":"2026-08-28","url":"https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/"},{"kind":"press","label":"OpenAI plans to build its own 3.2 GW data center campus in Georgia","publisher":"W.Media","retrievedAt":"2026-08-28","url":"https://w.media/openai-plans-to-build-its-own-3-2-gw-data-center-campus-in-georgia/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/openai-project-camellia-effingham-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Sparks","confidence":"medium","id":"compute_atlas-d2df012a34e84632","lat":39.563085,"location_precision":"approximate","lon":-119.554805,"name":"Apple Reno Data Center (Reno Technology Park)","operator":"Apple","source_notes":"Apple data center at 21505 Reno Technology Parkway W, Sparks, Washoe County — the first data center built at the Reno Technology Park, opened December 2012. Per Apple's July 2024 letter in a Nevada GOED tax-abatement board packet, the campus had grown to four data-center buildings plus a power substation across 1,700 acres, with 200+ staff; Apple committed to further investment (a 2024 expansion capex of ~$742M over 5 years / ~$992M over 10 years is documented in the GOED filing). No site-specific IT-load MW is disclosed. Coordinates are an address-level geocode (ArcGIS, exact-address match); a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Apple Inc. Board Packet (Data Center Sales & Use Tax Abatement), July 2024 — Apple's own letter: opened Dec 2012, four buildings + substation across 1,700 acres, 200+ staff","publisher":"Nevada Governor's Office of Economic Development","retrievedAt":"2026-07-19","url":"https://goed.nv.gov/wp-content/uploads/2024/07/7-B.-Apple-Inc.-Board-Packet.pdf"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Nevadans get few details into data centers receiving tax breaks — and it might be illegal","publisher":"The Nevada Independent","retrievedAt":"2026-08-14","url":"https://thenevadaindependent.com/article/nevadans-get-few-details-into-data-centers-receiving-tax-breaks-and-it-might-be-illegal"},{"kind":"other","label":"Northern Nevada data center directory (Apple Sparks campus, 21905 Reno Technology Pkwy E)","publisher":"goDataCenters","retrievedAt":"2026-09-24","url":"https://www.godatacenters.com/data-centers/nevada/reno"}],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/apple-reno-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-d2f66751c08b08f0","lat":36.303,"location_precision":"approximate","lon":-119.953,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-nas-lemoore-ca","value":100.0}],"name":"CyrusOne AI Data Center at NAS Lemoore","operator":"CyrusOne","source_notes":"Located at Naval Air Station Lemoore on the Kings/Fresno county border. Ameresco leads energy infrastructure via its Intelliscale platform; CyrusOne operates the data center for federal and defense AI workloads (FedRAMP, FISMA High, DoD IL5/IL6). Land leased from DOD. Announced September 9, 2025; first phase expected online 2027. Coordinates approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Ameresco and U.S. Navy Partner to Build AI-Optimized Data Center and Energy Infrastructure at NAS Lemoore","publisher":"Ameresco, Inc.","retrievedAt":"2026-07-06","url":"https://ir.ameresco.com/news-events/press-releases/detail/715/ameresco-and-u-s-navy-partner-to-build-ai-optimized-data"},{"kind":"press","label":"Ameresco Partners with CyrusOne to Develop Offgrid AI Data Center at Naval Air Station Lemoore in California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/ameresco-partners-with-cyrusone-to-develop-offgrid-ai-data-center-at-naval-air-station-lemoore-in-california/"},{"kind":"other","label":"Groundbreaking for NAS Lemoore data center & energy project","publisher":"Hanford Sentinel","retrievedAt":"2026-07-06","url":"https://hanfordsentinel.com/business/groundbreaking-for-big-nas-lemoore-data-center-and-energy-project-near-john-lindt/article_716c1006-1e5f-46cc-b4e9-eec31a7ee526.html"},{"kind":"other","label":"Gilcrease calls for dialogue over data center","publisher":"Hanford Sentinel","retrievedAt":"2026-07-06","url":"https://hanfordsentinel.com/business/agriculture/gilcrease-calls-for-dialogue-over-data-center-john-lindt/article_6a2df66b-4581-4589-9d21-7208d166f35a.html"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/cyrusone-nas-lemoore-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Columbia","confidence":"high","contains_osm":true,"id":"compute_atlas-d32118c8c9b71e35","lat":33.9873119,"location_precision":"exact","lon":-81.0308106,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dartpoints-columbia-sc","value":2.0}],"name":"DartPoints Columbia Data Center (CAE01)","operator":"DartPoints","source_notes":"Colocation facility in the SCRA Innovation Center: 15,000 sq ft raised floor, 8,200 sq ft data hall, 10 on-site network providers. Operator states 2 MW utility power with 110 kW critical IT load; the operational capacity records the 2 MW utility figure. Coordinates and address are from the OSM node carrying the operator's own site reference (CAE01).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"DartPoints — Columbia, SC (CAE01) data center","publisher":"DartPoints","retrievedAt":"2026-09-22","url":"https://dartpoints.com/locations/cae01-columbia-sc/"},{"kind":"osm","label":"OpenStreetMap node 12120745596 — DartPoints Columbia (telecom=data_center)","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-22","url":"https://www.openstreetmap.org/node/12120745596"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/dartpoints-columbia-sc"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12120745596"}],"state":"South Carolina","status":"operating"},{"ai_classification":"unknown","city":"Minneapolis","confidence":"medium","contains_osm":true,"id":"compute_atlas-d3c7362ab9cdef0d","lat":44.9906553,"location_precision":"exact","lon":-93.2766429,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/legacy-investing-north-loop-minneapolis-mn","value":20.0}],"name":"Legacy Investing North Loop (former Star Tribune printing plant)","operator":"Legacy Investing","source_notes":"CBS reports \"approximately 566,000 square feet\" on 13 acres with \"20 megawatts\" of capacity; FOX 9 puts the building at \"nearly 600,000 square feet\". The Star Tribune vacated the Heritage printing facility in December 2025. Minneapolis adopted a moratorium on data centers over 350,000 sq ft; the city's preliminary zoning recommendations would require a conditional use permit and confine new data centers to the DT1/DT2 districts in existing buildings.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-18","url":"https://www.compute-atlas.com/facilities/legacy-investing-north-loop-minneapolis-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Norristown","confidence":"high","contains_osm":true,"id":"compute_atlas-d3dca26775ad4051","lat":40.1218812,"location_precision":"exact","lon":-75.4208776,"name":"TierPoint Valley Forge","operator":"TierPoint","source_notes":"Address confirmed: 1000 Adams Ave, Norristown, PA — matches TierPoint's own Pennsylvania directory listing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1109881281","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1109881281"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-valley-forge-pa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1109881281"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-valley-forge-osmway-1109881281"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1109881281"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"South Charleston","confidence":"medium","contains_osm":true,"id":"compute_atlas-d40d68a8c8e2fd1f","lat":38.368429,"location_precision":"approximate","lon":-81.69957,"name":"Continent 8 West Virginia DC1","operator":"Continent 8 Technologies","source_notes":"Continent 8's first US site (2018), providing managed hosting, managed network and cybersecurity to regulated iGaming operators; PCI DSS compliant. No street address, square footage or MW figure is published. Pin is the city centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/continent-8-west-virginia-dc1-south-charleston-wv"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Yeehaw Junction","confidence":"medium","id":"compute_atlas-d414928632364e3e","lat":27.69944,"location_precision":"approximate","lon":-80.88694,"name":"US Development Yeehaw Junction Data Center Campus","operator":"US Development (end tenant undisclosed)","source_notes":"US Development sought a pre-application meeting with Osceola County planning (held Oct. 15, 2024) to discuss rezoning 434 acres in rural Yeehaw Junction from agricultural to industrial for nine three-story data center buildings (675,000 sq ft each, >7M sq ft total), a 15-acre on-site substation, and on-site water/wastewater treatment, with FPL as the named electrical provider. Land is owned by Yeehaw Ranch LLC and Patricia and Clyde Luke; over 100 acres were already industrial-zoned from a prior warehouse rezoning. No end-user/tenant has been named and, per subsequent 2025 reporting, no rezoning application had actually been filed as of mid-2025 -- this remains a pre-application-stage proposal, not yet a filed case. No megawatt, investment, or job figures were stated in the source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/yeehaw-junction-us-development-osceola-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"confirmed","city":"Homer City","confidence":"high","id":"compute_atlas-d416a7ba5472f11d","lat":40.5383,"location_precision":"approximate","lon":-79.1542,"name":"Homer City Energy Campus","operator":"Homer City Redevelopment","source_notes":"EPC contractor: Kiewit. The 4.5 GW figure describes the on-site power plant, not the data center's IT load, which, as of October 2026, the developers have not disclosed. Utility Dive (April 2025) reports, citing the developers, a \"$10 billion\" cost for the generating project.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"In Western Pennsylvania, a former coal town gets a gas-fired data center — The Allegheny Front","publisher":"The Allegheny Front","retrievedAt":"2026-08-16","url":"https://www.alleghenyfront.org/homer-city-pennsylvania-gas-plant-data-center-ai/"},{"kind":"press","label":"Homer City power plant to boost grid as data-center demand rises — Axios Pittsburgh","publisher":"Axios","retrievedAt":"2026-07-05","url":"https://www.axios.com/local/pittsburgh/2026/03/31/homer-city-power-plant-grid-data-centers-pennsylvania"},{"kind":"press","label":"Homer City and Kiewit unveil plans for 4.5GW natural gas powered AI data center in Pennsylvania","publisher":"DataCenterDynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/homer-city-energy-campus-pa"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/homer-city-and-kiewit-unveil-plans-for-45gw-natural-gas-powered-ai-data-center-in-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/homer-city-energy-campus-pa-pg"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Westover","confidence":"medium","id":"compute_atlas-d467b82920063e81","lat":33.3596201,"location_precision":"approximate","lon":-86.5102435,"name":"Swift Willow Westover Data Center Campus","operator":"Swift Willow Property, LLC","source_notes":"City records show discussions began in May 2024; the City Council rezoned the roughly 437-acre tract from Highway Commercial/Employment Center-Office/Rural Residential to Employment Center-Industrial on February 4, 2025, the Planning Commission added \"Data Center\" as a permitted use in that district on April 28, 2025, and Swift Willow Property, LLC took title from Westervelt Realty in June 2025 for $6,565,238.57. Principals named in records include Gregory DeBacker and Hugh Williamson, with Swift Data Development (petitioner Jeremy Wolf) as a related entity. Developers described the site as more than 450 acres along Highway 280 and projected 500 to 1,000 construction jobs and up to 200 permanent jobs; those are ranges, not point estimates, so no jobs figures are recorded here. No MW or investment figure has been disclosed. Coordinate is a Cheshire Drive road anchor in Westover, not a surveyed parcel centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How did Westover's proposed data center get here? Records show the timeline","publisher":"ABC 33/40","retrievedAt":"2026-09-15","url":"https://abc3340.com/news/abc-3340-news-iteam/how-did-westovers-proposed-data-center-get-here-records-show-the-timeline"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/swift-willow-westover-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","contains_osm":true,"id":"compute_atlas-d4cd54e183c4c77f","lat":37.4027449,"location_precision":"approximate","lon":-121.891051,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-svy01-ca","value":100.0}],"name":"STACK SVY01","operator":"STACK Infrastructure","source_notes":"SVY01 is STACK's 100MW, 4-building San Jose campus (buildings SVY01A-D on/near Fortune Drive & Ringwood Ave), actively expanding with a 60MW phase (DCD, 2024). Kept as canonical entry for this campus; the other 3 San Jose OSM nodes below are likely other buildings/map nodes on the same campus and are treated as duplicates absent per-building address confirmation.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/8238715059","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/8238715059"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/stack-svy01-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CPUC Resolution E-5447: PG&E EPC agreement (AL 7653-E) supporting energization of STACK Infrastructure's new 90 MW data center load in San Jose","publisher":"California Public Utilities Commission","retrievedAt":"2026-09-21","url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M598/K895/598895478.PDF"},{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-10-19","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"filing","label":"CPUC Resolution E-5447 – PG&E EPC Agreement with STACK Infrastructure (Ringwood Switching Station)","publisher":"California Public Utilities Commission","retrievedAt":"2026-10-19","url":"https://docs.cpuc.ca.gov/PublishedDocs/Published/G000/M603/K293/603293409.PDF"}],"updated":"2026-10-19","url":"https://www.compute-atlas.com/facilities/stack-trade-zone-park-san-jose-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Peoria","confidence":"medium","id":"compute_atlas-d4fb4ed57be047de","lat":33.5594634,"location_precision":"approximate","lon":-112.2201382,"name":"Aligned Data Centers Peoria Campus","operator":"Aligned Data Centers","source_notes":"Site at 75th Avenue and Butler Drive inside an existing Peoria industrial park whose zoning already permits data center use. Coordinate derived from the OSM geometries of the two named roads; treat as an approximate intersection pin, not a parcel.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/aligned-peoria-campus-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"likely","city":"Canton","confidence":"medium","id":"compute_atlas-d51caa436e02d5c6","lat":40.7517,"location_precision":"approximate","lon":-81.4,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/amazon-perry-township-stark-oh","value":240.0}],"name":"Amazon Perry Township Data Center","operator":"Amazon Web Services","source_notes":"240 MW hyperscale campus on ~105 acres at Faircrest St SW & Kropf Ave SW, Perry Township (Canton). Panattoni bought the land Feb 2025 (Clayco GC); excavation underway; two 220,000 sq ft + two 154,000 sq ft buildings targeted for ~April 2028. Amazon was confirmed as the end-user by the Stark County commission president and Canton's mayor to the Canton Repository after Panattoni initially withheld the tenant. Perry Township approved a 30-year, 75% property-tax abatement in March 2026. Coordinates approximate (township-level). Developer: Panattoni Development Co.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Open house sheds light on incoming user (cites Canton Repository confirmation of Amazon as end-user)","publisher":"Bluewater Healthy Living","retrievedAt":"2026-08-05","url":"https://bluewaterhealthyliving.com/news/national-news/ohio/open-house-for-perry-township-data-center-sheds-light-on-incoming-user/"}],"updated":"2026-08-05","url":"https://www.compute-atlas.com/facilities/amazon-perry-township-stark-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Sacramento","confidence":"medium","contains_osm":true,"id":"compute_atlas-d5685c2a60e3b98f","lat":38.6442393,"location_precision":"exact","lon":-121.4987627,"name":"NTT Sacramento CA3 Data Center","operator":"NTT Global Data Centers","source_notes":"180,000 sqft building on the integrated NTT Sacramento campus alongside CA1/CA2. Previously operated under NTT's legacy US brand, RagingWire (now retired).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","retrievedAt":"2026-07-22","url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers"},{"kind":"osm","label":"OpenStreetMap way/190868312","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/190868312"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca3-data-center-ca"}],"state":"California","status":"operating"},{"ai_classification":"confirmed","city":"Memphis","confidence":"medium","id":"compute_atlas-d5885f2ce8e2163b","lat":35.0565,"location_precision":"approximate","lon":-90.0148,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/xai-colossus-memphis-tn","value":1200.0}],"name":"Colossus","operator":"xAI","source_notes":"xAI did not obtain a PILOT or any other formally granted incentive for the Memphis site, unlike the usual Memphis path, so no subsidy is recorded, as a known absence rather than an unknown; the site is instead expected to pay more than $30 million in combined Memphis and Shelby County property taxes. A federal Clean Air Act suit filed 2026-04-14 (NAACP v. X.AI Corp. and MZX Tech LLC, No. 3:26-cv-00074, N.D. Miss.) targets xAI's separate 'Colossus Gas Plant' in Southaven, Mississippi (MZX Tech LLC, 2875 Stanton Road South), not this site or CTC Property LLC; it cites this site's turbine history only as background. Permit-level detail for this site's turbines, including that the permit covers 15 turbines on a permanent basis, is in the companion record CTC Property Gas Turbine Plant (Colossus 1).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Here's what xAI will pay in property taxes","publisher":"Daily Memphian","retrievedAt":"2026-09-09","url":"https://dailymemphian.com/subscriber/article/51159/heres-what-xai-will-pay-in-property-taxes"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/xai-colossus-memphis-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Marshall","confidence":"medium","id":"compute_atlas-d58ff29b1b1ecbe9","lat":42.276,"location_precision":"approximate","lon":-84.955,"name":"Alterra Marshall Technology & Energy Center","operator":"Alterra Development","source_notes":"Proposed data center (Marshall Technology & Energy Center, MTEC) plus a co-located natural-gas electric generation facility within Brooks Industrial Park, Marshall. WWMT (2026-04) resolves the load split that earlier reporting left open: up to 1,400 MW required at full buildout, around 1,000 MW of that from on-site gas turbines and up to 400 MW imported from the grid at peak; the 1 GW plant is carried both in the on-site generation figure and as its own power-generation record. ~270 acres (112 buildable), roughly half wetlands. Alterra (Toronto-based) estimates 300-500 direct high-skill jobs. Mayor Wolfersberger (2026-01) called it \"just a concept\" with \"no site plans or utility agreements yet\"; due diligence runs into Q3 2026, then construction is \"probably 18 months to two years away\" if approved. Land is already zoned heavy industrial, so no public referendum is required (unlike Augusta Township). Planned closed-loop liquid cooling. Coordinates are an approximate Marshall-area estimate, not parcel-geocoded; the LDFA purchase price ($1.12M) is for land only, not a project investment figure. In August 2026 the Marshall mayor said Alterra had decided not to build the gas plant, cutting the project's energy use by 60%, and called it \"more of an enterprise-class data center now\" (WWMT). Planned capacity is left unfilled: the source's ceiling ('up to 1,400 megawatts') describes the initial concept with the gas plant, and as of October 2026 none of the cited sources states a revised figure. Jobs are left unfilled rather than normalized: the source gives a range ('300 to 500 skilled jobs') that does not distinguish construction from permanent. The $1.12M is the land purchase price, not project investment.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center being proposed in Marshall begins 'due-diligence' period with city","publisher":"Ad-Visor & Chronicle (Marshall Advisor)","retrievedAt":"2026-08-08","url":"https://marshalladvisor.com/articles/news/data-center-being-proposed-in-marshall-begins-due-dilligence-period-with-city/"},{"kind":"press","label":"Marshall mayor answers questions on the data center proposal — names the Marshall Technology and Energy Center","publisher":"ARC West Michigan","retrievedAt":"2026-08-08","url":"https://arcwestmichigan.com/news/local/marshall-data-center-proposal-stuart-lake-brooks-nature-area-gas-generation-plant-energy-scott-wolfersberger-calhoun-county-west-michigan"},{"kind":"press","label":"Data center, gas generation plant proposed in Marshall","publisher":"WWMT Newschannel 3","retrievedAt":"2026-09-09","url":"https://wwmt.com/news/local/story/data-center-gas-generation-plant-proposed-in-marshall-alterra-development-calhoun-county-energy-electricity-water"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/alterra-development-marshall-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"confirmed","city":"Madison","confidence":"medium","id":"compute_atlas-d5da5dade10a07e2","lat":36.3801,"location_precision":"approximate","lon":-79.9692,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/whitefiber-nc1-madison-nc","value":200.0}],"name":"WhiteFiber NC-1 AI Data Center Campus","operator":"WhiteFiber (Bit Digital)","source_notes":"Operator is WhiteFiber (Bit Digital's AI unit); Nscale is the 40 MW anchor tenant (10-year, ~$865M total contract value = revenue, not capex). ~1M sq ft, up to 150 kW/cabinet, 99 MW secured from Duke Energy, 200 MW eventual site potential (planned figure). As of October 2026, no operational IT capacity is recorded: WhiteFiber's NC-1 page (last updated May 2026) cites 24MW of power expected online in Q4 2025, a power-supply figure rather than IT capacity, and its second-quarter 2026 results state 40 megawatts of contracted IT load and that initial capacity has been delivered, but give no figure for IT capacity in operation. $150M WhiteFiber equity. Madison is in Rockingham County, NC. Coordinates are the Madison town centroid. Property acquired for $45M (2025, from Unifi); the total buildout described as 'over $1B' is conditional on reaching 200 MW -> no investment figure is recorded. WFDD (June 2025) reports that the planned investment of more than $1 billion is \"estimated to generate some 60 jobs with an average salary of $67,000\". Cooling type not publicly disclosed -> no water details are recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Nscale agrees $865m deal for 40MW of space at WhiteFiber data center in North Carolina","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/nscale-agrees-865m-deal-for-40mw-of-space-at-whitefiber-data-center-in-north-carolina/"},{"kind":"press","label":"WhiteFiber (Bit Digital's AI unit) acquires North Carolina property; confirmed qualifying data center","publisher":"Bit Digital","retrievedAt":"2026-07-08","url":"https://bit-digital.com/press-releases/whitefiber-inc-bit-digitals-ai-unit-acquires-1000000-square-foot-north-carolina-industrial-property-to-support-up-to-200-mw-hpc-data-center-campus/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/whitefiber-nc1-madison-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-d62fbec5420426b1","lat":38.6320976,"location_precision":"approximate","lon":-77.4218513,"name":"Mid-County Industrial Park Data Center Campus","operator":"Minnieville Capital Acquisitions","source_notes":"Three data center buildings and an electric substation, about 250 feet northwest of the Dumfries Road (Route 234) and Minnieville Road intersection, with buildings nearest Route 234 capped at 75 feet. Press has linked a Minnieville-tied buyer to an Amazon P.O. box, but end-user identity is not confirmed. The coordinates are an approximate point on Dumfries Road at Independent Hill, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prince William supervisors approve contentious Mid-County Industrial Park data center project","publisher":"InsideNoVa","retrievedAt":"2026-10-14","url":"https://www.insidenova.com/headlines/prince-william-supervisors-approve-contentious-mid-county-industrial-park-data-center-project/article_041857e0-98ca-5344-9397-67329e70a394.html"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/minnieville-mid-county-industrial-park-prince-william-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Charlotte","confidence":"high","contains_osm":true,"id":"compute_atlas-d6368f72426230be","lat":35.329773,"location_precision":"exact","lon":-80.7657588,"name":"Flexential Charlotte - North (CLT04/05)","operator":"Flexential","source_notes":"Address 10105 David Taylor Dr, Charlotte, NC 28262. Distinct from PowerHouse Charlotte Campus (different operator).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Flexential official facility page (corroborated by DataCenterJournal CLT04/05 listing)","publisher":"Flexential","retrievedAt":"2026-07-22","url":"https://www.flexential.com/data-centers/nc/charlotte/north-data-center"},{"kind":"osm","label":"OpenStreetMap way/1307920829","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1307920829"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-charlotte-north-clt04-05-nc"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1307920829"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-charlotte-north-osmway-1307920829"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1307920829"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Solon Township","confidence":"medium","contains_osm":true,"id":"compute_atlas-d641fc77afe4a17e","lat":43.2612958,"location_precision":"approximate","lon":-85.6119334,"name":"Solon Township Data Center (16-17 Mile Road, US-131)","operator":"Undisclosed technology company (site search via The Right Place)","source_notes":"No official proposal had been submitted to Solon Township as of the cited reporting, and the end user is not named. Filed as rumored. Distinct from the tracked Microsoft sites in Gaines, Lowell and Dorr townships — Solon is north of Grand Rapids and the company has not been identified.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-14","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/solon-township-data-center-kent-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"mixed_use","city":"Honolulu","confidence":"medium","id":"compute_atlas-d65ddbb9688a63a8","lat":21.29868,"location_precision":"approximate","lon":-157.81681,"name":"University of Hawaiʻi Information Technology Center Data Center","operator":"University of Hawaiʻi (Information Technology Services)","source_notes":"An 8,000 sq ft data center with Tier II redundancy, backup batteries and generator, inside the six-story, 74,000 sq ft, LEED Gold IT Center on the UH Mānoa campus. The building is hardened against Category III hurricane winds. UH offers colocation there at $3,700 per cabinet per year. Under a 2016 agreement, it also houses part of the State of Hawaiʻi's executive-branch IT systems moved from the aging Kalanimoku Building data center, with ETS reimbursing UH's costs. It hosts UH's Mana HPC cluster, which as of 2022 had 8,964 cores and 120 GPUs that the source calls critical for machine-learning and AI research; about $4.5M had been invested in the cluster since 2014. That cluster figure is not a facility investment, so no investment figure is recorded. The AI classification is mixed-use: AI/ML work on the GPU cluster is one named use alongside enterprise university and state systems. No MW figure was published. Coordinates are the Census geocode of 2520 Correa Rd.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"UH Information Technology Center to house portion of state's IT systems","publisher":"University of Hawaiʻi News","retrievedAt":"2026-10-02","url":"https://www.hawaii.edu/news/2016/03/15/uh-information-technology-center-to-house-portion-of-states-it-systems/"},{"kind":"press","label":"University of Hawaii celebrates supercomputer milestone","publisher":"Hawaiʻi Data Science Institute","retrievedAt":"2026-10-02","url":"https://datascience.hawaii.edu/university-of-hawaii-celebrates-supercomputer-milestone/"}],"updated":"2026-10-02","url":"https://www.compute-atlas.com/facilities/uh-information-technology-center-honolulu-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Kihei","confidence":"medium","id":"compute_atlas-d668d9920254d29c","lat":20.74929227073,"location_precision":"approximate","lon":-156.439610266824,"name":"Maui High Performance Computing Center","operator":"University of Hawaiʻi (for Air Force Research Laboratory)","source_notes":"A real, currently-operating federal HPC installation on Maui: one of five DoD Supercomputing Resource Centers, run as an Air Force Research Laboratory Center managed by the University of Hawaiʻi since 1993. A new $11,980,000 Department of War contract awarded to UH in January 2026 (work through May 2031, for satellite-resiliency research/modeling) confirms it is still active as of September 2026, not a legacy listing. As of September 2026, none of the three sources then cited published a street address. Business directories (Yelp, Yellow Pages) independently and consistently name 550 Lipoa Pkwy, Kihei as the address, and the US Census geocoder resolves that exact string to a valid address at this zip (96753), although as of September 2026 neither directory page could be retrieved directly. An undated Sandia National Laboratories conference speaker bio for the center's executive director, cited since October 2026, lists 550 Lipoa Parkway, Kihei, HI 96753-6900. The pin is approximate. No AI-specific capability was named in the three sources cited in September 2026 (the recent contract is satellite-resiliency modeling), so no AI classification is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AFRL's Maui site lowers barriers to high performance computing","publisher":"Air Force Research Laboratory","retrievedAt":"2026-09-12","url":"https://afresearchlab.com/news/afrls-maui-site-lowers-barriers-to-high-performance-computing/"},{"kind":"press","label":"System: Maui High Performance Computing Center donates supercomputer to UH Hilo","publisher":"University of Hawaii News","retrievedAt":"2026-09-12","url":"https://manoa.hawaii.edu/news/article.php?aId=1522"},{"kind":"press","label":"$11.9M DOW Air Force contract awarded to UH to support the Maui High Performance Computing Center","publisher":"Maui Now","retrievedAt":"2026-09-12","url":"https://mauinow.com/2026/01/22/11-9m-dow-air-force-contract-awarded-to-uh-to-support-the-maui-high-performance-computing-center/"},{"kind":"other","label":"Speaker bio listing Maui High Performance Computing Center address","publisher":"Sandia National Laboratories","retrievedAt":"2026-10-21","url":"https://www.sandia.gov/cs-conferences/10th-workshop-on-distributed-virtual-supercomputers/eugene-bal-iii/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/uh-mhpcc-kihei-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"likely","city":"Newnan","confidence":"medium","id":"compute_atlas-d6d226eb4b43474e","lat":33.3807,"location_precision":"approximate","lon":-84.7974,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prologis-project-sail-coweta-ga","value":900.0}],"name":"Project Sail – Prologis Data Center Campus","operator":"Prologis","source_notes":"Nine buildings, 4.3 million sq ft. End tenant not publicly identified; project marketed to hyperscalers. Rezoning includes decommissioning and site restoration plan requirement if dormant over one year. Coordinates are Newnan city centroid; actual site is along US-27 southwest of Newnan. A developer-commissioned fiscal study modeled roughly $488M in county and school property-tax abatements over 18 years, but the Coweta County Development Authority reported no incentive negotiations had occurred as of January 2025; no confirmed incentive agreement or job count has been published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Coweta Residents Sue to Block Project Sail Data Center","publisher":"The Citizen","retrievedAt":"2026-07-06","url":"https://thecitizen.com/2026/05/11/coweta-residents-sue-to-block-project-sail-data-center/"},{"kind":"press","label":"Coweta County approves Project Sail rezoning (Prologis)","publisher":"Propmodo","retrievedAt":"2026-10-14","url":"https://propmodo.com/prologis-wins-approval-for-massive-georgia-data-center-project/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/prologis-project-sail-coweta-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Mesa","confidence":"medium","id":"compute_atlas-d71eaf571af15ae3","lat":33.3717,"location_precision":"approximate","lon":-111.6747,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/novva-mesa-az","value":300.0}],"name":"Novva Mesa Data Center Campus","operator":"Novva Data Centers","source_notes":"Located near Ellsworth and Warner roads, southeast Mesa. Five data halls, 1.3M sq ft data hall space, 200,000 sq ft office, two-phase buildout over ~10 years. Sixth Novva campus nationally, first in Arizona. Architectural design honors Hohokam heritage. Coordinates approximate. Public-reception check (2026-09-10): Checked Novva's own announcement page (2026-09-10); it markets design amenities ('dedicated acreage offering public pathways for the community') but documents no actual public hearing, resident feedback, or official statement of support/opposition. No community-reception record found in this source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Novva confirmed as behind Project Borealis data center campus in Phoenix","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/novva-confirmed-as-behind-project-borealis-data-center-campus-in-phoenix-arizona/"},{"kind":"permit","label":"City of Mesa case ZON24-00291 ('Project Borealis') Project Narrative — 'Each of the data hall buildings will utilize a closed-loop water cooling system... Crucially, no evaporative methods are used for reducing air temperature'","retrievedAt":"2026-08-31","url":"https://legistar1.granicus.com/Mesa/attachments/d6c1b1ca-28ad-400c-8d28-a59aca19080e.pdf"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/novva-mesa-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Maricopa","confidence":"medium","id":"compute_atlas-d7270a3561085c8f","lat":32.945,"location_precision":"approximate","lon":-112.035,"name":"Energy Generation and Technology Campus","operator":"W Holdings","source_notes":"Located south of the City of Maricopa, east of State Route 347 and west of the Nissan test track, abutting the southern boundary of the Ak-Chin Indian Community. Investment is recorded as the itemized $4B construction plus $5.5B equipment figure presented to the Planning and Zoning Commission; a separate report rounds the total to $10B. Acreage is also reported as 500 and, in one account, 656 acres. Some coverage associates the site with Copia Power; the applicant of record in commission and board coverage is W Holdings, represented by the same attorney who has appeared for Copia projects, so the corporate relationship is not established here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$10 billion data center campus OK'd south of Maricopa","publisher":"InMaricopa","retrievedAt":"2026-08-28","url":"https://inmaricopa.com/data-center-okd/"}],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/w-holdings-energy-generation-technology-campus-maricopa-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Littleton","confidence":"medium","id":"compute_atlas-d72f59e27dde79a2","lat":44.2933025,"location_precision":"approximate","lon":-71.7985028,"name":"SNS Littleton Data Center","operator":"Secured Network Services (a Thrive company)","source_notes":"Thrive acquired Secured Network Services, which is based in New Hampshire, on 2025-02-13. Thrive's press release does not mention the Littleton data center, so the 'a Thrive company' operator label rests on the tracker entry. The coordinates match the OSM commercial building at 775 Industrial Park Rd, which agrees with the Census geocode to within about 100 m. No capacity is published, and this is a small regional MSP colocation site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"New Hampshire data centers: 775 Industrial Park Rd, Littleton, Secured Network Services, Inc., operational","publisher":"Kadoa US Datacenter Tracker","retrievedAt":"2026-10-08","url":"https://www.kadoa.com/datacenter/state/new-hampshire"},{"kind":"other","label":"SNS Littleton Data Center: operator Secured Network Services (a Thrive Company), operating","publisher":"More Than Just Parks","retrievedAt":"2026-10-08","url":"https://morethanjustparks.com/data-center-tracker/sns-littleton-data-center-nh--ae4bc6af-e610-482f-b335-86441849ac11"},{"kind":"press","label":"Thrive Acquires Secured Network Services (2025-02-13)","publisher":"Thrive","retrievedAt":"2026-10-08","url":"https://thrivenextgen.com/thrive-acquires-secured-network-services/"}],"updated":"2026-10-08","url":"https://www.compute-atlas.com/facilities/sns-littleton-nh"}],"state":"New Hampshire","status":"operating"},{"ai_classification":"likely","city":"San Jose","confidence":"high","id":"compute_atlas-d738c97a4eb51895","lat":37.423,"location_precision":"approximate","lon":-121.943,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prologis-stem-park-zanker-road-san-jose-ca","value":396.0}],"name":"Prologis STEM Park","operator":"Prologis","source_notes":"159-acre city-owned parcel at Hwy 237 & Zanker Road, North San Jose (bounded by Los Esteros Energy Center, Artesian Slough, Hwy 237, and the Silicon Valley Advanced Water Purification Center). Prologis selected as preferred developer by San Jose City Council (unanimous vote, Nov 18 2025) over Catellus-Deca and Trammell Crow proposals; CEQA review and ground-lease negotiation still pending as of source dates — not yet approved. 'STEM Park' = Sustainable Technology, Engineering and Manufacturing Park: four 99MW data-center buildings (1.68M sq ft total, reflected in the recorded capacity) plus a separate ~785,000 sq ft / 100MW advanced-manufacturing component (not counted in the recorded capacity, different use). PG&E has committed initial 250MW via dual feed from the Los Esteros 230kV substation within 30-36 months. ~$25B investment widely reported (DCD et al.) but not confirmed directly by Prologis — no investment figure is recorded. Projected 6,000+ jobs and $30M/yr city tax revenue are projections tied to a not-yet-approved project, not delivered counts — no jobs figure is recorded. Two other Prologis San Jose sites in this dataset as of July 2026 (Prologis Silver Creek Valley Road Data Center and Prologis 5853 Rue Ferrari) are distinct parcels, not duplicates.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"400MW Prologis data center campus chosen as preferred project on city-owned land in San Jose, California","publisher":"Data Center Dynamics","retrievedAt":"2026-07-11","url":"https://www.datacenterdynamics.com/en/news/400mw-prologis-data-center-campus-chosen-as-preferred-project-on-city-owned-land-in-san-jose-california/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"GovTech (Government Technology Insider) — \"San Jose Eyes $30M Windfall From Proposed AI and Manufacturing Campus\"","retrievedAt":"2026-07-25","url":"https://insider.govtech.com/california/news/san-jose-eyes-30m-windfall-from-proposed-ai-and-manufacturing-campus"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/prologis-stem-park-zanker-road-san-jose-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/400mw-prologis-data-center-campus-chosen-as-preferred-project-on-city-owned-land-in-san-jose-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prologis-3"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Cle Elum","confidence":"medium","id":"compute_atlas-d73e6faa771a8d7d","lat":47.18,"location_precision":"approximate","lon":-120.97,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/blue-fern-cle-elum-data-center-wa","value":20.0}],"name":"Blue Fern Cle Elum Data Center","operator":"Blue Fern Development","source_notes":"Roughly 100,000 sq ft near Interstate 90, inside a residential and commercial development already under construction in Cle Elum. Developer projects 20 to 40 full-time positions. Because the site is covered by a pre-existing development agreement with the city, it may proceed despite the moratorium. Single-source; coordinates are an approximate geocode of the described location.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/blue-fern-cle-elum-data-center-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"compute_atlas-d78f233cab4b12ea","lat":41.135,"location_precision":"approximate","lon":-104.725,"name":"EchoStar Cheyenne Data Center and Satellite Uplink Facility","operator":"EchoStar","source_notes":"77,000 sq ft Tier III data center in the Cheyenne Business Park east of Cheyenne along Interstate 80, built adjacent to EchoStar's satellite uplink and broadcast facility. Announced 2010-08-03 with completion expected by end of 2011; the 2026 Wyoming Business Council materials describe it in the present tense as a certified qualifying data center. Jobs are not recorded: the widely quoted 360-plus Cheyenne headcount covers the whole broadcast centre, an entity-level figure that must not be attributed to the data center. Coordinates approximate the Cheyenne Business Park, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"EchoStar Picks Cheyenne for Data Center","publisher":"Data Center Knowledge","retrievedAt":"2026-08-19","url":"https://www.datacenterknowledge.com/business/echostar-picks-cheyenne-for-data-center"}],"updated":"2026-08-19","url":"https://www.compute-atlas.com/facilities/echostar-cheyenne-wy"}],"state":"Wyoming","status":"operating"},{"ai_classification":"unknown","city":"South Fulton","confidence":"medium","id":"compute_atlas-d790772e8de4c139","lat":33.6273,"location_precision":"approximate","lon":-84.5646,"name":"Vantage Data Centers Westlake","operator":"Vantage Data Centers","source_notes":"754,000 sq ft, targeted completion January 2028. Vantage filed a second Fulton County DRI the same period (Stacks Road, ~697,000 sq ft, January 2027) which is not listed separately as of August 2026 because no cited source gave it a distinguishable location.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage Data Centers Plans Two New Sites in Georgia (Westlake and Stacks Road, Fulton County)","publisher":"Inside Towers","retrievedAt":"2026-08-28","url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/"}],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/vantage-westlake-south-fulton-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"confirmed","city":"Douglasville","confidence":"medium","id":"compute_atlas-d7b3eea7021af66b","lat":33.7547,"location_precision":"approximate","lon":-84.7427,"name":"Microsoft Douglasville Data Center Campus","operator":"Microsoft","source_notes":"Four 245,000 sq ft technology facilities totaling ~980,000 sq ft on 160-acre parcel at 1601 North River Road, Douglasville. Part of Azure East US 3 region alongside facilities in East Point and Palmetto. Coordinates are Douglasville city centroid; actual site is northern Douglasville.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft to launch new cloud region in Atlanta, Georgia, in 2027","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-to-launch-new-cloud-region-in-atlanta-georgia-in-2027/"},{"kind":"press","label":"Microsoft aiming to build 1 million sq ft data center in Douglasville, GA — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-aiming-to-build-1-million-sq-ft-data-center-in-douglasville-ga-for-east-us-3/"},{"kind":"press","label":"Commissioner: Tax incentives aren't 'free money' — Douglas County Sentinel","publisher":"Douglas County Sentinel","retrievedAt":"2026-07-06","url":"https://www.douglascountysentinel.com/douglasville_sentinel/commissioner-tax-incentives-arent-free-money/article_ad7fb909-1658-5c71-b502-2356c87ff705.html"},{"kind":"subsidy","label":"Data Centers Sales & Use Tax Exemption — Aggregate Expenditures by County — Georgia DOR","publisher":"Georgia Department of Revenue","retrievedAt":"2026-07-06","url":"https://dor.georgia.gov/data-centers-sales-use-tax-exemption-aggregate-expenditures-county"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-douglasville-ga"}],"state":"Georgia","status":"under construction"},{"ai_classification":"confirmed","city":"Conesville","confidence":"medium","id":"compute_atlas-d7e57c023a247258","lat":40.27,"location_precision":"approximate","lon":-81.83,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://athensindependent.com/data-centers-across-appalachian-ohio/","value":340.0}],"name":"Aligned Data Centers – Conesville Industrial Park","operator":"Aligned Data Centers","source_notes":"Brownfield redevelopment of former AEP Conesville coal plant (reported as 2,000+ MW by Frontier Group of Companies and as 2,300 MW by its chief operating officer at the October 2025 groundbreaking; operational 62 years, closed May 2020). Frontier Group of Companies acquired the plant in 2020 and built the Conesville Industrial Park across ~2,500 acres; Aligned purchased a 197-acre parcel. Aligned describes the project as 'AI/HPC' and 'Gigascale' in its press materials, and this is its third Ohio campus (others: Perkins Township/Sandusky, 96 MW total; Pataskala). Multi-building campus — renderings show up to four buildings; second, third, and fourth buildings referenced at groundbreaking. As of October 2026, Aligned's press release states no capacity figure; the Coshocton County Port Authority executive director said, as reported by the Athens County Independent, that the final buildout will have a capacity of 340 megawatts. Investment described as 'multi-billion dollar' — as of July 2026, no firm figure was confirmed, so no investment figure is recorded. Aligned's press release says the phased development is anticipated to generate 'thousands of construction jobs and hundreds of high-quality, long-term operational roles'. The Athens County Independent reports the Port Authority executive director saying the project is expected to create more than 1,800 jobs during construction, and Aligned saying it will create 149 jobs in the long term. All are projections. Aligned is exploring on-site nuclear power (SMRs) for this campus and nearby Zanesville/Cambridge sites; no agreement confirmed. Coordinates approximate (village-level). Site infrastructure funding note: the Coshocton Port Authority received a $58.7M grant (Ohio Dept of Development All Ohio Future Fund, announced July 21, 2025) for utility upgrades, water/wastewater extensions, and roadway improvements across the broader industrial park — this benefits Aligned indirectly but is not a direct subsidy to Aligned and is therefore not listed under subsidies.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Aligned Data Centers official press release – Ohio mega-scale AI campus expansion","publisher":"Aligned Data Centers","retrievedAt":"2026-07-07","url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/"},{"kind":"press","label":"Aligned to develop 200-acre data center campus in Coshocton, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/aligned-to-develop-200-acre-data-center-campus-in-coshocton-ohio/"},{"kind":"press","label":"Aligned Data Centers expands with new mega-scale AI campus at Conesville Industrial Park","publisher":"Frontier Group of Companies","retrievedAt":"2026-07-07","url":"https://frontier-companies.com/aligned-data-centers-expands-with-new-mega-scale-ai-campus-at-conesville-industrial-park/"},{"kind":"subsidy","label":"Coshocton Port Authority secures $58.7M from Ohio Department of Development – All Ohio Future Fund","publisher":"Frontier Group of Companies","retrievedAt":"2026-07-07","url":"https://frontier-companies.com/coshocton-port-authority-secures-58-7-million-from-ohio-department-of-development-for-site-redevelopment-at-the-conesville-industrial-park/"},{"kind":"press","label":"Aligned Data Centers expands in Ohio, considering nuclear power for resilience","publisher":"eGeneration Foundation","retrievedAt":"2026-07-07","url":"https://egeneration.org/aligned-data-centers-expands-in-ohio-considering-nuclear-power-for-resilience"},{"kind":"press","label":"Appalachian Ohio a target for data centers","publisher":"Athens County Independent","retrievedAt":"2026-09-09","url":"https://athensindependent.com/data-centers-across-appalachian-ohio/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/aligned-conesville-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Birmingham","confidence":"medium","id":"compute_atlas-d86e0e1a5e7e4e6d","lat":33.4084384,"location_precision":"approximate","lon":-86.9094153,"name":"G. Phillip Pope Technology Center (Blue Cross and Blue Shield of Alabama Data Center)","operator":"Blue Cross and Blue Shield of Alabama","source_notes":"A 55,000 sq ft enterprise data center on 25 acres in Jefferson Metropolitan Park Lakeshore (Oxmoor Valley). The $55M investment and 25 acres are 2008 planned figures. The coordinates are the OSM locality point for Jefferson Metropolitan Park Lakeshore, not the building footprint. Capacity is not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Another Data Center for Birmingham, Alabama (June 16, 2008)","publisher":"Data Center Knowledge","retrievedAt":"2026-10-18","url":"https://www.datacenterknowledge.com/business/another-data-center-for-birmingham-alabama"},{"kind":"other","label":"Uptime Institute Awards: G. Phillip Pope Technology Center","publisher":"Uptime Institute","retrievedAt":"2026-10-18","url":"https://uptimeinstitute.com/uptime-institute-awards/datacenter/g-phillip-pope-technology-center/261"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/bcbs-alabama-pope-technology-center-birmingham-al"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"high","contains_osm":true,"id":"compute_atlas-d8ade3deef3ef9d1","lat":39.0046933,"location_precision":"exact","lon":-77.4417399,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-nva01a-va","value":17.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-nva01a-va","value":18.0}],"name":"STACK NVA01A","operator":"STACK Infrastructure","source_notes":"Confirmed at 22080 Pacific Boulevard, Sterling, Loudoun County — 17-18MW, listed on operator's own NVA01 page (site naming appears to have shortened from NVA01A to NVA01).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/59294476","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/59294476"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-08-16","url":"https://www.compute-atlas.com/facilities/stack-nva01a-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/59294476"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"high","contains_osm":true,"id":"compute_atlas-d8b2767c7292c29f","lat":42.0007753,"location_precision":"exact","lon":-87.9507686,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edgeconnex-chi01-elk-grove-village-il","value":24.0}],"name":"EdgeConneX CHI01","operator":"EdgeConneX","source_notes":"Operator data sheet: CHI01 has 24 MW of N+1 capacity and 75K sq ft of floor space. CHI03 (2055 Lunt Ave, 22.4 MW 'arriving soon') is deliberately not emitted, because it may be the same site as the tracked Lambda EdgeConneX AI factory.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"EdgeConneX Chicago (CHI01, CHI02, CHI03) Data Sheet","publisher":"EdgeConneX","retrievedAt":"2026-10-15","url":"https://edgeconnex.com/wp-content/uploads/2024/09/Chicago-Data-Sheet.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/edgeconnex-chi01-elk-grove-village-il"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/174242795"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Mequon","confidence":"medium","contains_osm":true,"id":"compute_atlas-d8e99b225b07dc0e","lat":43.205315,"location_precision":"approximate","lon":-87.9243984,"name":"ISCorp Mequon Data Center (MQS5)","operator":"ISCorp","source_notes":"Tier III+, SSAE18-audited private-cloud data center with 8,000 sq ft of raised floor and 20,000 sq ft of operations space, redundant hospital-grade generators, N+1 cooling and a private dark-fiber metro ring. Directories and the Journal Sentinel map list two ISCorp Mequon facilities — \"North MQN\" at 10325 and \"South MQN\" at 10235 N. Port Washington Road — but only the 10325 building is described on ISCorp's own facilities page, so this record covers only that building.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/iscorp-mequon-mqs5-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Charlotte","confidence":"medium","contains_osm":true,"id":"compute_atlas-d8fc6d4bfa9c8061","lat":35.1731955,"location_precision":"exact","lon":-80.928121,"name":"TierPoint Charlotte - Center Park","operator":"TierPoint","source_notes":"Confirmed on TierPoint's own directory: North Carolina - Charlotte - Center Park.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/838817907","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/838817907"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/tierpoint-charlotte-center-park-nc"}],"state":"North Carolina","status":"operating"},{"ai_classification":"mixed_use","city":"Canton","confidence":"medium","id":"compute_atlas-d901ba47a93c592a","lat":32.6121,"location_precision":"approximate","lon":-90.039,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aws-project-atlas-madison-county-ms","value":1000.0}],"name":"AWS Project Atlas – Madison County Mega Site (Canton)","operator":"Amazon Web Services","source_notes":"Two distinct complexes: Madison County Mega Site (outside Canton) and Costas Property (west of Tougaloo College near County Line Rd, Ridgeland). Amazon's total Mississippi statewide commitment expanded to $25B including subsequent Warren County ($3B) and Hinds County ($1B) announcements. Coordinates are approximate Canton-area centroid. The Veolia water partnership claim was removed: the About Amazon source names Arable (not Veolia) as water replenishment partner; recycled wastewater target of 83M gallons/year by 2027 is confirmed. Narrowed to Canton on 2026-09-10 (maintainer adjudication): this record previously combined two campuses. Madison County's own tax administration treats them as separate — it 'has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland' (Mississippi Free Press, 2026-08-19) — and Magnolia Tribune (2024-07-24) gives the physical split: the Madison County Mega Site is '927 acres ... located off Highway 22 and Nissan Parkway in Canton', while the Costas Property is 'an additional 786 acres in Ridgeland'. The Ridgeland campus is therefore, as of September 2026, tracked separately as AWS Costas Property Campus (Ridgeland), and the land acreage here was reduced from the combined 1,700 to Canton's 927 so the two records do not double-count acreage. The capacity, investment and jobs figures on this record remain program-level figures from the original Project Atlas announcement covering both Madison County campuses; they are left in place here rather than split, because no source apportions them per campus. They should not be summed with AWS Costas Property Campus (Ridgeland), which carries no capacity, investment or jobs figures for this reason. The location was also corrected from an exact pin to an approximate pin: this record's notes already stated the coordinate is a Canton-area centroid, so the exact-pin claim was wrong. The two campuses are treated by Madison County's tax and incentive administration as legally and financially separate: the Madison County Mega Site (927 acres, off Highway 22 and Nissan Parkway, Canton) and the Costas Property (786 acres, Highland Colony Parkway / West County Line Road, Ridgeland), as confirmed by a 2026-08-19 Mississippi Free Press report on Madison County's denial of AWS's Canton tax-valuation appeal: the county 'has entered into two fee-in-lieu-of-taxes agreements with the tech giant for its data center campuses in Canton and Ridgeland.' The latitude and longitude (32.6121, -90.039) read as Canton-specific, closer to Canton than to Ridgeland. The combined capacity (1000 MW planned), investment ($10B) and jobs (7,000/1,000) are not apportioned by site: as of September 2026, no source found states a per-site breakdown, and apportioning by acreage share (54%/46%) would be a fabricated estimate. Ridgeland is itself within Madison County, so the aggregate's 'Madison County' framing is not geographically wrong, only combined.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"AWS confirmed as company behind $10bn Mississippi data center development","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/aws-confirmed-as-company-behind-10bn-mississippi-data-center-development/"},{"kind":"press","label":"Amazon Delivers Record Package to Mississippi","publisher":"Site Selection Magazine","retrievedAt":"2026-07-17","url":"https://siteselection.com/amazon-delivers-record-package-to-mississippi/"},{"kind":"other","label":"Proposed Hyperscale Data Center Project, Clarksdale, MS: Frequently Asked Questions","publisher":"City of Clarksdale","retrievedAt":"2026-10-07","url":"https://www.cityofclarksdale.org/wp-content/uploads/2026/03/City-of-Clarksdale-Data-Center-Frequently-Asked-Questions-_FAQ_.pdf"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/aws-project-atlas-madison-county-ms"}],"state":"Mississippi","status":"operating"},{"ai_classification":"confirmed","city":"Walsenburg","confidence":"medium","id":"compute_atlas-d904103a2b68799e","lat":37.6235234,"location_precision":"approximate","lon":-104.780995,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/blusky-ai-walsenburg-co","value":15.0}],"name":"BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center","operator":"BluSky AI Inc.","source_notes":"BluSky AI Inc. (OTCID: BSAI), Salt Lake City, announced a purchase and sale agreement dated 2025-08-26 for LOT 1 INDIAN POOL RANCH, 36.06 acres north of Walsenburg, for up to 15 MW of modular 'SkyMod' compute. As of the Gazette's reporting in early 2026 the sale had not closed and the site remained under agreement with owner Snowy River Ranches. Coordinates are the Walsenburg town centroid (approximate); the parcel is north of town.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/blusky-ai-walsenburg-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"confirmed","city":"Oak Ridge","confidence":"medium","id":"compute_atlas-d92ccdaa00243268","lat":35.9352633,"location_precision":"representative_multi_site","lon":-84.3923554,"name":"Oak Ridge Reservation AI Data Center Sites (DOE land lease)","operator":"U.S. Department of Energy","source_notes":"DOE's Offices of Environmental Management and Science issued a Request for Proposal on 2025-09-30 (published the week of 2025-10-13 per FedScoop) seeking U.S. companies to build, own and operate AI data centers and/or energy generation on the Oak Ridge Reservation under one or more long-term ground leases funded entirely by the lessee. Two sites are named in the DOE release: one at the East Tennessee Technology Park and one on land adjacent to Oak Ridge National Laboratory. This is recorded as a single record with the pin at a representative point for a multi-site project, geocoded to the East Tennessee Technology Park, because DOE names two sites but publishes no design, footprint, or capacity for either; splitting it would duplicate a record with no site-specific facts. ORNL itself geocodes to 35.9301332, -84.3119307. Confirmed absences as of 2026-09-09: no lessee has been selected, no capacity, investment, footprint or timeline is stated, and applicants — not DOE — are responsible for securing utility interconnection agreements and all permitting. The operator field records DOE as the landowner and solicitor, not as the eventual data-center operator, which is unknown. Oak Ridge is one of four federal sites DOE identified for AI infrastructure. Distinct from Kairos Power Hermes 2 (tracked separately as of September 2026), which is a separate NRC-licensed reactor project at Oak Ridge.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Energy seeks proposals for AI data centers at Oak Ridge","publisher":"FedScoop","retrievedAt":"2026-09-09","url":"https://fedscoop.com/energy-rfp-oak-ridge-ai-data-centers/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/doe-oak-ridge-reservation-ai-data-centers-tn"}],"state":"Tennessee","status":"planned"},{"ai_classification":"confirmed","city":"Mesa","confidence":"medium","id":"compute_atlas-d94a476f505af905","lat":33.375,"location_precision":"approximate","lon":-111.6497,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/","value":450.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/","value":206.0}],"name":"EdgeCore Mesa Data Center Campus","operator":"EdgeCore Digital Infrastructure","source_notes":"Elliot Road Technology Corridor, Mesa. CEO stated 'Greater Phoenix is fast becoming the AI center of the West.' Expansion land purchase adds 43.87 acres to 40-acre original site. EdgeCore raised $2B equity and $2B debt in 2024. Coordinates approximate for Elliot Road corridor. Arizona's data-center sales/use-tax exemption (A.R.S. Sec. 41-1519) applies by statute, but no campus-specific certified award was publicly verifiable (eligibility != confirmed award); the $150M cited is first-building capex and the $2B equity + $2B debt EdgeCore raised in 2024 is corporate financing, not Mesa-campus capex.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"EdgeCore Announces Metro Phoenix Expansion to 450MW","publisher":"EdgeCore Digital Infrastructure","retrievedAt":"2026-07-06","url":"https://edgecore.com/resources/press-releases/edgecore-digital-infrastructure-announces-expansion-of-its-metro-phoenix-data-center-market-to-over-450-mw"},{"kind":"press","label":"EdgeCore expands Mesa data center campus in Arizona","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/edgecore-expands-mesa-data-center-campus-in-arizona/"},{"kind":"press","label":"EdgeCore expands Mesa data center campus to over 450 MW","publisher":"AZ Big Media","retrievedAt":"2026-08-08","url":"https://azbigmedia.com/real-estate/edgecore-expands-mesa-data-center-campus-to-over-450-mw/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/edgecore-mesa-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"compute_atlas-d99585ef7fe1582c","lat":39.612118,"location_precision":"approximate","lon":-119.87322,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/connect-data-centers-reno-north-valleys-nv","value":5.0}],"name":"Connect Reno Data Center (Oppidan North Valleys)","operator":"Connect Data Centers (Oppidan Investment Company)","source_notes":"Approximately 61,600 sq ft single-storey building, ~53,000 sq ft of which is server space, with a generator yard sized for later phases. Applicant-stated staffing is 10-12 people on site at peak. Filed by Oppidan Investment Company; the operating brand on facility directories is Connect Data Centers, Oppidan's data center affiliate. Coordinate is an address-level geocode of 9630 N Virginia St, not a parcel-confirmed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"5MW Data Center Planned Near Reno","publisher":"NVBEX","retrievedAt":"2026-09-24","url":"https://nevbex.com/2024/12/10/5mw-data-center-planned-near-reno/"},{"kind":"other","label":"Reno, Nevada data center directory (Connect Reno, N Virginia St & Stead Blvd)","publisher":"goDataCenters","retrievedAt":"2026-09-24","url":"https://www.godatacenters.com/data-centers/nevada/reno"}],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/connect-data-centers-reno-north-valleys-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Sacramento","confidence":"medium","contains_osm":true,"id":"compute_atlas-da0bb80259a656af","lat":38.6504319,"location_precision":"exact","lon":-121.4891868,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca1-data-center-ca","value":12.6}],"name":"NTT Sacramento CA1 Data Center","operator":"NTT Global Data Centers","source_notes":"12.6MW, 1625 West National Dr, Sacramento. Previously operated under NTT's legacy US brand, RagingWire (now retired).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/32560292","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/32560292"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca1-data-center-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NTT (RagingWire) facility directory","publisher":"NTT (RagingWire)","retrievedAt":"2026-07-22","url":"https://www.nttdata.com/en-us/services/global-data-centers/global-locations/americas/sacramento-data-centers"},{"kind":"osm","label":"OpenStreetMap way/32560290","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/32560290"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/ntt-sacramento-ca2-data-center-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Boardman","confidence":"medium","contains_osm":true,"id":"compute_atlas-da25cc25b0db0b77","lat":45.8523,"location_precision":"approximate","lon":-119.6302,"name":"AWS Boardman — Lewis and Clark Drive West Campus (PDX1)","operator":"Amazon Web Services","source_notes":"One of four AWS data center campuses at the Port of Morrow that pre-date the 2023 enterprise-zone deal. Compute Atlas's existing 'Amazon Boardman Exascale' record covers only the proposed 1,300-acre Threemile Canyon site and explicitly excludes Amazon's ~800 acres of operating Morrow County facilities, of which this is the original cluster. Capacity per campus is not published (Amazon reports $15.6B invested in Morrow and Umatilla counties 2012–2021 — an entity-level figure, not this site's). Coordinates are the OSM footprint centroid of the three mapped buildings.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OSM way 460070147 — Amazon Web Services data center 'PDX1', 73575 Lewis and Clark Drive, Boardman (owner Vadata Inc)","publisher":"OpenStreetMap","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/460070147"},{"kind":"osm","label":"OSM way 460070145 — Amazon Web Services data center 'PDX50/53', 73577 Lewis and Clark Drive, Boardman","publisher":"OpenStreetMap","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/460070145"},{"kind":"osm","label":"OSM way 697415323 — Amazon Web Services data center 'PDX56/59', 73579 Lewis and Clark Drive, Boardman","publisher":"OpenStreetMap","retrievedAt":"2026-09-17","url":"https://www.openstreetmap.org/way/697415323"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-boardman-lewis-clark-west-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"likely","city":"Palmetto","confidence":"medium","id":"compute_atlas-da6440d509db7793","lat":33.548,"location_precision":"approximate","lon":-84.724,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/t5-atlanta-iv-palmetto-ga","value":300.0}],"name":"T5 @ Atlanta IV","operator":"T5 Data Centers","source_notes":"City discrepancy: the ledger cited Fairburn, but T5's own page and PR Newswire list Palmetto, GA; DCD describes it as Fairburn/Fulton County with a 91-acre site in Palmetto - site is on the Fairburn/Palmetto border in South Fulton County (I-85 and Gullatt Rd). Capacity: T5's page lists '200 MW available' (Phase 1) while the Aug 2024 land-acquisition PR cites '300 MW' campus total - 300 MW recorded as planned. No tenant disclosed (T5 is a wholesale/build-to-suit developer targeting hyperscalers; page cites AI/liquid-cooling suitability). Phase 1 construction targeted Q2 2027; on-site substation expected 2026. No jobs figure disclosed as of July 2026. T5 has disclosed no investment figure, so none is recorded. The Newnan Times-Herald reports that Project Pegasus, a 2.95-million-square-foot, seven-building, 200-acre project proposed by T5@Atlanta IV, LP at Weldon and Palmetto-Tyrone roads in Coweta County (regional-impact review completed February 2024), is estimated to be valued at $1.5 billion at buildout; as of October 2026, no source read shows that project is the 91-acre campus described here, so the figure is not recorded. Coordinates approximate (I-85/Gullatt Rd corridor).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"T5 files to develop data center campus outside Atlanta, Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/t5-files-to-develop-data-center-campus-outside-atlanta-georgia/"},{"kind":"press","label":"T5 Data Centers pursues 495K square foot campus in Fairburn","publisher":"Atlanta Journal-Constitution","retrievedAt":"2026-07-07","url":"https://www.ajc.com/news/business/t5-data-centers-pursues-495k-square-foot-campus-in-fairburn/UVYQWF3CD5F2NM7JTKVPDX7E3E/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/t5-atlanta-iv-palmetto-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Alderdale (vicinity)","confidence":"medium","contains_osm":true,"id":"compute_atlas-da79da12184df066","lat":45.8349586,"location_precision":"approximate","lon":-119.9208683,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/vines-rest-data-center-alderdale-klickitat-wa","value":1000.0}],"name":"Vines Rest Data Center (BPA L0704)","operator":"Savion (Shell Energy subsidiary), per BPA application documents","source_notes":"The queue record places the site east of Alderdale, bounded by Columbia Ridge Road, Sonova Road and Highway 14, on land owned by Columbia Ridge Orchards LLC. It would interconnect on the McNary–John Day No. 1 and No. 2 500 kV lines. A Savion spokesperson said 'there is currently no defined Vines Rest project.' A queue position is not an approval. Coordinates are the Alderdale locality point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"More data centers possible for county","publisher":"Goldendale Sentinel","retrievedAt":"2026-10-30","url":"https://www.goldendalesentinel.com/news/more-data-centers-possible-for-county/article_b656c420-736c-4751-be22-209654a24211.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/vines-rest-data-center-alderdale-klickitat-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"compute_atlas-da88df8193c880fc","lat":42.0039,"location_precision":"approximate","lon":-87.9703,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stream-chicago-i-orda-elk-grove-village-il","value":31.0}],"name":"Stream Chicago I (ORDA)","operator":"Stream Data Centers","source_notes":"155,189 sq ft facility with 31 MW of utility power; fully leased. Expanded in 2024 by 1.10 acres.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report — SDC CHI I, LLC, Elk Grove Village (2021 MOU, underserved area)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-12","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/stream-chicago-i-orda-elk-grove-village-il"},{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — SDC CHI II Busse, LLC, Elk Grove Village, 2022 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/stream-chicago-ii-ordb-elk-grove-village-il"},{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — SDC CHI III, LLC, Elk Grove Village, 2025 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/stream-chicago-iii-ordc-elk-grove-village-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"confirmed","city":"Cheyenne","confidence":"medium","id":"compute_atlas-da909854c0322ba4","lat":41.13,"location_precision":"approximate","lon":-104.735,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/related-digital-cheyenne-wy","value":302.0}],"name":"Related Digital Cheyenne Data Center Campus","operator":"Related Digital","source_notes":"115-acre campus in the Cheyenne Business Parkway; up to 302 MW of critical IT capacity across the full campus. CoreWeave is the anchor tenant under a long-term lease for 88 MW of critical IT capacity — the 88 MW is the leased slice, not the campus total. Phase I projected to generate over $250 million in tax revenue to Wyoming and Cheyenne in its first 15 years. Coordinates approximate the Cheyenne Business Parkway, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/related-digital-cheyenne-wy"}],"state":"Wyoming","status":"under construction"},{"ai_classification":"unknown","city":"Sweetwater","confidence":"medium","id":"compute_atlas-da9f8f843e06ed2c","lat":32.4709519,"location_precision":"approximate","lon":-100.405938,"name":"Crusoe Nolan County Data Center","operator":"Crusoe Energy Systems","source_notes":"Reported to generate more than $3m annually in payments in lieu of taxes plus more than $2m annually in charitable contributions to Nolan County. No investment figure is recorded here: KTXS reports $7 billion without attributing the figure; as of October 2026 no other source found gives a figure. KTXS also reports a 200-megawatt facility without attributing the figure, so no planned capacity is recorded, and quotes a county commissioner estimating roughly 2,000 workers on site during construction; that estimate is not recorded as a jobs figure. Distinct from IREN's Sweetwater campus, which is a different operator on a different site in the same county. Coordinates are a city-level geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/crusoe-nolan-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Piqua","confidence":"medium","id":"compute_atlas-daae1cb2885e028f","lat":40.103974,"location_precision":"approximate","lon":-84.259053,"name":"Project Klondike","operator":"Meta","source_notes":"Two 350,000 sq ft buildings on 607 acres, approved November 2025 under NDA via emergency resolution. Meta's identity confirmed by a Hunterbrook investigation (Nevada filing traced to Meta HQ address and an ex-Meta counsel as manager). Drew a petition with over 2,500 signatures in opposition. Via shell entity J5 LLC.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta data centers investigation","publisher":"Hunterbrook","retrievedAt":"2026-07-17","url":"https://hntrbrk.com/breaking-news/meta-data-centers"},{"kind":"press","label":"Data center project coming to Piqua, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/data-center-project-coming-to-piqua-ohio/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"subsidy","label":"Miami County: Project Klondike Meta Data Center","publisher":"stopohiodatacenters.org","retrievedAt":"2026-08-27","url":"https://stopohiodatacenters.org/miami-county"}],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/meta-project-klondike-piqua-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"likely","city":"Mansfield","confidence":"medium","contains_osm":true,"id":"compute_atlas-dacc818788ddc1e5","lat":32.5498227,"location_precision":"exact","lon":-97.0748553,"name":"Aligned DFW-03","operator":"Aligned Data Centers","source_notes":"Confirmed operational; 3801 Britton Rd, Mansfield, TX; 27-acre campus. AI/HPC (likely): Mansfield DFW-03 on Aligned adaptive high-density AI/HPC platform.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1443620406","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1443620406"},{"kind":"press","label":"Aligned — DFW-03 Mansfield press release","retrievedAt":"2026-07-24","url":"https://aligneddc.com/press-release/aligned-data-centers-expands-dfw-footprint-with-new-data-center-in-mansfield-tx/"}],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/aligned-dfw-03-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"likely","city":"Inyokern","confidence":"medium","id":"compute_atlas-dade68f9d32bae2f","lat":35.631817,"location_precision":"approximate","lon":-117.807864,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/rb-inyokern-data-center-ca","value":99.0}],"name":"RB Inyokern Data Center","operator":"R&L Capital, Inc.","source_notes":"Unincorporated Kern County site south of West Inyokern Road (Hwy 178) and west of North Brown Road (APNs 084-010-43, -44, -45 portion; broader ~95-acre study area across 19 APNs). The CEC SPPE docket formally governs 40 diesel backup generator sets rated to 99 MW combined backup capacity, described by the CEC as not electrically interconnected to the transmission or distribution grid; primary power is a separate 115 kV interconnection to Southern California Edison. Proposer entities per the primary CEC filing: Intuva Inc. and Valley Wide Engineering & Construction, alongside applicant R&L Capital, Inc. (CEO Robbie Barker). Unconfirmed pending a direct read of the CEC Basis-of-Design filing: press claims of '6 modular data halls' and on-site canopy solar. Jobs figures are inconsistent across sources (30-60 permanent, 1,600 temporary construction, and a softer 530-total-including-indirect claim, all secondary/company-sourced) and are omitted from the structured jobs field for that reason. Investment (~$250M) is a company estimate reported by Tehachapi News, not seen in a primary filing. A Phase I cultural resources survey found no CRHR-eligible or tribal cultural resources (NAHC response negative, 2026-03-16). Distinct from the already-tracked Golden Valley Technology Hub (Beacon/CRC, Elk Hills) - different operator, site, capacity, and power model. Coordinates are an approximate road-intersection geocode near North Brown Road, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"CEC Docket Log - 26-SPPE-01","publisher":"California Energy Commission","retrievedAt":"2026-08-02","url":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-SPPE-01"},{"kind":"filing","label":"CEC filing TN 271058 - site/APN detail, SCE interconnection, phased capacity buildout","publisher":"California Energy Commission","retrievedAt":"2026-08-02","url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=271058&DocumentContentId=108645"},{"kind":"press","label":"Say it isn't so: an AI data center is coming to downtown Inyokern","publisher":"Roadrunner395","retrievedAt":"2026-08-02","url":"https://roadrunner395.com/2026/09/21/say-it-isnt-so-an-ai-data-center-is-coming-to-downtown-inyokern/"},{"kind":"other","label":"AI Data Center Environmental Review: Proposed Inyokern Data Center Highlights Water-Use Concerns","publisher":"Somach Law","retrievedAt":"2026-08-02","url":"https://somachlaw.com/policy-alert/ai-data-center-environmental-review-proposed-inyokern-data-center-highlights-water-use-concerns/"}],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/rb-inyokern-data-center-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Northlake","confidence":"medium","id":"compute_atlas-daec9f6ca0c9eb99","lat":41.9169,"location_precision":"approximate","lon":-87.8956,"name":"Aligned ORD-02","operator":"Aligned Data Centers","source_notes":"Second Aligned building on the Northlake campus, adjacent to ORD-01 at 505 Northwest Ave. Tier III design, 100% uptime SLA. Operator page does not publish MW.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — Aligned Data Centers, Northlake, 2021 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-09-25","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/aligned-ord-02-northlake-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"likely","city":"Mesa","confidence":"medium","id":"compute_atlas-daf5989a724b0555","lat":33.3025,"location_precision":"approximate","lon":-111.62,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-global-mesa-az","value":360.0}],"name":"NTT Global Data Centers Mesa — Pacific Proving Technology Park","operator":"NTT Global Data Centers","source_notes":"The investment figure is $300M land purchase only; total buildout investment is substantially higher. NE corner of Pecos and Crismon roads, far SE Mesa. Seven two-story buildings totaling 1.7M sq ft + warehouse + office. NTT's second Phoenix-area campus (existing 102-acre, 240MW campus is ~4 miles north on Elliot Road). Phase 1 targeted November 2028. Coordinates approximate for Pecos/Crismon intersection. Status as of 2026-08-08: the Planning & Zoning Board recommended approval 4-0 in mid-May 2026; the article (updated 2026-06-08) said the proposal \"will likely be heard in late July or mid-August by council\". As of August 2026, no source consulted records a Council vote, so the record stays listed as proposed — the 2026-07-20 date carried in earlier notes was an expected hearing date, not a decision.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NTT acquires 173-acre planned data center park in Mesa for $300m","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/ntt-acquires-173-acre-planned-data-center-park-in-mesa-arizona-for-300m/"},{"kind":"press","label":"Mesa residents are fighting a Tokyo tech giant's data center","publisher":"Copper Courier","retrievedAt":"2026-07-06","url":"https://coppercourier.com/news/politics/mesa-residents-fight-data-center/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/ntt-global-mesa-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Charlotte","confidence":"medium","id":"compute_atlas-db1c227cd7ea1e21","lat":35.2703,"location_precision":"approximate","lon":-80.7229,"name":"American Tower Reedy Creek Data Center (East Charlotte)","operator":"American Tower","source_notes":"Coordinates are a nature-preserve-level approximation; the parcel is described only as adjacent to Reedy Creek Nature Preserve. The company says the facility would consume about 2% of the power a hyperscale facility uses, but no MW figure is published. Distinct from the tracked Digital Realty (west Charlotte), PowerHouse and T5 Charlotte sites.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/american-tower-reedy-creek-charlotte-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Santaquin","confidence":"medium","id":"compute_atlas-db51b575afe6df8e","lat":39.97551,"location_precision":"approximate","lon":-111.78521,"name":"Summit Ridge Data Center","operator":"Data Center Power Company","source_notes":"Subsidies checked at the municipal tier (2026-09-05): no site-level subsidy found. The one Santaquin CDRA/RDA document directly confirmed, a May 2023 Notice of Intent to Transfer Property, covers a 0.69-acre parcel for the unrelated \"West Fields\" Community Reinvestment Project Area, not the 20-100MW Ridge Farms Road site. A separately-named 2022 \"Summit Ridge Commercial Development\" Master Development Agreement is a car-dealership site-plan agreement (per search-engine summaries, not a direct read of the agreement itself) — a name collision, not this project's record. The city's full council/RDA meeting-minutes archive was not searched exhaustively, so this is an evidenced absence in the documents checked, not an exhaustive clearance. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/summit-ridge-santaquin-ut"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-db7732a7557df240","lat":37.3314706,"location_precision":"approximate","lon":-121.8865883,"name":"Westbank 300 South First Street Data Center (downtown San José)","operator":"Westbank","source_notes":"Part of Westbank's downtown San José program pairing data centers with housing; San José Spotlight reports the two downtown sites (300 S. First and 323 Terraine) total 99 MW combined — not attributed to this site alone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"Data center, hundreds of homes coming to downtown San Jose (2025-04-16)","publisher":"San José Spotlight","retrievedAt":"2026-09-21","url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/westbank-300-south-first-street-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Hermantown","confidence":"medium","id":"compute_atlas-db93b1357ae337f2","lat":46.8068852,"location_precision":"approximate","lon":-92.2382464,"name":"Google Hermantown Data Center","operator":"Google","source_notes":"Listed by Google among its US data centers under development. As of August 2026, Google had not published a dedicated location page, capacity, investment figure, or timeline for this site, and as of October 2026 its US locations index still lists the site without a detail page. No investment figure is recorded. MPR News (May 2026) reports that under the proposed agreements Google was expected to spend $650 million on the first phase, and that the city expected three phases over eight to 10 years with a total investment \"in the ballpark of $2 billion\"; KAXE (May 2026) describes the build-out as four phases. The $2 billion is an estimate attributed to the city. The 100 permanent jobs are the long-term figure at full buildout given by Google's Liz Schwab, per MPR News. Coordinates are the Hermantown city centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google is behind proposed Hermantown data center","publisher":"KAXE","retrievedAt":"2026-08-24","url":"https://www.kaxe.org/local-news/2026-03-03/google-proposed-data-center-hermantown-minnesota-power"},{"kind":"press","label":"KAXE — More details emerge as Google, Hermantown work out data center agreements (2026-05-20): waterless/air-cooled design, max 50,000 gal/day, AUAR status, public objections","publisher":"KAXE","retrievedAt":"2026-09-18","url":"https://www.kaxe.org/local-news/2026-05-20/more-details-emerge-as-google-hermantown-work-out-data-center-agreements"},{"kind":"filing","label":"Minnesota PUC — Data centers and the PUC's role: Minnesota Power / Harmony Group, LLC electric service agreement for Hermantown, docket 26-159, filed 2026-03-26","publisher":"Minnesota Public Utilities Commission","retrievedAt":"2026-09-18","url":"https://mn.gov/puc/activities/v-l-e-c/data-centers/"},{"kind":"press","label":"Google data center in Minnesota would be powered by wind, energy storage","publisher":"POWER Magazine","retrievedAt":"2026-10-13","url":"https://www.powermag.com/google-data-center-in-minnesota-would-be-powered-by-wind-energy-storage/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-hermantown-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"confirmed","city":"Memphis","confidence":"medium","id":"compute_atlas-dbaada73c4d293ff","lat":35.161633,"location_precision":"exact","lon":-89.85969,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stem-practice-sycamore-view-memphis-tn","value":9.0}],"name":"The STEM Practice Sycamore View AI Data Center","operator":"Golden Acquisitions / The STEM Practice","source_notes":"Reported 2026-01-13: 'Nate Golden of Golden Acquisitions' is purchasing the building at 1341 Sycamore View and working with The STEM Practice, described as 'a tech company that works with Oracle,' to build a modular AI data center ('will be modular instead' of a hyperscale build like xAI's Colossus). Timeline per the source: 'the plan is to have part of the data center running by May 1.' Data Center Dynamics (January 15, 2026) reports that the existing four-story building, built in 1983, is set on a 1.5-acre parcel, that the first phase of the 38,500-square-foot data center could be live by May 2026, and that the site could offer up to 9MW at full build-out; it also reports Golden saying on LinkedIn that the Memphis site is one of four Tennessee data center locations slated to open in May 2026. The 9MW full build-out figure is recorded as planned capacity and the 1.5-acre parcel as the land area. A secondary aggregator (datacentermap.com, not independently fetched as of September 2026) reports the same figures and states this is one of four planned STEM Practice sites in Tennessee. Coordinates are an OSM-mapped building way at the exact street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/stem-practice-sycamore-view-memphis-tn"}],"state":"Tennessee","status":"under construction"},{"ai_classification":"unknown","city":"Buffalo","confidence":"medium","contains_osm":true,"id":"compute_atlas-dc1d1149c0dfe2da","lat":42.8930043,"location_precision":"approximate","lon":-78.8752659,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/colocrossing-buf1-buffalo-ny","value":1.44}],"name":"ColoCrossing BUF1, Buffalo","operator":"ColoCrossing","source_notes":"13,000 sq ft carrier-neutral colocation facility; operator states 1.44 MW of utility power capacity, 1.4 MW of generator capacity and 130 tons of cooling, and markets the site as leveraging hydroelectric power from Niagara Falls (a regional-grid claim, not a documented allocation, so no energy source is recorded). Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/colocrossing-buf1-buffalo-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Yorkville","confidence":"medium","id":"compute_atlas-dc4627d33e6c6a09","lat":41.679,"location_precision":"approximate","lon":-88.48,"name":"CyrusOne Yorkville Technology Campus (CHI-11)","operator":"CyrusOne","source_notes":"Applicant C1 Yorkville, LLC, with Yorkville Nexus LLC, on roughly 228 acres east of Eldamain Road, north of the BNSF railroad and Faxon Road, west of Beecher Road. A 2026 major PUD amendment reduced the plan from nine two-story buildings (about 2,451,200 sq ft) to eight one-story buildings (about 2,163,800 sq ft maximum) and cut height from 70 ft to about 50 ft 10 in. Distinct from the tracked CyrusOne Aurora, Wood Dale and Sangamon County campuses. Coordinates are the centre of the described parcel boundaries and are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Illinois DCEO Data Center Investment Program 2025 Annual Report — C1 Yorkville LLC, Yorkville, 2024 MOU","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/cyrusone-yorkville-chi11-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Conway","confidence":"high","contains_osm":true,"id":"compute_atlas-dc4fe884cd68f9f8","lat":35.0196304,"location_precision":"approximate","lon":-92.5572891,"name":"ForgeLight Ventures Conway Data Center","operator":"ForgeLight Ventures, LLC","source_notes":"Coordinates are the OpenStreetMap point for Conway Municipal Airport at Cantrell Field, whose OSM record places it on Lollie Road - the road named in reporting as the project's location ('Southwest Conway near Lollie Road and the Conway Municipal Airport area'). This is a landmark-level approximation, not a parcel. The end user is an unnamed Fortune 100 company; ForgeLight Ventures LLC is a Delaware shell with no in-state presence, so the operator recorded here is the developer of record, not a confirmed operating company. A 300,000-square-foot building size is reported but square footage is not recorded as a structured field. As of September 2026, a reported 65% tax abatement over 30 years appeared only in a search-result summary of a paywalled trade article that could not be fetched, so no subsidy is recorded. The record is marked reported: the project has an MOU and rezoning but no named end user and no permit.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Conway Data Center Public Information","publisher":"Conway Data Center (community group)","retrievedAt":"2026-09-15","url":"https://conwaydatacenter.com/"},{"kind":"press","label":"Conway to Welcome New $1 Billion Data Center for Fortune 100 Company","publisher":"Arkansas Money & Politics","retrievedAt":"2026-10-18","url":"https://armoneyandpolitics.com/conway-1-billion-data-center-fortune-100/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/forgelight-ventures-conway-ar"},{"dataset":"datacentersexposed","evidence":[{"url":"https://katv.com/news/local/conway-residents-protest-proposed-1b-data-center-citing-tax-water-and-power-concerns-ai-lollie-road-city-citizens-fortune-100-investment-drain-resources"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/forgelight-ventures-data-center"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"Quincy","confidence":"medium","contains_osm":true,"id":"compute_atlas-dcd76c20fef3a32d","lat":47.2501646,"location_precision":"exact","lon":-119.8144903,"name":"Vantage Quincy WA11","operator":"Vantage Data Centers","source_notes":"2101 M Street NE, Quincy, Grant County WA; WA1 campus with WA11/WA12/WA13 buildings. As of October 2026, Vantage's campus page states 89MW of critical IT load for the whole three-building campus and gives no figure for WA11 alone, so no operational capacity is recorded for this building; Vantage's October 2023 release says the WA13 building adds 64MW of that campus total.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/337127817","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/337127817"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/vantage-quincy-wa11-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"confirmed","city":"Southaven","confidence":"medium","id":"compute_atlas-dd22cc32427932b1","lat":34.9897,"location_precision":"approximate","lon":-90.043,"name":"xAI Tulane Road Data Center (Southaven)","operator":"xAI (SpaceXAI)","source_notes":"xAI's fifth Memphis-area data center: a 660,000 sq ft building on the city's old training-facility property at 8325 Tulane Road, next to the xAI power plant on Stanton Road. xAI got the land in a land swap with Southaven and gave $40 million toward a new city training facility. Ward 2 Alderman Charles Hoots voted no, citing unfinished turbine-noise commitments. The coordinates are the OSM centroid of Tulane Road, not the parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Southaven approves new SpaceXAI data center, fifth location in area","publisher":"Action News 5","retrievedAt":"2026-10-07","url":"https://www.actionnews5.com/2026/09/02/southaven-approves-new-spacexai-data-center-fifth-location-area/"}],"updated":"2026-10-07","url":"https://www.compute-atlas.com/facilities/xai-tulane-road-southaven-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"compute_atlas-dd68a21568ab8220","lat":37.3392085,"location_precision":"approximate","lon":-121.897492,"name":"Westbank 323 Terraine Street Data Center (downtown San José)","operator":"Westbank","source_notes":"Data center is one of two development options (Option A is residential/parking only). Earlier San José Spotlight coverage described an 11-story data center; the city's July 2026 list describes Option B as seven stories, ~240,000 sq ft.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"City of San José — Data Center and other Large Energy-Use Projects (application list updated 2026-07-13; Wayback capture 2026-08-13)","publisher":"City of San José Planning Division","retrievedAt":"2026-09-21","url":"http://web.archive.org/web/20260813091228/https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/data-center-and-other-large-energy-use-projects"},{"kind":"press","label":"Data center, hundreds of homes coming to downtown San Jose (2025-04-16)","publisher":"San José Spotlight","retrievedAt":"2026-09-21","url":"https://sanjosespotlight.com/data-center-hundreds-of-homes-coming-to-downtown-san-jose/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/westbank-323-terraine-street-san-jose-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"compute_atlas-dd8199f423fc5130","lat":38.8943,"location_precision":"approximate","lon":-77.4311,"name":"Chantilly Premier","operator":"Penzance","source_notes":"Roughly 12-acre site adjacent to Chantilly Auto Park south of Route 50. The Fairfax County Board of Supervisors approved the rezoning 8-1 in January 2024 over neighbour objections about height, traffic and environmental impacts; the approval permitted either a 150,000 sq ft warehouse or a data center up to 402,000 sq ft, and the building under construction is 236,000 sq ft. Reported as fully preleased, tenant undisclosed.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/penzance-chantilly-premier-fairfax-va"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Yorkville","confidence":"medium","id":"compute_atlas-dd8cdcbf991f1a5c","lat":41.699,"location_precision":"approximate","lon":-88.484,"name":"Project Steel Data Center Campus","operator":"Prologis","source_notes":"Petitioner Prologis, L.P. as contract purchaser across 16 parcels totalling roughly 540 acres east of Eldamain Road between Corneils Road and Galena Road. Plans as revised in March 2026 call for 16 data center buildings totalling over 9 million sq ft plus three electrical substations, built in three phases over about 20 years, with first-phase construction anticipated in summer 2027. Power capacity has not been disclosed. Coordinates are the centre of the described parcel boundaries and are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/prologis-project-steel-yorkville-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"high","contains_osm":true,"id":"compute_atlas-dd9c66071c327560","lat":41.8537537,"location_precision":"exact","lon":-87.6183798,"name":"Centersquare ORD1 (Chicago Cermak)","operator":"Centersquare (Csquare)","source_notes":"58,893 sq ft of raised floor. The operator publishes 32.8 MW utility capacity with 8.8 MW UPS and 16 MW generator capacity; utility service size is not IT load, so no capacity value is asserted here.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/centersquare-ord1-chicago-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10910879065"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/centersquare-chicago-data-center-ord1-osmnode-10910879065"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10910879065"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Byron Center","confidence":"medium","id":"compute_atlas-de09ece2c678a995","lat":42.826202163837,"location_precision":"approximate","lon":-85.67268596115,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-mi02-byron-center-mi","value":0.25}],"name":"US Signal MI02 Grand Rapids Data Center","operator":"US Signal","source_notes":"Multi-tenant colocation, a second Grand Rapids-area site paired with MI01 for regional redundancy. Operator's facility page (retrieved 2026-09-09) states: generator 450 kW at 2N, UPS 250 kW at 2N, utility 1,500 kVA, HVAC 242 tons N+1, Tier 2. Year built not stated. As of October 2026, the page also gives a critical IT workload of 250 kW, 15,750 total sq ft and 6,250 sq ft of whitespace; the operational capacity records the 250 kW critical IT workload, not the generator rating. Cooling medium not stated. Coordinates from the US Census geocoder, which matched the exact house number; parcel not confirmed. 123NET's own facility list gives the identical address (400 76th St SW, Byron Center) for its DC4 Grand Rapids data center, so this building appears to host two independent operators' colocation suites; both are recorded as separate records.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/us-signal-mi02-byron-center-mi"}],"state":"Michigan","status":"operating"},{"ai_classification":"confirmed","city":"Pampa","confidence":"medium","id":"compute_atlas-de217b3986327738","lat":35.5365,"location_precision":"approximate","lon":-100.9609,"name":"Google Meitner Energy Center","operator":"Google","source_notes":"Data center co-located with new energy generation, spanning Gray and Roberts counties near Pampa. Part of Google's ~$40B Texas commitment; Google took a stake in Intersect Power. IT capacity not disclosed. Coordinates are the Pampa area centroid. NewsChannel 10 (January 2026) calls it a $3 billion project, quoting the mayor; As of October 2026, the Intersect announcement states no project cost, so no investment figure is recorded. The same report says the data center will employ \"up to 30 workers or more per building\" across three planned buildings; the facility is not yet operational, so no job count is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google and Intersect deepen Texas roots with new data center and energy investments in Gray and Roberts Counties","publisher":"Intersect Power","retrievedAt":"2026-07-07","url":"https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties"},{"kind":"press","label":"Intersect Power's project ignites Ogallala Aquifer protection talks in Gray County","publisher":"ABC 7 Amarillo","retrievedAt":"2026-07-08","url":"https://abc7amarillo.com/news/local/intersect-powers-1-billion-project-ignites-ogallala-aquifer-protection-talks-meinter-intersect-power-project-pampa-chris-porter-mitchell-locke-highway-152-panhandle-groundwater-conservation-district-terry-hall-levi-berry-gray-county-roberts-county-texas"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-meitner-pampa-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Warrenton","confidence":"medium","id":"compute_atlas-de6f4ed8dc8479d4","lat":38.72948224074257,"location_precision":"exact","lon":-77.78753470617198,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/amazon-blackwell-road-warrenton-va","value":40.0}],"name":"Blackwell Road Data Center (Warrenton)","operator":"Amazon Data Services","source_notes":"Town of Warrenton SUP-22-3; 220,000 sq ft on 42 acres; site plan approved with 27 conditions (Apr 2024).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-03","url":"https://www.compute-atlas.com/facilities/amazon-blackwell-road-warrenton-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"compute_atlas-de94563bbb0dbe17","lat":33.7515,"location_precision":"approximate","lon":-84.7477,"name":"Vantage Data Centers Douglasville Campus","operator":"Vantage Data Centers","source_notes":"Reported as roughly 1.7 million sq ft across three buildings, filed August 2023. MW capacity omitted — no fetched source stated one.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Vantage Data Centers Plans Two New Sites in Georgia","publisher":"Inside Towers","retrievedAt":"2026-08-28","url":"https://insidetowers.com/vantage-data-centers-plans-two-new-sites-in-georgia/"}],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/vantage-douglasville-campus-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"likely","city":"Fernley","confidence":"medium","id":"compute_atlas-df005cfc4180258f","lat":39.6082,"location_precision":"approximate","lon":-119.2169,"name":"Microsoft Victory Logistics District Campus","operator":"Microsoft","source_notes":"~300.7-acre land acquisition at the Victory Logistics District in Fernley, Lyon County. Capacity and timeline not yet announced → proposed. Coordinates are the Fernley area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-fernley-nv"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-df1edaa8b2a247e3","lat":35.0046528,"location_precision":"approximate","lon":-81.1001847,"name":"QTS York County Data Center Campus","operator":"QTS Data Centers","source_notes":"Site is near Hands Mill Highway and Campbell Road in unincorporated York County (Clover area). York County sold 173 acres to QTS on 2023-07-26; QTS also purchased additional private land, so total campus acreage exceeds the county-sold figure. Investment reflects the $1 billion figure in the 2023 state announcement; York County's current page cites 'over $8 billion' in committed long-term investment for the campus. Coordinates are an approximate geocode of Hands Mill Highway. As of 2026-09-13, the SC Commerce announcement states no megawatt capacity figure and describes QTS only in generic colocation terms, so the AI classification cannot be confirmed for this specific site: an AI/GPU/HPC claim must be site-specific, not inferred from the operator's general business description. No community reception (support, opposition, hearings, or council votes) is documented in this source beyond standard economic-development congratulatory statements from the Governor, York County Council Chairwoman, and Secretary of Commerce, which describe state/county officials' reaction to the investment announcement, not documented public reception of the site by residents, so the community status is not characterized from them. As of September 2026, searches of the York County government site and the web, and attempts to read bizjournals.com and heraldonline.com, produced no capacity figure, AI classification or community reception, but bizjournals.com and heraldonline.com could not be read, so the search was inconclusive and is not a confirmed absence. As of October 2026, QTS's own York County campus page (q.com, the domain qtsdatacenters.com now redirects to) states an $8 billion investment and nine buildings in three phases, and gives no megawatt capacity.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS York County Data Center Campus","publisher":"QTS Data Centers","retrievedAt":"2026-09-10","url":"http://q.com/data-centers/york/"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/qts-york-county-sc"}],"state":"South Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Honolulu","confidence":"medium","contains_osm":true,"id":"compute_atlas-df25170fd8b3347c","lat":21.3056252,"location_precision":"exact","lon":-157.8555881,"name":"Hawaii State Data Center (Kalanimōkū Building)","operator":"State of Hawaii Office of Enterprise Technology Services","source_notes":"The state's primary enterprise data center is in the basement of the Kalanimōkū state office building. SB284 SD1 says it was created more than forty years ago, has had minimal upgrades, and is 'no longer used to run any critical state programs' in its current condition. The bill would have required it to be decommissioned by June 30, 2024, but enactment was not verified. In 2023 Civil Beat reported that about 70% of ETS data had moved to out-of-state servers, that sensitive data remained in the basement, and that Gov. Green had rejected relocation to the proposed Mililani First Responders Technology Campus. Whether the facility is still in use as of 2026 is not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"SB284 SD1 (2024): relocation of the state data center from the Kalanimoku building","publisher":"Hawaii State Legislature","retrievedAt":"2026-10-21","url":"https://data.capitol.hawaii.gov/sessions/session2024/Bills/SB284_SD1_.HTM"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/hawaii-ets-kalanimoku-state-data-center-honolulu-hi"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Encinal","confidence":"medium","contains_osm":true,"id":"compute_atlas-df8ebbfcfdc916f4","lat":28.0406329,"location_precision":"approximate","lon":-99.3552096,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","value":5000.0}],"name":"Project Star Data Center Campus","operator":"Related Digital","source_notes":"Announced Sept. 30, 2026 as a privately funded 5 GW campus on a site adjacent to the Project Star gas plant. The release names no tenant. The release gives no street, parcel or acreage; the pin is the Encinal village centroid. Lewis Energy's note to staff says Related Digital will develop the data centers that use the plant's power.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project Star, a $22.3 billion energy infrastructure campus in Encinal, Texas (joint press release, Sept. 30, 2026)","publisher":"NextEra Energy Newsroom (PR Newswire)","retrievedAt":"2026-10-26","url":"https://newsroom.nexteraenergy.com/2026-09-30-The-United-States-Department-of-Commerce-and-the-Government-of-the-Republic-of-Korea-Announce-Strategic-Investment-in-Project-Star,-a-22-3-billion-Energy-Infrastructure-Campus-in-Encinal,-Texas,-being-jointly-developed-by-Related-Companies-and?l=12"},{"kind":"press","label":"U.S. Dept. of Commerce and Republic of Korea announce Project Star","publisher":"Related Digital","retrievedAt":"2026-10-26","url":"https://www.related-digital.com/news/us-dept-of-commerce-and-republic-of-korea-announce-project-star"},{"kind":"press","label":"\"I want a seat at the table\" (La Salle County Judge on Project Star)","publisher":"Frio-Nueces Current","retrievedAt":"2026-10-26","url":"https://www.frio-nuecescurrent.com/2026/10/07/i-want-a-seat-at-the-table/"}],"updated":"2026-10-26","url":"https://newsroom.nexteraenergy.com/2026-09-30-The-United-States-Department-of-Commerce-and-the-Government-of-the-Republic-of-Korea-Announce-Strategic-Investment-in-Project-Star,-a-22-3-billion-Energy-Infrastructure-Campus-in-Encinal,-Texas,-being-jointly-developed-by-Related-Companies-and?l=12"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Portland","confidence":"high","contains_osm":true,"id":"compute_atlas-dfe8ecb3e164bae4","lat":45.5215436,"location_precision":"exact","lon":-122.680704,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.1547realty.com/data-center/portland-or-ptor1/","value":8.0}],"name":"Pittock Block (PTOR1)","operator":"1547 Critical Systems Realty","source_notes":"Carrier hotel in downtown Portland: 302,262 sq ft, 8 MW capacity, five on-site generators providing 7 MW of backup, 16 fiber carriers, 170+ service providers, seven subsea cable landings and an AWS Direct Connect location. Home of the Pittock Internet Exchange (NWAX).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"1547 Critical Systems Realty — Portland (Pittock Block / PTOR1): 302,262 sq ft, 8 MW","publisher":"1547 Critical Systems Realty","retrievedAt":"2026-09-05","url":"https://www.1547realty.com/data-center/portland-or-ptor1/"}],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/pittock-block-portland-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/369452572"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/pittock-block-osmway-369452572"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/369452572"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Tempe","confidence":"medium","contains_osm":true,"id":"compute_atlas-dff4fa3838465781","lat":33.3446197,"location_precision":"exact","lon":-111.8992189,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digital-realty-phx-tempe-az","value":33.8}],"name":"Digital Realty PHX (Tempe)","operator":"Digital Realty","source_notes":"2055 E Technology Circle, Tempe AZ 85284 (former Arizona Republic printing plant, converted 2001; 33.8MW). Marketed under DLR's Phoenix metro directory.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/220518160","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/220518160"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-phx-tempe-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"likely","city":"Henderson","confidence":"medium","contains_osm":true,"id":"compute_atlas-e019ef421b96e79e","lat":36.056187,"location_precision":"approximate","lon":-115.042545,"name":"Google Henderson Data Center","operator":"Google","source_notes":"Google data center on West Warm Springs Rd (east of Boulder Highway), Henderson, Clark County — two parcels totaling ~64 acres, groundbreaking July 1 2019, a $600M project ($25.2M in state tax incentives), online 2020. Confirmed by Google's own Henderson location page. No site-specific IT-load MW is disclosed. Coordinates are an approximate geocode of the disclosed Warm Springs Rd location; a county-parcel pass could upgrade precision to exact.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google's Nevada data center to be powered by billion-dollar solar farm","retrievedAt":"2026-07-24","url":"https://www.datacenterdynamics.com/en/news/googles-nevada-data-center-be-powered-billion-dollar-solar-farm/"},{"kind":"osm","label":"OpenStreetMap way 844359206: Google data center building (540 West Warm Springs Road, Henderson)","publisher":"OpenStreetMap","retrievedAt":"2026-10-14","url":"https://www.openstreetmap.org/way/844359206"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/google-henderson-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"San Francisco","confidence":"medium","id":"compute_atlas-e0e2ad0aa9489988","lat":37.7532109,"location_precision":"approximate","lon":-122.3853887,"name":"1215 Michigan Street Data Center (Nestory Park Capital proposal)","operator":"Nestory Park Capital","source_notes":"Pre-application lead reported by the SF Chronicle; Supervisor Walton has proposed a 45-day District 10 data center moratorium. The record is marked rumored until a filing appears.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/nestory-park-1215-michigan-street-san-francisco-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Johnstown","confidence":"medium","id":"compute_atlas-e0f62b1648947664","lat":40.09294,"location_precision":"exact","lon":-82.718059,"name":"CyrusOne New Albany COL-1","operator":"CyrusOne","source_notes":"12181 Jug St, Johnstown — in the Licking County section of the New Albany International Business Park. 274,518 sq ft, two-story building. Ohio Tax Credit Authority approved a 10-year, 75% data center sales tax exemption valued at $5.4M (approved ~April 2024). No IT-load MW figure is publicly disclosed for this site — an earlier 60MW figure found in some secondary sources actually belongs to a different operator's nearby New Albany campus (STACK Infrastructure NAL01) and is not attributable to CyrusOne COL-1, so no capacity is recorded. No AI/HPC-specific marketing found as of July 2026 — treated as generic hyperscale colo.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CyrusOne breaks ground on New Albany, Ohio data center","publisher":"Data Center Dynamics","retrievedAt":"2026-07-10","url":"https://www.datacenterdynamics.com/en/news/cyrusone-breaks-ground-on-new-albany-ohio-data-center/"}],"updated":"2026-07-18","url":"https://www.compute-atlas.com/facilities/cyrusone-new-albany-col1-licking-county-oh"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Edgerton","confidence":"medium","id":"compute_atlas-e12e48e854e07c87","lat":38.77374,"location_precision":"approximate","lon":-94.953635,"name":"DAMAC Digital Heartland Data Center (Project Heartland)","operator":"DAMAC Digital Solutions Kansas LLC","source_notes":"Conversion of an existing 378,000 sq ft NorthPoint warehouse (built 2016) in Logistics Park Kansas City. The plans include 60 diesel backup generators. DAMAC has not requested tax abatements.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DAMAC Data Center – City of Edgerton","publisher":"City of Edgerton","retrievedAt":"2026-10-21","url":"https://edgertonks.org/damac-data-center/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/damac-heartland-edgerton-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"North Las Vegas","confidence":"medium","id":"compute_atlas-e16510559c6462d4","lat":36.231699,"location_precision":"approximate","lon":-115.102555,"name":"ColoXchange Las Vegas Data Center","operator":"ColoXchange","source_notes":"Small North Las Vegas colocation facility. No capacity is asserted: as of September 2026, the only megawatt figure found (1 MW) came from a search-results summary of a directory page that could not be retrieved.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-24","url":"https://www.compute-atlas.com/facilities/coloxchange-north-las-vegas-nv"}],"state":"Nevada","status":"operating"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-e1ab92ad62467f71","lat":30.852,"location_precision":"approximate","lon":-96.972,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stargate-milam-county-tx","value":1200.0}],"name":"Stargate Milam County Campus","operator":"OpenAI / SoftBank (SB Energy)","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"OpenAI Stargate: where the US sites stand — Epoch AI","publisher":"Epoch AI","retrievedAt":"2026-07-05","url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand"},{"kind":"press","label":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites — OpenAI","publisher":"OpenAI","retrievedAt":"2026-07-05","url":"https://openai.com/index/five-new-stargate-sites/"},{"kind":"press","label":"SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/"},{"kind":"permit","label":"OpenAI Stargate's Milam 'Freebird' data center to span 548,950 sq ft in first phase ($470M) — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/openai-stargates-milam-texas-freebird-data-center-to-span-548950-sq-ft-in-first-phase/"},{"kind":"press","label":"SoftBank's SB Energy plans $3 billion Texas data center — The Real Deal","publisher":"The Real Deal","retrievedAt":"2026-07-06","url":"https://therealdeal.com/texas/austin/2025/06/10/softbank-groups-sb-energy-plans-3-billion-texas-data-center/"},{"kind":"other","label":"OpenAI Stargate Milam | AI data centers","publisher":"Epoch AI","retrievedAt":"2026-10-16","url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/stargate-milam-county-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"confirmed","city":"Berry Hill","confidence":"medium","id":"compute_atlas-e1b3d954dbe69a0b","lat":36.68,"location_precision":"approximate","lon":-79.35,"name":"Berry Hill / Southern Virginia Megasite","operator":"STACK Infrastructure","source_notes":"Performance agreement sets a minimum investment of at least $73.5B over 30 years (at least 2,050 jobs); parallel reporting cites a ~$100B project scope. ~2,990 acres of the Southern Virginia Megasite; land deal ~$737.8M. The recorded investment figure is the agreement's minimum, at least $73.5 billion (Virginia Business, May 2026). The March 2026 draft agreement carried $73 billion and 2,050 jobs over 30 years (Cardinal News); Virginia Business puts the company's planned investment at about $100 billion over three decades, and Cardinal News describes the final document as outlining $100 billion and 2,500 jobs. The $100 billion figure is a planned total and is not recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"STACK commits $73.5bn investment into data center campus in Berry Hill, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/stack-commits-735bn-investment-into-data-center-campus-in-berry-hill-virginia/"},{"kind":"press","label":"STACK Infrastructure says it's moving forward with AI data center in Pittsylvania","publisher":"Cardinal News","retrievedAt":"2026-07-17","url":"https://cardinalnews.org/2026/06/30/stack-infrastructure-says-its-moving-forward-with-ai-data-center-in-pittsylvania/"},{"kind":"press","label":"Cardinal News","retrievedAt":"2026-07-25","url":"https://cardinalnews.org/2026/03/10/73-billion-project-at-pittsylvania-megasite-would-be-largest-in-southside-history/"},{"kind":"press","label":"Pittsylvania supervisors back $100B Berry Hill Data Center project","publisher":"WSET (ABC13)","retrievedAt":"2026-08-19","url":"https://wset.com/news/local/pittsylvania-county-advances-100b-data-center-campus-proposal-despite-resident-concerns-berry-hill-july-2026"},{"kind":"press","label":"Local leaders approve $100B AI data campus in Pittsylvania County amid citizen concerns","publisher":"WSET (ABC13)","retrievedAt":"2026-08-19","url":"https://wset.com/news/local/local-leaders-approve-100b-ai-data-campus-in-pittsylvania-county-amid-citizen-concerns-megasite-berry-hill-may-2026"},{"kind":"press","label":"Southside Virginia advances historic $100B Berry Hill data center campus despite resident pushback","publisher":"Construction Review Online","retrievedAt":"2026-10-14","url":"https://constructionreviewonline.com/southside-virginia-advances-historic-100b-berry-hill-data-center-campus-despite-resident-pushback/"},{"kind":"press","label":"A data center project in Pittsylvania was approved Monday with higher investment and jobs than previously announced","publisher":"Cardinal News","retrievedAt":"2026-10-14","url":"https://cardinalnews.org/2026/05/19/a-data-center-project-in-pittsylvania-was-approved-monday-with-higher-investment-and-jobs-than-previously-announced/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/stack-berry-hill-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"confirmed","city":"Glendale","confidence":"medium","id":"compute_atlas-e21c5296a5e39e2a","lat":33.5387,"location_precision":"approximate","lon":-112.186,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://news.constructconnect.com/aligned-data-centers-breaks-ground-in-glendale-expanding-arizona-infrastructure","value":72.0}],"name":"Aligned PHX-13","operator":"Aligned Data Centers","source_notes":"PHX-13, a 72 MW facility in Glendale, Maricopa County, the first of four planned facilities on Aligned's 100-acre Glendale campus. The 100 acres cover the whole campus, so no land area is recorded for this facility. Coordinates are the Glendale area centroid. Data Center Dynamics reports that Aligned acquired 100 acres at 8785 N Reems Rd in December 2024 for $86.5M from LXP Industrial Trust, and also reports that PHX-13 is reportedly at 8805 N Reems Rd while another Aligned facility, PHX-07, is at 8785; as of October 2026, no cited source confirms that the purchase is the PHX-13 site. The $86.5M is land cost, not campus capex -> no investment figure is recorded. No job counts disclosed -> no job count is recorded. The campus likely uses Arizona's statutory data-center TPT exemption (A.R.S. 41-1519), but no ACA certification or GPLET agreement for this campus is public -> no subsidy is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Aligned Data Centers breaks ground in Glendale, expanding Arizona infrastructure","publisher":"ConstructConnect","retrievedAt":"2026-09-14","url":"https://news.constructconnect.com/aligned-data-centers-breaks-ground-in-glendale-expanding-arizona-infrastructure"},{"kind":"press","label":"Aligned Data Centers breaks ground on Glendale facility (APS 230 kV line; closed-loop cooling)","publisher":"DCNN Magazine","retrievedAt":"2026-07-08","url":"https://dcnnmagazine.com/data-centres/aligned-data-centers-breaks-ground-on-glendale-facility/"},{"kind":"press","label":"Aligned breaks ground on data center in Phoenix, Arizona ($86.5M for 100 acres)","publisher":"Data Center Dynamics","retrievedAt":"2026-07-08","url":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-data-center-in-phoenix-arizona/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aligned-phx13-glendale-az"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Osawatomie","confidence":"medium","id":"compute_atlas-e226aa43c248f42f","lat":38.5016,"location_precision":"approximate","lon":-94.9522,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/alcove-project-catalyst-osawatomie-ks","value":500.0}],"name":"Project Catalyst (Osawatomie)","operator":"Alcove Development","source_notes":"283-acre site inside Osawatomie city limits. The capacity is reported as '500+ MW'. Coordinates are the city centroid, which is approximate. Residents report that the agenda referenced a natural gas power plant and easement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Osawatomie moves forward with 500-megawatt data center campus","publisher":"KCTV5","retrievedAt":"2026-10-21","url":"https://www.kctv5.com/2026/05/29/osawatomie-moves-forward-with-500-megawatt-data-center-campus/"}],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/alcove-project-catalyst-osawatomie-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Washington","confidence":"medium","id":"compute_atlas-e22f2e2f128a7de6","lat":38.903131,"location_precision":"approximate","lon":-77.039741,"name":"Cogent Washington DC 2 Data Center","operator":"Cogent Communications","source_notes":"Cogent's Washington DC metro page lists one data center: 'Washington DC 2 Data Center', 1050 Connecticut Ave, NW, Washington, DC 20036, with '16,763 Sq. Feet, 42U Cabinets, Private Cages available'. It is described as carrier-neutral, with UPS and backup generator. Operational status is inferred from the operator's current colocation listing. Ownership was checked separately: Cogent's 10-facility sale to an I Squared Capital-sponsored entity, closed June 29, 2026, covered Phoenix, Anaheim, Burbank, Stockton, Atlanta, Chicago, Elkridge, Kansas City, Nashville and Houston, and did not include Washington DC. Cogent therefore remains the operator per its own current site. No MW figure is published. A 500 kW generator figure seen only in an aggregator summary was not used. An aggregator also lists a 'Cogent Washington DC 1' at 1120 Vermont Ave NW, but Cogent's own site no longer lists it, so, as of October 2026, it is not tracked as a separate record. A third-party directory also places a CenterServ facility at 1050 Connecticut Ave; that was not verified and is not asserted here. Coordinates are from the US Census geocoder (street-interpolated), so the pin is approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-01","url":"https://www.compute-atlas.com/facilities/cogent-washington-dc-2-1050-connecticut-ave-dc"}],"state":"District of Columbia","status":"operating"},{"ai_classification":"unknown","city":"Cartersville","confidence":"medium","id":"compute_atlas-e242a59e1ddf1fe8","lat":34.1181,"location_precision":"approximate","lon":-84.8698,"name":"Oakley Real Estate Partners Brown Farm Road Data Center","operator":"Oakley Real Estate Partners","source_notes":"Rezoning request by Akin & Tate P.C. on behalf of Oakley Real Estate Partners for about 111.4 acres at the west end of Brown Farm Road, near the Etowah River, from A-1 (agricultural) to Business Park District, with a land-use-map change from low density residential to industrial. Oakley described it as a micro-scale data center it intends to market; no end user has been named. The plan is two buildings of about 374,000 sq ft in total, with a power substation and a single access drive, and a voluntary condition that the campus never exceed 450,000 sq ft. Other self-imposed conditions: setbacks of at least 200 ft from residential areas, and no cryptocurrency mining. Oakley estimated about 50 jobs and roughly $5 million a year in property taxes. At the Planning Commission hearing, Oakley said the substation and the nearest building would each sit 400 ft from the riverbank. The hearing was first set for 2026-07-27 but was removed from that agenda after county staff found a discrepancy in the notice sent to Native American nations with ties to the district. The Planning Commission voted 6-0 to recommend denial on 2026-08-24; the commissioner's 2026-09-02 agenda listed zoning applications, but as of 2026-09-30 neither the meeting minutes nor any press report of the final decision had been found. No Georgia DRI filing exists for the project. No capacity or investment figure has been disclosed. Coordinates are the western end of Brown Farm Road SW in OpenStreetMap, the location the press gives for the site, not a surveyed parcel centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Agenda, Public Meeting, Bartow County Commissioner, September 2, 2026","publisher":"Bartow County Commissioner's Office","retrievedAt":"2026-09-30","url":"https://cms2.revize.com/revize/bartowcounty/CommissionerOffice/AGENDA.PUBLIC_MEETING_9-2-2026.pdf"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/oakley-brown-farm-road-cartersville-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Tioga","confidence":"medium","id":"compute_atlas-e24e0a902aef056f","lat":48.28,"location_precision":"approximate","lon":-102.9424,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/teton-digital-project-trinity-tioga-nd","value":100.0}],"name":"Project Trinity (Teton Digital)","operator":"Teton Digital","source_notes":"100 MW liquid-cooled data center about eight miles south of Tioga, next to the Enerfore Digital site. Phase one was targeted for late 2025, pending approval. No energization or construction confirmation was found, and trackers disagree on status. Coordinates reuse the approximate 8-mi-south-of-Tioga point used for the adjacent Enerfore record.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/teton-digital-project-trinity-tioga-nd"}],"state":"North Dakota","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"compute_atlas-e26c0e91f96abdd1","lat":45.5476034,"location_precision":"exact","lon":-122.891975,"name":"Digital Realty PDX10","operator":"Digital Realty","source_notes":"48,000 ft² (4,450 m²) operating colocation facility in Hillsboro, LEED Gold certified, with N+1 cooling and 2N UPS options. Digital Realty publishes no IT-load figure for this building. Compute Atlas already tracks Digital Realty PDX11 and PDX12; PDX10 is a separate, separately-addressed building.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-05","url":"https://www.compute-atlas.com/facilities/digital-realty-pdx10-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Ogden","confidence":"medium","id":"compute_atlas-e2841a7b46681364","lat":41.223,"location_precision":"approximate","lon":-111.97384,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lumen-ogden-ut","value":3.0}],"name":"Lumen Ogden 1","operator":"Lumen","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. Ogden City RDA's nine active project areas (CBD Mall, Ogden River, East Washington, Trackline, Kiesel, Adams, Continental, Flagship, Airport) carry no mention of the 526 W 17th Street facility or of Lumen in their published descriptions, board minutes, or bond packets; the only named tax-increment recipient found in RDA search results is Williams International, unrelated to this site. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/lumen-ogden-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"likely","city":"Uhland","confidence":"medium","id":"compute_atlas-e30627c1d66e30a7","lat":29.9499,"location_precision":"approximate","lon":-97.7889,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tract-caldwell-valley-uhland-tx","value":2000.0}],"name":"Tract Caldwell Valley Technology Park","operator":"Tract","source_notes":"1,515-acre megasite in Caldwell County (Uhland area, between Austin and San Antonio); over 2 GW at full buildout (expansion toward ~4 GW is a ceiling — in notes), initial 360 MW utility delivery H1 2028 via Blue Bonnet Electric Cooperative. Land acquisition closed May 2025 (pre-construction). Coordinates are the Uhland area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Muskin | Elam Group — 1,500-acre data center campus, 800 jobs confirmed for small town in Caldwell County","retrievedAt":"2026-07-25","url":"https://muskin-elam.com/1500-acre-data-center-campus-800-jobs-confirmed-for-small-town-in-caldwell-county/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/tract-caldwell-valley-uhland-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Enid","confidence":"medium","id":"compute_atlas-e31cf6ec361c8afe","lat":36.3967623,"location_precision":"approximate","lon":-97.8791341,"name":"Project Thunderbird (Enid)","operator":"Plainsmen Holdings, LLC","source_notes":"Four proposed campuses along a single corridor in Enid and Garfield County (sites north, east, west-central and south of Enid; Enid News & Eagle names 22nd and Phillips, 5th and Rupe, and South 5th south of Rupe). Acreage is reported as 1,735 by Oklahoma Energy Today and ~1,655 by the Enid News & Eagle — the larger figure is recorded here and the discrepancy is unresolved. Coordinates are the city of Enid: this is a four-campus proposal with no single footprint. The $35 billion investment figure appears only in secondary coverage and is omitted here. Briefed to Vance Air Force Base and the Department of the Air Force, but nothing has been signed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Massive data center campus unveiled for Enid","publisher":"Oklahoma Energy Today","retrievedAt":"2026-09-14","url":"https://okenergytoday.com/2026/09/massive-data-center-campus-unveiled-for-enid/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/plainsmen-project-thunderbird-enid-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"compute_atlas-e31fa9c20a66a86e","lat":36.132143,"location_precision":"approximate","lon":-86.752262,"name":"Cogent Data Center - Nashville (338 Woodycrest Ave)","operator":"Cogent Communications","source_notes":"Carrier/colocation facility. The coordinates come from a US Census geocode of the street address, not a parcel footprint. Third-party directories report about 27,500 sq ft and 2.5 MW, but those figures were not read from a fetched page, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-10","url":"https://www.compute-atlas.com/facilities/cogent-nashville-woodycrest-tn"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Maryland Heights","confidence":"medium","contains_osm":true,"id":"compute_atlas-e34295a933ced39b","lat":38.6993591,"location_precision":"exact","lon":-90.4114091,"name":"TierPoint St. Louis - Millpark","operator":"TierPoint","source_notes":"23,000+ sq ft total, 14,400+ sq ft raised floor, two 2 MW backup generators (no facility IT capacity stated). Interconnected with TierPoint's St. Louis Olive and Kansas City (Lenexa) sites.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/tierpoint-st-louis-millpark-mo"}],"state":"Missouri","status":"operating"},{"ai_classification":"mixed_use","city":"Pryor","confidence":"medium","id":"compute_atlas-e36b31bae7d0a24a","lat":36.32,"location_precision":"approximate","lon":-95.31,"name":"Google Pryor Data Center Campus (Mayes County Expansion)","operator":"Google","source_notes":"Campus operational since 2011; Google's second-largest data center globally per Alphabet CIO Ruth Porat. Four expansions now underway. $5.7B+ invested historically in Oklahoma prior to August 2025 $9B commitment. Expansion capacity and MW not publicly specified. Coordinates are Pryor city center.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-pryor-ok"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Walker","confidence":"medium","contains_osm":true,"id":"compute_atlas-e3848011dbeb53b1","lat":30.4541822,"location_precision":"approximate","lon":-90.8767224,"name":"Buddy Ellis Road Data Center Site (Walker)","operator":"Undisclosed (tract rezoned at the request of Juban Land Holdings, LLC)","source_notes":"No operator has been announced. A council member has said the project is controlled by Microsoft; the parish president has said he signed no NDA and has no project to announce, so no operator is asserted here. Dixie Electric Membership Cooperative has separately sought expedited authority for up to 1 GW of generation, supported by confidential LPSC testimony in November 2025; that filing is a lead, not confirmation of a built or awarded site. The coordinate is the OpenStreetMap centre of the roughly 2.4 km Buddy Ellis Road corridor south of Walker, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"LouisianaVoice learns new data center on tap for Livingston Parish; everything was done in secrecy through use of NDAs","publisher":"LouisianaVoice","retrievedAt":"2026-09-15","url":"https://louisianavoice.com/2026/08/31/louisianavoice-learns-new-data-center-on-tap-for-livingston-parish-everything-was-done-in-secrecy-via-use-of-ndas/"},{"kind":"press","label":"Livingston Parish President denies signing NDA for data center but does not say whether a deal is in the works or not","publisher":"LouisianaVoice","retrievedAt":"2026-09-15","url":"https://louisianavoice.com/2026/09/01/livingston-parish-president-denies-signing-nda-for-data-center-but-does-not-say-whether-a-deal-in-the-works-or-not/"}],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/walker-buddy-ellis-road-data-center-livingston-la"}],"state":"Louisiana","status":"planned"},{"ai_classification":"likely","city":"Mesa","confidence":"medium","id":"compute_atlas-e3d9f4c357d8a2a1","lat":33.3615205,"location_precision":"approximate","lon":-111.6012177,"name":"Apple Mesa Data Center (Global Command Center)","operator":"Apple","source_notes":"Apple's Global Data and Command Center at 3740 S Signal Butte Rd, Mesa, Maricopa County — a converted former GT Advanced sapphire plant (~1.3M sq ft), operational in the ~2016-2018 window, a $2B investment (Mesa Now / Data Center Knowledge), solar-powered. Functions as Apple's worldwide data-center monitoring/command hub. Apple's Feb 2025 newsroom names Arizona among states for continued data-center capacity expansion. As of July 2026, no site-specific IT-load MW is disclosed. A January 2014 Federal Register notice from the Foreign-Trade Zones Board describes the proposed subzone at 3740 S. Signal Butte Rd as 83.17 acres. Coordinates are an approximate geocode of the Signal Butte Rd address, not a surveyed building footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Grand opening for Apple's Arizona Data and Global Command Center in Mesa — $2B, 1.3M sq ft","publisher":"Mesa Now (Mesa economic development)","retrievedAt":"2026-07-19","url":"https://mesanow.org/news/public/article/2149"},{"kind":"press","label":"Step Inside Apple's Data Center in Arizona — 1.3M sq ft, latest expansion completed April 2018","publisher":"Data Center Knowledge","retrievedAt":"2026-07-19","url":"https://www.datacenterknowledge.com/business/step-inside-apple-s-data-center-in-arizona-courtesy-of-the-arizona-republic"},{"kind":"press","label":"Apple plants crowning achievement for renewable energy in Mesa (Arizona Technology Council)","retrievedAt":"2026-07-24","url":"https://www.aztechcouncil.org/tech_magazine/apple-plants-crowning-achievement-for-renewable-energy-in-mesa/"},{"kind":"press","label":"Apple is building a solar-powered data 'command center' in Arizona (Quartz)","retrievedAt":"2026-07-24","url":"https://qz.com/337842/apple-is-building-a-solar-powered-data-command-center-in-arizona"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/apple-mesa-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Itasca","confidence":"high","contains_osm":true,"id":"compute_atlas-e3e47ad0bc1dc88e","lat":41.9879619,"location_precision":"exact","lon":-88.0072217,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/ntt-chicago-ch1-data-center-il","value":36.0}],"name":"NTT Chicago CH1 Data Center","operator":"NTT Global Data Centers","source_notes":"255 Pierce Rd, Itasca, 36MW/126,000 sqft, opened 2019.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1154636644","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1154636644"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/ntt-chicago-ch1-data-center-il"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1271571726","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1271571726"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/ntt-chicago-ch2-data-center-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NTT data center campus (Village of Itasca)","publisher":"Village of Itasca","retrievedAt":"2026-10-15","url":"https://itasca.com/2279/NTT"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/ntt-chicago-ch3-itasca-il"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"NTT data center campus (Village of Itasca)","publisher":"Village of Itasca","retrievedAt":"2026-10-15","url":"https://itasca.com/2279/NTT"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/ntt-chicago-ch4-itasca-il"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1446350367"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ntt-chicago-ch3-osmway-1446350367"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Sanford","confidence":"medium","id":"compute_atlas-e3eb6deb535fb022","lat":43.4387179,"location_precision":"approximate","lon":-70.7746224,"name":"Sanford Woods Data Center","operator":"New England Energy","source_notes":"Reported capacity range is 100-300 MW (not a firm committed figure; not recorded as capacity pending a formal filing). Proposed as one component of the 1,060-acre 'Sanford Woods Industrial and Technical Campus' in south Sanford, bisected by the Mousam River, on land owned since 1975 by the Gibbs family's New England Energy (Randy Gibbs, founder of Multifuels of Houston, TX; co-developer Walt Bussells). Co-located with a planned 300 MW hydrogen fuel-cell power plant (as of October 2026, tracked separately as Sanford Woods Hydrogen Fuel Cell Power Plant), a 50-acre industrial greenhouse, and a cold-storage facility. Cumulative campus investment reported at ~$2.16 billion (a tally by Sanford City Manager Steve Buck, as reported by the Sanford Springvale News) with ~100 long-term jobs for the project as a whole (State Sen. Matthew Harrington's figure, as reported by the same paper) -- both figures span the whole campus, not the data center alone, so they are not recorded as this facility's investment or jobs. No land area is recorded, because the 1,060-acre parcel is the whole campus, not the data center's footprint alone. Disclosed to the Maine Legislature's Energy and Utilities Committee in February 2026; marketing, partner selection, financing and permitting expected to take ~2 years. Maine's 2026 data-center moratorium debate would allow continued groundwork but block new construction permits before 2028.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Company eyes Sanford site for data center","publisher":"Sanford Spring Vale News","retrievedAt":"2026-10-04","url":"https://sanfordspringvalenews.com/company-eyes-sanford-site-for-data-center/"},{"kind":"press","label":"Data center could pump $2 billion into city","publisher":"Sanford Spring Vale News","retrievedAt":"2026-10-04","url":"https://sanfordspringvalenews.com/data-center-could-pump-2-billion-into-city/"},{"kind":"press","label":"Sanford imposes emergency data center moratorium, halting Mousam River project","publisher":"Portland Press Herald","retrievedAt":"2026-10-22","url":"https://www.pressherald.com/2026/05/19/sanford-imposes-emergency-data-center-moratorium-halting-mousam-river-project/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/new-england-energy-sanford-woods-dc-me"}],"state":"Maine","status":"planned"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","contains_osm":true,"id":"compute_atlas-e3f05d543bf417a5","lat":38.9995277,"location_precision":"exact","lon":-77.4501109,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-ashburn-1-va","value":55.0}],"name":"QTS Ashburn 1","operator":"QTS Data Centers","source_notes":"Confirmed DC1 at 22271 Broderick Drive, Sterling VA (operational); DC2 at 22280 Randolph Drive under construction as part of same campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS facility directory","publisher":"QTS","retrievedAt":"2026-09-21","url":"https://q.com/data-centers/ashburn-1/"},{"kind":"osm","label":"OpenStreetMap way/701923200","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/701923200"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-ashburn-1-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS facility directory","publisher":"QTS","retrievedAt":"2026-09-21","url":"https://q.com/data-centers/ashburn-2/"},{"kind":"osm","label":"OpenStreetMap way/1064211366","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1064211366"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-ashburn-2-ashburn-lockridge-va"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"high","contains_osm":true,"id":"compute_atlas-e46008b4ceb5aa63","lat":37.3341181,"location_precision":"approximate","lon":-121.891646,"name":"CoreSite SV1 - San Jose, CA","operator":"CoreSite","source_notes":"OSM name 'San Jose Colocation Center' matches SV1 at 55 S. Market St, confirmed via facility page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap node/8897151054","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/node/8897151054"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/coresite-sv1-san-jose-ca-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8897151054"}],"state":"California","status":"operating"},{"ai_classification":"likely","city":"Washingtonville","confidence":"medium","id":"compute_atlas-e4aed2ed94bea631","lat":41.05,"location_precision":"approximate","lon":-76.67,"name":"Talen Energy Montour Data Center Campus","operator":"Talen Energy","source_notes":"Talen is seeking to rezone approximately 1,000 acres in northern Montour County from agricultural to industrial; the company anticipates about a dozen buildings, each on two to three acres. Acreage figure is the rezoning request area, not a confirmed campus footprint, so no land area is recorded. The request has drawn substantial local opposition over land use, pollution, water and noise. No tenant has been named.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DEP Invites Comments On Air Permit For Montour CT Natural Gas Power Plant Expansion In Montour County To Feed Data Centers","publisher":"PA Environment Digest","retrievedAt":"2026-08-31","url":"https://paenvironmentdaily.blogspot.com/2026/08/dep-invites-comments-on-air-permit-for.html"}],"updated":"2026-08-31","url":"https://www.compute-atlas.com/facilities/talen-montour-data-center-campus-montour-county-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Ontario","confidence":"medium","id":"compute_atlas-e4e364ca7859be95","lat":34.0633,"location_precision":"approximate","lon":-117.6509,"name":"One Data Center America (Ontario Campus)","operator":"One Data Center America, LLC","source_notes":"Operator's own site confirms two Ontario, CA facilities under this brand (an original site and a newer \"Second Data Center / ONT-2\"), in the Inland Empire near the I-10/I-15 interchange, carrier-neutral with an on-site 110ft telecom tower and dark-fiber transport to Downtown LA per a 2019 local-press item corroborating the company's existence at that time. No exact street address is confirmed by the cited sources: two business-directory listings (Yelp) named 350 S Milliken Ave and 3833 Ebony St, Ontario as possible addresses for the two sites, but neither could be retrieved directly as of September 2026, so neither is used as a source and neither address is recorded. Recorded as a single city-level entry rather than two records to avoid guessing which address belongs to which site or inventing a second coordinate. Capacity/square footage not disclosed in the cited sources.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"One Data Center America — homepage","publisher":"One Data Center America, LLC","retrievedAt":"2026-09-12","url":"https://onedatacenteramerica.com/"}],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/one-data-center-america-ontario-ca"}],"state":"California","status":"operating"},{"ai_classification":"confirmed","city":"Lansing","confidence":"medium","id":"compute_atlas-e4fab4b7cbbac4fa","lat":42.5453,"location_precision":"approximate","lon":-76.4968,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.ithaca.com/news/regional_news/tompkins-county-legislature-urges-state-to-deny-water-permit-for-lansing-data-center/article_1d89f22d-fcd0-43b3-97e2-173e08a483ea.html","value":400.0}],"name":"TeraWulf AI Data Center Campus, Lansing","operator":"TeraWulf","source_notes":"Site is the former Cayuga Power Plant (coal-fired, retired). NYSDEC water permit application for Cayuga Lake withdrawal was originally filed in 2021 for 'unspecified future use.' Permit dates to 1955 without modern monitoring requirements per opposition. TeraWulf also has a separate cryptomining operation at the Susquehanna site in PA (Nautilus). Operating entity: Cayuga Operating Company (acquired plant). No status change. The April 2026 DEC water-withdrawal/SPDES action is explicitly for the existing power plant's current operations, not the data center; DEC states it is 'not associated with the proposed data center'. As of the sources fetched 2026-09-09 the project remains proposed and had not cleared local site-plan review. Do not read the water permit as a data-center permit.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Tompkins County Legislature Urges State to Deny Water Permit for Lansing Data Center","publisher":"Ithaca.com","retrievedAt":"2026-07-06","url":"https://www.ithaca.com/news/regional_news/tompkins-county-legislature-urges-state-to-deny-water-permit-for-lansing-data-center/article_1d89f22d-fcd0-43b3-97e2-173e08a483ea.html"},{"kind":"press","label":"Data Center Developer Secures Long-Term Lease of Cayuga Power Plant","publisher":"The Ithaca Times","retrievedAt":"2026-09-14","url":"https://www.ithaca.com/news/tompkins_county/data-center-developer-secures-long-term-lease-of-cayuga-power-plant/article_af47439f-e785-4519-9018-6ad0a9de5048.html"},{"kind":"press","label":"Proposed data centers dividing New Yorkers — Lake Hawkeye (Lansing): planning board asked for more work; CLEAN lawsuit over runoff/coal ash; ~100 permanent jobs","publisher":"Spectrum News / NY State of Politics","retrievedAt":"2026-09-21","url":"https://nystateofpolitics.com/state-of-politics/new-york/environment/2026/07/07/proposed-data-centers-divide-new-yorkers"},{"kind":"press","label":"Tompkins County residents oppose AI data center on Cayuga Lake","publisher":"WBNG","retrievedAt":"2026-10-26","url":"https://www.wbng.com/2026/01/28/tompkins-county-residents-oppose-ai-data-center-cayuga-lake/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/terawulf-lansing-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"North Port","confidence":"medium","id":"compute_atlas-e51ee359901642a8","lat":27.0677773,"location_precision":"approximate","lon":-82.0743791,"name":"Deep Park Data Center (North Port 300)","operator":"North Port Holdings 300 LLC (end operator undisclosed)","source_notes":"Seven data center buildings totaling ~896,000 sq ft (incl. ~123,200 sq ft office) on ~112 acres within the 282-acre 'Deep Park' master concept (Activity Center 6) north of I-75 and south of Yorkshire Street. Applicant LLC is registered to Valley Stream, NY; end tenant is under NDA. Application filed 2026-07-20; ~22.5 acres of stormwater ponds and 4.14 acres of wetland impacts per filings.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"City of North Port — Data Center Info (application timeline)","publisher":"City of North Port","retrievedAt":"2026-09-21","url":"https://engage.zencity.io/north-port-fl/en-US/projects/data-center-info-jp3"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/north-port-holdings-300-deep-park-north-port-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Mount Comfort","confidence":"medium","id":"compute_atlas-e544b9f9b93489a7","lat":39.862,"location_precision":"approximate","lon":-85.868,"name":"Mt. Comfort Technology Park","operator":"EQT Real Estate","source_notes":"Site is northwest of County Roads 500 North and 500 West, north of Walmart's IND3 distribution center and Indianapolis Regional Airport. Currently zoned Industrial Business Park; EQT intended to seek Industrial General rezoning. EdgeConneX is EQT's data center builder affiliate. The letter states 100-150 permanent jobs and a PILOT framework ($22.2M upfront, $22M/yr at full buildout). Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-16","url":"https://www.compute-atlas.com/facilities/eqt-mt-comfort-technology-park-hancock-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Mount Prospect","confidence":"medium","id":"compute_atlas-e5636d6f95ccbcbd","lat":42.055,"location_precision":"approximate","lon":-87.935,"name":"CloudHQ Mount Prospect (ORD) Campus","operator":"CloudHQ","source_notes":"$2.5B, ~1.5 million sq ft across three two-story hyperscale buildings (each >80 MW) on a 49.7-acre site; ComEd grid partnership. Update: the village board approved a revised plan (~Oct 2025) consolidating the original three two-story buildings into two three-story buildings plus a second electrical substation, superseding the building-count description above; confirmed delivery targets are the first building in 2027 and the second by end of 2030. As of July 2026, CloudHQ was mid-permitting the revised design (~3,700 drawing sheets, 1,500+ pages of structural calcs); the village hired outside firm HR Green to review it. Construction is active, with cranes on the fenced 50-acre site as of January 2026. Public reception, as of 2026-09-10: the Daily Herald's Mount Prospect coverage and the original CloudHQ groundbreaking press release could not be read past a paywall or block. Notable circumstantial signal: the Village of Mount Prospect maintains its own dedicated 'Community Information and Fact Check Portal' page specifically for this project, which typically indicates the village has been fielding enough resident questions/concerns to warrant an official FAQ/rebuttal page -- but that page's content could not be read either, so no public-reception status is asserted from an inference that could not be verified. Search results also point to reporting, not read directly, that Illinois data-center opposition broadly 'escalates' statewide and that the village sought outside help on Biometric Information Privacy Act (BIPA)-related permitting questions; neither could be confirmed as specific to community opposition at this site. Public reception is therefore given as unknown rather than guessed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CloudHQ breaks ground on 1.5 million sq ft campus in Mount Prospect, Illinois","publisher":"DatacenterDynamics","retrievedAt":"2026-08-03","url":"https://www.datacenterdynamics.com/en/news/cloudhq-breaks-ground-on-15-million-sq-ft-campus-in-mount-prospect-illinois/"},{"kind":"press","label":"ComEd joins with CloudHQ to build $2.5B data center in northern Illinois","publisher":"Daily Energy Insider","retrievedAt":"2026-08-03","url":"https://dailyenergyinsider.com/innovation/36434-comed-joins-with-cloudhq-to-build-2-5b-data-center-in-northern-illinois/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/cloudhq-mount-prospect-ord-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-e5742b6425db7e29","lat":32.6467914,"location_precision":"approximate","lon":-83.4351636,"name":"Pine Ridge Tech Park","operator":"Eagle Rock Partners","source_notes":"Up to nine buildings, three substations and two retention ponds on roughly 300 acres of Weyerhaeuser-owned timberland near the Ocmulgee River, served by twin 230 kV lines. As of October 2026, neither cited source gives a megawatt figure; Georgia Public Broadcasting says the campus is \"expected to draw as much electricity as the cities of Macon and Augusta combined\", so no planned capacity is recorded. No corporate lessee had been named at rezoning. Projected taxable value of $2bn is a tax-base figure, not a stated investment, so no investment figure is recorded. Coordinates are the Twiggs County centroid (OSM Nominatim) — the site is near the county's western river edge, so the pin is indicative only.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/eagle-rock-pine-ridge-tech-park-twiggs-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-e5a97711f217f194","lat":45.5588149,"location_precision":"exact","lon":-122.9277661,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-hillsboro-1-or","value":20.0}],"name":"QTS Hillsboro 1","operator":"QTS Data Centers","source_notes":"Confirmed at 4951 NE Huffman St, Hillsboro, OR 97124, 25-acre multi-building campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/729192992","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/729192992"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/qts-hillsboro-1-or"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS Data Centers — Hillsboro 2: '51 acre campus', '180 MW+', four buildings at DC1 4755 NE Huffman St, DC2 4425 NE Huffman St, DC3 4327 NE Huffman St, DC5 4113 NE Huffman St, Hillsboro, Oregon","publisher":"QTS Data Centers","retrievedAt":"2026-08-14","url":"http://q.com/data-centers/hillsboro-2/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/qts-hillsboro-2-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Des Plaines","confidence":"medium","id":"compute_atlas-e5af6b4bf300e4ed","lat":42.0116575,"location_precision":"approximate","lon":-87.8811913,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/iron-mountain-chi1-des-plaines-il","value":36.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/iron-mountain-chi1-des-plaines-il","value":12.0}],"name":"Iron Mountain CHI-1","operator":"Iron Mountain Data Centers","source_notes":"13-acre campus, 315,000 sq ft with four planned 28,000 sq ft data halls; operator states a \"36MW IT load design\" being built out in phases. Subsidy value is the state's estimated tax benefit on a $320,000,000 investment commitment. Coordinates geocoded from the published street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (Iron Mountain Data Centers, LLC, Des Plaines, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/iron-mountain-chi1-des-plaines-il"}],"state":"Illinois","status":"operating"},{"ai_classification":"likely","city":"San Diego","confidence":"medium","id":"compute_atlas-e5c10dcde00e9173","lat":32.8377287,"location_precision":"approximate","lon":-117.132639,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/scalematrix-san-diego-ca","value":20.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/scalematrix-san-diego-ca","value":5.0}],"name":"ScaleMatrix San Diego","operator":"ScaleMatrix","source_notes":"ScaleMatrix's own site discloses '5MW aggregate availability; 20MW+ utility upgrade capacity' - the widely-repeated flat '20MW' figure on aggregator sites is the future upgrade ceiling, not installed/operational capacity; cross-validated by an independent SDG&E-sourced interconnection record showing <10MW. A May 2026 expansion added 46,000 sq ft to the ~50,000 sq ft Kearny Mesa campus (~96,000 sq ft total) - this 'doubling' is square footage, not MW capacity. The AI classification is set to likely: ScaleMatrix markets GPU-as-a-Service explicitly for HPC/deep learning/AI workloads, and this San Diego site is confirmed as the location of a ScaleMatrix/HPE 'Hybrid HPC Center of Excellence.' Address confirmed via a Washington-state LLC filing and parcel records; this is the company's headquarters campus, operating since approximately 2011-2012 in the Kearny Mesa neighborhood of the City of San Diego.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Scalematrix Management, LLC - business entity filing (5775 Kearny Villa Rd address)","publisher":"Washington State Corporations Registry","retrievedAt":"2026-08-02","url":"https://opengovwa.com/corporation/604264407"},{"kind":"press","label":"ScaleMatrix nearly doubles size of San Diego data center","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/scalematrix-nearly-doubles-size-of-san-diego-data-center/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/scalematrix-san-diego-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Malcolm","confidence":"medium","id":"compute_atlas-e5d9b56f8d7eda7c","lat":40.88,"location_precision":"approximate","lon":-96.8,"name":"Coffee Grounds Data Site (northwest Lincoln, east of Malcolm)","operator":"Coffee Grounds Data LLC (Arevia Power)","source_notes":"About 560 acres were optioned by landowner Larry Coffey. The site is just east of Malcolm, near U.S. 34 and Nebraska 79, and the agreement is recorded at about $3.46 million. The coordinates are an approximate placement from that description. Arevia Power is a utility-scale solar developer. Lancaster County currently requires industrial zoning for data centers and has set up a data center task force.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Another data center developer is eyeing land just outside of Lincoln","publisher":"Nebraska Public Media","retrievedAt":"2026-10-30","url":"https://nebraskapublicmedia.org/en/news/news-articles/another-data-center-developer-is-eyeing-land-just-outside-of-lincoln/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/coffee-grounds-data-arevia-malcolm-lancaster-ne"}],"state":"Nebraska","status":"planned"},{"ai_classification":"unknown","city":"Cannon Falls","confidence":"medium","id":"compute_atlas-e5dae2462b2fbcf8","lat":44.5068445,"location_precision":"approximate","lon":-92.9062175,"name":"Cannon Falls Technology Park (Tract)","operator":"Tract","source_notes":"The site lies just north of Cannon Falls, between Highway 52 and Rochester Blvd, on land annexed from Randolph Township. Reported acreage is about 240 to 250+ acres. The pin is the city centroid because no parcel point was sourced. The Post Bulletin article (Nov 6, 2025) says the vote was 'Wednesday', inferred as Nov 5, 2025. Investment figures conflict ('$30 billion over 20 years' per KSTP versus 'hundreds of millions to potentially a billion' per KTTC), so investment is omitted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cannon Falls, Pine Island are both discussing bringing data centers to their towns","publisher":"KSTP","retrievedAt":"2026-10-13","url":"https://kstp.com/accountability/cannon-falls-pine-island-are-both-discussing-bringing-data-centers-to-their-towns/"},{"kind":"press","label":"Where are data centers being proposed in Minnesota? We are tracking them.","publisher":"Courier Minnesota","retrievedAt":"2026-10-13","url":"https://couriermn.com/news/environment/where-are-data-centers-being-proposed-in-minnesota-we-are-tracking-them/"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/tract-cannon-falls-technology-park-mn"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"West Richland","confidence":"medium","id":"compute_atlas-e62f8b1f83f9f547","lat":46.3046,"location_precision":"approximate","lon":-119.3667,"name":"Trammell Crow Lewis & Clark Ranch Data Center","operator":"Trammell Crow Company","source_notes":"Feasibility-stage proposal on part of the 7,600-acre Lewis & Clark Ranch; the mayor said the data center would be situated on 500 acres to start and grow to 1,000 acres in total; due diligence and a purchase-and-sale agreement with landowner Frank Tiegs LLC underway as of Dec 2025; no capacity or investment figure disclosed; BPA power availability cited as the open question.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/trammell-crow-lewis-clark-ranch-west-richland-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"confirmed","city":"Temple","confidence":"medium","id":"compute_atlas-e637da041c36f9f4","lat":31.1399225,"location_precision":"approximate","lon":-97.3812992,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-temple-tx","value":152.0}],"name":"Meta Temple Data Center","operator":"Meta","source_notes":"Three-building greenfield campus of more than 750,000 sq ft of data center and administrative space. JE Dunn lists the project status as completed. Meta reported $1.7m in direct funding to Bell County schools and nonprofits, including a $400,000 grant announced at the opening.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta goes live in Temple with $1.2 billion AI data center","publisher":"KWTX","retrievedAt":"2026-08-26","url":"https://www.kwtx.com/2026/07/22/meta-goes-live-temple-with-12-billion-ai-data-center/"},{"kind":"other","label":"Meta Temple Data Center — project page (general contractor)","publisher":"JE Dunn Construction","retrievedAt":"2026-08-26","url":"https://jedunn.com/projects/meta-temple-data-center/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/meta-temple-tx"}],"state":"Texas","status":"operating"},{"ai_classification":"confirmed","city":"Buffalo","confidence":"medium","id":"compute_atlas-e652dbbfa32c2ac2","lat":42.8949,"location_precision":"approximate","lon":-78.8677,"name":"Empire AI Beta","operator":"Empire AI consortium (hosted by the University at Buffalo, SUNY)","source_notes":"New York State-funded public AI supercomputer, the second phase (Beta) of the Empire AI consortium. UB states it is \"housed at the Center of Excellence in Bioinformatics and Life Sciences on the medical campus\"; coordinates are geocoded to that building on the Buffalo Niagara Medical Campus, hence approximate. Described as \"a $40 million NVIDIA-powered supercomputer\" delivering \"an 11-fold increase in AI training capacity, a 40-fold boost in AI inference and an 8-fold expansion in data storage\" versus Alpha. As of 2026-09-09, none of the three retrieved sources states a GPU count, an IT load or any MW figure, a water/cooling detail, an acreage, or a job count for Beta. Empire AI overall is backed by \"over $500 million in public and private funding\"; that is consortium-wide, not this site, so it is not recorded as an investment figure. The Alpha phase (launched 2024, Simons Foundation gift) is also housed at UB and is the predecessor system on the same campus, not a separate site. The permanent Gamma facility is tracked separately as Empire AI Gamma as of September 2026. The governor's office states that the consortium's funding includes \"up to $340 million in state capital funding\"; that is a consortium-wide ceiling covering Empire AI statewide, not attributable to this phase or site, so it is not recorded and not counted against both the Beta and Gamma records. The $40 million Beta award, approved by the Empire State Development board, is recorded as the investment figure. It is a state grant to a public research consortium rather than an incentive to a company, so no subsidy entry is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Governor Hochul Announces Empire AI Beta Fully Online as Federal Government Takes Inspiration From New York to Launch State and Regional AI Infrastructure Hubs","publisher":"Office of the Governor of New York State","retrievedAt":"2026-09-09","url":"https://www.governor.ny.gov/news/governor-hochul-announces-empire-ai-beta-fully-online-federal-government-takes-inspiration-new"},{"kind":"press","label":"Empire AI Beta, housed at UB, now fully online","publisher":"University at Buffalo (UBNow)","retrievedAt":"2026-09-09","url":"https://www.buffalo.edu/ubnow/stories/2026/08/empire-ai-beta.html"},{"kind":"press","label":"Governor Hochul Announces $40 Million to Launch Empire AI Beta Supercomputer","publisher":"Office of the Governor of New York State","retrievedAt":"2026-09-09","url":"https://www.governor.ny.gov/news/governor-hochul-announces-40-million-launch-empire-ai-beta-supercomputer"},{"kind":"press","label":"Empire AI, housed at UB, awarded $40 million, Gov. Hochul says","publisher":"University at Buffalo (UBNow)","retrievedAt":"2026-09-10","url":"https://www.buffalo.edu/ubnow/stories/2025/06/empire-ai-supercomputing-funding.html"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/empire-ai-beta-buffalo-ny"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Starkville","confidence":"medium","id":"compute_atlas-e6605aed8eda0e2b","lat":33.4733639,"location_precision":"approximate","lon":-88.7907511,"name":"Mississippi State University HPC2 — Malcolm A. Portera High Performance Computing Center","operator":"Mississippi State University (High Performance Computing Collaboratory)","source_notes":"Academic HPC facility in the Thad Cochran Research, Technology and Economic Development Park. Houses the NOAA-funded Orion supercomputer — a Dell-EMC system described at its 2019 ribbon-cutting as 28 cabinets, 72,000 processing cores and 350 TB of RAM at 5 petaFLOPS, then the fourth-fastest system in U.S. academia. MSU separately broke ground in May 2023 on a 35,000-square-foot, $45 million High Performance Computing Data Center in the same park, expected to be finished in 2025; no cited source confirms that building's completion, so it is not listed separately as of September 2026 and no capacity is asserted for it here. Coordinates are the OpenStreetMap building point for the High Performance Computing Collaboratory at 2 Research Boulevard. Distinct site from C Spire Starkville Data Center, which is a commercial colocation facility elsewhere in the same park.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/msu-hpc2-portera-starkville-ms"}],"state":"Mississippi","status":"operating"},{"ai_classification":"unknown","city":"Morgantown","confidence":"high","contains_osm":true,"id":"compute_atlas-e6650c5b6634b6a4","lat":39.669344,"location_precision":"approximate","lon":-79.977168,"name":"NETL Computational Science and Engineering Center","operator":"National Energy Technology Laboratory (U.S. Department of Energy)","source_notes":"14,000 sq ft federal research computing facility consolidating NETL's Morgantown data centers into a single server hall. Houses the Joule supercomputer and expansion space for a Cerebras Systems Wafer-Scale Engine, plus a visualization center. NETL calls it its largest construction project in more than a decade. Pin is the published campus street address, not a parcel-confirmed building footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NETL's Computational Science & Engineering Center Is Under Construction","publisher":"National Energy Technology Laboratory (U.S. DOE)","retrievedAt":"2026-09-22","url":"https://netl.doe.gov/node/14819"}],"updated":"2026-09-22","url":"https://www.compute-atlas.com/facilities/netl-computational-science-engineering-center-morgantown-wv"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/netls-computational-science-engineering-center"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Towner","confidence":"medium","id":"compute_atlas-e6e9480a2d5da901","lat":48.3458,"location_precision":"approximate","lon":-100.4057,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/jde-holdings-towner-nd","value":5.0}],"name":"JDE Holdings Towner Data Center","operator":"JDE Holdings","source_notes":"Small (5 MW), unmanned facility about 40 miles east of Minot near Towner, reported under construction in October 2025. Its purpose was not disclosed; data_center is a placeholder type and could be crypto mining. Coordinates are the Towner town point. Current status after Oct. 2025 is unverified.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/jde-holdings-towner-nd"}],"state":"North Dakota","status":"under construction"},{"ai_classification":"unknown","city":"Gaines Township","confidence":"medium","id":"compute_atlas-e6ff3efb1bcf835a","lat":42.802,"location_precision":"approximate","lon":-85.571,"name":"Microsoft Gaines Township Data Center","operator":"Microsoft","source_notes":"Microsoft's second data center site within Gaines Township -- distinct from the unrelated, already-operational Switch Pyramid Campus (also in Gaines Township, tracked separately as of August 2026). Microsoft bought a ~300-316-acre former Steelcase parcel on/near Patterson Avenue for ~$45-45.3M in October 2024 and is seeking to rezone a 40.5-acre portion from large-scale PUD to light industrial; Gaines Charter Township Planning Commission held a public hearing Dec 18, 2025. Township Community Development Director, Dec 2025: no specific plans provided yet beyond general intent. As of August 2026, no capacity or total project-investment figure had been disclosed. Coordinates are an approximate Patterson Avenue / Gaines Township estimate (placed apart from the existing Switch record's East Paris Avenue coordinates), not parcel-geocoded. Microsoft has committed in writing to seek no local property tax abatement from Gaines Charter Township, so the absence of a recorded subsidy reflects a sourced negative at the township level. State-level (MEDC/MSF) incentives were not checked by this source.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/microsoft-gaines-township-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Van Wert","confidence":"medium","id":"compute_atlas-e70df9ec55930529","lat":40.8696461,"location_precision":"approximate","lon":-84.5829261,"name":"QTS Van Wert Data Center Campus","operator":"QTS Data Centers","source_notes":"Announced May 29, 2026 with roughly $10 billion of projected capital investment and $200 million in projected tax revenue over 20 years, plus a $100,000 Vantage Career Center partnership and a community betterment fund. Acreage and building count were not stated in the announcement read here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"City of Van Wert and QTS Announce Data Center Campus in Northwest Ohio","publisher":"QTS Data Centers","retrievedAt":"2026-09-09","url":"https://q.com/news/city-of-van-wert-and-qts-announce-data-center-campus-in-northwest-ohio/"}],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/qts-van-wert-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"mixed_use","city":"Tuscaloosa","confidence":"medium","contains_osm":true,"id":"compute_atlas-e73b3be22ae10edb","lat":33.2120822,"location_precision":"approximate","lon":-87.5396735,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/university-of-alabama-hpc-tuscaloosa-al","value":14.6}],"name":"University of Alabama High Performance Computing and Data Center","operator":"University of Alabama","source_notes":"University research computing facility on the eastern edge of the Tuscaloosa campus, not a commercial colocation or hyperscale site. UA states verbatim: \"The facility's 40,000 square feet will allow for a substantial increase in UA's computing power\" and \"an estimated $25 million of computing power\"; it will host a \"petascale computing system, meaning it will be capable of performing quadrillions of calculations per second\" and be the \"only system in Alabama to meet the benchmarks for the Top500 list\". The University of Alabama News article names a U.S. Department of Commerce NIST disbursement plus an Alabama Education Trust Fund appropriation approved by the legislature and Gov. Ivey in 2023, but states no dollar totals for either. The university's Building Bama project page lists a \"BOT Budget $96,000,000\" with funding sources \"Federal NIST Grant (2023-NIST-CICGP-01) : $44,550,000\", \"State Appropriation (Act #2023-378/SB-87) : $46,000,000\" and \"UA Central Reserves : $5,450,000\"; the $96 million budget is recorded as the investment figure. The $25M is computing equipment, not construction investment, and is not used as the investment figure. No MW figure appears in the University of Alabama News article. The planned capacity is from the university's HPC center About page, which states \"The building is master-planned for 14.6 MW of computing power\" and lists \"5 mW+ of HPC power available, scalable to 16 mW+\". Status is recorded as under construction: the university's Building Bama project page lists the project as active construction with a scheduled construction end of November 2026, and the HPC center page says \"Opening in early 2027\". Coordinates are the campus centroid, not the building on the eastern edge of campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"High Performance Computing and Data Center Construction Ready to Begin","publisher":"University of Alabama News","retrievedAt":"2026-09-09","url":"https://news.ua.edu/2024/11/stage-iv-approval-for-high-performance-computing-center/"},{"kind":"other","label":"High Performance Computing and Data Center - Building Bama project page","publisher":"The University of Alabama","retrievedAt":"2026-09-22","url":"https://buildingbama.ua.edu/projects/high-performance-computing-and-data-center/"},{"kind":"other","label":"About — High Performance Computing and Data Center, The University of Alabama","publisher":"The University of Alabama","retrievedAt":"2026-10-18","url":"https://hpc.ua.edu/about/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/university-of-alabama-hpc-tuscaloosa-al"}],"state":"Alabama","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-e79c8442df392a49","lat":33.4817907,"location_precision":"approximate","lon":-93.9640754,"name":"Bentaus Texarkana AI Data Center (Chadbourne Ranch site)","operator":"Bentaus","source_notes":"Coordinates are the OpenStreetMap point for Mandeville, the nearest named community inside the block of parcels described by the Texarkana Gazette - 'bordered on the west by U.S. 71, on the north by Arkansas 108 and on the south roughly by Interstate 49.' This is a nearest-community approximation only; no source gives coordinates or a street address, and the pin has not been confirmed to fall inside the assembled tract. Landowner and co-developer: Fort Chadbourne Farm LLC and Chadbourn Infrastructure Partners LLC, both with Michael 'Jacques' Davison of Bradley, Arkansas as sole corporate officer; a third entity, Chadbourn Energy Park LLC, was formed in February 2026. About 2,300 acres were marketed as Chadbourne Ranch and sold in October 2025 for $5.165 million. The record is marked reported rather than confirmed because the two newspaper accounts are from the same ownership group and the developer has not confirmed status; the 200 MW figure is the developer's own announcement, not a utility or permit record.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-15","url":"https://www.compute-atlas.com/facilities/bentaus-chadbourn-miller-county-ar"}],"state":"Arkansas","status":"planned"},{"ai_classification":"likely","city":"Goodyear","confidence":"medium","id":"compute_atlas-e7bc6ca93d5a63c6","lat":33.4353,"location_precision":"approximate","lon":-112.39,"name":"Microsoft Goodyear Data Center Campus","operator":"Microsoft","source_notes":"Near Citrus and Indian School roads, Goodyear (address: 3785 Citrus Rd per industry sources). Two-million sq ft of existing or under-construction data centers. The investment figure is reported campus value; land-only spend is additional. Coordinates approximate; exact site is west Goodyear near airport. First land purchase corrected to April 2019 / 150 acres / $37.11M per DCD primary source; intermediate purchases brought pre-2025 footprint to approximately 450 acres before the 100-acre 2025 expansion to 550+ total.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Microsoft purchases 100 acres next to Goodyear campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/microsoft-purchases-100-acres-next-to-existing-data-center-campus-in-goodyear-arizona/"},{"kind":"other","label":"Microsoft — Greater Phoenix, Arizona datacenter community","publisher":"Microsoft","retrievedAt":"2026-08-08","url":"https://local.microsoft.com/communities/americas/greater-phoenix/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/microsoft-goodyear-az"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"compute_atlas-e7d1c89aef6fd371","lat":40.102784,"location_precision":"approximate","lon":-82.715975,"name":"New Albany North Campus","operator":"EdgeConneX","source_notes":"EdgeConneX's second New Albany campus, on the 170.29-acre parcel owned by EdgeConneX MCN New Albany North PropCo 1 LLC (3356 Clover Valley Rd NW; bought for ~$62M in March 2025 per the Columbus Dispatch), north of Rt. 161 between Mink Street and Clover Valley Road, in the Johnstown-Monroe school district. Per OPSB filings as reported by The Reporting Project: about 1.3 million sq ft of data center space in four data halls, plus a substation and energy center; 5.86 acres of isolated wetland and 65 acres of trees would be removed. The co-located PowerConneX New Albany 3 Energy Center (up to ~430 MW of gas generation on ~30 acres; Reporting Project says 450 MW) is on-site generation, not IT load, so it is excluded from the capacity figure. As of October 2026, no data-center IT MW figure was found, so no capacity is recorded. The operator page targets commercial operation of the energy center as early as Q4 2027. Coordinates are the Licking County Auditor parcel centroid (approximate; the parcel is 170 ac). The Census geocoder matched the street address by road-segment interpolation at 40.103464, -82.723486, about 0.6 km west on the road frontage; the parcel centroid was used instead. The 'North Campus' name comes from the EdgeConneX project page URL and title. Distinct from EdgeConneX MCN New Albany (South campus: 9850 Innovation Campus Way, 80 MW Phase I warehouse conversion plus 2x72 MW Phase II, held by the South PropCo 2 / South Opco entities).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/edgeconnex-new-albany-north-campus-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Winchester","confidence":"medium","id":"compute_atlas-e7d5f3e3ed4124ce","lat":39.1442224,"location_precision":"approximate","lon":-78.1980384,"name":"Winchester Gateway","operator":"Winchester Gateway LLC","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/winchester-gateway-data-center-frederick-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"mixed_use","city":"Blanchard","confidence":"medium","id":"compute_atlas-e7fa09b1690e3d89","lat":32.6,"location_precision":"approximate","lon":-94.04,"name":"Amazon Web Services Caddo Parish Campus (Blanchard)","operator":"Amazon Web Services","source_notes":"One of the two campuses covered by Amazon's $12 billion northwest Louisiana announcement; the other is roughly five miles north of Benton in Bossier Parish. KSLA places this campus just north of Blanchard Latex Road on State Line Road. STACK Infrastructure is the developer partner and each campus is approximately 2-3 million sq ft. Program-level figures are deliberately not attributed to this site: the $12 billion investment and the roughly 1,500 construction / 540 permanent job figures cover both campuses jointly, and Amazon's up-to-$400 million public water-infrastructure commitment covers all of its northwest Louisiana campuses. The separately announced Resilient Technology Park campus in west Shreveport is, as of August 2026, tracked as Amazon Web Services Shreveport Campus (Resilient Technology Park); KSLA reported on 2026-02-24 that it is not part of the $12 billion investment. Coordinates are derived from the published road description and are approximate; no parcel coordinate has been published.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-27","url":"https://www.compute-atlas.com/facilities/aws-blanchard-caddo-parish-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-e8249bff569b0360","lat":21.353099,"location_precision":"approximate","lon":-158.13051,"name":"Kahe Point Cable Landing Station (Southern Cross)","operator":"Pacific Carriage Limited (Southern Cross Cable Network)","source_notes":"Southern Cross Cable Network landing station within Kahe Point Beach Park, on Oahu's southwest coast. Pacific Carriage Limited Inc. owns it and contracts Verizon for landing-party services, which Verizon subcontracts to Hawaiian Telcom (per Submarine Networks). Southern Cross currently lists Kahe Point (site KAH) as an access point, with Lumen and Calian as backhaul providers. The coordinates are from a map labelled 'Kahe Point Cable Landing Site' and may mark the landing rather than the station building. Possible co-location: this is distinct in operator from the Hawaiki CLS at 92-384 Farrington Highway (tracked as of October 2026), which also lands at Kahe Point Beach Park.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Southern Cross access point: Kahe Point (KAH)","publisher":"Southern Cross Cable Network","retrievedAt":"2026-10-21","url":"https://www.southerncrosscables.com/access-points/kahe-point"}],"updated":"2026-10-21","url":"https://www.southerncrosscables.com/access-points/kahe-point"}],"state":"Hawaii","status":"operating"},{"ai_classification":"unknown","city":"Trenton","confidence":"medium","id":"compute_atlas-e866e2701ada8d63","lat":39.4808905,"location_precision":"approximate","lon":-84.4577222,"name":"AWS Trenton / Madison–St. Clair Township Campus","operator":"Amazon Web Services","source_notes":"Roughly 600 acres in Madison and St. Clair townships straddling Wayne Madison and Hawkins roads, reported as a second AWS campus of about 18 buildings with an estimated project value near $690 million. The reporting also references a separate 141-acre site already inside Trenton city limits; as of September 2026, a 141-acre Prologis campus (Project Mila) is tracked separately at Trenton and no source read here links the two, so no relationship is asserted.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-09","url":"https://www.compute-atlas.com/facilities/aws-trenton-madison-st-clair-butler-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Canton","confidence":"medium","id":"compute_atlas-e87b4d2cc7caa4d8","lat":40.799759,"location_precision":"approximate","lon":-81.335551,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/panattoni-project-shelby-canton-oh","value":320.0}],"name":"Project Shelby","operator":"Panattoni","source_notes":"Operator is the developer (Panattoni); the end user is unnamed ('a major American technology company that provides digital services such as cloud computing'). Do not infer Amazon: WHBC only says Panattoni is 'most often associated with Amazon'. The lead's ~324 MW was not found in any source consulted as of October 2026; the Repository (Oct 9 2026) gives 320 MW, single-source. Property is 'nearly 91 acres' owned by A&J Urban Development (Repository Aug 13) — no land area is recorded because the figure is approximate and ownership/lease to Panattoni is not stated. Panattoni's page says it is 'completing engineering, environmental review, and permitting', ~30-month build. Coordinates: OSM intersection node of Marietta Ave NE and Georgetown St NE (Overpass node 199939548; sources say 'Georgetown Road NE'); the site is SE of that corner, between Marietta and Trump Aves off 8th St NE, so approximate (likely within ~0.5 km). Not a duplicate of Amazon Perry Township Data Center (Panattoni's other Stark project, Faircrest St SW, Perry Township, 240 MW) — the Repository lists both separately — nor of Midwest Digital Gateway (Central Avenue SE, Canton), in SE Canton. Site is the former Ford property in northeast Canton.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Project Shelby (City of Canton; ~30-month construction; completing engineering, environmental review and permitting)","publisher":"Panattoni Development Co. (project site)","retrievedAt":"2026-10-15","url":"https://marketing.panattoni.com/project-shelby/"}],"updated":"2026-10-29","url":"https://www.compute-atlas.com/facilities/panattoni-project-shelby-canton-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-e881a4f286410855","lat":32.44194,"location_precision":"approximate","lon":-97.76472,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/big-digital-energy-10netzero-hood-county-tx","value":311.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/big-digital-energy-10netzero-hood-county-tx","value":17.0}],"name":"Big Digital Energy–10NetZero Hood County AI Data Center Campus","operator":"Big Digital Energy, Inc. / 10NetZero, Inc. (50/50 joint venture)","source_notes":"Repurposing a power-ready ~50-acre industrial site (30,000+ sq ft of existing structures, 17 MW operational grid power, on-site gas pipelines) into an AI/HPC datacenter campus; acquisition completed 2026-07-20. AI datacenter build-out itself has not yet begun.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-08","url":"https://www.compute-atlas.com/facilities/big-digital-energy-10netzero-hood-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Holden","confidence":"medium","id":"compute_atlas-e8c7c03a86752978","lat":37.8134,"location_precision":"approximate","lon":-81.9822,"name":"Adams Fork Energy Campus Data Center (Harless Industrial Park, Holden)","operator":"TransGas Development Systems","source_notes":"Proposed at the Harless Industrial Park near the Mingo-Logan county line, in Holden, Logan County, to be powered exclusively by the co-located off-grid natural-gas plant (tracked separately as of September 2026 as the Adams Fork Energy Campus Power Plant, Harless Industrial Park, Holden; WV DEP permit R13-3715, approved October 2, 2025). No data-center-specific capacity, investment, or job figures distinct from the power plant were found as of 2026-09-10; reporting describes the plant and data center as a single 'energy campus' without separately quantifying the data center building. Part of TransGas's larger 'Adams Fork Energy' project alongside a proposed large natural-gas ammonia plant. The record is marked reported rather than confirmed (as of 2026-09-10): the WV DEP permit numbers and their 2025-10-02 approval are reported consistently by two independent organisations, but the permit documents themselves (R13-3714 and R13-3715) could not be retrieved from dep.wv.gov as of September 2026, so the sourcing is advocacy-group reporting rather than the primary record.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Adams Fork is a Giant Waste of Energy","publisher":"Ohio River Valley Institute","retrievedAt":"2026-09-10","url":"https://ohiorivervalleyinstitute.org/adams-fork-is-a-giant-waste-of-energy/"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/adams-fork-harless-datacenter-logan-county-wv"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"high","contains_osm":true,"id":"compute_atlas-e9a59b07e5a35b0e","lat":37.233028,"location_precision":"approximate","lon":-121.7807945,"name":"Equinix Great Oaks South Data Center (SV12, SV18, SV19)","operator":"Equinix","source_notes":"Three two-story buildings of 182,350 sq ft each at 123, 127 and 131 Great Oaks Boulevard, applicant SV1, LLC (a subsidiary of Equinix, LLC). Distinct parcel from Equinix's existing Great Oaks campus buildings already tracked (SV1/SV2/SV4/SV8/SV15). Status recorded as permitted because the fetched source establishes the exemption, not a build state.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/equinix-great-oaks-south-san-jose-ca"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/35491576","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/35491576"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-sv1-ca"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/35491576"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-e9ae6c8597d26094","lat":45.5679542,"location_precision":"exact","lon":-122.9167725,"name":"Digital Realty PDX11","operator":"Digital Realty","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/734323663","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/734323663"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-pdx11-or"},{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/digital-realty-pdx12-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"confirmed","city":"Midlothian","confidence":"medium","id":"compute_atlas-e9e91ad7bd949995","lat":37.454,"location_precision":"approximate","lon":-77.71,"name":"Google Project Loch","operator":"Google","source_notes":"Codename Project Loch; land acquired via shell entity Aeris Investments LLC (~$29M for ~340 acres). Site: 750 Watkins Centre Pkwy (Watkins Centre South), west of Rt 288 and south of Rt 60, near Westchester Commons. Three data-center buildings planned, each with a dedicated on-site substation. Google stated in Aug 2025 it has no near-term plans to develop Loch. Capacity MW not disclosed. A fixed tax-rate agreement with Chesterfield County for the data-center equipment rate is recorded as a program label with no dollar value, because no readable cited source states one, and as of October 2026 the agreement text has not been found. Coordinates are an approximate site centroid (address-derived, not GPS-verified).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google files for data center campus outside Richmond, Virginia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/google-files-for-data-center-campus-outside-richmond-virginia/"},{"kind":"other","label":"In Google, Chesterfield landed the Rolls-Royce of data center operators","publisher":"Chesterfield County, VA","retrievedAt":"2026-07-07","url":"https://www.chesterfield.gov/m/newsflash/Home/Detail/6383"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","retrievedAt":"2026-10-14","url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/google-loch-midlothian-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-ea2c795e2677d136","lat":31.5966,"location_precision":"approximate","lon":-89.8687,"name":"Big Woods Technology Park","operator":"Eagle Rock Partners","source_notes":"The exact site has not been disclosed; the source describes only private property in an isolated part of Jefferson Davis County. The coordinates are the county seat, Prentiss, used as a county-level placeholder. The end user and MW are not disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"$6B data center planned for Jefferson Davis, one of the poorest counties in the country (Mississippi Today, via Daily Journal)","publisher":"Mississippi Today / Northeast Mississippi Daily Journal","retrievedAt":"2026-10-24","url":"https://www.djournal.com/mississippi-today/6b-data-center-planned-for-jefferson-davis-one-of-the-poorest-counties-in-the-country/article_0ce91979-5c29-4eaf-a2bc-993b602c8752.html"}],"updated":"2026-10-24","url":"https://www.compute-atlas.com/facilities/eagle-rock-big-woods-technology-park-jefferson-davis-ms"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Beccaria Township","confidence":"medium","id":"compute_atlas-ea50401e66262298","lat":40.775104,"location_precision":"approximate","lon":-78.489923,"name":"Iron City No. 2 Data Center Project","operator":"Undisclosed applicant (Iron City No. 2 Data Center Project)","source_notes":"Proposed permitted emissions (tons/yr): NOx 19.93, CO 29.46, VOC 20.43, PM10/PM2.5 3.03, CO2e 37,580. The applicant is not named in the notice; the name parallels the Iron City Wells site in Karthaus Township, but common ownership was not verified. The pin is the township centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"DEP Invites Comments On Air Quality Permit For 15 Natural Gas Generators For Iron City No. 2 Data Center In Beccaria Twp., Clearfield County","publisher":"PA Environment Digest","retrievedAt":"2026-10-15","url":"http://paenvironmentdaily.blogspot.com/2026/07/dep-invites-comments-on-air-quality.html"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/iron-city-no-2-data-center-beccaria-township-clearfield-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"confirmed","city":"Graniteville","confidence":"medium","id":"compute_atlas-ea7115749af99341","lat":33.5629,"location_precision":"approximate","lon":-81.8287,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/meta-aiken-county-sc","value":200.0}],"name":"Meta Aiken Data Center","operator":"Meta","source_notes":"Sage Mill Industrial Park, Graniteville. 715,000 sq ft; Meta's 22nd US data center. Explicitly optimized for AI workloads. Administration building constructed with mass timber. Expected operational spring 2027. Coordinates are Graniteville area centroid. On subsidies: in April 2023 Aiken County Council approved, 7-2, a fee-in-lieu-of-tax agreement and a joint multi-county business/industrial park with Edgefield County for the then code-named 'Project Sabal' (intermediary Starskey LLC), reported by the Aiken Standard; a September 2024 Aiken Standard column reports that the fee-in-lieu agreement between Meta and Aiken County runs for 40 years. No dollar value or ordinance number was found, so the subsidy entry carries no amount.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Meta plans $800m data center campus in Aiken County, South Carolina","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/meta-plans-800m-data-center-campus-in-aiken-county-south-carolina/"},{"kind":"press","label":"Meta selects Aiken County for first South Carolina data center","publisher":"Office of the Governor of South Carolina","retrievedAt":"2026-08-26","url":"https://governor.sc.gov/news/2024-08/meta-selects-aiken-county-first-south-carolina-data-center"},{"kind":"press","label":"Meta's First Data Center in South Carolina Spurs New 100-MW Silicon Ranch Solar Project","publisher":"EnergyTech","retrievedAt":"2026-10-27","url":"https://www.energytech.com/renewables/news/55311348/metas-first-data-center-in-south-carolina-connecting-to-100-mw-silicon-ranch-solar-project"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/meta-aiken-county-sc"}],"state":"South Carolina","status":"under construction"},{"ai_classification":"confirmed","city":"Unknown","confidence":"medium","id":"compute_atlas-ea789ba0f7a92f2f","lat":29.9508,"location_precision":"approximate","lon":-96.2661,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cleanspark-austin-county-tx","value":285.0}],"name":"CleanSpark Austin County AI Data Center Campus","operator":"CleanSpark, Inc.","source_notes":"First of CleanSpark's two announced Greater Houston-area sites (see also the separate Brazoria County campus). No city/address disclosed anywhere in the filing — company language is only 'positioned between Houston and Austin'; Austin County (seat Bellville) fits that framing, so coordinates are an approximate county reference point, not a parcel. Targeting energization of >200 MW in H1 2027. Explicitly framed by named CleanSpark executives (CBO, SVP of AI Data Centers) as an AI/HPC campus, not continued bitcoin mining or generic cloud — clears the tracker's evidence bar for an AI classification. Combined with the separate Brazoria County campus, CleanSpark cites 'more than 890 MW of aggregate potential utility capacity' in the greater Houston area.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-25","url":"https://www.compute-atlas.com/facilities/cleanspark-austin-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"compute_atlas-ea97205c374a1b0e","lat":45.53957,"location_precision":"approximate","lon":-122.90018,"name":"Digital Realty 'Corny' Data Center (Cornelius Pass Rd & NE Cornell Rd, Hillsboro)","operator":"Digital Realty","source_notes":"The News-Times reports the 'Corny Data Center' application (nearly 29 acres, filed 2026-07-21) without naming the applicant; The Hillsboro Herald identifies the corner of Cornelius Pass Road and NE Cornell Road as a recently purchased open farmed parcel held by a Digital Realty entity, with an application for two buildings 'from the same group' as the Wagon Data Center. Operator attribution therefore rests on the Herald's reporting. Coordinates are the Cornelius Pass / Cornell intersection (OSM node 38738445); the exact parcel has not been published. Power capacity not published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center proposals filed days, hours before Hillsboro moratorium approved — Hillsboro News-Times (2026-08-08)","publisher":"Hillsboro News-Times","retrievedAt":"2026-09-17","url":"https://hillsboronewstimes.com/2026/08/08/data-center-proposals-filed-days-hours-before-hillsboro-moratorium-approved/"},{"kind":"press","label":"Next Wave: 7 Hillsboro data center projects march ahead — The Hillsboro Herald (2026-08-13)","publisher":"The Hillsboro Herald","retrievedAt":"2026-09-17","url":"https://hillsboroherald.com/next-wave-7-hillsboro-data-center-projects-march-ahead-as-humans-fight-it-out/"},{"kind":"press","label":"Hillsboro's latest data center now in permitting — The Hillsboro Herald (2026-08-11)","publisher":"The Hillsboro Herald","retrievedAt":"2026-09-17","url":"https://hillsboroherald.com/hillsboros-latest-data-center-now-in-permitting-is-across-from-liberty-high-and-near-rock-creek-homes/"},{"kind":"press","label":"The Real Story: data centers are encroaching on Hillsboro's schools — The Hillsboro Herald","publisher":"The Hillsboro Herald","retrievedAt":"2026-09-17","url":"https://hillsboroherald.com/the-real-story-data-centers-are-encroaching-on-hillsboros-schools-and-we-are-out-of-time/"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/digital-realty-cornelius-pass-cornell-hillsboro-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"compute_atlas-eaab0cf9b8626b72","lat":33.2468,"location_precision":"approximate","lon":-84.2641,"name":"High Falls Road Data Center Campus (Montana Property Group)","operator":"Montana Property Group LLC (developer; end user undisclosed)","source_notes":"Spalding County's first approved data center campus: three two-story buildings (two at 936,460 sq ft, one at 686,737 sq ft) totalling 2,559,500 sq ft, plus two detached administrative buildings. Property owner listed as Alan R. Mobley. Build-out scheduled for 2030; estimated local tax revenue at build-out $26.859M. As of April 2026 none of Spalding's approved campuses had requested a land disturbance permit.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-23","url":"https://www.compute-atlas.com/facilities/montana-property-group-high-falls-road-spalding-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"mixed_use","city":"Mililani","confidence":"medium","id":"compute_atlas-eace67c93e84a578","lat":21.448,"location_precision":"approximate","lon":-158.017,"name":"Servpac MTP Building 2","operator":"Servpac","source_notes":"Located in Mililani Technology Park, Central O'ahu, 10 miles inland and 850 feet above sea level, outside major flood, tsunami, and hurricane zones. Building 2 will approximately 10x the existing 1MW IT capacity of MTP Building 1 (Hawaii's only Uptime Institute Tier IV certified facility). Designed to withstand Category 5 hurricane-force winds. Primary use is enterprise colocation; no AI-specific tenant announced. DCD (February 2026) reports project is in design phase; 'broke ground' claim in original record is unsupported by the cited source. Hawaii's structural barriers (highest US electricity costs, limited grid capacity) make large-scale hyperscale AI builds unlikely; Servpac MTP2 is the only Hawaii project of note found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Hawaii-Based Cloud Provider Servpac Expands Data Center","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/hawaii-based-cloud-provider-servpac-expands-data-center/"},{"kind":"press","label":"Hawaii Tier IV Data Center: MTP Building 2 Groundbreaking","publisher":"Servpac","retrievedAt":"2026-10-02","url":"https://servpac.com/mtp-groundbreaking/"},{"kind":"press","label":"Servpac Inc. breaks ground on MTP Data Center's Building 2","publisher":"Building Industry Hawaii","retrievedAt":"2026-10-02","url":"https://buildingindustryhawaii.com/2026/03/servpac-inc-breaks-ground-on-mtp-data-centers-building-2/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/servpac-mtp2-mililani-hi"}],"state":"Hawaii","status":"under construction"},{"ai_classification":"unknown","city":"Cedar Rapids","confidence":"medium","id":"compute_atlas-ead21f1c235dae04","lat":41.9439273,"location_precision":"approximate","lon":-91.6736877,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/","value":10.0}],"name":"Oppidan Cedar Rapids Data Center","operator":"Oppidan","source_notes":"Just north of Highway 30 on the southwest side. Over 98,000 sq ft, no city incentives, construction expected to start in fall 2026 or early spring 2027 depending on equipment availability. Permit documents name the applicant entity as CLOP Cedar Rapids, IA LLC. The Gazette reports the facility is intended for networking, signal boosting and storage rather than AI training or inference, so no AI classification is recorded — the existing classification options cannot express 'assessed, not AI.' Oppidan built a comparable 60,000 sq ft, 5 MW facility in Des Moines in 2024, which is tracked separately as of September 2026.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Another data center is in the works for Cedar Rapids","publisher":"The Gazette","retrievedAt":"2026-09-04","url":"https://www.thegazette.com/news/local/3rd-cedar-rapids-data-center-ready-for-construction/article_e0973e26-383e-4896-bebc-a4c085b8d4a5.html"},{"kind":"press","label":"Building permit issued for new Cedar Rapids data center","publisher":"Corridor Business Journal","retrievedAt":"2026-09-16","url":"https://corridorbusiness.com/building-permit-issued-for-new-cedar-rapids-data-center/"}],"updated":"2026-09-16","url":"https://www.compute-atlas.com/facilities/oppidan-cedar-rapids-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"likely","city":"Atlanta","confidence":"medium","id":"compute_atlas-eb6f74ad174e76a8","lat":33.749,"location_precision":"approximate","lon":-84.388,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-atlanta-tilford-yard-ga","value":168.0},{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/edged-atlanta-tilford-yard-ga","value":27.0}],"name":"Edged Atlanta (ATL01)","operator":"Edged Energy (Endeavour)","source_notes":"First of three planned buildings on the campus; building one is 27 MW, full campus planned at 168 MW. Supports up to 70 kW/rack air-cooled and 200 kW/rack with liquid cooling.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-28","url":"https://www.compute-atlas.com/facilities/edged-atlanta-tilford-yard-ga"}],"state":"Georgia","status":"operating"},{"ai_classification":"confirmed","city":"Stillwater","confidence":"medium","id":"compute_atlas-eb7c44623ef8b771","lat":36.14,"location_precision":"approximate","lon":-97.06,"name":"Google Stillwater Data Center Campus","operator":"Google","source_notes":"Campus at intersection of Perkins Road and Richmond Road, north of Stillwater. Coordinates are approximate (city centroid shifted north). Up to 6 data center buildings, each 300,000 sq ft. Phase I targeted for 2027. City Council acceptance of final plat required before recording with Payne County Clerk. Job figures are projections (~30 permanent per phase; construction cited as 'thousands') - not recorded as confirmed counts. Oklahoma's Sec. 1357 data-center sales-tax exemption applies by statute but no Stillwater-specific award amount is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google to invest $9B in cloud and AI infrastructure in Oklahoma","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-cloud-and-ai-infrastructure-in-oklahoma/"},{"kind":"press","label":"Payne County commissioner raises water concerns over planned Google data center","publisher":"KFOR","retrievedAt":"2026-07-07","url":"https://kfor.com/news/local/payne-county-commissioner-raises-water-concerns-over-planned-google-data-center-complex-in-stillwater/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/google-stillwater-ok"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"mixed_use","city":"Green Bay","confidence":"medium","id":"compute_atlas-ebb46801e88a370e","lat":44.5155,"location_precision":"approximate","lon":-87.995,"name":"Netsonic Green Bay Data Center","operator":"Netsonic (Dynamic Ventures LLC)","source_notes":"Carrier-neutral colocation facility operating in Green Bay since 1996, veteran-owned. The operator advertises nearly 4 MW of available power capacity on 1200-amp 480-volt service, 60 tons of redundant Liebert cooling, N+1 power, an on-site generator with roughly 96 hours of runtime, and a 9,000+ sq ft expansion. Services span standard colocation, AI/GPU high-density colocation and ASIC miner hosting at $0.075/kWh. Figures are operator-published and not independently verified, so no capacity value is recorded. Coordinates are a best-effort geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/netsonic-green-bay-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"likely","city":"McCarran","confidence":"medium","id":"compute_atlas-ebfc545182672eeb","lat":39.53,"location_precision":"approximate","lon":-119.43,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/fleet-data-centers-storey-county-nv","value":400.0}],"name":"Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)","operator":"Fleet Data Centers","source_notes":"Two adjacent TRIC campuses (South Valley and Peru Ridge) along USA Parkway in Storey County, dual two-story buildings each, ~769-acre combined footprint and a reported combined ~400MW of critical compute plus ~30MW/campus utility power. Fully leased to an unnamed AA-rated, investment-grade tenant (market cap >$3T) under a ~16.4-year triple-net lease; Fleet closed $4.6B in senior secured notes for a 230MW Storey County campus. Groundbreaking May 2026. Coordinates approximate to the TRIC/USA Parkway area.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Fleet Data Centers closes $4.6bn in senior secured notes for 230MW Storey County campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-30","url":"https://www.datacenterdynamics.com/en/news/fleet-data-centers-closes-46bn-in-senior-secured-notes-for-230mw-storey-county-campus/"},{"kind":"press","label":"Gov. Lombardo, construction companies break ground on 2 million sq. ft. data center in Storey Co.","publisher":"KOLO 8 News Now","retrievedAt":"2026-07-30","url":"https://www.kolotv.com/2026/05/20/gov-lombardo-construction-companies-break-ground-2-million-sq-ft-data-center-storey-co/"},{"kind":"press","label":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"Carson Now","retrievedAt":"2026-08-14","url":"https://www.carsonnow.org/05/03/2026/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant"},{"kind":"press","label":"Why a Northern Nevada data center wants to build its own temporary natural gas power plant","publisher":"The Nevada Independent","retrievedAt":"2026-08-14","url":"https://thenevadaindependent.com/article/why-a-northern-nevada-data-center-wants-to-build-its-own-temporary-natural-gas-power-plant"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/fleet-data-centers-storey-county-nv"}],"state":"Nevada","status":"under construction"},{"ai_classification":"confirmed","city":"Rockingham","confidence":"medium","id":"compute_atlas-ec126e39096ce731","lat":34.9445,"location_precision":"approximate","lon":-79.775,"name":"Amazon Web Services Richmond County Data Center Campus","operator":"Amazon Web Services","source_notes":"Energy Way Industrial Park, Rockingham, NC. Up to 20 buildings each 200,000-225,000 sq ft at full build. Local county tax breaks apply, and Cardinal & Pine (reporting by Inside Climate News) says Amazon would also receive state sales tax exemptions on certain equipment, the value of which can legally be kept secret. MW capacity not publicly disclosed. Coordinates are Rockingham city centroid. Original secondary source (richmondnc.com/CivicAlerts.aspx?AID=168) was no longer available as of July 2026 and was replaced with Business NC article. A previously recorded powering arrangement was removed: DCD reports the method of powering has not been publicly confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Amazon breaks ground on $10bn data center complex in Richmond County, North Carolina","publisher":"Data Center Dynamics","retrievedAt":"2026-07-06","url":"https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/"},{"kind":"press","label":"Amazon plots state record $10B data center project in Richmond County","publisher":"Business North Carolina","retrievedAt":"2026-07-06","url":"https://businessnc.com/amazon-plots-state-record-10b-data-center-project-in-richmond-county/"},{"kind":"press","label":"Inside the secretive deal for a $10 billion Amazon data center in rural NC","publisher":"Cardinal & Pine (reporting by Inside Climate News)","retrievedAt":"2026-08-15","url":"https://cardinalpine.com/news/secret-deal-amazon-data-center-nc/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/aws-richmond-county-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Shippingport","confidence":"medium","id":"compute_atlas-ec563ac1632e14a4","lat":40.63,"location_precision":"approximate","lon":-80.44,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/aligned-shippingport-pa","value":2000.0}],"name":"Shippingport Industrial Park","operator":"Aligned Data Centers","source_notes":"Aligned's Project Phoenix campus in the Shippingport Industrial Park, a former coal-plant site. Aligned's press release of September 10, 2026 describes a 2 GW campus spanning three facilities and announces the groundbreaking that day. Data Center Dynamics reported in February 2026 that Aligned was then planning two natural-gas-powered buildings within the 660-acre industrial park, with construction possibly starting later in 2026. The 660 acres is the size Data Center Dynamics gives for the whole industrial park, not a campus figure, so no land area is recorded; Marcellus Drilling News reports Aligned bought 650 acres from Frontier Group of Companies in July 2026 for $223 million.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data Centers? Beaver County Can't Seem to Get Enough of Them","publisher":"Beaver County Business","retrievedAt":"2026-08-17","url":"https://beavercountyalmanac.com/data-centers-beaver-county-cant-seem-to-get-enough-of-them/"},{"kind":"press","label":"Beaver Valley could become center of AI infrastructure for region","publisher":"CBS Pittsburgh","retrievedAt":"2026-08-19","url":"https://www.cbsnews.com/pittsburgh/news/ai-infrastructure-beaver-valley/"},{"kind":"press","label":"Beaver Valley becomes data center target (Post-Gazette reprint, byline Anya Litvak and Chloe Jad, Feb 8 2026)","publisher":"Pittsburgh Post-Gazette (via Three Mile Island Alert reprint)","retrievedAt":"2026-08-19","url":"https://www.tmia.com/content/beaver-valley-becomes-data-center-target"},{"kind":"other","label":"Shippingport data centers will be financial, health burdens on Beaver County residents","publisher":"TribLive (community op-ed by Elan Justice Pavlinich, Environmental Health Project)","retrievedAt":"2026-08-19","url":"https://community.triblive.com/news/3990268"},{"kind":"press","label":"Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County","publisher":"Marcellus Drilling News","retrievedAt":"2026-09-12","url":"https://marcellusdrilling.com/2026/09/aligned-breaks-ground-on-10b-2-gw-data-center-in-beaver-county/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aligned-shippingport-pa"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Huntsville","confidence":"medium","id":"compute_atlas-ec663610d39655ac","lat":34.6297568,"location_precision":"approximate","lon":-86.6535802,"name":"USSPACECOM Command and Control Facility Secure Data Center (Redstone Arsenal)","operator":"U.S. Space Command","source_notes":"The secure data center is one part of a 700,000 sq ft permanent HQ command-and-control facility for about 1,800 personnel, on a 64-acre site at Redstone Arsenal. The roughly $4B estimate covers the whole HQ, including fixtures, furniture and equipment, so it is not given as the data center's own cost. Data center capacity is not disclosed. The coordinates are a representative Redstone Arsenal point; the exact site is not public.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"filing","label":"Industry Day for USSPACECOM HQ Command and Control Facility Construction and Project Management (SAM notice c09f90fb48d4435086078b67affa24bf)","publisher":"Govly (SAM.gov mirror)","retrievedAt":"2026-10-18","url":"https://app.govly.com/public/opportunities/16287452"},{"kind":"press","label":"DoD seeks partner for Alabama facility and data center","publisher":"iRecruit (citing DatacenterDynamics)","retrievedAt":"2026-10-18","url":"https://www.irecruit.co/insights/dod-seeks-partner-for-alabama-facility-data-center"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/us-space-command-c2f-redstone-arsenal-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"compute_atlas-eca867cac32b2035","lat":40.6255415,"location_precision":"approximate","lon":-103.207709,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/granite-renewables-logan-county-co","value":2000.0}],"name":"Granite Renewables Logan County Data Center Campus","operator":"Granite Renewables","source_notes":"Proposed hyperscale campus roughly 21 miles northwest of Sterling, 8-10 miles from the Nebraska border, discussed as up to 2 GW on about 4,000 acres. A $15 billion figure was attributed to a speaker describing investment across the corridor between Sterling and the Nebraska border, so it is not recorded as this site's investment. Coordinates are the Sterling town centroid (approximate); the site itself is northwest of town and has no confirmed parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"BIG PIVOTS: Massive Data Center Slated for Northeastern Colorado? Part One","publisher":"Pagosa Daily Post (Big Pivots)","retrievedAt":"2026-08-26","url":"https://pagosadailypost.com/2025/12/17/big-pivots-massive-data-center-slated-for-northeastern-colorado-part-one/"},{"kind":"press","label":"Gearing up for data centers","publisher":"Big Pivots","retrievedAt":"2026-08-26","url":"https://bigpivots.com/geaing-up-for-data-centers/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/granite-renewables-logan-county-co"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Merrillville","confidence":"medium","id":"compute_atlas-ecb932d6b66144a5","lat":41.47,"location_precision":"approximate","lon":-87.27,"name":"Karis Critical Deep River Campus","operator":"Karis Critical","source_notes":"Proposed campus on 180 acres on 101st Avenue east of Deep River County Park, at up to $900 million and reported to bring hundreds of jobs. Described as early-stage.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-01","url":"https://www.compute-atlas.com/facilities/karis-critical-deep-river-merrillville-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Thornburg","confidence":"medium","id":"compute_atlas-ecf8b91aba491c22","lat":38.135,"location_precision":"approximate","lon":-77.5208,"name":"Thornburg Industrial Park Data Center Campus","operator":"South Roxbury Mill LLC / Grindstone VA LLC","source_notes":"South Roxbury Mill LLC & Grindstone VA LLC data center campus on the east side of S. Roxbury Mill Road with significant I-95 frontage, Berkeley Magisterial District. County case R25-0011 (\"Thornburg Industrial Park 2\", filed 6/27/2025, Under Review per March 2026 report) conditionally rezones tax map parcel 63-5-C1 (~49.68 ac) from Agricultural-2 to Industrial-1, plus a proffer amendment to the adjacent ~124-acre parcel 63-5-C, forming one contiguous ~174-acre campus; the proffers restrict permitted use to \"data center and light public utility.\" Represented as a single campus record (63-5-C + 63-5-C1). Distinct from Thornburg Business Park (parcels 63-12/63-A/76-A, LID LLC) and SpotsyTech Campus (SpotsyTechnoCampus LLC, N Roxbury Mill Rd, mixed-use). Total sq ft not yet disclosed (proffers reference thresholds >1M sq ft). Coordinates approximate (S Roxbury Mill Rd geocode; parcels not GIS-confirmed as of July 2026).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/thornburg-industrial-park-data-center-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","contains_osm":true,"id":"compute_atlas-ed04d2e48fb85295","lat":26.4814565,"location_precision":"approximate","lon":-97.783051,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/soluna-project-kati-2-willacy-county-tx","value":350.0}],"name":"Soluna Project Kati 2","operator":"Soluna Holdings (JV with Metrobloks)","source_notes":"Adjacent to Project Kati 1 (as of October 2026, tracked as Soluna Project Kati) and planned for AI/HPC hosting. Full build is expected to exceed 350 MW. Tax abatement talks have begun. Coordinates are the Raymondville county-seat point.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/soluna-project-kati-2-willacy-county-tx"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/soluna-project-kati-willacy-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Lewistown","confidence":"medium","id":"compute_atlas-ed646ce349e3d2f6","lat":40.5656,"location_precision":"approximate","lon":-77.6176,"name":"Granville Township Data Center Campus (Loop Road)","operator":"PA Data Center Partners","source_notes":"Six buildings on farmland parcels either side of the Mifflin County Industrial Park. The developer's presentation claims $22.5 million in tax revenue to the county, school district and township — a developer projection, not an awarded incentive, so it is not recorded as a subsidy. Acreage and square footage are not stated in the cited source. Coordinates are a geocoded point on Loop Road in Granville Township.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-25","url":"https://www.compute-atlas.com/facilities/pa-data-center-partners-granville-township-mifflin-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Calvert","confidence":"medium","contains_osm":true,"id":"compute_atlas-ed8522a1f0dfbf5e","lat":31.1551748,"location_precision":"approximate","lon":-88.0099997,"name":"Calvert Infrastructure Hub","operator":"Beacon Data Centers","source_notes":"Developer's campus page states verbatim: \"A 95 acre development out of a 650 acre lot\" with \"less than 15% of the site planned for development\"; \"$6 billion\"; two data center buildings plus supporting infrastructure; \"2027 First Building Completed\"; currently in a \"planning, engineering, and community engagement phase\"; \"up to 1,000 construction workers at peak construction\" and \"250 staff for operations\" at an \"average salary of $115,000\". The recorded land area is the 650-acre site; the built footprint is 95 acres. No capacity is recorded: the campus page states no MW figure. Secondary coverage attributes 6 GW to Beacon's whole portfolio of six-plus campuses across Alberta, New Brunswick, Tom Green County TX, Kern County CA and Calvert; that is a portfolio figure, not this site's capacity, and is not recorded. County ambiguity: Beacon's own page places the hub in Mobile County and that is what is recorded, but Calvert is an unincorporated community straddling Mobile and Washington counties, and the OSM village node used for the coordinate sits on the Washington County side. As of September 2026, the county had not been confirmed against the parcel. Subsidy: no incentive or abatement is mentioned on the developer's page; Mobile County and Alabama Commerce records had not been checked as of September 2026, so this is an unchecked gap, not an audited negative. Coordinates are the Calvert community centroid, not the 650-acre parcel.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Calvert - Beacon Data Centers (developer's campus page)","publisher":"Beacon Data Centers","retrievedAt":"2026-10-18","url":"https://beacondatacenters.com/campuses/calvert/"},{"kind":"press","label":"Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact","publisher":"NBC 15 (WPMI)","retrievedAt":"2026-09-15","url":"https://mynbc15.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact"},{"kind":"press","label":"Proposed $6B data center campus in Calvert draws questions over growth, utilities, impact","publisher":"NBC 15 / UTV44","retrievedAt":"2026-09-28","url":"https://utv44.com/news/local/proposed-6b-data-center-campus-in-calvert-draws-questions-over-growth-utilities-impact"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/beacon-calvert-al"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-edbcf65abc053bca","lat":37.375002,"location_precision":"approximate","lon":-121.9548775,"name":"Prime Data Centers 1231 Comstock Street","operator":"Prime Data Centers (1231 Comstock Property LLC)","source_notes":"Four-story ~109,520–111,000 sq ft building (HKS Inc. design) replacing a single-story industrial building; six 3,000 kW diesel generators plus one 500 kW house generator per SF YIMBY. Separate parcel from Prime's Martin Avenue campus. City projected $21.1M to the general fund over 15 years.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/prime-1231-comstock-santa-clara-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209073659"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prime-santa-clara-data-center-osmway-209073659"}],"state":"California","status":"planned"},{"ai_classification":"likely","city":"Blakely","confidence":"medium","id":"compute_atlas-ede956bb1cfffbb4","lat":31.3763,"location_precision":"approximate","lon":-84.9346,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/qts-blue-hole-blakely-ga","value":1000.0}],"name":"QTS Project Blue Hole","operator":"QTS Data Centers","source_notes":"Project Blue Hole in Blakely, Early County; DRI filed 2026, ~12M sq ft at full buildout by ~2035. ~1 GW+ is an estimate of ultimate scale (in notes). Coordinates are the Blakely area centroid. QTS Data Centers is owned by Blackstone (2021 take-private).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"QTS targets two data center campuses in Georgia","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/qts-targets-two-data-center-campuses-in-georgia/"},{"kind":"press","label":"Early County approves new data center ordinance amid concerns","publisher":"WTVY-TV","retrievedAt":"2026-09-23","url":"https://www.wtvy.com/2026/07/14/early-county-approves-new-data-center-ordinance-amid-concerns/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/qts-blue-hole-blakely-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Roswell","confidence":"medium","id":"compute_atlas-ee0eb4978417478f","lat":33.3943,"location_precision":"approximate","lon":-104.523,"name":"Roswell Information Park","operator":"Roswell Information Park LLC (developer Sustany LLC)","source_notes":"Distinct from the Zenith Volts Roswell/Chaves County project, tracked separately as of September 2026: different developer (Sustany LLC / Roswell Information Park LLC vs Zenith Volts Corp.), different site size (~154 acres vs a 300-acre initial site inside an 8,400-acre approval), and a different power model (off-grid gas from DME's West Pecos field vs on-site solar plus gas plus BESS). Capacity figures circulating in secondary coverage (100-200 MW at start-up scaling toward 4 GW) had not been read on a primary page as of September 2026 and are not recorded. Coordinate is the Roswell locality anchor; the releases say only 'near Roswell'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Desert Mountain Energy signs gas offtake deal in New Mexico","publisher":"Pipeline & Gas Journal","retrievedAt":"2026-10-17","url":"https://pgjonline.com/news/2025/july/desert-mountain-energy-signs-gas-offtake-deal-in-new-mexico"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/roswell-information-park-chaves-county-nm"}],"state":"New Mexico","status":"planned"},{"ai_classification":"mixed_use","city":"Plainsboro","confidence":"medium","contains_osm":true,"id":"compute_atlas-ee6d0c061d6402d1","lat":40.3461201,"location_precision":"exact","lon":-74.6160723,"name":"Princeton University High-Performance Computing Research Center (Forrestal Campus)","operator":"Princeton University","source_notes":"A university research-computing data center. Gensler gives 47,000 sq ft in total, including a 12,000 sq ft data center, with Tier II space for administrative services and Tier I for HPC. DCK (2010) described it as 40,000 sq ft over two stories with a possible second phase. It houses general research systems (for example galaxy-formation modeling) and, since 2024, a 300-GPU Nvidia H100 cluster used for Princeton Language and Intelligence (PLI) AI research. That mix is why the record's AI classification is mixed-use. No MW figure is published. Coordinates are the OSM building footprint named 'High Performance Computing Research Center'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Princeton U. to Build New HPC Data Center","publisher":"Data Center Knowledge","retrievedAt":"2026-10-09","url":"https://www.datacenterknowledge.com/supercomputers/princeton-u-to-build-new-hpc-data-center"},{"kind":"press","label":"Research Photo: Advancing AI","publisher":"Princeton Alumni Weekly","retrievedAt":"2026-10-09","url":"https://paw.princeton.edu/article/research-photo-advancing-ai"},{"kind":"osm","label":"OpenStreetMap way 239801861: High Performance Computing Research Center, 151 Forrestal Road","publisher":"OpenStreetMap","retrievedAt":"2026-10-09","url":"https://www.openstreetmap.org/way/239801861"},{"kind":"press","label":"Princeton University Opens New Energy-Efficient HPC Research Center","publisher":"Campus Technology","retrievedAt":"2026-10-26","url":"https://campustechnology.com/articles/2013/01/17/princeton-university-opens-new-energy-efficient-hpc-research-center.aspx"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/princeton-university-hpcrc-plainsboro-nj"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Portland","confidence":"medium","contains_osm":true,"id":"compute_atlas-ee81787f1a507971","lat":42.3758232,"location_precision":"approximate","lon":-79.5200432,"name":"Sugar Hill Data Center (proposed, former Sugar Hill Golf Course)","operator":"Four Winds of Lake Erie LLC","source_notes":"Early-stage proposal on the grounds of the former Sugar Hill Golf Course along Route 5 (East Lake Road). Town Supervisor Rich Lewis characterised the project's stage as \"we're on step negative one. We're not even to one yet.\" As of September 2026, no megawatt figure or investment had been stated by the applicant in the sources reviewed — a board member's reference to \"an $11 billion project\" is a hypothetical raised in discussion, not an announced figure, and is not recorded. The recorded 44 acres is the size an April 9, 2026 WEED Inc. release gives for the Four Winds of Lake Erie, LLC property, formerly Sugar Hill. Coordinates are the golf-course polygon centroid; the built footprint is undefined.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Portland Town Board addresses confusion and concern over proposed data center","publisher":"WKBW (Buffalo)","retrievedAt":"2026-09-14","url":"https://www.wkbw.com/chautauqua-county/portland-town-board-addresses-confusion-and-concern-over-proposed-data-center"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/four-winds-sugar-hill-portland-ny"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Tallahassee","confidence":"medium","contains_osm":true,"id":"compute_atlas-eec03b9eb4541457","lat":30.4344984,"location_precision":"approximate","lon":-84.2887565,"name":"Cogent Tallahassee Edge Data Center","operator":"Cogent Communications","source_notes":"Cogent lists this as an edge data center. Its size and power are not published. It is separate from EdgeConneX TAL01 (1531 Commonwealth Business Dr). Coordinates are a street-address geocode.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/cogent-tallahassee-edge-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Casper","confidence":"medium","contains_osm":true,"id":"compute_atlas-eec188db763917fe","lat":42.8602,"location_precision":"approximate","lon":-106.3355,"name":"Data Center of the Rockies","operator":"Mountain West Technologies","source_notes":"Carrier-neutral colocation facility operated by Mountain West Technologies (Mountain West Technology Network). Operator describes N+1 cooling and power redundancy, a blended network with multiple on-site providers, and scalable space with capacity for 100 racks. No megawatt rating is published on the operator's own page, so none is recorded; colocation directories list roughly 1.2 MW and about 4,976 sq ft of raised floor inside a 132,000 sq ft building. As of September 2026, those directory figures had not been confirmed. Coordinates come from an OSM address point for the operator at this address, not a mapped building footprint.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/mwtn-data-center-of-the-rockies-casper-wy"}],"state":"Wyoming","status":"operating"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"high","id":"compute_atlas-eec1c555a6423df0","lat":38.00386898862997,"location_precision":"approximate","lon":-77.5030262165529,"name":"ADP Ladysmith Data Hub","operator":"ADP Ladysmith Data Hub, LLC","source_notes":"Companion case to RZ-02-2025 (proffer amendment). 2030 Comprehensive Plan designates parcel as Light Industrial within the Ladysmith Growth Area. Applicant proffering a 100' buffer. As of July 2026, no confirmed public hearing date had been found, and the status is proposed pending BOS action.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/adp-ladysmith-data-hub-caroline-va"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/adp-ladysmith-data-hub"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Liberty","confidence":"medium","id":"compute_atlas-eec2cc456328fe99","lat":39.2459,"location_precision":"approximate","lon":-94.4191,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://datacenter.news/story/lincoln-metrobloks-plan-kansas-city-data-centre-campus","value":150.0}],"name":"Metrobloks Liberty Campus","operator":"Metrobloks","source_notes":"$1.4B, 150 MW AI-ready campus in Liberty, Clay County. Coordinates are the Liberty area centroid. Partner: Lincoln Property Company.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Metrobloks announces $1.4 billion data center coming to Liberty","publisher":"KCTV5","retrievedAt":"2026-10-13","url":"https://www.kctv5.com/2026/03/24/metrobloks-announces-14-billion-data-center-investment-liberty/"},{"kind":"press","label":"Lincoln & Metrobloks plan Kansas City data centre campus","publisher":"DataCenterNews US","retrievedAt":"2026-10-13","url":"https://datacenter.news/story/lincoln-metrobloks-plan-kansas-city-data-centre-campus"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/metrobloks-liberty-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Cottonwood Heights","confidence":"medium","id":"compute_atlas-eec89f0ea45c8eb3","lat":40.61347,"location_precision":"approximate","lon":-111.82565,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-cottonwood-heights-ut","value":2.0}],"name":"Flexential Cottonwood","operator":"Flexential","source_notes":"Subsidies checked at the municipal tier (2026-09-08): no site-level subsidy found. Cottonwood Heights' CDRA (created 2006) has established exactly one project area citywide, Canyon Centre CDA (3700 East 7000 South, at Fort Union Blvd/Wasatch Blvd) — a materially different location from this site at 6340 South 3000 East — per a 2024 CDRA project-area analysis; no other project area or agreement is documented. Utah's EDTIF programme excludes data centres and the UCA 59-12-104 exemption is self-executing.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Data Center Growth in Utah and the United States — Data Summary, April 2026 (tables: Operating Data Centers in Utah, March 2026; Planned Data Centers in Utah, March 2026)","publisher":"Kem C. Gardner Policy Institute, David Eccles School of Business, University of Utah","retrievedAt":"2026-08-14","url":"https://d36oiwf74r1rap.cloudfront.net/wp-content/uploads/2026/04/Data-Center-Growth-FS-Apr2026.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/flexential-cottonwood-heights-ut"}],"state":"Utah","status":"operating"},{"ai_classification":"likely","city":"Trenton","confidence":"medium","id":"compute_atlas-eecf435f0da04500","lat":39.48,"location_precision":"approximate","lon":-84.4638,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prologis-mila-trenton-oh","value":250.0}],"name":"Prologis Project Mila","operator":"Prologis","source_notes":"Project Mila in Trenton, Butler County (outside Cincinnati): four 220,000 sq ft single-story buildings (880k sq ft total) plus an on-site substation. Planning approved March 2026; construction from fall 2026. Local reporting in 2026 (Journal-News, WYSO) describes a 250-megawatt data center, recorded as planned capacity. Prologis estimates the project will create 120 full-time jobs by December 31, 2035 (Journal-News, WYSO); as an estimate, it is not recorded as a job count. Distinct from Prologis's Newnan, GA campus. Coordinates are the Trenton area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prologis details plans for data center campus outside Cincinnati, Ohio","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/prologis-details-plans-for-data-center-campus-outside-cincinnati-ohio/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/prologis-mila-trenton-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Middletown","confidence":"high","contains_osm":true,"id":"compute_atlas-eef4e8924e251651","lat":39.0202984,"location_precision":"approximate","lon":-78.2907443,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/middletown-data-center-frederick-va","value":10.0}],"name":"Middletown Data Center","operator":"Middletown Data Center LLC","source_notes":"Operator specs: 14 MW total power, 10 MW critical IT, 43,416 sq ft of data center space. A Sept 2025 BZA variance allowed a supplemental backup generator. The coordinates are the OSM geocode of 8209 Valley Pike, the address listed by directories and not confirmed on a fetched primary page.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Middletown Data Center — Technical Specifications","publisher":"Middletown Data Center","retrievedAt":"2026-10-14","url":"https://www.middletowndatacenter.com/technical-specs"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/middletown-data-center-frederick-va"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/840582927"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/middletown-data-center-osmway-840582927"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/840582927"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Raleigh","confidence":"medium","id":"compute_atlas-ef0b36f5e1d3cd2d","lat":35.7289,"location_precision":"approximate","lon":-78.5776,"name":"Radius DC Raleigh I","operator":"Undisclosed (annexation petitioner: Radius DC Raleigh I)","source_notes":"Project name, address, acreage and parcel ID are taken from the City of Raleigh annexation petition itself. The operating company is not named in the petition, so operator is left undisclosed rather than inferred from the project name.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Petition for Annexation into Raleigh City Limits — Radius DC Raleigh I, 3101 Jones Sausage Road (AX-009-26)","publisher":"City of Raleigh Planning and Development","retrievedAt":"2026-08-15","url":"https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/AX-009-26.pdf"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/radius-dc-raleigh-1-wake-county-nc"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Scarborough","confidence":"medium","id":"compute_atlas-ef13e981c66ca543","lat":43.5899737,"location_precision":"approximate","lon":-70.3346065,"name":"Scarborough Technology Park (Scarborough High Technology Industrial Park) Data Center","operator":"Daniel Dickinson (landowner/developer)","source_notes":"About 52 acres just west of the Maine Turnpike, owned by Daniel Dickinson since 2022. The master plan proposes a two-story building for contracted data processing. No street address, MW, or investment figure has been published. The pin is the Scarborough town centroid (OSM relation 12166255), not the parcel, so precision is approximate. The town manager says the application is not considered pending. A third-party tracker lists it as cancelled, but no withdrawal by the developer was found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Scarborough to vote on data center moratorium","publisher":"Portland Press Herald","retrievedAt":"2026-10-22","url":"https://www.pressherald.com/2026/05/28/scarborough-to-vote-on-data-center-moratorium/"},{"kind":"press","label":"Brunswick, Scarborough enact data center moratoriums","publisher":"Spectrum News / NECN","retrievedAt":"2026-10-22","url":"https://spectrumnewsnecn.com/necn/maine/news/2026/06/08/brunswick--scarborough-enact-data-center-moratoriums"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/dickinson-scarborough-technology-park-me"}],"state":"Maine","status":"planned"},{"ai_classification":"likely","city":"Tonopah","confidence":"medium","id":"compute_atlas-ef62e646c019bb43","lat":33.511576,"location_precision":"approximate","lon":-112.769387,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/arizona-land-consulting-hassayampa-ranch-tonopah-az","value":1500.0}],"name":"Hassayampa Ranch Data Center","operator":"Arizona Land Consulting","source_notes":"~$25B proposed data center campus led by Arizona Land Consulting (Anita Verma-Lallian) with investor Chamath Palihapitiya, on ~2,000 acres of far-western Maricopa County near Tonopah (acquired in a ~$51M deal). Maricopa County approved industrial rezoning Dec 10, 2025; zoning applications pending. Coordinates are an approximate town-level geocode near Tonopah, not a parcel-confirmed point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Maricopa County Assessor Parcel Viewer (GIS parcel data service)","retrievedAt":"2026-07-18","url":"https://gis.mcassessor.maricopa.gov/arcgis/rest/services/Parcels/MapServer/0"},{"kind":"press","label":"$25B data center planned west of Phoenix wins key approval from county","publisher":"Berry Riddell (republishing John Leos, azcentral.com)","retrievedAt":"2026-09-10","url":"https://berryriddell.com/25b-data-center-planned-west-of-phoenix-wins-key-approval-from-county/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/arizona-land-consulting-hassayampa-ranch-tonopah-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Oneonta","confidence":"medium","id":"compute_atlas-efd1aea69472263c","lat":42.451656,"location_precision":"approximate","lon":-75.115285,"name":"Eco-Yotta Data Center (proposed, County Route 9)","operator":"Eco-Yotta Inc.","source_notes":"Coordinates geocoded from the street address via US Census geocoder (address-range interpolation on County Route 9, not a confirmed parcel), hence approximate precision. No capacity/MW, acreage, or investment figure found in the directly-fetched source as of 2026-09-13; omitted rather than guessed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"12-month halt on Oneonta AI data center construction plans","publisher":"WKTV","retrievedAt":"2026-10-26","url":"https://www.wktv.com/news/focus-economy/12-month-halt-on-oneonta-ai-data-center-construction-plans/article_f78ba803-32be-4331-95ed-c9c8e525ab1d.html"}],"updated":"2026-10-26","url":"https://www.compute-atlas.com/facilities/eco-yotta-oneonta-ny"}],"state":"New York","status":"planned"},{"ai_classification":"likely","city":"Tolar","confidence":"medium","id":"compute_atlas-efda03afb962fa5c","lat":32.35,"location_precision":"approximate","lon":-97.83,"name":"Comanche Circle","operator":"Sailfish Digital Ventures (SDV)","source_notes":"Near Vistra's Comanche Peak Nuclear Plant. Developer states a 5GW total pipeline across 9 campuses; a later, scaled-back figure puts Comanche Circle plus two smaller Sailfish projects combined at 'up to 3 gigawatts' - given conflicting figures, no single capacity figure is recorded here. Conditional county approval Jan 2026; construction targeted late 2026. No hyperscaler tenant confirmed - speculative developer-led land assembly. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Sailfish plans multi-gigawatt data center park outside DFW, Texas","publisher":"Data Center Dynamics","retrievedAt":"2026-07-09","url":"https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/comanche-circle-sailfish-hood-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Fitchburg","confidence":"medium","id":"compute_atlas-f01fc0098b154fd3","lat":42.9947535,"location_precision":"approximate","lon":-89.42339,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/us-signal-wi02-fitchburg-wi","value":6.0}],"name":"US Signal WI02 Madison (Fitchburg)","operator":"US Signal","source_notes":"Originally constructed in 2008 with expansions in 2011, 2015 and 2017; Tier 3 with 4,500 kW of 2N generators, 6,000 kW of UPS, 9,000 kVA of utility feeds and 1,510 tons of N+1 HVAC; nine on-net carriers. This is the former OneNeck Madison data center — oneneck.com/colocation/data-centers/madison redirected to ussignal.com as of August 2026, so the operator is recorded as US Signal rather than OneNeck. The operational capacity is taken from installed UPS capacity. Coordinates are an address geocode.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"US Signal WI02 Madison — facility specifications","publisher":"US Signal","retrievedAt":"2026-08-18","url":"https://ussignal.com/data-centers/wi02-madison/"}],"updated":"2026-08-18","url":"https://www.compute-atlas.com/facilities/us-signal-wi02-fitchburg-wi"}],"state":"Wisconsin","status":"operating"},{"ai_classification":"unknown","city":"Alexandria","confidence":"medium","contains_osm":true,"id":"compute_atlas-f031e6b16d114d01","lat":45.8844516,"location_precision":"approximate","lon":-95.3762121,"name":"Vaultas Alexandria (ALX1)","operator":"Vaultas","source_notes":"Vaultas designates this site ALX1. Distinct from the Vaultas St. Cloud proposal already tracked. Vaultas also references Minneapolis and St. Paul locations but publishes no street address for either, so neither is recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Vaultas — Alexandria MN data center (720 Hawthorne St; 30kW+ high-density workloads; dual substations with standby generators)","publisher":"Vaultas","retrievedAt":"2026-09-18","url":"https://vaultas.com/data-centers/alexandria-mn/"},{"kind":"other","label":"Vaultas — Minnesota data centers (Alexandria ALX1 at 720 Hawthorne Street, plus Minneapolis, St. Cloud and St. Paul)","publisher":"Vaultas","retrievedAt":"2026-09-18","url":"https://vaultas.com/data-centers/minnesota/"}],"updated":"2026-09-18","url":"https://www.compute-atlas.com/facilities/vaultas-alexandria-mn"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-f11665ff1d4e4d76","lat":39.609,"location_precision":"approximate","lon":-112.0136,"name":"Dog Valley Data Center (McWilliams/Sperry rezone)","operator":"Summit Group Holdings","source_notes":"Ryan Matthews of Summit Group Holdings said the group has the McWilliams/Sperry land under contract for a multi-billion-dollar data center near power, transmission and gas lines and about 4,000 acres of permitted solar. Deseret News describes the Dog Valley project as about 8 miles outside Nephi. The coordinates are a USGS gazetteer point for Dog Valley, not the parcel. Juab County Commission final action was not found.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Juab County Planning Commission Minutes, Nov 19, 2025","publisher":"Juab County","retrievedAt":"2026-10-13","url":"https://juabcounty.gov/wp-content/uploads/2025/11/Planning_Commission_Minutes_Nov_19_2025.pdf"}],"updated":"2026-10-13","url":"https://www.compute-atlas.com/facilities/summit-group-holdings-dog-valley-juab-county-ut"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Cave City","confidence":"medium","id":"compute_atlas-f149565705ea6d55","lat":37.1367544,"location_precision":"approximate","lon":-85.9562169,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/kentucky-industrial-alliance-cave-point-cave-city-ky","value":1200.0}],"name":"Cave Point Commerce Center","operator":"Kentucky Industrial Alliance LLC","source_notes":"Proposed multi-building hyperscale campus (10 buildings x ~200,000 sq ft, ~2M sq ft total) at the Cave City Industrial Park spanning Cave City and unincorporated Barren County. Combined critical capacity reported as 'about 1,200 megawatts.' Jobs figure of 360 is direct jobs at full build-out (300 data-center operations + 60 power generation, per the source, implying an on-site generation component that, as of September 2026, was not independently confirmed, itemized or listed separately, since no source found stated its own capacity or technology). An additional ~569 indirect/induced jobs were estimated (total ~929) but only the direct figure is recorded here. Developer/operator name is the plaintiff of record in the zoning lawsuit (Kentucky Industrial Alliance LLC), which the coverage also identifies as the current landowner; no separate development-company name was disclosed in the sources checked. Exact parcel location within the industrial park not confirmed -- coordinates are a Cave City town-center pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Barren data center suits proceed","publisher":"Bowling Green Daily News","retrievedAt":"2026-09-13","url":"https://bgdailynews.com/2026/08/27/barren-data-center-suits-proceed/"},{"kind":"press","label":"AI developer sues Kentucky town that tried to stop data center project","publisher":"Techstrong IT","retrievedAt":"2026-10-22","url":"https://techstrong.it/featured/ai-developer-sues-kentucky-town-that-tried-to-stop-data-center-project/"},{"kind":"press","label":"Developer sues Cave City over data center zoning moratorium","publisher":"WSMV / WBKO","retrievedAt":"2026-10-22","url":"https://www.wsmv.com/2026/06/09/developer-sues-cave-city-over-data-center-zoning-moratorium/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/kentucky-industrial-alliance-cave-point-cave-city-ky"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Metter","confidence":"medium","id":"compute_atlas-f160d406100f03bf","lat":32.3971,"location_precision":"approximate","lon":-82.0601,"name":"Metter Airport Data Center Campus","operator":"Canoochee River RV Resort, LLC (applicant; end user undisclosed)","source_notes":"Five buildings of up to 250,000 sq ft each and two on-site substations on 470 acres next to Metter-Candler Airport, south of I-16. Phased over 5–7 years to 2033. WTOC reports county talks pointing to a smaller footprint, so the final size is unsettled. A separate city proposal off East Hiawatha Street is not included. Coordinates are the Metter city centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/canoochee-river-metter-airport-campus-candler-ga"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-f167b4fd39d88691","lat":30.55,"location_precision":"approximate","lon":-81.68,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/nextnrg-nassau-county-data-center-energy-campus-fl","value":200.0}],"name":"NextNRG Nassau County Data Center & Energy Campus","operator":"NextNRG","source_notes":"1,600-acre site (1,200 acres energy / 400 acres data center), 50MW starter phase, with a 6,000-acre expansion option. Nassau County is pursuing a 12-month moratorium in response. On April 6, 2026, Nassau County stated that neither the Board of County Commissioners nor any member of its staff had knowledge of this project outside of a press release issued by NextNRG. Nassau NewsLine quotes an 8 April 2026 email from a NextNRG microgrid development manager to county staff: \"Our September press release was about our upcoming solar microgrid project,\" adding, \"The data center piece was noted as a future possibility given the site's power and infrastructure profile, not an active development.\" Multiple secondary outlets report that NextNRG's CEO has since said the company intends a solar/battery-storage project on the site rather than a data center; that report was not independently verified (the firstcoastnews.com story could not be retrieved).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"NextNRG secures lease for energy and data center campus in Nassau County","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/nextnrg-secures-lease-for-energy-and-data-center-campus-in-nassau-county-florida/"},{"kind":"press","label":"Nassau County orders data center pause after emails reveal confusion over 1,600-acre site","publisher":"Nassau NewsLine","retrievedAt":"2026-10-30","url":"https://nassaunewsline.net/nassau-county-orders-data-center-pause-after-emails-reveal-confusion-over-1600-acre-site/"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/nextnrg-nassau-county-data-center-energy-campus-fl"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Nutley","confidence":"medium","contains_osm":true,"id":"compute_atlas-f1cb620f11838de6","lat":40.8300104,"location_precision":"approximate","lon":-74.1535977,"name":"ON3 Data Center (275 Kingsland Street)","operator":"Prism Capital Partners","source_notes":"Nutley approved a redevelopment plan for 11 acres at 275 Kingsland Street, at the intersection with Cathedral Avenue, that 'can accommodate a major data center and other permitted uses'. The site is part of the 116-acre ON3 campus, the former Hoffmann-La Roche North American headquarters acquired by Prism in 2016; the parcel previously carried a truck-depot proposal that was withdrawn after community objections. No site plan application, end operator or megawatt figure has been made public, so no capacity is recorded.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prism Capital Partners press release, 'Prism Capital Partners Secures Three Key Redevelopment Plan Approvals for ON3', 9 July 2025","publisher":"Prism Capital Partners","retrievedAt":"2026-09-14","url":"https://prismpartners.net/news/press-release/prism-capital-partners-secures-three-key-redevelopment-plan-approvals-for-on3-solidifying-campus-live-work-play-future/"},{"kind":"press","label":"'Major Data Center May Be Coming To ON3 Site In Nutley' — Belleville Patch, 21 July 2025","publisher":"Patch","retrievedAt":"2026-09-14","url":"https://patch.com/new-jersey/belleville/major-data-center-may-be-coming-on3-site-nutley-other-updates-announced"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/prism-on3-nutley-data-center-nj"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-f267c7a94e3d92cc","lat":38.2445,"location_precision":"approximate","lon":-77.4334,"name":"Crossroads Technology Campus","operator":"RCK Digital Crossroads LLC","source_notes":"Previously only an mlq.ai aggregator lead — now confirmed via a REAL county case. Spotsylvania County special-use case SUP26-0003 'Crossroads Technology Campus'; applicant 'RCK Digital Crossroads LLC' (Delaware, McLean-based) per the county's SUP Application PDF. ~633 acres at the NW intersection of Benchmark Rd (Rt 608) and US-17 (Mills Dr), Lee Hill District, ~2.2-2.3M sq ft of data-center buildings plus three substations. Actively contested (packed BOS/planning-commission meetings, week of 2026-07-16). Distinct from all tracked records. MW not disclosed (sq ft only) -> omitted. Parcel/GPIN ","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/rck-crossroads-technology-campus-spotsylvania-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Urbana","confidence":"medium","id":"compute_atlas-f299554072ca7887","lat":40.12,"location_precision":"approximate","lon":-83.74722,"name":"Urbana Technology Hub","operator":"Thor Equities","source_notes":"Thor says it has spent over $19M on preliminary work and projects $3M/yr in city tax revenue. The end user is undisclosed. Coordinates are the Urbana city centroid (approximate). The site is near the OH-55 / US-68 intersection.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/thor-equities-urbana-technology-hub-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Anchorage","confidence":"medium","id":"compute_atlas-f2f35ffef40ced91","lat":61.251,"location_precision":"approximate","lon":-149.8065,"name":"Joint Base Elmendorf-Richardson AI Data Center Enhanced Use Lease Site","operator":"U.S. Department of the Air Force (lessor; developer not selected)","source_notes":"Enhanced Use Lease offering: 5 sites at JBER of about 60 to nearly 200 acres each (per ADN). The ~4,700 acres and 12 parcels are totals across all three Alaska installations, not this site. Coordinates are approximate (base location).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"USAF Offers Land for AI Data Centers on Three Alaska Bases","publisher":"Air & Space Forces Magazine","retrievedAt":"2026-10-18","url":"https://www.airandspaceforces.com/usaf-land-ai-data-centers-three-alaska-bases/"}],"updated":"2026-10-18","url":"https://www.compute-atlas.com/facilities/usaf-jber-ai-data-center-eul-anchorage-ak"}],"state":"Alaska","status":"planned"},{"ai_classification":"unknown","city":"Colwich","confidence":"medium","id":"compute_atlas-f3023ac3b7247a67","lat":37.78,"location_precision":"approximate","lon":-97.56,"name":"Monarch Energy Colwich/Andale Site","operator":"Monarch Energy","source_notes":"San Diego-based Monarch Energy, which pivoted to data centers in 2024, signed purchase agreements for more than 300 acres between 183rd W and 215th W off 53rd N in Colwich/Andale. The intended use is not stated explicitly, and the county had received no zoning application. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-21","url":"https://www.compute-atlas.com/facilities/monarch-energy-colwich-ks"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Denver","confidence":"medium","id":"compute_atlas-f3272e30bb840f7e","lat":39.744914,"location_precision":"approximate","lon":-104.979413,"name":"CoreSite DE2 (639 E. 18th Avenue)","operator":"CoreSite","source_notes":"The operator's Denver market page lists DE2 at 639 E. 18th Ave. with more than 5,100 sq ft, and shows it as operating. This is a small colocation site and no MW figure is published. It is a separate facility from DE1 and DE3. Coordinates are a Census geocode of the street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Colocation Data Centers in Denver","publisher":"CoreSite","retrievedAt":"2026-09-30","url":"https://www.coresite.com/data-center-locations/denver"}],"updated":"2026-09-30","url":"https://www.compute-atlas.com/facilities/coresite-de2-denver-co"}],"state":"Colorado","status":"operating"},{"ai_classification":"mixed_use","city":"Papillion","confidence":"medium","id":"compute_atlas-f361bd249217859a","lat":41.1544,"location_precision":"approximate","lon":-96.0428,"name":"LightEdge Omaha Data Center","operator":"LightEdge","source_notes":"LightEdge colocation facility at 1148 American Parkway, Papillion (Sarpy County). Thin record: LightEdge's own page publishes only the address, with no square footage, MW, tier, certifications or build date. Every size and power figure circulating for this site (e.g. '21,377 sq ft, 10,000 sq ft raised floor, 1.0 MW') comes from third-party colocation directories that, as of August 2026, were not consulted or verified, so none of it is recorded. DCD independently names LightEdge as an operator in the Omaha market, which corroborates the operator's presence but adds no site detail. The record is marked reported. Coordinates are a Papillion city-level point, not a geocode of American Parkway, and the map pin should not be trusted until an address geocode is done.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"LightEdge Omaha, NE Colocation Data Center — '1148 American Parkway, Papillion, Nebraska 68046'","publisher":"LightEdge","retrievedAt":"2026-08-14","url":"https://lightedge.com/data-centers/omaha-data-center/"},{"kind":"press","label":"DCD (archived) — 'Other operators in Omaha include H5, TierPoint, LightEdge, Lumen, Cogent, and Google'","publisher":"Data Center Dynamics (via Internet Archive)","retrievedAt":"2026-08-14","url":"http://web.archive.org/web/20250830145932/https://www.datacenterdynamics.com/en/news/1623-farnam-adds-15mw-to-omaha-data-center-in-nebraska/"}],"updated":"2026-08-14","url":"https://www.compute-atlas.com/facilities/lightedge-papillion-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"unknown","city":"Tampa","confidence":"medium","id":"compute_atlas-f3928e673188527b","lat":28.001197,"location_precision":"approximate","lon":-82.359058,"name":"Hivelocity Tampa 2 (TPA2)","operator":"Hivelocity","source_notes":"30,200 sq ft of raised-floor data center space; 420 tons of N+2 CRAC cooling; SOC 1/SOC 2 Type 2, ISAE 3402, HIPAA, PCI. MW not stated by the operator.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/hivelocity-tpa2-tampa-fl"}],"state":"Florida","status":"operating"},{"ai_classification":"confirmed","city":"Evanston","confidence":"medium","id":"compute_atlas-f3a7d84694a74ffe","lat":41.27,"location_precision":"approximate","lon":-110.81,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-evanston-wy","value":1250.0}],"name":"Prometheus Hyperscale Atlas Industrial Park Data Center Campus","operator":"Prometheus Hyperscale","source_notes":"506-acre 'Atlas Industrial Park' campus about 8-12 miles east of Evanston near the Silver Eagle refinery on County Road 180, south side of I-80 (Section 13, T15N R119W). Approved for 1.25GW initial IT capacity with a stated development path to 5GW; only the confirmed initial figure is recorded here.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Prometheus Hyperscale secures planning approval for gigawatt data center campus in Wyoming","publisher":"Data Center Dynamics","retrievedAt":"2026-08-07","url":"https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-secures-planning-approval-for-gigawatt-data-center-campus-in-wyoming/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/prometheus-hyperscale-evanston-wy"}],"state":"Wyoming","status":"planned"},{"ai_classification":"mixed_use","city":"Los Alamos","confidence":"medium","id":"compute_atlas-f3e8aa043a9dfdb8","lat":35.8755,"location_precision":"approximate","lon":-106.319,"name":"Los Alamos National Laboratory Strategic Computing Complex (Nicholas C. Metropolis Center)","operator":"Los Alamos National Laboratory (U.S. Department of Energy / NNSA)","source_notes":"A 307,749 sq ft secured supercomputing facility (Nicholas C. Metropolis Center) built around 1999-2001 for $131 million. Computer-floor power was expanded to 24 MW, with the ability to add 10 MW more, per the MEP engineer. It has housed Q, Roadrunner, Trinity, Crossroads and Venado. Venado (2,560 liquid-cooled Nvidia Grace Hopper superchips) was announced at 10 exaflops of peak AI performance, a figure LANL has not confirmed, which supports the mixed-use classification. Coordinates are an approximate point at LANL Technical Area 3, not a confirmed building pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Los Alamos National Laboratory Strategic Computing Complex","publisher":"Bridgers & Paxton Consulting Engineers","retrievedAt":"2026-10-17","url":"https://www.bpce.com/project/los-alamos-national-laboratory/"}],"updated":"2026-10-17","url":"https://www.compute-atlas.com/facilities/lanl-strategic-computing-complex-los-alamos-nm"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Nashville","confidence":"high","contains_osm":true,"id":"compute_atlas-f431575c3c57fe28","lat":36.0326354,"location_precision":"approximate","lon":-86.637789,"name":"HCA Information Technology & Services Data Center (Antioch)","operator":"HCA Healthcare","source_notes":"Metro's incentive record lists the parcel address as 5900 Crossings Boulevard, Antioch (Parcel ID 17400003200, Council District 33); the street field is left empty here because that address could not be reconciled against the mapped building footprint used for the coordinates, which reverse-geocodes to Old Franklin Road. The 834-position figure is Metro's reported employment at the site, not a data-center staffing figure, so no jobs value is asserted.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way 819981891 — 'HCA Information Technology & Services Data Center'","publisher":"OpenStreetMap contributors","retrievedAt":"2026-09-14","url":"https://www.openstreetmap.org/way/819981891"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/hca-it-services-data-center-nashville-tn"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/819981891"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/hca-information-technology-services-data-center-osmway-819981891"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/819981891"}],"state":"Tennessee","status":"operating"},{"ai_classification":"confirmed","city":"Columbiana","confidence":"medium","contains_osm":true,"id":"compute_atlas-f4a9248fb01a59d7","lat":33.1810918,"location_precision":"approximate","lon":-86.622753,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/digi-power-x-columbiana-al","value":40.0}],"name":"Digi Power X Columbiana AI Data Center","operator":"Digi Power X","source_notes":"Subsidy: the Columbiana City Council \"unanimously rejected a tax abatement proposal for Digi Power X\", and the article states \"The only governmental body that has the jurisdiction to give an abatement on taxes for the Columbiana data center is the City Council.\" So as of 29 May 2026 this site had no local tax abatement, and by the reporter's account no other body could have granted one. Digi Power X had requested abatement on \"all state and local non-educational property taxes on the project's industrial development property\" plus construction-related transaction taxes through 2027. WBRC reported on 24 July 2026 that the council had later voted to grant DigiPowerX \"a 12-month sales and use tax abatement, but only during construction to help cover the cost of equipment for expansion\", in return for a $3.5 million \"community impact payment\" to the city. Anchor tenant: 10-year master services agreement with Cerebras Systems for colocation of the 40 MW AI data center, \"valued at approximately $1.1 billion with potential for the contract value to reach $2.5 billion, inclusive of renewal terms\" — that $1.1B is contract value, not capital investment, and is not recorded as the investment figure; the $371.5M figure is the stated \"total investment ... in building, machinery and personal property\" from the abatement filing. Bham Now (June 2026) instead reports a 55 MW two-phase plan, with 22 MW and $176 million for the first phase and $440 million in total; those figures differ from the 40 MW colocation agreement and the abatement-filing figure and are not recorded. Jobs: \"Digi Power X plans to start out with two jobs at a total annual payroll of $200,000 and to expand to 45 permanent jobs by year three with a total payroll of $4.5 million\" — the 2 is the year-one headcount, not a construction workforce, so no construction job count is recorded; the source states no construction-worker count. Site history: property purchased by Digihost Technology Inc from Grede II LLC on 21 June 2022 after the Grede Foundry closed in 2020, and run as a bitcoin-mining operation until the January 2025 conversion announcement. Air emissions to be monitored by ADEM. Coordinates are the OSM industrial-park polygon centroid for Industrial Parkway, not a confirmed parcel footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Digi Power X Announces $200 Million Debt Financing Commitment to Support Completion of Alabama AI Data Center (Oct 13, 2026)","publisher":"Yahoo Finance (company release)","retrievedAt":"2026-10-18","url":"https://finance.yahoo.com/technology/ai/articles/digi-power-x-announces-200-113000058.html"},{"kind":"permit","label":"Data center project in Columbiana among new $1M+ building permits","publisher":"Bham Now","retrievedAt":"2026-10-18","url":"https://bhamnow.com/2026/06/29/data-center-columbiana-building-permits/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/digi-power-x-columbiana-al"}],"state":"Alabama","status":"under construction"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"compute_atlas-f4f220180fdea6c2","lat":45.52707,"location_precision":"exact","lon":-122.87139,"name":"Hines Walker Road Data Center Site (10500 NE Walker Road, Hillsboro)","operator":"Hines","source_notes":"Single-outlet lead: The Hillsboro Herald reports a ~20-acre data center 'placeholder application' (DR-032-25) at 10500 NE Walker Road, a property owned by Hines Global Income Trust (the 212,000 sq ft Wells Fargo Center, per Hines' 2022 SEC press-release exhibit), about 120 feet from the Beaverton Academy of Science and Engineering. The Herald itself notes the developer, use and size were not publicly confirmed at the time. No operator statement, MW figure or site plan has been published — treat as unconfirmed until the city posts the application.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Next Wave: 7 Hillsboro data center projects march ahead — The Hillsboro Herald (2026-08-13)","publisher":"The Hillsboro Herald","retrievedAt":"2026-09-17","url":"https://hillsboroherald.com/next-wave-7-hillsboro-data-center-projects-march-ahead-as-humans-fight-it-out/"},{"kind":"press","label":"The Real Story: data centers are encroaching on Hillsboro's schools — The Hillsboro Herald","publisher":"The Hillsboro Herald","retrievedAt":"2026-09-17","url":"https://hillsboroherald.com/the-real-story-data-centers-are-encroaching-on-hillsboros-schools-and-we-are-out-of-time/"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/hines-walker-road-hillsboro-or"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Holmdel","confidence":"medium","contains_osm":true,"id":"compute_atlas-f4f6cf10d0de56e1","lat":40.3650934,"location_precision":"approximate","lon":-74.1674935,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details","value":40.0}],"name":"Bell Works Data Center (101 Crawfords Corner Road)","operator":"Somerset Development","source_notes":"108,000 sq ft, 40 MW data center proposed in an existing two-story building off the ring road behind the main Bell Works building, under a 2012 redevelopment agreement that explicitly lists data centers as a permitted use. Coordinates are the mapped Bell Works main building; the proposed data center building sits elsewhere on the same campus, hence an approximate pin.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"'Data Center Proposed At Bell Works: See Details' — Holmdel/Hazlet Patch","publisher":"Patch","retrievedAt":"2026-09-14","url":"https://patch.com/new-jersey/holmdel-hazlet/data-center-proposed-bell-works-see-details"},{"kind":"press","label":"'Developer Filed Data Center Proposal for Bell Works Before Holmdel's Ban' — Two River Times","publisher":"Two River Times","retrievedAt":"2026-09-14","url":"https://tworivertimes.com/developer-filed-data-center-proposal-for-bell-works-before-holmdels-ban/"}],"updated":"2026-09-14","url":"https://www.compute-atlas.com/facilities/bell-works-holmdel-data-center-nj"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Midlothian","confidence":"high","id":"compute_atlas-f5950caa71f878e4","lat":37.44741159,"location_precision":"approximate","lon":-77.77600992,"name":"Project Skye","operator":"Google","source_notes":"887-acre parcel spanning Genito/Moseley/Duval Rds. Part of Google's 3-campus $9B Chesterfield County trio, alongside Project Peanut and Project Loch. Distinct from the separately tracked Project Loch (750 Watkins Centre Pkwy, 221 ac).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Details revealed for Google's Project Skye data center campus","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/details-revealed-for-googles-project-skye-data-center-campus-in-chesterfield-county-virginia/"},{"kind":"press","label":"Google files plans for 887-acre Project Skye data center campus","publisher":"US Data Center Projects","retrievedAt":"2026-07-17","url":"https://usdatacenterprojects.com/virginia/google-files-plans-for-887-acre-project-skye-data-center-campus-in-chesterfield-county-virginia"},{"kind":"press","label":"Chesterfield Report — Chesterfield Residents Seek Clarity on Data Center Expansion Plans","retrievedAt":"2026-07-26","url":"https://chesterfieldreport.com/story/google-to-invest-9b-in-three-chesterfield-data-center-campuses.html"},{"kind":"press","label":"Chesterfield says it won't approve any more data center projects","publisher":"Richmond BizSense","retrievedAt":"2026-10-14","url":"https://richmondbizsense.com/2026/08/27/chesterfield-says-it-wont-approve-any-more-data-center-projects/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/google-project-skye-midlothian-va"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-skye-google"}],"state":"Virginia","status":"planned"},{"ai_classification":"likely","city":"Unknown","confidence":"medium","id":"compute_atlas-f5cdd91af3ee50b0","lat":32.03,"location_precision":"approximate","lon":-97.13,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/rcm-hill-project-aquila-hill-county-tx","value":1235.0}],"name":"Project Aquila","operator":"RCM Hill, LLC","source_notes":"Unincorporated Hill County, near Hillsboro, ~55 mi south of Fort Worth. $80M+ land acquisition. A $61.75M ERCOT 'Batch Zero' capacity deposit was due July 24, 2026. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/rcm-hill-project-aquila-hill-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"likely","city":"Ashburn","confidence":"medium","id":"compute_atlas-f5d3e583e1a1ca65","lat":39.04,"location_precision":"approximate","lon":-77.49,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/stack-nova-loudoun-va","value":144.0}],"name":"STACK NVA Loudoun 144MW Hyperscale Campus","operator":"STACK Infrastructure","source_notes":"122-acre campus, two 72 MW buildings, near Dulles Airport / Evergreen Mills Rd. Announced Feb 2025. Distinct from Equinix's separately-branded Ashburn portfolio. Powered by an on-site substation with a 100%-renewable commitment. Coordinates are the Ashburn/Dulles area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/stack-nova-loudoun-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"high","contains_osm":true,"id":"compute_atlas-f5df18b1679c615b","lat":45.558302,"location_precision":"exact","lon":-122.9171647,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-2-or","value":18.0}],"name":"Flexential Portland - Hillsboro 2","operator":"Flexential","source_notes":"18MW, 5737 NE Huffman St, subsea cable termination point.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/471691760","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/471691760"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/flexential-portland-hillsboro-2-or"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/471691760"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-portland-hillsboro-2-osmway-471691760"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/471691760"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Fairview Township","confidence":"medium","id":"compute_atlas-f60ca97bbc74e096","lat":40.1692628,"location_precision":"approximate","lon":-76.8516507,"name":"Fairview Crossroads Data Center","operator":"Elysian Partners","source_notes":"Developer is Elysian Partners, a Boca Raton, Florida commercial and industrial real estate firm. The source records no capacity figure and no geocoded parcel; the coordinate here is a township-centroid geocode. Reported acreage (80), square footage (750,000) and investment ($500 million) figures appeared only in search summaries and in paywalled or blocked pages as of September 2026 and are not recorded.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-09-12","url":"https://www.compute-atlas.com/facilities/elysian-partners-fairview-crossroads-fairview-township-york-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"likely","city":"Eagle Creek Township","confidence":"medium","id":"compute_atlas-f6153e492103d929","lat":41.31,"location_precision":"approximate","lon":-87.3,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/project-shirley-eagle-creek-township-lake-county-in","value":500.0}],"name":"Project Shirley","operator":"Sentinel Data Centers","source_notes":"Unincorporated, SR-2/Clay St. 4 buildings across 160 largely agricultural acres. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"In Indiana, an anatomy of data center opposition","publisher":"Latitude Media","retrievedAt":"2026-07-09","url":"https://www.latitudemedia.com/news/in-indiana-an-anatomy-of-data-center-opposition/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/project-shirley-eagle-creek-township-lake-county-in"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Castroville","confidence":"medium","contains_osm":true,"id":"compute_atlas-f62d5694206d3852","lat":29.3565001,"location_precision":"approximate","lon":-98.8788844,"name":"CyrusOne SAT14A (Medina County)","operator":"CyrusOne","source_notes":"Investment is reported as $600M by the county (2025) and $500M by the TDLR filing (2026); the later filing figure is used. Distinct from Microsoft's SAT89/SAT90 record near Castroville. Coordinates are the Castroville town point. The site is about 3.75 mi west.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"County approves 80% tax break for new data center project","publisher":"Devine News","retrievedAt":"2026-10-14","url":"https://devinenews.com/county-approves-80-tax-break-for-new-data-center-project/"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/cyrusone-sat14a-medina-county-tx"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Hickory","confidence":"medium","id":"compute_atlas-f690bc7cfa01117f","lat":35.7333,"location_precision":"approximate","lon":-81.3443,"name":"Microsoft Hickory Data Center","operator":"Microsoft","source_notes":"Coordinates are a Hickory city-level approximation — the sources describe the parcel only as ~160 acres west of US 321 adjacent to Hickory Lincolnton Hwy. No per-site capacity or investment disclosed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Joint Statement on Microsoft Data Center Development in Catawba County","publisher":"Catawba County","retrievedAt":"2026-10-15","url":"https://www.catawbacountync.gov/news/joint-statement-on-microsoft-data-center-development-in-catawba-county/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/microsoft-hickory-catawba-county-nc"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Seattle","confidence":"medium","contains_osm":true,"id":"compute_atlas-f6df993a6b789181","lat":47.5698552,"location_precision":"approximate","lon":-122.3361429,"name":"Data Center at 3625 First Avenue South (SoDo)","operator":"Undisclosed developer","source_notes":"The developer is not named in the source read. KUOW separately mentions a PacLand-filed multi-story data center just south of the Spokane Street Viaduct, which is probably the same site, but that link was not confirmed from a fetched page. No MW or size figures were taken from a read source.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Seattle banned new data centers. Why companies want them here anyway","publisher":"KUOW","retrievedAt":"2026-10-30","url":"https://www.kuow.org/2026-06-18/seattle-banned-new-data-centers-why-companies-want-them-here-anyway"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/data-center-3625-first-ave-s-sodo-seattle-wa"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Wood Dale","confidence":"medium","id":"compute_atlas-f71ad2bc16c9a7fd","lat":41.9790594,"location_precision":"approximate","lon":-87.964189,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-chi6-wood-dale-il","value":18.0}],"name":"CyrusOne Wood Dale Campus","operator":"CyrusOne","source_notes":"Operator states \"the campus will include two buildings totaling more than 500,000 square feet, delivering an initial IT capacity of 18 megawatts with scalable capacity\" — the 18MW is the initial IT capacity, not a full-build figure. Street-level coordinate is approximate: the press release names only Wood Dale, and the Bryn Mawr Avenue location comes from secondary reporting. Distinct from the tracked CyrusOne Aurora (CHI1–CHI3) and CyrusOne Sangamon County records.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"subsidy","label":"Data Center Investment Program 2025 Annual Report (C1 Chicago 1 LLC - C1 Chicago 2 LLC, Wood Dale, 2024 MOU)","publisher":"Illinois Department of Commerce and Economic Opportunity","retrievedAt":"2026-10-15","url":"https://dceo.illinois.gov/content/dam/soi/en/web/dceo/aboutdceo/reportsrequiredbystatute/2025-data-centers-annual-report.pdf"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/cyrusone-chi6-wood-dale-il"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Omaha","confidence":"medium","id":"compute_atlas-f78c61e070e4fc0a","lat":41.334,"location_precision":"approximate","lon":-96.145,"name":"Google Omaha Data Center","operator":"Google","source_notes":"Google's third, distinct Nebraska campus (not the same site as Google Papillion Data Center). Located north of 114th Street & State Street / along the west side of Blair High Road (NE Hwy 133) in far northwest Omaha, Douglas County; Papillion is in Sarpy County, a separate site ~20 miles southeast. Filed under the shell entity 'Westwood Solutions, LLC'. Original phase: 270 acres, 4 buildings, 1.4M+ sq ft, ~$750M, 18-24 month construction timeline (filed/reported Jan 2023). Google separately sought to rezone an additional 187 adjacent acres (would bring the total site to ~457 acres / 2.2M+ sq ft if built); that expansion's approval/completion status was not independently confirmed as of August 2026, so the recorded acreage is the original 270-acre confirmed figure only. Google's own official Nebraska locations page lists Omaha as a distinct, separate site from Papillion and Lincoln, status 'Constructed in 2022'. Coordinates are a rough estimate from the named intersection (114th & State St), not a parcel-level geocode.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Public notice: Westwood Solutions, LLC air construction permit (FID 117197) — data processing center, 8425 North 114th Street, Omaha","publisher":"Nebraska Department of Water, Energy, and Environment","retrievedAt":"2026-10-12","url":"https://dwee.nebraska.gov/news-events/public-notices/westwood-solutions-llc-0"},{"kind":"press","label":"Google seeks to stretch farther in northwest Omaha (Westwood Solutions LLC representing Google)","publisher":"Patch","retrievedAt":"2026-10-12","url":"https://patch.com/nebraska/omaha/google-seeks-stretch-farther-northwest-omaha"}],"updated":"2026-10-12","url":"https://www.compute-atlas.com/facilities/google-omaha-ne"}],"state":"Nebraska","status":"operating"},{"ai_classification":"confirmed","city":"Falls Township","confidence":"medium","id":"compute_atlas-f7a443c8e4262bbc","lat":40.1545,"location_precision":"approximate","lon":-74.7882,"name":"Amazon Web Services Innovation Campus, Falls Township","operator":"Amazon Web Services","source_notes":"One of two announced Amazon data center sites in Pennsylvania part of the $20B PA AI investment commitment. NorthPoint Development is converting the 1,800-acre former Fairless Works site. Capacity in MW not publicly stated; 2M+ sq ft across 10 structures confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Not Everyone Is Sold on the Benefits of Amazon's Data Center Coming to Falls Township","publisher":"Bucks County Beacon","retrievedAt":"2026-07-06","url":"https://buckscountybeacon.com/2025/08/not-everyone-is-sold-on-the-benefits-of-amazons-data-center-coming-to-falls-township/"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/aws-falls-township-pa"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"New Castle","confidence":"medium","id":"compute_atlas-f7e4c69ede7b292c","lat":39.68965,"location_precision":"approximate","lon":-75.574117,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/dastor-new-castle-boulden-circle-de","value":8.0}],"name":"DāSTOR New Castle (3 Boulden Circle)","operator":"DāSTOR LLC","source_notes":"Colocation facility. The operator lists it at 61,000 sq ft and 8 MW, with N+1 generator backing, 2N+1 UPS and N+1 cooling. The 8 MW is the operator's stated facility power, not a measured IT load. Delaware Business Now (April 2024) reported more than 30,000 sq ft of raised floor. Delaware Business Times (July 2025) said DāSTOR 'added a nondescript warehouse in the Boulden Interchange Park last year.' Coordinates are a US Census geocode of the street address, and an OSM Nominatim lookup agrees to within about 30 m. Not a surveyed footprint.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"DāSTOR data center locations: New Castle, DE, 3 Boulden Circle, 61,000 S.F., 8 MW Power","publisher":"DāSTOR","retrievedAt":"2026-10-20","url":"https://dastorllc.com/locations/"},{"kind":"press","label":"New Castle could be the site of mega data center campus (notes DāSTOR's Boulden Interchange Park addition)","publisher":"Delaware Business Times","retrievedAt":"2026-10-01","url":"https://delawarebusinesstimes.com/news/new-castle-data-center-campus/"}],"updated":"2026-10-20","url":"https://www.compute-atlas.com/facilities/dastor-new-castle-boulden-circle-de"}],"state":"Delaware","status":"operating"},{"ai_classification":"unknown","city":"Gibraltar","confidence":"medium","id":"compute_atlas-f80c346bd2f1751b","lat":42.106282080203,"location_precision":"approximate","lon":-83.196799127817,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/raeden-gibraltar-mclouth-mi","value":100.0}],"name":"Gibraltar Data Center (former McLouth Steel site)","operator":"Raeden (with Cal Realty / Ferragon Corp.)","source_notes":"100 MW proposal on the former McLouth Steel plant site (operated from the 1950s to 1996, now a steel processing site) at 27800 W. Jefferson Ave., with an adjacent Superfund property at 28000 W. Jefferson. The record remains listed as proposed, not cancelled: the application is blocked by the moratorium and is the subject of active litigation, not a denial. Confirmed absences: no acreage, investment figure, water figure, or job count is stated in either source. The '80,000 households' comparison is the source's characterisation of the 100 MW draw, not an additional measured figure. Coordinates are the US Census geocoder's match for the street address named in the source; the parcel is not confirmed.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Gibraltar faces data center developer lawsuit after city passes moratorium","publisher":"Planet Detroit","retrievedAt":"2026-09-09","url":"https://planetdetroit.org/2026/08/gibraltar-faces-data-center-lawsuit/"},{"kind":"other","label":"How many AI data centers are planned in Michigan? We counted.","publisher":"Gander Newsroom","retrievedAt":"2026-09-21","url":"https://gandernewsroom.com/news/politics/how-many-ai-data-centers-are-planned-in-michigan-we-counted/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/raeden-gibraltar-mclouth-mi"}],"state":"Michigan","status":"planned"},{"ai_classification":"likely","city":"Menomonie","confidence":"medium","id":"compute_atlas-f82f509c9fa5a0e9","lat":44.8769,"location_precision":"approximate","lon":-91.9193,"name":"Menomonie Data Center Campus","operator":"Undisclosed (Balloonist LLC)","source_notes":"End operator undisclosed behind Balloonist LLC (a Delaware foreign LLC). Multiple outlets note Balloonist's Delaware address and registered agent match prior Meta data-center SPV patterns, but no source names Meta or any operator - recorded as undisclosed. A council member said the end user is 'one of the top tech giants' without naming them. The record is listed as proposed rather than permitted: the original I-1 rezoning was superseded by a January 2026 I-4 ordinance; no building permits were ever issued. Proposed investment up to $1.6B and 50-75 FTE jobs are developer projections (not recorded as firm fields). No MW capacity disclosed. Site: ~324 acres along County Highway B (annexed from Town of Red Cedar Aug 2025). Coordinates are the Menomonie centroid. The likely AI-specific classification rests on hyperscale scale + 'tech giant' attribution, not an explicit AI-workload statement.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Wisconsin's Year of the Data Center","publisher":"WTMJ","retrievedAt":"2026-07-07","url":"https://wtmj.com/news/2025/12/23/a-look-back-at-wisconsins-year-of-the-data-center/"},{"kind":"press","label":"Tech Giant Considering $1.6B Data Center in Dunn County","publisher":"Volume One","retrievedAt":"2026-07-07","url":"https://volumeone.org/articles/2025/08/26/370164-tech-giant-is-considering-16-billion-data-center-dunn-county"},{"kind":"press","label":"Data center in Red Cedar, Wisconsin, could be $1.6bn investment","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/data-center-in-red-cedar-wisconsin-could-be-16bn-investment/"},{"kind":"press","label":"Proposed Data Center - Menomonie News Net","publisher":"Menomonie News Net","retrievedAt":"2026-07-07","url":"https://menomonienewsnet.org/3707/city/proposed-data-center/"},{"kind":"press","label":"Data center development in Menomonie, Wisconsin, delayed","publisher":"Data Center Dynamics","retrievedAt":"2026-07-07","url":"https://www.datacenterdynamics.com/en/news/data-center-development-in-menomonie-wisconsin-delayed/"},{"kind":"press","label":"Menomonie City Council Approves Data Center Ordinance Change","publisher":"WCFW","retrievedAt":"2026-07-07","url":"https://wcfw.fm/news/2026/01/06/menomonie-data-center-ordinance"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/menomonie-data-center-wi"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Umatilla","confidence":"medium","id":"compute_atlas-f93ed489a783b0f0","lat":45.91735,"location_precision":"approximate","lon":-119.34252,"name":"AWS Umatilla Data Center Campus","operator":"Amazon Web Services","source_notes":"","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Small eastern Oregon city could be next hotspot for big data centers — enumerates Amazon's Umatilla County footprint as of Sept 2023: two existing data centers in Umatilla and two more under construction there plus two with tax-break agreements; one operating data center in unincorporated Umatilla County near Hermiston, one under construction within Hermiston city limits, and two further Hermiston projects with negotiated tax deals","publisher":"The Bulletin (Bend, OR)","retrievedAt":"2026-08-14","url":"https://bendbulletin.com/2023/09/15/small-eastern-oregon-city-could-be-next-hotspot-for-big-data-centers/"}],"updated":"2026-08-15","url":"https://www.compute-atlas.com/facilities/aws-umatilla-city-or"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"compute_atlas-f966a43eef9340bf","lat":38.474,"location_precision":"approximate","lon":-77.997,"name":"Red Ace Data Center","operator":"Red Ace Capital Management","source_notes":"69.19 acres rezoned Rural to Light Industrial (4-3 vote, July 2026); 1.16M sq ft, on-site substation, completion targeted 2028.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Data center campus in Virginia's Culpeper County gets approval","publisher":"Data Center Dynamics","retrievedAt":"2026-07-17","url":"https://www.datacenterdynamics.com/en/news/data-center-campus-in-virginias-culpeper-county-gets-approval/"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/red-ace-data-center-culpeper-va"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","contains_osm":true,"id":"compute_atlas-f967fcee105ee1fc","lat":37.3724077,"location_precision":"exact","lon":-121.973647,"name":"Digital Realty SJC34","operator":"Digital Realty","source_notes":"2820 Northwestern Parkway, Santa Clara CA 95051. Distinct site from SJC37 (641 Walsh Ave).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Digital Realty official facility page","publisher":"Digital Realty","retrievedAt":"2026-07-22","url":"https://www.digitalrealty.com/data-centers/americas/silicon-valley/sjc34"},{"kind":"osm","label":"OpenStreetMap way/38305431","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/38305431"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/digital-realty-sjc34-ca"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Monticello","confidence":"medium","id":"compute_atlas-f98825028a86f21b","lat":42.2382752,"location_precision":"approximate","lon":-91.1869428,"name":"ITS Iowa Data Center (Monticello)","operator":"Infrastructure Technology Solutions (ITS)","source_notes":"Small SOC 2 Type I certified colocation and hosted-desktop facility with N+1 UPS, automatic generator backup and N+1 cooling. The operator also keeps an office in Manchester, Iowa. Coordinate is a town-level approximation; the operator does not publish a street address.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Our Iowa Data Center — SOC 2 Certified Facility","publisher":"Infrastructure Technology Solutions (ITS)","retrievedAt":"2026-09-04","url":"https://its.tech/about/data-center/"}],"updated":"2026-09-04","url":"https://www.compute-atlas.com/facilities/its-monticello-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"compute_atlas-fa5ccccc6651798c","lat":39.0163894,"location_precision":"exact","lon":-77.4590691,"name":"Equinix DC2","operator":"Equinix","source_notes":"21715 Filigree Court, Ashburn, VA.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/234722029","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/234722029"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-dc2-va"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Equinix facility directory","publisher":"Equinix","retrievedAt":"2026-07-22","url":"https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/washington-dc-data-centers/dc3"},{"kind":"osm","label":"OpenStreetMap way/298242260","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/298242260"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-dc3-va"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/234722029"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298127059"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298127361"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298127420"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/796933516"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"compute_atlas-fa8bb416f7c0b854","lat":31.9243,"location_precision":"approximate","lon":-97.6564,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-bosque-county-thad-hill-tx","value":400.0}],"name":"CyrusOne Bosque County Campus (Thad Hill Energy Center)","operator":"CyrusOne","source_notes":"Referenced in CyrusOne's Freestone Energy Center release as a separate, already-agreed 400MW arrangement between Calpine and CyrusOne tied to the Thad Hill Energy Center in Bosque County (part of CyrusOne's >1,100MW contracted Texas power total). A July 2025 Energy Capital Partners and KKR release describes a 190 MW hyperscale campus at this site, the first investment from their $50 billion strategic partnership, being constructed through a joint venture with CyrusOne, with an initial IT capacity of 144 megawatts and an expected total investment 'approaching $4 billion'. Calpine's November 2025 release says the second phase of its agreement 'adds 210MW of power to the 190MW originally announced in July'.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Calpine and CyrusOne Announce Phase 2 of Powered Land Agreement at Thad Hill Energy Center (190 MW + 210 MW = 400 MW)","publisher":"Calpine","retrievedAt":"2026-08-26","url":"https://www.calpine.com/calpine-and-cyrusone-announce-phase-2-of-powered-land-agreement-to-support-hyperscale-data-center-at-thad-hill-energy-center-in-texas/"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/cyrusone-bosque-county-thad-hill-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Canton","confidence":"medium","id":"compute_atlas-faa284f593f179f7","lat":40.776093,"location_precision":"approximate","lon":-81.32096,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/damac-digital-canton-orchard-view-oh","value":225.0}],"name":"DAMAC Digital Canton Orchard View Data Center","operator":"DAMAC Digital","source_notes":"Land: DAMAC Digital Solution Ohio LLC bought the site from AIDC Canton 2 LLC (linked to Active Infrastructure) for $36.5M in Dec 2025 (CREW; CREW places it in Canton Township; the land was later annexed into Canton per an earlier Stark County Auditor lookup, parcel 10020089 on Trump Ave SE — a lookup not repeated as of October 2026). Site 'over 80 acres' per the Repository. 225 MW is a single-source figure (Repository, Oct 9 2026); no MW on DAMAC's own page; DAMAC's ~2,000 MW national target is entity-wide and not used. Investment (reported elsewhere as >$1B) and the construction/opening timeline were not confirmed on a page read directly as of October 2026 and are omitted. The record is listed as proposed per the newest source (Oct 9) even though a Jul 28 Repository piece says plans are submitted and dirt is being moved. Coordinates: the OSM intersection node of Trump Ave SE and Orchard View Dr SE (Overpass, node 200032979); the site lies NE of that corner, so the pin is approximate (likely within ~0.5 km). Distinct from the 312 MW Midwest Digital Gateway (Central Avenue SE, Canton) at Millerton St / Central Ave SE: the Oct 9 Repository lists the two as separate projects with different developers, sites and MW; aggregator listings that label a DAMAC site 'Midwest Digital Gateway' conflict with this and were not used.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Canton Orchard View: DAMAC Digital's proposed digital infrastructure development in Canton (two buildings, interior data halls, on-site substation, closed-loop cooling)","publisher":"DAMAC Digital (project site)","retrievedAt":"2026-10-15","url":"https://orchardviewdata.com/"},{"kind":"other","label":"Data centers are spiking Ohio utility prices (DAMAC Digital Solution Ohio bought the land from AIDC Canton 2 for $36.5M, Dec 2025; Mar 12, 2026)","publisher":"Citizens for Responsibility and Ethics in Washington (CREW)","retrievedAt":"2026-10-15","url":"https://www.citizensforethics.org/reports-investigations/crew-investigations/data-centers-are-spiking-ohio-utility-prices-one-developer-is-trumps-business-partner/"}],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/damac-digital-canton-orchard-view-oh"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Fairfield","confidence":"medium","id":"compute_atlas-fad2947efef96add","lat":31.7285,"location_precision":"approximate","lon":-96.1611,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/cyrusone-freestone-energy-center-fairfield-tx","value":760.0}],"name":"CyrusOne Freestone Energy Center Campus","operator":"CyrusOne","source_notes":"Phase 1 (380MW) is under construction adjacent to Calpine's Freestone Energy Center at 1366 FM488, Fairfield, targeted operational Q4 2026; Calpine holds an exclusive agreement to also supply Phase 2 (an additional 380MW, planned total 760MW). Not previously tracked -- no existing Freestone County entries.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Constellation and CyrusOne Announce Agreement to Support New Data Center Facility at Freestone Energy Center in Texas","publisher":"Constellation Energy","retrievedAt":"2026-08-26","url":"https://www.constellationenergy.com/news/2026/02/constellation-and-cyrusone-announce-agreement-to-support-new-data-center-facility-at-freestone-energy-center-in-texas.html"}],"updated":"2026-08-26","url":"https://www.compute-atlas.com/facilities/cyrusone-freestone-energy-center-fairfield-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Foristell","confidence":"medium","contains_osm":true,"id":"compute_atlas-fb88dfdec4775439","lat":38.8150501,"location_precision":"approximate","lon":-90.955972,"name":"Foristell I-70 Data Center Site (216-acre annexation)","operator":"Undisclosed developer","source_notes":"Out-of-state firms representing two unnamed data center developers contacted Foristell in May 2025. This record is the ~216-acre annexation site: R&R Holdings 95 ac, H. M. Boegeman Realty Co. 89 ac, Longhorn Property Management 32 ac, zoned agricultural in Warren County on the north outer road of I-70. A second ~240-acre site south of I-70, east of the American Food Groups plant, already inside city limits, is not recorded. The city refused to sign NDAs. No developer, end user or capacity is disclosed. As of October 2026, no fetched source states the annexation vote outcome. Minutes of the Board of Aldermen's April 20, 2026 meeting record a resident saying the data center \"pulled out on the north site\" (the minutes do not confirm this) and a vote, decided by the board president's tie-break, to refer a data center moratorium to the Planning & Zoning Commission. Coordinates are the Foristell town centroid (approximate).","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Two data centers eye land near St. Charles County, Mo. (St. Louis Post-Dispatch via TNS)","publisher":"GovTech / St. Louis Post-Dispatch","retrievedAt":"2026-10-13","url":"https://www.govtech.com/products/two-data-centers-eye-land-near-st-charles-county-mo"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/foristell-i70-annexation-data-center-site-mo"}],"state":"Missouri","status":"planned"},{"ai_classification":"confirmed","city":"Austin","confidence":"medium","id":"compute_atlas-fb8d3620cc61bc28","lat":30.2223,"location_precision":"approximate","lon":-97.6171,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/tesla-cortex-2-giga-texas-austin-tx","value":500.0}],"name":"Tesla Cortex 2.0 AI Training Cluster (Giga Texas)","operator":"Tesla","source_notes":"Dedicated, purpose-built AI training data center on the north side of Tesla's Giga Texas campus (unincorporated Travis County), separate from and adjacent to the original Cortex cluster. Trains neural networks for Full Self-Driving and the Optimus robot program; uses Nvidia GPUs. First ~250 MW targeted online with a full ~500 MW buildout targeted mid-2026; construction began early 2025. Coordinate is the Giga Texas campus point; Cortex 2.0 is a specific building on that campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Cortex 2.0: Tesla's new supercomputer at Giga Texas","publisher":"Interesting Engineering","retrievedAt":"2026-07-14","url":"https://interestingengineering.com/innovation/tesla-supercomputer-cortex-2-texas"},{"kind":"press","label":"Tesla's Giga Texas to Have World's Largest Rooftop Solar Installation (30MW)","retrievedAt":"2026-07-24","url":"https://teslanorth.com/2023/11/03/teslas-giga-texas-to-have-worlds-largest-rooftop-solar-installation/"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/tesla-cortex-2-giga-texas-austin-tx"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Casa Grande","confidence":"medium","id":"compute_atlas-fbd0f6dfbf462972","lat":32.84,"location_precision":"approximate","lon":-111.79,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lpi-group-project-midway-casa-grande-az","value":400.0}],"name":"Project Midway Data Center","operator":"LPI Group","source_notes":"Unincorporated Pinal County at the southwest corner of Selma Highway and Midway Road, roughly two miles south of the Casa Grande city limits but inside its planning area. The applicant projects about 225 permanent jobs at an average salary near $93,000 and $150 million in annual utility spend at full build-out. Reported acreage differs between sources (215 acres in the Pinal Post account, 294 acres in a same-day Pinal Central report); the 215-acre figure matches the comprehensive plan amendment as described. A Pinal Post report of 15 July 2026 says the current conceptual plan assigns approximately 400 megawatts across five buildings, about 80 megawatts each. The November 2025 economic impact study that projected a $6.6 billion capital investment and about 225 permanent jobs was based on a 225-megawatt facility, not the current plan of about 400 megawatts, and a separate supporting document in the application packet projects up to 405 people at full operating levels. As of October 2026, no investment figure or permanent job count is recorded, because the published figures are modeled projections for a 225-megawatt facility or an upper limit (\"up to\").","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Project Midway Data Center Approved by Pinal County Supervisors","publisher":"Pinal Post","retrievedAt":"2026-09-10","url":"https://pinalpost.com/supervisors-approve-project-midway-data-center-near-casa-grande/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/lpi-group-project-midway-casa-grande-az"}],"state":"Arizona","status":"planned"},{"ai_classification":"likely","city":"Clinton","confidence":"medium","id":"compute_atlas-fbd5de566a1e52e3","lat":41.88,"location_precision":"approximate","lon":-90.24,"name":"QTS Clinton Data Center Campus","operator":"QTS Data Centers","source_notes":"North of US Highway 30, near Clinton's airport. QTS has not filed a formal site plan; the city is still drafting a data-center ordinance. No confirmed MW or $ figure exists yet - local coverage describes it only as a potential 'multibillion-dollar investment.' Local TV coverage frames this as an 'AI data center' but QTS's own statements avoid the AI label. Coordinates are approximate.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"QTS Clinton, Iowa - In Consideration","publisher":"QTS Data Centers","retrievedAt":"2026-09-21","url":"https://q.com/data-centers/clinton/"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/qts-clinton-clinton-county-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Phoenix","confidence":"high","contains_osm":true,"id":"compute_atlas-fbe7acfa5f6f45ec","lat":33.4547261,"location_precision":"exact","lon":-111.9762182,"name":"Iron Mountain AZP-1","operator":"Iron Mountain","source_notes":"Confirmed operational at 615 N 48th Street, Phoenix, AZ 85008; distinct site from AZP-2 (candidate 685011021), same 39-acre campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/1357825755","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/1357825755"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/iron-mountain-azp-1-az"},{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/685011021","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/685011021"}],"updated":"2026-07-26","url":"https://www.compute-atlas.com/facilities/iron-mountain-azp-2-az"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1357825755"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iron-mountain-azp-1-osmway-1357825755"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/685011021"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1357825755"}],"state":"Arizona","status":"operating"},{"ai_classification":"likely","city":"Kansas City","confidence":"medium","id":"compute_atlas-fbf41684f6422fc2","lat":39.3097,"location_precision":"approximate","lon":-94.5845,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/google-project-mica-kc-northland-mo","value":700.0}],"name":"Google Project Mica","operator":"Google","source_notes":"Five hyperscale data center buildings on 493 acres, northeast of I-435 and US-169 in KC Northland (near Smithville, Clay County). Google committed $1.5M to Smithville School District and $250K to Northland Career Center. Coordinates mark the I-435/US-169 interchange; Port KC places the ~500-acre campus at its northeast corner.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google confirms new data center development in Kansas City's Northland","publisher":"KCTV5","retrievedAt":"2026-08-24","url":"https://www.kctv5.com/2026/02/12/google-confirms-new-data-center-development-kansas-citys-northland/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/google-project-mica-kc-northland-mo"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","id":"compute_atlas-fc40db16c953be10","lat":35.49,"location_precision":"approximate","lon":-97.795,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.investigatemidwest.org/a-loophole-leaves-oklahoma-data-center-water-consumption-largely-untracked/","value":1000.0}],"name":"Beltline Energy Oklahoma City Campus","operator":"Beltline Energy","source_notes":"Two adjoining parcels rezoned via PUD cases likely numbered PUD-2105 (111.5 acres at 3025 N. Frisco Road, near I-40/Frisco Rd) and PUD-2124 (184 acres at 13921 NW 23rd Street, near NW 23rd/Frisco Rd, ~0.5 mi west of Yukon) — the case-number-to-address pairing is probable (inferred by matching geographic descriptors across sources) but not confirmed by a single primary document naming both together. OKC Planning Commission voted 7-0 to recommend approval Jan 21 2026; the Oklahoma City Council voted 6-3 on Oct. 27, 2026 to rezone both tracts into planned unit development districts, with conditions on water, electricity and noise (OKCFOX, News9); the project then moves to plan submittal and permitting, so the record stays listed as proposed. Explicitly carved out of OKC's citywide data-center moratorium (~April 2026) as an already-pending application, confirming it remains active. Press coverage separately cites a larger '350-acre' and '480-acre' project total that doesn't reconcile with the confirmed 295.5-acre rezoned total (111.5+184) — the gap is plausibly an adjacent ~184.5-acre parcel Yukon Municipal Authority sold to BLE Landholdings LLC for $15.8M in Aug 2025 (near Hwy 66/Frisco Rd), which may be the same tract as the NW 23rd St parcel, but this is not confirmed. A $1B investment / 0.5GW capacity figure is associated with the broader Yukon-area BLE deal in local reporting but, as of July 2026, was not found tied specifically to this OKC rezoning by a primary source, so it is not recorded as this record's capacity or investment pending confirmation. The planned capacity of 1,000 MW comes from Investigate Midwest (July 2026), which gives it for the whole proposed campus straddling the Oklahoma City–Yukon border, not for the Oklahoma City rezoning alone.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"A loophole leaves Oklahoma data center water consumption largely untracked","publisher":"Investigate Midwest","retrievedAt":"2026-09-14","url":"https://www.investigatemidwest.org/a-loophole-leaves-oklahoma-data-center-water-consumption-largely-untracked/"}],"updated":"2026-10-28","url":"https://www.compute-atlas.com/facilities/beltline-oklahoma-city-frisco-road-ok"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Baltimore","confidence":"medium","id":"compute_atlas-fcafe8f98caff128","lat":39.2929,"location_precision":"approximate","lon":-76.5513,"name":"Johns Hopkins Bayview Research Computing Data Center","operator":"Johns Hopkins University","source_notes":"A 25,000 sq ft data science and computing center on the Bayview campus in East Baltimore. It expands the research computing operation (Maryland Advanced Research Computing Center, opened 2015). The university says it will draw under 10 MW, below the 10 MW threshold of Baltimore's proposed moratorium. The $192M figure is from the Baltimore Sun headline; the Banner did not give a total project cost. The pin is the Bayview Medical Center point (approximate).","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/johns-hopkins-bayview-research-data-center-baltimore-md"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Ames","confidence":"medium","id":"compute_atlas-fcb10aaded732630","lat":42.0308,"location_precision":"approximate","lon":-93.6319,"mw":[{"basis":"planned capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/lightedge-ames-ia","value":25.0}],"name":"LightEdge Ames Edge Colocation Data Center","operator":"LightEdge Solutions","source_notes":"Proposed single-storey edge colocation facility on roughly 10.86 acres of Ames airport land on Aviation Way, in a Planned Industrial zone, adjacent to the Ames Regional Airport and the ISU Research Park. Phased electrical demand of 3 MW in phase one, 6 MW in phase two, and as much as 25 MW at full buildout over roughly ten years — reported locally as about a 15 percent increase in the city's total consumption. LightEdge explicitly rules out AI or hyperscale use: asked whether it would house AI servers, its proposal answers 'No. This is edge colocation.' No AI classification is therefore recorded. Reported at roughly 100,000 sq ft in local coverage, but the operator's own page does not state a square footage, so it is not recorded. Distinct site from the LightEdge Altoona facility, tracked separately as of August 2026.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-21","url":"https://www.compute-atlas.com/facilities/lightedge-ames-ia"}],"state":"Iowa","status":"planned"},{"ai_classification":"likely","city":"Minooka","confidence":"medium","id":"compute_atlas-fcbb44463d007568","lat":41.4506,"location_precision":"approximate","lon":-88.262,"name":"Equinix CH8 Minooka","operator":"Equinix","source_notes":"Proposed ~300-acre, $1B+ Equinix campus in Minooka, Grundy County. Capacity not disclosed (omitted). Coordinates are the Minooka area centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-10-22","url":"https://www.compute-atlas.com/facilities/equinix-ch8-minooka-il"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"high","contains_osm":true,"id":"compute_atlas-fce59512cd64fb5f","lat":37.3754952,"location_precision":"exact","lon":-121.9884063,"name":"Equinix SV15","operator":"Equinix","source_notes":"2970 Corvin Drive, Pod C, Santa Clara — distinct building from SV14/SV16/SV17 despite shared campus.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"osm","label":"OpenStreetMap way/205823968","publisher":"OpenStreetMap","retrievedAt":"2026-07-22","url":"https://www.openstreetmap.org/way/205823968"},{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-07-23","url":"https://www.compute-atlas.com/facilities/equinix-sv15-ca"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/205823968"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/equinix-sv15-osmway-205823968"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205823968"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205823970"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205823971"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205823980"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Olympia","confidence":"medium","id":"compute_atlas-fd0b2f241c43dc42","lat":47.0345059,"location_precision":"exact","lon":-122.8945401,"name":"Washington State Data Center (1500 Jefferson Building)","operator":"Washington Technology Solutions","source_notes":"The state government's own consolidated data center, on the East Capitol Campus. Ecology's data-center permit index lists it under its former agency name, the Washington Department of Information Services, which was reorganised into Washington Technology Solutions; the operator recorded here is the current occupant named on the Capitol Campus page. Coordinates are the OSM polygon for the 1500 Jefferson Building, which contains but is larger than the data center wing. No capacity figure is published.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Data centers - air quality permits index (Olympia: Washington Department of Information Services, second-tier health impact assessment, 9/16/2010)","publisher":"Washington State Department of Ecology","retrievedAt":"2026-09-17","url":"https://ecology.wa.gov/air-climate/air-quality/data-centers"},{"kind":"other","label":"1500 Jefferson Building - completed 2011, 245,000 sq ft, six-storey L-shaped office with a three-storey wing wrapping a data center; houses Enterprise Services, Washington Technology Solutions and DCYF","publisher":"Washington State Capitol Campus","retrievedAt":"2026-09-17","url":"https://capitol.wa.gov/discover/buildings/1500-jefferson-building"}],"updated":"2026-09-17","url":"https://www.compute-atlas.com/facilities/washington-state-data-center-olympia-wa"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Boone","confidence":"medium","id":"compute_atlas-fd2694e7d8f8a984","lat":42.16522,"location_precision":"exact","lon":-93.79436,"name":"InfoBunker Underground Data Center","operator":"InfoBunker, LLC","source_notes":"Colocation built inside a hardened 1960s AT&T AUTOVON communications bunker in farmland north of Des Moines. The operator describes over 65,000 sq ft, five stories underground, three-foot reinforced concrete, 2N+2 redundant air handling filtered to 0.3 microns, and layered biometric and mantrap security. Coordinates come from the Iowa DNR facility record, which documents 20 m locational accuracy; the operator's website lists a West Des Moines corporate address (4350 Westown Pkwy) that is not the facility.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"permit","label":"Iowa DNR Facility Explorer — Infobunker, 308 T Ave, Boone, IA 50036 (State Facility ID 310505952)","publisher":"Iowa Department of Natural Resources","retrievedAt":"2026-09-04","url":"https://facilityexplorer.iowadnr.gov/FacilityExplorer/SiteDetail.aspx?facID=310505952"},{"kind":"other","label":"Infobunker AT&T Boone Tower Site","publisher":"Center for Land Use Interpretation","retrievedAt":"2026-09-04","url":"https://clui.org/ludb/site/infobunker-att-boone-tower-site"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/infobunker-boone-ia"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Dickson City","confidence":"medium","id":"compute_atlas-feffcd3e961b52f5","lat":41.4714693,"location_precision":"approximate","lon":-75.607688,"name":"Dickson City Data Center (Bell Mountain)","operator":"Dickson City Development LLC","source_notes":"Four-building data center proposed on Bell Mountain off Business Route 6, in a residential/open-space zone. The developer is linked to Kriger Construction (Jim Marzolino). Power load is not disclosed. The pin is the borough centroid.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-10-15","url":"https://www.compute-atlas.com/facilities/dickson-city-development-bell-mountain-lackawanna-pa"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Tulare","confidence":"medium","id":"compute_atlas-ffcdc63a6ff78525","lat":36.1991383,"location_precision":"approximate","lon":-119.3420041,"name":"Tulare County Fairgrounds Edge Data Center (Global Stack proposal)","operator":"Global Stack LLC","source_notes":"Global Stack calls it a self-contained edge computing and emergency-resilience system; residents call it a data center. Global Stack's generic spec is 8–10 MW on about 5 acres per fairground, but no site-specific figure was published. Tulare County supervisors adopted a 45-day moratorium on data centers in unincorporated areas. Coordinates are the OSM fairgrounds centroid.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Is it a data center? Tulare fairgrounds tables Global Stack proposal","publisher":"The Business Journal","retrievedAt":"2026-09-29","url":"https://thebusinessjournal.com/is-it-a-data-center-tulare-fairgrounds-tables-global-stack-proposal/"},{"kind":"press","label":"Tulare Fair board faces pushback over proposed high-tech fairgrounds project","publisher":"ABC30","retrievedAt":"2026-09-29","url":"https://abc30.com/post/tulare-fair-board-faces-pushback-proposed-high-tech-fairgrounds-project-packed-meeting/19700804/"}],"updated":"2026-09-29","url":"https://www.compute-atlas.com/facilities/global-stack-tulare-county-fairgrounds-ca"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Baltimore","confidence":"high","contains_osm":true,"id":"compute_atlas-ffdbbcc243d3ab67","lat":39.291652966378,"location_precision":"exact","lon":-76.619738877727,"name":"AiNET One Market Center (Baltimore Carrier Hotel)","operator":"AiNET","source_notes":"Coordinates confirmed via US Census geocoder (exact match on 300 W Lexington St, Baltimore, MD 21201). AiNET's own page states the One Market Center property totals '80 Megawatts of power, and over 150,000 rentable square feet of telecom, data center, and technical office space' -- this is a multi-tenant carrier hotel building (also home to DataBank's BWI1 facility, tracked separately as of September 2026), so the 80MW figure describes the building's total stated power capacity, not necessarily AiNET's own exclusive allocation; recorded as-stated per the source rather than apportioned. No AI classification is recorded: no source names AI/GPU/HPC use at this specific site.","sources":[{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Carrier Hotel | AiNET","publisher":"AiNET","retrievedAt":"2026-09-13","url":"https://www.ai.net/carrierhotel/"}],"updated":"2026-09-13","url":"https://www.compute-atlas.com/facilities/ainet-one-market-center-baltimore-md"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9669405859"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ainet-one-market-center-osmnode-9669405859"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9669405859"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"medium","id":"compute_atlas-fff1898df5610bf5","lat":40.4479,"location_precision":"approximate","lon":-80.0086,"mw":[{"basis":"operational capacity reported by Compute Atlas; load basis unspecified","source":"https://www.compute-atlas.com/facilities/databank-pit1-pittsburgh-pa","value":1.9}],"name":"DataBank PIT1 (Downtown Pittsburgh)","operator":"DataBank","source_notes":"30,760 IT square feet with 1.9 MW of critical IT load and 29 on-site carriers, at 100 S Commons on Pittsburgh's North Shore.","sources":[{"dataset":"compute_atlas","evidence":[],"updated":"2026-08-17","url":"https://www.compute-atlas.com/facilities/databank-pit1-pittsburgh-pa"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-004ab4ae9a68bca8","lat":39.72411,"location_precision":"source supplied","lon":-82.68755,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1501120016"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-1501120016"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Spotsylvania Courthouse","confidence":"medium","id":"datacentersexposed-005153638fe85fa3","lat":38.15994,"location_precision":"source supplied","lon":-77.51494,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/spotsytech-campus","value":800.0}],"name":"SpotsyTech Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/new-29-million-sq-ft-technology-park-proposed-in-spotsylvania-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/spotsytech-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Maiden","confidence":"medium","id":"datacentersexposed-0082bf62d1acdb9f","lat":35.58554,"location_precision":"source supplied","lon":-81.2315,"name":"Project Yoga","operator":"Microsoft Corporation","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-second-data-center-campus-in-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-yoga"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-0089afbd9151ed04","lat":38.473,"location_precision":"source supplied","lon":-77.999,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/culpeper-ec-park-campus","value":800.0}],"name":"Culpeper Tech Park — Tract Master Plan","operator":"Tract","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/culpeper-ec-park-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Westfield","confidence":"medium","id":"datacentersexposed-009b40e28f2b6dbe","lat":42.15831,"location_precision":"source supplied","lon":-72.74108,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/servistar-data-center","value":300.0}],"name":"Servistar Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://theshoestring.org/2025/12/30/ai-hallucination-proposed-westfield-data-center-appears-abandoned-by-developers/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/servistar-data-center"}],"state":"Massachusetts","status":"planned"},{"ai_classification":"unknown","city":"Colorado City","confidence":"medium","id":"datacentersexposed-00b2c0afc4a7f385","lat":32.39303,"location_precision":"source supplied","lon":-100.86351,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cipher-barber-lake-tx-pg","value":300.0}],"name":"Cipher Barber Lake","operator":"Cipher Mining","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-signs-300mw-hosting-deal-to-lease-capacity-from-cipher-mining/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cipher-barber-lake-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"PECOS","confidence":"medium","id":"datacentersexposed-00bdeb829c08a049","lat":31.10458,"location_precision":"source supplied","lon":-103.23971,"name":"POOLIN TARBUSH TAPROOT","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071256137"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/poolin-tarbush-taproot-110071256137"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-00fa1457c7a83476","lat":40.54084,"location_precision":"source supplied","lon":-74.53749,"name":"Rackspace Belmont NYC2","operator":"Rackspace Technology, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/998933389"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/rackspace-belmont-nyc2-osmway-998933389"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/998933389"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-00fde1dc4ca1b9c8","lat":44.66811,"location_precision":"source supplied","lon":-74.98058,"name":"Old Main","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/42000820"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/old-main-osmway-42000820"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/42000820"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Gainesville","confidence":"medium","id":"datacentersexposed-0101f96fb273b22f","lat":38.797,"location_precision":"source supplied","lon":-77.633,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pw-digital-gateway-phase-1","value":1500.0}],"name":"Prince William Digital Gateway — Phase 1","operator":"QTS Realty Trust, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/pw-digital-gateway-phase-1"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Brandon","confidence":"medium","id":"datacentersexposed-010ec9ec69d071ee","lat":32.26581,"location_precision":"source supplied","lon":-90.015,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/avaio-digital","value":116.0}],"name":"AVAIO Digital","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/avaio-digital"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Paducah","confidence":"medium","id":"datacentersexposed-0158201eec4034e2","lat":37.08831,"location_precision":"source supplied","lon":-88.70305,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/riot-1","value":60.0}],"name":"Riot 1","operator":"Riot Platforms, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/riot-to-convert-cryptomine-site-in-texas-to-hpc-signs-25mw-lease-with-amd/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/riot-1"}],"state":"Kentucky","status":"operating"},{"ai_classification":"unknown","city":"Hawesville","confidence":"medium","id":"datacentersexposed-0175966cd83d82e5","lat":37.94135,"location_precision":"source supplied","lon":-86.78807,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/terawulf-data-center","value":480.0}],"name":"TeraWulf Data Center","operator":"TeraWulf Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/terawulf-data-center"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-01939fc9bebc9062","lat":32.56777,"location_precision":"source supplied","lon":-96.7739,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/powercampus-dallas-by-lancaster-data-center-campus-lp","value":300.0}],"name":"PowerCampus Dallas by Lancaster Data Center Campus LP","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powercampus-dallas-by-lancaster-data-center-campus-lp"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"MARICOPA COUNTY","confidence":"medium","id":"datacentersexposed-01d9fd4009be35f3","lat":33.44259,"location_precision":"source supplied","lon":-112.37545,"name":"COMPASS DATACENTERS PHX I","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070550338"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/compass-datacenters-phx-i-air-110070550338"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Crown Point","confidence":"medium","id":"datacentersexposed-02bc21c386984ef3","lat":41.43521,"location_precision":"source supplied","lon":-87.3099,"name":"Karis Critical Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://nwindianabusiness.com/community/business-news/merrillville-committee-endorses-data-center/67103/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/karis-critical-data-center-4"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"NORRISTOWN","confidence":"medium","id":"datacentersexposed-02c60fef4c376b91","lat":40.12181,"location_precision":"source supplied","lon":-75.41944,"name":"VALLEY FORGE DIGITAL UTILITY FACILITY / LOWER PROVIDENCE","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110055599945"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/valley-forge-digital-utility-facility-lower-providence-air-110055599945"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"BIRMINGHAM","confidence":"medium","id":"datacentersexposed-02c777c0713d43c2","lat":33.41174,"location_precision":"source supplied","lon":-86.90598,"name":"BLUE CROSS AND BLUE SHIELD OF ALABAMA DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110042977400"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/blue-cross-and-blue-shield-of-alabama-data-center-110042977400"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","contains_osm":true,"id":"datacentersexposed-02d1830eca9519a8","lat":45.81993,"location_precision":"source supplied","lon":-119.63209,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1280344157"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1280344157"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344157"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017492"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017493"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017494"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"low","contains_osm":true,"id":"datacentersexposed-02e7bef90b8c6d80","lat":40.45137,"location_precision":"source supplied","lon":-80.19017,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-pittsburgh-pit2-osmway-168129695","value":5.0}],"name":"DataBank Pittsburgh PIT2","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/168129695"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-pittsburgh-pit2-osmway-168129695"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/168129695"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Silver Springs","confidence":"medium","id":"datacentersexposed-02ef39580dcbf0a9","lat":39.42805,"location_precision":"source supplied","lon":-119.232,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-data-center-7","value":1600.0}],"name":"Tract Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-7"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Ironton","confidence":"medium","id":"datacentersexposed-02f9109ffc78d003","lat":38.56767,"location_precision":"source supplied","lon":-82.78268,"name":"Ravel Data Center","operator":"Strata","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-project-in-lawrence-county-ohio-sparks-calls-for-moratorium-in-neighboring-city/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ravel-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-0329ca26d9a9e3d7","lat":33.39559,"location_precision":"source supplied","lon":-111.97008,"name":"EdgeConneX Data Center","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11666916913"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/edgeconnex-data-center-osmnode-11666916913"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Poughkeepsie","confidence":"low","id":"datacentersexposed-03588faccd743cf2","lat":41.66038,"location_precision":"source supplied","lon":-73.94002,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ibm-quantum-data-center-osmway-195803647","value":100.0}],"name":"IBM Quantum Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/195803647"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ibm-quantum-data-center-osmway-195803647"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","contains_osm":true,"id":"datacentersexposed-03c3871ef91d0682","lat":33.65701,"location_precision":"source supplied","lon":-84.41522,"name":"Digital Realty Data Center","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/278560778"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-data-center-osmway-278560778"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/278560778"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-03c40ccbda597385","lat":38.95442,"location_precision":"source supplied","lon":-77.4945,"name":"West Dulles & Dulles Commerce Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-west-dulles-dulles-commerce-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Idaho Falls","confidence":"medium","id":"datacentersexposed-03da61665760999d","lat":43.51967,"location_precision":"source supplied","lon":-112.04594,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/deep-atomic-data-center","value":60.0}],"name":"Deep Atomic Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/smr-developer-deep-atomic-proposes-nuclear-powered-ai-data-center-at-idaho-national-lab/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/deep-atomic-data-center"}],"state":"Idaho","status":"planned"},{"ai_classification":"unknown","city":"Piketon","confidence":"medium","id":"datacentersexposed-03f26f2e5ec80ca4","lat":39.01315,"location_precision":"source supplied","lon":-83.00055,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/softbank-data-center-ports-technology-campus","value":9200.0}],"name":"SoftBank Data Center/PORTS Technology Campus","operator":"Softbank/Open AI (unconfirmed)","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/softbank-eyes-10gw-data-center-at-former-doe-nuclear-enrichment-site-in-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/softbank-data-center-ports-technology-campus"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"KING OF PRUSSIA","confidence":"medium","id":"datacentersexposed-03f32bbe7bd753b1","lat":40.09509,"location_precision":"source supplied","lon":-75.40933,"name":"CSL BEHRING DATA CTR/KING OF PRUSSIA","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110069468132"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/csl-behring-data-ctr-king-of-prussia-air-110069468132"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"San Angelo","confidence":"medium","id":"datacentersexposed-03fd6479c5317ca2","lat":31.52764,"location_precision":"source supplied","lon":-100.33235,"name":"Skybox Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/skybox-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-041948d356e8a2ff","lat":37.48709,"location_precision":"source supplied","lon":-77.24098,"name":"RIC2 DC2","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516624"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric2-dc2-osmway-1493516624"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516624"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-04404d22e0fff5ce","lat":38.94413,"location_precision":"source supplied","lon":-77.5357,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/arcola","value":120.0}],"name":"ARCOLA","operator":"PowerHouse Data Centers","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/arcola"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-04b6c3a15436743a","lat":38.92352,"location_precision":"source supplied","lon":-92.28861,"name":"Carfax","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/553884511"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/carfax-osmway-553884511"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/553884511"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Roxboro","confidence":"medium","id":"datacentersexposed-0505cd3a6c98fd44","lat":36.39375,"location_precision":"source supplied","lon":-78.98279,"name":"Apple Person County Mega Park (land)","operator":"Apple Data Services LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/apple-person-county-mega-park-land-nc-pg"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-050f096fa5646bed","lat":37.47851,"location_precision":"source supplied","lon":-77.253,"name":"RIC3 DC3","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516631"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric3-dc3-osmway-1493516631"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516631"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-051be64be4c17ea7","lat":40.82145,"location_precision":"source supplied","lon":-74.13419,"name":"BT Radianz: 492 River Road","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/452116337"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bt-radianz-492-river-road-osmway-452116337"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/452116337"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-051ff23fe779cdce","lat":38.9432,"location_precision":"source supplied","lon":-77.52433,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/693385812"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-693385812"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Hazelton","confidence":"medium","id":"datacentersexposed-056fae5b929135fc","lat":40.9272,"location_precision":"source supplied","lon":-76.0426,"name":"Project Hazelnut","operator":"NorthPoint Development","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-hazelnut"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-0575a41744225286","lat":33.00638,"location_precision":"source supplied","lon":-97.24529,"name":"CITIGROUP TECHNOLOGY INC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/507673418"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/citigroup-technology-inc-osmway-507673418"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/507673418"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-05808baa1dfc4faa","lat":38.95967,"location_precision":"source supplied","lon":-77.52909,"name":"BRAMBLETON SHREVEPORT SOUTH DATA CENTER","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/brambleton-shreveport-south-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"LaGrange","confidence":"medium","id":"datacentersexposed-05a3b8341b1063f5","lat":32.96313,"location_precision":"source supplied","lon":-85.0219,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-west-2","value":600.0}],"name":"Project West","operator":"Economic Impact Group LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-west-2"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-05aa9ee5792f6a12","lat":39.01543,"location_precision":"source supplied","lon":-77.46737,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-acc9-osmway-649365764","value":13.9}],"name":"Digital Realty ACC9","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/649365764"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-acc9-osmway-649365764"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/701923203"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-northern-virginia-iad39-osmway-701923203"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Enterprise","confidence":"low","contains_osm":true,"id":"datacentersexposed-05d3f8fb82af33b5","lat":36.05992,"location_precision":"source supplied","lon":-115.2102,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/switch-las-vegas-7-osmway-172739953","value":495.0}],"name":"Switch Las Vegas 7","operator":"Switch, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/172739953"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/switch-las-vegas-7-osmway-172739953"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/585998678"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-las-vegas-9-osmway-585998678"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"King George","confidence":"medium","id":"datacentersexposed-05d671434b94bb7e","lat":38.30985,"location_precision":"source supplied","lon":-77.11264,"name":"Dahlgren West","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/9-million-sq-ft-data-center-campus-proposed-in-virginias-king-george-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dahlgren-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-05df095f44d7fccb","lat":39.07647,"location_precision":"source supplied","lon":-77.49912,"name":"19508 Freedom Trail Road","operator":"JK Land Holdings","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/jk-land-holdings-buys-108-acres-for-data-center-development-in-ashburn-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/19508-freedom-trail-road"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","id":"datacentersexposed-063b8f7bce714e4e","lat":33.70682,"location_precision":"source supplied","lon":-84.5833,"name":"Vantage: Westlake Project","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-for-two-data-center-campuses-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-westlake-project"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-065041364896af97","lat":37.47792,"location_precision":"source supplied","lon":-77.24898,"name":"RIC3 DC4","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516633"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric3-dc4-osmway-1493516633"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516633"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Pecos County","confidence":"medium","id":"datacentersexposed-068f8393c67b5b47","lat":31.14725,"location_precision":"source supplied","lon":-102.89146,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/gw-ranch-pacifico-energy","value":5000.0}],"name":"GW Ranch (Pacifico Energy)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/pacifico-energy-unveils-5gw-offgrid-natural-gas-project-in-texas-slated-to-serve-a-hyperscale-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gw-ranch-pacifico-energy"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Fairview Township","confidence":"medium","id":"datacentersexposed-06b9cc686ec97425","lat":40.20644,"location_precision":"source supplied","lon":-76.871,"name":"Fairview Crossroads Data Center","operator":"Fairview Crossroads LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fairview-crossroads-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Corsicana","confidence":"medium","id":"datacentersexposed-06c189ffe9d970dd","lat":31.96362,"location_precision":"source supplied","lon":-96.52103,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/riot-platforms","value":400.0}],"name":"Riot Platforms","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/riot-platforms"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Ellenwood","confidence":"medium","id":"datacentersexposed-06c5e808545867cb","lat":33.6353,"location_precision":"source supplied","lon":-84.30396,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/clayton-commerce-iii","value":180.0}],"name":"Clayton Commerce III","operator":"TA Realty/ EdgeconneX","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/ta-realty-gets-green-light-for-data-center-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/clayton-commerce-iii"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","contains_osm":true,"id":"datacentersexposed-06e9863a09e1bbe6","lat":33.3806,"location_precision":"source supplied","lon":-111.75289,"name":"The Chatfield Group","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7557868585"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/the-chatfield-group-osmnode-7557868585"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7557868585"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Dothan","confidence":"low","contains_osm":true,"id":"datacentersexposed-07225bbbe47919ba","lat":31.2319,"location_precision":"source supplied","lon":-85.45583,"name":"AngelTrax Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/626281456"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/angeltrax-data-center-osmway-626281456"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/626281456"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Columbia","confidence":"medium","id":"datacentersexposed-07a501bb172da407","lat":38.98998,"location_precision":"source supplied","lon":-92.2809,"name":"Columbia Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gocolumbiamo.legistar.com/View.ashx?M=F&ID=14838831&GUID=CD9D24B9-05B4-4203-B9BA-8DC02DA95B03"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/columbia-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-07eda79a9bf26f64","lat":36.06521,"location_precision":"source supplied","lon":-115.22205,"name":"Switch Las Vegas 14","operator":"Switch, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1421212901"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-las-vegas-14-osmway-1421212901"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","id":"datacentersexposed-07fa031875f6ec09","lat":32.68922,"location_precision":"source supplied","lon":-97.4945,"name":"Edged Fort Worth Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-developer-edged-eyes-tax-breaks-for-potential-facility-in-fort-worth-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-fort-worth-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-081836cc56effe6d","lat":47.3595,"location_precision":"source supplied","lon":-120.16009,"name":"EAT14","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1173822721"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/eat14-osmway-1173822721"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-081e4d185590e5f0","lat":33.61166,"location_precision":"source supplied","lon":-111.91398,"name":"DataPro USA Web Development","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10798644674"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/datapro-usa-web-development-osmnode-10798644674"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10798644674"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"White Sands","confidence":"low","contains_osm":true,"id":"datacentersexposed-082f7f19b242923a","lat":32.38051,"location_precision":"source supplied","lon":-106.48107,"name":"Information Systems Facility","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1519367009"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/information-systems-facility-osmway-1519367009"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1519367009"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"RIDGELAND","confidence":"medium","id":"datacentersexposed-0838c6ea44f438b0","lat":32.39955,"location_precision":"source supplied","lon":-90.12048,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-ridgeland-epoch","value":273.0}],"name":"Amazon Ridgeland","operator":"Amazon.com, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/amazon-ridgeland-epoch"}],"state":"Mississippi","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-083e641425903a77","lat":38.75393,"location_precision":"source supplied","lon":-77.54186,"name":"Redstone Tech Park North","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-redstone-tech-park-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-084ca3daf317358a","lat":38.90837,"location_precision":"source supplied","lon":-77.21974,"name":"Element Critical VA1","operator":"Element Critical","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/368724479"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/element-critical-va1-osmway-368724479"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"near Pringle","confidence":"medium","id":"datacentersexposed-0872bb766aa0b5bb","lat":35.71945,"location_precision":"source supplied","lon":-81.2758,"name":"Project Pine","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-second-data-center-campus-in-north-carolina/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/project-pine"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Archbald","confidence":"medium","id":"datacentersexposed-087e24a872a3ca4a","lat":41.50318,"location_precision":"source supplied","lon":-75.58995,"name":"Wildcat Ridge Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wildcat-ridge-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-0884edcb8e49093c","lat":39.03338,"location_precision":"source supplied","lon":-77.52171,"name":"CYRUSONE BROADLANDS DATA CENTER","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-broadlands-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Killen","confidence":"medium","id":"datacentersexposed-088bc84b8ea1f5a2","lat":31.06223,"location_precision":"source supplied","lon":-97.76623,"name":"Onmine Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://kdhnews.com/news/local/killeen-planning-and-zoning-commission-to-consider-approving-data-center-in-south-killeen/article_5539153b-752e-4def-9ab1-bf4cc7ad9e46.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/onmine-data-center"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Hutto","confidence":"medium","id":"datacentersexposed-088ecfc8158abbdc","lat":30.54322,"location_precision":"source supplied","lon":-97.57,"name":"Project Raptor","operator":"Colovore","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/colovore-plans-data-center-in-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-raptor"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-08b45714a5f657df","lat":38.98479,"location_precision":"source supplied","lon":-77.48216,"name":"MERCURE BUSINESS PARK LOT 4A1B","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mercure-business-park-lot-4a1b"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Louisa County","confidence":"medium","id":"datacentersexposed-08d78eb3634216fd","lat":37.97047,"location_precision":"source supplied","lon":-77.9546,"name":"Desper Creek Technology Campus (AWS Data Center)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-seeks-permit-for-another-data-center-campus-in-louisa-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/desper-creek-technology-campus-aws-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Frederick","confidence":"medium","id":"datacentersexposed-08de1df314eef4a7","lat":39.33511,"location_precision":"source supplied","lon":-77.46484,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-iad-06","value":72.0}],"name":"Aligned IAD-06","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-tops-out-maryland-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-iad-06"}],"state":"Maryland","status":"under construction"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","id":"datacentersexposed-08e2d9ec0cdea3be","lat":33.42125,"location_precision":"source supplied","lon":-111.85902,"name":"Centersquare: Phoenix - (PHX1 - Mesa)","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/543117031"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/centersquare-phoenix-phx1-mesa-osmway-543117031"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Tulsa","confidence":"low","contains_osm":true,"id":"datacentersexposed-08ebca5f1afd67e9","lat":36.15859,"location_precision":"source supplied","lon":-95.98863,"name":"TierPoint","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/159959672"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-osmway-159959672"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/159959672"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"San Diego","confidence":"low","id":"datacentersexposed-094ad8d270703f0d","lat":32.84236,"location_precision":"source supplied","lon":-117.16942,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-san-diego-osmway-31803515","value":0.5}],"name":"EdgeConneX San Diego","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/31803515"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-san-diego-osmway-31803515"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Denver","confidence":"low","contains_osm":true,"id":"datacentersexposed-09615724164ea70c","lat":39.74557,"location_precision":"source supplied","lon":-104.99569,"name":"Insurance Exchange Building","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/89784186"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/insurance-exchange-building-osmway-89784186"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/89784186"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"datacentersexposed-098267e161d0b8a5","lat":38.76814,"location_precision":"source supplied","lon":-77.53865,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/iron-mountain-va-6-osmway-1304357577","value":32.0}],"name":"Iron Mountain VA-6","operator":"Iron Mountain Incorporated","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1304357577"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iron-mountain-va-6-osmway-1304357577"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-099365c335129a01","lat":47.59462,"location_precision":"source supplied","lon":-117.53715,"name":"Iron Mountain","operator":"Iron Mountain Incorporated","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/876020641"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/iron-mountain-osmway-876020641"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/876020641"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"College Station City","confidence":"medium","id":"datacentersexposed-0999288583168545","lat":30.56981,"location_precision":"source supplied","lon":-96.2592,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-aggie","value":600.0}],"name":"Project Aggie","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-aggie"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-09e3da72e6c2430a","lat":37.39273,"location_precision":"source supplied","lon":-121.97843,"name":"QTS Santa Clara 2","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/58708529"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-santa-clara-2-osmway-58708529"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/58708529"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Marion","confidence":"medium","id":"datacentersexposed-09ee6cb65ca2c1d5","lat":34.198,"location_precision":"source supplied","lon":-79.35204,"name":"Project Liberty","operator":"Stream Data Centers","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-liberty"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Lakeland","confidence":"medium","id":"datacentersexposed-0a5a652527934d70","lat":28.03012,"location_precision":"source supplied","lon":-82.00534,"name":"Project Swan","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/600000-sq-ft-project-swan-data-center-could-be-built-in-lakeland-florida/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-swan"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"Becker","confidence":"medium","id":"datacentersexposed-0af232f5470852f7","lat":45.38527,"location_precision":"source supplied","lon":-93.8805,"name":"Amazon Becker Data Center","operator":"Amazon.com, Inc.","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-becker-data-center"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Secaucus","confidence":"low","id":"datacentersexposed-0af5233c90790597","lat":40.77729,"location_precision":"source supplied","lon":-74.07594,"name":"Equinix New York Secaucus NY2","operator":"Equinix, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/193611219"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/equinix-new-york-secaucus-ny2-osmway-193611219"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-0b75349467d4c342","lat":34.84044,"location_precision":"source supplied","lon":-86.62883,"name":"Meta Huntsville Data center","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1160814416"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/meta-huntsville-data-center-osmway-1160814416"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-0b8a344ba0fbe657","lat":39.0156,"location_precision":"source supplied","lon":-77.48328,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/golds-gym-ashburn-osmway-300970761","value":432.0}],"name":"Golds Gym Ashburn","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300970761"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/golds-gym-ashburn-osmway-300970761"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-0b9fb11ac5e1ca51","lat":38.76042,"location_precision":"source supplied","lon":-77.51418,"name":"George Mason Research Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-george-mason-research-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-0ba5d29c88c7c332","lat":38.99133,"location_precision":"source supplied","lon":-77.42659,"name":"Dulles Electric Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dulles-electric-data-centers"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Garden City","confidence":"medium","id":"datacentersexposed-0be2d24a0492bc2c","lat":31.86404,"location_precision":"source supplied","lon":-101.48135,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mara-garden-city-tx-pg","value":200.0}],"name":"MARA Garden City","operator":"MARA","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://ir.applieddigital.com/news-events/press-releases/detail/74/applied-digital-announces-energization-of-its-200-megawatt"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mara-garden-city-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Meridian","confidence":"medium","id":"datacentersexposed-0befacf578375e14","lat":32.36431,"location_precision":"source supplied","lon":-88.70366,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/","value":500.0}],"name":"Compass Datacenters Meridian","operator":"Compass Datacenters, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/compass-datacenters-meridian-ms-pg"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"low","contains_osm":true,"id":"datacentersexposed-0bf2d66e7785a419","lat":34.04789,"location_precision":"source supplied","lon":-118.25554,"name":"One Wilshire","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/428021816"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/one-wilshire-osmway-428021816"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/428021816"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-0c26f0bcf9135806","lat":45.54761,"location_precision":"source supplied","lon":-122.89195,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-pdx10-data-center-osmway-328702750","value":27.0}],"name":"Digital Realty PDX10 Data Center","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/328702750"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-pdx10-data-center-osmway-328702750"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-0c301b346d2b9706","lat":45.54391,"location_precision":"source supplied","lon":-122.89648,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/oracle-osmway-328702401","value":94.0}],"name":"Oracle","operator":"Oracle Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/328702401"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/oracle-osmway-328702401"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328702401"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"BARKER","confidence":"medium","id":"datacentersexposed-0d2351154d95558c","lat":43.34894,"location_precision":"source supplied","lon":-78.60291,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fluidstack-lake-mariner-epoch","value":500.0}],"name":"Fluidstack Lake Mariner","operator":"TeraWulf Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/fluidstack-lake-mariner-epoch"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-0d2540e389f8f4ff","lat":38.79498,"location_precision":"source supplied","lon":-77.54277,"name":"Century Park 2 & 3","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-08-05","url":"https://datacentersexposed.com/facilities/pwc-century-park-2-3"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Pottstown","confidence":"medium","id":"datacentersexposed-0d2a40bce6952714","lat":40.21353,"location_precision":"source supplied","lon":-75.59657,"name":"Pottstown Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/14-million-sq-ft-data-center-campus-planned-outside-philadelphia-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pottstown-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-0d3bc21761c20f2a","lat":39.04877,"location_precision":"source supplied","lon":-77.4454,"name":"VISA Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/380282154"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/visa-data-center-osmway-380282154"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"DeForest","confidence":"medium","id":"datacentersexposed-0dc0c6362d91517b","lat":43.23184,"location_precision":"source supplied","lon":-89.33042,"name":"DeForest QTS Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-plans-15-building-data-center-campus-in-madison-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/deforest-qts-data-center"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-0dc3e3fec9b4c32c","lat":39.52402,"location_precision":"source supplied","lon":-119.827,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lumen-technologies-mini-data-center","value":2.0}],"name":"Lumen Technologies mini Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lumen-technologies-mini-data-center"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-0df7b94d0c7bb40f","lat":40.15704,"location_precision":"source supplied","lon":-74.10158,"name":"Apollo Cable Landing Station","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/459188722"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apollo-cable-landing-station-osmway-459188722"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"New Florence","confidence":"medium","id":"datacentersexposed-0dfcf388a372a10d","lat":38.8889,"location_precision":"source supplied","lon":-91.44003,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-montgomery-county-data-center","value":1200.0}],"name":"Google Montgomery County Data Center (Project Spade)","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-montgomery-county-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Broomfield","confidence":"low","contains_osm":true,"id":"datacentersexposed-0e0f16e292050621","lat":39.98916,"location_precision":"source supplied","lon":-105.02073,"name":"JPMorgan Chase","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/845775548"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/jpmorgan-chase-osmway-845775548"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/845775548"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Rapid City","confidence":"medium","id":"datacentersexposed-0e1671a03e700701","lat":44.03367,"location_precision":"source supplied","lon":-103.18849,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sequitor-edge-data-center","value":2.0}],"name":"Sequitor Edge Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/sequitor-edge-targets-2mw-facility-in-rapid-city-south-dakota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sequitor-edge-data-center"}],"state":"South Dakota","status":"planned"},{"ai_classification":"unknown","city":"Alpharetta","confidence":"low","contains_osm":true,"id":"datacentersexposed-0e18e64120495614","lat":34.08699,"location_precision":"source supplied","lon":-84.25182,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-atlanta-alpharetta-data-center-osmway-39083797","value":6.0}],"name":"Flexential Atlanta - Alpharetta Data Center","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/39083797"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-atlanta-alpharetta-data-center-osmway-39083797"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/39083797"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Provo","confidence":"medium","id":"datacentersexposed-0e2319a003d82594","lat":40.21411,"location_precision":"source supplied","lon":-111.65521,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/provo-data-center","value":5.0}],"name":"Provo Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/provo-data-center"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Snowville","confidence":"medium","id":"datacentersexposed-0e2751a1a118f4a7","lat":41.78615,"location_precision":"source supplied","lon":-112.64388,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stratos-project-eastern-parcels","value":9000.0}],"name":"Stratos Project, eastern parcels","operator":"O'Leary Ventures","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.ksl.com/article/51488565/utah-box-elder-county-officials-mull-plan-to-spur-energy-production-data-center-development"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stratos-project-eastern-parcels"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-0e349bc11b935897","lat":38.47151,"location_precision":"source supplied","lon":-77.9693,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/culpeper-data-center","value":215.0}],"name":"Culpeper Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/culpeper-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-0e34a1eb8e70f38f","lat":33.00451,"location_precision":"source supplied","lon":-97.24614,"name":"Charles Schwab Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/815078625"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/charles-schwab-data-center-osmway-815078625"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/815078625"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"MARICOPA COUNTY","confidence":"medium","id":"datacentersexposed-0e5be0eda123004f","lat":33.65472,"location_precision":"source supplied","lon":-112.11014,"name":"PHX01 / PHX02 / PHX03 / PHX05","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070507328"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/phx01-phx02-phx03-phx05-air-110070507328"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Bristow","confidence":"medium","id":"datacentersexposed-0e5f556b26512c23","lat":38.76722,"location_precision":"source supplied","lon":-77.57575,"name":"Delvin Technology Park","operator":"STANLEY MARTIN HOMES, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://egcss.pwcgov.org/SelfService#/plan/323d298e-a0ad-4dc7-accd-f6b27b404c50"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/delvin-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Massena","confidence":"medium","id":"datacentersexposed-0e6e3b0654e636e1","lat":44.96177,"location_precision":"source supplied","lon":-74.8913,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/north-country-data-center","value":176.0}],"name":"North Country Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://northcountrynow.com/stories/north-country-data-centers-future-thwarted-by-proposed-regulations,236005"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/north-country-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Conesville","confidence":"medium","id":"datacentersexposed-0e923c2570103eaf","lat":40.18911,"location_precision":"source supplied","lon":-81.8728,"name":"Aligned Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-acquires-third-site-in-ohio-for-data-center-development-report/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"datacentersexposed-0eac888ce1dc2727","lat":42.01401,"location_precision":"source supplied","lon":-87.95375,"name":"Stream Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-stream-and-nexstar-planning-data-center-campuses-in-elk-grove-area-of-chicago/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-data-center-2"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-0ec391b8c7a985b3","lat":40.60738,"location_precision":"source supplied","lon":-74.17317,"name":"Merrill Lynch Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/247427998"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/merrill-lynch-data-center-osmway-247427998"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/247427998"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Quincy","confidence":"medium","id":"datacentersexposed-0f025c3e43035c06","lat":47.23437,"location_precision":"source supplied","lon":-119.85351,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-quincy-wa-pg","value":89.0}],"name":"Vantage Quincy","operator":"Vantage Data Centers Holdings, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-quincy-wa-pg"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Raleigh","confidence":"low","contains_osm":true,"id":"datacentersexposed-0f109234bb30c3b6","lat":35.72499,"location_precision":"source supplied","lon":-78.66236,"name":"Segra Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/233888384"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/segra-data-center-osmway-233888384"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/233888384"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Marshall","confidence":"medium","id":"datacentersexposed-0f3b073f5e348fa8","lat":42.23903,"location_precision":"source supplied","lon":-84.95583,"name":"Alterra Development Corporation Data Center","operator":"Alterra Development","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/alterra-development-corporation-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Seattle","confidence":"low","contains_osm":true,"id":"datacentersexposed-0f442fef0a3d79ef","lat":47.61779,"location_precision":"source supplied","lon":-122.35669,"name":"CTI Biopharma","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/223783259"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cti-biopharma-osmway-223783259"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/223783259"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-0f86466469790add","lat":40.53796,"location_precision":"source supplied","lon":-74.54572,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-somerset-osmway-460182320","value":40.0}],"name":"CyrusOne Somerset","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460182320"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-somerset-osmway-460182320"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"San Marcos","confidence":"medium","id":"datacentersexposed-0fde1e275e90de80","lat":29.79031,"location_precision":"source supplied","lon":-97.9952,"name":"Highlander SM One LLC","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-proposed-for-200-acre-site-in-san-marcos-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/highlander-sm-one-llc"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Des Moines","confidence":"low","contains_osm":true,"id":"datacentersexposed-0fe750b601814c3f","lat":41.58799,"location_precision":"source supplied","lon":-93.63101,"name":"Aureon","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/104082694"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/aureon-osmway-104082694"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/104082694"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-0ffc13ee844e0cf7","lat":38.77646,"location_precision":"source supplied","lon":-77.584,"name":"Yondr Bristow","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-yondr-bristow"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ione","confidence":"medium","id":"datacentersexposed-10424ae9e9020647","lat":38.27773,"location_precision":"source supplied","lon":-120.91554,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/buena-vista-biomass-power-site-data-center","value":41.0}],"name":"Buena Vista Biomass Power site Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/newyork-greencloud-acquires-californian-biomass-facility-for-carbon-negative-ai-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/buena-vista-biomass-power-site-data-center"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-1080ddd42326ee6d","lat":39.043,"location_precision":"source supplied","lon":-77.488,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-ashburn-corporate-campus","value":380.0}],"name":"Digital Realty Ashburn Corporate Campus","operator":"Digital Realty Trust, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-ashburn-corporate-campus"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"DeSoto","confidence":"medium","id":"datacentersexposed-109afd1e8f5e24df","lat":38.94522,"location_precision":"source supplied","lon":-95.0297,"name":"Mount Sunflower Properties LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mount-sunflower-properties-llc-data-center"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-109c075a605a2793","lat":32.828,"location_precision":"source supplied","lon":-96.88438,"name":"Lumen Dallas 6","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465032484"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-dallas-6-osmway-465032484"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465032484"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","id":"datacentersexposed-10c8c49093986fe4","lat":33.75503,"location_precision":"source supplied","lon":-84.58727,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/switch-data-center-osmway-975064004","value":150.0}],"name":"Switch Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/975064004"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/switch-data-center-osmway-975064004"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-10d3e4071348f6bb","lat":40.0485,"location_precision":"source supplied","lon":-76.2598,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coreweave-lancaster-1","value":100.0}],"name":"CoreWeave Lancaster 1","operator":"Chirisa Technology Parks and Machine Investment Group/CoreWeave","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coreweave-lancaster-1"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"PYOTE","confidence":"medium","id":"datacentersexposed-10f710eb795aedea","lat":31.59632,"location_precision":"source supplied","lon":-103.244,"name":"DDH PYOTE","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ddh-pyote-110071885714"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-112027759058171f","lat":45.52668,"location_precision":"source supplied","lon":-122.8755,"name":"Prime Data Centers (Oregon)","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/369728508"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/data-center-osmway-369728508"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Norfolk","confidence":"medium","id":"datacentersexposed-112b21db93f16057","lat":36.87813,"location_precision":"source supplied","lon":-76.21608,"name":"Zone5","operator":"Fair Holdings Llc","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://air.norfolk.gov/#/property/19029100"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/zone5"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Apple Valley","confidence":"medium","id":"datacentersexposed-1155613c2bc5840b","lat":44.72743,"location_precision":"source supplied","lon":-93.18794,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/oppidan-data-center-3","value":250.0}],"name":"Oppidan Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/oppidan-data-center-outside-minneapolis-rejected/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oppidan-data-center-3"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Aurora","confidence":"low","contains_osm":true,"id":"datacentersexposed-1174f57789012bf1","lat":41.80286,"location_precision":"source supplied","lon":-88.24675,"name":"CyrusOne CHI3","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1481581947"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-chi3-osmway-1481581947"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/199252950"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-chicago-aurora-cme-osmway-199252950"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-11815eba049c092a","lat":45.56795,"location_precision":"source supplied","lon":-122.91677,"name":"Digital Realty PDX11 Data Center","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/734323663"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-pdx11-data-center-osmway-734323663"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-1188fb841a884440","lat":45.62317,"location_precision":"source supplied","lon":-121.20666,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1443567519"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-1443567519"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Rural Hall","confidence":"medium","id":"datacentersexposed-118b4cbccc486928","lat":36.24073,"location_precision":"source supplied","lon":-80.30469,"name":"Drox Group Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/drox-group-data-center"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Clinton","confidence":"medium","id":"datacentersexposed-119a4464ec0bb93d","lat":32.3415,"location_precision":"source supplied","lon":-90.3218,"name":"Amazon Clinton Data Center","operator":"Amazon.com, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMiwwFBVV95cUxQWGVqOERreEs2b0NKUXAwVWdMNjNucGF6N1RxYnJWNWF3b1cxLW5EWWtfcldLdVZMQnpvc3hSbWZZa19PbDZRMnJLVWdyRkdEU0RWMWVOTXF4Q0dPNm5kMFJ1bFNHaUpfVHQ4WndqcTNUcVc1Mkc1c2hKeEVHWE91cjJTYks0V1hEdWo5a1Btbk1KRE1DMm1RNi00QTdZUFZBcDUyNUVxOVhkMEI0eFhLeDRtNGdOU1RlVWIzdTA2UUxLSTQ?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/amazon-clinton-data-center"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-11e9abc44f9622c3","lat":45.54,"location_precision":"source supplied","lon":-122.93,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-hillsboro","value":220.0}],"name":"Digital Realty Hillsboro","operator":"Digital Realty Trust, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-hillsboro"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Cascade Locks","confidence":"medium","id":"datacentersexposed-11f259db9a71b3c8","lat":45.67192,"location_precision":"source supplied","lon":-121.886,"name":"Roundhouse Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/roundhouse-data-center"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Altoona","confidence":"medium","id":"datacentersexposed-122aea6068354e7e","lat":41.66,"location_precision":"source supplied","lon":-93.47,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-altoona","value":540.0}],"name":"Meta Altoona","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-altoona"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"datacentersexposed-1264363c848fb9f8","lat":33.40903,"location_precision":"source supplied","lon":-112.36483,"name":"PHX-11","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1091128478"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/phx-11-osmway-1091128478"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Fort Meade","confidence":"medium","id":"datacentersexposed-126d42d50612fb46","lat":27.79178,"location_precision":"source supplied","lon":-81.8185,"name":"Fort Meade Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/44-million-sq-ft-data-center-campus-gets-zoning-approval-in-fort-meade-florida/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fort-meade-data-center"}],"state":"Florida","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1275719eca24410a","lat":43.06772,"location_precision":"source supplied","lon":-89.39228,"name":"Lumen Madison 1 Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13226718075"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/lumen-madison-1-data-center-osmnode-13226718075"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13226718075"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Clinton","confidence":"medium","id":"datacentersexposed-128de8573816aeea","lat":40.63284,"location_precision":"source supplied","lon":-74.9191,"name":"Comcast Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/comcast-to-convert-former-bank-into-data-center-in-new-jersey/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/comcast-data-center-2"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Hayward","confidence":"medium","id":"datacentersexposed-12927c559b671dc3","lat":37.62601,"location_precision":"source supplied","lon":-122.1134,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prime-data-centers-sjc01-hayward","value":20.0}],"name":"Prime Data Centers SJC01 (Hayward)","operator":"Prime Data Centers","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/prime-data-centers-sjc01-hayward"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Hutto","confidence":"medium","id":"datacentersexposed-12add03a9cc9e160","lat":30.53681,"location_precision":"source supplied","lon":-97.5178,"name":"Skybox Hutto PowerCampus Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/skybox-hutto-powercampus-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Sweetwater","confidence":"medium","id":"datacentersexposed-12c979f1ea4c4f63","lat":32.53339,"location_precision":"source supplied","lon":-100.40962,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sweetwater-1-and-2","value":2000.0}],"name":"Sweetwater 1 and 2","operator":"IREN Limited","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/iren-plans-75mw-liquid-cooled-ai-data-center-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sweetwater-1-and-2"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"New Castle Twp","confidence":"medium","id":"datacentersexposed-12f80389ce41944d","lat":40.7742,"location_precision":"source supplied","lon":-76.235,"name":"KRNL Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/krnl-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Michigan City","confidence":"medium","id":"datacentersexposed-135042bba7e2ec7b","lat":41.57408,"location_precision":"source supplied","lon":-86.7276,"name":"Project Maize","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://dailyjournal.net/2025/06/26/iedc-board-approves-incentives-for-four-planned-data-center-projects/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-maize"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Stafford","confidence":"medium","id":"datacentersexposed-13826d60657bfbc6","lat":38.38512,"location_precision":"source supplied","lon":-77.43162,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stafford-technology-campus","value":1000.0}],"name":"Stafford Technology Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/long_range/rezonings,_cups,_comp_plan_amendments/development_review_meetings_new_applications.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stafford-technology-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Conshohocken (Plymouth Township)","confidence":"medium","id":"datacentersexposed-138aa82cbe1a1a39","lat":40.0872,"location_precision":"source supplied","lon":-75.31887,"name":"Plymouth Township Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/planning-agency-of-plymouth-township-pennsylvania-votes-not-to-recommend-data-center-proposal/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/plymouth-township-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Scranton/ Dickson City","confidence":"medium","id":"datacentersexposed-13a162345f9908ff","lat":41.47686,"location_precision":"source supplied","lon":-75.63828,"name":"Dickson City Development LLC s","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dickson-city-development-llc-s"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"RED OAK","confidence":"medium","id":"datacentersexposed-13adc1e5e0852c32","lat":32.52998,"location_precision":"source supplied","lon":-96.79979,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-red-oak-epoch","value":93.0}],"name":"Google Red Oak","operator":"Google LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/google-red-oak-epoch"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"datacentersexposed-13cd0a08183912a6","lat":33.75552,"location_precision":"source supplied","lon":-84.39148,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/atlanta-atl13-osmnode-8109664813","value":3.0}],"name":"Atlanta ATL13","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8109664813"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlanta-atl13-osmnode-8109664813"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Hays","confidence":"low","contains_osm":true,"id":"datacentersexposed-144619734df0f066","lat":38.87213,"location_precision":"source supplied","lon":-99.30019,"name":"Cloud Storage Corp","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/581234765"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cloud-storage-corp-osmway-581234765"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/581234765"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"East Point","confidence":"medium","id":"datacentersexposed-1447e787302ce403","lat":33.64246,"location_precision":"source supplied","lon":-84.51482,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/east-point-campus","value":38.0}],"name":"East Point Campus","operator":"Microsoft Corporation","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/east-point-campus"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Stafford","confidence":"medium","id":"datacentersexposed-145c3ee67330f363","lat":38.38504,"location_precision":"source supplied","lon":-77.4276,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-data-center","value":1100.0}],"name":"Stack Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stack-plans-1gw-campus-in-stafford-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"St. Francisville","confidence":"medium","id":"datacentersexposed-145f5deeddad336e","lat":30.78072,"location_precision":"source supplied","lon":-91.37634,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hut-8-river-bend-la-pg","value":330.0}],"name":"Hut 8 River Bend","operator":"Hut 8","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hut-8-river-bend-la-pg"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"Dekalb","confidence":"medium","id":"datacentersexposed-14707769f0b3cd81","lat":41.894,"location_precision":"source supplied","lon":-88.7222,"name":"Karis Critical Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/seven-building-data-center-campus-gets-preliminary-ok-from-illinois-planning-commission/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/karis-critical-data-center-3"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Plainfield","confidence":"medium","id":"datacentersexposed-149029a71a3c4f0f","lat":39.7416,"location_precision":"source supplied","lon":-86.36464,"name":"Radius Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/radiusdc-looks-to-build-two-data-centers-outside-indianapolis-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/radius-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Eynon","confidence":"medium","id":"datacentersexposed-149c5e815120b692","lat":41.51232,"location_precision":"source supplied","lon":-75.5583,"name":"Archbald Data Center","operator":"PDC Realty LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/archbald-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Altoona","confidence":"low","contains_osm":true,"id":"datacentersexposed-150a180658e503bc","lat":41.66681,"location_precision":"source supplied","lon":-93.45594,"name":"Lightedge Des Moines 2","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1202051225"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lightedge-des-moines-2-osmway-1202051225"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1202051225"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Barberton","confidence":"medium","id":"datacentersexposed-154eb3e18cd31154","lat":41.01417,"location_precision":"source supplied","lon":-81.6502,"name":"Project Triton","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-triton"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Centennial","confidence":"low","contains_osm":true,"id":"datacentersexposed-154f0bf0504d6727","lat":39.59993,"location_precision":"source supplied","lon":-104.86017,"name":"Time Warner Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/453969923"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/time-warner-datacenter-osmway-453969923"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/453969917"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/453969923"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-15df8677cbe71447","lat":40.55,"location_precision":"source supplied","lon":-104.39,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-weld-proposed","value":500.0}],"name":"Aligned Weld County Campus (proposed)","operator":"Aligned Energy Holdings, LP","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aligned-weld-proposed"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-161150bcba504642","lat":41.1244,"location_precision":"source supplied","lon":-104.89702,"name":"CYS41 Datacenter","operator":"Compass Datacenters, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386017500"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cys41-datacenter-osmway-1386017500"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017500"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Onondaga","confidence":"low","contains_osm":true,"id":"datacentersexposed-1617978110452b71","lat":43.01208,"location_precision":"source supplied","lon":-76.11593,"name":"SU Green Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/930043986"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/su-green-data-center-osmway-930043986"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/930043986"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Port Washington","confidence":"medium","id":"datacentersexposed-16218438214d677a","lat":43.44933,"location_precision":"source supplied","lon":-87.8525,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-lighthouse","value":1300.0}],"name":"Project Lighthouse","operator":"Vantage Data Centers Holdings, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cloverleaf-reveals-plans-for-1000-acre-data-center-campus-in-port-washington-wisconsin/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/project-lighthouse"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Lima","confidence":"medium","id":"datacentersexposed-164af23f1a7f2798","lat":40.80032,"location_precision":"source supplied","lon":-84.11909,"name":"Project BOSC","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500m-data-center-in-lima-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-bosc"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Fayetteville","confidence":"medium","id":"datacentersexposed-16577c0b3062642b","lat":33.44873,"location_precision":"source supplied","lon":-84.45493,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-fayetteville-project-excalibur-ga-pg","value":250.0}],"name":"QTS Fayetteville (Project Excalibur)","operator":"QTS Realty Trust, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-files-to-expand-fayetteville-data-center-campus-in-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-fayetteville-project-excalibur-ga-pg"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"datacentersexposed-16810110fd976fc0","lat":30.21216,"location_precision":"source supplied","lon":-97.69576,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-austin-aus11-osmway-379204279","value":16.0}],"name":"Digital Realty Austin AUS11","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/379204279"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-austin-aus11-osmway-379204279"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379204279"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-1697eba977b1fe7f","lat":38.7476,"location_precision":"source supplied","lon":-77.51948,"name":"AWS IAD105","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1134911640"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aws-iad105-osmway-1134911640"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-16a1f89526d59d05","lat":29.42085,"location_precision":"source supplied","lon":-98.7818,"name":"AWS Rockfish 3","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-rockfish-planning-documents-reveal-three-amazon-data-centers-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-rockfish-3"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-16b867c39015ca7c","lat":36.15329,"location_precision":"source supplied","lon":-95.98919,"name":"OCOSA","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13873419223"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ocosa-osmnode-13873419223"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13873419223"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"datacentersexposed-16c4f5d4070f9cd9","lat":38.95657,"location_precision":"source supplied","lon":-77.53436,"name":"Tech Park at Brambleton","operator":"BlackChamber Group","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/blackchamber-files-to-build-data-center-campus-in-northern-virginias-arcola/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tech-park-at-brambleton"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544103415"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544103416"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-16d88774167d63d9","lat":32.539,"location_precision":"source supplied","lon":-96.79321,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1426525184"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-osmway-1426525184"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-16ff53404a52a593","lat":38.74589,"location_precision":"source supplied","lon":-77.53496,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pwc-stack-infrastructure-nva02-manassas","value":48.0}],"name":"Stack Infrastructure NVA02 Manassas","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-stack-infrastructure-nva02-manassas"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Barstow","confidence":"medium","id":"datacentersexposed-171cd4a39d2ba50d","lat":31.46147,"location_precision":"source supplied","lon":-103.39463,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nscale-cedarvale-barstow-tx-pg","value":240.0}],"name":"Nscale Cedarvale (Barstow)","operator":"Fidelis/Nscale","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nscale-cedarvale-barstow-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-172b48ae03bff463","lat":41.26142,"location_precision":"source supplied","lon":-95.9365,"name":"First National Technical Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/256728809"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/first-national-technical-center-osmway-256728809"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/256728809"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Collegeville","confidence":"low","contains_osm":true,"id":"datacentersexposed-176b0ae504612e8d","lat":40.15224,"location_precision":"source supplied","lon":-75.47762,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-philadelphia-collegeville-osmway-1178609569","value":7.2}],"name":"Flexential Philadelphia - Collegeville","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1178609569"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-philadelphia-collegeville-osmway-1178609569"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1178609569"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Alabama","confidence":"medium","id":"datacentersexposed-17aef56c6287dd2c","lat":43.08677,"location_precision":"source supplied","lon":-78.3978,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stamp-data-center","value":500.0}],"name":"STAMP Data Center","operator":"Genesee County Economic Development Corporation (GCEDC)/Plug Power/Edwards Vaccum","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stamp-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-17f05c0ab52e0000","lat":39.38897,"location_precision":"source supplied","lon":-84.22185,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-lebanon-osmway-95349317","value":14.0}],"name":"CyrusOne Cincinnati-Lebanon","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/95349317"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-lebanon-osmway-95349317"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Hyattsville","confidence":"medium","id":"datacentersexposed-181492fe43e6ee12","lat":38.91977,"location_precision":"source supplied","lon":-76.8565,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/brightseat-tech-park-data-center","value":820.0}],"name":"Brightseat Tech Park Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/brightseat-tech-park-data-center"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"datacentersexposed-18419cab67b439e7","lat":38.54699,"location_precision":"source supplied","lon":-77.80626,"name":"Convergent Technology Park","operator":"Convergent VA LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://commdevpay.fauquiercounty.gov/Energov_Prod/SelfService#/plan/4370817a-ce39-47d9-994b-1a0548fa9fa2?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/convergent-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-18499f0f9ccc675d","lat":36.21564,"location_precision":"source supplied","lon":-86.784,"name":"Tennessee Processing Center LLC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/776316726"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tennessee-processing-center-llc-osmway-776316726"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/776316726"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Temple","confidence":"medium","id":"datacentersexposed-1853cb5b256986d2","lat":31.13391,"location_precision":"source supplied","lon":-97.3723,"name":"Polmer Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://dgtlinfra.com/polmer-800m-temple-texas-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/polmer-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-1869b5254abee804","lat":39.61473,"location_precision":"source supplied","lon":-119.879,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/webb-data-center","value":28.0}],"name":"Webb Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/webb-data-center"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-18eabd544fd7b9b1","lat":32.92,"location_precision":"source supplied","lon":-111.3,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-phoenix-pinal","value":420.0}],"name":"QTS Pinal County Campus","operator":"QTS Realty Trust, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/500-acre-data-center-could-be-built-near-phoenix-arizona/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/qts-phoenix-pinal"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Phoenix","confidence":"medium","id":"datacentersexposed-18ed1415f8572ccd","lat":33.56456,"location_precision":"source supplied","lon":-112.112,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/phx1","value":4.0}],"name":"PHX1","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.expedient.com/data-centers/phoenix/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/phx1"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"New Bethel/ Indianapolis","confidence":"medium","id":"datacentersexposed-191b5a1c6fbe210f","lat":39.72007,"location_precision":"source supplied","lon":-85.9992,"name":"Project Flo","operator":"Deep Meadow Ventures, LLC/Google","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/project-flo"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-197970bafbeb932b","lat":43.59991,"location_precision":"source supplied","lon":-96.79476,"name":"ADP South Dakota","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/545895086"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/adp-south-dakota-osmway-545895086"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/545895086"}],"state":"South Dakota","status":"unknown"},{"ai_classification":"unknown","city":"Fowlerville","confidence":"medium","id":"datacentersexposed-19963b8b46b215f0","lat":42.65542,"location_precision":"source supplied","lon":-84.02875,"name":"Howell Data Center","operator":"Santec Consulting/Meta","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/1000-acre-data-center-campus-planned-outside-detroit-michigan-set-to-be-blocked/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/howell-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Liberty","confidence":"medium","id":"datacentersexposed-19a70cc6f1a947b0","lat":39.20711,"location_precision":"source supplied","lon":-94.45515,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/metrobloks-lincoln-data-center","value":150.0}],"name":"Metrobloks/ Lincoln Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/lincoln-property-partners-with-data-center-firm-metrobloks-for-kansas-city-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/metrobloks-lincoln-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Menomonie","confidence":"low","id":"datacentersexposed-19fd888b8a8b4350","lat":44.87717,"location_precision":"source supplied","lon":-91.92,"name":"West Wisconsin Telcom","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1157356188"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/west-wisconsin-telcom-osmway-1157356188"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"San Francisco","confidence":"low","id":"datacentersexposed-1a4aba38edc71dab","lat":37.72363,"location_precision":"source supplied","lon":-122.39795,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-san-francisco-sfo10-osmway-289620443","value":15.3}],"name":"Digital Realty San Francisco SFO10","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/289620443"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-san-francisco-sfo10-osmway-289620443"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Childress","confidence":"medium","id":"datacentersexposed-1a4ceae1266fe316","lat":34.37564,"location_precision":"source supplied","lon":-100.053,"name":"Lancium Childress","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lancium-childress"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-1a5c976239d1d518","lat":34.99545,"location_precision":"source supplied","lon":-106.61803,"name":"Molina Healthcare","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/169170979"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/molina-healthcare-osmway-169170979"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/169170979"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Maysville","confidence":"medium","id":"datacentersexposed-1a87ee15706ce12c","lat":38.66357,"location_precision":"source supplied","lon":-83.86959,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fortune-500","value":400.0}],"name":"Fortune 500","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://local12.com/news/local/nky-officials-hear-plan-2000-acre-hyperscale-data-center-complex-tech-technology-special-meeting-maysville-kentucky-fortune-50-company-contracts-property-owners-selling-land-rights-job-jobs-cost-consturction-renderings-nda-corporations"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fortune-500"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-1afb2ce650b45a91","lat":38.7559,"location_precision":"source supplied","lon":-77.54548,"name":"Manassas Tech Park North","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-manassas-tech-park-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Newnan","confidence":"medium","id":"datacentersexposed-1b10fbc8eab8bc93","lat":33.42518,"location_precision":"source supplied","lon":-84.72857,"name":"Central Coweta Industrial Phase II","operator":"American Tower Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/central-coweta-industrial-phase-ii"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","contains_osm":true,"id":"datacentersexposed-1b36cfd5cf353855","lat":33.37999,"location_precision":"source supplied","lon":-111.72841,"name":"Alliance Technology","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7821940847"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/alliance-technology-osmnode-7821940847"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7821940847"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Monticello","confidence":"medium","id":"datacentersexposed-1b3d355b2c0f8e9b","lat":45.27509,"location_precision":"source supplied","lon":-93.81535,"name":"Monitcello Data Center","operator":"Monticello Tech, LLC,","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-data-center-projects-planned-for-monticello-minnesota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/monitcello-data-center"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Moapa","confidence":"medium","id":"datacentersexposed-1b53b963eb245cfc","lat":36.68882,"location_precision":"source supplied","lon":-114.62739,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/jet-ai","value":50.0}],"name":"Jet.AI","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/jetai-cce-form-jv-to-develop-50mw-data-center-in-clark-county-nevada/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jet-ai"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Delta","confidence":"medium","id":"datacentersexposed-1b6808455dff2290","lat":39.28873,"location_precision":"source supplied","lon":-112.465,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fibernet-mercurydelta-campus-delta-gigasite","value":2000.0}],"name":"Fibernet MercuryDelta Campus/Delta Gigasite","operator":"Fibernet MercuryDelta","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fibernet-mercurydelta-campus-delta-gigasite"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Lincoln","confidence":"medium","id":"datacentersexposed-1bc08b4408fede86","lat":40.82278,"location_precision":"source supplied","lon":-96.7574,"name":"Google Lincoln Data Center","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-lincoln-data-center"}],"state":"Nebraska","status":"under construction"},{"ai_classification":"unknown","city":"Martinsburg","confidence":"medium","id":"datacentersexposed-1be83945f4d62bb4","lat":39.52688,"location_precision":"source supplied","lon":-77.89455,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/penzance-management","value":600.0}],"name":"Penzance Management","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/penzance-targets-600mw-data-center-campus-in-west-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/penzance-management"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Festus","confidence":"medium","id":"datacentersexposed-1bfa715a802e6759","lat":38.19273,"location_precision":"source supplied","lon":-90.41881,"name":"Festus Data Center","operator":"CRG","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/festus-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-1c0e5e40cc398ccb","lat":38.91688,"location_precision":"source supplied","lon":-77.49325,"name":"Amazon IAD63","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/544596573"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad63-osmway-544596573"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1c3eedd29ec0ec32","lat":34.03626,"location_precision":"source supplied","lon":-84.31951,"name":"Cox Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/269166415"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cox-data-center-osmway-269166415"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/269166415"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"medium","id":"datacentersexposed-1c9b9195158a2c01","lat":32.76849,"location_precision":"source supplied","lon":-96.7941,"name":"KYNDRYL DALLAS DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/kyndryl-dallas-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"McCarran","confidence":"low","id":"datacentersexposed-1ce47d41f1457e72","lat":39.5141,"location_precision":"source supplied","lon":-119.47959,"name":"Switch Tahoe Reno - The Citadel Campus","operator":"Switch, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/6685432442"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-tahoe-reno-the-citadel-campus-osmnode-6685432442"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1d2004e065c78990","lat":40.09979,"location_precision":"source supplied","lon":-83.19926,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1154503133"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1154503133"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/821081357"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/821081358"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1154503131"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1154503132"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1154503133"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Turtle","confidence":"medium","id":"datacentersexposed-1d2cbd82deb636da","lat":42.54766,"location_precision":"source supplied","lon":-88.94026,"name":"Panattoni Turtle Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi2gFBVV95cUxQQzY0U0ZZQklEQmlIRC1oYXd3YmtKT280ai1vcGJTcTBZY1I1cHZvTFJIb3VxVzQ1aC02SWJuYjRZRjRZeWdUald3MmxPbTVQdUxMLUpNWUktY053bTZBNjZpQVJxWkplZk1CcVF0MFhtNmJiTV90eXFXYm16NHd4N0J2RzRKVzY5T3JfRTVsX1N1eGF0aER4a09VNXZWTXBXdXFWbC1fcHluS2ZheTdCUkFQOHcyOS1melZXTDhwUFBKOUJQTmxMSXRkSnFubEVMX3dYMTRQcndwQQ?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/panattoni-turtle-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1d59b3dd628cd867","lat":36.14845,"location_precision":"source supplied","lon":-95.99082,"name":"TulsaConnect","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13720841438"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/tulsaconnect-osmnode-13720841438"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13720841436"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13720841438"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Matthews","confidence":"medium","id":"datacentersexposed-1d713eafbfa9000e","lat":35.10738,"location_precision":"source supplied","lon":-80.71056,"name":"Project Accelerate","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/project-accelerate-data-center-proposal-withdrawn/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-accelerate"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1d85422f52475e79","lat":41.16552,"location_precision":"source supplied","lon":-96.08337,"name":"Fidelity","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/421273622"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/fidelity-osmway-421273622"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/421273622"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1d99c07da275ae21","lat":29.41822,"location_precision":"source supplied","lon":-98.78784,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-sat10-sat11-osmway-1344366214","value":32.0}],"name":"CyrusOne SAT10 & SAT11","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1344366214"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-sat10-sat11-osmway-1344366214"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344366214"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-1dcc861d3b875612","lat":29.47006,"location_precision":"source supplied","lon":-98.67211,"name":"CyrusOne San Antonio III","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611439"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/cyrusone-san-antonio-iii-osmway-509611439"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Memphis","confidence":"high","contains_osm":true,"id":"datacentersexposed-1dda342e217e6957","lat":35.05995,"location_precision":"source supplied","lon":-90.15638,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/xai-colossus-osmway-1381264361","value":422.0}],"name":"xAI Colossus (South Memphis)","operator":"xAI Corp.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/xai-colossus-osmway-1381264361"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1381264361"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"datacentersexposed-1df3e5b2fad67d25","lat":39.04425,"location_precision":"source supplied","lon":-77.53796,"name":"TikTok Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1387391201"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tiktok-data-center-osmway-1387391201"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Pine Island","confidence":"medium","id":"datacentersexposed-1df532157dc2f9e4","lat":44.22483,"location_precision":"source supplied","lon":-92.6442,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-skyway","value":1200.0}],"name":"Project Skyway","operator":"Ryan Companies US, Inc/Google","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://finance-commerce.com/2025/03/ryan-cos-tech-industrial-hub-pine-island/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-skyway"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Nesquehoning","confidence":"medium","id":"datacentersexposed-1e091ae4a806e155","lat":40.85592,"location_precision":"source supplied","lon":-75.87033,"name":"Bitfarms AI","operator":"Bitfarms","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitfarms-ai"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Lisle","confidence":"medium","id":"datacentersexposed-1e166ed5572454bc","lat":41.80169,"location_precision":"source supplied","lon":-88.06276,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cloud-centers-data-center","value":50.0}],"name":"Cloud Centers Data Center","operator":"CloudBurst","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/public-meeting-over-planned-data-center-project-in-lisle-illinois-postponed-due-to-large-number-of-attendees/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloud-centers-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1e28205b8ab9e2dd","lat":33.77157,"location_precision":"source supplied","lon":-84.36686,"name":"Google Fiber","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/4879481820"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-fiber-osmnode-4879481820"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/4879481820"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1e2d8fd8b891674f","lat":44.28728,"location_precision":"source supplied","lon":-120.87022,"name":"Apple","operator":"Apple Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/706759844"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apple-osmway-706759844"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/397914434"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/517411076"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/706759844"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1276373853"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Farmington Hills","confidence":"medium","id":"datacentersexposed-1e4ba3144ce5c657","lat":42.48806,"location_precision":"source supplied","lon":-83.31892,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/southfield-data-center","value":100.0}],"name":"Southfield Data Center","operator":"Metrobloks","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/southfield-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Alpharetta","confidence":"low","contains_osm":true,"id":"datacentersexposed-1e815ff57d0ce7cf","lat":34.09481,"location_precision":"source supplied","lon":-84.23572,"name":"Strategic Datasphere","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/39083541"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/strategic-datasphere-osmway-39083541"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/39083541"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-1ebb87e2795ec9e1","lat":43.14362,"location_precision":"source supplied","lon":-70.95245,"name":"UNH Durham Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/79056848"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/university-of-new-hampshire-osmway-79056848"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Franklin Park","confidence":"low","id":"datacentersexposed-1ecd3f9786f42393","lat":41.92836,"location_precision":"source supplied","lon":-87.85925,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-chicago-ord12-osmway-409296605","value":40.0}],"name":"Digital Realty Chicago ORD12","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/409296605"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-chicago-ord12-osmway-409296605"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"El Paso","confidence":"low","contains_osm":true,"id":"datacentersexposed-1ef79c0fceb08fb6","lat":31.75001,"location_precision":"source supplied","lon":-106.30993,"name":"MDC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1504463315"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/mdc-osmway-1504463315"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1504463315"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-1f35105eaa03b644","lat":38.59732,"location_precision":"source supplied","lon":-77.31694,"name":"Atlantic Funding","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-atlantic-funding"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Point Pleasant","confidence":"medium","id":"datacentersexposed-1f378a4d03224eb5","lat":38.84453,"location_precision":"source supplied","lon":-82.13709,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mountaineer-gigasystem-monarch-wv-pg","value":1000.0}],"name":"Mountaineer GigaSystem / Monarch","operator":"Fidelis New Energy","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/1gw-hydrogen-powered-data-center-campus-proposed-in-west-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mountaineer-gigasystem-monarch-wv-pg"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-1f5d96363765d85c","lat":32.41193,"location_precision":"source supplied","lon":-90.18784,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1510517631","value":1000.0}],"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1510517631"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1510517631"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517631"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517632"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517633"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517634"}],"state":"Mississippi","status":"unknown"},{"ai_classification":"unknown","city":"Edison","confidence":"low","contains_osm":true,"id":"datacentersexposed-1f7aea3ec7b990f2","lat":40.52082,"location_precision":"source supplied","lon":-74.34722,"name":"IO Datacenter","operator":"Compass Datacenters, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204316962"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/io-datacenter-osmway-204316962"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204316962"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"datacentersexposed-1f819840f776c241","lat":30.19891,"location_precision":"source supplied","lon":-97.71378,"name":"Data Foundry - Texas 1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/383888914"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/data-foundry-texas-1-osmway-383888914"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/383888914"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"FAYETTEVILLE","confidence":"medium","id":"datacentersexposed-1f9d28b9cfee5c67","lat":33.44534,"location_precision":"source supplied","lon":-84.52545,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-fairwater-atlanta-epoch","value":859.0}],"name":"Microsoft Fairwater Atlanta","operator":"Microsoft Corporation","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-fairwater-atlanta-epoch"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Rome","confidence":"medium","id":"datacentersexposed-1fb54cfc339750db","lat":34.2664,"location_precision":"source supplied","lon":-85.3029,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/atlas-battey-business-complex","value":500.0}],"name":"Atlas Battey Business Complex","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-planned-on-114-acre-plot-in-rome-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlas-battey-business-complex"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Glen Rose","confidence":"medium","id":"datacentersexposed-2081cd3dce55b135","lat":32.23408,"location_precision":"source supplied","lon":-97.755,"name":"AWS Project Spectrum (Comanche Peak)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-looks-to-build-large-scale-data-center-campus-next-to-nuclear-plant-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-project-spectrum-comanche-peak-tx-pg"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"datacentersexposed-209357ce0758fc5f","lat":38.91267,"location_precision":"source supplied","lon":-77.45168,"name":"SCG Global Holdings LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/starwood-looks-to-buy-county-owned-land-in-fairfax-virginia-for-data-center-development/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/scg-global-holdings-llc-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-20a530f1ced8b9ea","lat":38.98593,"location_precision":"source supplied","lon":-77.47833,"name":"MERCURE BUSINESS PARK LOT 22","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mercure-business-park-lot-22"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lexington","confidence":"medium","id":"datacentersexposed-20aad65332cc02c9","lat":38.04641,"location_precision":"source supplied","lon":-84.49704,"name":"DartPoints Lexington Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/dartpoints-lexington-data-center"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Abernathy","confidence":"medium","id":"datacentersexposed-20c98b60cfb1e53c","lat":33.83238,"location_precision":"source supplied","lon":-101.84302,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/terawulf-abernathy-tx-pg","value":240.0}],"name":"TeraWulf Abernathy","operator":"TeraWulf Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/terawulf-abernathy-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Trenton","confidence":"medium","id":"datacentersexposed-20e0d4455f21d969","lat":39.45522,"location_precision":"source supplied","lon":-84.45998,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-mila","value":240.0}],"name":"Project Mila","operator":"Prologis","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/prologis-acquires-land-outside-cincinnati-ohio-for-potential-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-mila"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-20ef89a71b1f15cb","lat":41.22196,"location_precision":"source supplied","lon":-95.86429,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-osmway-578438011","value":284.0}],"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/578438011"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-578438011"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"West Memphis","confidence":"medium","id":"datacentersexposed-20ef9593df1ac002","lat":35.14648,"location_precision":"source supplied","lon":-90.18454,"name":"Google West Memphis","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://arkansasadvocate.com/2025/10/02/google-state-and-local-officials-mark-start-of-4-billion-ai-data-center-in-west-memphis/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-west-memphis-ar-pg"}],"state":"Arkansas","status":"under construction"},{"ai_classification":"unknown","city":"McLean","confidence":"low","contains_osm":true,"id":"datacentersexposed-2108080e307cbda0","lat":38.92002,"location_precision":"source supplied","lon":-77.21162,"name":"Lumen McLean","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/239147373"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lumen-mclean-osmway-239147373"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9669639033"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","contains_osm":true,"id":"datacentersexposed-217192dcff6c56fc","lat":37.40274,"location_precision":"source supplied","lon":-121.89105,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-infrastructure-osmnode-8238715059","value":118.0}],"name":"STACK Infrastructure","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8238715059"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/stack-infrastructure-osmnode-8238715059"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8238715059"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8238715061"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"San Francisco","confidence":"low","id":"datacentersexposed-217b3da97c739239","lat":37.78899,"location_precision":"source supplied","lon":-122.39014,"name":"360 Spear Street Data Center","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/192307107"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/360-spear-street-data-center-osmway-192307107"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2180fd2cf46a9744","lat":38.77077,"location_precision":"source supplied","lon":-77.58677,"name":"Hunter Property","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-hunter-property"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"datacentersexposed-21acd3d28bd49da1","lat":40.08,"location_precision":"source supplied","lon":-82.808,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-new-albany-1","value":600.0}],"name":"AWS New Albany Campus 1","operator":"Amazon Data Services, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-new-albany-1"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-2210d0a0dbb249ce","lat":40.55561,"location_precision":"source supplied","lon":-74.70552,"name":"Verizon Wireless NE Headquarters","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/761185667"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireless-ne-headquarters-osmway-761185667"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"datacentersexposed-2236df9e6f6e0c83","lat":38.53449,"location_precision":"source supplied","lon":-77.78287,"name":"Gigaland Remington","operator":"Gigaland Data Centers","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gigaland-remington"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Bastrop","confidence":"medium","id":"datacentersexposed-2249aaa714357fd4","lat":30.14174,"location_precision":"source supplied","lon":-97.56553,"name":"EdgeConneX  AUS02","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edgeconnex-acquires-180-acre-parcel-near-its-own-data-center-project-in-bastrop-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-aus02"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","id":"datacentersexposed-226a8b7304420ebf","lat":33.29757,"location_precision":"source supplied","lon":-111.607,"name":"Mesa Amazon Data Center 1","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-plots-four-data-centers-in-mesa-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mesa-amazon-data-center-1"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Vicksburg","confidence":"medium","id":"datacentersexposed-229411b98d9fd005","lat":32.35281,"location_precision":"source supplied","lon":-90.87773,"name":"AWS Warren County (Vicksburg)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-warren-county-vicksburg-ms-pg"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","contains_osm":true,"id":"datacentersexposed-22a8ffd651644f40","lat":37.36428,"location_precision":"source supplied","lon":-121.95879,"name":"SV Colo","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/224174031"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/sv-colo-osmway-224174031"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/224174031"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Vega","confidence":"medium","id":"datacentersexposed-22db62297f9ba9ed","lat":35.24603,"location_precision":"source supplied","lon":-102.42527,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hut-8-vega-tx-pg","value":205.0}],"name":"Hut 8 Vega","operator":"Hut 8","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/hut-8-launches-cryptomine-data-center-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hut-8-vega-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Baltimore Peninsula/ Port Covington","confidence":"medium","id":"datacentersexposed-22ef33d07cfe1f1d","lat":39.26509,"location_precision":"source supplied","lon":-76.6127,"name":"Mag Partners Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/new-york-based-mag-partners-may-build-data-centers-on-235-acre-site-in-baltimore/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mag-partners-data-centers"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-22f49700f56b25b9","lat":33.30628,"location_precision":"source supplied","lon":-111.67172,"name":"AZ Labs","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/152163722"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/az-labs-osmway-152163722"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/152163722"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Burgettstown","confidence":"medium","id":"datacentersexposed-22fea3679adacb0e","lat":40.43197,"location_precision":"source supplied","lon":-80.42476,"name":"Starpointe Industrial Park Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/starpointe-industrial-park-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2327692d1ee96584","lat":40.075,"location_precision":"source supplied","lon":-82.76,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-new-albany-3","value":1100.0}],"name":"AWS New Albany Campus 3 (expansion)","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-new-albany-3"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-236c428e397c538b","lat":38.99824,"location_precision":"source supplied","lon":-77.44915,"name":"QTS Ashburn 2","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13860564221"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-ashburn-2-osmnode-13860564221"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1188680253"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-ashburn-lockridge-osmway-1188680253"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Omaha","confidence":"low","contains_osm":true,"id":"datacentersexposed-2371119a4eb463d0","lat":41.31799,"location_precision":"source supplied","lon":-96.05035,"name":"Union Pacific Jack Koraleski Technology, Research & Development Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/166431620"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/union-pacific-jack-koraleski-technology-research-development-center-osmway-16643"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/166431620"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-23b11d03a926c9cd","lat":37.37241,"location_precision":"source supplied","lon":-121.97365,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sjc34-osmway-38305431","value":72.0}],"name":"Digital Realty Silicon Valley SJC34","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/38305431"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sjc34-osmway-38305431"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-23b535f64a2b0f0d","lat":38.4626,"location_precision":"source supplied","lon":-78.85672,"name":"DBT Data - Harrisonburg Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/876120402"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dbt-data-harrisonburg-center-osmway-876120402"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/876120402"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Moseley","confidence":"medium","id":"datacentersexposed-23b96cd323e3e199","lat":37.42037,"location_precision":"source supplied","lon":-77.75997,"name":"Upper Magnolia Green East","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://chesterfieldfits.com/site/wp-content/uploads/2025/05/East.Proffers.Executed.04-09-25-01709493xBE3E4.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/upper-magnolia-green-east"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cascade","confidence":"medium","id":"datacentersexposed-23e9dbba30dc3666","lat":42.2922,"location_precision":"source supplied","lon":-91.0185,"name":"Simple Mining","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/simple-mining-plans-bitcoin-mining-expansion-in-dubuque-county-iowa/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/simple-mining-2"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"low","contains_osm":true,"id":"datacentersexposed-243891b64037299d","lat":43.60697,"location_precision":"source supplied","lon":-96.80919,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tierpoint-sioux-falls-west-data-center-osmway-239032142","value":1.0}],"name":"TierPoint Sioux Falls West Data Center","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/239032142"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-sioux-falls-west-data-center-osmway-239032142"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/239032142"}],"state":"South Dakota","status":"operating"},{"ai_classification":"unknown","city":"Clarksville","confidence":"medium","id":"datacentersexposed-2464c5eb4ccb71a1","lat":34.14858,"location_precision":"source supplied","lon":-90.54147,"name":"Clarksville Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/648-acre-data-center-could-be-built-in-clarksdale-mississippi/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/clarksville-data-center-2"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Kings Mountain","confidence":"low","contains_osm":true,"id":"datacentersexposed-24682de7252865cd","lat":35.25042,"location_precision":"source supplied","lon":-81.39504,"name":"T5 Charlotte Campus","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/715098032"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/t5-charlotte-campus-osmway-715098032"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/715098032"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Clinton","confidence":"medium","id":"datacentersexposed-2479dbf09e2e2dc4","lat":41.85028,"location_precision":"source supplied","lon":-90.18775,"name":"Clinton Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi7gFBVV95cUxNYjdldnNhS0ZKcEZJMjI2MlVqeU93dm1NOTBoZEM1djJCLXRfOThsUlhIS0xYLVJTZzVWaktoZEx5LWZKWFZzeklPS0VhNG1NWXU1NWNFaFdZbEVrN1gzdXpuTHV2MzFpUVdoTVk3Nm12ejhTWXgyTkd2ZHhUcXNESEJFdFN3WXVBUi13OUd3M3pQZ2JSWkUtTEFqTHE5b01OX0QxalVkeDNnUWRmMVc1UEZTVEZ1c1ZpSDR1UEJVY2UyRWlINFNVZ2lkS2hMSlJPTDVENi1wSmZWTUJGNlJtMGNnSUt6TkZPb0FYU0pn?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/clinton-data-center"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Marion","confidence":"medium","id":"datacentersexposed-25156d9a9115e562","lat":29.52044,"location_precision":"source supplied","lon":-98.15466,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/legacy-data-center","value":50.0}],"name":"Legacy Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/legacy-investing-eyes-50mw-data-center-outside-san-antonio-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/legacy-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Tonopah","confidence":"medium","id":"datacentersexposed-25300269317fee38","lat":33.49648,"location_precision":"source supplied","lon":-112.775,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/arizona-land-consulting-co","value":1500.0}],"name":"Arizona Land Consulting Co.","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.bloomberg.com/news/articles/2025-05-27/palihapitiya-buys-stake-in-arizona-property-for-data-center-bet"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/arizona-land-consulting-co"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Stowe Township","confidence":"medium","id":"datacentersexposed-253429d93f5b03a1","lat":40.48045,"location_precision":"source supplied","lon":-80.06048,"name":"McKees Rocks Rock Point Industrial Site Data Center","operator":"SunCap Property Group","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.cbsnews.com/pittsburgh/news/proposed-data-center-stowe-township/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mckees-rocks-rock-point-industrial-site-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-2538cd856b0c3c6d","lat":40.05018,"location_precision":"source supplied","lon":-83.17552,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016640"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1386016640"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196808"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196809"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196810"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016640"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016641"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2579577d58541b8c","lat":38.75309,"location_precision":"source supplied","lon":-77.51623,"name":"QTS Manassas 1","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-qts-manassas-1"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Harwood","confidence":"low","contains_osm":true,"id":"datacentersexposed-25cbf7de9259fc3e","lat":46.97417,"location_precision":"source supplied","lon":-96.87394,"name":"Applied Digital","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13639231258"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/applied-digital-osmnode-13639231258"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13639231258"}],"state":"North Dakota","status":"unknown"},{"ai_classification":"unknown","city":"Newnan","confidence":"medium","id":"datacentersexposed-25f40d977b670bd7","lat":33.49088,"location_precision":"source supplied","lon":-84.66487,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/t5-atlanta-iv","value":200.0}],"name":"T5 @ Atlanta IV","operator":"T5","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5-atlanta-iv"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"datacentersexposed-260c2ca6021ca8c4","lat":36.16832,"location_precision":"source supplied","lon":-86.80557,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/quantum-leap-data-center-fisk-university","value":30.0}],"name":"Quantum Leap Data Center/ Fisk University","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/fisk-university-looks-to-build-data-center-in-nashville-tennessee/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/quantum-leap-data-center-fisk-university"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Broadview","confidence":"medium","id":"datacentersexposed-260f0534aec94f36","lat":45.89389,"location_precision":"source supplied","lon":-108.88078,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/quantica-llc-big-sky-campus","value":1000.0}],"name":"Quantica LLC Big Sky Campus","operator":"Meta, Google, Amazon","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://bigskyeconomicdevelopment.org/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/quantica-llc-big-sky-campus"}],"state":"Montana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-268e028c115d3477","lat":36.22189,"location_precision":"source supplied","lon":-115.14705,"name":"Verizon North Las Vegas","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1235846520"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-north-las-vegas-osmway-1235846520"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1235846520"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-26a3523a1ec5add9","lat":41.17363,"location_precision":"source supplied","lon":-95.79219,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1287260560"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-osmway-1287260560"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Groveland Twp","confidence":"medium","id":"datacentersexposed-26dfa41642c5ab31","lat":40.59457,"location_precision":"source supplied","lon":-89.59023,"name":"Western Hospitality Partners Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/western-hospitality-partners-data-center-3"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-270e1a621cc60073","lat":40.42179,"location_precision":"source supplied","lon":-86.91415,"name":"Learning GIS!","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7264976228"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/learning-gis-osmnode-7264976228"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7264976228"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Tolleson","confidence":"medium","id":"datacentersexposed-271c800aebbc4b47","lat":33.41237,"location_precision":"source supplied","lon":-112.30683,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prime-data-center","value":240.0}],"name":"Prime Data Center","operator":"Prime Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/prime-and-vantage-buy-land-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prime-data-center"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Phoeniz","confidence":"medium","id":"datacentersexposed-2741c4051f3a5f8f","lat":33.31197,"location_precision":"source supplied","lon":-111.97816,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/md-phx1-data-center","value":180.0}],"name":"MD-PHX1 Data Center","operator":"Menlo Digital","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/menlo-equities-plans-five-building-data-center-campus-in-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/md-phx1-data-center"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Pampa","confidence":"medium","id":"datacentersexposed-275e631143dc1625","lat":35.54431,"location_precision":"source supplied","lon":-101.004,"name":"APR Energy Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/apr-energy-obtains-approval-for-800-acre-natural-gas-powered-data-center-in-pampa-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/apr-energy-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-279bbf5e79367ca3","lat":29.29301,"location_precision":"source supplied","lon":-98.3916,"name":"Amazon AWS SAT - 12807 Donop","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1460861317"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/amazon-aws-sat-12807-donop-osmway-1460861317"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460861317"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-27dd054185993f72","lat":38.01594,"location_precision":"source supplied","lon":-77.4973,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cleanarc-data-center-va1","value":300.0}],"name":"CleanArc Data Center (VA1)","operator":"CleanArc","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cleanarc-gets-green-light-for-600mw-data-center-campus-in-caroline-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cleanarc-data-center-va1"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Jarrell","confidence":"medium","id":"datacentersexposed-27e91df49868c1d1","lat":30.81534,"location_precision":"source supplied","lon":-97.6328,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/jarrell-data-center","value":200.0}],"name":"Jarrell Data Center","operator":"Mesones","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jarrell-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Glen Allen","confidence":"medium","id":"datacentersexposed-28302630991ff720","lat":37.68879,"location_precision":"source supplied","lon":-77.54134,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-data-center-2","value":900.0}],"name":"Tract Data Center","operator":"Tract","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tracts-430-acre-data-center-rejected-by-local-officials-in-hanover-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-2"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"ODESSA","confidence":"medium","id":"datacentersexposed-2838b6206493e234","lat":31.84165,"location_precision":"source supplied","lon":-102.33081,"name":"CIPHER MINING ODESSA DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071181368"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cipher-mining-odessa-data-center-110071181368"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Catlett","confidence":"medium","id":"datacentersexposed-284745adb706b90f","lat":38.66282,"location_precision":"source supplied","lon":-77.6317,"name":"Headwaters Site Development LLC","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/headwaters-site-development-llc"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lowell","confidence":"medium","id":"datacentersexposed-2899a8a82e5a3789","lat":42.88078,"location_precision":"source supplied","lon":-85.37618,"name":"Lowell Covenant Business Park Data Center","operator":"Franklin Partners/Microsoft","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lowell-covenant-business-park-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Orangeburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-289cb8744b2abc2c","lat":41.03619,"location_precision":"source supplied","lon":-73.98763,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bloomberg-data-center-osmway-1238955720","value":7.0}],"name":"Bloomberg Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1238955720"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bloomberg-data-center-osmway-1238955720"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1238955720"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Clifton","confidence":"low","contains_osm":true,"id":"datacentersexposed-28b0f727323bf981","lat":40.82993,"location_precision":"source supplied","lon":-74.12675,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-new-jersey-ewr20-osmway-460177088","value":11.0}],"name":"Digital Realty New Jersey EWR20","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460177088"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-new-jersey-ewr20-osmway-460177088"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460177088"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"datacentersexposed-28e3bf1ff4b55c90","lat":33.24212,"location_precision":"source supplied","lon":-84.19505,"name":"Spalding Investments LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/land-rezoning-for-georgia-data-center-recommended-for-approval/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/spalding-investments-llc-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Chandler","confidence":"low","id":"datacentersexposed-29101b41c4152d0f","lat":33.26878,"location_precision":"source supplied","lon":-111.88252,"name":"CyrusOne PHX4","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/977653858"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-phx4-osmway-977653858"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Ilion","confidence":"medium","id":"datacentersexposed-2915f25e2efa3141","lat":43.01354,"location_precision":"source supplied","lon":-75.03375,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/former-remington-gun-factory-data-center","value":200.0}],"name":"Former Remington Gun Factory Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/former-remington-gun-factory-in-new-york-set-to-become-200mw-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/former-remington-gun-factory-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2930733689c7aa4d","lat":38.77636,"location_precision":"source supplied","lon":-77.55598,"name":"South Point Phase II","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-south-point-phase-ii"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Charles City","confidence":"medium","id":"datacentersexposed-293baa70fc3d1fe5","lat":37.46036,"location_precision":"source supplied","lon":-77.1559,"name":"Diode Ventures Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/diode-drops-plans-for-500-acre-data-center-campus-outside-richmond-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/diode-ventures-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Tempe","confidence":"low","contains_osm":true,"id":"datacentersexposed-2977c4c9e52254cf","lat":33.39444,"location_precision":"source supplied","lon":-111.95252,"name":"Omnis Network","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/940821791"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/omnis-network-osmway-940821791"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/940821791"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","contains_osm":true,"id":"datacentersexposed-29a48724ac73c5e5","lat":33.34415,"location_precision":"source supplied","lon":-111.61959,"name":"EdgeCore","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/808979618"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/edgecore-osmway-808979618"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/808979618"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Covington","confidence":"medium","id":"datacentersexposed-29b8175ea31f3ca8","lat":33.65354,"location_precision":"source supplied","lon":-83.81398,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-lighthouse-2","value":360.0}],"name":"Project Lighthouse","operator":"Universal Planning and Development LLC, JBW Investments, LLC data center","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.ajc.com/news/business/sprawling-data-center-campuses-proposed-south-and-east-of-atlanta/5QKZEN5W45GU5NCHUHGVYX4UUM/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-lighthouse-2"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Owings Mills","confidence":"low","id":"datacentersexposed-29c2e56aed0f29eb","lat":39.42732,"location_precision":"source supplied","lon":-76.81155,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/expedient-owings-mills-osmnode-11167641842","value":0.8}],"name":"Expedient Owings Mills","operator":"Expedient, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11167641842"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/expedient-owings-mills-osmnode-11167641842"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-29e14be176f0a7fd","lat":33.40478,"location_precision":"source supplied","lon":-86.91157,"name":"Sungard Systems International","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/836908998"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/sungard-systems-international-osmway-836908998"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/836908998"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-29efa64fdf951c06","lat":39.00237,"location_precision":"source supplied","lon":-77.47198,"name":"CloudHQ","operator":"CloudHQ, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1381994242"}],"updated":"2026-06-30","url":"https://datacentersexposed.com/facilities/cloudhq-osmway-1381994242"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-29f63edd25a07b57","lat":41.4322,"location_precision":"source supplied","lon":-82.71896,"name":"Aligned Data Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/383796776"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aligned-data-centers-osmway-383796776"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-29f8a889ad3ffb8a","lat":46.40688,"location_precision":"source supplied","lon":-105.8207,"name":"State of Montana Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1417637306"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/state-of-montana-data-center-osmway-1417637306"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1417637306"}],"state":"Montana","status":"unknown"},{"ai_classification":"unknown","city":"Broadview","confidence":"medium","id":"datacentersexposed-29f9fb6189c7eb6e","lat":46.09773,"location_precision":"source supplied","lon":-108.8771,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/quantica-big-sky-mt-pg","value":1000.0}],"name":"Quantica Big Sky","operator":"Quantica Infrastructure","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://bigskyeconomicdevelopment.org/quantica-infrastructure-introduces-big-sky-digital-infrastructure-as-its-flagship-development-platform-in-montana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/quantica-big-sky-mt-pg"}],"state":"Montana","status":"planned"},{"ai_classification":"unknown","city":"Abernathy","confidence":"medium","id":"datacentersexposed-2a260415f336660c","lat":33.86355,"location_precision":"source supplied","lon":-101.85285,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-caprock-data-center","value":540.0}],"name":"Project Caprock Data Center","operator":"Aligned Energy Holdings, LP","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-540mw-data-center-campus-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-caprock-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Socorro","confidence":"medium","id":"datacentersexposed-2a2b47e5e1227202","lat":31.67769,"location_precision":"source supplied","lon":-106.289,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/oppidan-data-center-2","value":5.0}],"name":"Oppidan Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/oppidan-files-for-5mw-data-center-in-el-paso-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oppidan-data-center-2"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"DeSoto","confidence":"medium","id":"datacentersexposed-2a2c4fe36a32c229","lat":38.94633,"location_precision":"source supplied","lon":-95.02935,"name":"Project Pilot","operator":"Beale Infrastructure","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/beale-infrastructure-buys-land-parcel-for-project-pilot-in-de-soto-kansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-pilot"}],"state":"Kansas","status":"under construction"},{"ai_classification":"unknown","city":"Louisville","confidence":"low","contains_osm":true,"id":"datacentersexposed-2a67e9651e03fc02","lat":38.27719,"location_precision":"source supplied","lon":-85.50724,"name":"Flexential Louisville - East","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/329551673"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-louisville-east-osmway-329551673"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/329551673"}],"state":"Kentucky","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-2a76a884795c4b8d","lat":38.74742,"location_precision":"source supplied","lon":-77.67446,"name":"OVH US East Vint Hill","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/225745958"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ovh-us-east-vint-hill-osmway-225745958"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/225745958"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2a78821516e72df9","lat":38.25656,"location_precision":"source supplied","lon":-77.29122,"name":"Green Energy Ventures Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://kinggeorgetechnologycenter.com/submissions/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/green-energy-ventures-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Hannibal","confidence":"medium","id":"datacentersexposed-2b3b7bc1961ad286","lat":39.70499,"location_precision":"source supplied","lon":-80.8452,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mara-holdings","value":200.0}],"name":"Mara Holdings","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/mara-acquires-505mw-gas-plant-in-ohio-intends-to-construct-200mw-data-center-at-site/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mara-holdings"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Villa Rica","confidence":"medium","id":"datacentersexposed-2b3ef679ad5edeca","lat":33.70459,"location_precision":"source supplied","lon":-84.94,"name":"Avemore GA LLC Data Center","operator":"Atlanta Development","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://cms2.revize.com/revize/villaricaga/Documents/Government/Boards%20and%20Committees/Planning%20and%20Zoning/2024/Agenda/PlanningandZoningCommissionPacket08-20-24031218092024PM1371.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/avemore-ga-llc-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Sugarloaf","confidence":"medium","id":"datacentersexposed-2b43495db01a0909","lat":40.97039,"location_precision":"source supplied","lon":-76.0435,"name":"LBT Investment Group LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lbt-investment-group-llc-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"datacentersexposed-2b9dd5d776f032fc","lat":39.07479,"location_precision":"source supplied","lon":-77.56413,"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/886330269"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-osmway-886330269"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Concord","confidence":"low","contains_osm":true,"id":"datacentersexposed-2bae1b44d1f9afeb","lat":37.97108,"location_precision":"source supplied","lon":-122.04374,"name":"e360","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10880725408"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/e360-osmnode-10880725408"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10880725408"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"datacentersexposed-2bb2aba6f7c8c75b","lat":38.89054,"location_precision":"source supplied","lon":-77.45367,"name":"LEE ROAD PROPERTY","operator":"LEE ROAD PROPERTY LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://icare.fairfaxcounty.gov/ffxcare/datalets/datalet.aspx?mode=com_combined&UseSearch=no&pin=0343%2001%20%200023E1&jur=129&taxyr=2025&LMparent=138"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lee-road-property"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","id":"datacentersexposed-2bc0a1a87128aec8","lat":33.35201,"location_precision":"source supplied","lon":-111.64753,"name":"EdgeConneX PHX02 Data Center","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1015704066"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/edgeconnex-phx02-data-center-osmway-1015704066"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2bc128032344420d","lat":38.79521,"location_precision":"source supplied","lon":-77.59346,"name":"5451 Wellington Road East","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-5451-wellington-road-east"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"LEESBURG","confidence":"medium","id":"datacentersexposed-2bc1858bbf55cb49","lat":39.06691,"location_precision":"source supplied","lon":-77.55187,"name":"MICROSOFT CORPORATION – LEESBURG DATA CENTER (IAD01-02-03-04-05)","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071374546"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-corporation-leesburg-data-center-iad01-02-03-04-05-air-110071374546"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-2bc27e33e5ca4745","lat":38.36789,"location_precision":"source supplied","lon":-77.47358,"name":"Enon Road Technologies","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/enon-road-technologies"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-2bc7ba4169de5f91","lat":39.00275,"location_precision":"source supplied","lon":-77.48545,"name":"Amazon Web Services Building C","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300969615"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-building-c-osmway-300969615"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ebensburg","confidence":"medium","id":"datacentersexposed-2c04b2c48a40a746","lat":40.45876,"location_precision":"source supplied","lon":-78.75877,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vilogics-ebensburg","value":3.0}],"name":"viLogics Ebensburg","operator":"viLogics","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://vilogics.com/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vilogics-ebensburg"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Roswell","confidence":"medium","id":"datacentersexposed-2c149840cc79ac5d","lat":33.38971,"location_precision":"source supplied","lon":-104.536,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/zenith-volts-data-center","value":1240.0}],"name":"Zenith Volts Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/zenith-volts-data-center"}],"state":"New Mexico","status":"planned"},{"ai_classification":"unknown","city":"Wampum","confidence":"medium","id":"datacentersexposed-2c845228efecbc46","lat":40.85128,"location_precision":"source supplied","lon":-80.34748,"name":"Wampum Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wampum-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2c8484710b30a424","lat":38.79171,"location_precision":"source supplied","lon":-77.54574,"name":"DOANE DRIVE - DULLES GLASS","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-doane-drive-dulles-glass"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-2c91c48827ef2dac","lat":32.3897,"location_precision":"source supplied","lon":-97.05,"name":"Midlothian 2 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-2-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Sacramento","confidence":"low","contains_osm":true,"id":"datacentersexposed-2c9fc53ec3b512b4","lat":38.6504,"location_precision":"source supplied","lon":-121.49195,"name":"RagingWire CA2","operator":"RagingWire Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/32560290"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ragingwire-ca2-osmway-32560290"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/190868312"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ragingwire-ca3-osmway-190868312"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/32560290"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2cd9092ed940daf8","lat":40.084,"location_precision":"source supplied","lon":-82.778,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-new-albany-2","value":800.0}],"name":"AWS New Albany Campus 2","operator":"Amazon Data Services, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-new-albany-2"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Kenilworth","confidence":"medium","id":"datacentersexposed-2ce329bad97b92e8","lat":40.67714,"location_precision":"source supplied","lon":-74.28707,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/","value":250.0}],"name":"CoreWeave Kenilworth (former Merck)","operator":"Core Scientific, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://re-nj.com/coreweave-begins-1-8-billion-data-center-project-in-kenilworth-landing-first-award-under-new-eda-tax-credit-program/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coreweave-kenilworth-former-merck-nj-pg"}],"state":"New Jersey","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-2d1489cf735c5380","lat":37.37804,"location_precision":"source supplied","lon":-121.95413,"name":"Layer42 Santa Clara","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/37947315"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/layer42-santa-clara-osmway-37947315"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-2d16619ab671095a","lat":38.12168,"location_precision":"source supplied","lon":-77.5042,"name":"Hunter's Ridge South","operator":"AREP SOF III HRS LLC C/O AMERICAN REAL ESTATE PARTNERS, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hunters-ridge-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"El Segundo","confidence":"low","contains_osm":true,"id":"datacentersexposed-2d290e280e891a6a","lat":33.92174,"location_precision":"source supplied","lon":-118.38646,"name":"Serverfarm - LAX1","operator":"Serverfarm","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/424945845"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/serverfarm-lax1-osmway-424945845"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/424945845"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Gretna","confidence":"medium","id":"datacentersexposed-2d6b61fcd8d65e46","lat":36.98035,"location_precision":"source supplied","lon":-79.35187,"name":"Unnamed Data Center","operator":"BOLES, BRENDA ET ALS EAST, SHARON ET ALS BOLES, DOUGLAS ET ALS KELLEY, OTEY HARRIS III ET ALS KELLEY, CHARLES ET ALS","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://experience.arcgis.com/experience/72964533b5b14058835193306c7a33bc#data_s=id%3AdataSource_4-18e66caa3c0-layer-48%3A1299%2Cid%3Awidget_251_output_config_9%3A0&widget_101=active_datasource_id:dataSource_4,center:-8833175.170597687%2C4436226.724131098%2C102100,scale:3328.2265114471415,rotation:0,viewpoint:%7B%22rotation%22%3A0%2C%22scale%22%3A3328.2265114471415%2C%22targetGeometry%22%3A%7B%22spatialReference%22%3A%7B%22latestWkid%22%3A3857%2C%22wkid%22%3A102100%7D%2C%22x%22%3A-8833175.170597687%2C%22y%22%3A4436226.724131098%7D%7D"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/unnamed-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-2d7bf5f780fb586e","lat":29.4246,"location_precision":"source supplied","lon":-98.49514,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-san-antonio-campus-tx-pg","value":200.0}],"name":"Stream San Antonio Campus","operator":"Stream Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-san-antonio-campus-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Shoals Crossing","confidence":"medium","id":"datacentersexposed-2d88834ecce3724b","lat":33.98826,"location_precision":"source supplied","lon":-83.30194,"name":"Athens Shoals Crossing Data Center","operator":"Brasfield & Gorrie","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.accgov.com/CivicSend/ViewMessage/message/206304"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/athens-shoals-crossing-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-2dac0101a4ba62f9","lat":38.94927,"location_precision":"source supplied","lon":-77.55563,"name":"Arcola Tech Park","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/897226573"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/arcola-tech-park-osmway-897226573"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/897226573"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-2dce11e5786bac50","lat":35.31567,"location_precision":"source supplied","lon":-81.82211,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1109074150"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-osmway-1109074150"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"medium","id":"datacentersexposed-2deffdf1f89702cb","lat":43.59399,"location_precision":"source supplied","lon":-96.64092,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/gemini-data-center-sd-llc","value":500.0}],"name":"Gemini Data Center SD LLC","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://siouxfalls.business/hyperscale-data-center-seeking-city-approvals-to-build-northeast-of-sioux-falls/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gemini-data-center-sd-llc"}],"state":"South Dakota","status":"planned"},{"ai_classification":"unknown","city":"Vineland","confidence":"medium","id":"datacentersexposed-2e02d249d7bb89ea","lat":39.43012,"location_precision":"source supplied","lon":-75.0131,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nebius-data-center","value":300.0}],"name":"Nebius Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nebius-data-center"}],"state":"New Jersey","status":"under construction"},{"ai_classification":"unknown","city":"Fairmont","confidence":"medium","id":"datacentersexposed-2e710e3c7377ea4d","lat":39.42027,"location_precision":"source supplied","lon":-80.21346,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hog-lick-aggregates","value":200.0}],"name":"Hog Lick Aggregates","operator":"Hog Lick Aggregates","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://wajr.com/2026/05/06/data-center-study-underway-in-marion-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hog-lick-aggregates"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-2e7a86071b77b8e6","lat":40.05,"location_precision":"source supplied","lon":-86.46,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-boone-county","value":240.0}],"name":"QTS Boone County Campus","operator":"QTS Realty Trust, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-boone-county"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Franklin Furnace","confidence":"medium","id":"datacentersexposed-2e9131855d4b26eb","lat":38.59737,"location_precision":"source supplied","lon":-82.84261,"name":"Franklin Furnace Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-confirmed-as-company-behind-500000-sq-ft-data-center-in-scioto-county-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/franklin-furnace-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Waverly/ Talkington Twp","confidence":"medium","id":"datacentersexposed-2ea7436a3c5058f6","lat":39.54828,"location_precision":"source supplied","lon":-89.89837,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone","value":632.0}],"name":"CyrusOne","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","id":"datacentersexposed-2ea780f1cc2247e9","lat":32.80798,"location_precision":"source supplied","lon":-96.85739,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tierpoint-dallas-data-center-osmway-465042594","value":11.1}],"name":"TierPoint Dallas Data Center","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465042594"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-dallas-data-center-osmway-465042594"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-2ead77591080d2a9","lat":35.92451,"location_precision":"source supplied","lon":-86.85569,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tierpoint-osmway-819981908","value":2.4}],"name":"TierPoint","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/819981908"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-osmway-819981908"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/819981908"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Waukesha","confidence":"low","contains_osm":true,"id":"datacentersexposed-2f3ed4b6c2fc819a","lat":43.05137,"location_precision":"source supplied","lon":-88.2167,"name":"Pewaukee Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1011125238"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/pewaukee-data-center-osmway-1011125238"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1011125238"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"low","contains_osm":true,"id":"datacentersexposed-2f490cb3abbbed5d","lat":33.09508,"location_precision":"source supplied","lon":-96.68379,"name":"Evoque Allen DA1","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/254773897"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/evoque-allen-da1-osmway-254773897"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254773897"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Rochelle","confidence":"medium","id":"datacentersexposed-2f505d21316bbb01","lat":41.89956,"location_precision":"source supplied","lon":-89.04816,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lff-industrial","value":48.0}],"name":"LFF Industrial","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/planning-decision-on-rochelle-illinois-data-center-postponed/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lff-industrial"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Wisconsin Rapids","confidence":"medium","id":"datacentersexposed-2f5c10a0b2c3e2e5","lat":44.41945,"location_precision":"source supplied","lon":-89.8253,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-power-optimization","value":20.0}],"name":"Digital Power Optimization","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/dpo-secures-land-and-power-supply-for-20mw-hpc-data-center-in-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-power-optimization"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Muskogee","confidence":"medium","id":"datacentersexposed-2f78f738a11d6188","lat":35.74788,"location_precision":"source supplied","lon":-95.36969,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center","value":100.0}],"name":"Core Scientific / CoreWeave Muskogee","operator":"Core Scientific, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://investors.corescientific.com/news-events/press-releases/detail/99/core-scientific-and-port-muskogee-break-ground-on-100-mw-hpc-data-center"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/core-scientific-coreweave-muskogee-ok-pg"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Coachella","confidence":"medium","id":"datacentersexposed-2faaa874e0e1e843","lat":33.6714,"location_precision":"source supplied","lon":-116.129,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coachella-valley-technology-campus","value":270.0}],"name":"Coachella Valley Technology Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-data-center-could-be-built-in-coachella-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coachella-valley-technology-campus"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Tempe","confidence":"low","id":"datacentersexposed-303821b32659b621","lat":33.34462,"location_precision":"source supplied","lon":-111.89922,"name":"Digital Realty Data Center","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/220518160"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-data-center-osmway-220518160"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Rome","confidence":"medium","id":"datacentersexposed-30574e7511c708cd","lat":34.36917,"location_precision":"source supplied","lon":-85.0482,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-sassy","value":504.0}],"name":"Project Sassy","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/atlas-named-as-developer-on-project-sassy-in-rome-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-sassy"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-307a4aa1b05b893f","lat":38.98892,"location_precision":"source supplied","lon":-104.78633,"name":"SAP COS02","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/813532303"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/sap-cos02-osmway-813532303"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/813532303"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Endicott","confidence":"medium","id":"datacentersexposed-3096b5e59891b668","lat":42.10429,"location_precision":"source supplied","lon":-76.04444,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/global-ai-2","value":32.0}],"name":"Global AI","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/global-ai-set-to-develop-data-center-outside-denver-colorado/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/global-ai-2"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Fort Wayne","confidence":"medium","id":"datacentersexposed-309a8126d14f66c8","lat":41.07999,"location_precision":"source supplied","lon":-85.1386,"name":"Google Fort Wayne (Project Zodiac)","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/googles-2bn-data-center-now-operational-in-fort-wayne-indiana/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/google-fort-wayne-project-zodiac-in-pg"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Galena","confidence":"medium","id":"datacentersexposed-30a96078f45d827f","lat":40.21813,"location_precision":"source supplied","lon":-82.8478,"name":"Amazon Sunbury Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-plans-2bn-data-center-campus-in-sunbury-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-sunbury-data-center"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Roanoke","confidence":"medium","id":"datacentersexposed-30af5656637b6f13","lat":37.33734,"location_precision":"source supplied","lon":-79.9992,"name":"Google Data Center: Center for Research and Technology","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-data-center-center-for-research-and-technology"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Warrenton","confidence":"medium","id":"datacentersexposed-31181bbc4df8537e","lat":38.75228,"location_precision":"source supplied","lon":-77.67349,"name":"Vint Hill Technology Campus (CyrusOne)","operator":"C1 Vint Hill LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-sites-in-virginias-fauquier-county-bought-by-data-center-developer/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vint-hill-technology-campus-cyrusone"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Rome","confidence":"medium","id":"datacentersexposed-3145926932b9c244","lat":34.30175,"location_precision":"source supplied","lon":-85.3087,"name":"Project Firecracker (Microsoft)","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-develop-350-acre-data-center-campus-in-rome-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-firecracker-microsoft"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Reston","confidence":"low","id":"datacentersexposed-31ad72f60086597a","lat":38.94881,"location_precision":"source supplied","lon":-77.32941,"name":"IAD1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/79159494"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iad1-osmway-79159494"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-31b36b106be9fe00","lat":38.78874,"location_precision":"source supplied","lon":-77.58088,"name":"Project Gainesville","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-project-gainesville"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-31ce826c60380907","lat":38.76585,"location_precision":"source supplied","lon":-77.54635,"name":"Sudley Manor North","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-sudley-manor-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"low","contains_osm":true,"id":"datacentersexposed-32053cfb5adbf420","lat":36.06593,"location_precision":"source supplied","lon":-115.13856,"name":"Fiberhub LAS1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13311012216"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/fiberhub-las1-osmnode-13311012216"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13311012216"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-32156251af72b224","lat":32.98891,"location_precision":"source supplied","lon":-97.25927,"name":"QTS Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/507673437"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/qts-data-center-osmway-507673437"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/507673437"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Uhland","confidence":"medium","id":"datacentersexposed-3218f53107da3b85","lat":29.91937,"location_precision":"source supplied","lon":-97.77206,"name":"PowerHouse Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-looking-to-build-500-acre-data-center-near-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-data-centers-3"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-325a7e238200c469","lat":39.77,"location_precision":"source supplied","lon":-86.5,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-fort-wayne","value":480.0}],"name":"Google Fort Wayne","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-fort-wayne"}],"state":"Indiana","status":"operating"},{"ai_classification":"unknown","city":"Gainesville","confidence":"medium","id":"datacentersexposed-328fcbbb77183713","lat":38.82437,"location_precision":"source supplied","lon":-77.56874,"name":"Prince William Digital Gateway","operator":"Compass, QTS Data Centers","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://egcss.pwcgov.org/SelfService#/plan/b0fcafed-a7f4-4ea1-8f83-e71a94ebf4f9?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prince-william-digital-gateway"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","contains_osm":true,"id":"datacentersexposed-32e407c9c1173f29","lat":41.85369,"location_precision":"source supplied","lon":-87.61827,"name":"Lakeside Technology Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/156520409"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lakeside-technology-center-osmway-156520409"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/156520409"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-32f9cc3b2967ef17","lat":40.53587,"location_precision":"source supplied","lon":-74.55343,"name":"BNY Mellon Somerset","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460182335"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/bny-mellon-somerset-osmway-460182335"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460182335"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-332e07ab92581d7a","lat":41.07832,"location_precision":"source supplied","lon":-74.15291,"name":"NYSE Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/472761713"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/nyse-data-center-osmway-472761713"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/472761713"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Temple","confidence":"medium","id":"datacentersexposed-335ffdf45b2f357a","lat":31.07,"location_precision":"source supplied","lon":-97.43,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-temple","value":600.0}],"name":"Stack Temple Campus","operator":"Stack Infrastructure, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-15","url":"https://datacentersexposed.com/facilities/stack-temple"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","id":"datacentersexposed-336cd93fd84c4958","lat":40.09876,"location_precision":"source supplied","lon":-82.74724,"name":"Vantage Building 3","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1427613546"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/vantage-building-3-osmway-1427613546"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-3381dd97865257d4","lat":35.04995,"location_precision":"source supplied","lon":-106.5428,"name":"HPC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/14930068"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/hpc-osmrelation-14930068"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"low","contains_osm":true,"id":"datacentersexposed-33c23d1737e0995d","lat":37.39963,"location_precision":"source supplied","lon":-122.01456,"name":"Equinix SV6","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/390287635"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/equinix-sv6-osmway-390287635"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/390287635"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-33dfa82ad49552fe","lat":31.25445,"location_precision":"source supplied","lon":-94.61812,"name":"Angelina County AI Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/angelina-county-ai-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-33ed698c205f6f0a","lat":41.53392,"location_precision":"source supplied","lon":-93.86344,"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1375475071"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-osmway-1375475071"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1173569101"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1375475071"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1375475072"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1375475073"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Granbury","confidence":"medium","id":"datacentersexposed-33fb3f9a9b2293a0","lat":32.44268,"location_precision":"source supplied","lon":-97.78705,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mara-granbury-wolf-hollow-tx-pg","value":300.0}],"name":"MARA Granbury (Wolf Hollow)","operator":"MARA","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://ir.mara.com/news-events/press-releases/detail/1347/marathon-digital-holdings-enters-definitive-agreement-to-acquire-200-megawatt-bitcoin-mining-data-center-adjacent-to-a-wind-farm"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mara-granbury-wolf-hollow-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-33fbd326020f1d50","lat":37.36006,"location_precision":"source supplied","lon":-77.32704,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-fortress-richmond-osmway-550355261","value":25.0}],"name":"Digital Fortress: Richmond","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/550355261"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-fortress-richmond-osmway-550355261"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/550355261"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-3427c19540b0b9df","lat":37.9241,"location_precision":"source supplied","lon":-77.54387,"name":"VALCO Data Center Park","operator":"VALCO CAROLINE COUNTY","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/valco-data-center-park-2"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Denton","confidence":"medium","id":"datacentersexposed-344f67289d0c4e43","lat":33.21504,"location_precision":"source supplied","lon":-97.13304,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coreweave-core-scientific-denton-tx-pg","value":400.0}],"name":"CoreWeave / Core Scientific Denton","operator":"Core Scientific, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coreweave-core-scientific-denton-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-3460f04c5d55e03c","lat":38.71706,"location_precision":"source supplied","lon":-77.49994,"name":"CloudHQ MCC1","operator":"CloudHQ, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/882977350"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq-mcc1-osmway-882977350"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/996899489"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq-mcc2-osmway-996899489"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1227614670"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq-mcc3-osmway-1227614670"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-34935c48daa01e10","lat":29.47827,"location_precision":"source supplied","lon":-98.69069,"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/364289073"}],"updated":"2026-06-30","url":"https://datacentersexposed.com/facilities/microsoft-osmway-364289073"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/364289073"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/364289077"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-34b54414c44e0b56","lat":38.79296,"location_precision":"source supplied","lon":-77.59684,"name":"Manassas Data Center","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-manassas-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-34cc1c305031b8b3","lat":39.27466,"location_precision":"source supplied","lon":-76.59167,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/expedient-tidepoint-osmnode-11168593094","value":1.5}],"name":"Expedient Tidepoint","operator":"Expedient, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11168593094"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/expedient-tidepoint-osmnode-11168593094"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11168593094"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Milwaukee","confidence":"medium","id":"datacentersexposed-3523198c495bcdcc","lat":43.09332,"location_precision":"source supplied","lon":-87.9846,"name":"Data center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/former-walmart-in-milwaukee-wisconsin-could-become-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-2"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-35247c18a5383ac5","lat":37.69948,"location_precision":"source supplied","lon":-121.9038,"name":"QES Computers","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/358946546"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qes-computers-osmway-358946546"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/358946546"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Bowling Green","confidence":"medium","id":"datacentersexposed-352f7f353b47dc00","lat":41.45447,"location_precision":"source supplied","lon":-83.6489,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-bowling-green-data-center-project-accordion","value":514.0}],"name":"Meta Bowling Green Data Center/ Project Accordion","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-bowling-green-data-center-project-accordion"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"South Hill","confidence":"medium","id":"datacentersexposed-35320efa1ef60ad0","lat":36.70315,"location_precision":"source supplied","lon":-78.12708,"name":"Hillcrest Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-permit-to-build-data-center-campus-in-mecklenburg-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hillcrest-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Silver Springs","confidence":"medium","id":"datacentersexposed-35399becfc66c605","lat":39.47083,"location_precision":"source supplied","lon":-119.40618,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-data-center-4","value":1200.0}],"name":"Tract Data Center","operator":"Fleet","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-acquires-8590-acres-in-reno-nevada-for-data-center-park/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/tract-data-center-4"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-355ebc8d32993b9f","lat":32.4049,"location_precision":"source supplied","lon":-97.0522,"name":"Midlothian 1 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-1-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Lenoir","confidence":"medium","id":"datacentersexposed-356851779c34f446","lat":35.91,"location_precision":"source supplied","lon":-81.54,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-lenoir","value":360.0}],"name":"Google Lenoir","operator":"Google LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-lenoir"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Boulder City","confidence":"medium","id":"datacentersexposed-35839ced18fcd226","lat":35.94159,"location_precision":"source supplied","lon":-114.9138,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/townsite-solar-2-llc","value":170.0}],"name":"Townsite Solar 2 LLC","operator":"Townsite Solar 2 LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/170mw-data-center-campus-proposed-in-boulder-nevada/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/townsite-solar-2-llc"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Silverton","confidence":"medium","id":"datacentersexposed-3584e3a31b2ec124","lat":34.39186,"location_precision":"source supplied","lon":-101.31593,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-dorothy-1a-and-1b-soluna","value":50.0}],"name":"Project Dorothy 1A and 1B (Soluna)","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-dorothy-1a-and-1b-soluna"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Braidwood/ Braceville","confidence":"medium","id":"datacentersexposed-35c210eda0648e4c","lat":41.2564,"location_precision":"source supplied","lon":-88.2417,"name":"Western Hospitality Partners Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/planned-data-center-project-outside-chicago-illinois-paused-due-to-energy-infrastructure/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/western-hospitality-partners-data-center-2"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Santa Monica","confidence":"medium","id":"datacentersexposed-35cca7c862d38f17","lat":26.37778,"location_precision":"source supplied","lon":-97.5874,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-kati-1-and-2-soluna","value":166.0}],"name":"Project Kati 1 and 2 (Soluna)","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-kati-1-and-2-soluna"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-35e402cba0fc79ca","lat":39.10508,"location_precision":"source supplied","lon":-77.53671,"name":"Leesburg Gateway","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/peterson-co-plots-three-building-data-center-campus-in-leesburg-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/leesburg-gateway"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Caledonia","confidence":"medium","id":"datacentersexposed-3670c78f251888d1","lat":42.8392,"location_precision":"source supplied","lon":-85.56194,"name":"Microsoft Caledonia Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-looks-to-buy-578-additional-acres-in-gaines-township-michigan/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-caledonia-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Walnut Cove","confidence":"medium","id":"datacentersexposed-367855cac014a098","lat":36.32441,"location_precision":"source supplied","lon":-80.09938,"name":"Project Delta","operator":"Engineered Land Solutions","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-north-carolina-county-void-data-center-rezoning-amid-legal-challenge/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-delta"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-36a67c62da0fb3ad","lat":32.78375,"location_precision":"source supplied","lon":-96.79464,"name":"Live Oak Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/471658485"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/live-oak-data-center-osmway-471658485"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/471658485"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Medford","confidence":"low","contains_osm":true,"id":"datacentersexposed-36b6b90f5168a4a4","lat":42.33246,"location_precision":"source supplied","lon":-122.88043,"name":"Date Center West - Eugene","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/967131562"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/date-center-west-eugene-osmway-967131562"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/967131562"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Altoona","confidence":"low","contains_osm":true,"id":"datacentersexposed-370d83b9c87d4c2c","lat":41.66766,"location_precision":"source supplied","lon":-93.45548,"name":"Lightedge Des Moines 1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1227883682"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lightedge-des-moines-1-osmway-1227883682"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227883682"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-370f7159d1c1c746","lat":33.30297,"location_precision":"source supplied","lon":-111.84054,"name":"Emailage","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7737996606"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/emailage-osmnode-7737996606"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7737996606"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Nottingham","confidence":"medium","id":"datacentersexposed-373f5f6f4be5a708","lat":43.17961,"location_precision":"source supplied","lon":-71.10022,"name":"Nottingham Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/proposal-for-data-center-in-nottingham-new-hampshire-withdrawn-after-facing-intense-opposition/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nottingham-data-center"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Ocilla","confidence":"medium","id":"datacentersexposed-3800ef4885eb7969","lat":31.59873,"location_precision":"source supplied","lon":-83.37431,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-arrowhead","value":1250.0}],"name":"Project Arrowhead","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.change.org/p/protect-irwin-county-from-data-centers"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-arrowhead"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Brooklyn","confidence":"low","contains_osm":true,"id":"datacentersexposed-3822673caa6b100b","lat":40.6577,"location_precision":"source supplied","lon":-74.00482,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dataverge-osmnode-12766117170","value":10.0}],"name":"Dataverge","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12766117170"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dataverge-osmnode-12766117170"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12766117170"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-387443b33bd1b048","lat":34.09371,"location_precision":"source supplied","lon":-84.25088,"name":"Secure Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/39083830"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/secure-data-center-osmway-39083830"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/39083830"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Ridgeville","confidence":"medium","id":"datacentersexposed-38c36b455c7f6021","lat":33.09662,"location_precision":"source supplied","lon":-80.31528,"name":"Google Dorchester County (Pine Hill & Winding Woods)","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-invest-9bn-in-south-carolina-data-centers/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-dorchester-county-pine-hill-winding-woods-sc-pg"}],"state":"South Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Sharon","confidence":"medium","id":"datacentersexposed-38c9b3dd8132e3ac","lat":41.24472,"location_precision":"source supplied","lon":-80.50655,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bitfarms","value":30.0}],"name":"Bitfarms","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitfarms"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"ORLANDO","confidence":"medium","id":"datacentersexposed-38ecc8ec65b61f49","lat":28.42807,"location_precision":"source supplied","lon":-81.42271,"name":"CORESITE REAL ESTATE OR1 LLC","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110058903110"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/coresite-real-estate-or1-llc-air-110058903110"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-38f0753a00c0fbb6","lat":38.19514,"location_precision":"source supplied","lon":-77.43207,"name":"Summit Technology Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/summit-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Salem","confidence":"medium","id":"datacentersexposed-3942f15d9da872c4","lat":37.2685,"location_precision":"source supplied","lon":-80.1678,"name":"Google Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-data-center-2"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Great Falls","confidence":"medium","id":"datacentersexposed-395ae5f4f9a92b65","lat":47.52962,"location_precision":"source supplied","lon":-111.179,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tac-data-centers-project-cardinal","value":500.0}],"name":"TAC Data Centers: Project Cardinal","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-data-center-campus-proposed-in-montana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tac-data-centers-project-cardinal"}],"state":"Montana","status":"planned"},{"ai_classification":"unknown","city":"Henrico","confidence":"medium","id":"datacentersexposed-396f96ca82c72e0c","lat":37.62389,"location_precision":"source supplied","lon":-77.50267,"name":"Lumen Richmond 2","operator":"Level3 Communications","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/lumen-richmond-2"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Warrenton","confidence":"medium","id":"datacentersexposed-39a972df5de9d30d","lat":38.713,"location_precision":"source supplied","lon":-77.795,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/warrenton-amazon-campus","value":220.0}],"name":"Warrenton Amazon Campus (proposed)","operator":"Amazon Data Services, Inc.","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/warrenton-amazon-campus"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"KING OF PRUSSIA","confidence":"medium","id":"datacentersexposed-39bc871acefcfbe8","lat":40.08439,"location_precision":"source supplied","lon":-75.33872,"name":"INNOVATION 2201 LLC / UPPER MERION TWP","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110034126158"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/innovation-2201-llc-upper-merion-twp-air-110034126158"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"medium","id":"datacentersexposed-39bde50bd6b9180b","lat":38.95731,"location_precision":"source supplied","lon":-77.51306,"name":"Farah-Naples Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/farah-naples-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"SIMPSONVILLE","confidence":"medium","id":"datacentersexposed-39f666fb1bf1cbda","lat":38.21736,"location_precision":"source supplied","lon":-85.34313,"name":"LG&E KU SYSTEM CONTROL & DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110044243164"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/lg-e-ku-system-control-data-center-110044243164"}],"state":"Kentucky","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-3a17ddd940a4b37c","lat":39.01589,"location_precision":"source supplied","lon":-77.45314,"name":"Amazon IAD-179","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1088203907"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad-179-osmway-1088203907"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Medicine Lodge","confidence":"low","id":"datacentersexposed-3ab365660309fe48","lat":37.27841,"location_precision":"source supplied","lon":-98.58846,"name":"SC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1498005255"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/sc-osmway-1498005255"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Barrington Hills","confidence":"medium","id":"datacentersexposed-3b18e4da3154ca09","lat":42.1029,"location_precision":"source supplied","lon":-88.2281,"name":"Barrington Hills Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/barrington-hills-data-center"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-3ba0f1bd37fa9eec","lat":39.61418,"location_precision":"source supplied","lon":-119.877,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/oppidan-data-center","value":8.0}],"name":"Oppidan Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oppidan-data-center"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Hermiston","confidence":"low","contains_osm":true,"id":"datacentersexposed-3bb977a67b6cd25d","lat":45.79778,"location_precision":"source supplied","lon":-119.36197,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196822"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1252196822"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/706776322"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196822"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196823"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017497"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017498"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017499"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Richardson","confidence":"low","contains_osm":true,"id":"datacentersexposed-3bd82eedafb68310","lat":32.96478,"location_precision":"source supplied","lon":-96.71586,"name":"Rackspace Richardson DFW3","operator":"Rackspace Technology, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/597876719"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/rackspace-richardson-dfw3-osmway-597876719"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876719"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Lebanon","confidence":"medium","id":"datacentersexposed-3c11aa00d59da344","lat":40.05408,"location_precision":"source supplied","lon":-86.538,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-domino","value":1000.0}],"name":"Project Domino","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-set-to-develop-1500-acre-data-center-campus-outside-indianapolis-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-domino"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-3c59396ca4817c51","lat":44.89301,"location_precision":"source supplied","lon":-74.07288,"name":"NYGC Chateaugay","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1501825871"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/nygc-chateaugay-osmway-1501825871"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501825871"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Peculiar","confidence":"medium","id":"datacentersexposed-3c647ccdab3ea93a","lat":38.74797,"location_precision":"source supplied","lon":-94.4821,"name":"Project Harper","operator":"Diode Ventures","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/peculiar-officials-in-missouri-remove-data-centers-from-ordinance-blocking-15bn-diode-project/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-harper"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Little Rock","confidence":"medium","id":"datacentersexposed-3cde7e8e9de85a39","lat":34.71681,"location_precision":"source supplied","lon":-92.1737,"name":"Data center","operator":"Willowbend Capital LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/mystery-developer-plans-1bn-data-center-in-little-rock-arkansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-5"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"MARICOPA COUNTY","confidence":"medium","id":"datacentersexposed-3cff2472147f707f","lat":33.32536,"location_precision":"source supplied","lon":-111.60801,"name":"MECP1 MESA INTERMEDIATE 1","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/mecp1-mesa-intermediate-1-air-110071876341"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Forsyth","confidence":"medium","id":"datacentersexposed-3d40ef908faa0dc8","lat":32.99113,"location_precision":"source supplied","lon":-83.8368,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/rumble-technology-campus","value":1120.0}],"name":"Rumble Technology Campus","operator":"Google/Cloverleaf Infrastructure","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/12-building-42-million-sq-ft-data-center-campus-proposed-in-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rumble-technology-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Chatham","confidence":"medium","id":"datacentersexposed-3dac7c9bf1d6e67b","lat":36.84796,"location_precision":"source supplied","lon":-79.37026,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pittsylvania-county-data-center","value":3500.0}],"name":"Pittsylvania County Data Center","operator":"Balico LLC","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pittsylvania-county-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Stratton","confidence":"medium","id":"datacentersexposed-3de185ff3022ba6c","lat":40.52817,"location_precision":"source supplied","lon":-80.62949,"name":"Sammis Power Plant Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sammis-power-plant-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-3e15737f723e7332","lat":33.63448,"location_precision":"source supplied","lon":-111.88435,"name":"K-Motion Interactive","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10938672218"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/k-motion-interactive-osmnode-10938672218"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10938672218"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Tucson","confidence":"medium","id":"datacentersexposed-3e1adfefa668f673","lat":32.05091,"location_precision":"source supplied","lon":-110.783,"name":"Project Blue Tucson","operator":"Beale Infrastructure","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/arizona-land-parcel-rezoned-and-sold-to-develop-project-blue-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-blue-tucson"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"New Orleans East","confidence":"medium","id":"datacentersexposed-3e2fecef384cf56b","lat":30.0374,"location_precision":"source supplied","lon":-89.97886,"name":"MS Solar Grid Data","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://veritenews.org/2026/01/28/data-centers-ban-new-orleans-council/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ms-solar-grid-data"}],"state":"Louisiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-3e6089424059ae31","lat":40.12006,"location_precision":"source supplied","lon":-83.19932,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016637"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1386016637"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196805"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-3e69d6bc6337db6d","lat":38.73577,"location_precision":"source supplied","lon":-77.50254,"name":"Amazon Tanner Way","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-tanner-way"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-3ea3fe8572bb9699","lat":33.71,"location_precision":"source supplied","lon":-84.78,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-douglas-georgia","value":360.0}],"name":"Google Douglas County","operator":"Google LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-douglas-georgia"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Palmetto","confidence":"medium","id":"datacentersexposed-3ea6e01e3740cd11","lat":33.52662,"location_precision":"source supplied","lon":-84.63638,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/palmetto-campus","value":38.0}],"name":"Palmetto Campus","operator":"Microsoft Corporation","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/palmetto-campus"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Benson","confidence":"low","id":"datacentersexposed-3eb0f4739fa73122","lat":31.97267,"location_precision":"source supplied","lon":-110.30475,"name":"DirecTV","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1042260902"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/directv-osmway-1042260902"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Newton","confidence":"medium","id":"datacentersexposed-3edcdb342fd292d6","lat":41.02557,"location_precision":"source supplied","lon":-74.75826,"name":"Newton Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/newton-data-center"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-3eea35bbf20e0bed","lat":38.7478,"location_precision":"source supplied","lon":-77.5208,"name":"Amazon Innovation Drive","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-innovation-drive"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cleveland","confidence":"medium","id":"datacentersexposed-3efe937cb6d358bf","lat":41.4646,"location_precision":"source supplied","lon":-81.6521,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://neo-trans.blog/2026/05/06/1-6b-data-center-planned-in-cleveland/","value":150.0}],"name":"Slavic Village Data Center","operator":"Lakeland Equity Group","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://neo-trans.blog/2026/05/06/1-6b-data-center-planned-in-cleveland/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/slavic-village-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-3f077a0884cc1279","lat":37.38372,"location_precision":"source supplied","lon":-121.9654,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgecore-silicon-valley-osmway-1460847458","value":72.0}],"name":"EdgeCore Silicon Valley","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1460847458"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgecore-silicon-valley-osmway-1460847458"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460847458"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","id":"datacentersexposed-3f26418be87231bd","lat":32.67766,"location_precision":"source supplied","lon":-97.49922,"name":"Edged Energy Outpost Data Center","operator":"Edged","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edged-files-to-develop-data-center-in-fort-worth-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-energy-outpost-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Stamford","confidence":"low","contains_osm":true,"id":"datacentersexposed-3fb26df23c4b9efc","lat":41.09178,"location_precision":"source supplied","lon":-73.51667,"name":"amnet Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/878795698"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amnet-data-center-osmway-878795698"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/878795698"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","id":"datacentersexposed-3ff1d88e01a79262","lat":33.4,"location_precision":"source supplied","lon":-111.67,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aws-mesa","value":480.0}],"name":"AWS Mesa Campus","operator":"Amazon Data Services, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aws-mesa"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Moberly","confidence":"medium","id":"datacentersexposed-4000917e853a3961","lat":39.3459,"location_precision":"source supplied","lon":-92.44693,"name":"Project Tiger Zou","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://jeremyhasnoplan.com/notes/missouri-data-center-gold-rush/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-tiger-zou"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-4014d2623739672d","lat":45.55634,"location_precision":"source supplied","lon":-122.93941,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-portland-hillsboro-5-osmway-1080170580","value":36.0}],"name":"Flexential Portland - Hillsboro 5","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1080170580"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-portland-hillsboro-5-osmway-1080170580"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-403d74c93b328467","lat":37.37672,"location_precision":"source supplied","lon":-121.95314,"name":"Colovore","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209073645"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/colovore-osmway-209073645"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073645"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-406e3d0b8779d07f","lat":32.80695,"location_precision":"source supplied","lon":-96.86859,"name":"Lumen Dallas - 3180 Irving Blvd.","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465032201"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lumen-dallas-3180-irving-blvd-osmway-465032201"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465032201"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-4076981fba44f40f","lat":32.3862,"location_precision":"source supplied","lon":-97.064,"name":"Midlothian 4 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-4-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"low","id":"datacentersexposed-40844ca78245d334","lat":39.09447,"location_precision":"source supplied","lon":-94.57944,"name":"Patmos Hosting, Inc.","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/118650988"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/patmos-hosting-inc-osmway-118650988"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Morrisville","confidence":"medium","id":"datacentersexposed-4091dc09b3bb9f72","lat":40.15494,"location_precision":"source supplied","lon":-74.74442,"name":"Amazon Falls Township Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/falls-township-approves-nda-for-data-center-project-outside-philadelphia-in-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-falls-township-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Eagan","confidence":"medium","id":"datacentersexposed-40d35a74c17233ac","lat":44.82953,"location_precision":"source supplied","lon":-93.1176,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/msp1-data-center","value":12.0}],"name":"MSP1 Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/centra-breaks-ground-on-data-center-redevelopment-in-minneapolis-minnesota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/msp1-data-center"}],"state":"Minnesota","status":"under construction"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"datacentersexposed-40dee42962b2bd99","lat":42.0015,"location_precision":"source supplied","lon":-87.95256,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-chi02-osmway-377032058","value":6.0}],"name":"EdgeConneX CHI02","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/377032058"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-chi02-osmway-377032058"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Centennial","confidence":"medium","id":"datacentersexposed-40e91ce3657e3dd4","lat":39.58275,"location_precision":"source supplied","lon":-104.841,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/den1","value":2.0}],"name":"DEN1","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/den1"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-40ea29e20ae3beff","lat":38.98789,"location_precision":"source supplied","lon":-77.41115,"name":"AWS","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1022744248"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aws-osmway-1022744248"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/817338831"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad140-osmway-817338831"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Rochester","confidence":"low","contains_osm":true,"id":"datacentersexposed-40f3f68cef7bf600","lat":44.0708,"location_precision":"source supplied","lon":-92.52213,"name":"Epic / Mayo Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/718465287"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/epic-mayo-data-center-osmway-718465287"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/718465287"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"datacentersexposed-410fc4a469641b2f","lat":36.16228,"location_precision":"source supplied","lon":-86.7743,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nashville-zoo-ai-data-center","value":50.0}],"name":"DC BLOX Nashville (Grassmere Park)","operator":"DC BLOX","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/dc-bloxs-proposed-24-acre-data-center-near-nashville-zoo-could-be-blocked-by-moratorium/"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/nashville-zoo-ai-data-center"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-4191b0bab3965c9a","lat":37.77965,"location_precision":"source supplied","lon":-122.394,"name":"Ntirety","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10780794741"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/ntirety-osmnode-10780794741"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Detroit","confidence":"low","id":"datacentersexposed-41b7670cf518d89a","lat":42.32618,"location_precision":"source supplied","lon":-83.06977,"name":"Quicken Loans","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/903236619"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/quicken-loans-osmway-903236619"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","contains_osm":true,"id":"datacentersexposed-41eb4724d90ca868","lat":41.04106,"location_precision":"source supplied","lon":-80.63308,"name":"Carrier Services Group","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1210421871"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/carrier-services-group-osmway-1210421871"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210421871"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-423c57326bf0c7ae","lat":38.72886,"location_precision":"source supplied","lon":-77.50886,"name":"CloudHQ Manassas Data Center (MDC)","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-cloudhq-manassas-data-center-mdc"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-426066e9bffd93f1","lat":29.47021,"location_precision":"source supplied","lon":-98.68767,"name":"Frost Bank","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611429"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/frost-bank-osmway-509611429"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Clarks Summit","confidence":"medium","id":"datacentersexposed-427a934eec17ae27","lat":41.45007,"location_precision":"source supplied","lon":-75.7125,"name":"Clarks Summit Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-building-data-center-campus-proposed-in-northeast-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/clarks-summit-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Hermiston","confidence":"low","contains_osm":true,"id":"datacentersexposed-42837f6a8e6c8c3f","lat":45.90145,"location_precision":"source supplied","lon":-119.32052,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1126159710"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1126159710"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1126159710"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1126159711"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1126159714"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1126159715"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Weehawken","confidence":"low","id":"datacentersexposed-428d8bb6f64d35cb","lat":40.76182,"location_precision":"source supplied","lon":-74.02503,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-new-jersey-ewr10-osmway-279410766","value":14.0}],"name":"Digital Realty New Jersey EWR10","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/279410766"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-new-jersey-ewr10-osmway-279410766"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Hampton","confidence":"medium","id":"datacentersexposed-42c238bd57b912d9","lat":33.40127,"location_precision":"source supplied","lon":-84.22438,"name":"Rocky Creek","operator":"Redcentric","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rocky-creek"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Hampton","confidence":"medium","id":"datacentersexposed-42e1261294fc3b9c","lat":33.40101,"location_precision":"source supplied","lon":-84.2243,"name":"0 Rocky Creek Data Center Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/125-million-sq-ft-data-center-proposed-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/0-rocky-creek-data-center-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Midlothian","confidence":"medium","id":"datacentersexposed-42e6d45fed378565","lat":32.47629,"location_precision":"source supplied","lon":-97.0691,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/arep-powerhouse-grand-prairie","value":1800.0}],"name":"AREP PowerHouse Grand Prairie","operator":"PowerHouse Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/arep-powerhouse-grand-prairie"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"medium","id":"datacentersexposed-42fbe24564fa1e08","lat":37.37618,"location_precision":"source supplied","lon":-121.9731,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coresite-real-estate-3032-coronado-l-p-61482","value":345.0}],"name":"CoreSite Real Estate 3032 Coronado, L.P.","operator":"CoreSite, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-13","url":"https://datacentersexposed.com/facilities/coresite-real-estate-3032-coronado-l-p-61482"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Silver Spring","confidence":"low","contains_osm":true,"id":"datacentersexposed-430b400464b364e4","lat":39.05861,"location_precision":"source supplied","lon":-76.96447,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lincoln-rackhouse-maryland-osmway-93210344","value":5.0}],"name":"Lincoln Rackhouse Maryland","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/93210344"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lincoln-rackhouse-maryland-osmway-93210344"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/93210344"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Millersport","confidence":"medium","id":"datacentersexposed-432048ca7ebc1df8","lat":39.89945,"location_precision":"source supplied","lon":-82.5619,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-data-center-2","value":800.0}],"name":"Vantage Data Center","operator":"Vantage Data Centers Holdings, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-data-center-2"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-43248e8ce6697e66","lat":40.17706,"location_precision":"source supplied","lon":-111.69107,"name":"Utah County Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi3AFBVV95cUxOaEw2VElTcXI3ZmpqX1JDWUxreTdpQUxCZEgzaGh5MGd3YU1FSUxQcngyRTI5amtJdE1TRVdoWGhEMDVuLXkwWEg5TFAyZTctbWUwZ09vQUFNeW42Mks2NHo5Q2lROFRfQmR3c1FYVnBsQUhsZ3BWMW13UUtYRkd3bW9qejJ1X203aThmVFNSTEptd2laR3hCWDdEOGxZVUtiWURtUUhxQVJKWEhjU0JmQUJHV3BERWcyRk9HbGJGME5iU3JudVlUa0VuM3pFV3JZVi1CeWZfX2gxT05q?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/utah-county-data-center"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Clarksville","confidence":"medium","id":"datacentersexposed-4331dcea91cde130","lat":36.63564,"location_precision":"source supplied","lon":-78.5181,"name":"Clarksville Data Center Campus","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-another-virginia-campus-in-mecklenburg-county/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/clarksville-data-center-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-433c37924248273e","lat":33.77726,"location_precision":"source supplied","lon":-100.8689,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/argo-data-center-osmway-1490401523","value":800.0}],"name":"Argo Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1490401523"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/argo-data-center-osmway-1490401523"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1490401523"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-43446cad42060f40","lat":38.31828,"location_precision":"source supplied","lon":-77.5166,"name":"Stack Infrastructure Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-campus-recommended-for-disapproval-by-fredericksburg-planning-commission/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-infrastructure-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4369e7d1ec216750","lat":41.50507,"location_precision":"source supplied","lon":-81.65778,"name":"Lumen Cleveland","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/923148801"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-cleveland-osmway-923148801"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/923148801"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"medium","id":"datacentersexposed-436c8a0ad405e207","lat":38.63025,"location_precision":"source supplied","lon":-77.42247,"name":"Potomac Technology Park/ Quantico Ridge","operator":"Plaza Realty Management Inc","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://egcss.pwcgov.org/SelfService/PWCePortal#/plan/a6ee77bc-ded4-40cd-ab62-1a962feb18a1?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/potomac-technology-park-quantico-ridge"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Umatilla","confidence":"low","contains_osm":true,"id":"datacentersexposed-43a6215c9fd2979a","lat":45.87953,"location_precision":"source supplied","lon":-119.34163,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1374895921"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1374895921"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344153"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1374895921"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1374895922"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Dalton","confidence":"medium","id":"datacentersexposed-43b2c61b8551a924","lat":34.68098,"location_precision":"source supplied","lon":-84.94408,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/core-dalton-4","value":195.0}],"name":"CORE DALTON 4","operator":"CoreSite, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://newschannel9.com/news/local/ai-data-center-to-occupy-10-acres-in-dalton-residents-worry-about-noise-and-disruption?fbclid=IwZXh0bgNhZW0CMTEAAR0qBKoGaPqCaC-SeXxvrxOiIw21X6S2k_Xwys5N4RXZP9MubzNyzEE1q9A_aem_GychPh4WLqAOKhyPihISPQ"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/core-dalton-4"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-43e7ed527792d858","lat":33.35414,"location_precision":"source supplied","lon":-111.67643,"name":"Google Data Center","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/518921099"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/google-data-center-osmway-518921099"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"West Jordan","confidence":"medium","id":"datacentersexposed-43f668a9a0278314","lat":40.60613,"location_precision":"source supplied","lon":-111.93952,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/novva-west-jordan-flagship-ut-pg","value":180.0}],"name":"Novva West Jordan Flagship","operator":"Novva Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/novva-west-jordan-flagship-ut-pg"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Delta","confidence":"medium","id":"datacentersexposed-440d7e64a4b5fb3e","lat":39.75768,"location_precision":"source supplied","lon":-76.2754,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/energy-capital-partners","value":828.0}],"name":"Energy Capital Partners","operator":"Calpine (Energy Capital Parners)","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/energy-capital-partners-announces-plans-for-5bn-pennsylvania-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/energy-capital-partners"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4456b3a71f5541ba","lat":38.95833,"location_precision":"source supplied","lon":-77.50573,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-sterling-ix-osmway-990537858","value":135.0}],"name":"CyrusOne Sterling IX","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/990537858"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-sterling-ix-osmway-990537858"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/990537858"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Herndon","confidence":"low","contains_osm":true,"id":"datacentersexposed-445ea1ca895d31e3","lat":38.92277,"location_precision":"source supplied","lon":-77.42787,"name":"Amazon IAD-165","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1343764880"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad-165-osmway-1343764880"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343764880"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Victoria","confidence":"medium","id":"datacentersexposed-4471bbdfde21d781","lat":28.68914,"location_precision":"source supplied","lon":-96.96172,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/crusoe-blue-energy-data-center","value":1500.0}],"name":"Crusoe/ Blue Energy Data Center","operator":"Crusoe","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/crusoe-blue-energy-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-44cb82d8595abc75","lat":32.6512,"location_precision":"source supplied","lon":-97.31967,"name":"Novartis","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1227550179"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/novartis-osmway-1227550179"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227550179"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Beaverton","confidence":"low","contains_osm":true,"id":"datacentersexposed-44dbebbfe961d946","lat":45.47621,"location_precision":"source supplied","lon":-122.77609,"name":"Digital Fortress - Portland 2","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13746843367"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-fortress-portland-2-osmnode-13746843367"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13746843367"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"North Bergen","confidence":"low","id":"datacentersexposed-44f43272f4e1bf2f","lat":40.79686,"location_precision":"source supplied","lon":-74.03114,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-ny7-data-center-osmway-95782052","value":5.6}],"name":"Equinix NY7 Data Center","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/95782052"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-ny7-data-center-osmway-95782052"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-4501ef82e48fa48e","lat":38.46679,"location_precision":"source supplied","lon":-77.96353,"name":"Cielo Digital Infrastructure","operator":"Cielo Digital Infrastructure","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://go.boarddocs.com/va/ccva/Board.nsf/goto?open&id=CWBKLL525B17"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cielo-digital-infrastructure-2"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Kermit","confidence":"medium","id":"datacentersexposed-451954fd7daa4e86","lat":31.8579,"location_precision":"source supplied","lon":-103.09321,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cipher-black-pearl-tx-pg","value":300.0}],"name":"Cipher Black Pearl","operator":"Cipher Mining","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cipher-mining-acquires-more-than-500-acres-across-two-sites-in-texas-for-crypto-and-hpc-use/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cipher-black-pearl-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-457166503855f6de","lat":39.00469,"location_precision":"source supplied","lon":-77.44174,"name":"STACK NVA01A - Northern Virginia","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/59294476"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-nva01a-northern-virginia-osmway-59294476"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"EDGERTON","confidence":"medium","id":"datacentersexposed-4573c6012593101d","lat":38.77132,"location_precision":"source supplied","lon":-94.9522,"name":"EDGERTON PROJECT","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=KSR124159"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/edgerton-project-ksr124159"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Cedar Falls","confidence":"medium","id":"datacentersexposed-4595643491637dc4","lat":42.4806,"location_precision":"source supplied","lon":-92.48979,"name":"Simple Mining","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-cedar-falls-iowa-delay-hearing-on-simple-minings-cryptomine-rezoning/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/simple-mining"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"St. Francisville","confidence":"medium","id":"datacentersexposed-45bc2eca2887558d","lat":30.76431,"location_precision":"source supplied","lon":-91.3373,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/river-bend-data-center-campus","value":245.0}],"name":"River Bend Data Center Campus","operator":"Fluidstack, Anthropic, Google","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/hut-8-signs-245mw-capacity-deal-with-fluidstack-as-part-of-multi-gigawatt-partnership-with-anthropic/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/river-bend-data-center-campus"}],"state":"Louisiana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-45ef611ced123348","lat":38.9966,"location_precision":"source supplied","lon":-77.47326,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1020877489"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1020877489"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Childersburg","confidence":"medium","id":"datacentersexposed-462bc378265c4bac","lat":33.34088,"location_precision":"source supplied","lon":-86.33621,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/western-hospitality-partners-data-center","value":500.0}],"name":"Western Hospitality Partners Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/planned-data-center-project-outside-chicago-illinois-paused-due-to-energy-infrastructure/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/western-hospitality-partners-data-center"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-46712db7d57274e3","lat":38.79416,"location_precision":"source supplied","lon":-77.5452,"name":"Century Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-century-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","contains_osm":true,"id":"datacentersexposed-467cd094d74d3230","lat":37.3621,"location_precision":"source supplied","lon":-121.94646,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-osmway-224998784","value":48.0}],"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/224998784"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-osmway-224998784"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/224998784"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-46c6be7a9784a00d","lat":40.52807,"location_precision":"source supplied","lon":-74.68282,"name":"Vital Records","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/758580536"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/vital-records-osmway-758580536"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/758580536"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-46eefab50dc45765","lat":47.24358,"location_precision":"source supplied","lon":-119.86575,"name":"NTT Data Quincy","operator":"NTT Global Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/337127824"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ntt-data-quincy-osmway-337127824"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337127824"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"SPEARVILLE","confidence":"medium","id":"datacentersexposed-46f867ab1ba6fc08","lat":37.85824,"location_precision":"source supplied","lon":-99.75299,"name":"SFP 241 242 LLC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/sfp-241-242-llc-110072107255"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"BENTONVILLE","confidence":"medium","id":"datacentersexposed-47128b122d881ab9","lat":36.36243,"location_precision":"source supplied","lon":-94.18338,"name":"WAL- MART STORES, INC. - EAST DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110024578688"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/wal-mart-stores-inc-east-data-center-110024578688"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"Durant","confidence":"low","id":"datacentersexposed-4740614517e9058c","lat":33.97168,"location_precision":"source supplied","lon":-96.40285,"name":"Choctaw Nation of Oklahoma Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/726150321"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/choctaw-nation-of-oklahoma-data-center-osmway-726150321"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"datacentersexposed-479be7efb2efce1c","lat":45.55167,"location_precision":"source supplied","lon":-122.915,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/portland-edge-data-center-edc-campus","value":9.0}],"name":"Portland Edge Data Center (EDC) campus","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/portland-edge-data-center-edc-campus"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-47a35d4e43ecaabc","lat":38.98108,"location_precision":"source supplied","lon":-77.43653,"name":"Loudoun Business Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-loudoun-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Richmond","confidence":"medium","id":"datacentersexposed-47f14c43fdd3c3f4","lat":37.60472,"location_precision":"source supplied","lon":-77.42342,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/azalea","value":10.0}],"name":"Azalea","operator":"BWS Enterprises","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/proposals-for-two-data-center-projects-in-richmond-virginia-deferred-by-local-officials/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/azalea"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-47f4d7fe571e5cc9","lat":38.64762,"location_precision":"source supplied","lon":-77.44059,"name":"Six Towers Industrial Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-six-towers-industrial-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Dickerson","confidence":"medium","id":"datacentersexposed-480feab8557c99ed","lat":39.20937,"location_precision":"source supplied","lon":-77.46454,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dickerson-data-centers","value":300.0}],"name":"Dickerson Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dickerson-data-centers"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-48e5026e56191cfd","lat":40.3,"location_precision":"source supplied","lon":-83.36,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/union-county-google-proposed","value":600.0}],"name":"Google Union County (proposed)","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/union-county-google-proposed"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-491f85815a40fee8","lat":32.3911,"location_precision":"source supplied","lon":-96.83244,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-south-dallas-lancaster-tx-pg","value":220.0}],"name":"STACK South Dallas (Lancaster)","operator":"Stack Infrastructure, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-south-dallas-lancaster-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-492cf0d62f7afbc4","lat":37.47533,"location_precision":"source supplied","lon":-121.92211,"name":"XO Fremont","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/384310259"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/xo-fremont-osmway-384310259"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/384310259"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"datacentersexposed-4932a4a9a019b24f","lat":45.84147,"location_precision":"source supplied","lon":-119.65179,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196819"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1252196819"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"New Hudson","confidence":"medium","id":"datacentersexposed-4937484ec87d0983","lat":42.50185,"location_precision":"source supplied","lon":-83.61119,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lyon-township-data-center-project-flex","value":200.0}],"name":"Lyon Township Data Center/ Project Flex","operator":"Verrus/Anthropic","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lyon-township-data-center-project-flex"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-4975937e248acc6f","lat":38.81597,"location_precision":"source supplied","lon":-77.65254,"name":"Amazon","operator":"Amazon.com, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/697021949"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-osmway-697021949"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"McAdoo/ Kline Twp","confidence":"medium","id":"datacentersexposed-497be39726c23c63","lat":40.86813,"location_precision":"source supplied","lon":-76.02425,"name":"AWS Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-plans-25-million-sq-ft-data-center-campus-in-kline-township-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-49982e83082904e1","lat":39.55602,"location_precision":"source supplied","lon":-119.49028,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-nv1-reno-nv-pg","value":224.0}],"name":"Vantage NV1 Reno","operator":"Vantage Data Centers Holdings, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://vantage-dc.com/news/vantage-data-centers-invests-3-billion-to-deliver-ai-campus-in-growing-nevada-market/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-nv1-reno-nv-pg"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-499e60b540f4941e","lat":42.00686,"location_precision":"source supplied","lon":-87.96518,"name":"STACK Chicago CHI01","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/863162822"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stack-chicago-chi01-osmway-863162822"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-49ae4f9481059228","lat":35.25532,"location_precision":"source supplied","lon":-120.64151,"name":"Digital West Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8477460442"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/digital-west-data-center-osmnode-8477460442"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8477460442"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Union Township","confidence":"medium","id":"datacentersexposed-49cc059abe0f200c","lat":41.49809,"location_precision":"source supplied","lon":-87.1875,"name":"Jeremiah B QTS Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jeremiah-b-qts-data-center"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-49fab26f0ddecd55","lat":33.4484,"location_precision":"source supplied","lon":-84.52249,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-osmway-1472128597","value":500.0}],"name":"QTS","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1472128597"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/qts-osmway-1472128597"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472128597"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472128598"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-4a12f16fc389c540","lat":38.74904,"location_precision":"source supplied","lon":-77.53979,"name":"Redstone Tech Park Central","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-redstone-tech-park-central"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-4a158ccfa1441869","lat":29.3019,"location_precision":"source supplied","lon":-98.3888,"name":"AWS Rockfish 1","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-rockfish-planning-documents-reveal-three-amazon-data-centers-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-rockfish-1"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"datacentersexposed-4a27c16a63fe9811","lat":38.80338,"location_precision":"source supplied","lon":-77.51055,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-dc14-osmway-1227539675","value":4.0}],"name":"Equinix DC14","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1227539675"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-dc14-osmway-1227539675"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45583050"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227539675"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4a2b636800b96fd8","lat":40.72593,"location_precision":"source supplied","lon":-99.03834,"name":"Compute North","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1092757323"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/compute-north-osmway-1092757323"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1092757323"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Edgecombe County","confidence":"medium","id":"datacentersexposed-4a44de0f88d7be1c","lat":35.92471,"location_precision":"source supplied","lon":-77.65831,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/kingsboro-data-center-project","value":900.0}],"name":"Kingsboro Data Center Project","operator":"Energy Storage Solutions","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterknowledge.com/build-design/developer-forges-ahead-with-38b-in-nc-data-center-builds?utm_source=chatgpt.com"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/kingsboro-data-center-project"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","contains_osm":true,"id":"datacentersexposed-4a4a87cc6f52e1b7","lat":33.74422,"location_precision":"source supplied","lon":-84.58121,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/centersquare-atlanta-atl1-osmway-713410334","value":7.0}],"name":"Centersquare Atlanta ATL1","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/713410334"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/centersquare-atlanta-atl1-osmway-713410334"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/713410334"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Broken Arrow","confidence":"medium","id":"datacentersexposed-4a8fdb6d658e77ac","lat":36.03942,"location_precision":"source supplied","lon":-95.74154,"name":"Data center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-eyes-broken-arrow-oklahoma-for-new-data-center-development/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-6"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"medium","id":"datacentersexposed-4b017e1fa515b73b","lat":33.76345,"location_precision":"source supplied","lon":-84.60477,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/t5-atlanta-iii","value":300.0}],"name":"T5 @ Atlanta III","operator":"T5","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5-atlanta-iii"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"North Tonawanda","confidence":"medium","id":"datacentersexposed-4b17d8b48b2f5154","lat":43.06086,"location_precision":"source supplied","lon":-78.85376,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/north-tonawanda-data-center","value":46.0}],"name":"North Tonawanda Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/north-tonawanda-data-center"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"New Kensington (Upper Burrell)","confidence":"medium","id":"datacentersexposed-4b1bc75498bdf9b8","lat":40.5489,"location_precision":"source supplied","lon":-79.6466,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/upper-burrell-data-center-tecfusions-keystone-connect","value":12.0}],"name":"Upper Burrell Data Center/TECfusions Keystone Connect","operator":"TECfusions/TensorWave","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/upper-burrell-data-center-tecfusions-keystone-connect"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-4b34304537dcbfe9","lat":32.41778,"location_precision":"source supplied","lon":-91.7635,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-louisiana-data-center","value":2000.0}],"name":"Meta Louisiana Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi1gFBVV95cUxNeXBIWG1EV1Z3Nzh4b3ZlMkdXUGZrWEYyVkRRYUlQNUFuT2dzMlF0V3UzUzlsSkptZ2dXM2dyTXo4ZE9LRHNabzAydGNZSkJVZ0M1UGNkdmEycUNGdTZ6U0VVQlJ3djh1TGZqV08wcFVZcHNUN1NrYVZTbGdmRlZpOUZCaDdMX2JjOW5SOVFLbGF4RDBubWVQeF9DTG9yUWotT2x0ZVBLRnJlbVJ3dlRfek1Rc2R4OW02eldGMmctcEZCOGNUWENiNFBRRjBXemhOOWx2Rk53?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/meta-louisiana-data-center"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-4b3ec98745009a34","lat":29.42937,"location_precision":"source supplied","lon":-98.48691,"name":"H5 Data Centers San Antonio","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/102129663"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/h5-data-centers-san-antonio-osmway-102129663"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/102129663"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4b54ff92560c6a3d","lat":33.1718,"location_precision":"source supplied","lon":-96.72551,"name":"Experian McKinney Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/549418041"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/experian-mckinney-data-center-osmway-549418041"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/549418041"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"medium","id":"datacentersexposed-4b6473de513c863a","lat":33.46723,"location_precision":"source supplied","lon":-112.38535,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-goodyear-az-pg","value":176.0}],"name":"Vantage Goodyear","operator":"Vantage Data Centers Holdings, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-goodyear-az-pg"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-4bbfd507adeaf488","lat":39.0594,"location_precision":"source supplied","lon":-77.55797,"name":"Orme Farm Rezoning","operator":"Vantage Data Centers Holdings, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/1E44BC95-A7BA-4323-86B8-C41ADFE4A88E?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/orme-farm-rezoning"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Marietta","confidence":"medium","id":"datacentersexposed-4bc7a2cd77e9bfec","lat":33.99411,"location_precision":"source supplied","lon":-84.55299,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/marietta-data-center","value":180.0}],"name":"Marietta Data Center","operator":"MMM Acquisitions LLC/Grindcap","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/108mw-data-center-campus-granted-zoning-approval-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/marietta-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-4bf0d870695d9484","lat":39.04252,"location_precision":"source supplied","lon":-77.53829,"name":"42311 THUNDERBALL DR","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1292897241"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/42311-thunderball-dr-osmway-1292897241"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1292897241"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-4c0ac34a1ba5d9d4","lat":40.78428,"location_precision":"source supplied","lon":-74.06524,"name":"CoreSite Secaucus Campus","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/714139868"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-secaucus-campus-osmway-714139868"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"datacentersexposed-4c31acbce548d389","lat":33.7515,"location_precision":"source supplied","lon":-84.74771,"name":"AWS Douglas County (Douglasville)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-reveals-11bn-data-center-investment-plan-for-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-douglas-county-douglasville-ga-pg"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"San Marcos","confidence":"medium","id":"datacentersexposed-4c493f8fd4f2e560","lat":29.76679,"location_precision":"source supplied","lon":-97.98101,"name":"CloudBurst","operator":"CloudBurst","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/706-acre-data-center-approved-for-development-outside-san-antonio-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudburst"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","contains_osm":true,"id":"datacentersexposed-4c9faa96dc2fbf86","lat":40.065,"location_precision":"source supplied","lon":-82.75813,"name":"QTS NAL1 DC1","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1425043215"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-nal1-dc1-osmway-1425043215"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1425043215"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"BETHLEHEM","confidence":"medium","id":"datacentersexposed-4cabc464007531b1","lat":40.67035,"location_precision":"source supplied","lon":-75.37712,"name":"TIERPOINT LLC/BETHLEHEM 2 DATA CTR","operator":"TierPoint, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071442514"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-llc-bethlehem-2-data-ctr-air-110071442514"},{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110058903058"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-pennsylvania-two-llc-air-110058903058"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Council Bluffs","confidence":"medium","id":"datacentersexposed-4cdfe193f0501ede","lat":41.27521,"location_precision":"source supplied","lon":-95.8246,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-data-center","value":200.0}],"name":"Edged Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edged-reduces-scope-of-planned-data-center-campus-in-council-bluffs-iowa/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-data-center"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Lewis Center","confidence":"medium","id":"datacentersexposed-4d1d8ee9c4a2ab52","lat":40.19086,"location_precision":"source supplied","lon":-83.0113,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/col-5-cologix-data-center","value":25.0}],"name":"COL 5 (Cologix) Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/col-5-cologix-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Bridgewater","confidence":"low","contains_osm":true,"id":"datacentersexposed-4d2cfed2237bbec7","lat":40.58148,"location_precision":"source supplied","lon":-74.57389,"name":"365 Bridgewater NJ","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/618339179"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/365-bridgewater-nj-osmway-618339179"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/618339179"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-4d46b0e6a781c6a5","lat":37.3563,"location_precision":"source supplied","lon":-77.33366,"name":"PowerHouse","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1085712184"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/powerhouse-osmway-1085712184"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-4d95dc8e11218ae3","lat":37.48607,"location_precision":"source supplied","lon":-77.24189,"name":"RIC2 DC3","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516625"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric2-dc3-osmway-1493516625"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516625"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"HENDERSON","confidence":"medium","id":"datacentersexposed-4d9a52d3e1a8bc26","lat":36.05485,"location_precision":"source supplied","lon":-115.00717,"name":"JASMINE DEVELOPMENT LLC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071854178"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/jasmine-development-llc-110071854178"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Tonawanda","confidence":"medium","id":"datacentersexposed-4dba1614c2594693","lat":42.97878,"location_precision":"source supplied","lon":-78.93396,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/riverview-innovation-technology-campus","value":600.0}],"name":"Riverview Innovation & Technology Campus","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"http://www.riverviewtechcampus.com/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/riverview-innovation-technology-campus"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Forest Grove","confidence":"low","contains_osm":true,"id":"datacentersexposed-4dbbe7fc09af1e4d","lat":45.51479,"location_precision":"source supplied","lon":-123.07883,"name":"Crane DC - Portland","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1501805557"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/crane-dc-portland-osmway-1501805557"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501805557"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4dbc59e20ce50c2d","lat":45.74308,"location_precision":"source supplied","lon":-108.60301,"name":"Parsec Data Management","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13603878193"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/parsec-data-management-osmnode-13603878193"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13603878193"}],"state":"Montana","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-4de81810bf843ded","lat":40.5799,"location_precision":"source supplied","lon":-74.5194,"name":"PSE&G Delivery Emergency Response Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/714943309"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/pse-g-delivery-emergency-response-center-osmway-714943309"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714943309"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Hill County","confidence":"medium","id":"datacentersexposed-4e4d20a53f43afc1","lat":31.96484,"location_precision":"source supplied","lon":-97.12383,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-aquilla-abbott-holding-data-center","value":1235.0}],"name":"Project Aquilla: Abbott Holding Data Center","operator":"RCM Hill","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-aquilla-abbott-holding-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Miami","confidence":"medium","id":"datacentersexposed-4e4f8ee7e5fd652b","lat":25.88661,"location_precision":"source supplied","lon":-80.2539,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/iron-mountain-data-center","value":16.0}],"name":"Iron Mountain Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/iron-mountain-tops-outs-miami-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iron-mountain-data-center"}],"state":"Florida","status":"under construction"},{"ai_classification":"unknown","city":"Granbury","confidence":"low","contains_osm":true,"id":"datacentersexposed-4e72c0b48ae4bb56","lat":32.34134,"location_precision":"source supplied","lon":-97.73169,"name":"MARA Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1301559332"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/mara-data-center-osmway-1301559332"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1301559332"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-4ee1d3f34c2d6608","lat":37.93823,"location_precision":"source supplied","lon":-77.54898,"name":"VALCO Data Center Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/valco-data-center-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Falls Township","confidence":"medium","id":"datacentersexposed-4f0ef33dd0273f27","lat":40.17407,"location_precision":"source supplied","lon":-74.79213,"name":"AWS Falls Township (Keystone Trade Center)","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-falls-township-keystone-trade-center-pa-pg"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-4f6a343222d3c88d","lat":38.91012,"location_precision":"source supplied","lon":-77.47259,"name":"Digital Realty","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/251716328"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-osmway-251716328"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Louisville","confidence":"low","contains_osm":true,"id":"datacentersexposed-4f8e69103b68f3a6","lat":38.2425,"location_precision":"source supplied","lon":-85.73334,"name":"Flexential Louisville - Downtown","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/330276516"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-louisville-downtown-osmway-330276516"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/330276516"}],"state":"Kentucky","status":"operating"},{"ai_classification":"unknown","city":"Broken Arrow","confidence":"medium","id":"datacentersexposed-4fa16ccd143f1fed","lat":35.99037,"location_precision":"source supplied","lon":-95.76194,"name":"Broken Arrow Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMie0FVX3lxTE9UMG5IOG96WDRDWVBOcDJEVXdmY2psTnN3bFZRVHU5aEZsd1JpNkxzT1hwbnkwSHloanF0VllEd2dPd1ZRQXduOUtWVVVtT3BGanVJX1NUTDY0Sy1zb2NUdEJuS2M1ZEFSaU40Q0UxN1gtckZwcjJ0SHNFRQ?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/broken-arrow-data-center"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Porter","confidence":"medium","id":"datacentersexposed-502ac5b0194f2278","lat":35.89665,"location_precision":"source supplied","lon":-95.60666,"name":"Project Atlas","operator":"Beale Infrastructure","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/beale-infrastructure-in-talks-to-build-data-center-campus-outside-tulsa-oklahoma/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-atlas"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Pottstown","confidence":"medium","id":"datacentersexposed-5033692202d62cac","lat":40.23405,"location_precision":"source supplied","lon":-75.5769,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-laurel","value":750.0}],"name":"Project Laurel","operator":"MCD 7 LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/14-million-sq-ft-data-center-campus-planned-outside-philadelphia-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-laurel"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Fairfax","confidence":"medium","id":"datacentersexposed-504f1a19d6837821","lat":38.87626,"location_precision":"source supplied","lon":-77.46178,"name":"COPT STONECROFT","operator":"COPT STONECROFT LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://icare.fairfaxcounty.gov/ffxcare/datalets/datalet.aspx?mode=profileall&UseSearch=no&pin=0432%2002%20%200039C&jur=129&taxyr=2025&LMparent=138"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/copt-stonecroft"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","contains_osm":true,"id":"datacentersexposed-50b0d790bdf39ee6","lat":41.84219,"location_precision":"source supplied","lon":-87.66894,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-chicago-osmway-209786637","value":42.0}],"name":"QTS Chicago","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209786637"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-chicago-osmway-209786637"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209786637"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"datacentersexposed-50c3d9007ed01a6c","lat":33.75599,"location_precision":"source supplied","lon":-84.39117,"name":"CoreSite AT1","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12331366645"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-at1-osmnode-12331366645"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-50ecc4e58d672c4d","lat":39.38527,"location_precision":"source supplied","lon":-84.56628,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-hamilton-cin4-osmway-1346610234","value":4.73}],"name":"CyrusOne Cincinnati-Hamilton CIN4","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1346610234"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-hamilton-cin4-osmway-1346610234"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1346610234"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","contains_osm":true,"id":"datacentersexposed-50fb16a05b7b574b","lat":37.37883,"location_precision":"source supplied","lon":-121.95593,"name":"OpenColo","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/37947313"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/opencolo-osmway-37947313"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/37947313"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"HOUSTON","confidence":"medium","id":"datacentersexposed-5110bd97a82fc5d5","lat":29.94515,"location_precision":"source supplied","lon":-95.5388,"name":"ENERGY CONTROL & DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/energy-control-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Lewis Center","confidence":"medium","id":"datacentersexposed-5152956eca7c1913","lat":40.15455,"location_precision":"source supplied","lon":-83.0143,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cmh3","value":7.0}],"name":"CMH3","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cmh3"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Albany","confidence":"medium","id":"datacentersexposed-517baee5282bfe9f","lat":32.72807,"location_precision":"source supplied","lon":-99.2946,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/frontier-stargate-shackelford-county-tx-pg","value":1400.0}],"name":"Frontier (Stargate Shackelford County)","operator":"Vantage Data Centers Holdings, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/frontier-stargate-shackelford-county-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"LaPorte","confidence":"medium","id":"datacentersexposed-5199f690cfd8b9b9","lat":41.58093,"location_precision":"source supplied","lon":-86.6924,"name":"Microsoft LaPorte Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/microsoft-laporte-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-519a9117eabf766e","lat":38.76503,"location_precision":"source supplied","lon":-77.54393,"name":"Sudley Manor Drive","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-sudley-manor-drive"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Durham","confidence":"low","contains_osm":true,"id":"datacentersexposed-51d746f2dba7c500","lat":35.88136,"location_precision":"source supplied","lon":-78.85157,"name":"Level 3 Communications","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7324132051"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/level-3-communications-osmnode-7324132051"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7324132051"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-51d7d6d835e65b30","lat":41.6758,"location_precision":"source supplied","lon":-93.50604,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1253282104"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-osmway-1253282104"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Alexandria","confidence":"medium","id":"datacentersexposed-51ff4239e88c32c0","lat":38.80227,"location_precision":"source supplied","lon":-77.14253,"name":"Plaza 500","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/starwood-re-proposes-data-center-in-alexandria-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/plaza-500"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Covington","confidence":"medium","id":"datacentersexposed-5215a7aa3a6f0518","lat":33.63342,"location_precision":"source supplied","lon":-83.83302,"name":"Amazon Covington Data Center","operator":"Amazon.com, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-plans-data-center-in-covington-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-covington-data-center"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Pflugerville","confidence":"low","contains_osm":true,"id":"datacentersexposed-524c0bb68b3c58df","lat":30.42114,"location_precision":"source supplied","lon":-97.5916,"name":"Thin-nology","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/570397131"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/thin-nology-osmway-570397131"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/570397131"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-5252e22cab8a8927","lat":38.79786,"location_precision":"source supplied","lon":-77.62237,"name":"Gardner Property","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-gardner-property"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-525fe605b87c352a","lat":29.6864,"location_precision":"source supplied","lon":-98.46265,"name":"GVTC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1296723872"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/gvtc-osmway-1296723872"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1296723872"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5284209a0d2fd60f","lat":34.04733,"location_precision":"source supplied","lon":-118.25751,"name":"DRT LAX10","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/428021796"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/drt-lax10-osmway-428021796"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/428021796"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"datacentersexposed-5284ec283997c224","lat":39.01256,"location_precision":"source supplied","lon":-77.4754,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-dc13-osmway-300969250","value":16.0}],"name":"Equinix DC13","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300969250"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-dc13-osmway-300969250"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969250"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","id":"datacentersexposed-52aaab6bc0b02a45","lat":33.60657,"location_precision":"source supplied","lon":-84.5304,"name":"Vantage Data Centers Stacks Road Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-files-for-two-data-center-campuses-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-data-centers-stacks-road-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Villa Ridge","confidence":"medium","id":"datacentersexposed-53067e4bc56a46b7","lat":38.48019,"location_precision":"source supplied","lon":-90.8453,"name":"Provident Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-data-center-projects-debated-for-11-hours-at-planning-meeting-in-franklin-county-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/provident-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"low","id":"datacentersexposed-533377beac8f26a2","lat":36.05975,"location_precision":"source supplied","lon":-115.14717,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-las-vegas-las1-osmway-1034475557","value":3.35}],"name":"DataBank Las Vegas LAS1","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1034475557"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-las-vegas-las1-osmway-1034475557"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Tarentum","confidence":"medium","id":"datacentersexposed-5386ea20cf40e36c","lat":40.60163,"location_precision":"source supplied","lon":-79.8196,"name":"Tarentum (Rockpointe) Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tarentum-rockpointe-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Van Ormy/ San Antonio","confidence":"medium","id":"datacentersexposed-53a5fea54f991657","lat":29.27012,"location_precision":"source supplied","lon":-98.57086,"name":"Black Mountain Power Data Center","operator":"Black Mountain Power","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/black-mountain-power-buys-432-acres-in-san-antonio-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/black-mountain-power-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Holly Ridge","confidence":"medium","id":"datacentersexposed-53d4e8ad31e8aa12","lat":32.98752,"location_precision":"source supplied","lon":-83.51138,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-hyperion-richland-parish-la-pg","value":5000.0}],"name":"Meta Hyperion (Richland Parish)","operator":"Facebook USA, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://datacenters.atmeta.com/richland-parish-data-center/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/meta-hyperion-richland-parish-la-pg"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-53e00514d4934ce9","lat":33.46088,"location_precision":"source supplied","lon":-111.99716,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-osmway-1132632705","value":42.0}],"name":"QTS","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1132632705"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-osmway-1132632705"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1132632705"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1315636714"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"BEATTYVILLE","confidence":"medium","id":"datacentersexposed-53e5d737875636f6","lat":37.53886,"location_precision":"source supplied","lon":-83.72747,"name":"ACS","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110006656181"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/acs-110006656181"}],"state":"Kentucky","status":"operating"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"datacentersexposed-53ebcef4ac058886","lat":37.37847,"location_precision":"source supplied","lon":-121.95498,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-santa-clara-sv2-osmway-37947314","value":7.0}],"name":"Equinix Santa Clara SV2","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/37947314"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-santa-clara-sv2-osmway-37947314"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Manassas","confidence":"medium","id":"datacentersexposed-53f632f7c135b535","lat":38.75157,"location_precision":"source supplied","lon":-77.47666,"name":"Microsoft Manassas (Hansen Farm)","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-manassas-hansen-farm-va-pg"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-53f6a3792cb2746c","lat":39.00179,"location_precision":"source supplied","lon":-77.43806,"name":"Vantage VA12","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/985207884"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/vantage-va12-osmway-985207884"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1344901575"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-va2-osmway-1344901575"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Union Township","confidence":"medium","id":"datacentersexposed-5407b8411332de12","lat":41.50386,"location_precision":"source supplied","lon":-87.2014,"name":"Jeremiah A QTS Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jeremiah-a-qts-data-center"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-541c787344ce5e50","lat":38.98864,"location_precision":"source supplied","lon":-77.44078,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-iad03-osmway-1276518684","value":72.0}],"name":"Aligned IAD03","operator":"Aligned Energy Holdings, LP","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1276518684"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-iad03-osmway-1276518684"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1276518684"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Jessup","confidence":"medium","id":"datacentersexposed-541cc392feebda2e","lat":41.47588,"location_precision":"source supplied","lon":-75.5564,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/breaker-street-associates-llc-data-center","value":600.0}],"name":"Breaker Street Associates LLC Data Center","operator":"Breaker Street Associates LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/breaker-street-associates-llc-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Coshocton","confidence":"medium","id":"datacentersexposed-541f803ad7efba18","lat":40.27204,"location_precision":"source supplied","lon":-81.85952,"name":"Aligned Conesville / Coshocton","operator":"Aligned Energy Holdings, LP","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-in-ohio-with-new-mega-scale-ai-campus/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/aligned-conesville-coshocton-oh-pg"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Sulphur Springs","confidence":"medium","id":"datacentersexposed-548f18be4120b30d","lat":33.08515,"location_precision":"source supplied","lon":-95.546,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/msb-global-services-matrix-data-center","value":3000.0}],"name":"MSB Global Services Matrix Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://msbglobalservices.com/matrix-data-center-campus-breaks-ground-in-sulphur-springs-tx-a-new-era-for-net-zero-ai-infrastructure/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/msb-global-services-matrix-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Georgetown","confidence":"medium","id":"datacentersexposed-548fee823299edbd","lat":30.60149,"location_precision":"source supplied","lon":-97.6773,"name":"Georgetown Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/georgetown-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-54983e5287f5231d","lat":38.74347,"location_precision":"source supplied","lon":-77.54348,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pwc-stack-infrastructure-nva02-yft","value":118.0}],"name":"Stack Infrastructure NVA02 YFT","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-stack-infrastructure-nva02-yft"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Allen Park","confidence":"medium","id":"datacentersexposed-54a1d0d53f89b31b","lat":42.26865,"location_precision":"source supplied","lon":-83.20818,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/solstice-data-center","value":26.0}],"name":"Solstice Data Center","operator":"Solstice","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/solstice-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Papillion","confidence":"medium","id":"datacentersexposed-54a9bab5bd71235c","lat":41.15,"location_precision":"source supplied","lon":-96.04,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-papillion","value":480.0}],"name":"Meta Papillion","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-papillion"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-54aa0e9cf72bfa5a","lat":39.08263,"location_precision":"source supplied","lon":-77.56523,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nva06-campus","value":48.0}],"name":"NVA06 Campus","operator":"Stack Infrastructure, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/permit/c5987365-88d6-4775-92c7-1ee4c5fdc8d3?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nva06-campus"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Hamlet","confidence":"medium","id":"datacentersexposed-54f08226ee8b5f5a","lat":34.82899,"location_precision":"source supplied","lon":-79.72932,"name":"Amazon Hamlet Data Center","operator":"Amazon.com, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-hamlet-data-center"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-551f241090f88628","lat":32.59966,"location_precision":"source supplied","lon":-96.7302,"name":"Project Labrador (WHL Dallas 45 LLC)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/large-data-center-campus-proposed-in-lancaster-area-of-dallas-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-labrador-whl-dallas-45-llc"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-560816322cfd74d0","lat":38.75367,"location_precision":"source supplied","lon":-77.5242,"name":"Innovation on the Parkway","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-innovation-on-the-parkway"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-564da652106e2425","lat":39.01248,"location_precision":"source supplied","lon":-77.45422,"name":"Equinix Ashburn East","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-equinix-ashburn-east"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-566d11b35d0461b0","lat":29.44738,"location_precision":"source supplied","lon":-98.64072,"name":"Texas Cryptologic Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611414"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/texas-cryptologic-center-osmway-509611414"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611414"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"medium","id":"datacentersexposed-5674a331a82e2cf6","lat":37.47669,"location_precision":"source supplied","lon":-77.2329,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sandston-data-center-campus","value":200.0}],"name":"Sandston Data Center Campus","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/iron-mountain-starts-work-on-data-center-campus-near-richmond-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sandston-data-center-campus"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Harlingen","confidence":"medium","id":"datacentersexposed-56ec61c8e223915d","lat":26.22642,"location_precision":"source supplied","lon":-97.63307,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/eneus-energy","value":2000.0}],"name":"Eneus Energy","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/2gw-data-center-could-be-developed-in-cameron-county-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/eneus-energy"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"King of Prussia","confidence":"low","contains_osm":true,"id":"datacentersexposed-572c874d19042e80","lat":40.08792,"location_precision":"source supplied","lon":-75.33972,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/d-stor-3400-horizon-drive-osmnode-13409186015","value":4.0}],"name":"DāStor: 3400 Horizon Drive","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13409186015"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/d-stor-3400-horizon-drive-osmnode-13409186015"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13409186015"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"low","contains_osm":true,"id":"datacentersexposed-5733ca0d4447bdc4","lat":36.14365,"location_precision":"source supplied","lon":-115.07678,"name":"Switch Las Vegas 4","operator":"Switch, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1017460713"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-las-vegas-4-osmway-1017460713"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1017460713"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-57430aeb702c8c28","lat":45.54738,"location_precision":"source supplied","lon":-122.89739,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-infrastructure-por02-osmway-328702378","value":24.0}],"name":"Stack Infrastructure - POR02","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/328702378"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-infrastructure-por02-osmway-328702378"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-574346ad3d09a3bb","lat":41.66776,"location_precision":"source supplied","lon":-86.47306,"name":"Amazon AWS Data Center","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1303947602"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-aws-data-center-osmway-1303947602"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1303947602"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Newnan","confidence":"medium","id":"datacentersexposed-575a0b144eb3912e","lat":33.38067,"location_precision":"source supplied","lon":-84.79966,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-sail-ga-pg","value":900.0}],"name":"Project Sail","operator":"Atlas Development LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/project-sail-data-center-newnan-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-sail-ga-pg"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Eugene","confidence":"low","contains_osm":true,"id":"datacentersexposed-576023558884174e","lat":44.05061,"location_precision":"source supplied","lon":-123.09298,"name":"Date Center West - Eugene","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13748859030"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/date-center-west-eugene-osmnode-13748859030"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13748859030"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Miami","confidence":"low","contains_osm":true,"id":"datacentersexposed-57774537569cd6d2","lat":25.78239,"location_precision":"source supplied","lon":-80.19308,"name":"NAP of the Americas","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/435518280"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/nap-of-the-americas-osmway-435518280"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/435518280"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-577d498d565ff93c","lat":45.54462,"location_precision":"source supplied","lon":-122.88234,"name":"Verizon Hillsboro (Tanasbourne) Data Center","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/331132308"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/verizon-hillsboro-tanasbourne-data-center-osmway-331132308"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/331132308"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-578eef55243c9158","lat":39.02426,"location_precision":"source supplied","lon":-77.45233,"name":"Equinix Ashburn DC16","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1123249721"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/equinix-ashburn-dc16-osmway-1123249721"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Aliquippa","confidence":"medium","id":"datacentersexposed-5793449bcab58a51","lat":40.63018,"location_precision":"source supplied","lon":-80.23629,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aliquippa-data-center-campus","value":496.0}],"name":"Aliquippa Data Center Campus","operator":"Five 9s Digital","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://aliquippapa.gov/wp-content/uploads/2025/02/doc07611720250225144324.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aliquippa-data-center-campus"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Fort Stockton","confidence":"medium","id":"datacentersexposed-57a599ef86214b7a","lat":30.8919,"location_precision":"source supplied","lon":-102.88366,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/poolside-project-horizon-tx-pg","value":2000.0}],"name":"Poolside Project Horizon","operator":"Poolside","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/poolside-project-horizon-tx-pg"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"NEW CARLISLE","confidence":"medium","id":"datacentersexposed-57d8e636f6fa2c63","lat":41.69378,"location_precision":"source supplied","lon":-86.46052,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/anthropic-amazon-new-carlisle-epoch","value":1092.0}],"name":"Anthropic-Amazon New Carlisle","operator":"Amazon.com, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/anthropic-amazon-new-carlisle-epoch"}],"state":"Indiana","status":"operating"},{"ai_classification":"unknown","city":"Pflugerville","confidence":"medium","id":"datacentersexposed-57f0ec335632f7db","lat":30.48241,"location_precision":"source supplied","lon":-97.6246,"name":"Skybox - Austin 2","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/skybox-austin-2"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Charlotte","confidence":"low","contains_osm":true,"id":"datacentersexposed-5859bea5c3a62bba","lat":35.18005,"location_precision":"source supplied","lon":-80.92636,"name":"SEGRA","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/838817943"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/segra-osmway-838817943"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/838817943"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Walterboro","confidence":"medium","id":"datacentersexposed-585e6db27021876c","lat":32.84068,"location_precision":"source supplied","lon":-80.60291,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/walterboro-data-center","value":1000.0}],"name":"Walterboro Data Center","operator":"Eagle Rock Partners","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.live5news.com/2025/12/15/9-new-data-centers-proposed-colleton-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/walterboro-data-center"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-587b6f8f500e57b6","lat":38.77796,"location_precision":"source supplied","lon":-77.5471,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/iron-mountain-va-1-osmway-996723586","value":280.0}],"name":"Iron Mountain VA-1","operator":"Iron Mountain Incorporated","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/996723586"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iron-mountain-va-1-osmway-996723586"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Ashland","confidence":"medium","id":"datacentersexposed-5887aa69455e8c8b","lat":37.7862,"location_precision":"source supplied","lon":-77.4404,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-technology-campus","value":2400.0}],"name":"Tract Technology Campus","operator":"VALCO HANOVER COUNTY","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-technology-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-58956f604ceb314f","lat":32.81755,"location_precision":"source supplied","lon":-96.87307,"name":"CoreSpace Dallas","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/290703004"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/corespace-dallas-osmway-290703004"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/290703004"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"DE SOTO","confidence":"medium","id":"datacentersexposed-5895b16a6f94fa59","lat":38.94212,"location_precision":"source supplied","lon":-95.00581,"name":"PILOT","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/pilot-110072162116"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-58d7718b902c7f1b","lat":38.76466,"location_precision":"source supplied","lon":-77.5183,"name":"Stack Northern Virginia NVA05","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-stack-northern-virginia-nva05"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Forest Grove","confidence":"medium","id":"datacentersexposed-5900de59705d9268","lat":45.51303,"location_precision":"source supplied","lon":-123.05,"name":"Crane Data Centers","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/crane-data-centers"}],"state":"Oregon","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-590ba91014c308ca","lat":38.99094,"location_precision":"source supplied","lon":-77.44883,"name":"Dulles Summit and Markey Court","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-30","url":"https://datacentersexposed.com/facilities/loudoun-dulles-summit-and-markey-court"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Monroe Township","confidence":"medium","id":"datacentersexposed-591a5eb1779a4d6b","lat":39.59592,"location_precision":"source supplied","lon":-86.4602,"name":"Project Louie","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/391-acre-data-center-campus-proposed-in-morgan-county-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-louie"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-593dd825d976b259","lat":38.72524,"location_precision":"source supplied","lon":-77.50404,"name":"Project Gulfstream","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-project-gulfstream"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Urbana","confidence":"medium","id":"datacentersexposed-59417e1f2b09e746","lat":40.08692,"location_precision":"source supplied","lon":-83.77341,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/urbana-technology-hub","value":100.0}],"name":"Urbana Technology Hub","operator":"Thor Equities","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/thor-equities-looks-to-build-460000-sq-ft-data-center-campus-near-urbana-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/urbana-technology-hub"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Liberty","confidence":"medium","id":"datacentersexposed-5982f35ba9b0ea0d","lat":30.04849,"location_precision":"source supplied","lon":-94.67973,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/barupon-data-center","value":240.0}],"name":"BaRupOn Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/medical-equipment-manufacturer-pivots-chemical-plant-to-data-center-and-manufacturing-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/barupon-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Vernon","confidence":"medium","id":"datacentersexposed-59847e74e02b402b","lat":34.15131,"location_precision":"source supplied","lon":-99.28609,"name":"Google Wilbarger County","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-to-develop-clean-energy-colocated-data-center-in-wilbarger-county-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-wilbarger-county-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-59bfdddeeced5654","lat":39.73406,"location_precision":"source supplied","lon":-104.70794,"name":"QTS","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1273968634"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-osmway-1273968634"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1273968634"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560424378"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-59c9c5168c2cab62","lat":38.73935,"location_precision":"source supplied","lon":-77.50583,"name":"Digital Realty","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-digital-realty"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5a666a98bec6b11f","lat":40.54724,"location_precision":"source supplied","lon":-74.45974,"name":"Barclays Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204460835"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/barclays-datacenter-osmway-204460835"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460835"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Tustin","confidence":"low","contains_osm":true,"id":"datacentersexposed-5abcc7ff2a0c55c1","lat":33.71678,"location_precision":"source supplied","lon":-117.80578,"name":"Lumen Technologies","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/441502816"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-technologies-osmway-441502816"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/441502816"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Frederick","confidence":"medium","id":"datacentersexposed-5ae9d72a275fac14","lat":39.3343,"location_precision":"source supplied","lon":-77.4679,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/quantum-frederick","value":264.0}],"name":"Quantum Frederick","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-looks-to-develop-three-more-data-centers-at-quantum-frederick-park-in-maryland/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/quantum-frederick"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"datacentersexposed-5b20721bd6a7b040","lat":30.20068,"location_precision":"source supplied","lon":-97.70705,"name":"LightEdge Austin II","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/379204643"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lightedge-austin-ii-osmway-379204643"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379204643"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Chester","confidence":"medium","id":"datacentersexposed-5b2597633704e33c","lat":37.29442,"location_precision":"source supplied","lon":-77.453,"name":"Tract Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-6"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Missoula","confidence":"medium","id":"datacentersexposed-5b4d1777dee0b96a","lat":46.87265,"location_precision":"source supplied","lon":-113.86772,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/krambu","value":10.0}],"name":"Krambu","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-krambu-looks-to-build-ai-data-center-in-missoula-county-montana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/krambu"}],"state":"Montana","status":"planned"},{"ai_classification":"unknown","city":"Stillwater","confidence":"medium","id":"datacentersexposed-5b71a8d4b8986a7f","lat":36.17396,"location_precision":"source supplied","lon":-97.05177,"name":"Google Stillwater Data Center Campus","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/oklahomas-stillwater-planning-commission-recommends-approval-for-3bn-data-center-campus/"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/google-stillwater-data-center-campus"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Greenleaf","confidence":"medium","id":"datacentersexposed-5b7457a0fceb9360","lat":44.32815,"location_precision":"source supplied","lon":-88.11041,"name":"Cloverleaf Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/residents-of-greenleaf-wisconsin-offered-up-to-120000-per-acre-to-sell-land-for-data-center-report/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloverleaf-data-center"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Massena","confidence":"medium","id":"datacentersexposed-5ba9ff3b5eb6b7ec","lat":44.95557,"location_precision":"source supplied","lon":-74.85362,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/new-york-state-artificial-intelligence-data-center","value":300.0}],"name":"New York State Artificial Intelligence Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/new-york-state-artificial-intelligence-data-center"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"datacentersexposed-5bbbea78b468415e","lat":45.54,"location_precision":"source supplied","lon":-122.99,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aws-hillsboro","value":460.0}],"name":"AWS Hillsboro","operator":"Amazon Data Services, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aws-hillsboro"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Corpus Christi","confidence":"medium","id":"datacentersexposed-5c1b98efad566499","lat":27.84481,"location_precision":"source supplied","lon":-97.6115,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hut-8-beacon-point-data-center","value":597.0}],"name":"Hut 8 Beacon Point Data Center","operator":"Hut 8","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.hut8.com/news-insights/press-releases/hut-8-commercializes-first-phase-of-1-gw-beacon-point-ai-data-center-campus-with-15-year-352-mw"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hut-8-beacon-point-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Lusby","confidence":"medium","id":"datacentersexposed-5c3e05f0bf266318","lat":38.42979,"location_precision":"source supplied","lon":-76.45836,"name":"Amazon Lusby Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-proposes-data-center-campus-next-to-nuclear-plant-in-calvert-county-maryland/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-lusby-data-center"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5c41bb4cf9bc7189","lat":33.62725,"location_precision":"source supplied","lon":-111.90205,"name":"Profit Finder Pro Software","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10796113033"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/profit-finder-pro-software-osmnode-10796113033"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10796113033"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Whitewater","confidence":"low","id":"datacentersexposed-5c4fa332b92af1be","lat":42.83364,"location_precision":"source supplied","lon":-88.734,"name":"Central Office","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/758306877"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/central-office-osmway-758306877"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Maxwell","confidence":"medium","id":"datacentersexposed-5c7944547c954973","lat":29.86609,"location_precision":"source supplied","lon":-97.8132,"name":"Edged Austin","operator":"Edged","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edged-files-to-develop-2-million-sq-ft-data-center-campus-outside-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-austin"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-5cd61a0189fd6976","lat":38.985,"location_precision":"source supplied","lon":-77.47932,"name":"MERCURE BUSINESS PARK LOTS 19 AND 20","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/306dbd90-969b-4e70-ac97-be032ae24344?tab=attachments"}],"updated":"2026-09-01","url":"https://datacentersexposed.com/facilities/mercure-business-park-lots-19-and-20"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"medium","id":"datacentersexposed-5ce6002d005cd7f7","lat":38.99734,"location_precision":"source supplied","lon":-104.792,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/colorado-springs-data-center","value":3.0}],"name":"Colorado Springs Data Center","operator":"Flexential Corp.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/colorado-springs-data-center"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"datacentersexposed-5ceb0a0e3c850e98","lat":39.00065,"location_precision":"source supplied","lon":-77.43981,"name":"Sentinel Ashburn Nexus Data Center","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/701924664"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sentinel-ashburn-nexus-data-center-osmway-701924664"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Reston","confidence":"low","id":"datacentersexposed-5d14e5407c9a222c","lat":38.94849,"location_precision":"source supplied","lon":-77.32731,"name":"VA3","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/79158387"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/va3-osmway-79158387"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"VERNON","confidence":"medium","id":"datacentersexposed-5d2b9f30a0e00329","lat":34.08364,"location_precision":"source supplied","lon":-99.17914,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ddh-vernon-110071866106","value":60.0}],"name":"DDH VERNON","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ddh-vernon-110071866106"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Denton","confidence":"medium","id":"datacentersexposed-5d57499bc574e45f","lat":33.20929,"location_precision":"source supplied","lon":-97.18082,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qumulus-ai","value":20.0}],"name":"Qumulus AI","operator":"Qumulus AI","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qumulusai-gets-approval-for-modular-data-center-in-denton-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qumulus-ai"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5d79a2e2e53af89e","lat":42.44767,"location_precision":"source supplied","lon":-83.26263,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-detroit-det01-osmway-377585075","value":3.0}],"name":"EdgeConneX Detroit DET01","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/377585075"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-detroit-det01-osmway-377585075"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377585075"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-5de3105216f4418d","lat":38.26742,"location_precision":"source supplied","lon":-77.3867,"name":"Forest Lane Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-proposed-for-850-acres-of-land-in-stafford-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/forest-lane-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Latham","confidence":"low","contains_osm":true,"id":"datacentersexposed-5dfd317dda241682","lat":42.74544,"location_precision":"source supplied","lon":-73.7592,"name":"Turnkey Internet","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/871694597"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/turnkey-internet-osmway-871694597"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/871694597"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-5e046a614ad2b921","lat":38.74372,"location_precision":"source supplied","lon":-77.5298,"name":"Amazon Thomasson Barn","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-thomasson-barn"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-5e502c7fb590c1eb","lat":46.01372,"location_precision":"source supplied","lon":-98.57255,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/applied-digital-ellendale-data-center-osmway-1422191450","value":400.0}],"name":"Applied Digital / Ellendale Data Center","operator":"Applied Digital Corporation","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1422191450"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/applied-digital-ellendale-data-center-osmway-1422191450"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"North Tonawanda","confidence":"medium","id":"datacentersexposed-5e5cd75a84a540ec","lat":43.04,"location_precision":"source supplied","lon":-78.86,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digihost-north-tonawanda-ai-data-center","value":123.0}],"name":"DigiHost North Tonawanda AI Data Center","operator":"Digi Power X","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digihost-north-tonawanda-ai-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5e5ea2c1330e4e3f","lat":38.75317,"location_precision":"source supplied","lon":-77.51088,"name":"QTS Manassas DC2","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1287260558"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-manassas-dc2-osmway-1287260558"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1090837713"}],"updated":"2026-07-07","url":"https://datacentersexposed.com/facilities/qts-manassas-dc5-osmway-1090837713"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5e7c0215cc24a380","lat":41.36107,"location_precision":"source supplied","lon":-81.63278,"name":"Involta Independence","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1238705019"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/involta-independence-osmway-1238705019"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1238705019"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"The Woodlands","confidence":"low","contains_osm":true,"id":"datacentersexposed-5f40903089a9ec26","lat":30.17814,"location_precision":"source supplied","lon":-95.48605,"name":"Stream Data Centers Houston","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9190480200"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/stream-data-centers-houston-osmnode-9190480200"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9190480200"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-5f4e671688f3eacf","lat":41.55027,"location_precision":"source supplied","lon":-90.48241,"name":"Geneseo Communications Inc","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/342664739"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/geneseo-communications-inc-osmway-342664739"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/342664739"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Thomson","confidence":"medium","id":"datacentersexposed-5f5d579be7e62f69","lat":33.45301,"location_precision":"source supplied","lon":-82.39851,"name":"Project Azalea","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-six-building-data-center-campus-outside-augusta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-azalea"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Corsicana","confidence":"medium","id":"datacentersexposed-5f66bfb9be4b91f4","lat":32.0954,"location_precision":"source supplied","lon":-96.4688,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tx-crypto-corsicana","value":1000.0}],"name":"Riot Platforms Corsicana","operator":"Riot Platforms, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tx-crypto-corsicana"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Lenexa","confidence":"low","contains_osm":true,"id":"datacentersexposed-5faa80381d9d373d","lat":38.92516,"location_precision":"source supplied","lon":-94.77032,"name":"Data Center Lenexa","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/502927599"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/data-center-lenexa-osmway-502927599"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/502927599"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Lueders","confidence":"medium","id":"datacentersexposed-5fd3192d01bca06f","lat":32.98045,"location_precision":"source supplied","lon":-99.5673,"name":"Data Center THM1A","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-to-be-built-in-lueders-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-thm1a"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-5ffc77b4a68ec7cc","lat":33.13852,"location_precision":"source supplied","lon":-96.65995,"name":"CyrusOne Allen","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/590213771"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-allen-osmway-590213771"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"low","contains_osm":true,"id":"datacentersexposed-60168865367aa66f","lat":34.0581,"location_precision":"source supplied","lon":-118.23539,"name":"USPO Terminal Annex","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/30666790"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/uspo-terminal-annex-osmway-30666790"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/30666790"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Denton","confidence":"medium","id":"datacentersexposed-604658b9bc64608a","lat":33.21948,"location_precision":"source supplied","lon":-97.2129,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/denton-data-center","value":391.0}],"name":"Denton Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/denton-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Hermiston","confidence":"low","contains_osm":true,"id":"datacentersexposed-6070ffa6dbb9f96a","lat":45.81121,"location_precision":"source supplied","lon":-119.27825,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1501456882"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1501456882"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017495"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017496"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501455347"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501455348"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501456882"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Saint Louis","confidence":"low","contains_osm":true,"id":"datacentersexposed-609af2bf11c8cb79","lat":38.63655,"location_precision":"source supplied","lon":-90.25544,"name":"Genome Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/617511179"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/genome-data-center-osmway-617511179"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/617511179"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Brooklyn Park","confidence":"low","contains_osm":true,"id":"datacentersexposed-60b29a8d574fe4cb","lat":45.14369,"location_precision":"source supplied","lon":-93.38712,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-osmway-1343100173","value":9.0}],"name":"DataBank","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1343100173"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-osmway-1343100173"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343100173"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Lexington","confidence":"medium","id":"datacentersexposed-60e6074cdc883a68","lat":30.41522,"location_precision":"source supplied","lon":-97.00979,"name":"Lexington Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lexington-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6107ccae46d4d6bd","lat":40.78539,"location_precision":"source supplied","lon":-74.07501,"name":"H5 Secaucus","operator":"H5 Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12471740457"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/h5-secaucus-osmnode-12471740457"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12471740457"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"datacentersexposed-61130420de122552","lat":45.85379,"location_precision":"source supplied","lon":-119.63004,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/697415323"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-697415323"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-614699b221c5676c","lat":38.98595,"location_precision":"source supplied","lon":-77.44189,"name":"Relocation Drive Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-relocation-drive-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Abilene","confidence":"medium","id":"datacentersexposed-6189f532bf53209f","lat":32.50204,"location_precision":"source supplied","lon":-99.7907,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/open-ai-softbank-stargate-data-center-lancium-clean-campus","value":1200.0}],"name":"Open AI/ SoftBank Stargate Data Center (Lancium Clean Campus)","operator":"Microsoft Corporation","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/open-ai-softbank-stargate-data-center-lancium-clean-campus"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Blacksburg","confidence":"medium","id":"datacentersexposed-61b3dd33d41b7ca5","lat":37.20373,"location_precision":"source supplied","lon":-80.4118,"name":"Brush Mountain Blacksburg","operator":"BRUSH MOUNTAIN DATA CENTER LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://realestate.montva.com/search/commonsearch.aspx?mode=owner"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/brush-mountain-blacksburg"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Mansfield","confidence":"low","id":"datacentersexposed-61ddef182ff3d68a","lat":32.54982,"location_precision":"source supplied","lon":-97.07486,"name":"Alinged Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1443620406"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/alinged-data-center-osmway-1443620406"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-61e75e2236c53a8f","lat":39.29356,"location_precision":"source supplied","lon":-76.55173,"name":"Johns Hopkins Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/931369845"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/johns-hopkins-data-center-osmway-931369845"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/931369845"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Stanford","confidence":"low","contains_osm":true,"id":"datacentersexposed-620f73e7161e392e","lat":37.43341,"location_precision":"source supplied","lon":-122.18071,"name":"Northwest Data Center and Communications Hub","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/978632013"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/northwest-data-center-and-communications-hub-osmway-978632013"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/978632013"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"ASHBURN","confidence":"medium","id":"datacentersexposed-625ca7cc5f3137e4","lat":38.95391,"location_precision":"source supplied","lon":-77.51837,"name":"Brambleton Business Campus Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/c34be238-7d4b-4f9b-9b80-152afd7a05d4?tab=locations"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/brambleton-business-campus-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-6270cf3a15cfe6e2","lat":37.94278,"location_precision":"source supplied","lon":-77.41627,"name":"Caroline Center for Innovation","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/caroline-center-for-innovation"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"low","contains_osm":true,"id":"datacentersexposed-6298a29f234885b2","lat":38.78616,"location_precision":"source supplied","lon":-104.78858,"name":"T5@Colorado Springs","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1083841125"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/t5-colorado-springs-osmway-1083841125"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1083841125"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Spokane","confidence":"medium","id":"datacentersexposed-62a8bd29dee83aa2","lat":47.65719,"location_precision":"source supplied","lon":-117.42351,"name":"Spokane Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://my.spokanecity.org/news/releases/2026/06/10/council-members-introduce-an-ordinance-imposing-data-center-moratorium/"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/spokane-data-center"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"datacentersexposed-62cd354bc2c3fe68","lat":38.79035,"location_precision":"source supplied","lon":-77.54001,"name":"Amazon IAD24","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/45776979"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad24-osmway-45776979"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460060340"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad59-osmway-460060340"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Culpeper","confidence":"low","contains_osm":true,"id":"datacentersexposed-62f0004a67a428d8","lat":38.45484,"location_precision":"source supplied","lon":-77.97813,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-cu2-osmway-450078003","value":11.0}],"name":"Equinix CU2","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/450078003"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-cu2-osmway-450078003"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/450078003"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Haskell","confidence":"medium","id":"datacentersexposed-632122422629a1d3","lat":33.16058,"location_precision":"source supplied","lon":-99.73452,"name":"Google Haskell County","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-haskell-county-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-635addc4e04b162c","lat":34.08206,"location_precision":"source supplied","lon":-84.26729,"name":"Hewlett-Packard","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/34770750"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/hewlett-packard-osmway-34770750"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/34770750"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-639de7b44ace32c0","lat":37.3654,"location_precision":"source supplied","lon":-121.96167,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cologix-santa-clara-sv1-data-center-osmway-40608200","value":9.0}],"name":"Cologix Santa Clara SV1 Data Center","operator":"Cologix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/40608200"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cologix-santa-clara-sv1-data-center-osmway-40608200"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/40608200"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Joplin","confidence":"medium","id":"datacentersexposed-63a9d58c028ad864","lat":37.06882,"location_precision":"source supplied","lon":-94.60008,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/wildwood-ranch-data-center","value":200.0}],"name":"Wildwood Ranch Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-joplin-missouri-greenlight-rezoning-request-for-potential-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wildwood-ranch-data-center"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"Fort Stockton","confidence":"medium","id":"datacentersexposed-63e94ae270266ff7","lat":30.42173,"location_precision":"source supplied","lon":-102.50932,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-horizon","value":2000.0}],"name":"Project Horizon","operator":"Poolside/CoreWeave","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-horizon"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","id":"datacentersexposed-64102bed7f91fd74","lat":35.42508,"location_precision":"source supplied","lon":-97.5998,"name":"Valor C3 Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://kfor.com/news/local/new-tornado-proof-data-center-in-okc/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/valor-c3-data-center"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Box Springs","confidence":"medium","id":"datacentersexposed-64537a8499e68803","lat":32.5815,"location_precision":"source supplied","lon":-84.71003,"name":"Project Ruby","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-ruby"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Taylor","confidence":"medium","id":"datacentersexposed-6455833376731184","lat":30.56745,"location_precision":"source supplied","lon":-97.38766,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/blueprint-projects","value":30.0}],"name":"Blueprint Projects","operator":"Blueprint Project","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/360mw-data-center-to-be-built-outside-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blueprint-projects"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Reston","confidence":"low","contains_osm":true,"id":"datacentersexposed-64676741abb5c7ab","lat":38.95061,"location_precision":"source supplied","lon":-77.36455,"name":"CoreSite Reston Campus VA1","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/79298926"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-reston-campus-va1-osmway-79298926"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/79818498"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/coresite-reston-va3-osmway-79818498"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6481e5da1149cf9a","lat":40.06078,"location_precision":"source supplied","lon":-83.13275,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-975484798","value":73.0}],"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/975484798"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-975484798"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/673532692"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/874506250"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975484796"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975484797"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975484798"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Beloit","confidence":"medium","id":"datacentersexposed-64a9b5244482401d","lat":42.57651,"location_precision":"source supplied","lon":-88.99512,"name":"Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-signs-pre-development-agreement-for-data-center-in-beloit-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Reading","confidence":"medium","id":"datacentersexposed-64aeeaa959ba7661","lat":40.34144,"location_precision":"source supplied","lon":-76.00547,"name":"Omega Systems Reading Data Center","operator":"Omega","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://omegasystemscorp.com/company/locations/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/omega-systems-reading-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-651be5d4536de916","lat":41.61685,"location_precision":"source supplied","lon":-93.9244,"name":"Apple","operator":"Apple Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1318322780"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apple-osmway-1318322780"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Lyon Township","confidence":"medium","id":"datacentersexposed-65406bcee5b80619","lat":42.47646,"location_precision":"source supplied","lon":-83.61326,"name":"Lyon Township Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lyon-township-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Louisa","confidence":"medium","id":"datacentersexposed-6589b6192ec38d3f","lat":37.98242,"location_precision":"source supplied","lon":-77.9511,"name":"Amazon Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-files-for-38-million-sq-ft-data-center-campus-in-louisa-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-center-4"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Malaga","confidence":"medium","id":"datacentersexposed-658ae72998b6ddc1","lat":47.37235,"location_precision":"source supplied","lon":-120.20118,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-malaga-wa-pg","value":360.0}],"name":"Microsoft Malaga","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-malaga-wa-pg"}],"state":"Washington","status":"under construction"},{"ai_classification":"unknown","city":"Harrison","confidence":"medium","id":"datacentersexposed-65dd211c059fe81c","lat":36.21472,"location_precision":"source supplied","lon":-93.0786,"name":"Harrison Data Center","operator":"Windstream","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/harrison-data-center"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"Kalamazoo","confidence":"medium","id":"datacentersexposed-65ff5224f1264500","lat":42.24379,"location_precision":"source supplied","lon":-85.51012,"name":"Kalamazoo County Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/kalamazoo-county-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6632e08b909f44d8","lat":41.7721,"location_precision":"source supplied","lon":-88.21708,"name":"Lincoln Rackhouse","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/124088810"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lincoln-rackhouse-osmway-124088810"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/124088810"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"MARICOPA COUNTY","confidence":"medium","id":"datacentersexposed-663dda4e6d244e62","lat":33.27468,"location_precision":"source supplied","lon":-111.88483,"name":"CYRUSONE - CHANDLER","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110066858323"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/cyrusone-chandler-air-110066858323"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"CANTON","confidence":"medium","id":"datacentersexposed-66476825f9b476db","lat":32.58749,"location_precision":"source supplied","lon":-90.09539,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-data-services-inc-madison-mega-site-air-110071424758","value":341.0}],"name":"AMAZON DATA SERVICES INC, MADISON MEGA SITE","operator":"Amazon.com, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071424758"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-services-inc-madison-mega-site-air-110071424758"}],"state":"Mississippi","status":"unknown"},{"ai_classification":"unknown","city":"Dowagiac","confidence":"medium","id":"datacentersexposed-66aac4fd67a38de9","lat":41.99246,"location_precision":"source supplied","lon":-86.09898,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hyperscale-data-michigan-data-center","value":30.0}],"name":"Hyperscale Data Michigan Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hyperscale-data-michigan-data-center"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-66aed4b1c1aaeb6d","lat":38.80191,"location_precision":"source supplied","lon":-77.62207,"name":"Amazon Village Place Technology Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-village-place-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"New Hill","confidence":"medium","id":"datacentersexposed-66bc8f9232d56547","lat":35.66731,"location_precision":"source supplied","lon":-78.95606,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/new-hill-digital-campus","value":250.0}],"name":"New Hill Digital Campus","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-withdraws-proposal-for-250mw-data-center-in-apex-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/new-hill-digital-campus"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Farmington","confidence":"medium","id":"datacentersexposed-670ad9ab21a53e58","lat":44.62754,"location_precision":"source supplied","lon":-93.1229,"name":"TRACT Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://finance-commerce.com/2025/07/cannon-falls-data-center-tract-auar-review/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-3"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Marshfield","confidence":"medium","id":"datacentersexposed-6714c2ebec8a4bda","lat":37.3666,"location_precision":"source supplied","lon":-92.88345,"name":"Lumon Solutions Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-lumon-solutions-backing-data-center-project-in-marshfield-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lumon-solutions-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Chase City","confidence":"medium","id":"datacentersexposed-67290f3b6d4f25db","lat":36.78062,"location_precision":"source supplied","lon":-78.46783,"name":"LYH03 Bailey – Microsoft","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/lyh03-bailey-microsoft"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Niagara Falls","confidence":"low","id":"datacentersexposed-6755f349a1a8c85a","lat":43.07483,"location_precision":"source supplied","lon":-78.94481,"name":"Blockfusion","operator":"Blockfusion USA Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/832622369"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/blockfusion-osmway-832622369"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Johnstown","confidence":"medium","id":"datacentersexposed-676a45a0fd4c2fed","lat":40.08851,"location_precision":"source supplied","lon":-82.7583,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-new-albany-data-center","value":120.0}],"name":"EdgeConneX New Albany Data Center","operator":"EdgeConneX, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edgeconnex-files-to-convert-warehouse-and-build-new-700000-sq-ft-data-center-in-new-albany-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-new-albany-data-center"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"SAN ANTONIO","confidence":"medium","id":"datacentersexposed-6781b27ffa443720","lat":29.41698,"location_precision":"source supplied","lon":-98.7916,"name":"VANTAGE TX 11","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071655854"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/vantage-tx-11-110071655854"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Cary","confidence":"low","contains_osm":true,"id":"datacentersexposed-678af172b7be6123","lat":35.76675,"location_precision":"source supplied","lon":-78.78399,"name":"iGLASS Networks","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/758278314"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/iglass-networks-osmway-758278314"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/758278314"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Waddell","confidence":"medium","id":"datacentersexposed-679da5da7e7f3f12","lat":33.56755,"location_precision":"source supplied","lon":-112.37177,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/takanock-data-center-project-baccara","value":700.0}],"name":"Takanock Data Center/Project Baccara","operator":"DigitalBridge","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-data-center-projects-proposed-near-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/takanock-data-center-project-baccara"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Glendale","confidence":"medium","id":"datacentersexposed-682520dd1b396f5f","lat":33.53869,"location_precision":"source supplied","lon":-112.18599,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-phx3-glendale-az-pg","value":750.0}],"name":"QTS PHX3 (Glendale)","operator":"QTS Realty Trust, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-files-for-750mw-campus-in-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-phx3-glendale-az-pg"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-682f0e727ec1075c","lat":32.83271,"location_precision":"source supplied","lon":-97.04103,"name":"Cyxtera Dallas-Fort Worth Data Center","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/25706343"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cyxtera-dallas-fort-worth-data-center-osmway-25706343"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/25706343"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Springfield","confidence":"medium","id":"datacentersexposed-683fb8740e3a9cf7","lat":38.74227,"location_precision":"source supplied","lon":-77.18642,"name":"AWS Loisdale Station","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-loisdale-station"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Glen Allen","confidence":"medium","id":"datacentersexposed-68973b452dde0907","lat":37.71385,"location_precision":"source supplied","lon":-77.6231,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hunter-hawking-data-center","value":900.0}],"name":"Hunter Hawking Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hunter-hawking-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-68b689f395ff3e02","lat":40.062,"location_precision":"source supplied","lon":-82.815,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-new-albany","value":480.0}],"name":"Google New Albany","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-new-albany"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Austin","confidence":"medium","id":"datacentersexposed-68e0e965886cbd8b","lat":30.38364,"location_precision":"source supplied","lon":-97.6863,"name":"ORACLE-AUSTIN DATA CENTER","operator":"Oracle Corporation","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oracle-austin-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-69047dd25746beb0","lat":29.45068,"location_precision":"source supplied","lon":-98.6387,"name":"Amazon","operator":"Amazon.com, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1344369104"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-osmway-1344369104"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344369104"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Oklahoma CIty","confidence":"low","contains_osm":true,"id":"datacentersexposed-69048eafc71a617d","lat":35.4672,"location_precision":"source supplied","lon":-97.64975,"name":"Rack59 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/6401035673"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/rack59-data-center-osmnode-6401035673"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/6401035673"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-6906a03832fa26f7","lat":37.99738,"location_precision":"source supplied","lon":-77.50243,"name":"Airlee Industrial and Data Center Site","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/airlee-industrial-and-data-center-site"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Beaverton","confidence":"low","contains_osm":true,"id":"datacentersexposed-690fdedb99944e9d","lat":45.47563,"location_precision":"source supplied","lon":-122.77641,"name":"Digital Fortress - Portland 3","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13746843368"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-fortress-portland-3-osmnode-13746843368"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13746843368"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Waddell","confidence":"medium","id":"datacentersexposed-692e53d96669d891","lat":33.57577,"location_precision":"source supplied","lon":-112.45042,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-data-centers-waddell-campus","value":80.0}],"name":"Aligned Data Centers Waddell Campus","operator":"Aligned Energy Holdings, LP","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-data-center-in-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-data-centers-waddell-campus"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"Warrenton","confidence":"medium","id":"datacentersexposed-693c273e63749b4f","lat":38.81913,"location_precision":"source supplied","lon":-91.13043,"name":"Crusoe Warrenton Data Center (Meta)","operator":"Crusoe","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-signs-16gw-capacity-agreement-with-crusoe-report/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/crusoe-warrenton-meta"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Santaquin","confidence":"medium","id":"datacentersexposed-696049276b6055b3","lat":39.94664,"location_precision":"source supplied","lon":-111.80722,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/summit-ridge-data-center","value":20.0}],"name":"Summit Ridge Data Center","operator":"Data4","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/20mw-off-grid-data-center-planned-outside-salt-lake-city-utah/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/summit-ridge-data-center"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Gilroy","confidence":"medium","id":"datacentersexposed-696a83f7045e3ef7","lat":37.01868,"location_precision":"source supplied","lon":-121.56053,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aws-gilroy","value":49.0}],"name":"AWS Gilroy","operator":"Amazon.com, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-data-services-gains-approval-for-data-center-on-56-acres-in-gilroy-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-gilroy"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-697029749ceb1ee7","lat":39.0441,"location_precision":"source supplied","lon":-77.53971,"name":"42310 THUNDERBALL DR","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/909455922"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/42310-thunderball-dr-osmway-909455922"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/909455922"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Delta","confidence":"medium","id":"datacentersexposed-697a4652aa6d89a4","lat":39.19891,"location_precision":"source supplied","lon":-112.36232,"name":"Joule Capital Partners, LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/millard-county-commission-in-utah-approves-data-center-land-rezoning-request/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/joule-capital-partners-llc-data-center"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-6987ba06035cb0f4","lat":36.06174,"location_precision":"source supplied","lon":-115.21329,"name":"Switch12","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/172739950"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch12-osmway-172739950"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Southaven","confidence":"medium","id":"datacentersexposed-69b240f01543e432","lat":34.99349,"location_precision":"source supplied","lon":-90.03417,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/xai-macrohardrr-osmway-1077131079","value":500.0}],"name":"xAI Colossus 2 — Southaven Turbine Plant","operator":"xAI Corp.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://earthjustice.org/case/xai-illegal-gas-power-plant-data-center-colossus"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/xai-macrohardrr-osmway-1077131079"}],"state":"Mississippi","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-69ce43d56445f8c9","lat":38.25873,"location_precision":"source supplied","lon":-77.38705,"name":"Sisson North","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://app.sharebase.com/#/folder/25961/share/528-yQozqmn5XpbUDzV-NPVaxs9--JIo"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sisson-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-69dfd5a2a8685800","lat":38.46971,"location_precision":"source supplied","lon":-77.97376,"name":"Keyser Farm","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis.vgsi.com/culpeperva/Parcel.aspx?pid=6279"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/keyser-farm"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"datacentersexposed-69e0e14cc4f78bab","lat":38.54051,"location_precision":"source supplied","lon":-77.78908,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/remington-technology-park","value":300.0}],"name":"Remington Technology Park","operator":"REMINGTON TECHNOLOGY PARK LTD PTNRSHP","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://commdevpay.fauquiercounty.gov/Energov_Prod/SelfService#/plan/418c4f35-ec88-4631-97e8-6b53bf810a32"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/remington-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"medium","id":"datacentersexposed-69ea2b9c8f36a31b","lat":40.5186,"location_precision":"source supplied","lon":-80.0152,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/consolidated-communications-pittsburgh-data-center","value":4.0}],"name":"Consolidated Communications Pittsburgh Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/consolidated-communications-pittsburgh-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Richardson","confidence":"medium","id":"datacentersexposed-6a12e3167014c81b","lat":32.98529,"location_precision":"source supplied","lon":-96.6969,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/richardson-data-center","value":24.0}],"name":"Richardson Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/prime-and-vantage-buy-land-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/richardson-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-6a2851870584c765","lat":38.82431,"location_precision":"source supplied","lon":-77.58061,"name":"Compass Data Centers","operator":"Compass","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-compass-data-centers"},{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-07-30","url":"https://datacentersexposed.com/facilities/pwc-compass-datacenters-pwc"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"WEST DES MOINES","confidence":"medium","id":"datacentersexposed-6a2c35c53f558c15","lat":41.49478,"location_precision":"source supplied","lon":-93.79064,"name":"OSMIUM DATA CENTER","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070616781"}],"updated":"2026-06-13","url":"https://datacentersexposed.com/facilities/osmium-data-center-air-110070616781"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6ac0ae08b3912548","lat":38.25407,"location_precision":"source supplied","lon":-122.27309,"name":"Kaiser Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/464371693"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/kaiser-data-center-osmway-464371693"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/464371693"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Bloomfield","confidence":"medium","id":"datacentersexposed-6ae93f88d73693e5","lat":41.88474,"location_precision":"source supplied","lon":-72.7435,"name":"Atlas Capital Group","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlas-capital-group"}],"state":"Connecticut","status":"planned"},{"ai_classification":"unknown","city":"Conyers","confidence":"medium","id":"datacentersexposed-6b11bbcd2fe9fcd7","lat":33.68682,"location_precision":"source supplied","lon":-84.05222,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/rockdale-technology-park","value":126.0}],"name":"Rockdale Technology Park","operator":"SDP Aquisitions LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.11alive.com/article/tech/metro-atlanta-data-center-proposed-53-acre-site/85-ac4c267f-95ad-4670-85c6-bdae1b9a337a"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rockdale-technology-park"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-6b17e9cd39bdc9bd","lat":38.49927,"location_precision":"source supplied","lon":-77.8971,"name":"XX Tech Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis.vgsi.com/culpeperva/Parcel.aspx?pid=7077"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/xx-tech-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Baltimore","confidence":"low","contains_osm":true,"id":"datacentersexposed-6b51ee85ece3f454","lat":39.2877,"location_precision":"source supplied","lon":-76.60649,"name":"Crown Castle Baltimore","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9669340912"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/crown-castle-baltimore-osmnode-9669340912"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9669340912"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6ba5e212e9aa7d25","lat":37.66514,"location_precision":"source supplied","lon":-121.04003,"name":"Modesto Junior College West Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1296163129"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/modesto-junior-college-west-data-center-osmway-1296163129"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1296163129"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Beaver Dams","confidence":"medium","id":"datacentersexposed-6bb84b06d0fbca36","lat":42.33748,"location_precision":"source supplied","lon":-77.01904,"name":"Camp Monterey Data Center","operator":"FLX Gateway","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/camp-monterey-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Saline","confidence":"medium","id":"datacentersexposed-6bc8e0f419849988","lat":42.11276,"location_precision":"source supplied","lon":-83.88956,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/related-digital-the-barn","value":1400.0}],"name":"Related Digital/The Barn","operator":"Related Digital/Open AI/Oracle","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/related-pitches-575-acre-data-center-campus-outside-detroit-michigan/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/related-digital-the-barn"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-6bf04bbd6930b670","lat":38.78946,"location_precision":"source supplied","lon":-77.57969,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1510517639"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1510517639"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Winter Garden","confidence":"low","contains_osm":true,"id":"datacentersexposed-6bf9fd0a6a17a8bd","lat":28.57794,"location_precision":"source supplied","lon":-81.56455,"name":"E-Foam","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/958728802"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/e-foam-osmway-958728802"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/958728802"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Hamilton","confidence":"medium","id":"datacentersexposed-6c705b3c12240c96","lat":39.38385,"location_precision":"source supplied","lon":-84.56061,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/logistix-data-center","value":200.0}],"name":"Logistix Data Center","operator":"Logistix Property Group","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.bizjournals.com/cincinnati/news/2025/09/08/hyperscale-ai-data-center-hamilton-logistix.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/logistix-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"REMINGTON","confidence":"medium","id":"datacentersexposed-6d0761ed20cdd378","lat":38.56304,"location_precision":"source supplied","lon":-77.77671,"name":"Remington Innovation Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://commdevpay.fauquiercounty.gov/Energov_Prod/SelfService#/plan/e900e88c-2070-4bb5-81ff-23e7be27ca04?tab=locations"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/remington-innovation-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Detroit","confidence":"low","id":"datacentersexposed-6d24d7375d614111","lat":42.32629,"location_precision":"source supplied","lon":-83.07698,"name":"Verizon Wireless","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/71187940"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireless-osmway-71187940"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-6d636bc6e8e7a776","lat":35.0925,"location_precision":"source supplied","lon":-106.65367,"name":"Oso Grande","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/6625492701"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/oso-grande-osmnode-6625492701"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/6625492701"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6d86a4a7e2a53810","lat":35.97256,"location_precision":"source supplied","lon":-86.80804,"name":"Flexential Brentwood Data Center","operator":"Flexential Corp.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/826001604"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/flexential-brentwood-data-center-osmway-826001604"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/826001604"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Taylor","confidence":"medium","id":"datacentersexposed-6d8768ee229cf22a","lat":30.54663,"location_precision":"source supplied","lon":-97.4439,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-comal","value":360.0}],"name":"Project Comal","operator":"KDC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/360mw-data-center-to-be-built-outside-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-comal"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Wilsonville","confidence":"low","contains_osm":true,"id":"datacentersexposed-6d92b900d0785edd","lat":45.31872,"location_precision":"source supplied","lon":-122.76588,"name":"Siemens EDA - HDC / Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/480762078"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/siemens-eda-hdc-data-center-osmway-480762078"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/480762078"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Minneapolis","confidence":"low","contains_osm":true,"id":"datacentersexposed-6ddad2658582136c","lat":44.97129,"location_precision":"source supplied","lon":-93.2547,"name":"Minnesota Gateway Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/63619642"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/minnesota-gateway-data-center-osmway-63619642"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/63619642"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6e1e426c63e1f26b","lat":38.90914,"location_precision":"source supplied","lon":-77.22056,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-dc7-osmway-368724474","value":2.0}],"name":"Equinix DC7","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/368724474"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-dc7-osmway-368724474"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/368724474"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"datacentersexposed-6e2956d2f4e4cb7b","lat":36.09049,"location_precision":"source supplied","lon":-86.74721,"name":"DC Blox Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dc-blox-data-center"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-6e5623cf23f013b3","lat":39.00596,"location_precision":"source supplied","lon":-77.47724,"name":"DARAB VENTURES SIX","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/darab-ventures-six"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6e94bf3c8052dc0d","lat":39.05284,"location_precision":"source supplied","lon":-76.92592,"name":"AiNET","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/363017375"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ainet-osmway-363017375"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/363017375"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Olathe","confidence":"low","id":"datacentersexposed-6f13598acd8da241","lat":38.94013,"location_precision":"source supplied","lon":-94.86768,"name":"State Farm Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/598261190"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/state-farm-data-center-osmway-598261190"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Homer City","confidence":"medium","id":"datacentersexposed-6f1ebcaa2b360ea3","lat":40.51395,"location_precision":"source supplied","lon":-79.1967,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/homer-city-energy-campus","value":4500.0}],"name":"Homer City Energy Campus","operator":"Homer City Redevelopment (with Kiewit as contractor/partner)","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://triblive.com/local/regional/developers-offer-details-on-planned-natural-gas-fueled-power-generating-plant-in-homer-city/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/homer-city-energy-campus"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","id":"datacentersexposed-6f418e4082cc0adf","lat":38.80186,"location_precision":"source supplied","lon":-77.62121,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1287260554"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1287260554"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Torrance","confidence":"low","contains_osm":true,"id":"datacentersexposed-6f64695971bed7a0","lat":33.85075,"location_precision":"source supplied","lon":-118.30408,"name":"Equinix","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/409027020"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/equinix-osmway-409027020"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/409027020"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"South Charleston","confidence":"low","contains_osm":true,"id":"datacentersexposed-6f8ccbae7cb5dae9","lat":38.35318,"location_precision":"source supplied","lon":-81.69618,"name":"Alpha Federal","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13546262077"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/alpha-federal-osmnode-13546262077"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13546262077"}],"state":"West Virginia","status":"operating"},{"ai_classification":"unknown","city":"Willis","confidence":"medium","id":"datacentersexposed-6fc52dcbab2eba8b","lat":30.43083,"location_precision":"source supplied","lon":-95.4817,"name":"Willis Data Center (Comcast)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/comcast-to-convert-former-bank-into-data-center-in-new-jersey/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/willis-data-center-comcast"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-6fc7d46fabc3b6f3","lat":40.71999,"location_precision":"source supplied","lon":-74.00457,"name":"32 Avenue of the Americas","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/250052753"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/32-avenue-of-the-americas-osmway-250052753"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/250052753"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Pryor","confidence":"medium","id":"datacentersexposed-6fe030b81c1d0c8f","lat":36.2275,"location_precision":"source supplied","lon":-95.3185,"name":"Google Mayes County Data Center (Pryor)","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/google-mayes-county-data-center"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-7003143c170d5d4c","lat":38.98361,"location_precision":"source supplied","lon":-77.42408,"name":"Centersquare IAD2-B","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/273896102"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/centersquare-iad2-b-osmway-273896102"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/273896089"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/273896102"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Dry Branch","confidence":"medium","id":"datacentersexposed-7005bd43af289085","lat":32.63236,"location_precision":"source supplied","lon":-83.5072,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-eagle","value":900.0}],"name":"Project Eagle","operator":"Eagle Rock Partners","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.13wmaz.com/article/news/local/twiggs/5-billion-data-center-proposed-for-rural-twiggs-county-mixed-reactions/93-8c88256d-72bf-47d8-83b7-992aa21475a1"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-eagle"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Okeechobee","confidence":"medium","id":"datacentersexposed-7032313ce88921ee","lat":27.30744,"location_precision":"source supplied","lon":-80.82401,"name":"Okee-One","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/okee-one"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-704e91cd961853aa","lat":37.4839,"location_precision":"source supplied","lon":-77.24376,"name":"RIC2 DC6","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516628"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric2-dc6-osmway-1493516628"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516628"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","contains_osm":true,"id":"datacentersexposed-705e4e885381d5a5","lat":41.8487,"location_precision":"source supplied","lon":-87.64546,"name":"Iron Mountain Data & Record Storage","operator":"Iron Mountain Incorporated","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/210222970"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/iron-mountain-data-record-storage-osmway-210222970"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/210222970"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Piqua","confidence":"medium","id":"datacentersexposed-706bd01eb107aeeb","lat":40.10546,"location_precision":"source supplied","lon":-84.25993,"name":"J5 LLC Data Center","operator":"Cleanview","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://miamivalleytoday.com/piqua-commission-hears-plans-for-new-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/j5-llc-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-70718d744590ee92","lat":31.51344,"location_precision":"source supplied","lon":-103.44855,"name":"IONIC Digital Cedarvale","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1455361421"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ionic-digital-cedarvale-osmway-1455361421"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/21073054"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Fort Waye","confidence":"medium","id":"datacentersexposed-70946a27e31c5d53","lat":41.03761,"location_precision":"source supplied","lon":-85.0481,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-zodiac","value":200.0}],"name":"Project Zodiac","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-announces-2bn-campus-in-fort-wayne-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-zodiac"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Aberdeen","confidence":"medium","id":"datacentersexposed-70c403473d17a4cf","lat":38.63815,"location_precision":"source supplied","lon":-83.69277,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aberdeen-data-center","value":400.0}],"name":"Aberdeen Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/new-data-center-construction-confirmed-in-adams-county-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aberdeen-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Camden","confidence":"medium","id":"datacentersexposed-70fc6c341d9579bc","lat":34.29839,"location_precision":"source supplied","lon":-80.534,"name":"Terra Nexus Ventures Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-data-center-site-outside-columbia-south-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/terra-nexus-ventures-data-center"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Litha Springs","confidence":"medium","id":"datacentersexposed-7111f14807d8fd3a","lat":33.7474,"location_precision":"source supplied","lon":-84.5403,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/data-bank-atl5-data-center","value":72.0}],"name":"Data Bank ATL5 Data Center","operator":"DataBank Holdings, Ltd.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-bank-atl5-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Vernon","confidence":"medium","id":"datacentersexposed-712d64feac2c2787","lat":34.00368,"location_precision":"source supplied","lon":-118.22968,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-data-center","value":32.0}],"name":"Digital Data Center","operator":"American Tower Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/digital-realty-buys-land-in-los-angeles-for-32mw-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-data-center"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Bastrop","confidence":"medium","id":"datacentersexposed-716ce96df66444d4","lat":30.00363,"location_precision":"source supplied","lon":-97.43292,"name":"EdgeConneX potential Data Center","operator":"EdgeConneX, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edgeconnex-acquires-180-acre-parcel-near-its-own-data-center-project-in-bastrop-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-potential-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"low","contains_osm":true,"id":"datacentersexposed-717597b082635b2b","lat":39.10091,"location_precision":"source supplied","lon":-94.58115,"name":"Netrality Data Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9922928085"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/netrality-data-centers-osmnode-9922928085"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9922928085"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-71a06e066da2702c","lat":39.11346,"location_precision":"source supplied","lon":-94.6265,"name":"KCK Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMiggFBVV95cUxNejdwU2xJNmlZbkRaeUU2R2kyU216OWp4SFFjWTQwRFZGd3N5Y3ctWEhSdVMtMVlqNm83d3JSUjdaZ0NTVmJRbHBCVno5X1hsVUtkOWVEejdRdGxzMmYtMERqQ094YmJMS09QWWpVX3J6RDdoaUNuQWlxMEljRWRlQmNB0gGCAUFVX3lxTE5scnhlTF9vcTJrd0poMUY5YmN1QTJOTThPN0RlVjBSYXdEUVVvMWNSUlVyMkozZVg5SFJVRmNBYzQ5YmJGaHBlTWNwTFpRZVl6Vk5rSnA5XzJCTDVVdHJUR2w5bzRIbUxlNHFNM2tTbXMxUEJZVExhZzhPdktFVTJSZGc?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/kck-data-center"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Barker","confidence":"medium","id":"datacentersexposed-71ad14c1893e6738","lat":43.35908,"location_precision":"source supplied","lon":-78.6068,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lake-mariner-data-center","value":500.0}],"name":"Lake Mariner Data Center","operator":"TeraWulf/Fluidstack/Google/Core42","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lake-mariner-data-center"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-71feb1a2028fe591","lat":40.54684,"location_precision":"source supplied","lon":-74.49205,"name":"Optimum","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204460799"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/optimum-osmway-204460799"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460799"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-72131c9e362fed01","lat":40.05267,"location_precision":"source supplied","lon":-83.12742,"name":"Oppidan","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1411056682"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/oppidan-osmway-1411056682"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Berwick","confidence":"medium","id":"datacentersexposed-721ebb0402ebb4e5","lat":41.09279,"location_precision":"source supplied","lon":-76.16732,"name":"QTS Salem","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-acquires-1700-acres-of-land-in-pennsylvania-for-data-center-development/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-salem"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Conover","confidence":"medium","id":"datacentersexposed-72ebc134892ff32a","lat":35.73274,"location_precision":"source supplied","lon":-81.2088,"name":"Project Agate","operator":"Microsoft Corporation","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-breaks-ground-on-second-data-center-campus-in-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-agate"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Silverton","confidence":"medium","id":"datacentersexposed-733d4fa66cf9e93c","lat":34.39169,"location_precision":"source supplied","lon":-101.31496,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-dorothy-2-soluna","value":48.0}],"name":"Project Dorothy 2 (Soluna)","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-dorothy-2-soluna"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Fremont","confidence":"low","contains_osm":true,"id":"datacentersexposed-73524705e66881c0","lat":37.47183,"location_precision":"source supplied","lon":-121.92029,"name":"Hurricane Electric Fremont 2","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/384310269"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/hurricane-electric-fremont-2-osmway-384310269"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/384310269"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-7360d6a3683f3b54","lat":37.95416,"location_precision":"source supplied","lon":-77.40686,"name":"Thornberry Data Center Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://co.caroline.va.us/DocumentCenter/View/10426/RZ-03-2025-Thornberry-LLC-Reedy-Church"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/thornberry-data-center-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"datacentersexposed-73616ed4d3183bb1","lat":33.4463,"location_precision":"source supplied","lon":-112.37389,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-osmway-1283734104","value":176.0}],"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1283734104"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-osmway-1283734104"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"datacentersexposed-73a6495ca196abb7","lat":41.99435,"location_precision":"source supplied","lon":-87.96494,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-ch3-osmway-713428715","value":25.6}],"name":"Digital Realty CH3","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/713428715"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-ch3-osmway-713428715"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Douglasville","confidence":"low","id":"datacentersexposed-73dbbc25a571abc7","lat":33.73106,"location_precision":"source supplied","lon":-84.61608,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-atlanta-douglasville-1-osmway-1097502168","value":120.0}],"name":"Flexential Atlanta - Douglasville 1","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1097502168"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-atlanta-douglasville-1-osmway-1097502168"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Baltimore","confidence":"low","contains_osm":true,"id":"datacentersexposed-73f19dbc9ed671a8","lat":39.27537,"location_precision":"source supplied","lon":-76.62551,"name":"Baltimore Technology Park","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/336387583"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/baltimore-technology-park-osmway-336387583"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/336387583"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"West Jordan","confidence":"medium","id":"datacentersexposed-73f1f0b563beb46e","lat":40.61,"location_precision":"source supplied","lon":-111.97,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-west-jordan","value":220.0}],"name":"Microsoft West Jordan","operator":"Microsoft Data Center LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-west-jordan"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-741975642a348a88","lat":41.70713,"location_precision":"source supplied","lon":-87.97596,"name":"Datacenter (386)","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1154349280"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/datacenter-386-osmway-1154349280"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1154349280"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-7462b8f1a93ff127","lat":35.10329,"location_precision":"source supplied","lon":-106.58935,"name":"Southwest Cyberport","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/1825907839"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/southwest-cyberport-osmnode-1825907839"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/1825907839"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Massena","confidence":"medium","id":"datacentersexposed-749748f27de1f2ca","lat":44.94854,"location_precision":"source supplied","lon":-74.84243,"name":"Former Sears Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/st-lawrence-county-planning-board-approves-conversion-sears-store-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/former-sears-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","contains_osm":true,"id":"datacentersexposed-74e9073ee2f0e1d4","lat":39.02891,"location_precision":"source supplied","lon":-77.42748,"name":"Amazon IAD174","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/984953813"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad174-osmway-984953813"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/744496750"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-iad116-osmway-744496750"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Temple","confidence":"medium","id":"datacentersexposed-753c9f82ad71bcbf","lat":31.05745,"location_precision":"source supplied","lon":-97.2979,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/rowan-digital-infrastructure-data-center","value":300.0}],"name":"Rowan Digital Infrastructure Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rowan-digital-infrastructure-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Jacksonville","confidence":"low","contains_osm":true,"id":"datacentersexposed-7561e12456cf6c4c","lat":30.24575,"location_precision":"source supplied","lon":-81.58172,"name":"Flexential Jacksonville","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112266917"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-jacksonville-osmnode-12112266917"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112266917"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Boydton","confidence":"medium","id":"datacentersexposed-75d6dd0d1abc03b8","lat":36.661,"location_precision":"source supplied","lon":-78.37,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/boydton-microsoft-region-2","value":380.0}],"name":"Microsoft Boydton — Region 2","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/boydton-microsoft-region-2"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Duncannon","confidence":"medium","id":"datacentersexposed-761414180d804176","lat":40.432,"location_precision":"source supplied","lon":-77.00678,"name":"MRP","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-may-build-data-center-instead-of-warehouse-in-perry-county-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mrp"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Danville","confidence":"medium","id":"datacentersexposed-76447443c49ac5f4","lat":36.5541,"location_precision":"source supplied","lon":-79.59838,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-data-center-2","value":299.0}],"name":"Stack Data Center","operator":"Stack Infrastructure, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stack-commits-735bn-investment-into-data-center-campus-in-berry-hill-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-data-center-2"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Omaha","confidence":"low","id":"datacentersexposed-764a84439ffca2d9","lat":41.2204,"location_precision":"source supplied","lon":-96.14764,"name":"Verizon Wireless","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/607753694"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/verizon-wireless-osmway-607753694"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-766bc1d3cd045dc1","lat":32.77503,"location_precision":"source supplied","lon":-117.07089,"name":"SDSU Computer Room","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/2607827436"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/sdsu-computer-room-osmnode-2607827436"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/2607827436"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-76a72f9c92a83572","lat":32.85048,"location_precision":"source supplied","lon":-97.0703,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/557140229"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-557140229"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/557140229"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Whitney","confidence":"medium","id":"datacentersexposed-76cd8aca654f717b","lat":31.85679,"location_precision":"source supplied","lon":-97.3625,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dfw-10-data-center","value":190.0}],"name":"DFW-10 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dfw-10-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Gaines Township","confidence":"medium","id":"datacentersexposed-76d03c38060dae94","lat":42.85255,"location_precision":"source supplied","lon":-85.5601,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/switch-pyramid-data-center","value":320.0}],"name":"Switch Pyramid Data Center","operator":"Switch, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/switch-pyramid-data-center"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"Davis","confidence":"medium","id":"datacentersexposed-76dad069372c9d64","lat":39.13851,"location_precision":"source supplied","lon":-79.4867,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ridgeline-microgrid","value":1656.0}],"name":"Ridgeline Microgrid","operator":"Fundamental Data LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ridgeline-microgrid"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7702074d6a5b869c","lat":37.3607,"location_precision":"source supplied","lon":-77.33181,"name":"Virginia Information Technologies Agency","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/439365340"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/virginia-information-technologies-agency-osmway-439365340"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/439365340"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-7712b62a9c12f6ec","lat":37.48392,"location_precision":"source supplied","lon":-77.24781,"name":"DC4","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516621"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dc4-osmway-1493516621"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516621"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashland","confidence":"medium","id":"datacentersexposed-772214d138e1bbd3","lat":38.39971,"location_precision":"source supplied","lon":-82.79701,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/muskie-data-campus-data-center","value":500.0}],"name":"Muskie Data Campus Data Center","operator":"TeraWulf Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/muskie-data-campus-data-center"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Fort Dix","confidence":"medium","id":"datacentersexposed-7748e82750fe7db8","lat":40.01661,"location_precision":"source supplied","lon":-74.60877,"name":"Joint Base McGuire-Dix-Lakehurst","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-department-of-the-air-force-accepting-proposals-for-ai-data-centers-in-military-bases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/joint-base-mcguire-dix-lakehurst"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","id":"datacentersexposed-775487cdff356955","lat":33.8084,"location_precision":"source supplied","lon":-84.45469,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-atl01-1","value":27.0}],"name":"Edged ATL01-1","operator":"Edged","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://cdn.prod.website-files.com/62f4046c4606ae485a2c58ec/66c39e92b470df059c06bccf_ATL01-1_Spec%20Sheet_240814_Digital.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-atl01-1"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Harlem","confidence":"medium","id":"datacentersexposed-77a5b5af35c17f67","lat":33.418,"location_precision":"source supplied","lon":-82.316,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pumpkin-tech-campus","value":500.0}],"name":"Pumpkin Tech Campus","operator":"Cloverleaf Infrastructure","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pumpkin-tech-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Wharncliffe","confidence":"medium","id":"datacentersexposed-77edbb506812dc6c","lat":37.59904,"location_precision":"source supplied","lon":-81.9545,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/adams-fork-wharncliffe-data-center","value":2398.5}],"name":"Adams Fork Wharncliffe Data Center","operator":"TransGas Development, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/adams-fork-wharncliffe-data-center"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7834123e2b2dceaf","lat":45.63201,"location_precision":"source supplied","lon":-121.2012,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-data-center-the-dalles-oregon-osmway-231769626","value":185.0}],"name":"Google Data Center The Dalles Oregon","operator":"Google LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/231769626"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-data-center-the-dalles-oregon-osmway-231769626"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/700431553"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-taylor-lake-data-center-osmway-700431553"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/231769626"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Portland","confidence":"low","contains_osm":true,"id":"datacentersexposed-7841d2a8e032b172","lat":45.52142,"location_precision":"source supplied","lon":-122.68056,"name":"The Pittock Internet Exchange","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/3732415309"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/the-pittock-internet-exchange-osmnode-3732415309"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/3732415309"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Chattanooga","confidence":"medium","id":"datacentersexposed-78478f3af24cf7ce","lat":35.04956,"location_precision":"source supplied","lon":-85.30803,"name":"Jailhouse Studios Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/former-jail-in-chattanooga-tennessee-targeted-for-production-space-and-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jailhouse-studios-data-center"}],"state":"Tennessee","status":"under construction"},{"ai_classification":"unknown","city":"Rockdale","confidence":"medium","id":"datacentersexposed-784ffb1a8dfe71b7","lat":30.65494,"location_precision":"source supplied","lon":-97.00582,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/riot-platforms-rockdale-tx-pg","value":700.0}],"name":"Riot Platforms Rockdale","operator":"Riot Platforms, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/riot-platforms-rockdale-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Newburg","confidence":"medium","id":"datacentersexposed-78687d12ce22221a","lat":38.3596,"location_precision":"source supplied","lon":-76.9757,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/morgantown-data-center","value":210.0}],"name":"Morgantown Data Center","operator":"TeraWulf, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://thebaynet.com/charles-countys-morgantown-plant-being-bought-by-data-infrastructure-company/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/morgantown-data-center"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/terawulf-data-center-2"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Stafford","confidence":"medium","id":"datacentersexposed-787b993586fdb029","lat":38.4145,"location_precision":"source supplied","lon":-77.43574,"name":"Austin Ridge Logisitics Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/austin-ridge-logisitics-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cartersville","confidence":"medium","id":"datacentersexposed-78b49fb2cc2d2ed6","lat":34.11429,"location_precision":"source supplied","lon":-84.7938,"name":"Switch","operator":"Switch, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/switch-to-invest-772-million-in-second-georgia-campus-outside-atlanta/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/switch"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-78b68b0bdbaa1c3e","lat":38.18847,"location_precision":"source supplied","lon":-77.44053,"name":"Summit Crossing Tech Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/summit-crossing-tech-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Northlake","confidence":"low","contains_osm":true,"id":"datacentersexposed-78f492beb5476de9","lat":41.92296,"location_precision":"source supplied","lon":-87.91826,"name":"Microsoft - Azure Datacenter","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/578443547"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-azure-datacenter-osmway-578443547"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/578443547"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Morris","confidence":"medium","id":"datacentersexposed-7916289b9cc9d86b","lat":41.39786,"location_precision":"source supplied","lon":-88.37636,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-morris-data-center","value":1000.0}],"name":"Tract Morris Data Center","operator":"Tract","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-expands-into-illinois-with-plans-for-1gw-data-center-park-outside-chicago/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-morris-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Pyote","confidence":"medium","id":"datacentersexposed-7925d6dd7f42dd3d","lat":31.52544,"location_precision":"source supplied","lon":-103.117,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://genesisdigitalassets.com/our-work-and-impact/","value":300.0}],"name":"Pyote Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://genesisdigitalassets.com/our-work-and-impact/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pyote-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"KING GEORGE","confidence":"medium","id":"datacentersexposed-79c4bd3f72c1afe0","lat":38.26772,"location_precision":"source supplied","lon":-77.31706,"name":"BIRCHWOOD","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110000542743"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/birchwood-110000542743"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Pikeville","confidence":"medium","id":"datacentersexposed-79cf31437b7a4a3b","lat":37.47927,"location_precision":"source supplied","lon":-82.51876,"name":"Pikeville Data Center at Kentucky Enterprise Industrial Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/pikeville-data-center-at-kentucky-enterprise-industrial-park"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-79e027386e78e91b","lat":38.79884,"location_precision":"source supplied","lon":-77.61443,"name":"NTT Grove at Gainesville","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-ntt-grove-at-gainesville"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Appling","confidence":"medium","id":"datacentersexposed-7a13931f6219f8d5","lat":33.51421,"location_precision":"source supplied","lon":-82.34112,"name":"White Oak Technology Park","operator":"Trammell Crow Company","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4443"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/white-oak-technology-park"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7a817ba61e9c6565","lat":39.14023,"location_precision":"source supplied","lon":-76.60643,"name":"CyberNAP Glen Burnie","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/16282459"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cybernap-glen-burnie-osmrelation-16282459"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/16282459"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Shreveport","confidence":"medium","id":"datacentersexposed-7a88a07698c26fac","lat":32.45425,"location_precision":"source supplied","lon":-93.9052,"name":"Shreveport Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/shreveport-data-center"}],"state":"Louisiana","status":"planned"},{"ai_classification":"unknown","city":"Fairfax","confidence":"medium","id":"datacentersexposed-7a9febee33027acc","lat":38.86084,"location_precision":"source supplied","lon":-77.39341,"name":"BIT HOLDINGS FIFTY-FOUR","operator":"BIT HOLDINGS FIFTY-FOUR INC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bit-holdings-fifty-four"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"New York","confidence":"low","id":"datacentersexposed-7aa47e4226dd5c8e","lat":40.71768,"location_precision":"source supplied","lon":-74.00844,"name":"Digital Realty New York JFK12","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12221880448"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-realty-new-york-jfk12-osmnode-12221880448"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Bristow","confidence":"medium","id":"datacentersexposed-7ac904881b7820e3","lat":38.73797,"location_precision":"source supplied","lon":-77.54125,"name":"Bristow Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bristow-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Rocky Mount","confidence":"medium","id":"datacentersexposed-7aecc1680433affd","lat":37.07742,"location_precision":"source supplied","lon":-79.9252,"name":"Google Data Center: Summit View Business Park","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-data-center-summit-view-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-7b05d1e71551a361","lat":29.41298,"location_precision":"source supplied","lon":-98.80637,"name":"Microsoft TRP3 (SAT46)","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1010260675"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-trp3-sat46-osmway-1010260675"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7b0bb3a9029390f3","lat":37.41569,"location_precision":"source supplied","lon":-79.14271,"name":"Lumos Networks","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/5225685660"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/lumos-networks-osmnode-5225685660"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/5225685660"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-7b18dbaddd7e3e01","lat":38.78015,"location_precision":"source supplied","lon":-77.53988,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/996723587"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-996723587"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Puyallup","confidence":"low","contains_osm":true,"id":"datacentersexposed-7b2695b71af27d63","lat":47.15892,"location_precision":"source supplied","lon":-122.27986,"name":"Centeris SH2 Build-to-Suit","operator":"Centeris","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/634635617"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/centeris-sh2-build-to-suit-osmway-634635617"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/634635617"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Moses Lake","confidence":"medium","id":"datacentersexposed-7b9f348854258c71","lat":47.13014,"location_precision":"source supplied","lon":-119.27808,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/keel-moses-lake-wa-pg","value":18.0}],"name":"KEEL Moses Lake","operator":"KEEL","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://northwiseproject.com/research/keel-stock-moses-lake"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/keel-moses-lake-wa-pg"}],"state":"Washington","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-7ba845b7bcee186d","lat":38.79496,"location_precision":"source supplied","lon":-77.5951,"name":"5451 Wellington Road West","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-5451-wellington-road-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ransom Twp","confidence":"medium","id":"datacentersexposed-7bbf18a9a55418b8","lat":41.44154,"location_precision":"source supplied","lon":-75.70432,"name":"Ransom Township Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/zoning-amendment-rejected-for-data-center-in-ransom-township-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ransom-township-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Saline","confidence":"medium","id":"datacentersexposed-7c0437636d61ab56","lat":42.16671,"location_precision":"source supplied","lon":-83.78161,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stargate-michigan-saline-township-mi-pg","value":1400.0}],"name":"Stargate Michigan (Saline Township)","operator":"Related Digital/Open AI/Oracle","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/oracle-and-openai-start-construction-on-stargate-data-center-campus-in-saline-township-michigan/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/stargate-michigan-saline-township-mi-pg"}],"state":"Michigan","status":"under construction"},{"ai_classification":"unknown","city":"Villa Rica","confidence":"medium","id":"datacentersexposed-7c82602500857aa6","lat":33.70841,"location_precision":"source supplied","lon":-84.9497,"name":"Atlas","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/atlas-files-for-428-acre-technology-and-data-park-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlas"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7ca43e1b1429ba1d","lat":37.48862,"location_precision":"source supplied","lon":-77.24621,"name":"RIC1 DC2","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13685576465"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ric1-dc2-osmnode-13685576465"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13685576465"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"PHILADELPHIA","confidence":"medium","id":"datacentersexposed-7cce3744852425fe","lat":39.95958,"location_precision":"source supplied","lon":-75.16205,"name":"EQUINIX","operator":"Equinix, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070616505"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/equinix-air-110070616505"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7ce667c9558dfbc3","lat":37.37502,"location_precision":"source supplied","lon":-121.95325,"name":"Prime Santa Clara","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209073636"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/prime-santa-clara-osmway-209073636"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073636"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Pasadena","confidence":"medium","id":"datacentersexposed-7d1507284a5757ca","lat":34.16684,"location_precision":"source supplied","lon":-118.08752,"name":"AWS","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-plans-another-quantum-research-center-in-pasadena-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Lansing","confidence":"medium","id":"datacentersexposed-7d1a184c44c090b2","lat":42.731,"location_precision":"source supplied","lon":-84.54565,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/deep-green-data-center","value":24.0}],"name":"Deep Green Data Center","operator":"Deep Green","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/deep-green-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","contains_osm":true,"id":"datacentersexposed-7d432ec04fbff0fd","lat":37.41838,"location_precision":"source supplied","lon":-121.94312,"name":"Dell 350 Holger Way","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/224139416"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dell-350-holger-way-osmway-224139416"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/224139416"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Quincy","confidence":"medium","id":"datacentersexposed-7d43d46c23d87fd1","lat":47.23,"location_precision":"source supplied","lon":-119.86,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-quincy","value":600.0}],"name":"Microsoft Quincy","operator":"Microsoft Data Center LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-quincy"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7d58483b734ce8d2","lat":33.34261,"location_precision":"source supplied","lon":-111.84096,"name":"StrongMind","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/828228235"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/strongmind-osmway-828228235"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/828228235"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"datacentersexposed-7d633a8863288c41","lat":30.19957,"location_precision":"source supplied","lon":-97.71307,"name":"Data Foundry - Texas 2","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/577628941"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/data-foundry-texas-2-osmway-577628941"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/577628941"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Saint Louis","confidence":"low","contains_osm":true,"id":"datacentersexposed-7d70d740870173da","lat":38.62926,"location_precision":"source supplied","lon":-90.19717,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/netrality-data-centers-osmway-42323063","value":12.0}],"name":"Netrality Data Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/42323063"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/netrality-data-centers-osmway-42323063"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/42323063"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Independence","confidence":"medium","id":"datacentersexposed-7d8dfd6c6ac1a7f1","lat":39.07347,"location_precision":"source supplied","lon":-94.33286,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nebius-data-center-2","value":880.0}],"name":"Nebius Data Center","operator":"Patmos","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/nebius-plans-800mw-data-center-campus-in-kansas-city-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nebius-data-center-2"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"Tampa","confidence":"low","contains_osm":true,"id":"datacentersexposed-7d8dfdb36a5d60fc","lat":28.0373,"location_precision":"source supplied","lon":-82.53998,"name":"Flexential Tampa - West","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112380995"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-tampa-west-osmnode-12112380995"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112380995"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-7d8ff45b0b9c1b22","lat":38.79116,"location_precision":"source supplied","lon":-77.5821,"name":"University Business Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-university-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"datacentersexposed-7da081b9f2d1ae15","lat":41.08,"location_precision":"source supplied","lon":-104.8,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-jade-data-center-campus-cheyenne","value":1800.0}],"name":"Project Jade Data Center Campus (Cheyenne)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMiygFBVV95cUxNbE1GM29xaUVFMFRtWjM0U21CMFhmOGFMbkVMVk1pU0htTjlXM1hKS01MZlk3NHRRVVlUbGd6RUtQdlFCc3YwOUZxU2Zyc2Y4VmVHY3NjaWdJN25MX3BGcmdMMk9mVnNfWE4yYWJUVDByUFJWU00wSmstdXJkdVpTemZvY2kwVjB5T1pJZVpwZzZTY0hDZXdQT3hsNmpnVXdpc3FwR3ZaQ0FOQkZWQjBKTXZWakJCLXF3bDFSSGROM212NmhZd1drOUxn?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/project-jade-data-center-campus-cheyenne"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Chesteron","confidence":"medium","id":"datacentersexposed-7db5f18bdbd292db","lat":41.59884,"location_precision":"source supplied","lon":-87.094,"name":"Provident Realty Advisors","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/application-for-13bn-data-center-in-chesterton-indiana-withdrawn/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/provident-realty-advisors"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Milam County","confidence":"medium","id":"datacentersexposed-7dd4c0584a8c86d6","lat":30.99355,"location_precision":"source supplied","lon":-97.0035,"name":"MIlan County Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.energy.gov/policy/articles/first-made-usa-solar-plant-set-power-google-data-centers-boosting-local-economy-and"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/milan-county-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Monclova Township","confidence":"medium","id":"datacentersexposed-7de12fc47d51c542","lat":41.54617,"location_precision":"source supplied","lon":-83.71574,"name":"Monclova Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.toledoblade.com/local/suburbs/2026/03/16/monclova-township-residents-wary-prospective-data-centers-backyard/stories/20260316097#:~:text=Monclova%20Township%20residents%20wary%20of,data%20centers%20in%20their%20backyard&text=To%20continue%20reading%2C%20try%20unlimited"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/monclova-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"datacentersexposed-7e15c702f7dee2a6","lat":38.5367,"location_precision":"source supplied","lon":-77.7811,"name":"Gigaland LLC Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gigaland-llc-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-7e33bb8858ec7b78","lat":32.82175,"location_precision":"source supplied","lon":-96.87355,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-dallas-empire-central-data-center-osmway-465032631","value":4.0}],"name":"DataBank Dallas Empire Central Data Center","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465032631"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-dallas-empire-central-data-center-osmway-465032631"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465032631"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-7e57e7e6e1b79eef","lat":38.79738,"location_precision":"source supplied","lon":-77.533,"name":"Microsoft Azure Balls Ford Road","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-microsoft-azure-balls-ford-road"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-7e5bdc7fa1ade771","lat":38.80276,"location_precision":"source supplied","lon":-77.5119,"name":"Equinix Manassas","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-equinix-manassas"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Van Buren Township","confidence":"medium","id":"datacentersexposed-7e5f08abdb630c6f","lat":42.22704,"location_precision":"source supplied","lon":-83.43421,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/panattoni-project-cannoli","value":1000.0}],"name":"Panattoni Project Cannoli","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/panattoni-looks-to-develop-1gw-data-center-campus-outside-detroit-michigan/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/panattoni-project-cannoli"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7e82866fbeafdbbe","lat":33.64467,"location_precision":"source supplied","lon":-111.8961,"name":"Iron Mountain Data Centers AZS-1","operator":"Iron Mountain Incorporated","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11018926315"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/iron-mountain-data-centers-azs-1-osmnode-11018926315"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11018926315"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Oregon","confidence":"medium","id":"datacentersexposed-7e834da0b6df4362","lat":41.66384,"location_precision":"source supplied","lon":-83.4237,"name":"Oregon Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/rezoning-requests-approved-for-data-center-outside-toledo-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oregon-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-7ea877ed7c454e7f","lat":29.47988,"location_precision":"source supplied","lon":-98.69253,"name":"Microsoft San Antonio","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/364289074"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-san-antonio-osmway-364289074"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/364289074"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Rushmere","confidence":"medium","id":"datacentersexposed-7ecc1109a9914ba0","lat":37.15202,"location_precision":"source supplied","lon":-76.68507,"name":"Green Energy Center","operator":"green.ch","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/green-energy-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"ALPHARETTA","confidence":"medium","id":"datacentersexposed-7ed9d1cd362d13d1","lat":34.08337,"location_precision":"source supplied","lon":-84.27354,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/enterprise-services-llc-air-110028005986","value":11.0}],"name":"ENTERPRISE SERVICES, LLC","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110028005986"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/enterprise-services-llc-air-110028005986"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-7f0781f079104d9a","lat":39.02,"location_precision":"source supplied","lon":-77.435,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aws-sterling-data-center-cluster","value":950.0}],"name":"AWS Sterling Data Center Cluster","operator":"Amazon Data Services, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/aws-sterling-data-center-cluster"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"HAVERHILL","confidence":"medium","id":"datacentersexposed-7f102000f3eccd0e","lat":42.78574,"location_precision":"source supplied","lon":-71.11934,"name":"AMAZON COM SERVICES LLC DTB9","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110003476462"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/amazon-com-services-llc-dtb9-air-110003476462"}],"state":"Massachusetts","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7f6112c66fee6f83","lat":40.83345,"location_precision":"source supplied","lon":-74.14022,"name":"Credit Suisse: Clifton Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/818790301"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/credit-suisse-clifton-data-center-osmway-818790301"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/818790301"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-7fbed3d862aadfb5","lat":35.03155,"location_precision":"source supplied","lon":-85.29725,"name":"DC Blox Chattanooga","operator":"DC BLOX","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/525060850"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/dc-blox-chattanooga-osmway-525060850"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/525060850"}],"state":"Tennessee","status":"operating"},{"ai_classification":"unknown","city":"Manassas","confidence":"medium","id":"datacentersexposed-7fd23935fc2a0504","lat":38.751,"location_precision":"source supplied","lon":-77.475,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-manassas-campus","value":425.0}],"name":"QTS Manassas Campus","operator":"QTS Realty Trust, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-manassas-campus"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Fremont","confidence":"low","contains_osm":true,"id":"datacentersexposed-7ff5db8ed6ea9f9b","lat":37.48988,"location_precision":"source supplied","lon":-121.93102,"name":"Hurricane Electric Fremont 1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/383728972"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/hurricane-electric-fremont-1-osmway-383728972"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/383728972"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"medium","id":"datacentersexposed-8009f5f761c00a47","lat":32.08659,"location_precision":"source supplied","lon":-97.09979,"name":"Provident Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://hillsbororeporter.com/city-hears-feedback-on-data-center-proposal-p31629-54.htm"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/provident-data-center-2"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Mansfield Twp","confidence":"medium","id":"datacentersexposed-800f455d196fcea0","lat":40.11868,"location_precision":"source supplied","lon":-74.75121,"name":"Tower Gate Project","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tower-gate-project"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Warrenton","confidence":"medium","id":"datacentersexposed-806456fb59c3ddad","lat":38.69159,"location_precision":"source supplied","lon":-77.77973,"name":"Maple Tree Farm","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/maple-tree-farm"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-80c10001b2bc15d8","lat":36.62459,"location_precision":"source supplied","lon":-87.26129,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/844389014"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-844389014"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/708931343"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844389014"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1103333136"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-80d6556163f20e4b","lat":38.91615,"location_precision":"source supplied","lon":-77.4787,"name":"Amazon IAD151","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/989735624"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad151-osmway-989735624"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Centennial","confidence":"low","contains_osm":true,"id":"datacentersexposed-80f2d6200baa61da","lat":39.58832,"location_precision":"source supplied","lon":-104.83242,"name":"Xfinity/Comcast Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/200989527"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/xfinity-comcast-data-center-osmway-200989527"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/200989527"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-810025a9656be361","lat":46.8151,"location_precision":"source supplied","lon":-96.84431,"name":"Dakota Carrier Network","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/19390019"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/dakota-carrier-network-osmrelation-19390019"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/19390019"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"datacentersexposed-81022a3e8a897de8","lat":41.13757,"location_precision":"source supplied","lon":-104.71874,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://oilcity.news/statewide/2025/10/07/1-2-billion-data-center-breaks-ground-in-cheyenne-promises-water-free-operations/","value":250.0}],"name":"Related Digital Cheyenne Data Center","operator":"Related Digital/CoreWeave","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://oilcity.news/statewide/2025/10/07/1-2-billion-data-center-breaks-ground-in-cheyenne-promises-water-free-operations/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/related-digital-cheyenne-data-center"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-8127e80a9de12dbe","lat":37.48817,"location_precision":"source supplied","lon":-77.24006,"name":"RIC2 DC1","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516623"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric2-dc1-osmway-1493516623"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516623"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Kents Store","confidence":"medium","id":"datacentersexposed-8185baeac4a7c747","lat":37.88311,"location_precision":"source supplied","lon":-78.0388,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgecore","value":1100.0}],"name":"EdgeCore","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edgecore-to-develop-11gw-data-center-in-louisa-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgecore"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-819bb9a384fd7c99","lat":38.84396,"location_precision":"source supplied","lon":-77.57113,"name":"Digital Gateway North","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-digital-gateway-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Austell","confidence":"low","contains_osm":true,"id":"datacentersexposed-81d713213dcc1b74","lat":33.74656,"location_precision":"source supplied","lon":-84.57974,"name":"Digital Realty Atlanta ATL11","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/975064000"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-atlanta-atl11-osmway-975064000"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975064000"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Moorestown","confidence":"medium","id":"datacentersexposed-8208998a21b0eea6","lat":39.98939,"location_precision":"source supplied","lon":-74.8896,"name":"Comcast Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/comcast-to-convert-former-bank-into-data-center-in-new-jersey/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/comcast-data-center"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"datacentersexposed-823b87213b23b87b","lat":33.24653,"location_precision":"source supplied","lon":-84.2326,"name":"Project Spalding","operator":"Montana Property Group LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-255-million-sq-ft-data-center-campus-outside-atlanta/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-spalding"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Piscataway","confidence":"low","contains_osm":true,"id":"datacentersexposed-825ee52662c7bccc","lat":40.55694,"location_precision":"source supplied","lon":-74.48392,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-piscataway-data-center-osmway-362662493","value":52.0}],"name":"QTS Piscataway Data Center","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/362662493"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-piscataway-data-center-osmway-362662493"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/362662493"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"College Park","confidence":"medium","id":"datacentersexposed-826dcd8c77fab66c","lat":33.62499,"location_precision":"source supplied","lon":-84.56204,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-union-city-data-center-campus","value":324.0}],"name":"Microsoft Union City Data Center Campus","operator":"Microsoft Corporation","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-union-city-data-center-campus"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-82779c1fbc7b8139","lat":39.30389,"location_precision":"source supplied","lon":-84.31161,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-mason-cin3-osmway-31250931","value":30.0}],"name":"CyrusOne Cincinnati-Mason CIN3","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/31250931"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-cincinnati-mason-cin3-osmway-31250931"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/31250931"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Thomaston","confidence":"medium","id":"datacentersexposed-829a8a5a9064f3ba","lat":32.88515,"location_precision":"source supplied","lon":-84.24026,"name":"Upson County Megasite","operator":"Dominion Capital","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.upsonbeacon.com/news/possible-data-center-megasite-listed-for-sale-in-upson-county/article_a74d3bdd-121e-4e4e-87b1-a14254476b3a.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/upson-county-megasite"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Santa Ana","confidence":"low","id":"datacentersexposed-829decc922b8d8dd","lat":33.70751,"location_precision":"source supplied","lon":-117.8441,"name":"TPx Colocation Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/492699069"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tpx-colocation-datacenter-osmway-492699069"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"datacentersexposed-83118a3b34c5daf3","lat":37.381,"location_precision":"source supplied","lon":-121.935,"name":"LBA Realty Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lba-realty-data-center"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Jim Thorpe","confidence":"medium","id":"datacentersexposed-837227de1ef4969e","lat":40.89574,"location_precision":"source supplied","lon":-75.68105,"name":"Jim Thorpe Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jim-thorpe-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-8376635fcb203362","lat":38.78936,"location_precision":"source supplied","lon":-77.57494,"name":"Astrid","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-astrid"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-838029d809974586","lat":42.98209,"location_precision":"source supplied","lon":-70.95059,"name":"Information Technology Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/589070714"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/information-technology-data-center-osmway-589070714"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Carlisle","confidence":"medium","id":"datacentersexposed-839127c3dad987ce","lat":40.2481,"location_precision":"source supplied","lon":-77.1092,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pax-1-data-center","value":1350.0}],"name":"PAX-1 Data Center","operator":"PowerHouse Data Centers / Pennsylvania Data Center Partners","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pax-1-data-center"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-83b59d40852b80d1","lat":38.96157,"location_precision":"source supplied","lon":-77.37742,"name":"Equinix DC97","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/221897579"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-dc97-osmway-221897579"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/221897579"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Bismark","confidence":"medium","id":"datacentersexposed-83c41afc737f00d5","lat":46.81102,"location_precision":"source supplied","lon":-100.721,"name":"Aurum Capital Ventures","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/company-eyes-300-acre-data-center-development-in-bismarck-north-dakota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aurum-capital-ventures"}],"state":"North Dakota","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-844d5a6ee1cb5324","lat":38.76895,"location_precision":"source supplied","lon":-77.54382,"name":"Wellington Glen Technology Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-wellington-glen-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","id":"datacentersexposed-845184ecf0e25ddb","lat":33.42,"location_precision":"source supplied","lon":-111.7,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-mesa-proposed","value":600.0}],"name":"Google Mesa (proposed)","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-mesa-proposed"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"MONTGOMERY","confidence":"medium","id":"datacentersexposed-846086bce7520c8b","lat":32.265,"location_precision":"source supplied","lon":-86.36351,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-montgomery-epoch","value":100.0}],"name":"Meta Montgomery","operator":"Meta Platforms, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-montgomery-epoch"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"New York","confidence":"low","contains_osm":true,"id":"datacentersexposed-848fdbdd1ba7ed5d","lat":40.71652,"location_precision":"source supplied","lon":-74.0059,"name":"33 Thomas Street","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/289884123"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/33-thomas-street-osmway-289884123"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/289884123"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"medium","id":"datacentersexposed-8491fcadefac2298","lat":32.80512,"location_precision":"source supplied","lon":-96.83142,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stemmons-corridor-data-campus","value":70.0}],"name":"Stemmons Corridor data campus","operator":"CleanArc","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cleanarc-partners-with-crow-holdings-for-245mw-campus-in-dallas-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stemmons-corridor-data-campus"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-84aedc9168212096","lat":39.07675,"location_precision":"source supplied","lon":-77.51513,"name":"Cochran Tech Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-cochran-tech-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-84b48d9d207093c3","lat":38.79881,"location_precision":"source supplied","lon":-77.52738,"name":"Aligned Manassas","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-aligned-manassas"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","contains_osm":true,"id":"datacentersexposed-84bf487997f2c666","lat":33.40022,"location_precision":"source supplied","lon":-112.04788,"name":"Cogent Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/290307022"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cogent-data-center-osmway-290307022"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/290307022"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Salem","confidence":"low","contains_osm":true,"id":"datacentersexposed-84e84410239ccfd5","lat":44.92657,"location_precision":"source supplied","lon":-123.00185,"name":"Oregon State Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/733721782"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/oregon-state-data-center-osmway-733721782"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/733721782"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-8500fea3a159fed1","lat":45.55881,"location_precision":"source supplied","lon":-122.92777,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-data-center-hillsboro-1-osmway-729192992","value":24.0}],"name":"QTS Data Center - Hillsboro 1","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/729192992"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-data-center-hillsboro-1-osmway-729192992"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/918871787"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-data-center-hillsboro-2-osmway-918871787"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/729192992"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","id":"datacentersexposed-850200366ff1c3c7","lat":32.751,"location_precision":"source supplied","lon":-97.331,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-fort-worth","value":700.0}],"name":"Meta Fort Worth","operator":"Facebook USA, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/meta-fort-worth"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-85331e4bb29410e7","lat":39.3022,"location_precision":"source supplied","lon":-94.72083,"name":"Meta Kansas City (Golden Plains)","operator":"Facebook USA, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-kansas-city-golden-plains-mo-pg"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"South Fulton","confidence":"medium","id":"datacentersexposed-856204d2bc090c3b","lat":33.70833,"location_precision":"source supplied","lon":-84.58456,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/westlake","value":113.0}],"name":"Westlake","operator":"Vantage Data Centers Holdings, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/westlake"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-85798863deac921b","lat":40.1046,"location_precision":"source supplied","lon":-82.80491,"name":"Compugen New Albany","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/547156405"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/compugen-new-albany-osmway-547156405"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/547156405"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/547277699"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Cartoosa","confidence":"medium","id":"datacentersexposed-8593ebd7f350b5be","lat":36.14817,"location_precision":"source supplied","lon":-95.7338,"name":"Project Anthem","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/340-acre-data-center-campus-planned-in-tulsa-oklahoma/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-anthem"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Harrodsburg","confidence":"medium","id":"datacentersexposed-85a106b1ded414c9","lat":37.76989,"location_precision":"source supplied","lon":-84.77884,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mercer-county-data-center","value":645.0}],"name":"Mercer County Data Center","operator":"Jones Lang Sallee","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mercer-county-data-center"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-85dc2f5a33f5869f","lat":38.7793,"location_precision":"source supplied","lon":-77.5685,"name":"Microsoft Azure Gainesville Tech Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-microsoft-azure-gainesville-tech-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lynnwood","confidence":"low","contains_osm":true,"id":"datacentersexposed-860e329c1e34c909","lat":47.86469,"location_precision":"source supplied","lon":-122.28415,"name":"Norma Beach Cable Landing Station","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/842544718"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/norma-beach-cable-landing-station-osmway-842544718"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/842544718"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Seattle","confidence":"low","contains_osm":true,"id":"datacentersexposed-86332087e1f5cc78","lat":47.61442,"location_precision":"source supplied","lon":-122.33974,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-se3-data-center-osmway-359930465","value":7.0}],"name":"Equinix SE3 Data Center","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/359930465"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-se3-data-center-osmway-359930465"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/359930465"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Stevensburg","confidence":"medium","id":"datacentersexposed-867e28be14883cd5","lat":38.4358,"location_precision":"source supplied","lon":-77.87576,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/marvell-developments","value":135.0}],"name":"Marvell Developments","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://go.boarddocs.com/va/tocva/Board.nsf/files/CTNP796180C4/$file/Copper%20Ridge%20Data%20Center_RZStaffReport.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/marvell-developments"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Villa Rica","confidence":"medium","id":"datacentersexposed-869e134f632fb81a","lat":33.7077,"location_precision":"source supplied","lon":-84.86278,"name":"Hickman Property","operator":"East Village Donthan LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hickman-property"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Ankeny","confidence":"medium","id":"datacentersexposed-86b60fee9d967db5","lat":41.65646,"location_precision":"source supplied","lon":-93.5616,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-dsm01-1-data-center","value":13.0}],"name":"Edged DSM01-1 Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edged-announces-13mw-data-center-outside-des-moines-iowa/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-dsm01-1-data-center"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Santa Teresa","confidence":"medium","id":"datacentersexposed-86d9e2cca9c987c6","lat":31.81646,"location_precision":"source supplied","lon":-106.678,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-jupiter","value":700.0}],"name":"Project Jupiter","operator":"OpenAI","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://elpasomatters.org/2025/08/27/dona-ana-billion-dollar-data-center-santa-teresa-el-paso-water-meta/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-jupiter"}],"state":"New Mexico","status":"under construction"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"medium","id":"datacentersexposed-86e56a80580d6519","lat":36.33975,"location_precision":"source supplied","lon":-114.943,"name":"Novva Data Center (site 2)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/novva-data-centers-buys-205-acres-of-land-in-las-vegas-nevada/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/novva-data-center-site-2"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-86ecdc8a46898590","lat":38.80095,"location_precision":"source supplied","lon":-77.58262,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/pwc-corscale-gainesville-crossing","value":306.0}],"name":"CorScale Gainesville Crossing","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-corscale-gainesville-crossing"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"STERLING","confidence":"medium","id":"datacentersexposed-86fdf56689dbd414","lat":38.99123,"location_precision":"source supplied","lon":-77.42243,"name":"108 CARPENTER DRIVE","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/c649938c-a42c-43c1-af23-ac3e7ece8a37?tab=locations"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/108-carpenter-drive"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-87660bd025c307a9","lat":39.0435,"location_precision":"source supplied","lon":-77.54084,"name":"42254 THUNDERBALL DR","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1292897243"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/42254-thunderball-dr-osmway-1292897243"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1292897243"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Muhlenburg","confidence":"medium","id":"datacentersexposed-876f45c6458f8bb3","lat":39.69766,"location_precision":"source supplied","lon":-83.11986,"name":"Pacifico Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/muhlenberg-ohio-introduces-year-long-moratorium-on-new-data-centers/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pacifico-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Racine/ Caledonia","confidence":"medium","id":"datacentersexposed-877a2dd8f99ea572","lat":42.83487,"location_precision":"source supplied","lon":-87.8458,"name":"Caledonia Data Center","operator":"Microsoft Corporation","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/244-acre-data-center-campus-proposed-outside-milwaukee-wisconsin/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/caledonia-data-center"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Gilbert","confidence":"low","contains_osm":true,"id":"datacentersexposed-878eece328250cd9","lat":33.36193,"location_precision":"source supplied","lon":-111.83929,"name":"GoDaddy - Gilbert","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/530982335"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/godaddy-gilbert-osmway-530982335"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/530982335"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Amarillo","confidence":"medium","id":"datacentersexposed-87ac4b1bdb5b9e1f","lat":35.28762,"location_precision":"source supplied","lon":-101.554,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fermi-america-hypergrid-project-matador","value":11000.0}],"name":"Fermi America HyperGrid/ Project Matador","operator":"Fermi America and Texas Tech","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/fermi-america-acquires-600mw-of-gas-turbines-for-11gw-ai-mega-campus-in-amarillo-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fermi-america-hypergrid-project-matador"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"datacentersexposed-87ca1b17f9d9b0eb","lat":38.81513,"location_precision":"source supplied","lon":-77.65292,"name":"Amazon IAD64","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/697021948"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad64-osmway-697021948"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Washingtonville","confidence":"medium","id":"datacentersexposed-87decc182c9f52d4","lat":41.07108,"location_precision":"source supplied","lon":-76.67566,"name":"Montour County Amazon Data Center","operator":"Talen Energy/Amazon","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/montour-county-amazon-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-88251534758239f0","lat":40.09362,"location_precision":"source supplied","lon":-82.75146,"name":"Amazon Web Services  CMH53","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1020374277"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-cmh53-osmway-1020374277"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Archbald","confidence":"medium","id":"datacentersexposed-882b8d0e3b1d99ba","lat":41.52498,"location_precision":"source supplied","lon":-75.55418,"name":"Project North","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-north"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Bloomington","confidence":"low","contains_osm":true,"id":"datacentersexposed-88509fad462a0814","lat":44.80721,"location_precision":"source supplied","lon":-93.37539,"name":"Verizon - Bloomington Network","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/99861735"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-bloomington-network-osmway-99861735"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/99861735"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-88688cffceb48889","lat":30.2155,"location_precision":"source supplied","lon":-97.69607,"name":"Data Foundry Austin 1 Data Center","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/379205427"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/data-foundry-austin-1-data-center-osmway-379205427"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379205427"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-88914cbb8d4c9ade","lat":38.78063,"location_precision":"source supplied","lon":-77.57463,"name":"Gainesville Tech Park Piney Branch","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-gainesville-tech-park-piney-branch"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-8898fa036c74f5cc","lat":35.92951,"location_precision":"source supplied","lon":-84.31057,"name":"Frontier (supercomputer)","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10648552506"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/frontier-supercomputer-osmnode-10648552506"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-88a974c70d1e03ef","lat":41.11435,"location_precision":"source supplied","lon":-96.14281,"name":"Meta Sarpy Data center","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1253282101"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-sarpy-data-center-osmway-1253282101"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/844394340"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-sarpy-data-center-osmway-844394340"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"medium","id":"datacentersexposed-894e8e25be28b2c8","lat":41.84624,"location_precision":"source supplied","lon":-87.6257,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hydravault-data-center","value":20.0}],"name":"HydraVault Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/new-firm-announces-plans-for-20mw-liquid-cooled-data-center-in-chicago/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hydravault-data-center"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-8957af4e7c54a55f","lat":38.99379,"location_precision":"source supplied","lon":-77.45051,"name":"Amazon IAD76","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/299927846"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad76-osmway-299927846"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465062053"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad88-osmway-465062053"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/299927846"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Grand Rapids","confidence":"medium","id":"datacentersexposed-897a5cd8f8af1793","lat":42.85125,"location_precision":"source supplied","lon":-85.54604,"name":"Microsoft Grand Rapids Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-confirms-plans-for-data-center-in-grand-rapids-michigan/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-grand-rapids-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Imperial","confidence":"medium","id":"datacentersexposed-8982b04923baa4e2","lat":32.81923,"location_precision":"source supplied","lon":-115.56083,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/imperial-data-center-project","value":330.0}],"name":"Imperial Data Center Project","operator":"Imperial Valley Computer Manufacturing, LLC/ Google (unconfirmed)","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/330mw-google-linked-data-center-proposed-in-southern-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/imperial-data-center-project"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-89fd63d979742203","lat":38.94809,"location_precision":"source supplied","lon":-77.56054,"name":"Amazon IAD125","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/897226574"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad125-osmway-897226574"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/897226574"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Wilmington","confidence":"medium","id":"datacentersexposed-8a03ec151b095f97","lat":39.42304,"location_precision":"source supplied","lon":-83.84547,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/wilmington-data-center","value":400.0}],"name":"Wilmington Data Center","operator":"Amazon.com, Inc.","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wilmington-data-center"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Mountain Top","confidence":"medium","id":"datacentersexposed-8a2068e2da7d8cd5","lat":41.08069,"location_precision":"source supplied","lon":-75.95785,"name":"Dorrance Township Data Center","operator":"Brewster Land Company, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/municipal-leaders-debate-data-center-zoning-ordinance-in-dorrance-township-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dorrance-township-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-8a40b218c1904d19","lat":33.75045,"location_precision":"source supplied","lon":-84.58568,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-datacenter-douglas-county-osmway-578435601","value":78.0}],"name":"Google Datacenter - Douglas County","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/578435601"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-datacenter-douglas-county-osmway-578435601"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Cedar City","confidence":"medium","id":"datacentersexposed-8a8a2c6ad01bad51","lat":37.79538,"location_precision":"source supplied","lon":-113.37061,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/antelope-data-center","value":1500.0}],"name":"Antelope Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/640-acre-data-center-could-be-built-in-iron-county-utah/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/antelope-data-center"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8ab7efa83463a5af","lat":37.363,"location_precision":"source supplied","lon":-87.54715,"name":"Dynamics Mining","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1254161871"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dynamics-mining-osmway-1254161871"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1254161871"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"PAPILLION","confidence":"medium","id":"datacentersexposed-8ab89c8a12ad55c6","lat":41.13272,"location_precision":"source supplied","lon":-96.1395,"name":"FIREBALL GROUP LLC DATA CENTER","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110064734202"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/fireball-group-llc-data-center-air-110064734202"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Midlothian","confidence":"medium","id":"datacentersexposed-8b0dcdaad1fb9c20","lat":37.49907,"location_precision":"source supplied","lon":-77.69161,"name":"Project Loch","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://chesterfieldfits.com/site/wp-content/uploads/2025/05/25SN1040-Watkins.-Proffers.-Executed.-5.9.25-01718951xBE3E4.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-loch"},{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-loch-google"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sunrise","confidence":"low","contains_osm":true,"id":"datacentersexposed-8b212145d60d1813","lat":26.18499,"location_precision":"source supplied","lon":-80.28688,"name":"T-Mobile Everglades MSO Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1017518460"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/t-mobile-everglades-mso-data-center-osmway-1017518460"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1017518460"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-8b337b5a3cb96612","lat":38.44996,"location_precision":"source supplied","lon":-77.97819,"name":"DataBank","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://go.boarddocs.com/va/ccva/Board.nsf/goto?open&id=BD5H3G466E8A"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8b3e0a66008f4748","lat":40.64379,"location_precision":"source supplied","lon":-74.28545,"name":"Barclays Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/15884451"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/barclays-datacenter-osmrelation-15884451"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/15884451"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"low","id":"datacentersexposed-8b5bd7819b0e8b13","lat":41.4989,"location_precision":"source supplied","lon":-93.78707,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-osmway-830885774","value":100.0}],"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/830885774"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-osmway-830885774"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Cedar Rapids","confidence":"medium","id":"datacentersexposed-8bb7543b0f194e6b","lat":41.97589,"location_precision":"source supplied","lon":-91.67041,"name":"QTS Cedar Rapids","operator":"QTS Realty Trust, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-cedar-rapids-ia-pg"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"near Childress","confidence":"medium","id":"datacentersexposed-8bc08a3a6a54ebe3","lat":34.37431,"location_precision":"source supplied","lon":-100.094,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-fei-soluna","value":100.0}],"name":"Project Fei (Soluna)","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-fei-soluna"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Valparaiso","confidence":"medium","id":"datacentersexposed-8bceb064f6b04990","lat":41.50217,"location_precision":"source supplied","lon":-87.01344,"name":"Agincourt","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/indianas-city-of-valparaiso-pulls-the-plug-on-agincourt-data-center-project/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/agincourt"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-8be114322a23b53d","lat":45.5502,"location_precision":"source supplied","lon":-122.93167,"name":"Adobe Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/325096144"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/adobe-data-center-osmway-325096144"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/325096144"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Hampton","confidence":"medium","id":"datacentersexposed-8c9fee9f411d19e2","lat":33.38445,"location_precision":"source supplied","lon":-84.26329,"name":"Hampton Data Center","operator":"Southeast Property Holdings LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://henryga.news/2025/03/28/data-center-approved-to-locate-off-georgia-20-in-hampton/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hampton-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Pine Bluffs","confidence":"low","contains_osm":true,"id":"datacentersexposed-8ca62ab2c2d8192f","lat":41.1826,"location_precision":"source supplied","lon":-104.0685,"name":"Windbreak Cable","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1268789798"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/windbreak-cable-osmway-1268789798"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1268789798"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"medium","id":"datacentersexposed-8cc130c5e4ae7582","lat":36.21911,"location_precision":"source supplied","lon":-115.3135,"name":"Switch Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/switch-data-center"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-8cebaf93e849db8e","lat":35.08445,"location_precision":"source supplied","lon":-106.64899,"name":"123 Central","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9808044840"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/123-central-osmnode-9808044840"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9808044840"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Archbald","confidence":"medium","id":"datacentersexposed-8cf04d2f32d3000d","lat":41.51686,"location_precision":"source supplied","lon":-75.56445,"name":"Project Scott","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-scott"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Rome","confidence":"medium","id":"datacentersexposed-8cf3841ccc8be66d","lat":34.26722,"location_precision":"source supplied","lon":-85.2995,"name":"Project Gracie (Atlas Development)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/atlas-plans-24-million-sq-ft-data-center-campus-outside-rome-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-gracie-atlas-development"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Henderson","confidence":"low","contains_osm":true,"id":"datacentersexposed-8cf43461677141c5","lat":36.05882,"location_precision":"source supplied","lon":-115.0088,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/844359207"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-844359207"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844359206"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844359207"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8d00ec0a36a4c004","lat":29.47285,"location_precision":"source supplied","lon":-98.68957,"name":"Lowe's Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611423"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lowes-data-center-osmway-509611423"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611423"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Woodford","confidence":"medium","id":"datacentersexposed-8d298336df15b508","lat":38.12135,"location_precision":"source supplied","lon":-77.50528,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-data-service-orrock-rd","value":770.0}],"name":"Amazon Data Service: Orrock Rd","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/amazon-data-service-orrock-rd"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"datacentersexposed-8d2f3e01463acd3e","lat":33.25612,"location_precision":"source supplied","lon":-84.14383,"name":"75 South Data Center Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/hillwood-affiliate-files-to-develop-22-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/75-south-data-center-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-8d5a5f0441136788","lat":32.43176,"location_precision":"source supplied","lon":-97.0869,"name":"Venus Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/venus-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"datacentersexposed-8d8f8dc7db88f960","lat":38.90306,"location_precision":"source supplied","lon":-77.46525,"name":"PDCREF 2 Chantilly","operator":"PDCREF 2 CHANTILLY LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Zoning&TabName=Zoning&capID1=REC22&capID2=00000&capID3=00GHV&agencyCode=FFX"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pdcref-2-chantilly"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Huntsville","confidence":"low","contains_osm":true,"id":"datacentersexposed-8d9c612870195543","lat":34.74543,"location_precision":"source supplied","lon":-86.69188,"name":"SimpleHelix","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/961071564"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/simplehelix-osmway-961071564"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/961071564"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8dd1bd34d2ed39b7","lat":40.13579,"location_precision":"source supplied","lon":-83.21264,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016636"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1386016636"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344148"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016636"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Harwood","confidence":"medium","id":"datacentersexposed-8df36d9fed92537a","lat":46.97181,"location_precision":"source supplied","lon":-96.8542,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/applied-digital-polaris-forge-2","value":280.0}],"name":"Applied Digital: Polaris Forge 2","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-plans-280mw-ai-data-center-campus-in-north-dakota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/applied-digital-polaris-forge-2"}],"state":"North Dakota","status":"under construction"},{"ai_classification":"unknown","city":"Bloomington","confidence":"low","contains_osm":true,"id":"datacentersexposed-8e0b890a4c1887ba","lat":39.17442,"location_precision":"source supplied","lon":-86.50069,"name":"IU Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/203432103"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/iu-data-center-osmway-203432103"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/203432103"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-8e3580850fd73f7e","lat":38.76422,"location_precision":"source supplied","lon":-77.53508,"name":"Hornbaker Road","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-hornbaker-road"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"datacentersexposed-8ea825b9e47a2600","lat":39.01489,"location_precision":"source supplied","lon":-77.4588,"name":"Equinix Ashburn DC11","operator":"Equinix, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/298127420"}],"updated":"2026-07-14","url":"https://datacentersexposed.com/facilities/equinix-ashburn-dc11-osmway-298127420"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/796933516"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-ashburn-dc21-osmway-796933516"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8eea0294ef1ad6a0","lat":33.47542,"location_precision":"source supplied","lon":-111.71917,"name":"Myndshift Technologies","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/836947535"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/myndshift-technologies-osmway-836947535"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/836947535"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Garland","confidence":"medium","id":"datacentersexposed-8f0ca60c543be85c","lat":32.91262,"location_precision":"source supplied","lon":-96.63888,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-garland-tx-pg","value":160.0}],"name":"Digital Realty Garland","operator":"Digital Realty Trust, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/digital-realty-files-to-expand-planned-data-center-campus-in-garland-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-garland-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-8f518b419deb0a8c","lat":38.64322,"location_precision":"source supplied","lon":-77.4388,"name":"Amazon Parsons Business Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-parsons-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","contains_osm":true,"id":"datacentersexposed-8f89586b70818061","lat":41.85356,"location_precision":"source supplied","lon":-87.61805,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-chicago-data-center-ch1-osmnode-12695496267","value":6.0}],"name":"Equinix Chicago Data Center - CH1","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12695496267"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-chicago-data-center-ch1-osmnode-12695496267"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12695496267"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Umatilla","confidence":"low","contains_osm":true,"id":"datacentersexposed-8fd0cabd4e670837","lat":45.92059,"location_precision":"source supplied","lon":-119.23,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196821"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1252196821"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196820"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196821"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344149"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344150"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344151"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-8fe5fafb4068da2e","lat":29.47424,"location_precision":"source supplied","lon":-98.68008,"name":"Valero Wiserman","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611436"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/valero-wiserman-osmway-509611436"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611436"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"datacentersexposed-903237abf24205e4","lat":38.87255,"location_precision":"source supplied","lon":-77.46563,"name":"PARKSTONE TECH PARK, LLC","operator":"PARKSTONE TECH PARK, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://plus.fairfaxcounty.gov/CitizenAccess/Cap/CapDetail.aspx?Module=Zoning&TabName=Zoning&capID1=20HS5&capID2=00000&capID3=003UO&agencyCode=FFX"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/parkstone-tech-park-llc"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Naperville","confidence":"medium","id":"datacentersexposed-90578f84e14b938c","lat":41.81113,"location_precision":"source supplied","lon":-88.1191,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/karis-critical-data-center","value":36.0}],"name":"Karis Critical Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/karis-critical-data-center"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Gordon","confidence":"medium","id":"datacentersexposed-90687c43ff91e8d8","lat":32.91623,"location_precision":"source supplied","lon":-83.383,"name":"Eagle Rock Partners LLC and Thomas & Hutton Engineering Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/eagle-rock-partners-llc-and-thomas-hutton-engineering-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9083341184a074db","lat":40.3,"location_precision":"source supplied","lon":-83.0,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/delaware-county-aws-proposed","value":600.0}],"name":"AWS Delaware County (proposed)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/delaware-county-aws-proposed"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-908bf7335876625c","lat":39.04165,"location_precision":"source supplied","lon":-77.53921,"name":"42255 THUNDERBALL DR","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1292897242"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/42255-thunderball-dr-osmway-1292897242"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1292897242"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Kennerdell","confidence":"medium","id":"datacentersexposed-90aaaa2011407917","lat":41.26942,"location_precision":"source supplied","lon":-79.81057,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bitfarm-scrubgrass","value":63.0}],"name":"Bitfarm Scrubgrass","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitfarm-scrubgrass"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"St Charles","confidence":"medium","id":"datacentersexposed-90b5ef983203b3a9","lat":38.82242,"location_precision":"source supplied","lon":-90.5378,"name":"St Charles Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://fox2now.com/news/missouri/st-charles-proposed-data-center-sparks-environmental-concerns/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/st-charles-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Springfield","confidence":"low","contains_osm":true,"id":"datacentersexposed-9142e5c8bd390dca","lat":39.9128,"location_precision":"source supplied","lon":-83.72366,"name":"LexisNexus Springfield","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/138643160"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lexisnexus-springfield-osmway-138643160"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/138643160"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Philadelphia","confidence":"medium","id":"datacentersexposed-9148c6d0aafb7eae","lat":40.11643,"location_precision":"source supplied","lon":-75.00086,"name":"Philadelphia Vanguard Data Center","operator":"The Government of Ontario","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://property.compstak.com/2000-Kubach-Road-Philadelphia/p/72300"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/philadelphia-vanguard-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","contains_osm":true,"id":"datacentersexposed-91844de851059045","lat":33.41608,"location_precision":"source supplied","lon":-112.00947,"name":"PhoenixNAP","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/244490839"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/phoenixnap-osmway-244490839"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/244490839"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Cleveland","confidence":"low","contains_osm":true,"id":"datacentersexposed-918b5154eebd47b4","lat":41.50636,"location_precision":"source supplied","lon":-81.68359,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-data-center-osmway-491914767","value":10.0}],"name":"H5 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/491914767"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-data-center-osmway-491914767"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/491914767"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-91c10a4de0a74223","lat":41.12499,"location_precision":"source supplied","lon":-104.89485,"name":"MineOne Wyoming Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1282875386"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/mineone-wyoming-data-center-osmway-1282875386"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Sarcoxie","confidence":"medium","id":"datacentersexposed-9222270bcdf6e204","lat":37.13561,"location_precision":"source supplied","lon":-94.09406,"name":"Sarcoxie Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sarcoxie-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"KUNA","confidence":"medium","id":"datacentersexposed-92327c1f63c44a70","lat":43.45923,"location_precision":"source supplied","lon":-116.42108,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-kuna-epoch","value":198.0}],"name":"Meta Kuna","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/meta-kuna-epoch"}],"state":"Idaho","status":"under construction"},{"ai_classification":"unknown","city":"Somerville","confidence":"low","contains_osm":true,"id":"datacentersexposed-92b0f701af6345e8","lat":42.37671,"location_precision":"source supplied","lon":-71.07976,"name":"CoreSite BO1","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/29827954"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-bo1-osmway-29827954"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/29827954"}],"state":"Massachusetts","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-931606dbe9494bf3","lat":45.57019,"location_precision":"source supplied","lon":-122.91983,"name":"QTS Data Center - Hillsboro 3","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1465196736"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-data-center-hillsboro-3-osmway-1465196736"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1465196735"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1465196736"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-9320ac1d282d1e1a","lat":32.83796,"location_precision":"source supplied","lon":-96.8784,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prime-dfw01-01-osmway-465032380","value":12.0}],"name":"Prime DFW01-01","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465032380"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prime-dfw01-01-osmway-465032380"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465032380"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1461896928"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Eagle Mountain","confidence":"medium","id":"datacentersexposed-932c8cbc48f0402f","lat":40.31,"location_precision":"source supplied","lon":-112.01,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-eagle-mountain","value":460.0}],"name":"Meta Eagle Mountain","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-eagle-mountain"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Stockton","confidence":"medium","id":"datacentersexposed-934dfc2f1d252d4a","lat":37.96411,"location_precision":"source supplied","lon":-121.369,"name":"Nautilus Data Technology","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/nautilus-data-technology"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Decatur","confidence":"medium","id":"datacentersexposed-9354b87e0368ad2a","lat":39.6662,"location_precision":"source supplied","lon":-86.30182,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sabey-data-center","value":250.0}],"name":"Sabey Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/4bn-data-center-in-indianapolis-indiana-gets-go-ahead/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sabey-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","id":"datacentersexposed-936b23de4ff12bb2","lat":32.82755,"location_precision":"source supplied","lon":-96.87375,"name":"Digital Realty DFW36","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/465032487"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-dfw36-osmway-465032487"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","id":"datacentersexposed-93bfb4a04fc8838d","lat":33.61512,"location_precision":"source supplied","lon":-84.55222,"name":"Stonewall Tell Data Center","operator":"RSC Investment Management LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stonewall-tell-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-9401fb6728f725a7","lat":39.10011,"location_precision":"source supplied","lon":-94.57814,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city","value":24.0}],"name":"Lambda Kansas City AI Factory","operator":"Lambda Labs","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://ded.mo.gov/press-room/lambda-establish-ai-factory-facility-kansas-city"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lambda-kansas-city-ai-factory-mo-pg"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"Little Rock","confidence":"medium","id":"datacentersexposed-940e8cf4b2a03448","lat":34.618,"location_precision":"source supplied","lon":-92.26808,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/avaio-digital-leo","value":150.0}],"name":"Avaio Digital Leo","operator":"Avaio Digital","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/avaio-to-develop-6bn-data-center-campus-in-little-rock-arkansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/avaio-digital-leo"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"Centennial","confidence":"low","id":"datacentersexposed-943bab84e7a42c78","lat":39.59134,"location_precision":"source supplied","lon":-104.84707,"name":"zColo by Zayo","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/292506452"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/zcolo-by-zayo-osmway-292506452"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-946f8acf456aa98c","lat":38.74405,"location_precision":"source supplied","lon":-77.5292,"name":"COPT Data Center Bldg 2","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1059037051"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/copt-data-center-bldg-2-osmway-1059037051"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Spur","confidence":"medium","id":"datacentersexposed-948e1fe400460bec","lat":33.47648,"location_precision":"source supplied","lon":-100.85569,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/galaxy-digital-helios-tx-pg","value":800.0}],"name":"Galaxy Digital Helios","operator":"Galaxy Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/galaxy-digital-closes-14bn-debt-facility-for-helios-data-center-campus-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/galaxy-digital-helios-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-949d6df6e1988841","lat":44.77522,"location_precision":"source supplied","lon":-122.61593,"name":"PTC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1365213539"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ptc-osmway-1365213539"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1365213539"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-94da94ccdadc86a0","lat":38.42,"location_precision":"source supplied","lon":-77.46,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stafford-cyrusone-campus","value":250.0}],"name":"CyrusOne Stafford Campus","operator":"CyrusOne LLC","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stafford-cyrusone-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-94e9ff9c745e0ff2","lat":38.98726,"location_precision":"source supplied","lon":-77.43797,"name":"Global Plaza","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-global-plaza"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Clarksville","confidence":"medium","id":"datacentersexposed-94efaad1cdb947cb","lat":35.45438,"location_precision":"source supplied","lon":-93.44725,"name":"Clarksville Data Center","operator":"Serverfarm","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/serverfarm-targets-135-acre-data-center-campus-in-arkansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/clarksville-data-center"}],"state":"Arkansas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-94f44af9d0569386","lat":39.5,"location_precision":"source supplied","lon":-89.32,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/eagle-rock-christian-county-data-center","value":1000.0}],"name":"Eagle Rock Christian County Data Center","operator":"Eagle Rock Partners","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMixgFBVV95cUxNT1A1NkI0WjNXeG05ZERQam0ydzEtbXVpTUNiX3g2cEY4YUpyTlZ0bUVOaG1jRGhseE92RWh1YVlwNVdkVEFjOWdqOTdZd3VTbkJBTG0wd1dJZlVqS1Vpb0kxTHN6RmlqWlZtWjRRN0xyVjhRMllONkZ6enRtdTBqSHBTZzJ3eXJBWTlxaFBLNVRMUkY2dy04czF6bU52ZW9pX256SE9PVjhMZEV0aEUzMzdmQUpMOUZYNmdHMjdRT2dTOUMyTVE?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/eagle-rock-christian-county-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-951303dc3f818f1f","lat":36.4085,"location_precision":"source supplied","lon":-86.37162,"name":"Gallatin Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1213758201"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gallatin-data-center-osmway-1213758201"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-9520fce5f2664990","lat":37.47973,"location_precision":"source supplied","lon":-77.25221,"name":"RIC3 DC2","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516630"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric3-dc2-osmway-1493516630"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516630"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-9538cd8d66e2aabb","lat":33.13596,"location_precision":"source supplied","lon":-96.66099,"name":"Cisco Allen","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/373913881"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cisco-allen-osmway-373913881"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/373913881"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-95704c78c093d546","lat":36.41138,"location_precision":"source supplied","lon":-86.366,"name":"Meta Gallatin Data Center","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1312795639"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-gallatin-data-center-osmway-1312795639"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Albany","confidence":"low","id":"datacentersexposed-957c7fecea845720","lat":42.64935,"location_precision":"source supplied","lon":-73.75275,"name":"IBM Building","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/69827429"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ibm-building-osmway-69827429"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"datacentersexposed-9587861ede36b682","lat":39.02217,"location_precision":"source supplied","lon":-77.45359,"name":"Centersquare IAD4-B","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300163074"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/centersquare-iad4-b-osmway-300163074"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300163074"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460175666"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Exton","confidence":"medium","id":"datacentersexposed-958cc2a4b4e2556f","lat":40.03989,"location_precision":"source supplied","lon":-75.5847,"name":"Sentinel Data Center","operator":"Sentinel","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-says-it-will-build-larger-data-center-if-plans-for-smaller-facility-near-philadelphia-go-unapproved/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sentinel-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Augusta","confidence":"medium","id":"datacentersexposed-959d669eb3f843e4","lat":33.43883,"location_precision":"source supplied","lon":-82.1557,"name":"T5: Project Eisenhower","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-to-expand-former-t5-campus-site-in-augusta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5-project-eisenhower"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-95d6a65bb7e6e3b2","lat":32.58069,"location_precision":"source supplied","lon":-96.70294,"name":"QTS Wilmer  (DFW2 and DC1)","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-files-to-add-another-building-to-wilmer-data-center-campus-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-wilmer-dfw2-and-dc1"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-95ed159077470571","lat":30.2156,"location_precision":"source supplied","lon":-97.61894,"name":"Cortex supercomputer","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1221574918"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cortex-supercomputer-osmway-1221574918"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1221574918"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-96795e6c972c3319","lat":37.48786,"location_precision":"source supplied","lon":-77.24483,"name":"RIC1 DC3","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13685576466"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ric1-dc3-osmnode-13685576466"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13685576466"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","id":"datacentersexposed-96bf55a4ae8e54cc","lat":41.8628,"location_precision":"source supplied","lon":-87.6413,"name":"CoreSite Chicago Data Center (CH2)","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/841813139"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-chicago-data-center-ch2-osmway-841813139"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Fairfax","confidence":"medium","id":"datacentersexposed-96de888b9a657408","lat":41.89881,"location_precision":"source supplied","lon":-91.7211,"name":"QTS Fairfax Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/city-of-cedar-rapids-officially-confirms-qts-behind-iowa-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-fairfax-data-center"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-97231efa9a2f86b3","lat":33.91029,"location_precision":"source supplied","lon":-117.50302,"name":"IT","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11924506303"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/it-osmnode-11924506303"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11924506303"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"ASHBURN","confidence":"medium","id":"datacentersexposed-972a7a6b8fe951a6","lat":39.04195,"location_precision":"source supplied","lon":-77.47813,"name":"ISKANDER (LC-1A) JAMSHID (LC-1B) KAVEH (LC2) LOHRASP VENTURES (LC3)","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070520700"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/iskander-lc-1a-jamshid-lc-1b-kaveh-lc2-lohrasp-ventures-lc3-air-110070520700"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9755e282ec704394","lat":41.41938,"location_precision":"source supplied","lon":-87.36922,"name":"Rural Lake County Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMijwFBVV95cUxOV0hHa202R2s2a3E1eHdiamc2Q19DLWN1MHZZYkZ0MURoTkZEZmpuOGVTV2hCdGc5aVQ4d3ZlbWwxZGI4VjVjYWV3MVF5eUNob0JWdXpCTS1sS2dSVEdweEh1dDVxRjVkM3dkLVI1d2hBTkdKV2x2Q0Z2NVltWVNVZ3lUallRWHpHSDdzMG9xZw?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/rural-lake-county-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"PECOS","confidence":"medium","id":"datacentersexposed-97685108083ca958","lat":31.5335,"location_precision":"source supplied","lon":-103.80075,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/core-scientific-110072132710","value":300.0}],"name":"CORE SCIENTIFIC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/core-scientific-110072132710"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-9784cc04053cb18d","lat":38.30967,"location_precision":"source supplied","lon":-77.1084,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/oasis-data-center","value":1200.0}],"name":"Oasis Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://dahlgrenwest.com/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oasis-data-center"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Saint Paul","confidence":"low","contains_osm":true,"id":"datacentersexposed-97a00d8864881190","lat":44.9722,"location_precision":"source supplied","lon":-93.14747,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-minneapolis-osmway-131874718","value":8.0}],"name":"H5 Minneapolis","operator":"H5 Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/131874718"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-minneapolis-osmway-131874718"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/131874718"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-97c0fe5b14ffad2b","lat":38.33172,"location_precision":"source supplied","lon":-77.48733,"name":"Blaisdell Property Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blaisdell-property-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Athens","confidence":"medium","id":"datacentersexposed-97cb695d985edd20","lat":33.97097,"location_precision":"source supplied","lon":-83.31563,"name":"Athens Studio Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/georgia-based-film-studio-considers-converting-to-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/athens-studio-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-97d31c70aebc2861","lat":40.1063,"location_precision":"source supplied","lon":-82.80076,"name":"STACK New Albany","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/723117951"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stack-new-albany-osmway-723117951"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/723117951"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Latham/ Laenna Twp","confidence":"medium","id":"datacentersexposed-980fbb8af959c20f","lat":39.97475,"location_precision":"source supplied","lon":-89.19171,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hut8-data-center","value":500.0}],"name":"Hut8 Data Center","operator":"Hut 8","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hut8-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-98388dd7745b0592","lat":38.78528,"location_precision":"source supplied","lon":-77.56569,"name":"Hansen Farm South","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-hansen-farm-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"New Palestine","confidence":"low","id":"datacentersexposed-984ad3b47224c57b","lat":39.7172,"location_precision":"source supplied","lon":-85.94141,"name":"Verizon Wireless","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/349925359"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireless-osmway-349925359"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"MANASSAS","confidence":"medium","id":"datacentersexposed-986f1f474a2f9731","lat":38.7739,"location_precision":"source supplied","lon":-77.54487,"name":"IRON MOUNTAIN INFORMATION MANAGEMENT LLC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070144508"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/iron-mountain-information-management-llc-air-110070144508"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Troy","confidence":"medium","id":"datacentersexposed-98a445c3a1053d21","lat":38.72534,"location_precision":"source supplied","lon":-89.90965,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/troy-cloverleaf-data-center","value":500.0}],"name":"Troy Cloverleaf Data Center","operator":"Cloverleaf","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cloverleaf-infrastructure-proposes-data-center-campus-near-st-louis-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/troy-cloverleaf-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Mineral","confidence":"medium","id":"datacentersexposed-98d0dfda2f85049a","lat":38.04825,"location_precision":"source supplied","lon":-77.80991,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lake-anna-tech-campus","value":420.0}],"name":"Lake Anna Tech Campus","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://tammypurcell.substack.com/p/more-details-emerge-about-plans-for?utm_source=substack&utm_medium=email"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lake-anna-tech-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Glen Allen","confidence":"medium","id":"datacentersexposed-9944d8099b100fe9","lat":37.66088,"location_precision":"source supplied","lon":-77.57392,"name":"Cavalier Innsbrook Data Center","operator":"HIGHWOODS PROP","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cavalier-innsbrook-data-center"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"La Pine","confidence":"medium","id":"datacentersexposed-9958df4cdc6b340c","lat":43.66909,"location_precision":"source supplied","lon":-121.4879,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/la-pine-data-center","value":20.0}],"name":"La Pine Data Center","operator":"Box Miner","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.bendsource.com/news/localnews/after-pushback-to-la-pine-data-center-community-developers-await-next-steps/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/la-pine-data-center"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-9978ac3fefc63600","lat":42.67936,"location_precision":"source supplied","lon":-76.94858,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/greenidge-power-plant-and-data-center-osmway-253670255","value":55.0}],"name":"Greenidge Power Plant and Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/253670255"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/greenidge-power-plant-and-data-center-osmway-253670255"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/253670255"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-99838f5416e1dd33","lat":41.12787,"location_precision":"source supplied","lon":-96.14507,"name":"Travelers Insurance","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/942557184"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/travelers-insurance-osmway-942557184"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/942557184"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Delta","confidence":"medium","id":"datacentersexposed-99aabcceb3959698","lat":39.50757,"location_precision":"source supplied","lon":-112.601,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/blusky-ai","value":50.0}],"name":"BluSky AI","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/blusky-ai-signs-letter-of-intent-for-25-acre-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blusky-ai"}],"state":"Utah","status":"planned"},{"ai_classification":"unknown","city":"Snowville","confidence":"medium","id":"datacentersexposed-99c53960322cb1ac","lat":41.78426,"location_precision":"source supplied","lon":-112.89835,"name":"Stratos Project, western parcels","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.ksl.com/article/51488565/utah-box-elder-county-officials-mull-plan-to-spur-energy-production-data-center-development"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stratos-project-western-parcels"}],"state":"Utah","status":"under construction"},{"ai_classification":"unknown","city":"Indianapolis","confidence":"medium","id":"datacentersexposed-99db10b3a768b8e7","lat":39.8941,"location_precision":"source supplied","lon":-86.20275,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/american-tower-atc-watertown-llc-edge-data-center","value":4.0}],"name":"American Tower/ ATC Watertown LLC/ Edge Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/american-tower-pauses-plans-for-edge-data-center-in-indianapolis-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/american-tower-atc-watertown-llc-edge-data-center"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Laveen, Phoenix","confidence":"medium","id":"datacentersexposed-99e77e306dffd08f","lat":33.42196,"location_precision":"source supplied","lon":-112.19218,"name":"Vintage Partners","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vintage-partners"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"LaGrange","confidence":"medium","id":"datacentersexposed-99fd5b3d4a0baa3a","lat":32.98697,"location_precision":"source supplied","lon":-85.05588,"name":"Project Pegasus","operator":"Form8tion (Thor Equities), Google","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-pegasus"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Texarkana","confidence":"medium","id":"datacentersexposed-9a18fa45d675535f","lat":33.4248,"location_precision":"source supplied","lon":-94.044,"name":"Texarkana Data center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/texarkana-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Allentown","confidence":"medium","id":"datacentersexposed-9a2a86aaf6ff6103","lat":40.64362,"location_precision":"source supplied","lon":-75.53651,"name":"Atlas Industrial Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlas-industrial-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-9a6719feb2bd39db","lat":41.33498,"location_precision":"source supplied","lon":-85.90404,"name":"Prologis","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/prologis-data-center-proposal-in-kosciusko-county-indiana-denied/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prologis"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"AMARILLO","confidence":"medium","id":"datacentersexposed-9a783346a8243d8e","lat":35.18739,"location_precision":"source supplied","lon":-101.812,"name":"AIG DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aig-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-9a80134f21bfddd0","lat":38.98164,"location_precision":"source supplied","lon":-77.42743,"name":"Amazon IAD144","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/701929066"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad144-osmway-701929066"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701929066"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9ad42d89757566ad","lat":38.98761,"location_precision":"source supplied","lon":-77.41558,"name":"Glenn Drive North & South","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-glenn-drive-north-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Windsor","confidence":"medium","id":"datacentersexposed-9b2aeea0f28b4c69","lat":40.45861,"location_precision":"source supplied","lon":-104.87199,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/global-ai","value":18.0}],"name":"Global AI","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/global-ai-set-to-develop-data-center-outside-denver-colorado/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/global-ai"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Austin","confidence":"medium","id":"datacentersexposed-9b74b48a04df0c89","lat":30.32,"location_precision":"source supplied","lon":-97.79,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-austin","value":220.0}],"name":"Digital Realty Austin Campus","operator":"Digital Realty Trust, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-austin"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Spring City (East Vincent Township)","confidence":"medium","id":"datacentersexposed-9b83704ca47f5a98","lat":40.19455,"location_precision":"source supplied","lon":-75.56007,"name":"Pennhurst Data Center","operator":"Pennhurst Holdings LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/new-regulations-could-stall-plan-to-convert-former-psychiatric-hospital-near-philadelphia-into-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/pennhurst-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Marysville","confidence":"medium","id":"datacentersexposed-9bf901cd14a3c78e","lat":40.2203,"location_precision":"source supplied","lon":-83.3259,"name":"Project Cosmos","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-eyes-another-data-center-campus-outside-columbus-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-cosmos"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","id":"datacentersexposed-9c536638a4ec2abe","lat":29.67259,"location_precision":"source supplied","lon":-82.29993,"name":"UF Research Computing Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/429782814"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/uf-research-computing-center-osmway-429782814"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Fort Pierce","confidence":"medium","id":"datacentersexposed-9cca46aabd05c7b6","lat":27.45444,"location_precision":"source supplied","lon":-80.55799,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sentinel-grove-technology-park-project-jarvis","value":1000.0}],"name":"Sentinel Grove Technology Park/ Project Jarvis","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-fail-to-back-plans-for-1gw-data-center-campus-in-florida/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sentinel-grove-technology-park-project-jarvis"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Laurel","confidence":"medium","id":"datacentersexposed-9cce50ac07e7aa25","lat":39.13351,"location_precision":"source supplied","lon":-76.85197,"name":"Eternal Rings Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/harrison-street-sells-two-powered-shell-data-center-sites-in-maryland/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/eternal-rings-data-center"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Johnstown","confidence":"medium","id":"datacentersexposed-9cda2c356e7742db","lat":40.09545,"location_precision":"source supplied","lon":-82.7181,"name":"CyrusOne COL-1","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-breaks-ground-on-new-albany-ohio-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-col-1"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"El Paso","confidence":"medium","id":"datacentersexposed-9cef5a004942158d","lat":31.76,"location_precision":"source supplied","lon":-106.49,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-el-paso-data-center","value":1000.0}],"name":"Meta El Paso Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/meta-el-paso-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9cf0fb3284abe50a","lat":38.58809,"location_precision":"source supplied","lon":-77.32151,"name":"Southgate South","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-southgate-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Andover","confidence":"low","id":"datacentersexposed-9cf3a526a4fb229c","lat":42.68571,"location_precision":"source supplied","lon":-71.2086,"name":"TierPoint","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/211832626"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-osmway-211832626"}],"state":"Massachusetts","status":"operating"},{"ai_classification":"unknown","city":"Heppner","confidence":"medium","id":"datacentersexposed-9d0dd894aa55304f","lat":45.6047,"location_precision":"source supplied","lon":-119.57336,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-data-center-2","value":1200.0}],"name":"Amazon Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-acquires-shovel-ready-12gw-solar-and-storage-facility-in-oregon-report/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-center-2"}],"state":"Oregon","status":"planned"},{"ai_classification":"unknown","city":"Maiden","confidence":"medium","id":"datacentersexposed-9d2217441c43b2a8","lat":35.66,"location_precision":"source supplied","lon":-81.21,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/apple-maiden","value":480.0}],"name":"Apple Maiden","operator":"Apple Data Services LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apple-maiden"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Forest Park","confidence":"medium","id":"datacentersexposed-9d24907cad88ae2d","lat":33.61974,"location_precision":"source supplied","lon":-84.32903,"name":"Digital Realty Fort Gillem Campus","operator":"Digital Edge","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-fort-gillem-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-9d3fb693bc3b3ca4","lat":39.03804,"location_precision":"source supplied","lon":-77.43372,"name":"CORSCALE VA2 BLDG 1","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/corscale-va2-bldg-1"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-9d6552ac05a878b9","lat":38.92712,"location_precision":"source supplied","lon":-77.42407,"name":"Menlo Digital MD-DC1","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/262058094"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/menlo-digital-md-dc1-osmway-262058094"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/262058094"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Statesville","confidence":"medium","id":"datacentersexposed-9d79573a8a810974","lat":35.77436,"location_precision":"source supplied","lon":-80.9749,"name":"Compass Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/compass-datacenters-proposes-333-acre-campus-in-statesville-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/compass-data-center"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Franklin","confidence":"medium","id":"datacentersexposed-9d88e8a16a0e99ac","lat":36.66604,"location_precision":"source supplied","lon":-86.57219,"name":"TenKey LandCo","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-proposal-in-franklin-kentucky-gets-approval-from-planning-and-zoning-commission/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tenkey-landco"}],"state":"Kentucky","status":"under construction"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-9d97af1d28902879","lat":38.22135,"location_precision":"source supplied","lon":-77.47741,"name":"Hunters Ridge LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hunters-ridge-llc-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Thorton","confidence":"low","contains_osm":true,"id":"datacentersexposed-9dbdedecb4279f19","lat":39.92247,"location_precision":"source supplied","lon":-104.98343,"name":"Google - Thornton","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/426586135"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-thornton-osmway-426586135"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/426586135"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9dc95813ebe4025d","lat":38.0269,"location_precision":"source supplied","lon":-77.50431,"name":"Ladysmith Technology Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ladysmith-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-9df959f88f2fd984","lat":29.47033,"location_precision":"source supplied","lon":-98.68619,"name":"CHRISTUS Health","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611426"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/christus-health-osmway-509611426"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Berwick","confidence":"low","contains_osm":true,"id":"datacentersexposed-9e1f1ecd5d4b99a4","lat":41.08399,"location_precision":"source supplied","lon":-76.14337,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-aws-phl-osmway-1334234458","value":960.0}],"name":"Amazon AWS PHL","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1334234458"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-aws-phl-osmway-1334234458"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1334234458"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Rexburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-9e354b3d150ce41e","lat":43.82523,"location_precision":"source supplied","lon":-111.78207,"name":"VentureData","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/290101976"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/venturedata-osmway-290101976"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/290101976"}],"state":"Idaho","status":"unknown"},{"ai_classification":"unknown","city":"Wayside","confidence":"medium","id":"datacentersexposed-9e356cd0bae31df2","lat":34.79283,"location_precision":"source supplied","lon":-101.54712,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-armstrong-county-meitner-energy-center-tx-pg","value":1000.0}],"name":"Google Armstrong County (Meitner Energy Center)","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-armstrong-county-meitner-energy-center-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Russellville","confidence":"medium","id":"datacentersexposed-9e45b811fb543dde","lat":35.27746,"location_precision":"source supplied","lon":-93.1372,"name":"Brightspeed Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/brightspeed-data-center-up-for-sale-leaseback-in-arkansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/brightspeed-data-center"}],"state":"Arkansas","status":"operating"},{"ai_classification":"unknown","city":"El Segundo","confidence":"low","id":"datacentersexposed-9e46efddc61fbb1a","lat":33.91566,"location_precision":"source supplied","lon":-118.38462,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/drt-lax12-osmway-424945852","value":18.0}],"name":"DRT LAX12","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/424945852"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/drt-lax12-osmway-424945852"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-9e57aae354a38837","lat":36.06402,"location_precision":"source supplied","lon":-115.22111,"name":"Switch","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1263819877"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/switch-osmway-1263819877"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Sioux Falls","confidence":"medium","id":"datacentersexposed-9eceec86f124ddc4","lat":43.66,"location_precision":"source supplied","lon":-96.78,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-sioux-falls-proposed","value":720.0}],"name":"Microsoft Sioux Falls (proposed)","operator":"Microsoft Data Center LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-sioux-falls-proposed"}],"state":"South Dakota","status":"planned"},{"ai_classification":"unknown","city":"Tulsa","confidence":"low","contains_osm":true,"id":"datacentersexposed-9f11aedab9571825","lat":36.26255,"location_precision":"source supplied","lon":-95.91004,"name":"Cherokee Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/195664350"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cherokee-data-center-osmway-195664350"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/195664350"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Sparks","confidence":"medium","id":"datacentersexposed-9f26809f545486ea","lat":39.53511,"location_precision":"source supplied","lon":-119.497,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-data-center-8","value":810.0}],"name":"Tract Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-acquires-1000-acres-in-nevada-for-16gw-data-center-park/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-8"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Hermantown","confidence":"medium","id":"datacentersexposed-9f29e6e9f5a38cfa","lat":46.77741,"location_precision":"source supplied","lon":-92.28186,"name":"Project Loon","operator":"Google LLC","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-loon"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-9f44167dfcecb25b","lat":38.77069,"location_precision":"source supplied","lon":-77.51074,"name":"Ashton Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-ashton-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-9f54034763bd19e3","lat":39.02218,"location_precision":"source supplied","lon":-77.45761,"name":"Level 3 Ashburn","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300162689"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/level-3-ashburn-osmway-300162689"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lansing","confidence":"low","contains_osm":true,"id":"datacentersexposed-9f746539024ba241","lat":42.70539,"location_precision":"source supplied","lon":-84.66609,"name":"Liquid Web, Inc","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/545060574"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/liquid-web-inc-osmway-545060574"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/545060574"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Fredonia","confidence":"medium","id":"datacentersexposed-9fbdcf6d7e21e822","lat":43.45566,"location_precision":"source supplied","lon":-87.9353,"name":"Fredonia Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.jsonline.com/story/communities/north/2025/04/08/port-washington-takes-up-zoning-standards-for-proposed-data-center/82774695007/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fredonia-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Tyrone","confidence":"medium","id":"datacentersexposed-9fbf261b62c1d7c0","lat":33.51811,"location_precision":"source supplied","lon":-84.57832,"name":"Microsoft","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-confirms-plans-for-data-center-in-tyrone-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"McKees Rock","confidence":"medium","id":"datacentersexposed-a003de79edfdf300","lat":40.43956,"location_precision":"source supplied","lon":-80.1421,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/northern-data-ardent-data-center","value":20.0}],"name":"Northern Data/ Ardent Data Center","operator":"Northern Data","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/northern-data-launches-data-center-in-pittsburgh-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/northern-data-ardent-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-a021d0155f3180f8","lat":38.40892,"location_precision":"source supplied","lon":-77.44693,"name":"George Washington Village Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/george-washington-village-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Richland","confidence":"medium","id":"datacentersexposed-a0487cb82368ef55","lat":46.35512,"location_precision":"source supplied","lon":-119.3108,"name":"Atlas Agro","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/six-building-data-center-campus-proposed-in-washington-by-fertilizer-company/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/atlas-agro"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"medium","id":"datacentersexposed-a05af4f4ff7c3bb2","lat":37.50429,"location_precision":"source supplied","lon":-77.26043,"name":"Atlantic Crossing","operator":"ATLANTIC CROSSING LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/hourigan-files-for-320-acre-data-center-campus-outside-richmond-virginia/?emci=44212ab4-0fa0-ee11-bea1-002248223f36&emdi=712e0f52-37a0-ee11-bea1-002248223f36&ceid=11786847"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlantic-crossing"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"New Carlisle","confidence":"medium","id":"datacentersexposed-a064063fe0bb7d0b","lat":41.72029,"location_precision":"source supplied","lon":-86.4905,"name":"Mall-O-Manor LLC Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mall-o-manor-llc-data-center"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Richmond","confidence":"medium","id":"datacentersexposed-a0b1fe95c75b84d5","lat":37.48448,"location_precision":"source supplied","lon":-77.3579,"name":"Wagner Urban Logistics LLC Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/planners-oppose-data-center-campus-in-varina-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wagner-urban-logistics-llc-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Princeton","confidence":"low","id":"datacentersexposed-a0c2d98829af68c6","lat":40.31556,"location_precision":"source supplied","lon":-74.66885,"name":"501 West","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12708029111"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/501-west-osmnode-12708029111"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Coryell","confidence":"medium","id":"datacentersexposed-a0fdd807eae917f8","lat":31.1558,"location_precision":"source supplied","lon":-97.80226,"name":"Fort Hood data base","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-dod-details-military-bases-available-for-ai-data-center-build-out/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fort-hood-data-base"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"datacentersexposed-a0febd732cea6b34","lat":42.01142,"location_precision":"source supplied","lon":-88.0317,"name":"Nexstar Media Group Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-stream-and-nexstar-planning-data-center-campuses-in-elk-grove-area-of-chicago/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nexstar-media-group-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-a133213c515da043","lat":29.42026,"location_precision":"source supplied","lon":-98.8087,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tx12-vantage-data-center","value":96.0}],"name":"TX12: Vantage Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tx12-vantage-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Bend","confidence":"low","id":"datacentersexposed-a146d6eb9258a863","lat":44.04741,"location_precision":"source supplied","lon":-121.32855,"name":"Fort Rock DC","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/752001022"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/fort-rock-dc-osmway-752001022"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a163bbdcf81a60a1","lat":38.76474,"location_precision":"source supplied","lon":-77.57501,"name":"Devlin Technology Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-devlin-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-a190b22bcc111413","lat":39.00334,"location_precision":"source supplied","lon":-77.48709,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-northern-virginia-iad14-osmway-300969614","value":12.0}],"name":"Digital Realty Northern Virginia IAD14","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300969614"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-northern-virginia-iad14-osmway-300969614"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a1a9576ab5e7148d","lat":38.78319,"location_precision":"source supplied","lon":-77.53581,"name":"Iron Mountain Manassas Point","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-iron-mountain-manassas-point"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Madison","confidence":"medium","id":"datacentersexposed-a1c4388b44739e5f","lat":36.40271,"location_precision":"source supplied","lon":-79.9882,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/enovum-data-center","value":99.0}],"name":"Enovum Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/enovum-data-center"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"El Paso","confidence":"medium","id":"datacentersexposed-a1c9a35f712937da","lat":31.98718,"location_precision":"source supplied","lon":-106.3691,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-project-seafox","value":1000.0}],"name":"Meta Project Seafox","operator":"Meta Platforms, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-files-to-expand-campus-in-el-paso-texas-with-12-new-buildings/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-project-seafox"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"COUNCIL BLUFFS","confidence":"medium","id":"datacentersexposed-a23fbca702fb2003","lat":41.16753,"location_precision":"source supplied","lon":-95.79376,"name":"GABLE CORP","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110046464250"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/gable-corp-air-110046464250"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Oklahoma City","confidence":"medium","id":"datacentersexposed-a269fb530e55b3f6","lat":35.53575,"location_precision":"source supplied","lon":-97.5223,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cerebras-systems-data-center-2","value":10.0}],"name":"Cerebras Systems Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cerebras-opens-10mw-data-center-in-oklahoma-city/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cerebras-systems-data-center-2"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Marana","confidence":"medium","id":"datacentersexposed-a27ff1f2836c7d6d","lat":32.4929,"location_precision":"source supplied","lon":-111.28652,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-blue-marana","value":250.0}],"name":"Project Blue Marana","operator":"Beale Infrastructure","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://tucson.com/news/local/environment/article_52f0d4ba-aa9e-4c17-b290-ca3c2ad8d011.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-blue-marana"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a282c144532c183f","lat":40.05791,"location_precision":"source supplied","lon":-82.76533,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-nby-3-osmway-1252196811","value":543.0}],"name":"Google NBY-3","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196811"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-nby-3-osmway-1252196811"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196812"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-nby-4-osmway-1252196812"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"datacentersexposed-a2ab4534a7d736fa","lat":41.03169,"location_precision":"source supplied","lon":-104.7964,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-jade","value":10000.0}],"name":"Project Jade","operator":"Crusoe","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://capcity.news/community/county-community/county-government/2025/10/09/laramie-county-oks-zoning-to-allow-massive-switchgrass-industrial-park-for-data-center-power-plant/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-jade"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-a2da270480e2ed27","lat":32.77831,"location_precision":"source supplied","lon":-96.79844,"name":"DataBank","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/30827429"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/databank-osmway-30827429"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/30827429"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a2e639d77b88a96b","lat":38.78972,"location_precision":"source supplied","lon":-77.54771,"name":"Patriot Business Center","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-patriot-business-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a32720fadb19f955","lat":30.1965,"location_precision":"source supplied","lon":-97.7124,"name":"Lumen Austin 1","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/383888101"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-austin-1-osmway-383888101"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/383888101"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a334c3bcd522cc6c","lat":38.9526,"location_precision":"source supplied","lon":-77.54705,"name":"Yondr - Tarring","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-yondr-tarring"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"low","id":"datacentersexposed-a3485636782c6366","lat":34.05848,"location_precision":"source supplied","lon":-118.23591,"name":"CoreSite - LA2","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13042311881"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-la2-osmnode-13042311881"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a36d82328f993360","lat":41.81256,"location_precision":"source supplied","lon":-87.97285,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-chicago-data-ch7-osmway-243242167","value":12.0}],"name":"Equinix Chicago Data CH7","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/243242167"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-chicago-data-ch7-osmway-243242167"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/243242167"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-a3798a0643cb4fde","lat":45.55406,"location_precision":"source supplied","lon":-122.94925,"name":"Aligned DC - PDX-01","operator":"Aligned Energy Holdings, LP","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1114969101"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/aligned-dc-pdx-01-osmway-1114969101"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a3b01fe454fb33aa","lat":38.77946,"location_precision":"source supplied","lon":-77.56296,"name":"Project Well","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-project-well"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"PALM BAY","confidence":"medium","id":"datacentersexposed-a3b5862989294b5f","lat":28.05364,"location_precision":"source supplied","lon":-80.58903,"name":"RAYTHEON COI FLORIDA EXPANSION","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110070162930"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/raytheon-coi-florida-expansion-110070162930"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Prudhoe Bay","confidence":"medium","id":"datacentersexposed-a3e186dc780b0ada","lat":70.18478,"location_precision":"source supplied","lon":-148.44,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prudhoe-bay-data-center","value":120.0}],"name":"Prudhoe Bay Data Center","operator":"Far North Digital, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prudhoe-bay-data-center"}],"state":"Alaska","status":"operating"},{"ai_classification":"unknown","city":"Edwards","confidence":"medium","id":"datacentersexposed-a4034f746cdc4289","lat":34.91205,"location_precision":"source supplied","lon":-117.93109,"name":"Edwards AFB Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-department-of-the-air-force-accepting-proposals-for-ai-data-centers-in-military-bases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edwards-afb-data-center"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"medium","id":"datacentersexposed-a4158811925985aa","lat":37.40071,"location_precision":"source supplied","lon":-122.03299,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/menlo-equities-data-centere","value":49.0}],"name":"Menlo Equities Data Centere","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/menlo-equities-pivots-office-site-in-silicon-valley-to-data-center-development/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/menlo-equities-data-centere"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Castroville","confidence":"medium","id":"datacentersexposed-a44435123c6c99ed","lat":29.35138,"location_precision":"source supplied","lon":-98.9406,"name":"Microsoft Castroville Data Center (SAT 89-90)","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-for-data-center-campus-outside-san-antonio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-castroville-data-center-sat-89-90"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Buffalo","confidence":"medium","id":"datacentersexposed-a47bd715f5a9eef5","lat":42.86061,"location_precision":"source supplied","lon":-78.84132,"name":"Tesla Dojo Supercomputer","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tesla-dojo-supercomputer"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Clifton Twship","confidence":"medium","id":"datacentersexposed-a48c2e63e4b9b99f","lat":41.24829,"location_precision":"source supplied","lon":-75.5166,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-gold-data-center","value":1500.0}],"name":"Project Gold Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/15gw-data-center-campus-proposed-in-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-gold-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"La Grange","confidence":"medium","id":"datacentersexposed-a4f864655b8ec3c7","lat":38.40755,"location_precision":"source supplied","lon":-85.37882,"name":"Project Lincoln (Oldham County)","operator":"Western Hospitality Partners","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-lincoln-oldham-county-ky-pg"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Butte","confidence":"medium","id":"datacentersexposed-a5445014843cc336","lat":45.99697,"location_precision":"source supplied","lon":-112.66617,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://nbcmontana.com/news/local/proposed-butte-data-center-stirs-debate","value":50.0}],"name":"Butte Data Center","operator":"Sabey Data Centers","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://nbcmontana.com/news/local/proposed-butte-data-center-stirs-debate"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/butte-data-center"}],"state":"Montana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-a55e91376e03fed9","lat":38.92131,"location_precision":"source supplied","lon":-77.4858,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1252196826"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1252196826"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Jessup","confidence":"medium","id":"datacentersexposed-a5711eedd0f3e707","lat":41.46812,"location_precision":"source supplied","lon":-75.5516,"name":"Catalyst Commercial Development LLC","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/catalyst-commercial-development-llc"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"LEESBURG","confidence":"medium","id":"datacentersexposed-a5742b589d686dc2","lat":39.0644,"location_precision":"source supplied","lon":-77.60377,"name":"COMPASS IAD DATACENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071344611"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/compass-iad-datacenter-air-110071344611"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Norcross","confidence":"low","contains_osm":true,"id":"datacentersexposed-a584ff78c9126735","lat":33.95474,"location_precision":"source supplied","lon":-84.19852,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-atlanta-norcross-osmway-392324240","value":2.0}],"name":"Flexential Atlanta - Norcross","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/392324240"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-atlanta-norcross-osmway-392324240"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/392324240"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","id":"datacentersexposed-a58e7af9ca5d0ffa","lat":38.79997,"location_precision":"source supplied","lon":-77.60996,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ntt-va11-data-center-osmnode-13154826379","value":96.0}],"name":"NTT VA11 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13154826379"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ntt-va11-data-center-osmnode-13154826379"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-a5b06ac8371c9e5c","lat":35.08863,"location_precision":"source supplied","lon":-106.65265,"name":"505 Marquette","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9808044830"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/505-marquette-osmnode-9808044830"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9808044830"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-a5c5021b3329b2de","lat":45.53406,"location_precision":"source supplied","lon":-122.9559,"name":"OVHcloud - Hillsboro","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/4645970"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/ovhcloud-hillsboro-osmrelation-4645970"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/4645970"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Round Rock","confidence":"medium","id":"datacentersexposed-a5dbc24496da1a5d","lat":30.5489,"location_precision":"source supplied","lon":-97.6441,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/skybox-round-rock-data-center","value":40.0}],"name":"Skybox Round Rock Data Center","operator":"Skybox Datacenters","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/skybox-round-rock-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-a60f38c13658e994","lat":38.94826,"location_precision":"source supplied","lon":-77.55591,"name":"Microsoft IAD11","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1124864831"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-iad11-osmway-1124864831"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Claremore","confidence":"medium","id":"datacentersexposed-a62238ae43586447","lat":36.34346,"location_precision":"source supplied","lon":-95.60581,"name":"Project Mustang","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/beale-infrastructure-in-talks-to-build-data-center-campus-outside-tulsa-oklahoma/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-mustang"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-a62bc44211254e42","lat":38.18,"location_precision":"source supplied","lon":-77.65,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/spotsylvania-aws-campus","value":550.0}],"name":"AWS Spotsylvania Campus","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/10m-sq-ft-amazon-files-for-four-data-center-campuses-in-virginias-spotsylvania-and-caroline-counties/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/spotsylvania-aws-campus"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Ashville","confidence":"medium","id":"datacentersexposed-a6657591e55d08e4","lat":39.73382,"location_precision":"source supplied","lon":-82.97449,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-ashville-data-center","value":200.0}],"name":"EdgeConneX Ashville Data Center","operator":"EdgeConneX, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/proposed-edgeconnex-data-center-in-pickaway-county-ohio-facing-criticism/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-ashville-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Shirley","confidence":"low","contains_osm":true,"id":"datacentersexposed-a66c44c5e88aae10","lat":40.84365,"location_precision":"source supplied","lon":-72.88338,"name":"Cable & Wireless Cable Landing Station","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/459188725"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cable-wireless-cable-landing-station-osmway-459188725"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/459188725"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","id":"datacentersexposed-a66c90719e36cee5","lat":29.58015,"location_precision":"source supplied","lon":-98.5413,"name":"HEB","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1310628998"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/heb-osmway-1310628998"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Burlington","confidence":"medium","id":"datacentersexposed-a6734afc7c8949fa","lat":31.00507,"location_precision":"source supplied","lon":-97.0179,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/open-ai-softbank-freebird","value":1500.0}],"name":"Open AI/ SoftBank \"Freebird\"","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/open-ai-softbank-freebird"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Maysville","confidence":"medium","id":"datacentersexposed-a676ee45d7d063a3","lat":34.2525,"location_precision":"source supplied","lon":-83.5614,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/northern-data","value":120.0}],"name":"Northern Data","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/northern-data-to-develop-120mw-hpc-data-center-in-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/northern-data"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Bath (Berkeley Springs)","confidence":"low","contains_osm":true,"id":"datacentersexposed-a68014fead30e0eb","lat":39.63099,"location_precision":"source supplied","lon":-78.22532,"name":"Morgan Wireless","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/6793837329"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/morgan-wireless-osmnode-6793837329"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/6793837329"}],"state":"West Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Seattle","confidence":"low","contains_osm":true,"id":"datacentersexposed-a69e42de3dffb889","lat":47.61923,"location_precision":"source supplied","lon":-122.34829,"name":"KOMO Plaza East","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/417682780"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/komo-plaza-east-osmway-417682780"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/417682780"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","contains_osm":true,"id":"datacentersexposed-a6acab01caec1645","lat":33.38041,"location_precision":"source supplied","lon":-111.75267,"name":"OptimumHQ","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7557854384"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/optimumhq-osmnode-7557854384"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7557854384"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a6addb94315bfdd6","lat":41.80693,"location_precision":"source supplied","lon":-88.2411,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-chicago-ord01-osmway-1481581948","value":72.0}],"name":"Edged Chicago ORD01","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1481581948"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-chicago-ord01-osmway-1481581948"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1481581948"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"datacentersexposed-a6d00335b1d60c7a","lat":39.02632,"location_precision":"source supplied","lon":-77.43402,"name":"CyrusOne NVA7","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/983627455"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-nva7-osmway-983627455"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Reading","confidence":"medium","id":"datacentersexposed-a6d565c104803663","lat":43.71104,"location_precision":"source supplied","lon":-95.6839,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/geronimo-power-data-center","value":400.0}],"name":"Geronimo Power Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/geronimo-power-proposes-data-center-in-nobles-county-minnesota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/geronimo-power-data-center"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-a6ea87ba63bae405","lat":35.1732,"location_precision":"source supplied","lon":-80.92812,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tierpoint-charlotte-data-center-osmway-838817907","value":2.2}],"name":"TierPoint - Charlotte Data Center","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/838817907"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-charlotte-data-center-osmway-838817907"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Indianapolis","confidence":"medium","id":"datacentersexposed-a732cb6e9eb2381d","lat":39.87038,"location_precision":"source supplied","lon":-86.2369,"name":"US Signal Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-signal-acquires-data-center-in-indianapolis-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/us-signal-data-center"}],"state":"Indiana","status":"operating"},{"ai_classification":"unknown","city":"Appomattox","confidence":"medium","id":"datacentersexposed-a77228669cff9b33","lat":37.35554,"location_precision":"source supplied","lon":-78.82243,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/avaio-digital-partners","value":300.0}],"name":"Avaio Digital Partners","operator":"Avaio Digital","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/avaio-digital-partners"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Tukwila","confidence":"low","contains_osm":true,"id":"datacentersexposed-a79076862c774bb1","lat":47.4934,"location_precision":"source supplied","lon":-122.28888,"name":"Intergate Seattle East Building 4","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/293211687"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/intergate-seattle-east-building-4-osmway-293211687"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/293211687"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Prineville","confidence":"medium","id":"datacentersexposed-a7a15254f49c3dd1","lat":44.3,"location_precision":"source supplied","lon":-120.83,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-prineville","value":540.0}],"name":"Meta Prineville","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-prineville"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","contains_osm":true,"id":"datacentersexposed-a8219196c42b1596","lat":37.32287,"location_precision":"source supplied","lon":-121.94742,"name":"Forescout Technologies, Inc.","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12550746951"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/forescout-technologies-inc-osmnode-12550746951"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12550746951"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a85f47d8dc5f4de7","lat":41.66551,"location_precision":"source supplied","lon":-93.50821,"name":"Facebook Altoona Data Center 2","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/438078070"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/facebook-altoona-data-center-2-osmway-438078070"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/830931210"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/facebook-altoona-data-center-5-osmway-830931210"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Nutley","confidence":"medium","id":"datacentersexposed-a860f5a75176cfc9","lat":40.8294,"location_precision":"source supplied","lon":-74.1536,"name":"Prism Capital Partners Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/approval-for-major-data-center-development-granted-to-prism-capital-partners-in-nutley-new-jersey/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prism-capital-partners-data-center"}],"state":"New Jersey","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a889ad08c5ae7568","lat":40.42185,"location_precision":"source supplied","lon":-86.91655,"name":"Agricultural and Biological Engineering","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7264976991"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/agricultural-and-biological-engineering-osmnode-7264976991"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7264976991"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Granger","confidence":"medium","id":"datacentersexposed-a88f292a9f01cdf1","lat":41.72418,"location_precision":"source supplied","lon":-86.1341,"name":"Granger Data Center Expansion","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.insideindianabusiness.com/articles/new-data-center-project-being-proposed-for-new-carlisle"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/granger-data-center-expansion"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-a88f8c087be20dfb","lat":35.89515,"location_precision":"source supplied","lon":-81.54628,"name":"Google Data Center","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/9474864"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/google-data-center-osmrelation-9474864"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-a89f33cd593a546f","lat":39.12852,"location_precision":"source supplied","lon":-94.8801,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://www.kshb.com/news/local-news/multibillion-dollar-data-center-proposal-makes-its-way-to-kansas-city-kansas","value":600.0}],"name":"Red Wolf Properties","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.kshb.com/news/local-news/multibillion-dollar-data-center-proposal-makes-its-way-to-kansas-city-kansas"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/red-wolf-properties"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Remington","confidence":"medium","id":"datacentersexposed-a8c938b450a54cf0","lat":38.54318,"location_precision":"source supplied","lon":-77.7834,"name":"SAMX Data Center","operator":"SAMX Data","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://commdevpay.fauquiercounty.gov/Energov_Prod/SelfService#/plan/e3d99e5d-0689-4369-9a48-015f450b6517"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/samx-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a8ec3182133515d6","lat":37.38993,"location_precision":"source supplied","lon":-121.96599,"name":"Amazon","operator":"Amazon.com, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1065780801"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-osmway-1065780801"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1065780801"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Jeffersonville","confidence":"medium","id":"datacentersexposed-a8fc78fb6fd72c7b","lat":39.62815,"location_precision":"source supplied","lon":-83.57187,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-jeffersonville-data-center","value":1184.0}],"name":"Amazon Jeffersonville Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-weighing-up-data-center-project-in-fayette-county-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-jeffersonville-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-a929574255114dcf","lat":40.55035,"location_precision":"source supplied","lon":-74.45686,"name":"Open Data Centers Piscataway","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12452254071"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/open-data-centers-piscataway-osmnode-12452254071"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12452254071"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Ashland","confidence":"medium","id":"datacentersexposed-a930419f75da1430","lat":37.81047,"location_precision":"source supplied","lon":-77.4485,"name":"LS Power","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/behind-the-meter-data-center-proposed-outside-richmond-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ls-power"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Lewiston","confidence":"medium","id":"datacentersexposed-a94b292d4a7c2d86","lat":44.09427,"location_precision":"source supplied","lon":-70.21859,"name":"Tier III AI Data Center","operator":"MillCompute LLC","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tier-iii-ai-data-center-proposed-for-lewiston-bates-mill-in-maine/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tier-iii-ai-data-center"}],"state":"Maine","status":"unknown"},{"ai_classification":"unknown","city":"Irving","confidence":"low","contains_osm":true,"id":"datacentersexposed-a94d11605d0ddc6f","lat":32.89725,"location_precision":"source supplied","lon":-96.98265,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-irving-dallas-data-center-campus-osmway-526806006","value":147.0}],"name":"QTS Irving - Dallas Data Center Campus","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/526806006"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-irving-dallas-data-center-campus-osmway-526806006"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/526806006"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-a9abf8f44ca171be","lat":38.98971,"location_precision":"source supplied","lon":-77.43743,"name":"Dulles Downs","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-dulles-downs"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Albany","confidence":"low","contains_osm":true,"id":"datacentersexposed-a9ac8e436b585df5","lat":42.73563,"location_precision":"source supplied","lon":-73.81867,"name":"Lumen Albany 4","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12682482760"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-albany-4-osmnode-12682482760"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12682482760"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Monterey Park","confidence":"medium","id":"datacentersexposed-a9d9f08e27188f67","lat":34.04039,"location_precision":"source supplied","lon":-118.11365,"name":"Monterey Park Data Center","operator":"HMC StratCorp and subsidiary DigiCo REIT","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/monterey-park-data-center"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-aa0cbc6ec459c6b2","lat":38.3713,"location_precision":"source supplied","lon":-77.45144,"name":"Cranes Corner Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cranes-corner-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-aa15f928f886c335","lat":47.41,"location_precision":"source supplied","lon":-120.3,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-east-wenatchee","value":480.0}],"name":"Google East Wenatchee","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-east-wenatchee"}],"state":"Washington","status":"planned"},{"ai_classification":"unknown","city":"Carlton","confidence":"medium","id":"datacentersexposed-aa4278505971f7f3","lat":44.42317,"location_precision":"source supplied","lon":-87.53463,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/carlton-cloverleaf-data-center","value":100.0}],"name":"Carlton Cloverleaf Data Center","operator":"Cloverleaf","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cloverleaf-walks-away-from-data-center-site-project-in-kewaunee-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/carlton-cloverleaf-data-center"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Muncy Township","confidence":"medium","id":"datacentersexposed-aa53232936cc23c8","lat":41.25403,"location_precision":"source supplied","lon":-76.79914,"name":"Muncy Township Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi4wFBVV95cUxQQmJHVURsdGRyVHZ6TzEtMmlhUFFJUTVrSlNJMldsQllQUGo1Szk3TFplVjVjTjZHZkx3Z09vMk16QzBqcnB0WjZGNkFJcU9uZ2xSYUM1QXVUc3pub09yZVB2MUZaUURxbkJuTFFZZE5OUDc4TmIyUDlidDliUjJYUWM3b2ctd1FIMzZGUjhmX1I1S0hub0dTX0dadHF0RkV5OXZvZDhrT3FyYnNZWktqLU8xM0lPQWJmLThEV3BVTGRKQzQzYUFDeEdnTTBySjVIOVYtV0FyNHFpMzNRU0NYaEI0NA?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/muncy-township-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-aa821294d6423566","lat":38.98573,"location_precision":"source supplied","lon":-104.78726,"name":"Walmart Colorado Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/400540223"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/walmart-colorado-data-center-osmway-400540223"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/400540223"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"La Grange","confidence":"medium","id":"datacentersexposed-aa90d63e40f4521d","lat":38.44456,"location_precision":"source supplied","lon":-85.398,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-lincoln-oc-data-center","value":600.0}],"name":"Project Lincoln: OC Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/kentuckys-oldham-county-passes-150-day-data-center-moratorium/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-lincoln-oc-data-center"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Birmingham","confidence":"medium","id":"datacentersexposed-aad01b4ef43eb747","lat":33.42746,"location_precision":"source supplied","lon":-86.88143,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bhm01-nebius-data-center","value":300.0}],"name":"BHM01 Nebius Data Center","operator":"Nebius","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/nebius-targets-data-center-development-in-birmingham-alabama/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bhm01-nebius-data-center"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-aaec54489872c1ad","lat":39.02662,"location_precision":"source supplied","lon":-77.41167,"name":"Horseshoe Drive","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-horseshoe-drive"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Holden","confidence":"medium","id":"datacentersexposed-aafba967aa3bf2dd","lat":37.75417,"location_precision":"source supplied","lon":-82.1179,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/adams-fork-harless-data-center","value":2398.5}],"name":"Adams Fork Harless Data Center","operator":"TransGas Development, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/adams-fork-harless-data-center"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Franklin","confidence":"low","contains_osm":true,"id":"datacentersexposed-ab18e7a26499181d","lat":42.86314,"location_precision":"source supplied","lon":-87.97788,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/expedient-milwaukee-osmway-664938835","value":1.6}],"name":"Expedient Milwaukee","operator":"Expedient, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/664938835"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/expedient-milwaukee-osmway-664938835"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/664938835"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ab397a060f781c5c","lat":39.32263,"location_precision":"source supplied","lon":-94.59808,"name":"Meta Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1184066765"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center-osmway-1184066765"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1184066765"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Augusta Township","confidence":"medium","id":"datacentersexposed-ab66ac7c75393eec","lat":42.09171,"location_precision":"source supplied","lon":-83.63743,"name":"Thor Equities Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/thor-equities-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Severn","confidence":"medium","id":"datacentersexposed-abea66c5f2cc253e","lat":39.14969,"location_precision":"source supplied","lon":-76.67996,"name":"Sandy Farms Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/harrison-street-sells-two-powered-shell-data-center-sites-in-maryland/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sandy-farms-data-center"}],"state":"Maryland","status":"planned"},{"ai_classification":"unknown","city":"Quinlan","confidence":"medium","id":"datacentersexposed-abf17a645402b766","lat":32.98813,"location_precision":"source supplied","lon":-96.08421,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/core-scientific","value":285.0}],"name":"Core Scientific","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/core-scientific-buys-land-outside-dallas-texas-for-285mw-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/core-scientific"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Adairsville","confidence":"medium","id":"datacentersexposed-ac073802cb32344e","lat":34.37998,"location_precision":"source supplied","lon":-85.034,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dixon-data-center-project-sassy","value":200.0}],"name":"Dixon Data Center/Project Sassy","operator":"AtlasEdge","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/atlas-named-as-developer-on-project-sassy-in-rome-georgia/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/dixon-data-center-project-sassy"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ac3297139511a39a","lat":36.09947,"location_precision":"source supplied","lon":-95.83828,"name":"TulsaConnect DC3","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12793428582"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tulsaconnect-dc3-osmnode-12793428582"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12793428582"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ac41ad345ff5a1cf","lat":33.00014,"location_precision":"source supplied","lon":-96.66165,"name":"Stream DFW IV","operator":"Stream Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/597835788"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stream-dfw-iv-osmway-597835788"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597835788"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ac43b29311b9ff60","lat":38.80312,"location_precision":"source supplied","lon":-77.5107,"name":"Equinix Manassas DC14","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-07-22","url":"https://datacentersexposed.com/facilities/pwc-equinix-manassas-dc14"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Chaska","confidence":"low","contains_osm":true,"id":"datacentersexposed-ac52467f3be86352","lat":44.85161,"location_precision":"source supplied","lon":-93.5989,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-minneapolis-chaska-osmway-52227492","value":9.0}],"name":"Flexential Minneapolis - Chaska","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/52227492"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-minneapolis-chaska-osmway-52227492"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52227492"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-ac8df9797717fca2","lat":38.95402,"location_precision":"source supplied","lon":-77.52864,"name":"Dulles Trade Center West","operator":"10 Trade West Drive LLC/Charles S Kuhn Manager","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/1623A063-96C6-448D-91CC-B7B3E9DA7B8B?tab=attachments"}],"updated":"2026-09-01","url":"https://datacentersexposed.com/facilities/dulles-trade-center-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Hobart","confidence":"medium","id":"datacentersexposed-ac932e8f0e43527e","lat":41.50489,"location_precision":"source supplied","lon":-87.28408,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hobart-data-center","value":2400.0}],"name":"Hobart Data Center","operator":"Amazon.com, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-in-hobart-indiana-gets-green-light-for-rezoning/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hobart-data-center"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ac99b8a4b7a93f74","lat":41.1805,"location_precision":"source supplied","lon":-96.08491,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/yahoo-osmway-1235150788","value":17.0}],"name":"Yahoo","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1235150788"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/yahoo-osmway-1235150788"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1235150788"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"St. Louis","confidence":"medium","id":"datacentersexposed-ad0dbfe9c97b27d9","lat":38.63161,"location_precision":"source supplied","lon":-90.2377,"name":"Tierpoint Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tierpoint-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-ad1570c768d85508","lat":39.01025,"location_precision":"source supplied","lon":-77.46267,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cloudhq-lc1-osmway-794147654","value":144.0}],"name":"CloudHQ LC1","operator":"CloudHQ, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/794147654"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq-lc1-osmway-794147654"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Effingham","confidence":"medium","id":"datacentersexposed-ad1b4e49713af6e1","lat":39.16273,"location_precision":"source supplied","lon":-88.51865,"name":"Gail Technology Data Center","operator":"Gail Technology","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gail-technology-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Aurora","confidence":"medium","id":"datacentersexposed-ad28c52ca47ea5a3","lat":39.70643,"location_precision":"source supplied","lon":-104.80743,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://coloradosun.com/2023/10/11/aurora-data-center-to-become-one-of-xcels-biggest-customers-rivaling-mines-and-steel-mills/","value":177.0}],"name":"QTS Aurora-Denver","operator":"QTS Realty Trust, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://coloradosun.com/2023/10/11/aurora-data-center-to-become-one-of-xcels-biggest-customers-rivaling-mines-and-steel-mills/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-aurora-denver-co-pg"}],"state":"Colorado","status":"under construction"},{"ai_classification":"unknown","city":"Riesel","confidence":"medium","id":"datacentersexposed-ad36985151278c1d","lat":31.48,"location_precision":"source supplied","lon":-96.92,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cipher-riesel-data-center-campus-waco-area","value":500.0}],"name":"Cipher Riesel Data Center Campus (Waco area)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cipher-riesel-data-center-campus-waco-area"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Tyrone","confidence":"medium","id":"datacentersexposed-ad5ae2110d0b8234","lat":33.51788,"location_precision":"source supplied","lon":-84.57948,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-rita-campus","value":96.0}],"name":"Project Rita Campus","operator":"Fayette County Development Authority","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-rita-campus"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-ada243bdbe35eb72","lat":38.77886,"location_precision":"source supplied","lon":-77.55712,"name":"Amazon IAD601","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1015995259"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/amazon-iad601-osmway-1015995259"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Rancho Cordova","confidence":"low","id":"datacentersexposed-adb06dac2db3696c","lat":38.5923,"location_precision":"source supplied","lon":-121.27744,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edgeconnex-data-center-osmway-933393863","value":2.0}],"name":"Edgeconnex Data Center","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/933393863"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edgeconnex-data-center-osmway-933393863"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Orangeburg","confidence":"low","contains_osm":true,"id":"datacentersexposed-adbe40c91d898801","lat":41.03449,"location_precision":"source supplied","lon":-73.97579,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fifteenfortyseven-csr-orny1-osmway-1238955733","value":24.0}],"name":"fifteenfortyseven CSR ORNY1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1238955733"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fifteenfortyseven-csr-orny1-osmway-1238955733"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1238955733"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-adc9c5f1151dea7b","lat":37.48923,"location_precision":"source supplied","lon":-77.24748,"name":"RIC1 DC1","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13685576464"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/ric1-dc1-osmnode-13685576464"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13685576464"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Janesville","confidence":"medium","id":"datacentersexposed-ade102a4115079f5","lat":42.65851,"location_precision":"source supplied","lon":-89.0211,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/janesville-data-center","value":25.0}],"name":"Janesville Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-janesville-wisconsin-seek-data-center-partner-for-former-gm-auto-assembly-plant/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/janesville-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Huntington","confidence":"medium","id":"datacentersexposed-ae180c10ea3a3584","lat":38.41845,"location_precision":"source supplied","lon":-82.4386,"name":"Alpha Technologies Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/alpha-technologies-to-convert-office-to-data-center-in-west-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/alpha-technologies-data-center"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Crown Point","confidence":"medium","id":"datacentersexposed-ae1d2933ee7e13b4","lat":41.44693,"location_precision":"source supplied","lon":-87.3319,"name":"Wylie Capital Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wylie-capital-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Yorkville","confidence":"medium","id":"datacentersexposed-ae3d0f1ad94d915a","lat":41.68361,"location_precision":"source supplied","lon":-88.4681,"name":"CyrusOne Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-data-center"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Eaton","confidence":"medium","id":"datacentersexposed-ae5b2661660d47de","lat":39.8307,"location_precision":"source supplied","lon":-84.7197,"name":"PRSM Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/300-acres-of-land-in-preble-county-ohio-could-host-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prsm-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Council Bluffs","confidence":"medium","id":"datacentersexposed-ae754cb901d1358c","lat":41.25884,"location_precision":"source supplied","lon":-95.85195,"name":"Google Council Bluffs expansion","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/google-council-bluffs-expansion-ia-pg"}],"state":"Iowa","status":"under construction"},{"ai_classification":"unknown","city":"Pyote","confidence":"medium","id":"datacentersexposed-aeaa41f59d3685f2","lat":31.53661,"location_precision":"source supplied","lon":-103.12619,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/genesis-digital-assets-pyote-tx-pg","value":195.0}],"name":"Genesis Digital Assets Pyote","operator":"Genesis Digital Assets","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/genesis-digital-assets-pyote-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-aed960d3c71d11dd","lat":45.55642,"location_precision":"source supplied","lon":-122.91221,"name":"EdgeConneX - Portland","operator":"EdgeConneX, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1019812125"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/edgeconnex-portland-osmway-1019812125"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-af11aa97834bc9f5","lat":41.12259,"location_precision":"source supplied","lon":-104.90352,"name":"Microsoft CYS Datacenter","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/414055237"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-cys-datacenter-osmway-414055237"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-af9ffe569c1bf3eb","lat":33.62737,"location_precision":"source supplied","lon":-111.9017,"name":"VaultLogix","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10796113031"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/vaultlogix-osmnode-10796113031"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10796113031"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Locust Grove","confidence":"medium","id":"datacentersexposed-afa1f12d7da6a663","lat":38.33316,"location_precision":"source supplied","lon":-77.73109,"name":"Wilderness Crossing","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.battlefields.org/preserve/speak-out/fight-continues-wilderness-battlefield"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wilderness-crossing"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Fairburn","confidence":"medium","id":"datacentersexposed-afae4469511f8a17","lat":33.53273,"location_precision":"source supplied","lon":-84.58926,"name":"Fairburn Technology Center","operator":"Bohannon Road Venture, LLC.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/large-data-center-campus-planned-outside-atlanta-georgia/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/fairburn-technology-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"datacentersexposed-afb54eafc3bcc6a3","lat":33.7515,"location_precision":"source supplied","lon":-84.74771,"name":"Microsoft East US 3 — Douglasville","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://azure.microsoft.com/en-us/blog/microsoft-will-establish-its-next-us-datacenter-region-in-georgia-s-fulton-and-douglas-counties/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-east-us-3-douglasville-ga-pg"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-afbd3addcb611eb6","lat":39.29176,"location_precision":"source supplied","lon":-76.6204,"name":"Lumen Baltimore","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11168593074"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lumen-baltimore-osmnode-11168593074"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11168593074"}],"state":"Maryland","status":"operating"},{"ai_classification":"unknown","city":"Clinton","confidence":"medium","id":"datacentersexposed-b03f6994b82db0ca","lat":32.34915,"location_precision":"source supplied","lon":-90.36636,"name":"Amazon Clinton Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-likely-behind-plans-for-750m-data-center-in-clinton-mississippi/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-clinton-data-center-2"}],"state":"Mississippi","status":"planned"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-b05aa3c7c98fb1cd","lat":39.09197,"location_precision":"source supplied","lon":-77.56057,"name":"Oaklawn","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oaklawn"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b05b7cb5db61433b","lat":38.63122,"location_precision":"source supplied","lon":-77.41277,"name":"Amazon Colchester Industrial Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-colchester-industrial-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b0733e584b98826d","lat":39.84845,"location_precision":"source supplied","lon":-82.99639,"name":"Google Lockbourne, OH","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1281982556"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-lockbourne-oh-osmway-1281982556"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b093083a87a9f12a","lat":38.43,"location_precision":"source supplied","lon":-85.62,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-jeffersonville-proposed","value":407.0}],"name":"Meta Jeffersonville (proposed)","operator":"Facebook USA, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-jeffersonville-proposed"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"medium","id":"datacentersexposed-b0a914ead94a88da","lat":42.03573,"location_precision":"source supplied","lon":-87.9766,"name":"Aligned","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aligned-stream-and-nexstar-planning-data-center-campuses-in-elk-grove-area-of-chicago/"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/aligned"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"Cordele","confidence":"medium","id":"datacentersexposed-b0b0a2574dbabbe1","lat":31.97113,"location_precision":"source supplied","lon":-83.7316,"name":"Project Splice","operator":"Redcentric","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/21-million-sq-ft-technology-campus-proposed-in-southern-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-splice"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-b10577cfe2f3e2f2","lat":39.02475,"location_precision":"source supplied","lon":-77.4122,"name":"Centersquare IAD1-C","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/52094294"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/centersquare-iad1-c-osmway-52094294"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52094269"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52094270"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52094294"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Vernon Hills","confidence":"low","contains_osm":true,"id":"datacentersexposed-b11cb13a7c8bc017","lat":42.21678,"location_precision":"source supplied","lon":-87.95293,"name":"VISA","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/317466755"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/visa-osmway-317466755"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/317466755"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b17e298bb6582c16","lat":38.7499,"location_precision":"source supplied","lon":-82.05246,"name":"Mason County Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/mason-county-data-center"}],"state":"West Virginia","status":"under construction"},{"ai_classification":"unknown","city":"South Riding","confidence":"medium","id":"datacentersexposed-b1946b2f77d527d0","lat":38.92061,"location_precision":"source supplied","lon":-77.47289,"name":"Firefox Dulles","operator":"Brian Clifford/DLA PIPER LLP (US)","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/firefox-dulles"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Luther","confidence":"medium","id":"datacentersexposed-b1959e95f9481fde","lat":35.68475,"location_precision":"source supplied","lon":-97.21583,"name":"Luther Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-proposal-in-luther-oklahoma-faces-opposition-prior-to-official-filing/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/luther-data-center-2"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Plano","confidence":"medium","id":"datacentersexposed-b1a21da94939aef3","lat":33.00439,"location_precision":"source supplied","lon":-96.6502,"name":"DFW-04 Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://itbrief.news/story/aligned-lambda-join-forces-on-ai-ready-data-centre-in-texas"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dfw-04-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"New Braunfels","confidence":"medium","id":"datacentersexposed-b1bd70b70b870d31","lat":29.76201,"location_precision":"source supplied","lon":-97.9909,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cloudburst-data-center","value":1200.0}],"name":"CloudBurst Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudburst-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Cleveland","confidence":"medium","id":"datacentersexposed-b1d8b9a21d38ffc6","lat":41.46194,"location_precision":"source supplied","lon":-81.65161,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lakeland-equity-group-data-center","value":150.0}],"name":"Lakeland Equity Group Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developers-file-application-for-16bn-data-center-in-cleveland-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lakeland-equity-group-data-center"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Chandler","confidence":"low","id":"datacentersexposed-b1f621f746a3d87e","lat":33.27492,"location_precision":"source supplied","lon":-111.88664,"name":"Digital Realty Phoenix PHX15","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300952513"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-phoenix-phx15-osmway-300952513"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Rockdale","confidence":"medium","id":"datacentersexposed-b286f0638eb2be52","lat":30.65494,"location_precision":"source supplied","lon":-97.00582,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bitdeer-rockdale-tx-pg","value":563.0}],"name":"Bitdeer Rockdale","operator":"Bitdeer","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.sec.gov/Archives/edgar/data/1899123/000121390025076048/ea025183701ex99-1_bitdeer.htm"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitdeer-rockdale-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"East Wenatchee","confidence":"low","contains_osm":true,"id":"datacentersexposed-b2a8829f7ec5b3d3","lat":47.41832,"location_precision":"source supplied","lon":-120.20771,"name":"Microsoft EAT03","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1173537116"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-eat03-osmway-1173537116"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1173537117"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-eat04-osmway-1173537117"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-b2c27f610bdfe570","lat":29.41341,"location_precision":"source supplied","lon":-98.7773,"name":"CITICORP DATA SYSTEMS","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/citicorp-data-systems"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Ashland","confidence":"medium","id":"datacentersexposed-b2d6263b78e1177c","lat":37.75563,"location_precision":"source supplied","lon":-77.44994,"name":"Hanover-Ashland Data Center","operator":"Tradeport Ashland Land LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/hanover-ashland-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Beaver Dam","confidence":"medium","id":"datacentersexposed-b2e1e6e352b47fee","lat":43.50288,"location_precision":"source supplied","lon":-88.8095,"name":"Edge Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/oppidan-targets-edge-data-center-in-beaver-dam-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edge-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Kalkaska Township","confidence":"medium","id":"datacentersexposed-b34f4f0c4fd307d3","lat":44.7287,"location_precision":"source supplied","lon":-85.21632,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/rocklocker-llc","value":1000.0}],"name":"Rocklocker LLC","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/opposition-leads-developer-to-withdraw-data-center-proposal-in-kalkaska-county-michigan/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rocklocker-llc"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"medium","id":"datacentersexposed-b35b95e671e2bf87","lat":36.2705,"location_precision":"source supplied","lon":-115.048,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/novva-data-center","value":100.0}],"name":"Novva Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/novva-data-centers-buys-205-acres-of-land-in-las-vegas-nevada/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/novva-data-center"}],"state":"Nevada","status":"operating"},{"ai_classification":"unknown","city":"Charlestown","confidence":"medium","id":"datacentersexposed-b377aa45eb69aef9","lat":38.44286,"location_precision":"source supplied","lon":-85.66203,"name":"Charlestown Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/charlestown-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Griffin","confidence":"medium","id":"datacentersexposed-b3c491a8eed2946d","lat":33.27351,"location_precision":"source supplied","lon":-84.12198,"name":"Wallace Jackson Data Center Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/application-filed-for-5-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wallace-jackson-data-center-campus"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Charlotte","confidence":"low","contains_osm":true,"id":"datacentersexposed-b3d6c993c59aed95","lat":35.14281,"location_precision":"source supplied","lon":-80.91622,"name":"Spectrum Charlotte National Data Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/516686211"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/spectrum-charlotte-national-data-center-osmway-516686211"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/516686211"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b40ea4c37fa334b0","lat":38.7839,"location_precision":"source supplied","lon":-77.56075,"name":"Rose East/West","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-rose-east-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Phoenix","confidence":"medium","id":"datacentersexposed-b42ab07038725fa5","lat":33.56452,"location_precision":"source supplied","lon":-112.112,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/expedient-data-center","value":2.0}],"name":"Expedient Data Center","operator":"Expedient, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/expedient-opens-data-center-in-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/expedient-data-center"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b43282fcfb089201","lat":40.53753,"location_precision":"source supplied","lon":-74.55552,"name":"Digital Realty","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460182337"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-osmway-460182337"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Richmond","confidence":"medium","id":"datacentersexposed-b45162bcbd0c32f5","lat":37.61285,"location_precision":"source supplied","lon":-77.47348,"name":"Infotel Systems Data Center","operator":"Infotel","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/infotel-systems-data-center"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"St Charles","confidence":"medium","id":"datacentersexposed-b46a2ce1ad88c77e","lat":38.81535,"location_precision":"source supplied","lon":-90.5454,"name":"Project Cumulus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.ksdk.com/article/money/economy/energy/missouri-massive-data-center-st-charles-secretive-power-water-worries-polluted-groundwater-protected-wetland/63-cdae3e73-efab-4c0c-9215-938d064188e3"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-cumulus"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Red Oak","confidence":"medium","id":"datacentersexposed-b4fb221e83bfe0a4","lat":32.53531,"location_precision":"source supplied","lon":-96.7339,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-dfw11-and-dfw12","value":480.0}],"name":"Databank: DFW11 and DFW12","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/databank-files-to-develop-two-more-data-centers-at-upcoming-red-oak-texas-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-dfw11-and-dfw12"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b50396bccd566260","lat":41.6,"location_precision":"source supplied","lon":-93.55,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-council-bluffs","value":480.0}],"name":"Google Council Bluffs","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-council-bluffs"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Plano","confidence":"low","id":"datacentersexposed-b50f36f26447d8a3","lat":33.00601,"location_precision":"source supplied","lon":-96.65709,"name":"Aligned Data Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1486780799"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/aligned-data-centers-osmway-1486780799"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","contains_osm":true,"id":"datacentersexposed-b54822dc02a9886d","lat":45.83792,"location_precision":"source supplied","lon":-119.68835,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/914613836"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-914613836"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/914613836"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Faribault","confidence":"medium","id":"datacentersexposed-b5561d76c62212d1","lat":44.29496,"location_precision":"source supplied","lon":-93.26883,"name":"Faribault Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/faribault-data-center"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b55d17554365fa2d","lat":38.94795,"location_precision":"source supplied","lon":-77.5231,"name":"Amazon IAD83","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/990537813"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/amazon-iad83-osmway-990537813"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Hubbard","confidence":"medium","id":"datacentersexposed-b56463a87786de59","lat":31.8252,"location_precision":"source supplied","lon":-96.75136,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nexus-data-center","value":600.0}],"name":"Nexus Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/600mw-natural-gas-powered-data-center-campus-proposed-in-hubbard-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nexus-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Louisa County","confidence":"medium","id":"datacentersexposed-b5c164727fc950d2","lat":38.00263,"location_precision":"source supplied","lon":-77.94,"name":"Amazon Data Center","operator":"Amazon.com, Inc.","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-center-3"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b5cc3dd4fa1c5c07","lat":47.24537,"location_precision":"source supplied","lon":-119.81609,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/intergate-quincy-data-center-osmway-283051472","value":85.0}],"name":"Intergate Quincy Data Center","operator":"Sabey Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/283051472"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/intergate-quincy-data-center-osmway-283051472"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"datacentersexposed-b61239d78ccc2ab5","lat":37.33415,"location_precision":"source supplied","lon":-121.89162,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coresite-real-estate-55-s-market-street-61474","value":78.0}],"name":"CoreSite Real Estate 55 S. Market Street","operator":"CoreSite, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-13","url":"https://datacentersexposed.com/facilities/coresite-real-estate-55-s-market-street-61474"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","id":"datacentersexposed-b614bbc16efa649f","lat":32.90195,"location_precision":"source supplied","lon":-97.39384,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-eolian-data-center","value":70.0}],"name":"CyrusOne/Eolian Data Center","operator":"CyrusOne/Eolian","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-partners-with-energy-firm-eolian-for-dallas-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-eolian-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Columbus","confidence":"medium","id":"datacentersexposed-b620bb112f18a029","lat":32.46107,"location_precision":"source supplied","lon":-84.98804,"name":"Columbus Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMiekFVX3lxTFBHblZjQkphcFg0c1h5WlRWd3lLdWFIMFFyZklmMTUzX2lpb1dGZnJxaEsyUUhqVzhIT1FiSVNKbWpiSTY3anZkcEx2by1pbVA2N3pxMGVmSk16QXhYLVB0WTB1ZGI0OWdWRmVWd1VjRnR3bHNyQ3JWZ1V30gF6QVVfeXFMTkFud3p6Mll4UUdqMWlwdnBZZ2hyVHMxUWVVUnRsT2tWZzU4bUkweUJqUmotR18zSXZ1YU5PQjR1b0sxVmRoYXdhM2VhSG1IT1g2czR0cGMwU0tfSnl4Z0Flc3lGWDI1Z0xzOUsxMEQ5RU14cEdjWW00WUE?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/columbus-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","id":"datacentersexposed-b636a4d665b71fe6","lat":33.34703,"location_precision":"source supplied","lon":-111.60414,"name":"Apple Data Center","operator":"Apple Data Services LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300974499"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/apple-data-center-osmway-300974499"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Temple","confidence":"medium","id":"datacentersexposed-b652556d532d4881","lat":33.70915,"location_precision":"source supplied","lon":-85.06483,"name":"Project Bus","operator":"AtlasEdge","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/atlas-development-files-for-12-building-data-center-campus-in-temple-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-bus"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"medium","id":"datacentersexposed-b65b2c8c3506b535","lat":38.88027,"location_precision":"source supplied","lon":-77.46223,"name":"TFG INDEPENDENCE CENTER I PROPERTY","operator":"TFG INDEPENDENCE CENTER I PROPERTY LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tfg-independence-center-i-property"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Hayward","confidence":"medium","id":"datacentersexposed-b6c2f9238d8068cd","lat":37.6282,"location_precision":"source supplied","lon":-122.11952,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-svy03a-hayward","value":50.0}],"name":"STACK Infrastructure SVY03A Data Center Campus","operator":"Stack Infrastructure, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/stack-svy03a-hayward"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-b6e0c207d544490a","lat":39.07723,"location_precision":"source supplied","lon":-77.53375,"name":"Tuscarora Crossing Landbay 3","operator":"BlackChamber Group","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://dgtlinfra.com/blackchamber-group-data-centers-northern-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tuscarora-crossing-landbay-3"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-b71b13d191a5071c","lat":36.32703,"location_precision":"source supplied","lon":-88.32007,"name":"Newrays Two LLC Mining","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1459680304"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/newrays-two-llc-mining-osmway-1459680304"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1459680304"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Kenosha","confidence":"medium","id":"datacentersexposed-b7212b63da9ccab4","lat":42.62348,"location_precision":"source supplied","lon":-87.9679,"name":"Kenosha Microsoft Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://biztimes.com/microsoft-buys-240-acres-of-land-in-kenosha-for-data-center-development/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/kenosha-microsoft-data-center"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b75e9b482c409199","lat":41.69023,"location_precision":"source supplied","lon":-86.46869,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-aws-data-center-osmway-1203535554","value":2200.0}],"name":"Amazon AWS Data Center","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1203535554"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-aws-data-center-osmway-1203535554"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Alpharetta","confidence":"low","contains_osm":true,"id":"datacentersexposed-b7605a4abf142360","lat":34.09671,"location_precision":"source supplied","lon":-84.23748,"name":"Mapletree Industrial","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/615593145"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/mapletree-industrial-osmway-615593145"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/615593145"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"El Mirage","confidence":"medium","id":"datacentersexposed-b7a9ec63757b5444","lat":33.61303,"location_precision":"source supplied","lon":-112.32449,"name":"Microsoft El Mirage (Copperwing)","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-files-to-expand-el-mirage-data-center-campus-in-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-el-mirage-copperwing-az-pg"}],"state":"Arizona","status":"under construction"},{"ai_classification":"unknown","city":"LENOIR","confidence":"medium","id":"datacentersexposed-b7abc2dae71b558c","lat":35.90043,"location_precision":"source supplied","lon":-81.54659,"name":"TAPAHA DYNAMICS, LLC","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110028259480"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/tapaha-dynamics-llc-air-110028259480"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b7affb0d1a53e107","lat":40.09,"location_precision":"source supplied","lon":-82.795,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-new-albany","value":420.0}],"name":"Meta New Albany","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-new-albany"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","contains_osm":true,"id":"datacentersexposed-b7c6f54a047d9a72","lat":41.87288,"location_precision":"source supplied","lon":-87.63344,"name":"Netrality","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10537283366"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/netrality-osmnode-10537283366"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10537283366"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Dundee","confidence":"medium","id":"datacentersexposed-b7d3ccf60101c848","lat":41.99728,"location_precision":"source supplied","lon":-83.66742,"name":"Cloverleaf Infrastructure Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cloverleaf-drops-initial-plans-for-michigan-data-center-council-votes-to-block-water-supply/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloverleaf-infrastructure-data-center"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b7edace0e624a676","lat":40.4949,"location_precision":"source supplied","lon":-74.44309,"name":"Verizon Wireline Network Building","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/187574082"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireline-network-building-osmway-187574082"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-b7fb79380e25c2f2","lat":38.95792,"location_precision":"source supplied","lon":-77.49806,"name":"Amazon IAD120","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/693390022"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad120-osmway-693390022"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/693390022"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Huntsville","confidence":"low","id":"datacentersexposed-b867fd7191ed774b","lat":34.73654,"location_precision":"source supplied","lon":-86.6731,"name":"George C. Wallace Alabama Supercomputer Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/408012357"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/george-c-wallace-alabama-supercomputer-center-osmway-408012357"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-b876dba1dd9556ad","lat":38.46529,"location_precision":"source supplied","lon":-77.98739,"name":"Copper Ridge","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-granted-rezoning-approval-for-data-centers-in-culpeper-county-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/copper-ridge"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-b89c63860aab87dd","lat":38.97872,"location_precision":"source supplied","lon":-77.44249,"name":"Dulles Distribution Center Phase 1 and 2","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-dulles-distribution-center-phase-1-and-2"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","contains_osm":true,"id":"datacentersexposed-b89ff8fca08e2762","lat":37.4073,"location_precision":"source supplied","lon":-121.96598,"name":"DataBank Santa Clara SFO1","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1351049826"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/databank-santa-clara-sfo1-osmway-1351049826"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1351049826"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-b8bff608d428e286","lat":29.43828,"location_precision":"source supplied","lon":-98.50652,"name":"Lumen San Antonio 2","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/319857331"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-san-antonio-2-osmway-319857331"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/319857331"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ferris","confidence":"medium","id":"datacentersexposed-b8c2f5838f67b59b","lat":32.53902,"location_precision":"source supplied","lon":-96.6347,"name":"Cawley Partners","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cawley-partners-acquires-5200-acres-outside-dallas-plans-data-center-park/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cawley-partners"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","contains_osm":true,"id":"datacentersexposed-b8c4bc50108dddfd","lat":42.02304,"location_precision":"source supplied","lon":-87.97556,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/t5-chicago-ii-osmway-1219083554","value":36.0}],"name":"T5 Chicago II","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1219083554"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5-chicago-ii-osmway-1219083554"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1219083554"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"DE SOTO","confidence":"medium","id":"datacentersexposed-b8c51e18ae8f98dc","lat":38.94463,"location_precision":"source supplied","lon":-94.98973,"name":"DIGITAL DE SOTO","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=KSR124266"}],"updated":"2026-07-14","url":"https://datacentersexposed.com/facilities/digital-de-soto-ksr124266"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-b8cd4efff4065d13","lat":39.31801,"location_precision":"source supplied","lon":-94.5773,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-micah","value":700.0}],"name":"Project Micah","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-files-final-plans-for-rocky-branch-creek-technology-park-in-kansas-city-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-micah"}],"state":"Missouri","status":"under construction"},{"ai_classification":"unknown","city":"West Des Moines","confidence":"medium","id":"datacentersexposed-b8f9658b42623620","lat":41.59,"location_precision":"source supplied","lon":-93.71,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-west-des-moines","value":360.0}],"name":"Microsoft West Des Moines","operator":"Microsoft Data Center LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-west-des-moines"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Olathe","confidence":"low","contains_osm":true,"id":"datacentersexposed-b90cdef81a17aff1","lat":38.93559,"location_precision":"source supplied","lon":-94.8645,"name":"U.S. Bank National Data Process Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/598263496"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/u-s-bank-national-data-process-center-osmway-598263496"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/598263496"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"St Louis","confidence":"medium","id":"datacentersexposed-b90e753ca49e5b35","lat":38.63044,"location_precision":"source supplied","lon":-90.20682,"name":"1831 Chestnut Condominium Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/340000-sq-ft-data-center-and-office-for-sale-in-downtown-st-louis-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/1831-chestnut-condominium-data-center"}],"state":"Missouri","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-b93794b81d3c24ce","lat":39.001,"location_precision":"source supplied","lon":-77.455,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-loudoun-build","value":600.0}],"name":"Meta — Loudoun build","operator":"Facebook USA, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-loudoun-build"}],"state":"Virginia","status":"under construction"},{"ai_classification":"unknown","city":"Hammond","confidence":"low","contains_osm":true,"id":"datacentersexposed-b99aae6eb3d05c93","lat":41.70742,"location_precision":"source supplied","lon":-87.52023,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-crossroad-osmway-978934687","value":180.0}],"name":"Digital Crossroad","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/978934687"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-crossroad-osmway-978934687"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/978934687"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Ridgeville","confidence":"medium","id":"datacentersexposed-b99b88416c88837e","lat":33.13228,"location_precision":"source supplied","lon":-80.2672,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dc-blox-camp-hall","value":45.0}],"name":"DC Blox: Camp Hall","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/dc-blox-acquires-27-acres-in-south-carolina-for-45mw-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dc-blox-camp-hall"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-b9dd50fac9c5750b","lat":46.82747,"location_precision":"source supplied","lon":-92.13048,"name":"Ark Duluth Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1307072785"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/ark-duluth-data-center-osmway-1307072785"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1307072785"}],"state":"Minnesota","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-b9df9cc7323a41cb","lat":47.35843,"location_precision":"source supplied","lon":-120.15998,"name":"EAT13","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1173822722"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/eat13-osmway-1173822722"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Greensburg","confidence":"medium","id":"datacentersexposed-ba0fd3f2253318e3","lat":39.37664,"location_precision":"source supplied","lon":-85.5201,"name":"Jumping Bison LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://wrbiradio.com/greensburg-council-approves-era-establishment-data-center-abatement/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/jumping-bison-llc-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Ypsilanti","confidence":"medium","id":"datacentersexposed-ba7fbfc3de59ae15","lat":42.20446,"location_precision":"source supplied","lon":-83.5551,"name":"University of Michigan Los Alamos Data Center","operator":"Los Alamos National Laboratory","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/university-of-michigan-los-alamos-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-ba8b89920b031ae8","lat":42.23533,"location_precision":"source supplied","lon":-83.44414,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/us-signal-osmway-773848531","value":1.5}],"name":"US Signal","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/773848531"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/us-signal-osmway-773848531"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Pacific","confidence":"medium","id":"datacentersexposed-bb0ba2db398f635f","lat":38.43454,"location_precision":"source supplied","lon":-90.75512,"name":"BLE Landholdings Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-data-center-projects-debated-for-11-hours-at-planning-meeting-in-franklin-county-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ble-landholdings-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"SPRINGFIELD","confidence":"medium","id":"datacentersexposed-bb172c7759903cb9","lat":41.11841,"location_precision":"source supplied","lon":-96.1431,"name":"RAVEN NORTHBROOK LLC","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071150094"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/raven-northbrook-llc-air-110071150094"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Cincinnati","confidence":"low","contains_osm":true,"id":"datacentersexposed-bb223f19534a3ea3","lat":39.10269,"location_precision":"source supplied","lon":-84.5179,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-cin2-osmway-46128119","value":13.0}],"name":"CyrusOne CIN2","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/46128119"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-cin2-osmway-46128119"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/46128119"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Harrisburg","confidence":"medium","id":"datacentersexposed-bb3d7ea5b4237459","lat":40.22755,"location_precision":"source supplied","lon":-76.8093,"name":"Harrisburg Data Center","operator":"Provident Realty (Harrisburg I, LLC)","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/golf-course-set-to-become-data-center-in-dauphin-county-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/harrisburg-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Charlotte","confidence":"low","contains_osm":true,"id":"datacentersexposed-bb4bec8559824bda","lat":35.13541,"location_precision":"source supplied","lon":-80.93683,"name":"Flexential Charlotte - South","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/215630401"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-charlotte-south-osmway-215630401"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/215630401"}],"state":"North Carolina","status":"operating"},{"ai_classification":"unknown","city":"Fairfield","confidence":"medium","id":"datacentersexposed-bb5932200b6a31b2","lat":31.89392,"location_precision":"source supplied","lon":-96.11786,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-2","value":380.0}],"name":"CyrusOne","operator":"CyrusOne LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-partners-with-constellation-for-760mw-data-center-campus-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-2"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Council Bluffs","confidence":"low","id":"datacentersexposed-bb59be6a3c97400f","lat":41.2122,"location_precision":"source supplied","lon":-95.878,"name":"CyrusOne OCB1 Council Bluffs","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1226436457"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-ocb1-council-bluffs-osmway-1226436457"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-bb9597196d049a04","lat":38.77854,"location_precision":"source supplied","lon":-77.55721,"name":"Amazon Wellington South","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-wellington-south"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Childress","confidence":"medium","id":"datacentersexposed-bb99dd35f1479fa4","lat":34.51966,"location_precision":"source supplied","lon":-100.20677,"name":"Crusoe Childress Data Center (Meta)","operator":"Crusoe","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-signs-16gw-capacity-agreement-with-crusoe-report/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/crusoe-childress-meta"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-bbaeb59c38634c29","lat":43.78218,"location_precision":"source supplied","lon":-89.57484,"name":"Marquette-Adams Telephone Coop","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/850342266"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/marquette-adams-telephone-coop-osmway-850342266"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/850342266"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-bbb3bb507f01ad22","lat":38.80589,"location_precision":"source supplied","lon":-77.51192,"name":"Verizon Manassas 7777 Infantry Ridge","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-verizon-manassas-7777-infantry-ridge"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Massena","confidence":"medium","id":"datacentersexposed-bbb808b446df0b0f","lat":44.95484,"location_precision":"source supplied","lon":-74.84906,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/st-lawrence-data-and-agricultural-center","value":200.0}],"name":"St Lawrence Data and Agricultural Center","operator":"Petawatt Holdings","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/st-lawrence-data-and-agricultural-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-bbbb52c7460fcdb5","lat":38.81645,"location_precision":"source supplied","lon":-77.64936,"name":"Amazon Midwood Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-midwood-center"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-bbc0ca665889bd91","lat":33.66475,"location_precision":"source supplied","lon":-112.11171,"name":"Accelera Data Systems","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11113161710"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/accelera-data-systems-osmnode-11113161710"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11113161710"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-bc16da6af9948587","lat":41.34193,"location_precision":"source supplied","lon":-96.0877,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1422101112"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-osmway-1422101112"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Raymondville","confidence":"medium","id":"datacentersexposed-bc2670c57300b127","lat":26.48146,"location_precision":"source supplied","lon":-97.78305,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/soluna-project-kati-tx-pg","value":166.0}],"name":"Soluna Project Kati","operator":"Soluna","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/soluna-project-kati-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-bc5bb4835f27936e","lat":36.2,"location_precision":"source supplied","lon":-115.0,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-henderson-proposed","value":600.0}],"name":"Google Henderson (proposed)","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-henderson-proposed"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"datacentersexposed-bc6f07f1ec10f45f","lat":45.55037,"location_precision":"source supplied","lon":-122.89215,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-portland-hillsboro-1-osmway-328703599","value":12.0}],"name":"Flexential Portland - Hillsboro 1","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/328703599"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-portland-hillsboro-1-osmway-328703599"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-bcba5f1b1b5c8ba7","lat":39.022,"location_precision":"source supplied","lon":-77.476,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-dc-campus-ashburn","value":320.0}],"name":"Equinix DC Campus — Ashburn","operator":"Equinix, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/equinix-dc-campus-ashburn"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Portland","confidence":"low","contains_osm":true,"id":"datacentersexposed-bccca337f30bc2aa","lat":45.52126,"location_precision":"source supplied","lon":-122.68175,"name":"Digital Fortress - Portland 1","operator":"Interactive","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13746843366"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-fortress-portland-1-osmnode-13746843366"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13746843366"}],"state":"Oregon","status":"operating"},{"ai_classification":"unknown","city":"Blakely","confidence":"medium","id":"datacentersexposed-bd07cb9bb68ad16c","lat":31.40668,"location_precision":"source supplied","lon":-84.91299,"name":"Project Blue Hole","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-blue-hole"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Ivel","confidence":"low","contains_osm":true,"id":"datacentersexposed-bd24b6796e7327ec","lat":37.60019,"location_precision":"source supplied","lon":-82.67877,"name":"East Kentucky Network Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1456953254"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/east-kentucky-network-datacenter-osmway-1456953254"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1456953254"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Williston","confidence":"medium","id":"datacentersexposed-bd539a8f6ffd6949","lat":48.22199,"location_precision":"source supplied","lon":-103.62824,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-fighting-pike","value":455.0}],"name":"Project Fighting Pike","operator":"Critical Data House","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/455mw-data-center-campus-proposed-in-north-dakota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-fighting-pike"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"Warner Robins","confidence":"medium","id":"datacentersexposed-bdb9d6aa0c73ccf2","lat":32.6389,"location_precision":"source supplied","lon":-83.59209,"name":"Robins Air Force Base Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-department-of-the-air-force-accepting-proposals-for-ai-data-centers-in-military-bases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/robins-air-force-base-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Lancaster","confidence":"medium","id":"datacentersexposed-be463193f657a2fe","lat":32.57294,"location_precision":"source supplied","lon":-96.6993,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-oranger-whl-dallas-45-llc","value":252.0}],"name":"Project Oranger (WHL Dallas 45 LLC)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/large-data-center-campus-proposed-in-lancaster-area-of-dallas-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-oranger-whl-dallas-45-llc"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-be46619f31b8a626","lat":36.28218,"location_precision":"source supplied","lon":-86.79714,"name":"Verizon Wireless","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1489113575"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireless-osmway-1489113575"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1489113575"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Nashville","confidence":"medium","id":"datacentersexposed-be54537a1a261c56","lat":36.16228,"location_precision":"source supplied","lon":-86.7743,"name":"Fisk University Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/fisk-university-data-center"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-be574c1010b63dab","lat":37.48478,"location_precision":"source supplied","lon":-77.24911,"name":"DC5","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516620"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dc5-osmway-1493516620"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516620"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-be7200961608bf99","lat":41.51761,"location_precision":"source supplied","lon":-93.70632,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-osmway-830881743","value":200.0}],"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/830881743"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-osmway-830881743"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-bec83962a62f32b5","lat":38.93238,"location_precision":"source supplied","lon":-77.21859,"name":"Valo Park","operator":"TAMARES 7950 OWNER LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/valo-park"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Gaffney","confidence":"medium","id":"datacentersexposed-beca634969219508","lat":35.07913,"location_precision":"source supplied","lon":-81.5961,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cielo-digital-infrastructure","value":300.0}],"name":"Cielo Digital Infrastructure","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cielo-digital-infrastructure-plans-300mw-data-center-campus-in-south-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cielo-digital-infrastructure"}],"state":"South Carolina","status":"planned"},{"ai_classification":"unknown","city":"Albuquerque","confidence":"low","contains_osm":true,"id":"datacentersexposed-bf150e8975ee2338","lat":35.08674,"location_precision":"source supplied","lon":-106.61535,"name":"UNM Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12387534800"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/unm-data-center-osmnode-12387534800"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12387534800"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-bf1e12bf499b423d","lat":40.85,"location_precision":"source supplied","lon":-103.45,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sterling-data-center","value":2000.0}],"name":"Sterling Data Center","operator":"Granite Renewables","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sterling-data-center"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"PHILADELPHIA","confidence":"medium","id":"datacentersexposed-bf21ff69dc8ce58e","lat":39.96271,"location_precision":"source supplied","lon":-75.16308,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-data-centers-air-110071294369","value":10.0}],"name":"H5 DATA CENTERS","operator":"H5 Data Centers","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071294369"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-data-centers-air-110071294369"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Glastonbury","confidence":"low","contains_osm":true,"id":"datacentersexposed-bf337e7e4465cacd","lat":41.70708,"location_precision":"source supplied","lon":-72.58986,"name":"Ergonomic Group","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8767284091"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/ergonomic-group-osmnode-8767284091"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8767284091"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Georgetown","confidence":"medium","id":"datacentersexposed-bf3dcf8ef24abe0e","lat":30.58426,"location_precision":"source supplied","lon":-97.67268,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/blueprint-project","value":35.0}],"name":"Blueprint Project","operator":"Blueprint Project","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/blueprint-projects-gets-greenlight-for-data-center-in-taylor-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blueprint-project"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-bf89a5f73efb02c5","lat":32.483,"location_precision":"source supplied","lon":-96.992,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-midlothian","value":540.0}],"name":"Google Midlothian","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/google-midlothian"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"URBANA","confidence":"medium","id":"datacentersexposed-bfa378123b7d8b9f","lat":39.32216,"location_precision":"source supplied","lon":-77.352,"name":"FANNIE MAE UTC DATA CENTER","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110054317333"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/fannie-mae-utc-data-center-air-110054317333"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Jeffersonville","confidence":"medium","id":"datacentersexposed-bfa6c572b326f1f3","lat":38.36471,"location_precision":"source supplied","lon":-85.66,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-data-center-5","value":407.0}],"name":"Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-to-develop-data-center-campus-in-jeffersonville-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center-5"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"GOODYEAR","confidence":"medium","id":"datacentersexposed-bfd0dd12d2c63aac","lat":33.47928,"location_precision":"source supplied","lon":-112.35933,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-phoenix-epoch","value":77.0}],"name":"Stream Phoenix","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/stream-phoenix-epoch"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"medium","id":"datacentersexposed-c02cac54aeaf39d4","lat":29.456,"location_precision":"source supplied","lon":-98.521,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-san-antonio-quarry","value":380.0}],"name":"Microsoft San Antonio (Quarry)","operator":"Microsoft Data Center LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-san-antonio-quarry"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c02d7a9a4e12e1c2","lat":29.80289,"location_precision":"source supplied","lon":-95.75534,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/skybox-houston-one-osmway-714776107","value":26.0}],"name":"Skybox Houston One","operator":"Element Critical","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/714776107"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/skybox-houston-one-osmway-714776107"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714776107"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Lockhart","confidence":"medium","id":"datacentersexposed-c0355c8699cb9009","lat":29.91816,"location_precision":"source supplied","lon":-97.7668,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/tract-data-centers","value":360.0}],"name":"Tract Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-centers"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Wyalusing","confidence":"medium","id":"datacentersexposed-c08e648e6a0e9c69","lat":41.65357,"location_precision":"source supplied","lon":-76.23531,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/wyalusing-data-center","value":248.0}],"name":"Wyalusing Data Center","operator":"American Tower Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wyalusing-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Gainesville","confidence":"medium","id":"datacentersexposed-c0b49f66ff44daaa","lat":34.22643,"location_precision":"source supplied","lon":-83.78167,"name":"Project Turbo","operator":"Alphabet Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/company-files-for-project-turbo-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-turbo"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Hutto","confidence":"medium","id":"datacentersexposed-c0d49d23e71a3ff4","lat":30.55,"location_precision":"source supplied","lon":-97.55,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/compass-hutto","value":720.0}],"name":"Compass Hutto Campus","operator":"Compass Datacenters, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/compass-hutto"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-c0f24c6034fd39b8","lat":38.799,"location_precision":"source supplied","lon":-77.50153,"name":"Exter Property Group","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-exter-property-group"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Colorado City","confidence":"medium","id":"datacentersexposed-c10ef8fac87cdf0c","lat":32.39647,"location_precision":"source supplied","lon":-100.91535,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/fluidstack","value":300.0}],"name":"Fluidstack","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/fluidstack-signs-additional-39mw-lease-with-cipher-mining-in-texas-backed-by-google/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fluidstack"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c1157909dbabd3ad","lat":47.25159,"location_precision":"source supplied","lon":-119.8188,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-data-center-osmway-283051474","value":40.0}],"name":"H5 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/283051474"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-data-center-osmway-283051474"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/283051477"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/yahoo-data-center-osmway-283051477"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c198fa62412bc90b","lat":30.2143,"location_precision":"source supplied","lon":-97.71267,"name":"LightEdge Austin I","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/382785871"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lightedge-austin-i-osmway-382785871"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/382785871"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c1a4a498ac222df3","lat":37.38954,"location_precision":"source supplied","lon":-121.96194,"name":"Evocative Santa Clara SJC11","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209117217"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/evocative-santa-clara-sjc11-osmway-209117217"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209117217"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c1bb7b08d019ca80","lat":33.30534,"location_precision":"source supplied","lon":-111.67169,"name":"L3Harris Technologies Inc","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/152163711"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/l3harris-technologies-inc-osmway-152163711"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/152163711"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Bridgeport","confidence":"medium","id":"datacentersexposed-c213bf2dda7e11b7","lat":34.94752,"location_precision":"source supplied","lon":-85.71719,"name":"Google Jackson County (Widows Creek)","operator":"Google LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://aldailynews.com/google-invests-1-5b-to-expand-jackson-county-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-jackson-county-widows-creek-al-pg"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"Luther","confidence":"medium","id":"datacentersexposed-c219b7c10993244b","lat":35.65961,"location_precision":"source supplied","lon":-97.19414,"name":"Luther Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi0AFBVV95cUxPVmQxZnNISFN6aXgwbk9FVEtlRUR0Z1g0YkhqdjRjZ2RfQ0ZzWjJQMGlZa2M1ZUxCYTd6bzN1UjFDdmdDUEMyVmFIN0hqZk1IQWs4U1BzeXgwZTQxdjQtWU03YUxkdzA0anhBSC1aVzRaVXRDTWI5LVNFcXJIaFFqaWF1QjY5bWFzTWNTV0FRSk1fTnd1V0l0VjZMM0cyRlFTODJfUHVTcEVtck04RElCYzhWenVSb3Rpc1lHQXpaUEpGN181WXl1aHFvLXhQN0U0?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/luther-data-center"}],"state":"Oklahoma","status":"planned"},{"ai_classification":"unknown","city":"Henderson","confidence":"medium","id":"datacentersexposed-c21f33c63b95bccd","lat":36.30721,"location_precision":"source supplied","lon":-78.47415,"name":"Natelli Investments Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-north-carolina-county-give-ok-for-rezoning-potential-data-center-incoming/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/natelli-investments-data-center"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Warren","confidence":"medium","id":"datacentersexposed-c24ffe3bf4735587","lat":41.15324,"location_precision":"source supplied","lon":-80.8803,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stargate-data-center","value":1500.0}],"name":"Stargate Data Center","operator":"Bristolville 25 Developer LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.chron.com/business/article/openai-texas-stargate-ai-hub-21065041.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stargate-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c25edc4f8cf6cf1a","lat":40.54492,"location_precision":"source supplied","lon":-74.49536,"name":"Equinix","operator":"Equinix, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204460812"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/equinix-osmway-204460812"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460812"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Fairmont","confidence":"medium","id":"datacentersexposed-c310d237bcb28a42","lat":39.43058,"location_precision":"source supplied","lon":-80.196,"name":"Rhea super computing facility (NASA)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rhea-super-computing-facility-nasa"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c3249102bb340c33","lat":41.44262,"location_precision":"source supplied","lon":-81.8023,"name":"T5@Cleveland","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1382205749"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/t5-cleveland-osmway-1382205749"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1292169104"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1382205749"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-c32ed9a08e0a3ac6","lat":38.29463,"location_precision":"source supplied","lon":-77.5023,"name":"Penzance Development Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-campus-recommended-for-disapproval-by-fredericksburg-planning-commission/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/penzance-development-data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Edgerton","confidence":"medium","id":"datacentersexposed-c34167a05ccc2ced","lat":38.76473,"location_precision":"source supplied","lon":-95.00802,"name":"Edgerton Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/edgerton-data-center"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","contains_osm":true,"id":"datacentersexposed-c370cba2cc8ae803","lat":38.98093,"location_precision":"source supplied","lon":-77.44438,"name":"Centersquare IAD3","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/273895868"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/centersquare-iad3-osmway-273895868"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/273895868"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Springfield","confidence":"medium","id":"datacentersexposed-c3a172934a09ad45","lat":38.73919,"location_precision":"source supplied","lon":-77.20798,"name":"VA 95 BUILDING NINE LP","operator":"VA 95 BUILDING NINE LP","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://icare.fairfaxcounty.gov/ffxcare/Datalets/Datalet.aspx?mode=&UseSearch=no&pin=0991%2012%20%200010&jur=129&taxyr=2025"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/va-95-building-nine-lp"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-c3b31f9d6aa763c9","lat":37.4944,"location_precision":"source supplied","lon":-77.23749,"name":"Bank of America","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/429040021"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bank-of-america-osmway-429040021"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-c3c2cb69a0dc304f","lat":29.99733,"location_precision":"source supplied","lon":-95.56404,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dxc-technology-osmway-543404966","value":40.0}],"name":"DXC Technology","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/543404966"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dxc-technology-osmway-543404966"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Research Triangle Park","confidence":"medium","id":"datacentersexposed-c3d2240886de570d","lat":35.85025,"location_precision":"source supplied","lon":-78.87698,"name":"Apple Reserch Triangle Park Data Center","operator":"Apple Inc.","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://abc11.com/post/apple-research-triangle-park-north-carolina/10547896/?userab=abc_web_player-460*variant_a_abc_control-1900%2Cotv_web_player-461*variant_a_otv_control-1902&userab=abc_web_player-460*variant_a_abc_control-1900%2Cotv_web_player-461*variant_a_otv_control-1902"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/apple-reserch-triangle-park-data-center"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-c3dd72335dad8baa","lat":38.22205,"location_precision":"source supplied","lon":-77.4771,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/powerhouse95","value":150.0}],"name":"PowerHouse95","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-plans-800mw-campus-in-virginias-spotsylvania-county/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse95"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-c3e1acda7c270c38","lat":29.44916,"location_precision":"source supplied","lon":-98.65313,"name":"QTS San Antonio II","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1081973944"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-san-antonio-ii-osmway-1081973944"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1081973944"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Temple","confidence":"medium","id":"datacentersexposed-c3e44cc2f8e6ea9f","lat":31.13252,"location_precision":"source supplied","lon":-97.3644,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-data-center-2","value":152.0}],"name":"Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://rbnenergy.com/daily-posts/blog/tech-giants-may-be-surest-bets-data-center-power-demand"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center-2"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Lansing","confidence":"medium","id":"datacentersexposed-c40f7f3fad5c7546","lat":42.60211,"location_precision":"source supplied","lon":-76.635,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/lake-hawkeye-data-center","value":150.0}],"name":"Lake Hawkeye Data Center","operator":"TeraWulf Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lake-hawkeye-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Graniteville","confidence":"medium","id":"datacentersexposed-c42f979c28e808b6","lat":33.62525,"location_precision":"source supplied","lon":-81.83863,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-data-center-3","value":100.0}],"name":"Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-plans-800m-data-center-campus-in-aiken-county-south-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center-3"}],"state":"South Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-c50d8ce74b42e96d","lat":39.05636,"location_precision":"source supplied","lon":-77.55221,"name":"Greenlin Park","operator":"Charles S Kuhn/JK Landholdings II LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/greenlin-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-c51f90ff95e14358","lat":38.76819,"location_precision":"source supplied","lon":-77.53961,"name":"Iron Mountain","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-iron-mountain"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"datacentersexposed-c545a24e5888b5d4","lat":38.74429,"location_precision":"source supplied","lon":-77.53333,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1059030596"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1059030596"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Mooresville","confidence":"medium","id":"datacentersexposed-c5741541beb39cad","lat":35.51575,"location_precision":"source supplied","lon":-80.7532,"name":"Tract Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-plans-400-acre-data-center-park-outside-charlotte-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-c58bf380216d295d","lat":37.4805,"location_precision":"source supplied","lon":-77.25162,"name":"RIC3 DC1","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516629"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric3-dc1-osmway-1493516629"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516629"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Kalamazoo","confidence":"medium","id":"datacentersexposed-c5ac58d24fa0b86e","lat":42.26271,"location_precision":"source supplied","lon":-85.54166,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/harbor-farmz-data-center","value":1.0}],"name":"Harbor Farmz Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/owners-of-indoor-cannabis-farm-in-michigan-offer-site-up-for-data-center-use/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/harbor-farmz-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-c5cfdca5dd710243","lat":38.7346,"location_precision":"source supplied","lon":-77.50664,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-iad100-osmway-996899488","value":48.0}],"name":"Amazon IAD100","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/996899488"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad100-osmway-996899488"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Covington","confidence":"medium","id":"datacentersexposed-c6048eab7db2f329","lat":33.61121,"location_precision":"source supplied","lon":-83.83438,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/serverfarm-atl2","value":75.0}],"name":"Serverfarm ATL2","operator":"Severfarm","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/serverfarm-plans-natural-gas-powered-data-center-in-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/serverfarm-atl2"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Trumbull","confidence":"low","contains_osm":true,"id":"datacentersexposed-c634a101f7dd01b2","lat":41.24073,"location_precision":"source supplied","lon":-73.14727,"name":"Digital Realty New York HVN10","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/122665255"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/digital-realty-new-york-hvn10-osmway-122665255"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/122665255"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-c63752cfd3a3bfe8","lat":39.03549,"location_precision":"source supplied","lon":-77.4507,"name":"Amazon IAD114","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/701930929"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad114-osmway-701930929"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Spring Hill","confidence":"medium","id":"datacentersexposed-c639edd665f8d294","lat":38.78178,"location_precision":"source supplied","lon":-94.77902,"name":"Colossus Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-withdraws-plan-to-build-316-acre-data-center-in-spring-hill-kansas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/colossus-data-center"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"New York City","confidence":"low","contains_osm":true,"id":"datacentersexposed-c642eac90f4f9622","lat":40.60704,"location_precision":"source supplied","lon":-74.1749,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/telehouse-teleport-osmway-247428943","value":10.0}],"name":"Telehouse Teleport","operator":"Telehouse","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/247428943"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/telehouse-teleport-osmway-247428943"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/247428943"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c64993620420a5d4","lat":38.79997,"location_precision":"source supplied","lon":-77.58335,"name":"Microsoft Data Center 2","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1447029365"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-data-center-2-osmway-1447029365"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1447029365"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"STAMFORD","confidence":"medium","id":"datacentersexposed-c65f34babe88ae5a","lat":32.94092,"location_precision":"source supplied","lon":-99.85097,"name":"PROJECT QUEST","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/project-quest-110072159405"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Johnstown","confidence":"medium","id":"datacentersexposed-c67960deaf6571aa","lat":40.11718,"location_precision":"source supplied","lon":-82.7506,"name":"Johnstown Data Center (Beech Rd.)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-plans-five-building-data-center-campus-in-new-albany-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/johnstown-data-center-beech-rd"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c67be7b830f8d5cb","lat":42.62794,"location_precision":"source supplied","lon":-82.98839,"name":"Chick-fil-A Hiring Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8641856300"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/chick-fil-a-hiring-center-osmnode-8641856300"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8641856300"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Appling","confidence":"medium","id":"datacentersexposed-c684dc4824da5fc1","lat":33.49546,"location_precision":"source supplied","lon":-82.337,"name":"Project JGK","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-jgk"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Champaign","confidence":"low","contains_osm":true,"id":"datacentersexposed-c6c37b414afdeeab","lat":40.09526,"location_precision":"source supplied","lon":-88.24203,"name":"NCSA Petascale Computing Facility","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/138260136"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ncsa-petascale-computing-facility-osmway-138260136"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/138260136"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-c6c4290a38e1ad60","lat":39.02202,"location_precision":"source supplied","lon":-77.46024,"name":"Equinix Ashburn DC3","operator":"Equinix, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/298242260"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/equinix-ashburn-dc3-osmway-298242260"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Moore","confidence":"medium","id":"datacentersexposed-c6dc22fc521f177e","lat":34.85631,"location_precision":"source supplied","lon":-82.00952,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-spero","value":100.0}],"name":"Project Spero","operator":"TigerDC","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-spero"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-c6f679f3be2e1887","lat":32.77845,"location_precision":"source supplied","lon":-96.7985,"name":"Rad Web Hosting","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13465438761"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/rad-web-hosting-osmnode-13465438761"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13465438761"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"medium","id":"datacentersexposed-c74ba97f7dc9816a","lat":40.06521,"location_precision":"source supplied","lon":-82.74974,"name":"Microsoft Licking County (Heath/Hebron/New Albany)","operator":"Microsoft Data Center LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-backs-away-from-1bn-data-center-plans-in-licking-county-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-licking-county-heath-hebron-new-albany-oh-pg"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"DALLAS","confidence":"medium","id":"datacentersexposed-c778cc526cd54da9","lat":32.79974,"location_precision":"source supplied","lon":-96.82027,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-n-stemmons-freeway-dallas-air-110071241271","value":3.0}],"name":"EQUINIX N STEMMONS FREEWAY DALLAS","operator":"Equinix, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071241271"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-n-stemmons-freeway-dallas-air-110071241271"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-c7b5a796c3e7d8a8","lat":47.35743,"location_precision":"source supplied","lon":-120.15955,"name":"EAT12","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1173822723"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/eat12-osmway-1173822723"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Ashland","confidence":"medium","id":"datacentersexposed-c7c0cf3e1f9c7abf","lat":37.75902,"location_precision":"source supplied","lon":-77.4508,"name":"Ironhorse East Ashland","operator":"Harris and Douglass Properties, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ironhorse-east-ashland"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Gray","confidence":"medium","id":"datacentersexposed-c7d74bde5104032e","lat":32.93783,"location_precision":"source supplied","lon":-83.39697,"name":"Crooked Creek Data Center","operator":"Eagle Rock Partners","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.13wmaz.com/article/news/local/gray-jones/proposed-jones-county-data-center-axed-zoning-board-agenda-developers-withdraw/93-1cb42aca-7025-4d9c-b843-b1ada7cd7465"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/crooked-creek-data-center"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Catlett","confidence":"medium","id":"datacentersexposed-c7e80ee2f3d38e65","lat":38.66178,"location_precision":"source supplied","lon":-77.63222,"name":"Catlett Data Center Park","operator":"Catlett Station II LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://commdevpay.fauquiercounty.gov/Energov_Prod/SelfService#/plan/8f168f14-7317-41b8-9a51-0fb7fc218ac1?tab=attachments"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/catlett-data-center-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c7e8a9e923790cb0","lat":29.472,"location_precision":"source supplied","lon":-98.67172,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-san-antonio-ii-osmway-509611437","value":10.8}],"name":"Stream San Antonio II","operator":"Stream Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611437"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-san-antonio-ii-osmway-509611437"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611437"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-c7f2d4c9fb3f5795","lat":32.91274,"location_precision":"source supplied","lon":-83.47205,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/eagle-rock-jones-county","value":900.0}],"name":"Eagle Rock Jones County","operator":"Eagle Rock Partners","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/eagle-rock-jones-county"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"MANASSAS","confidence":"medium","id":"datacentersexposed-c81aec12671323c3","lat":38.75891,"location_precision":"source supplied","lon":-77.51776,"name":"SI NVA05A, LLC AND SI NVA05D, LLC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071506594"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/si-nva05a-llc-and-si-nva05d-llc-air-110071506594"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Newton","confidence":"medium","id":"datacentersexposed-c8b0a89ff0acc460","lat":35.60278,"location_precision":"source supplied","lon":-81.3073,"name":"Newton Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-begins-acquiring-land-in-north-carolina-for-data-centers/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/newton-data-center-2"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Buchanan","confidence":"medium","id":"datacentersexposed-c8b611f8838db5a8","lat":41.26511,"location_precision":"source supplied","lon":-73.9493,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/holtec-decommissioning-international-data-center","value":200.0}],"name":"Holtec Decommissioning International Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/holtec-decommissioning-international-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Herndon","confidence":"low","contains_osm":true,"id":"datacentersexposed-c8e51c025564e070","lat":38.93646,"location_precision":"source supplied","lon":-77.42468,"name":"Amazon IAD-500","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1426663253"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad-500-osmway-1426663253"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426663253"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Hutto","confidence":"medium","id":"datacentersexposed-c8eab137ab42f69e","lat":30.51289,"location_precision":"source supplied","lon":-97.48946,"name":"Iron Mountain Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/iron-mountain-eyes-seven-building-data-center-campus-outside-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/iron-mountain-data-center-2"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Jackson","confidence":"medium","id":"datacentersexposed-c8efe635a4be1727","lat":33.27651,"location_precision":"source supplied","lon":-84.09031,"name":"River Park","operator":"Interstate Health Systems, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/river-park"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Winston","confidence":"medium","id":"datacentersexposed-c8f02c795d2c4689","lat":33.73446,"location_precision":"source supplied","lon":-84.8097,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-data-center-3","value":240.0}],"name":"Stream Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stream-files-for-13-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-data-center-3"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-c90ed2ebaf618242","lat":38.46024,"location_precision":"source supplied","lon":-77.98773,"name":"Culpeper Technology Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/culpeper-technology-campus"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-c915f91181e7d2fa","lat":40.11,"location_precision":"source supplied","lon":-82.76,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-licking-1","value":900.0}],"name":"Microsoft Licking County Campus 1","operator":"Microsoft Data Center LLC","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-licking-1"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Hamburg","confidence":"medium","id":"datacentersexposed-c95e19144f66656a","lat":40.57368,"location_precision":"source supplied","lon":-76.01037,"name":"CloudHQ Berks 61 Hyperscale Campus","operator":"CloudHQ, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq-berks-61-hyperscale-campus"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Adair","confidence":"medium","id":"datacentersexposed-c968b66a459534b8","lat":41.46419,"location_precision":"source supplied","lon":-94.6051,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/applied-digital","value":200.0}],"name":"Applied Digital","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-faces-opposition-to-planned-data-center-in-adair-county-iowa/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/applied-digital"}],"state":"Iowa","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-c9e4538c1a2727f4","lat":30.40745,"location_precision":"source supplied","lon":-91.17255,"name":"Center for Computation & Technology (CCT)","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/3468203102"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/center-for-computation-technology-cct-osmnode-3468203102"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/3468203102"}],"state":"Louisiana","status":"unknown"},{"ai_classification":"unknown","city":"Claude","confidence":"medium","id":"datacentersexposed-ca0e505a4ab18db6","lat":35.01844,"location_precision":"source supplied","lon":-101.31152,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/goodnight-campus","value":1030.0}],"name":"Goodnight Campus","operator":"Crusoe","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.aterio.io/blog/crusoe-launches-usd29b-goodnight-campus-in-claude-mirroring-openai-s-stargate"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/goodnight-campus"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Miami","confidence":"medium","id":"datacentersexposed-ca37a3744887581d","lat":35.69127,"location_precision":"source supplied","lon":-100.6382,"name":"Project Pumpkin 2A","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/intersect-is-being-acquired-by-googles-parent-company-alphabet/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-pumpkin-2a"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ca394b189541c747","lat":47.8224,"location_precision":"source supplied","lon":-122.28961,"name":"Digital Fortress Lynnwood","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/589360530"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/digital-fortress-lynnwood-osmway-589360530"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/589360530"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"PRYOR","confidence":"medium","id":"datacentersexposed-ca9f81590338f6bf","lat":36.2398,"location_precision":"source supplied","lon":-95.33297,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/myall-llc-110040506119","value":195.0}],"name":"MYALL, LLC","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110040506119"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/myall-llc-110040506119"}],"state":"Oklahoma","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-caa751f350836e5b","lat":39.01368,"location_precision":"source supplied","lon":-77.45172,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-data-centers-ashburn-osmway-234722720","value":42.0}],"name":"H5 Data Centers Ashburn","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/234722720"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-data-centers-ashburn-osmway-234722720"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Monongahela Township","confidence":"medium","id":"datacentersexposed-cab4159f6e691ede","lat":39.83526,"location_precision":"source supplied","lon":-79.94251,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/robena-mine-data-center-project-hummingbird","value":910.0}],"name":"Robena Mine Data Center (Project Hummingbird)","operator":"International Electric Power","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/robena-mine-data-center-project-hummingbird"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"IRVING","confidence":"medium","id":"datacentersexposed-cae56ef40c18e254","lat":32.81797,"location_precision":"source supplied","lon":-96.91684,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-energy-nfl-110071953300","value":24.0}],"name":"EDGED ENERGY NFL","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-energy-nfl-110071953300"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"West Chester","confidence":"medium","id":"datacentersexposed-cb02bc3e64579e65","lat":39.9987,"location_precision":"source supplied","lon":-75.5737,"name":"Comcast West Chester Data Center","operator":"Comcast","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/comcast-to-convert-former-bank-into-data-center-in-new-jersey/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/comcast-west-chester-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"datacentersexposed-cb03a5bec890c328","lat":41.08515,"location_precision":"source supplied","lon":-104.833,"name":"Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-named-as-company-behind-945-acre-data-center-development-in-cheyenne-wyoming/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-data-center-4"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Spotsylvania","confidence":"medium","id":"datacentersexposed-cb1679b16b107eb8","lat":38.16502,"location_precision":"source supplied","lon":-77.5295,"name":"Gateway Commerce Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gateway-commerce-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-cb232c66aa69a967","lat":32.4401,"location_precision":"source supplied","lon":-97.06092,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1458626323"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/google-osmway-1458626323"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-cbd7e85dacecb433","lat":39.05263,"location_precision":"source supplied","lon":-77.53957,"name":"Google Data Center","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/710070925"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-data-center-osmway-710070925"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-cbe44faad08d5a13","lat":45.54933,"location_precision":"source supplied","lon":-122.92782,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-infrastructure-por01-osmway-471691757","value":4.0}],"name":"Stack Infrastructure - POR01","operator":"Stack Infrastructure, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/471691757"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-infrastructure-por01-osmway-471691757"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1243089557"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/stack-infrastructure-por03-osmway-1243089557"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-cbe7a1c3dd3ff7d4","lat":38.94063,"location_precision":"source supplied","lon":-94.75523,"name":"TierPoint","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/880052062"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/tierpoint-osmway-880052062"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-cc0d53592d7ecb8f","lat":34.0354,"location_precision":"source supplied","lon":-84.06111,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-suwanee-data-center-1-osmway-387378765","value":26.0}],"name":"QTS Suwanee Data Center 1","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/387378765"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-suwanee-data-center-1-osmway-387378765"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/387378765"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","contains_osm":true,"id":"datacentersexposed-cc26c796aec0505b","lat":33.42169,"location_precision":"source supplied","lon":-112.0343,"name":"Data Storage Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/210917861"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/data-storage-centers-osmway-210917861"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/210917861"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-cc5b69a6a4b996c6","lat":37.36059,"location_precision":"source supplied","lon":-77.32569,"name":"PowerHouse CTP-02","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1449347339"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/powerhouse-ctp-02-osmway-1449347339"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1449347339"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lufkin","confidence":"medium","id":"datacentersexposed-cc6faa6844244994","lat":31.3579,"location_precision":"source supplied","lon":-94.67748,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-lufkin-amp-z-data-center","value":175.0}],"name":"Project LufKin: Amp Z Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://lufkindailynews.com/news/local/ai-data-center-planned-on-1-000-acres-at-former-southland-paper-mill-site/article_ff9e97bf-361d-5649-835b-68a75818bd94.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-lufkin-amp-z-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-cc838a94a6ebd060","lat":38.91372,"location_precision":"source supplied","lon":-77.22588,"name":"8100 Boone Boulevard","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7985753364"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/8100-boone-boulevard-osmnode-7985753364"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7985753364"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","contains_osm":true,"id":"datacentersexposed-cce8995a87ee95e1","lat":33.41949,"location_precision":"source supplied","lon":-112.35999,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-data-centers-phx-1-osmway-468707940","value":200.0}],"name":"Stream Data Centers PHX-1","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/468707940"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-data-centers-phx-1-osmway-468707940"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/468707940"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Milano","confidence":"medium","id":"datacentersexposed-cd17da6fb081ef16","lat":30.71064,"location_precision":"source supplied","lon":-96.86475,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stargate-milam-county-sb-energy-tx-pg","value":1200.0}],"name":"Stargate Milam County (SB Energy)","operator":"SB Energy","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/softbanks-sb-energy-to-build-and-operate-openais-12gw-stargate-data-center-in-milam-county-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stargate-milam-county-sb-energy-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Fairfield","confidence":"low","contains_osm":true,"id":"datacentersexposed-cd37baeddb3e13d1","lat":38.24624,"location_precision":"source supplied","lon":-122.06718,"name":"PG&E Datacenter","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/780063735"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/pg-e-datacenter-osmway-780063735"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/780063735"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"datacentersexposed-cd6a68735faecf10","lat":37.40396,"location_precision":"source supplied","lon":-121.88923,"name":"NTT Limited","operator":"NTT Global Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460159925"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ntt-limited-osmway-460159925"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Vernal","confidence":"low","contains_osm":true,"id":"datacentersexposed-cd98259f869c7617","lat":40.4566,"location_precision":"source supplied","lon":-109.52902,"name":"Strata Networks","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/611308188"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/strata-networks-osmway-611308188"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/611308188"}],"state":"Utah","status":"operating"},{"ai_classification":"unknown","city":"Kansas City","confidence":"medium","id":"datacentersexposed-cda1e81c4bf93d39","lat":39.35368,"location_precision":"source supplied","lon":-94.6967,"name":"Project Kestrel","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.kshb.com/news/local-news/tech-firm-eyes-development-for-6-data-centers-north-of-kansas-city-international-airport"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-kestrel"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Barnesville","confidence":"medium","id":"datacentersexposed-cdcfdd69909e18c9","lat":33.10417,"location_precision":"source supplied","lon":-84.00954,"name":"Trammell Crow Company Data Center","operator":"CBRE","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cbres-trammell-crow-files-to-develop-12-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/trammell-crow-company-data-center"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-cdeb74a634f920ad","lat":38.76214,"location_precision":"source supplied","lon":-77.53711,"name":"Manassas Tech Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-manassas-tech-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ce1afb0bf4b42ffa","lat":41.16,"location_precision":"source supplied","lon":-96.07,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-papillion","value":600.0}],"name":"Google Papillion","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-papillion"}],"state":"Nebraska","status":"under construction"},{"ai_classification":"unknown","city":"Brisbane","confidence":"medium","id":"datacentersexposed-ce605b872fa2dcd3","lat":37.68586,"location_precision":"source supplied","lon":-122.416,"name":"Guadalupe Quarry Redevelopment Project Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/proposed-data-center-scaled-down-amid-environmental-concerns-near-san-francisco-california/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/guadalupe-quarry-redevelopment-project-data-center"}],"state":"California","status":"planned"},{"ai_classification":"unknown","city":"Union City","confidence":"medium","id":"datacentersexposed-ce91b3a1e694c7f5","lat":33.56294,"location_precision":"source supplied","lon":-84.5134,"name":"Union City Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://share.newsbreak.com?s=i3"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/union-city-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Johnstown","confidence":"medium","id":"datacentersexposed-cec10af3c0a93393","lat":40.12115,"location_precision":"source supplied","lon":-82.7517,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/karis-critical-data-center-2","value":36.0}],"name":"Karis Critical Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/karis-critical-purchases-115-acres-for-data-center-in-new-albany-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/karis-critical-data-center-2"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Bessemer","confidence":"medium","id":"datacentersexposed-ced23d384a5de549","lat":33.342,"location_precision":"source supplied","lon":-87.0341,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-marvel","value":1200.0}],"name":"Project Marvel","operator":"Logistic Land Investments LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/700-acre-data-center-in-bessemer-alabama-approved-despite-opposition/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-marvel"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-cef1184ce5faa18d","lat":37.47702,"location_precision":"source supplied","lon":-77.24969,"name":"RIC3 DC5","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516632"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric3-dc5-osmway-1493516632"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516632"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-cf27cdb5dd84e4f2","lat":38.75355,"location_precision":"source supplied","lon":-77.54373,"name":"Manassas Tech Park II South","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-manassas-tech-park-ii-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-cf3762affa60a34e","lat":38.99516,"location_precision":"source supplied","lon":-77.46972,"name":"SDC Ashburn I","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-19","url":"https://datacentersexposed.com/facilities/loudoun-sdc-ashburn-i"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sugar Land","confidence":"medium","id":"datacentersexposed-cf39a68dc28da748","lat":29.62003,"location_precision":"source supplied","lon":-95.6306,"name":"Sugar Land Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sugar-land-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Dorr","confidence":"medium","id":"datacentersexposed-cf629a70fa3f0857","lat":42.73734,"location_precision":"source supplied","lon":-85.68578,"name":"Microsoft Dorr Data Center","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-plans-data-centers-in-dorr-and-lowell-townships-applies-for-property-rezoning-in-gaines-townships/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-dorr-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Piedmont","confidence":"medium","id":"datacentersexposed-cfb5140503836e7b","lat":35.72121,"location_precision":"source supplied","lon":-97.787,"name":"Cloverleaf Data Center: Project Open Sky","operator":"Cloverleaf","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloverleaf-data-center-project-open-sky"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Akron","confidence":"medium","id":"datacentersexposed-cfee800ac4d0b619","lat":41.05043,"location_precision":"source supplied","lon":-81.4743,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/viking-data-centers","value":150.0}],"name":"Viking Data Centers","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/viking-data-centers"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"New Castle","confidence":"medium","id":"datacentersexposed-d006f4a4a14204d7","lat":39.60745,"location_precision":"source supplied","lon":-75.6397,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/starwood-digital-ventures","value":1200.0}],"name":"Starwood Digital Ventures","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/starwood-files-to-develop-12gw-11-building-data-center-campus-in-delaware/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/starwood-digital-ventures"}],"state":"Delaware","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-d0489b076a41cd52","lat":38.81823,"location_precision":"source supplied","lon":-77.58228,"name":"Digital Gateway South","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-digital-gateway-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Red Rock","confidence":"medium","id":"datacentersexposed-d087b9b8d69b3b5d","lat":32.55145,"location_precision":"source supplied","lon":-111.452,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vermaland-data-center","value":3000.0}],"name":"Vermaland Data Center","operator":"Vermaland LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.bizjournals.com/phoenix/news/2025/08/01/vermaland-proposed-pinal-county-data-center.html"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vermaland-data-center"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d08a72485181566b","lat":30.0187,"location_precision":"source supplied","lon":-95.86375,"name":"DXC Technology","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/487170215"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dxc-technology-osmway-487170215"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Charlotte","confidence":"medium","id":"datacentersexposed-d0b59d288b7ba170","lat":35.25571,"location_precision":"source supplied","lon":-80.99796,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-reality-charlotte-data-center","value":400.0}],"name":"Digital Reality Charlotte Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/digital-realty-files-to-develop-400mw-data-center-campus-in-charlotte-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-reality-charlotte-data-center"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"McCordsville","confidence":"medium","id":"datacentersexposed-d1643493d7a1f982","lat":39.8564,"location_precision":"source supplied","lon":-85.8785,"name":"Surge Development LLC","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/surge-development-llc"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-d1690bda1e23cead","lat":27.19025,"location_precision":"source supplied","lon":-81.82442,"name":"DeSoto County AI Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi4AFBVV95cUxQR1Vkakc0RHlKYUdBMk80cmczOFNvZ2hET0NpOE56WWFHa1BkQ3ZzbGYwTHZicHczUDB0c29yaHM5Z25FUzFIMmNGNWZpc1RVVXJBdjRlcDZQN001cFMwV083enpZYnJGeTZkUGlYVkdCM0ZMbkZrUl9sT2c2TmFDTFhILS1MOG5yTXJPTXBncjdUcW5uLVg5ZzJvcHowVWw5UE5KSFhLS1lXQVNYRmxUY2VCeUV3cng5bjItZUxTLUF4emhEVy1jVkQ1ZFgxWnM4cnJWWXVLZGcwZDN6WklrRw?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/desoto-county-ai-data-center"}],"state":"Florida","status":"planned"},{"ai_classification":"unknown","city":"ROSEMOUNT","confidence":"medium","id":"datacentersexposed-d194dcb16782455c","lat":44.73882,"location_precision":"source supplied","lon":-93.057,"name":"Meta Rosemount","operator":"Meta Platforms, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/meta-rosemount-epoch"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Los Lunas","confidence":"low","contains_osm":true,"id":"datacentersexposed-d1a5dc75cb25a58a","lat":34.82588,"location_precision":"source supplied","lon":-106.77889,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1191496040"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-osmway-1191496040"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/626785488"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/756778306"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/777679751"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1191496040"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Ekron","confidence":"medium","id":"datacentersexposed-d1ebaed2fc264f0d","lat":37.90755,"location_precision":"source supplied","lon":-86.10922,"name":"Ekron Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-meade-county-kentucky-reject-data-center-rezoning-plan/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ekron-data-center"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Albany","confidence":"medium","id":"datacentersexposed-d2bd42350a6e8de0","lat":42.62812,"location_precision":"source supplied","lon":-73.77215,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/kenwood-commons","value":100.0}],"name":"Kenwood Commons","operator":"Edged","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://drive.google.com/file/d/1vVzC512mN4V8rhcgZoehh_pgZ-5OZIwx/view"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/kenwood-commons"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","id":"datacentersexposed-d2c3d8fc699f282f","lat":33.39,"location_precision":"source supplied","lon":-111.65,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-mesa-campus","value":700.0}],"name":"Meta Mesa Campus","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-mesa-campus"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d2c85a2a13576844","lat":40.06842,"location_precision":"source supplied","lon":-82.75031,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-osmway-671301768","value":691.0}],"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/671301768"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-osmway-671301768"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-d2cce5f75f029bcd","lat":42.63028,"location_precision":"source supplied","lon":-71.30456,"name":"Markley Data Center","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/214321737"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/markley-data-center-osmway-214321737"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/214321737"}],"state":"Massachusetts","status":"operating"},{"ai_classification":"unknown","city":"Goodyear","confidence":"medium","id":"datacentersexposed-d2dba26fba9348e4","lat":33.43,"location_precision":"source supplied","lon":-112.39,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-goodyear-campus","value":143.0}],"name":"Microsoft Goodyear Campus","operator":"Microsoft Data Center LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/microsoft-goodyear-campus"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Waterville","confidence":"medium","id":"datacentersexposed-d3330c03ec41ae8b","lat":41.4983,"location_precision":"source supplied","lon":-83.75243,"name":"Waterville Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/waterville-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"medium","id":"datacentersexposed-d3814491673cb056","lat":33.749,"location_precision":"source supplied","lon":-84.6093,"name":"Rock House Road Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/t5-requests-permission-for-3-million-sq-ft-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/rock-house-road-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Boyce","confidence":"medium","id":"datacentersexposed-d3891f4f8e84626c","lat":31.39046,"location_precision":"source supplied","lon":-92.66931,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/applied-digital-delta-forge-1-boyce-la","value":300.0}],"name":"Applied Digital Delta Forge 1 (Boyce)","operator":"Applied Digital Corporation","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/applied-digital-delta-forge-1-boyce-la"}],"state":"Louisiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-d39eb828bc3635f9","lat":40.09423,"location_precision":"source supplied","lon":-82.73211,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016629"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1386016629"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196802"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196803"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196804"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016629"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016630"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016631"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Socorro","confidence":"medium","id":"datacentersexposed-d3d1d72a0819930c","lat":34.07745,"location_precision":"source supplied","lon":-107.02448,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/green-data-center","value":2000.0}],"name":"Green Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/2gw-data-center-could-come-to-socorro-new-mexico/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/green-data-center"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Bridgewater Township","confidence":"low","contains_osm":true,"id":"datacentersexposed-d3e7293f370f85d3","lat":40.57037,"location_precision":"source supplied","lon":-74.67033,"name":"Goldman Sachs","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/612045611"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/goldman-sachs-osmway-612045611"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/612045611"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d402ee448430db5e","lat":38.74764,"location_precision":"source supplied","lon":-77.49479,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1510517641"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1510517641"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lamar County","confidence":"medium","id":"datacentersexposed-d42e921bf681c1f1","lat":33.1795,"location_precision":"source supplied","lon":-84.0563,"name":"Lamar County Amazon Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-acquires-1000-acres-of-land-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/lamar-county-amazon-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-d4461b52c2b6b967","lat":32.3797,"location_precision":"source supplied","lon":-97.0997,"name":"Midlothian 6 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-6-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d44b8627ee348290","lat":32.98362,"location_precision":"source supplied","lon":-96.65426,"name":"Stream Data Centers","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1300765126"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/stream-data-centers-osmway-1300765126"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d4681cb2f4211f96","lat":33.06218,"location_precision":"source supplied","lon":-80.03965,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1069388075"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-1069388075"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-d47d16d48d8c554c","lat":38.79501,"location_precision":"source supplied","lon":-77.59438,"name":"Wellington West","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-09-21","url":"https://datacentersexposed.com/facilities/pwc-wellington-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Evanston","confidence":"medium","id":"datacentersexposed-d4a2c4ecc5cabfb3","lat":41.26825,"location_precision":"source supplied","lon":-110.96376,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prometheus-hyperscale-wy-1-evanston-wy-pg","value":1250.0}],"name":"Prometheus Hyperscale WY-1 (Evanston)","operator":"Prometheus Hyperscale","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prometheus-hyperscale-wy-1-evanston-wy-pg"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Alpharetta","confidence":"low","contains_osm":true,"id":"datacentersexposed-d4e4e36816121773","lat":34.07579,"location_precision":"source supplied","lon":-84.26427,"name":"T5 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/891031651"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/t5-data-center-osmway-891031651"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/891031651"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","contains_osm":true,"id":"datacentersexposed-d51db3639b21a55b","lat":33.35668,"location_precision":"source supplied","lon":-111.63524,"name":"Comarch","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/13019681063"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/comarch-osmnode-13019681063"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13019681063"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"datacentersexposed-d57b6b3639b4aa71","lat":37.364,"location_precision":"source supplied","lon":-121.94689,"name":"Vantage Santa Clara CA2","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1314010354"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/vantage-santa-clara-ca2-osmway-1314010354"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Hebron","confidence":"medium","id":"datacentersexposed-d57d6eb090970b84","lat":41.28743,"location_precision":"source supplied","lon":-87.2737,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/sentinel-data-center-project-shirley","value":500.0}],"name":"Sentinel Data Center: Project Shirley","operator":"Sentinel","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/sentinel-data-center-project-shirley"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Hopewell Junction","confidence":"medium","id":"datacentersexposed-d5aabedc66a1c07f","lat":41.5234,"location_precision":"source supplied","lon":-73.81024,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/treetop-development-project","value":1000.0}],"name":"Treetop Development Project","operator":"onovan Drive Holdings LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/treetop-development-project"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Fayetteville","confidence":"medium","id":"datacentersexposed-d5b4e16a42586304","lat":33.48471,"location_precision":"source supplied","lon":-84.43693,"name":"Crow Holdings Development","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-effectively-withdraws-application-for-data-center-in-fayetteville-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/crow-holdings-development"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Loxahatchee","confidence":"medium","id":"datacentersexposed-d5ea66c72fe97c4e","lat":26.69484,"location_precision":"source supplied","lon":-80.37178,"name":"Project Tango","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/37-million-sq-ft-data-center-campus-gets-initial-ok-from-officials-in-florida/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-tango"}],"state":"Florida","status":"under construction"},{"ai_classification":"unknown","city":"Marshfield","confidence":"medium","id":"datacentersexposed-d5fbf760ca9f310d","lat":37.33116,"location_precision":"source supplied","lon":-92.92123,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://sbj.net/stories/webster-county-data-center,104328","value":20.0}],"name":"Swarm Systems Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://sbj.net/stories/webster-county-data-center,104328"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/swarm-systems-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Whitney","confidence":"medium","id":"datacentersexposed-d612d151afeb65d4","lat":31.86066,"location_precision":"source supplied","lon":-97.35856,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-dfw10","value":400.0}],"name":"CyrusOne: DFW10","operator":"CyrusOne LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/cyrusone-partners-with-constellation-for-760mw-data-center-campus-in-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-dfw10"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Liberty","confidence":"medium","id":"datacentersexposed-d625c36dcc68510c","lat":39.20707,"location_precision":"source supplied","lon":-94.45517,"name":"Metrobloks data center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/metrobloks-announces-plans-for-three-building-data-center-campus-in-kansas-city-missouri/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/metrobloks-data-center"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d64f591fa09ff9a0","lat":40.10389,"location_precision":"source supplied","lon":-82.81061,"name":"TJX Companies Data Center (New Albany, OH)","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/547156394"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tjx-corporate-techno-osmway-547156394"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Waterford","confidence":"medium","id":"datacentersexposed-d6509a0a5349f581","lat":41.31387,"location_precision":"source supplied","lon":-72.1673,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ne-edge-data-center","value":1500.0}],"name":"NE Edge Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/15gw-data-center-campus-proposed-in-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ne-edge-data-center"}],"state":"Connecticut","status":"planned"},{"ai_classification":"unknown","city":"Atlanta","confidence":"medium","id":"datacentersexposed-d68292bc6ba17fb0","lat":33.788,"location_precision":"source supplied","lon":-84.547,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-atlanta-metro","value":240.0}],"name":"QTS Atlanta Metro","operator":"QTS Realty Trust, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-atlanta-metro"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Newark","confidence":"low","contains_osm":true,"id":"datacentersexposed-d6a25c41be15f620","lat":40.73673,"location_precision":"source supplied","lon":-74.17389,"name":"165 Halsey / Equinix NY1 / Databank EWR1","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/387208881"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/165-halsey-equinix-ny1-databank-ewr1-osmway-387208881"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/387208881"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"ANDERSON","confidence":"medium","id":"datacentersexposed-d6af8fcba78581f2","lat":64.28543,"location_precision":"source supplied","lon":-149.16276,"name":"GDMS - GEP PROGRAM - ALASKA","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/gdms-gep-program-alaska-110071931534"}],"state":"Alaska","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d6b52d5c173454fd","lat":43.08218,"location_precision":"source supplied","lon":-79.03078,"name":"US Bitcoin","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1109643936"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/us-bitcoin-osmway-1109643936"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Boydton","confidence":"medium","id":"datacentersexposed-d6c1134e1f4df619","lat":36.667,"location_precision":"source supplied","lon":-78.385,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/boydton-microsoft-region-1","value":540.0}],"name":"Microsoft Boydton — Region 1","operator":"Microsoft Data Center LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/boydton-microsoft-region-1"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-d6ea4e7314c0008d","lat":38.94556,"location_precision":"source supplied","lon":-77.54126,"name":"JK TECHNOLOGY PARK #3","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/c87c4b0c-a3aa-4261-9954-8cc95f06f912?tab=locations"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/jk-technology-park-3"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d7314cc10f2cb0eb","lat":44.20443,"location_precision":"source supplied","lon":-88.34493,"name":"Involta","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/766768556"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/involta-osmway-766768556"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-d756f82b898c10e3","lat":27.71538,"location_precision":"source supplied","lon":-97.61999,"name":"Beacon Point AI Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi3gFBVV95cUxNaUZibE1RS3d3eFBSV3FQZmwwdG5lMW5MWS0yZk95MlVEVTV2d3hGS0hUWUd2d2N6ZXU0dHczcVgtVFlLVXZhdFNUMkNRZHhJT2dBOEs2NTNsM1Y4aEFyT01fYkE4QlZDVDBYbUlrNWt2Ul8tdXBLSkFmXzVoZW90ekE3RDRscENEVDRuRDdzWU13M093WnVJSTBRTVNEN0tpQjJQNDdsN083STJVWEJwOUNlTXRGSUR1a21EVUJtWnNaWGNiXzVGeXI2aGM0WkpORUgtcTBNOG9pb3RBZXc?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/beacon-point-ai-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"MOUNT PLEASANT","confidence":"medium","id":"datacentersexposed-d7830754b86f4738","lat":42.6762,"location_precision":"source supplied","lon":-87.8947,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-corporation-mke-3b-data-center-air-110071538060","value":450.0}],"name":"Microsoft Mount Pleasant (Fairwater Wisconsin)","operator":"Microsoft Corporation","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071538060"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-corporation-mke-3b-data-center-air-110071538060"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Shelby","confidence":"medium","id":"datacentersexposed-d78826d5656563a6","lat":39.52904,"location_precision":"source supplied","lon":-85.71126,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prologis-2","value":5200.0}],"name":"Prologis","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/industrial-real-estate-giant-prologis-is-planning-a-large-data-center-development-in-illinois-first-reported-by-local-news-including-shelbyville-news-and-fox-prologis-is-filing-to-develop-a-campus-in-the-city-of-shelbyville-in-central-illinois-lorm/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prologis-2"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"datacentersexposed-d78859940551eeb3","lat":37.37493,"location_precision":"source supplied","lon":-121.956,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sjc16-osmway-209073653","value":9.0}],"name":"Digital Realty Silicon Valley SJC16","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209073653"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sjc16-osmway-209073653"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-d7b6061a33be37e1","lat":37.48529,"location_precision":"source supplied","lon":-77.25018,"name":"DC6","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516619"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/dc6-osmway-1493516619"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516619"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-d7c596d3e8366623","lat":39.00569,"location_precision":"source supplied","lon":-77.44946,"name":"Digital Realty IAD42 (Building R)","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1025002889"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-iad42-building-r-osmway-1025002889"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1344901569"}],"updated":"2026-06-16","url":"https://datacentersexposed.com/facilities/digital-realty-iad43-building-s-osmway-1344901569"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d7db586465fb3292","lat":29.4158,"location_precision":"source supplied","lon":-98.80451,"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1010260677"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-osmway-1010260677"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"datacentersexposed-d7f88afd72dc5bc6","lat":38.99219,"location_precision":"source supplied","lon":-77.43392,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-iad55-osmway-1276518687","value":24.0}],"name":"Digital Realty IAD55","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1276518687"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-iad55-osmway-1276518687"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1276518687"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d838dedd57523fc3","lat":45.80983,"location_precision":"source supplied","lon":-119.8589,"name":"amazon web services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1510517629"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1510517629"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"New Brunswick","confidence":"medium","id":"datacentersexposed-d8aa8b3ccda4c2ad","lat":40.48662,"location_precision":"source supplied","lon":-74.45843,"name":"New Brunswick Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/proposed-data-center-in-new-brunswick-new-jersey-denied-by-local-authorities/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/new-brunswick-data-center"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-d8c29716fadd4570","lat":30.2614,"location_precision":"source supplied","lon":-97.7236,"name":"Lumen Austin 3","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/379195054"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-austin-3-osmway-379195054"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379195054"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","id":"datacentersexposed-d926f5507c36fc0d","lat":40.05308,"location_precision":"source supplied","lon":-82.75663,"name":"QTS NAL 2 DC2","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1425043213"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/qts-nal-2-dc2-osmway-1425043213"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Jackson","confidence":"medium","id":"datacentersexposed-d93df1bcd343a1a6","lat":33.29457,"location_precision":"source supplied","lon":-83.96602,"name":"AWS Butts County","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/aws-reveals-11bn-data-center-investment-plan-for-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-butts-county-ga-pg"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Duffield","confidence":"medium","id":"datacentersexposed-d94ba3662c732af0","lat":36.71586,"location_precision":"source supplied","lon":-82.80459,"name":"Scott County Regional Business & Technology Park","operator":"SCOTT COUNTY INDUSTRIAL DEV.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/scott-county-regional-business-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Royal Oak","confidence":"low","contains_osm":true,"id":"datacentersexposed-d95cdf2512f54737","lat":42.53348,"location_precision":"source supplied","lon":-83.17749,"name":"Liberty Center One","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/relation/12901583"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/liberty-center-one-osmrelation-12901583"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/12901583"}],"state":"Michigan","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d969bbf16442e2f7","lat":38.99871,"location_precision":"source supplied","lon":-77.47433,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-ashburn-shellhorn-dc2-osmway-1188680247","value":42.0}],"name":"QTS Ashburn-Shellhorn DC2","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1188680247"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-ashburn-shellhorn-dc2-osmway-1188680247"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-d96f642a3927cdd1","lat":40.06149,"location_precision":"source supplied","lon":-82.74055,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016634"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-osmway-1386016634"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"South Annville Twp","confidence":"medium","id":"datacentersexposed-d97f5000d69c566d","lat":40.32545,"location_precision":"source supplied","lon":-76.52686,"name":"South Annville Data Center","operator":"Inch & Company","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/17bn-data-center-could-be-built-in-lebanon-county-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/south-annville-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Archbald","confidence":"medium","id":"datacentersexposed-d9824ef5e695b96b","lat":41.52497,"location_precision":"source supplied","lon":-75.56155,"name":"Project Gravity Data Center","operator":"Archbald 25 Developer LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-16-million-sq-ft-data-center-campus-in-northeast-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-gravity-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-d9b7c0bcb5dbd492","lat":32.97204,"location_precision":"source supplied","lon":-97.15671,"name":"Verizon Wireless Mew Building","operator":"Verizon Communications Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/989325195"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/verizon-wireless-mew-building-osmway-989325195"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/989325195"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Milpitas","confidence":"medium","id":"datacentersexposed-da0a49e945c08f7f","lat":37.40573,"location_precision":"source supplied","lon":-121.9162,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/coresite-real-estate-1656-mccarthy-l-p-61475","value":50.0}],"name":"CoreSite Real Estate 1656 McCarthy, L.P.","operator":"CoreSite, LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-13","url":"https://datacentersexposed.com/facilities/coresite-real-estate-1656-mccarthy-l-p-61475"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"datacentersexposed-da23cba9c5ac759b","lat":37.36165,"location_precision":"source supplied","lon":-121.94398,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sc1-osmway-358455179","value":36.6}],"name":"Digital Realty Silicon Valley SC1","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/358455179"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-silicon-valley-sc1-osmway-358455179"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Toronto","confidence":"medium","id":"datacentersexposed-da5d6e6b0d1fa1ef","lat":44.58366,"location_precision":"source supplied","lon":-96.56283,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/applied-digital-data-center","value":430.0}],"name":"Applied Digital Data Center","operator":"Applied Digital Corporation","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/applied-digital-proposes-multi-billion-dollar-data-center-in-south-dakota/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/applied-digital-data-center"}],"state":"South Dakota","status":"unknown"},{"ai_classification":"unknown","city":"Chester","confidence":"medium","id":"datacentersexposed-da97545edcef2458","lat":37.34593,"location_precision":"source supplied","lon":-77.3102,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/chesterfield-google-data-center","value":200.0}],"name":"Chesterfield Google Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/chesterfield-google-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sandusky","confidence":"medium","id":"datacentersexposed-da97ebc60269b6ee","lat":41.4561,"location_precision":"source supplied","lon":-82.71158,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-sandusky-northeast-ohio-oh-pg","value":96.0}],"name":"Aligned Sandusky (Northeast Ohio)","operator":"Aligned Energy Holdings, LP","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://aligneddc.com/press-release/aligned-data-centers-expands-north-american-footprint-with-new-hyperscale-campus-in-northeast-ohio/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-sandusky-northeast-ohio-oh-pg"}],"state":"Ohio","status":"under construction"},{"ai_classification":"unknown","city":"Douglasville","confidence":"medium","id":"datacentersexposed-da986c38dca3265a","lat":33.71054,"location_precision":"source supplied","lon":-84.6269,"name":"Vantage Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-data-center-3"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-dabc6349ae413cd5","lat":38.7611,"location_precision":"source supplied","lon":-77.51822,"name":"Amazon IAD131","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1181391922"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad131-osmway-1181391922"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"New Carlisle","confidence":"medium","id":"datacentersexposed-dacff1bff9d30dea","lat":41.7,"location_precision":"source supplied","lon":-86.524,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-laporte-mega-site","value":1300.0}],"name":"AWS LaPorte Mega-Site","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/amazon-laporte-mega-site"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Conyers","confidence":"medium","id":"datacentersexposed-db12f5e5cab5db32","lat":33.68936,"location_precision":"source supplied","lon":-84.04566,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dc-blox-atlanta-east-campus","value":216.0}],"name":"DC BLOX Atlanta East Campus","operator":"DC BLOX","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dc-blox-atlanta-east-campus"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-db1b1ee0903075fe","lat":41.89031,"location_precision":"source supplied","lon":-88.72663,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-osmway-1312792613","value":250.0}],"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1312792613"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-osmway-1312792613"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Allentown","confidence":"low","contains_osm":true,"id":"datacentersexposed-db240f8b2f84707d","lat":40.6357,"location_precision":"source supplied","lon":-75.45757,"name":"Flexential Allentown data center","operator":"Flexential Corp.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/296374269"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/flexential-allentown-data-center-osmway-296374269"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/296374269"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-db2c33e843654bde","lat":38.7875,"location_precision":"source supplied","lon":-77.55903,"name":"Hansen Farm North","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-hansen-farm-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","id":"datacentersexposed-db46bb007a83df83","lat":33.65905,"location_precision":"source supplied","lon":-112.11116,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-energy-data-center-osmway-155739337","value":180.0}],"name":"Aligned Energy Data Center","operator":"Aligned Energy Holdings, LP","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/155739337"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-energy-data-center-osmway-155739337"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Indianapolis","confidence":"medium","id":"datacentersexposed-db85a802160f4738","lat":39.80434,"location_precision":"source supplied","lon":-86.1023,"name":"Brightwood Data Center","operator":"Metrobloks","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/brightwood-data-center"}],"state":"Indiana","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-dba254c96b4634d5","lat":38.797,"location_precision":"source supplied","lon":-77.59325,"name":"Gainesville RLC Data Center","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-gainesville-rlc-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cheyenne","confidence":"medium","id":"datacentersexposed-dbab9a8806da61b2","lat":41.13998,"location_precision":"source supplied","lon":-104.82025,"name":"Microsoft Cheyenne Expansion","operator":"Microsoft Data Center LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-cheyenne-expansion-wy-pg"}],"state":"Wyoming","status":"planned"},{"ai_classification":"unknown","city":"Lynchburg","confidence":"medium","id":"datacentersexposed-dbb15a4fce37fca1","lat":37.3761,"location_precision":"source supplied","lon":-79.0327,"name":"Data center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Portsmouth","confidence":"low","id":"datacentersexposed-dbc1a7d12d27b0c0","lat":43.07613,"location_precision":"source supplied","lon":-70.80804,"name":"FirstLight","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/87058670"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/firstlight-osmway-87058670"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-dbff5dc6fb8a1513","lat":33.40513,"location_precision":"source supplied","lon":-111.97734,"name":"Alembic Computer Services, Inc.","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11938614120"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/alembic-computer-services-inc-osmnode-11938614120"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11938614120"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-dc22e306660e9295","lat":38.76327,"location_precision":"source supplied","lon":-77.51421,"name":"TPC Data Centers","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-tpc-data-centers"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-dc3725b495326eca","lat":32.98378,"location_precision":"source supplied","lon":-97.25934,"name":"Facebook Fort Worth Datacenter","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/500820007"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/facebook-fort-worth-datacenter-osmway-500820007"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/500820007"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/673145182"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/815057182"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"West Memphis/Proctor","confidence":"medium","id":"datacentersexposed-dc7a06328893327a","lat":35.11835,"location_precision":"source supplied","lon":-90.2123,"name":"Groot LLC/ Google","operator":"Google LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://wreg.com/news/local/data-center-deal-comes-as-area-emerges-as-tech-hub/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/groot-llc-google"}],"state":"Arkansas","status":"under construction"},{"ai_classification":"unknown","city":"Hobbs","confidence":"medium","id":"datacentersexposed-dcca6a43396e99fc","lat":32.70361,"location_precision":"source supplied","lon":-103.137,"name":"Hobbs Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hobbs-data-center"}],"state":"New Mexico","status":"operating"},{"ai_classification":"unknown","city":"Buffalo","confidence":"medium","id":"datacentersexposed-dd2cf68518233df5","lat":38.63524,"location_precision":"source supplied","lon":-81.96641,"name":"Google Buffalo Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-purchases-land-for-data-center-in-putnam-county-west-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-buffalo-data-center"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ellenwood","confidence":"medium","id":"datacentersexposed-dd3cf5b7a87d3397","lat":33.64961,"location_precision":"source supplied","lon":-84.29482,"name":"Conley Creek Data Center","operator":"Telecad Wireless","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/conley-creek-data-center"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Brunswick","confidence":"low","contains_osm":true,"id":"datacentersexposed-dd78654e47afb496","lat":43.89516,"location_precision":"source supplied","lon":-69.92343,"name":"Oxford Networks","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/667796922"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/oxford-networks-osmway-667796922"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/667796922"}],"state":"Maine","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-dd7fcda5c7f37ed6","lat":48.75726,"location_precision":"source supplied","lon":-122.48055,"name":"CSSNW Bellingham","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/376627431"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cssnw-bellingham-osmway-376627431"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/376627431"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-dd9127851f052e85","lat":39.01361,"location_precision":"source supplied","lon":-77.47056,"name":"Aligned Ashburn","operator":"Aligned Energy Holdings, LP","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/793622740"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/aligned-ashburn-osmway-793622740"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1088241977"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-iad02-osmway-1088241977"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-dde38bdbb776d312","lat":40.54921,"location_precision":"source supplied","lon":-74.45821,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-piscataway-ewr2-osmway-204460681","value":3.0}],"name":"DataBank Piscataway EWR2","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/204460681"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-piscataway-ewr2-osmway-204460681"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/204460681"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"medium","id":"datacentersexposed-de3c91a4576fdff3","lat":37.38112,"location_precision":"source supplied","lon":-121.993,"name":"Cerebras Systems Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.cerebras.ai/press-release/cerebras-announces-six-new-ai-datacenters-across-north-america-and-europe-to-deliver-industry-s"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cerebras-systems-data-center"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Indianapolis","confidence":"medium","id":"datacentersexposed-de3d2dabeb348915","lat":39.76848,"location_precision":"source supplied","lon":-86.05339,"name":"Thunderbird Commerce Center Project","operator":"DC BLOX","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/dc-blox-to-expand-into-indiana-targets-data-center-campus-in-indianapolis/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/thunderbird-commerce-center-project"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Secaucus","confidence":"low","contains_osm":true,"id":"datacentersexposed-de80f6a9970be84d","lat":40.78616,"location_precision":"source supplied","lon":-74.06916,"name":"Centersquare NYC3 Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/193612533"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/centersquare-nyc3-data-center-osmway-193612533"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/193612533"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-de9c2e5379b0847f","lat":32.3757,"location_precision":"source supplied","lon":-97.0817,"name":"Midlothian 5 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-5-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","contains_osm":true,"id":"datacentersexposed-deab5f05434f25f8","lat":42.00263,"location_precision":"source supplied","lon":-87.95111,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-chicago-i-osmway-863162825","value":15.0}],"name":"Stream Chicago I","operator":"Stream Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/863162825"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-chicago-i-osmway-863162825"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/863162820"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-chicago-ii-osmway-863162820"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Hutto","confidence":"medium","id":"datacentersexposed-debbfd595fb1f2c0","lat":30.5563,"location_precision":"source supplied","lon":-97.55823,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-hutto","value":70.0}],"name":"Project Hutto","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/950000-sq-ft-data-center-proposed-for-hutto-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-hutto"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Upper Macungie","confidence":"medium","id":"datacentersexposed-dece1e9ae9fa34b5","lat":40.55624,"location_precision":"source supplied","lon":-75.59831,"name":"Upper Macungie Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/upper-macungie-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-def7167356c0c0cb","lat":36.68592,"location_precision":"source supplied","lon":-78.37641,"name":"Microsoft Boydton Data Center","operator":"Microsoft Data Center LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/675108684"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-boydton-data-center-osmway-675108684"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Van Wert","confidence":"medium","id":"datacentersexposed-df051a63ff23a618","lat":40.86965,"location_precision":"source supplied","lon":-84.58293,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-van-wert-oh-pg","value":500.0}],"name":"QTS Van Wert","operator":"QTS Realty Trust, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/qts-behind-van-wert-ohio-mega-site-acquisition-announces-10-billion-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-van-wert-oh-pg"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-df47092dbef2ee5f","lat":37.93933,"location_precision":"source supplied","lon":-77.47797,"name":"Carmel Church Data Hub","operator":"W & F PARTNERS","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/carmel-church-data-hub"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sanford","confidence":"medium","id":"datacentersexposed-df5e91da9de2963e","lat":35.47988,"location_precision":"source supplied","lon":-79.1803,"name":"Lee County Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMif0FVX3lxTE8wUFpjUVU0SzdmdGZtYU41amtZUWlZU1V2WVQ1Vk1iTmRyMi1uZ1BkaURSdkt4QXNOTEE0bHY0SDg0amlBYldqZ2hNUmlmc1RVcEl2X2ZSamtFamR2VUNmQ29GZmt1WktWNENaRUxKbjlwcG5TV0FGRG90STlacGs?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lee-county-data-center"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-df96390b00672c45","lat":38.74696,"location_precision":"source supplied","lon":-77.53217,"name":"CloudHQ Manassas Hornbaker","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-cloudhq-manassas-hornbaker"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Lytle","confidence":"medium","id":"datacentersexposed-dfd26adf7b9bb489","lat":29.21952,"location_precision":"source supplied","lon":-98.82438,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/north-east-data-center-llc","value":300.0}],"name":"North East Data Center LLC","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/rowan-secures-500m-for-300mw-texas-data-center-project/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/north-east-data-center-llc"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Manchester","confidence":"medium","id":"datacentersexposed-dfd8f137d9dd7300","lat":35.37539,"location_precision":"source supplied","lon":-86.07293,"name":"Arnold Air Force Base Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-department-of-the-air-force-accepting-proposals-for-ai-data-centers-in-military-bases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/arnold-air-force-base-data-center"}],"state":"Tennessee","status":"planned"},{"ai_classification":"unknown","city":"Windsor","confidence":"medium","id":"datacentersexposed-dfdba11eb5168c26","lat":40.47748,"location_precision":"source supplied","lon":-104.90136,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/globalai-windsor-former-kodak-carestream-co-pg","value":1000.0}],"name":"GlobalAI Windsor (former Kodak/Carestream)","operator":"GlobalAI","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.kunc.org/news/2025-12-23/globalai-data-center-company-buys-carestream-property"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/globalai-windsor-former-kodak-carestream-co-pg"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Beaver Dam","confidence":"medium","id":"datacentersexposed-dff7e0061ac42156","lat":43.51469,"location_precision":"source supplied","lon":-88.8214,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/beaver-dam-meta-data-center","value":220.0}],"name":"Beaver Dam Meta Data Center","operator":"Meta Platforms, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/520-acre-data-center-campus-planned-in-beaver-dam-wisconsin/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/beaver-dam-meta-data-center"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Janesville","confidence":"medium","id":"datacentersexposed-e0aef5d4e57206e6","lat":42.57651,"location_precision":"source supplied","lon":-88.99986,"name":"Project Cornmaze","operator":"Cambrin LLC., Meta?","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/developer-panattoni-seeks-to-claw-back-cash-from-town-of-turtle-wisconsin-for-430-acre-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-cornmaze"}],"state":"Wisconsin","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e0d1287b59cba489","lat":45.70827,"location_precision":"source supplied","lon":-119.82227,"name":"Percheron DC","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1501824328"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/percheron-dc-osmway-1501824328"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501824326"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501824327"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501824328"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501824329"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"MARICOPA COUNTY","confidence":"medium","id":"datacentersexposed-e1102ff06f710146","lat":33.56559,"location_precision":"source supplied","lon":-112.33744,"name":"MICROSOFT CORP - OLIVE AVE","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071395844"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/microsoft-corp-olive-ave-air-110071395844"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Joliet","confidence":"medium","id":"datacentersexposed-e122e9aec711b0de","lat":41.46266,"location_precision":"source supplied","lon":-88.05086,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/powerhouse-hillwood-holding","value":1800.0}],"name":"PowerHouse Hillwood Holding","operator":"PowerHouse Hillwood Holding","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/approval-given-to-20bn-data-center-near-chicago-illinois/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-hillwood-holding"}],"state":"Illinois","status":"under construction"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"datacentersexposed-e1451992f0fe38e5","lat":39.02636,"location_precision":"source supplied","lon":-77.45087,"name":"Amazon IAD79","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/463571876"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-iad79-osmway-463571876"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e14bde6efba5d1f6","lat":33.41319,"location_precision":"source supplied","lon":-111.97115,"name":"J-Curve Technologies","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11938631189"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/j-curve-technologies-osmnode-11938631189"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11938631189"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"medium","id":"datacentersexposed-e15d9dcc84e18f1b","lat":39.03693,"location_precision":"source supplied","lon":-77.56153,"name":"Curata Partners Leesburg Data Center","operator":"Curata Partners","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/two-building-data-center-campus-eyed-outside-leesburg-virginia/"}],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/curata-partners-leesburg-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Merrillville","confidence":"medium","id":"datacentersexposed-e16bf560a8f7a4ca","lat":41.45333,"location_precision":"source supplied","lon":-87.3033,"name":"Province Group Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/province-group-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e17122ba5055f630","lat":38.79442,"location_precision":"source supplied","lon":-77.54869,"name":"Premier Business Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-premier-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-e19a5c089cb190f3","lat":29.47909,"location_precision":"source supplied","lon":-98.6977,"name":"Vantage Data Centers TX22","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1502710557"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-data-centers-tx22-osmway-1502710557"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1502710557"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e21dfb27f7f87420","lat":40.01642,"location_precision":"source supplied","lon":-83.12585,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386016642"}],"updated":"2026-06-30","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-1386016642"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016642"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016643"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Farmville","confidence":"medium","id":"datacentersexposed-e244cdaec8f59cc8","lat":37.28852,"location_precision":"source supplied","lon":-78.35012,"name":"Heartland Innovative Technology (HIT) Park","operator":"Prince Edward County Industrial Development Authority","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/heartland-innovative-technology-hit-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Montgomery","confidence":"medium","id":"datacentersexposed-e24a38411acc5e98","lat":32.37771,"location_precision":"source supplied","lon":-86.30908,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dc-blox-montgomery-al-pg","value":40.0}],"name":"DC BLOX Montgomery","operator":"DC BLOX","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dc-blox-montgomery-al-pg"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e24fb6d19005eb35","lat":42.31727,"location_precision":"source supplied","lon":-111.30425,"name":"Family History Center","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/903642490"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/family-history-center-osmway-903642490"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/903642490"}],"state":"Idaho","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-e25f371a7df4fdef","lat":32.80041,"location_precision":"source supplied","lon":-96.81937,"name":"Flexential Dallas - Downtown Dallas","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/12112238944"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-dallas-downtown-dallas-osmnode-12112238944"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12112238944"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Tucson","confidence":"low","id":"datacentersexposed-e26b6fb55539abb8","lat":32.09271,"location_precision":"source supplied","lon":-110.78742,"name":"DirecTV","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/843314844"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/directv-osmway-843314844"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Charlestown","confidence":"medium","id":"datacentersexposed-e282011004b3f1fa","lat":38.4303,"location_precision":"source supplied","lon":-85.67671,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qlevr-data-center","value":3.0}],"name":"QLevr Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qlevr-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Richardson","confidence":"low","contains_osm":true,"id":"datacentersexposed-e29ab406f5717ee2","lat":32.96628,"location_precision":"source supplied","lon":-96.71321,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/digital-realty-dallas-dfw17-osmway-597876721","value":100.0}],"name":"Digital Realty Dallas DFW17","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/597876721"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-dallas-dfw17-osmway-597876721"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876721"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Tampa","confidence":"low","contains_osm":true,"id":"datacentersexposed-e2a824db50577017","lat":27.94554,"location_precision":"source supplied","lon":-82.3511,"name":"Cyxtera Tampa TP1","operator":"CenterSquare (formerly Cyxtera)","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/523886201"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cyxtera-tampa-tp1-osmway-523886201"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/523886201"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Smyrna","confidence":"medium","id":"datacentersexposed-e2b4d13ae975d72b","lat":33.84121,"location_precision":"source supplied","lon":-84.52242,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/smyrna-ga2","value":4.0}],"name":"Smyrna GA2","operator":"365 Data Centers","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://365datacenters.com/wp-content/uploads/2023/05/365_CUTSHEET_FINAL_SMYRNA_V3.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/smyrna-ga2"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e2cd96fb2a84c965","lat":41.05738,"location_precision":"source supplied","lon":-81.52193,"name":"Involta-Akron","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1278541792"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/involta-akron-osmway-1278541792"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1278541792"}],"state":"Ohio","status":"operating"},{"ai_classification":"unknown","city":"Wise","confidence":"medium","id":"datacentersexposed-e2dc307d022afb5f","lat":36.97807,"location_precision":"source supplied","lon":-82.52703,"name":"DP Facilities: Mineral Gap","operator":"DP FACILITIES INC SOUTH LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-23","url":"https://datacentersexposed.com/facilities/dp-facilities-mineral-gap"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-e2f4097e13773eb9","lat":39.55602,"location_precision":"source supplied","lon":-119.49028,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/novva-tahoe-reno-nv-pg","value":60.0}],"name":"Novva Tahoe Reno","operator":"Novva Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/novva-tahoe-reno-nv-pg"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"low","id":"datacentersexposed-e2fedb43d1b31923","lat":40.42737,"location_precision":"source supplied","lon":-80.04252,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/expedient-pittsburgh-south-osmway-537807168","value":1.8}],"name":"Expedient Pittsburgh South","operator":"Expedient, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/537807168"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/expedient-pittsburgh-south-osmway-537807168"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"datacentersexposed-e32576e48e779d78","lat":38.96085,"location_precision":"source supplied","lon":-77.4914,"name":"Digital Realty Northern Virginia IAD44","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1317733642"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/digital-realty-northern-virginia-iad44-osmway-1317733642"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Point Pleasant","confidence":"medium","id":"datacentersexposed-e3318459f3c59c73","lat":38.9132,"location_precision":"source supplied","lon":-82.1103,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mountaineer-gigasystem-monarch-cloud-campus","value":2000.0}],"name":"Mountaineer Gigasystem/ Monarch Cloud Campus","operator":"Fidelis/Nscale","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mountaineer-gigasystem-monarch-cloud-campus"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Paris","confidence":"medium","id":"datacentersexposed-e349c8c5c8e04eb2","lat":33.65263,"location_precision":"source supplied","lon":-95.6048,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-annie-soluna","value":75.0}],"name":"Project Annie (Soluna)","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-annie-soluna"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e34f62007e4c072a","lat":47.25248,"location_precision":"source supplied","lon":-119.81364,"name":"Vantage WA13","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1343760339"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/vantage-wa13-osmway-1343760339"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343760339"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Williston","confidence":"medium","id":"datacentersexposed-e353611701b5845a","lat":48.1455,"location_precision":"source supplied","lon":-103.77432,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/atlas-power","value":240.0}],"name":"Atlas Power","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atlas-power"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"Red Cedar/ Elk Mound","confidence":"medium","id":"datacentersexposed-e3689ada849d0d92","lat":44.92341,"location_precision":"source supplied","lon":-91.8447,"name":"Menomonie Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/menomonie-data-center"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-e373e13153c9aab5","lat":38.90289,"location_precision":"source supplied","lon":-77.02915,"name":"CoreSite DC1","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/751881301"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-dc1-osmnode-751881301"}],"state":"District of Columbia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e3fa49e1b55338f7","lat":38.75112,"location_precision":"source supplied","lon":-77.53603,"name":"Redstone Tech Park South","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-redstone-tech-park-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Porter","confidence":"medium","id":"datacentersexposed-e463cbc5fa7c9260","lat":41.61319,"location_precision":"source supplied","lon":-87.1014,"name":"Provident Realty Advisors Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/provident-realty-advisors-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Lockport","confidence":"medium","id":"datacentersexposed-e47007538047344d","lat":43.16983,"location_precision":"source supplied","lon":-78.74797,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/h5-data-center","value":44.0}],"name":"H5 Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/h5-acquires-new-york-data-centers-from-yahoo-in-sale-leaseback-deal/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/h5-data-center"}],"state":"New York","status":"operating"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-e497438234d721f6","lat":37.92403,"location_precision":"source supplied","lon":-77.50552,"name":"Carmel Technology & Enterprise Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://co.caroline.va.us/DocumentCenter/View/9994/RZ-06-2024-Luck-Stone-CTEC"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/carmel-technology-enterprise-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e4af4196cb93abf5","lat":39.00163,"location_precision":"source supplied","lon":-77.48236,"name":"Digital Loudoun Plaza","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1020953461"}],"updated":"2026-08-25","url":"https://datacentersexposed.com/facilities/digital-loudoun-plaza-osmway-1020953461"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020953454"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020953461"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lima","confidence":"medium","id":"datacentersexposed-e4e7dfdff0080306","lat":40.7965,"location_precision":"source supplied","lon":-84.121,"name":"Bistrozzi LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.limaohio.com/top-stories/2025/08/14/company-behind-data-center-completes-land-purchases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bistrozzi-llc-data-center"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e4f3b291c7139b4d","lat":39.02337,"location_precision":"source supplied","lon":-77.44888,"name":"EQUINIX ASHBURN NORTH","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-equinix-ashburn-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Cannon Falls","confidence":"medium","id":"datacentersexposed-e5205968010731d2","lat":44.53196,"location_precision":"source supplied","lon":-92.9268,"name":"TRACT Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.kttc.com/2025/08/27/cannon-falls-explores-major-data-center-project-following-land-annexation/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/tract-data-center-5"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e52902f365e5d1dd","lat":38.79028,"location_precision":"source supplied","lon":-77.54092,"name":"Amazon Mason King Court","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-mason-king-court"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Buckeye","confidence":"medium","id":"datacentersexposed-e5516850d7de3850","lat":33.19227,"location_precision":"source supplied","lon":-112.67318,"name":"Maricopa Data Center","operator":"Fortescue","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/australias-fortescue-could-get-zoning-permission-for-potential-data-center-near-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/maricopa-data-center"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Everett","confidence":"medium","id":"datacentersexposed-e56064a85c750d47","lat":42.39638,"location_precision":"source supplied","lon":-71.05932,"name":"Everett Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/everett-data-center"}],"state":"Massachusetts","status":"planned"},{"ai_classification":"unknown","city":"Midland","confidence":"medium","id":"datacentersexposed-e5809f8a18651020","lat":40.6323,"location_precision":"source supplied","lon":-80.45189,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/mawson-midland-data-center","value":100.0}],"name":"Mawson Midland Data Center","operator":"Mawson Infrastructure Group","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mawson-midland-data-center"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","contains_osm":true,"id":"datacentersexposed-e590b3ec1c797f53","lat":33.68468,"location_precision":"source supplied","lon":-112.09834,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-phoenix-deer-valley-osmway-157362579","value":5.02}],"name":"Flexential Phoenix - Deer Valley","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/157362579"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-phoenix-deer-valley-osmway-157362579"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/157362579"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-e5d155ade481632d","lat":38.31871,"location_precision":"source supplied","lon":-77.51735,"name":"NEON AT CELEBRATE VIRGINIA SOUTH","operator":"Stack Infrastructure, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stack-infrastructure-files-for-10bn-data-center-in-fredericksburg-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/neon-at-celebrate-virginia-south"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e60a36436fc6982a","lat":32.64,"location_precision":"source supplied","lon":-90.04,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-madison-mississippi","value":750.0}],"name":"AWS Madison Mississippi","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/amazon-madison-mississippi"}],"state":"Mississippi","status":"under construction"},{"ai_classification":"unknown","city":"Hogansville","confidence":"medium","id":"datacentersexposed-e62de1fbcc764020","lat":33.14624,"location_precision":"source supplied","lon":-84.94037,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/hogansville-data-center","value":600.0}],"name":"Hogansville Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/hogansville-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Niagara Falls","confidence":"medium","id":"datacentersexposed-e64695fddedf9af0","lat":43.08452,"location_precision":"source supplied","lon":-79.05135,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/niagara-digital-campus","value":140.0}],"name":"Niagara Digital Campus","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/niagara-digital-campus"}],"state":"New York","status":"under construction"},{"ai_classification":"unknown","city":"Newnan","confidence":"medium","id":"datacentersexposed-e6c06d6f9f9d4c99","lat":33.43413,"location_precision":"source supplied","lon":-84.8768,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-sail","value":936.0}],"name":"Project Sail","operator":"AtlasEdge","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/project-sail-data-center-newnan-atlanta-georgia/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/project-sail"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Sidney","confidence":"medium","id":"datacentersexposed-e6e5ba76efc9aacf","lat":40.26942,"location_precision":"source supplied","lon":-84.19626,"name":"Amazon Project Galaxy","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-project-galaxy"}],"state":"Ohio","status":"planned"},{"ai_classification":"unknown","city":"CORSICANA","confidence":"medium","id":"datacentersexposed-e6f0f9a77d2a9397","lat":31.96471,"location_precision":"source supplied","lon":-96.51074,"name":"RIOT","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/riot-110071993425"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e70c077f144dee02","lat":41.88053,"location_precision":"source supplied","lon":-87.63594,"name":"West Monroe","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10945121336"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/west-monroe-osmnode-10945121336"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10945121336"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e70cf8c03e0d5a0c","lat":36.21,"location_precision":"source supplied","lon":-115.03,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/apple-las-vegas","value":220.0}],"name":"Apple Las Vegas","operator":"Apple Data Services LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apple-las-vegas"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Fort Bliss","confidence":"medium","id":"datacentersexposed-e734f74f872aba96","lat":31.82617,"location_precision":"source supplied","lon":-106.4042,"name":"Fort Bliss Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-dod-details-military-bases-available-for-ai-data-center-build-out/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fort-bliss-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-e73f536ffa83074f","lat":36.21539,"location_precision":"source supplied","lon":-86.78363,"name":"BNYM","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/894425613"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/bnym-osmway-894425613"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Sunnyvale","confidence":"low","contains_osm":true,"id":"datacentersexposed-e75a2f00804a487b","lat":37.37347,"location_precision":"source supplied","lon":-121.9878,"name":"Lumen Sunnyvale 1","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/37877544"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lumen-sunnyvale-1-osmway-37877544"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/37877544"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Lysander","confidence":"medium","id":"datacentersexposed-e7adf82a02321954","lat":43.18687,"location_precision":"source supplied","lon":-76.35703,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ranalli-super-dc-llc-data-center","value":300.0}],"name":"Ranalli Super DC, LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ranalli-super-dc-llc-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-e7c6801aee2cbab7","lat":29.67282,"location_precision":"source supplied","lon":-82.29976,"name":"HiPerGator","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8017899486"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/hipergator-osmnode-8017899486"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e7f0d6f44bb00dd3","lat":32.54419,"location_precision":"source supplied","lon":-96.80219,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/compass-data-center-osmway-1426525213","value":350.0}],"name":"Compass Data Center","operator":"Compass Datacenters, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1426525213"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/compass-data-center-osmway-1426525213"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/850965775"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525212"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525213"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525214"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525215"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525216"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525217"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525218"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525219"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Yaphank","confidence":"medium","id":"datacentersexposed-e81f5caec399870f","lat":40.82991,"location_precision":"source supplied","lon":-72.94618,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/brookhaven-logistics-center","value":176.0}],"name":"Brookhaven Logistics Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/brookhaven-logistics-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"College Park","confidence":"medium","id":"datacentersexposed-e860fa223dd3f098","lat":33.70823,"location_precision":"source supplied","lon":-84.52996,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stacks-college-park","value":105.0}],"name":"Stacks/College Park","operator":"Vantage Data Centers Holdings, LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4257"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stacks-college-park"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Roxboro","confidence":"medium","id":"datacentersexposed-e8ab51e6482ba796","lat":36.47922,"location_precision":"source supplied","lon":-78.9898,"name":"Person County Mega Site","operator":"Microsoft Corporation","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-to-start-permitting-for-1385-acre-data-center-campus-in-north-carolina/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/person-county-mega-site"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Allenwood","confidence":"medium","id":"datacentersexposed-e8ce86220814e1cf","lat":41.13256,"location_precision":"source supplied","lon":-76.9053,"name":"Data Centric LLC Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-for-pennsylvania-data-center-scrapped/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-centric-llc-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Cave City","confidence":"medium","id":"datacentersexposed-e8cf16736bdaea2d","lat":37.13675,"location_precision":"source supplied","lon":-85.95622,"name":"Cave City Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMid0FVX3lxTE11R1gwUFJYUWlSNWl5X1pJdkNhNDNnOVgxXzh6bDNvVi13TUkyYmIwQUFwNTctS1U2c0JWV0w3MXcyYkNJM0tPVVVuWTFwVlZScEJ5V3J1dk42eTdKS3k0b2g0WHB5UXg4SHRJVU8tejhnZkFUcnB3?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/cave-city-data-center"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"Sparks","confidence":"medium","id":"datacentersexposed-e8d13cd83935abbe","lat":39.51259,"location_precision":"source supplied","lon":-119.43559,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/south-valley-technology-park-data-center","value":1200.0}],"name":"South Valley Technology Park Data Center","operator":"Tract","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/tract-acquires-8590-acres-in-reno-nevada-for-data-center-park/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/south-valley-technology-park-data-center"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-e8d62fa092310475","lat":40.78755,"location_precision":"source supplied","lon":-74.06805,"name":"Evocative Secaucus","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/451497833"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/evocative-secaucus-osmway-451497833"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/451497833"}],"state":"New Jersey","status":"operating"},{"ai_classification":"unknown","city":"Fredericksburg","confidence":"medium","id":"datacentersexposed-e8e52c1ac6f324d0","lat":38.39153,"location_precision":"source supplied","lon":-77.46516,"name":"Vantage Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-data-center"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-e906b90daff12dfd","lat":33.7,"location_precision":"source supplied","lon":-84.77,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-douglas-georgia","value":750.0}],"name":"Microsoft East Point — Douglas County","operator":"Microsoft Data Center LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-douglas-georgia"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"North Pekin","confidence":"medium","id":"datacentersexposed-e916745cce8f3ddd","lat":40.60275,"location_precision":"source supplied","lon":-89.62978,"name":"North Pekin Data Center","operator":"NorthC","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/head-of-north-pekin-illinois-says-that-former-amc-theater-will-not-be-turned-into-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/north-pekin-data-center"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Macon","confidence":"medium","id":"datacentersexposed-e92910a2d2e70959","lat":32.94087,"location_precision":"source supplied","lon":-83.8188,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bolingbroke-technology-campus","value":900.0}],"name":"Bolingbroke Technology Campus","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/900mw-data-center-campus-proposed-outside-macon-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bolingbroke-technology-campus"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Moses Lake","confidence":"medium","id":"datacentersexposed-e97e868025b1404e","lat":47.19689,"location_precision":"source supplied","lon":-119.29321,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bitfarm-bitcoin-washington","value":18.0}],"name":"Bitfarm Bitcoin Washington","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitfarm-bitcoin-washington"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Culpeper","confidence":"medium","id":"datacentersexposed-e99d85ddcd593347","lat":38.46164,"location_precision":"source supplied","lon":-77.97762,"name":"CloudHQ","operator":"CloudHQ, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cloudhq"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Abilene","confidence":"medium","id":"datacentersexposed-e9d12a7909022896","lat":32.55212,"location_precision":"source supplied","lon":-99.5651,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/frontier-vantage-data-center","value":1400.0}],"name":"Frontier Vantage Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/frontier-vantage-data-center"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-e9d2f657ae6b5724","lat":30.20701,"location_precision":"source supplied","lon":-97.70113,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-austin-data-center-iii-osmway-455171103","value":24.0}],"name":"CyrusOne Austin Data Center III","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/455171103"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-austin-data-center-iii-osmway-455171103"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Washington Township","confidence":"medium","id":"datacentersexposed-e9df4e6f35c53c7e","lat":42.80183,"location_precision":"source supplied","lon":-82.99235,"name":"Washington Township Data Center","operator":"Prologis","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/washington-township-data-center"}],"state":"Michigan","status":"planned"},{"ai_classification":"unknown","city":"Moseley","confidence":"medium","id":"datacentersexposed-e9e096e203f98d36","lat":37.44423,"location_precision":"source supplied","lon":-77.77384,"name":"Upper Magnolia Green West Tract A and Tract B","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://chesterfieldfits.com/site/wp-content/uploads/2025/05/25SN1038.West-Tract-A.-Proffers.-Executed.-5.9.25-01718952xBE3E4.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/upper-magnolia-green-west-tract-a-and-tract-b"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Sacramento","confidence":"medium","id":"datacentersexposed-e9e8e70b416dd072","lat":38.58106,"location_precision":"source supplied","lon":-121.4939,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prime-data-centers-sacramento-smf02-ca-pg","value":18.0}],"name":"Prime Data Centers Sacramento SMF02","operator":"Prime Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prime-data-centers-sacramento-smf02-ca-pg"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Lino Lakes","confidence":"low","contains_osm":true,"id":"datacentersexposed-ea3ac746053e3441","lat":45.13216,"location_precision":"source supplied","lon":-93.09562,"name":"Encompass Minneapolis Facility","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1391966326"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/encompass-minneapolis-facility-osmway-1391966326"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1391966326"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"medium","id":"datacentersexposed-ea4c3cbad5a3d4fc","lat":33.76018,"location_precision":"source supplied","lon":-84.6017,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stack-atlanta-atl02","value":160.0}],"name":"STACK Atlanta ATL02","operator":"Stack Infrastructure, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stack-files-to-build-two-more-data-centers-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stack-atlanta-atl02"}],"state":"Georgia","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-ea6196064eac40ec","lat":41.54061,"location_precision":"source supplied","lon":-93.82484,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/microsoft-osmway-438077632","value":106.0}],"name":"Microsoft","operator":"Microsoft Corporation","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/438077632"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/microsoft-osmway-438077632"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"New Florence","confidence":"medium","id":"datacentersexposed-ea7d572a71372ad7","lat":38.90566,"location_precision":"source supplied","lon":-91.41777,"name":"Amazon Montgomery County Data Center (Project Green)","operator":"Amazon Data Services, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://abc17news.com/news/montgomery/2025/12/03/montgomery-county-approves-land-for-two-large-scale-projects-on-amazon-data-center-campus/"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/project-green"}],"state":"Missouri","status":"planned"},{"ai_classification":"unknown","city":"Childress","confidence":"medium","id":"datacentersexposed-ea9940e30f46f4b3","lat":34.38328,"location_precision":"source supplied","lon":-100.05689,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/childress-data-center","value":750.0}],"name":"Childress Data Center","operator":"IREN Limited","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://comptroller.texas.gov/taxes/data-centers/data-center-lists.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/childress-data-center"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"DOUGLASVILLE","confidence":"medium","id":"datacentersexposed-eaa0f26113133fb3","lat":33.73056,"location_precision":"source supplied","lon":-84.61667,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-corporation-air-110071949183","value":150.0}],"name":"FLEXENTIAL CORPORATION","operator":"Unknown","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-corporation-air-110071949183"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-eaa437676837e3d3","lat":34.05709,"location_precision":"source supplied","lon":-84.273,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/ascent-atlanta-data-center-osmway-635022480","value":12.0}],"name":"Ascent - Atlanta Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/635022480"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/ascent-atlanta-data-center-osmway-635022480"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/635022480"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"datacentersexposed-eaf471ac5c13a727","lat":38.89786,"location_precision":"source supplied","lon":-77.45408,"name":"Amazon IAD-1","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/258343749"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-iad-1-osmway-258343749"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"FREDERICKSBURG","confidence":"medium","id":"datacentersexposed-eaf9cb37e6ad644e","lat":38.20335,"location_precision":"source supplied","lon":-77.46941,"name":"AMAZON DATA SERVICES INC. IAD450 COSNER TECH CAMPUS","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-services-inc-iad450-cosner-tech-campus-air-110072000328"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Brenham","confidence":"medium","id":"datacentersexposed-eafaa997e06c9c83","lat":30.14047,"location_precision":"source supplied","lon":-96.40983,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/viridien-data-center","value":45.0}],"name":"Viridien Data Center","operator":"Viridien","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/officials-in-brenham-texas-reject-tax-abatement-for-data-center-project/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/viridien-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-eb094c233510c27b","lat":38.77873,"location_precision":"source supplied","lon":-77.53871,"name":"Amazon Bethlehem Technology Park","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-bethlehem-technology-park"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-eb3971c7517d63fa","lat":39.01549,"location_precision":"source supplied","lon":-77.48216,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-ashburn-iad1-osmway-300970759","value":70.0}],"name":"Databank Ashburn IAD1","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/300970759"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-ashburn-iad1-osmway-300970759"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"UPPER BURRELL, TOWNSHIP OF","confidence":"medium","id":"datacentersexposed-eb466723dd94d24d","lat":40.54596,"location_precision":"source supplied","lon":-79.63185,"name":"TECFUSIONS PROPOSED SEWER LINE","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=PAC650493"}],"updated":"2026-09-13","url":"https://datacentersexposed.com/facilities/tecfusions-proposed-sewer-line-pac650493"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Milwaukee","confidence":"low","contains_osm":true,"id":"datacentersexposed-eb46dd59c43decae","lat":43.04394,"location_precision":"source supplied","lon":-87.95398,"name":"Data Holdings Data Center","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/8165754026"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/data-holdings-data-center-osmnode-8165754026"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8165754026"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-eb46fb2d1551d78c","lat":37.37331,"location_precision":"source supplied","lon":-121.97278,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-osmway-38305611","value":45.0}],"name":"Vantage","operator":"Vantage Data Centers Holdings, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/38305611"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/vantage-osmway-38305611"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Stafford","confidence":"medium","id":"datacentersexposed-eb589810a8335cad","lat":38.41132,"location_precision":"source supplied","lon":-77.40424,"name":"Old Potomac Church Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://staffordcountyva.gov/government/departments_p-z/planning_and_zoning/long_range/rezonings,_cups,_comp_plan_amendments/development_review_meetings_new_applications.php"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/old-potomac-church-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Bozrah","confidence":"medium","id":"datacentersexposed-eb6a0c46a5a0e99d","lat":41.5586,"location_precision":"source supplied","lon":-72.1706,"name":"GotSpace Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/15gw-data-center-campus-proposed-in-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gotspace-data-center"}],"state":"Connecticut","status":"planned"},{"ai_classification":"unknown","city":"Grand Prairie","confidence":"medium","id":"datacentersexposed-ebc845b487ad3a11","lat":32.74596,"location_precision":"source supplied","lon":-96.99778,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/powerhouse-provident-grand-prairie-tx-pg","value":1800.0}],"name":"PowerHouse/Provident Grand Prairie","operator":"PowerHouse Data Centers","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/powerhouse-and-provident-to-develop-18gw-campus-in-dfw-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-provident-grand-prairie-tx-pg"}],"state":"Texas","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ec3833c3d6e53aac","lat":38.79641,"location_precision":"source supplied","lon":-77.55256,"name":"Merritt I-66 Business Park","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-merritt-i-66-business-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ec5de60e8a0dddfa","lat":38.78095,"location_precision":"source supplied","lon":-77.57915,"name":"Project Industry","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-project-industry"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","contains_osm":true,"id":"datacentersexposed-ec5f2b944873b1ca","lat":42.00122,"location_precision":"source supplied","lon":-87.9552,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-chicago-ch3-osmway-377032061","value":20.65}],"name":"Equinix Chicago CH3","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/377032061"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-chicago-ch3-osmway-377032061"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377032061"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ec9b90988f6ff97e","lat":41.08334,"location_precision":"source supplied","lon":-76.15145,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nautilus-cryptomine-osmway-1334234455","value":50.0}],"name":"Nautilus Cryptomine","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1334234455"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nautilus-cryptomine-osmway-1334234455"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1334234454"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1334234455"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-eca823d28c2e0018","lat":34.91364,"location_precision":"source supplied","lon":-85.74592,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/844371953"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-844371953"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714889192"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844371952"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844371953"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-ecf2641146384b1c","lat":47.24385,"location_precision":"source supplied","lon":-119.86967,"name":"CyrusOne Quincy","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/640148472"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-quincy-osmway-640148472"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Blakely","confidence":"medium","id":"datacentersexposed-ed635b479468f05e","lat":41.48713,"location_precision":"source supplied","lon":-75.59684,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/blakely-data-center","value":1500.0}],"name":"Blakely Data Center","operator":"Unknown","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blakely-data-center"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","id":"datacentersexposed-ed6c0f3e90477620","lat":41.87594,"location_precision":"source supplied","lon":-87.63147,"name":"CoreSite Chicago Data Center (CH1)","operator":"CoreSite, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11098469355"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coresite-chicago-data-center-ch1-osmnode-11098469355"}],"state":"Illinois","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ed75bf391e3cb823","lat":37.37703,"location_precision":"source supplied","lon":-121.95206,"name":"Lumen Santa Clara","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/209073635"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/lumen-santa-clara-osmway-209073635"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073635"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ed94915a92e602d5","lat":47.83141,"location_precision":"source supplied","lon":-104.55942,"name":"Richland County Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://news.google.com/rss/articles/CBMi8AFBVV95cUxObzFscl9Xc1gxRDVfbmM2Wm9zb1hMZnQ0Vlk3SG9YU2lJdnhLVUFGaWF4U3RtemRHN1lFSm1oNzNqRTlCeTZFNHVMUzFfeHJyVGVyZDV3TU9pLVhTMXNaTHV6aVdfTndIZ0ZEcG1KdkZHTlhQV0hjRGtQUjVBWkEzTWFIUTZBcG42cUdPMWVaREZYMER3MmNOekg3Zk5kcDBGcE54OHNFZUFKT19yTS15djNUY3VPVUdhYmdRX3J3OEtZSHd2a3d1aEhScG9xRlBBU2R3UXF1dDVYR0ZzblhCZ0EzbUR2bExLR0tWVXlHZ3U?oc=5&hl=en-US&gl=US&ceid=US:en"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/richland-county-data-center"}],"state":"Montana","status":"planned"},{"ai_classification":"unknown","city":"Mishawaka","confidence":"medium","id":"datacentersexposed-ed95f51d42be8aa3","lat":41.66116,"location_precision":"source supplied","lon":-86.1807,"name":"Microsoft Mishawaka","operator":"Microsoft Data Center LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/microsoft-expands-plans-for-la-porte-indiana-data-center-campus/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/microsoft-mishawaka-in-pg"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Sanford","confidence":"medium","id":"datacentersexposed-edbb0b859c1107e1","lat":35.53914,"location_precision":"source supplied","lon":-79.25537,"name":"Deep River Data AI Data Center","operator":"Deep River Data","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://insideclimatenews.org/news/01112025/north-carolina-natural-gas-well-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/deep-river-data-ai-data-center"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Wicasset","confidence":"medium","id":"datacentersexposed-edc30de0d5c122e0","lat":43.95572,"location_precision":"source supplied","lon":-69.69428,"name":"Yankee Nuclear Power Plant Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/vampire-data-center-scheme-irks-residents-in-wiscasset-maine/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/yankee-nuclear-power-plant-data-center"}],"state":"Maine","status":"planned"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"datacentersexposed-edd01825a8308aed","lat":45.54651,"location_precision":"source supplied","lon":-122.89379,"name":"TGN Hillsboro","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/328702348"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/tgn-hillsboro-osmway-328702348"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328702348"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Kearneysville","confidence":"medium","id":"datacentersexposed-edd32f3f87aa15bc","lat":39.33659,"location_precision":"source supplied","lon":-77.85235,"name":"QTS Kearneysville Data Center","operator":"QTS Realty Trust, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://observerwv.com/plan-for-data-center-complex-near-kearneysville-approved/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-kearneysville-data-center"}],"state":"West Virginia","status":"planned"},{"ai_classification":"unknown","city":"Social Circle","confidence":"medium","id":"datacentersexposed-ee3d16f6ec46a5ff","lat":33.66494,"location_precision":"source supplied","lon":-83.68987,"name":"0 Social Circle Parkway Data Center","operator":"Sailfish Investors Acquisitions, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/0-social-circle-parkway-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Richmond","confidence":"medium","id":"datacentersexposed-ee3f261fa412c5e3","lat":37.60576,"location_precision":"source supplied","lon":-77.4211,"name":"Richmond Data Center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/richmond-data-center"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Venus","confidence":"medium","id":"datacentersexposed-eea3b4be8e531487","lat":32.3862,"location_precision":"source supplied","lon":-97.064,"name":"Midlothian 3 Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://8888cre.com/Data-center-land-for-sale-in-tax-incentive-zone-data-center-land-for-sale-with-power-substation-access-megawatt-powerline-near-Dallas-Texas-Fort-Worth-TX.pdf"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/midlothian-3-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"Sandston","confidence":"low","contains_osm":true,"id":"datacentersexposed-eedb30d9dab8e35b","lat":37.48485,"location_precision":"source supplied","lon":-77.24298,"name":"RIC2 DC5","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1493516626"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ric2-dc5-osmway-1493516626"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1493516626"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Plano","confidence":"low","contains_osm":true,"id":"datacentersexposed-eedd0cd5f7d4764a","lat":33.08774,"location_precision":"source supplied","lon":-96.81522,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-plano-data-center-osmway-714120969","value":20.0}],"name":"DataBank Plano Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/714120969"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-plano-data-center-osmway-714120969"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714120969"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","contains_osm":true,"id":"datacentersexposed-eee30200ebc44f0d","lat":32.78255,"location_precision":"source supplied","lon":-96.78281,"name":"VIRTBIZ","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/6856057098"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/virtbiz-osmnode-6856057098"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/6856057098"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Shippingport","confidence":"medium","id":"datacentersexposed-eee3dae962742ad0","lat":40.63213,"location_precision":"source supplied","lon":-80.4145,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/shippingport-bruce-mansfield-data-center-project-phoenix","value":3600.0}],"name":"Shippingport Bruce Mansfield Data Center/Project Phoenix","operator":"Aligned Energy Holdings, LP","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/shippingport-bruce-mansfield-data-center-project-phoenix"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Rayville","confidence":"medium","id":"datacentersexposed-eef99719c1558414","lat":32.50788,"location_precision":"source supplied","lon":-91.6349,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-rpl-10x-hyperion-project-sucre","value":1500.0}],"name":"Meta RPL-10X Hyperion/Project Sucre","operator":"Meta Platforms, Inc.","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/meta-announces-4-million-sq-ft-louisiana-data-center-campus/"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/meta-rpl-10x-hyperion-project-sucre"}],"state":"Louisiana","status":"operating"},{"ai_classification":"unknown","city":"Tucson","confidence":"medium","id":"datacentersexposed-eefea30b2ed3c011","lat":32.16432,"location_precision":"source supplied","lon":-110.86484,"name":"Data center: Davis-Monthan Air Force Base","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/us-department-of-the-air-force-accepting-proposals-for-ai-data-centers-in-military-bases/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-davis-monthan-air-force-base"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ef3f59fc3213d491","lat":33.60139,"location_precision":"source supplied","lon":-83.70543,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1054387471"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-osmway-1054387471"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1054387470"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/meta-stanton-springs-data-center-osmway-1054387470"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Dalton","confidence":"medium","id":"datacentersexposed-ef506678280e8f22","lat":34.76418,"location_precision":"source supplied","lon":-84.9711,"name":"Data center","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-3"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Pittsburg","confidence":"medium","id":"datacentersexposed-ef7319a9efebdc6c","lat":38.0126,"location_precision":"source supplied","lon":-121.90993,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/avaio-perseus-data-center","value":99.0}],"name":"AVAIO Perseus Data Center","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/avaio-perseus-data-center"}],"state":"California","status":"under construction"},{"ai_classification":"unknown","city":"Northlake","confidence":"low","contains_osm":true,"id":"datacentersexposed-ef7d7839058f243f","lat":41.914,"location_precision":"source supplied","lon":-87.91752,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/aligned-data-center-chicago-ord-01-osmway-1217649348","value":42.0}],"name":"Aligned Data Center - Chicago ORD-01","operator":"Aligned Energy Holdings, LP","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1217649348"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aligned-data-center-chicago-ord-01-osmway-1217649348"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1217649348"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"San Diego","confidence":"low","contains_osm":true,"id":"datacentersexposed-ef98b1480456a4a0","lat":32.82789,"location_precision":"source supplied","lon":-117.12993,"name":"LightEdge SAN1","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/31800424"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/lightedge-san1-osmway-31800424"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/31800424"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-efb8e9da6c641ebb","lat":40.12707,"location_precision":"source supplied","lon":-75.40866,"name":"Lumen Norristown","operator":"Lumen Technologies, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/366049843"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/lumen-norristown-osmway-366049843"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/366049843"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-efe2074e6623e01e","lat":25.79155,"location_precision":"source supplied","lon":-80.31775,"name":"NocRoom Miami IT Services","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/3406467087"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/nocroom-miami-it-services-osmnode-3406467087"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/3406467087"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Amherst","confidence":"low","contains_osm":true,"id":"datacentersexposed-f03b5d0aaebeac9e","lat":42.9902,"location_precision":"source supplied","lon":-78.81238,"name":"Frontier Science","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/9736262934"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/frontier-science-osmnode-9736262934"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9736262934"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Reno","confidence":"medium","id":"datacentersexposed-f07362bc4303dcb3","lat":39.52577,"location_precision":"source supplied","lon":-119.82659,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/centra","value":12.0}],"name":"Centra","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/centra-breaks-ground-on-second-reno-data-center/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/centra"}],"state":"Nevada","status":"under construction"},{"ai_classification":"unknown","city":"Sterling","confidence":"medium","id":"datacentersexposed-f0a1133fb47bc7d8","lat":38.97512,"location_precision":"source supplied","lon":-77.42687,"name":"Dulles 2000 Redevelopment","operator":"BCG JV Sterling LLC; Phil Tager","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://loudouncountyvaeg.tylerhost.net/prod/selfservice#/plan/06089816-10BD-4D2E-8A91-826D008AA2C4?tab=attachments"}],"updated":"2026-06-30","url":"https://datacentersexposed.com/facilities/dulles-2000-redevelopment"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Maxwell","confidence":"medium","id":"datacentersexposed-f0aadf35e5405c20","lat":29.92406,"location_precision":"source supplied","lon":-97.7511,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/prime-dc-aus01-and-aus02","value":384.0}],"name":"Prime DC AUS01 and AUS02","operator":"Prime Data Centers","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/prime-files-to-build-two-data-centers-outside-austin-texas/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/prime-dc-aus01-and-aus02"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"San Diego","confidence":"low","contains_osm":true,"id":"datacentersexposed-f0d63584c992dec5","lat":32.74765,"location_precision":"source supplied","lon":-117.15895,"name":"AT&T Center","operator":"AT&T Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/531709017"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/at-t-center-osmway-531709017"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/531709017"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Stafford","confidence":"medium","id":"datacentersexposed-f0e973649ccf3c35","lat":38.41976,"location_precision":"source supplied","lon":-77.44698,"name":"GWV","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gwv"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-f0f519e73852af3f","lat":38.79498,"location_precision":"source supplied","lon":-77.54277,"name":"Century Park Phase 2 & 3","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-century-park-phase-2-3"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Niagara Falls","confidence":"medium","id":"datacentersexposed-f110666c085fbfad","lat":43.12389,"location_precision":"source supplied","lon":-79.04118,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/9lives-data-center","value":600.0}],"name":"9Lives Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/9ldg-plans-ai-data-center-at-niagara-falls/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/9lives-data-center"}],"state":"New York","status":"planned"},{"ai_classification":"unknown","city":"Minneapolis","confidence":"medium","id":"datacentersexposed-f1513a78e111af18","lat":45.02485,"location_precision":"source supplied","lon":-93.3328,"name":"US Internet Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/minnesota-abortion-clinic-site-set-to-be-turned-into-data-center-pro-life-memorial-held/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/us-internet-data-center"}],"state":"Minnesota","status":"planned"},{"ai_classification":"unknown","city":"Waukee","confidence":"medium","id":"datacentersexposed-f19eb42967ec85c5","lat":41.61185,"location_precision":"source supplied","lon":-93.88451,"name":"Apple Waukee","operator":"Apple Data Services LLC","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/apple-launches-data-center-in-waukee-iowa/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/apple-waukee-ia-pg"}],"state":"Iowa","status":"operating"},{"ai_classification":"unknown","city":"Mooresville","confidence":"medium","id":"datacentersexposed-f1d8844fa2293716","lat":35.585,"location_precision":"source supplied","lon":-80.81,"name":"Tract Mooresville Technology Park (withdrawn)","operator":"Tract","source_status":"withdrawn","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/tract-apex"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f20e9aeab0e7efda","lat":25.64656,"location_precision":"source supplied","lon":-80.42343,"name":"NocRoom Miami IT Services","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/3406476814"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/nocroom-miami-it-services-osmnode-3406476814"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/3406476814"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f270fa77092d6b6d","lat":35.83934,"location_precision":"source supplied","lon":-78.32814,"name":"BB&T Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/830138727"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/bb-t-data-center-osmway-830138727"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830138727"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Falls Church","confidence":"medium","id":"datacentersexposed-f2b619b9091f9f90","lat":38.84643,"location_precision":"source supplied","lon":-77.36562,"name":"Data center","operator":"Black Chamber Partners, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/data-center-4"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Portland","confidence":"low","contains_osm":true,"id":"datacentersexposed-f2e432e091ec3d56","lat":43.65784,"location_precision":"source supplied","lon":-70.26138,"name":"FirstLight Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7171975407"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/firstlight-data-center-osmnode-7171975407"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7171975407"}],"state":"Maine","status":"unknown"},{"ai_classification":"unknown","city":"Philadelphia","confidence":"low","contains_osm":true,"id":"datacentersexposed-f308c0a6fa301758","lat":39.95981,"location_precision":"source supplied","lon":-75.16083,"name":"Terminal Commerce Building","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/334264478"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/terminal-commerce-building-osmway-334264478"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/334264478"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Frankfort","confidence":"medium","id":"datacentersexposed-f35174de92ab9b0d","lat":40.3066,"location_precision":"source supplied","lon":-86.5855,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/logistix-data-center-2","value":300.0}],"name":"Logistix Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/land-rezoning-proposal-for-300mw-data-center-in-frankfort-indiana-rescinded-by-developer/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/logistix-data-center-2"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Niagara Falls","confidence":"low","contains_osm":true,"id":"datacentersexposed-f3530f9ae267f043","lat":43.0832,"location_precision":"source supplied","lon":-79.00334,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/blockfusion-niagra-falls-osmway-1229749894","value":50.0}],"name":"Blockfusion Niagra Falls","operator":"Blockfusion USA Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1229749894"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/blockfusion-niagra-falls-osmway-1229749894"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/832656125"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/832656868"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/832658041"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749890"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749891"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749892"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749893"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749894"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749895"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1229749896"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1442054199"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Winston","confidence":"medium","id":"datacentersexposed-f38631bbe1958c81","lat":33.73994,"location_precision":"source supplied","lon":-84.80678,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stream-atlanta-west-data-center","value":240.0}],"name":"Stream Atlanta West Data Center","operator":"Stream Data Centers","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4334"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stream-atlanta-west-data-center"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Umatilla","confidence":"low","contains_osm":true,"id":"datacentersexposed-f3bed628b63a5882","lat":45.91584,"location_precision":"source supplied","lon":-119.26732,"name":"Amazon Web Services","operator":"Amazon Data Services, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460070139"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-web-services-osmway-460070139"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070135"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070136"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070137"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070138"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070139"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070140"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070141"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070143"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/592257327"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697413741"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1127951468"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"BRANDON","confidence":"medium","id":"datacentersexposed-f3ef6c1f79b4f6b7","lat":32.26,"location_precision":"source supplied","lon":-90.01806,"name":"ADP RANKIN DATA HUB, LLC, DATA CENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/adp-rankin-data-hub-llc-data-center-110071963442"}],"state":"Mississippi","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-f40e8963830a555c","lat":38.98487,"location_precision":"source supplied","lon":-77.42567,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-osmway-273896096","value":13.0}],"name":"CyrusOne","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/273896096"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-osmway-273896096"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Palmetto","confidence":"medium","id":"datacentersexposed-f413e43d74f81787","lat":33.49292,"location_precision":"source supplied","lon":-84.6615,"name":"T5","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/t5-requests-permission-for-3-million-sq-ft-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Centennial","confidence":"low","id":"datacentersexposed-f4463125c284a38f","lat":39.59387,"location_precision":"source supplied","lon":-104.84316,"name":"Flexential - Denver - Centennial Data Center","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/11400893880"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/flexential-denver-centennial-data-center-osmnode-11400893880"}],"state":"Colorado","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f48f9fde9595845d","lat":41.704,"location_precision":"source supplied","lon":-91.58708,"name":"ForceAmp.com","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/837139011"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/forceamp-com-osmway-837139011"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/837139011"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Sparks","confidence":"medium","id":"datacentersexposed-f49ee84715bfbc2a","lat":39.55287,"location_precision":"source supplied","lon":-119.474,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/nv11-nv14-data-center-campus","value":224.0}],"name":"NV11–NV14 Data Center Campus","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/vantage-announces-224mw-data-center-campus-in-reno-nevada/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/nv11-nv14-data-center-campus"}],"state":"Nevada","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-f4d0c823e315b88b","lat":38.79005,"location_precision":"source supplied","lon":-77.58538,"name":"Gainesville West","operator":"Unknown","source_status":"permitted","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-gainesville-west"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"datacentersexposed-f5850e46160db134","lat":30.26105,"location_precision":"source supplied","lon":-97.72212,"name":"Alpheus DataCenter","operator":"Unknown","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/379199519"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/alpheus-datacenter-osmway-379199519"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379199519"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-f5aaaf74eebe4543","lat":38.77444,"location_precision":"source supplied","lon":-77.58562,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1287260553"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-1287260553"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Plano","confidence":"low","contains_osm":true,"id":"datacentersexposed-f5b2c0a6e148b222","lat":33.00703,"location_precision":"source supplied","lon":-96.66635,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/flexential-dallas-plano-osmway-650412346","value":18.0}],"name":"Flexential Dallas - Plano","operator":"Flexential Corp.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/650412346"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/flexential-dallas-plano-osmway-650412346"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/650412346"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Eastport","confidence":"medium","id":"datacentersexposed-f634991b558fa647","lat":44.94704,"location_precision":"source supplied","lon":-67.01703,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/deepgreen-western-passage-spv-llc-data-center","value":51.0}],"name":"DeepGreen Western Passage SPV LLC  Data Center","operator":"DeepGreen Western Passage SPV LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/underwater-data-center-powered-by-tidal-energy-proposed-off-the-coast-of-maine/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/deepgreen-western-passage-spv-llc-data-center"}],"state":"Maine","status":"planned"},{"ai_classification":"unknown","city":"Seattle","confidence":"low","contains_osm":true,"id":"datacentersexposed-f63adbaeca7e4fd9","lat":47.61896,"location_precision":"source supplied","lon":-122.34853,"name":"KOMO Plaza West","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/417682781"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/komo-plaza-west-osmway-417682781"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/417682781"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sand Springs","confidence":"medium","id":"datacentersexposed-f6e181321569a124","lat":36.24621,"location_precision":"source supplied","lon":-96.10994,"name":"Project Spring","operator":"Unknown","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/sand-springs-oklahoma-to-consider-project-spring-data-center-proposal/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-spring"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"North Slope Borough","confidence":"medium","id":"datacentersexposed-f71d21945da1ac4f","lat":69.90071,"location_precision":"source supplied","lon":-148.81477,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stak-energy-data-center","value":3000.0}],"name":"Stak Energy Data Center","operator":"Stak","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/stak-energy-proposes-3gw-natural-gas-powered-data-center-in-alaskas-north-slope/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stak-energy-data-center"}],"state":"Alaska","status":"planned"},{"ai_classification":"unknown","city":"Fairburn","confidence":"medium","id":"datacentersexposed-f71f3c887e2ba297","lat":33.52815,"location_precision":"source supplied","lon":-84.6147,"name":"T5 ATL IV","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/t5-files-to-develop-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/t5-atl-iv"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Jackson Twp/ Joliet","confidence":"medium","id":"datacentersexposed-f76ce2841840c264","lat":41.46523,"location_precision":"source supplied","lon":-88.06284,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/powerhouse-data-centers","value":1800.0}],"name":"PowerHouse Data Centers","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/powerhouse-data-centers"}],"state":"Illinois","status":"planned"},{"ai_classification":"unknown","city":"La Grange","confidence":"medium","id":"datacentersexposed-f78d4d688a4db10b","lat":38.39444,"location_precision":"source supplied","lon":-85.4094,"name":"Project Lincoln: OC Data Center (second version)","operator":"WHP","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-lincoln-oc-data-center-second-version"}],"state":"Kentucky","status":"planned"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"datacentersexposed-f796bf8c011c5540","lat":29.46661,"location_precision":"source supplied","lon":-98.68809,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cyrusone-san-antonio-i-osmway-509611432","value":9.0}],"name":"CyrusOne San Antonio I","operator":"CyrusOne LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/509611432"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cyrusone-san-antonio-i-osmway-509611432"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611432"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-f7c7e6981d83ec50","lat":41.13439,"location_precision":"source supplied","lon":-96.1559,"name":"Google","operator":"Google LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1237494981"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/google-osmway-1237494981"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Troutville (Botetourt County)","confidence":"medium","id":"datacentersexposed-f7d08fdab992985c","lat":37.44555,"location_precision":"source supplied","lon":-79.9223,"name":"Google Data Center","operator":"Google LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/google-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Ruther Glen","confidence":"medium","id":"datacentersexposed-f822fa5b284afccb","lat":37.95119,"location_precision":"source supplied","lon":-77.42421,"name":"Caroline Center for Innovation - North","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/caroline-center-for-innovation-north"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"medium","id":"datacentersexposed-f831e87edeac9d19","lat":32.64334,"location_precision":"source supplied","lon":-97.25621,"name":"Black Mountain Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/black-mountain-data-center"}],"state":"Texas","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","contains_osm":true,"id":"datacentersexposed-f83c0c4188be2471","lat":37.38827,"location_precision":"source supplied","lon":-121.88845,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-san-jose-sv3-osmway-460076753","value":4.6}],"name":"Equinix San Jose SV3","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/460076753"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-san-jose-sv3-osmway-460076753"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460076753"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Wilsonville","confidence":"medium","id":"datacentersexposed-f8a5d37b29e19773","lat":33.257,"location_precision":"source supplied","lon":-86.495,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://alabamareflector.com/2025/08/24/wilsonville-residents-seek-preemptive-strike-against-massive-data-center-project/","value":1008.0}],"name":"Wilsonville Data Center","operator":"NorthPoint Development","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://alabamareflector.com/2025/08/24/wilsonville-residents-seek-preemptive-strike-against-massive-data-center-project/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/wilsonville-data-center"}],"state":"Alabama","status":"planned"},{"ai_classification":"unknown","city":"Middletown","confidence":"medium","id":"datacentersexposed-f8ae4fc5abe690e6","lat":40.19428,"location_precision":"source supplied","lon":-76.73145,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/crane-clean-energy-center-three-mile-island-pa-pg","value":835.0}],"name":"Crane Clean Energy Center (Three Mile Island)","operator":"Constellation Energy","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.constellationenergy.com/news/2024/Constellation-to-Launch-Crane-Clean-Energy-Center-Restoring-Jobs-and-Carbon-Free-Power-to-The-Grid.html"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/crane-clean-energy-center-three-mile-island-pa-pg"}],"state":"Pennsylvania","status":"under construction"},{"ai_classification":"unknown","city":"Oxford","confidence":"medium","id":"datacentersexposed-f8d98889d5b53a82","lat":33.65342,"location_precision":"source supplied","lon":-83.8231,"name":"Gregory Road Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/plans-filed-for-14-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/gregory-road-data-center"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Santa Fe","confidence":"low","id":"datacentersexposed-f8e43e5b182bdca6","lat":35.67246,"location_precision":"source supplied","lon":-105.95658,"name":"New Mexico State Data Center (Simms Building)","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/318069356"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/john-f-simms-building-osmway-318069356"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","contains_osm":true,"id":"datacentersexposed-f8e966adfd354796","lat":33.77769,"location_precision":"source supplied","lon":-84.42115,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/qts-atlanta-data-center-1-osmway-269847438","value":70.0}],"name":"QTS Atlanta Data Center 1","operator":"QTS Realty Trust, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/269847438"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/qts-atlanta-data-center-1-osmway-269847438"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/269847438"}],"state":"Georgia","status":"operating"},{"ai_classification":"unknown","city":"Oneonta","confidence":"medium","id":"datacentersexposed-f8f9b3098d4813e1","lat":42.45303,"location_precision":"source supplied","lon":-75.1168,"name":"Oneonta Data Center","operator":"Unknown","source_status":"blocked","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.allotsego.com/residents-oppose-data-center-proposal-in-heated-board-meeting/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/oneonta-data-center"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-f92c860e91b1035e","lat":38.71929,"location_precision":"source supplied","lon":-77.4968,"name":"CloudHQ Manassas Corporate Center (MCC)","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-cloudhq-manassas-corporate-center-mcc"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f92ed66bbce923a1","lat":40.5636,"location_precision":"source supplied","lon":-112.0478,"name":"eBay","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/240724127"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ebay-osmway-240724127"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/240724127"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/931732650"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f933ee701ef5e71c","lat":40.54426,"location_precision":"source supplied","lon":-75.65437,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/allentown-tekpark-osmway-777196805","value":17.0}],"name":"Allentown-TekPark","operator":"TierPoint, LLC","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/777196805"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/allentown-tekpark-osmway-777196805"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/777196805"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"JAMESTOWN","confidence":"medium","id":"datacentersexposed-f98da9b25d47aabc","lat":47.02731,"location_precision":"source supplied","lon":-98.67925,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/apld-jamestown-datacenter-110071785777","value":100.0}],"name":"APLD JAMESTOWN DATACENTER","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110071785777"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/apld-jamestown-datacenter-110071785777"}],"state":"North Dakota","status":"operating"},{"ai_classification":"unknown","city":"DALEVILLE","confidence":"medium","id":"datacentersexposed-f9bc2b8faf09d32e","lat":37.4417,"location_precision":"source supplied","lon":-79.9127,"name":"Greenfield","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/google-buys-land-for-data-center-in-botetourt-county-west-virginia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/greenfield"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Port Washington","confidence":"medium","id":"datacentersexposed-f9d3096aa785e5ae","lat":43.38855,"location_precision":"source supplied","lon":-87.86928,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stargate-lighthouse-port-washington-wi-pg","value":902.0}],"name":"Stargate Lighthouse (Port Washington)","operator":"Vantage Data Centers Holdings, LLC","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/stargate-lighthouse-port-washington-wi-pg"}],"state":"Wisconsin","status":"under construction"},{"ai_classification":"unknown","city":"Marietta","confidence":"medium","id":"datacentersexposed-f9e2f5068ffaee79","lat":33.99401,"location_precision":"source supplied","lon":-84.5527,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/grindcap","value":108.0}],"name":"Grindcap","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/108mw-data-center-campus-granted-zoning-approval-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/grindcap"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-f9e722e4f7dc6378","lat":30.33143,"location_precision":"source supplied","lon":-81.66243,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/cologix-jacksonville-jax1-osmway-497151852","value":10.0}],"name":"Cologix Jacksonville JAX1","operator":"Cologix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/497151852"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/cologix-jacksonville-jax1-osmway-497151852"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/497151852"}],"state":"Florida","status":"operating"},{"ai_classification":"unknown","city":"Abilene","confidence":"medium","id":"datacentersexposed-f9e94c6f35ae0961","lat":32.44645,"location_precision":"source supplied","lon":-99.74759,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/stargate-abilene-lancium-clean-campus-tx-pg","value":1200.0}],"name":"Stargate Abilene (Lancium Clean Campus)","operator":"Crusoe","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/stargate-abilene-lancium-clean-campus-tx-pg"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"PITTSBURG","confidence":"medium","id":"datacentersexposed-f9f99b707fe443fd","lat":37.44192,"location_precision":"source supplied","lon":-94.74115,"name":"WILDCAT","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/wildcat-110071955119"}],"state":"Kansas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-f9fe7d49eb623e44","lat":38.7604,"location_precision":"source supplied","lon":-77.51751,"name":"Amazon Freedom Boulevard","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gisweb.pwcva.gov/arcgis/rest/services/CountyMapper/LandDevelopment/MapServer/11"}],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/pwc-amazon-freedom-boulevard"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-fa04a7825c770b82","lat":41.11309,"location_precision":"source supplied","lon":-73.38865,"name":"CyrusOne Norwalk","operator":"CyrusOne LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/571010571"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cyrusone-norwalk-osmway-571010571"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Mesa","confidence":"medium","id":"datacentersexposed-fa1d589ab3dd9f08","lat":33.33552,"location_precision":"source supplied","lon":-111.64406,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/edged-mesa-data-center","value":36.0}],"name":"Edged Mesa Data Center","operator":"Edged","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/edged-launches-36mw-data-center-in-phoenix-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/edged-mesa-data-center"}],"state":"Arizona","status":"operating"},{"ai_classification":"unknown","city":"San Jose","confidence":"medium","id":"datacentersexposed-fa776a622ffe9135","lat":37.23,"location_precision":"source supplied","lon":-121.84,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-sv-campus","value":380.0}],"name":"Equinix Silicon Valley Campus","operator":"Equinix, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/equinix-sv-campus"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-facbdc110327ffff","lat":47.40751,"location_precision":"source supplied","lon":-120.21401,"name":"Actapio","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/813688320"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/actapio-osmway-813688320"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/813688320"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Durham","confidence":"low","contains_osm":true,"id":"datacentersexposed-fae9e8333b271aa2","lat":35.8814,"location_precision":"source supplied","lon":-78.85155,"name":"Windstream Communications","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/7324132050"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/windstream-communications-osmnode-7324132050"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7324132050"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"medium","id":"datacentersexposed-faeb9c27d16823aa","lat":33.08641,"location_precision":"source supplied","lon":-96.6802,"name":"EXPERIAN DATA CENTER ALLEN","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://gis-tceq.opendata.arcgis.com/datasets/daece6e3181140f69093ab69cf9ae0ba/explore?layer=0&showTable=true"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/experian-data-center-allen"}],"state":"Texas","status":"operating"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"datacentersexposed-faf06ab5c477f294","lat":40.27233,"location_precision":"source supplied","lon":-112.01506,"name":"Meta Eagle Mountain Data Center","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1035123473"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-eagle-mountain-data-center-osmway-1035123473"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-fb1ba0bcb722947f","lat":41.12538,"location_precision":"source supplied","lon":-104.90889,"name":"CYS42 Datacenter","operator":"Compass Datacenters, LLC","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1386017501"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/cys42-datacenter-osmway-1386017501"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017501"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"McLean","confidence":"low","id":"datacentersexposed-fb6b9e6772de1b15","lat":38.91991,"location_precision":"source supplied","lon":-77.21359,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/databank-mclean-iad2-osmway-239147724","value":3.0}],"name":"DataBank McLean IAD2","operator":"DataBank Holdings, Ltd.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/239147724"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/databank-mclean-iad2-osmway-239147724"}],"state":"Virginia","status":"operating"},{"ai_classification":"unknown","city":"Wheatfield","confidence":"medium","id":"datacentersexposed-fb7a41e7616f0950","lat":41.22792,"location_precision":"source supplied","lon":-87.00762,"name":"Amazon Data Center","operator":"Amazon.com, Inc.","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/amazon-plans-nine-building-data-center-campus-in-wheatfield-indiana/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/amazon-data-center"}],"state":"Indiana","status":"planned"},{"ai_classification":"unknown","city":"Rockingham","confidence":"medium","id":"datacentersexposed-fb9929332ddae46d","lat":34.93932,"location_precision":"source supplied","lon":-79.77395,"name":"AWS Richmond County (Energy Way)","operator":"Amazon Data Services, Inc.","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://governor.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/aws-richmond-county-energy-way-nc-pg"}],"state":"North Carolina","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-fba0d8cef8936647","lat":42.68795,"location_precision":"source supplied","lon":-84.64304,"name":"Liquid Web","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/544536822"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/liquid-web-osmway-544536822"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/544536822"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Palmetto","confidence":"medium","id":"datacentersexposed-fba369354b9e2ee0","lat":33.50277,"location_precision":"source supplied","lon":-84.6692,"name":"Project Peach","operator":"NorthC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/strategic-files-for-21m-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-peach"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"LANCASTER","confidence":"medium","id":"datacentersexposed-fbd29c39fe912891","lat":39.72703,"location_precision":"source supplied","lon":-82.68311,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/google-lancaster-epoch","value":164.0}],"name":"Google Lancaster","operator":"Google LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/google-lancaster-epoch"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Houston","confidence":"low","contains_osm":true,"id":"datacentersexposed-fbd8d23eed15d207","lat":29.65815,"location_precision":"source supplied","lon":-95.44331,"name":"Rice Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/671838900"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/rice-data-center-osmway-671838900"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/671838900"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Bristow","confidence":"low","id":"datacentersexposed-fbf28a9a250eaf3c","lat":38.77806,"location_precision":"source supplied","lon":-77.59491,"name":"VA 4","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/46831933"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/va-4-osmway-46831933"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-fc01635ccfb394d3","lat":44.31,"location_precision":"source supplied","lon":-120.85,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/apple-prineville","value":320.0}],"name":"Apple Prineville","operator":"Apple Data Services LLC","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/apple-prineville"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Seattle","confidence":"low","contains_osm":true,"id":"datacentersexposed-fc4b2681dc909bf8","lat":47.61436,"location_precision":"source supplied","lon":-122.33886,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/westin-building-osmway-223928497","value":13.0}],"name":"Westin Building","operator":"Digital Realty Trust, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/223928497"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/westin-building-osmway-223928497"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/223928497"}],"state":"Washington","status":"operating"},{"ai_classification":"unknown","city":"Page","confidence":"medium","id":"datacentersexposed-fc9af87fe07c917e","lat":36.89838,"location_precision":"source supplied","lon":-111.48315,"name":"Page Data Center","operator":"Huntley LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-proposed-for-500-acre-site-in-page-arizona/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/page-data-center"}],"state":"Arizona","status":"planned"},{"ai_classification":"unknown","city":"Greensboro","confidence":"medium","id":"datacentersexposed-fca80fab7e91a76a","lat":36.05276,"location_precision":"source supplied","lon":-79.9516,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/dc-blox-high-point","value":10.0}],"name":"DC Blox: High Point","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/dc-blox-high-point"}],"state":"North Carolina","status":"planned"},{"ai_classification":"unknown","city":"Colorado Springs","confidence":"medium","id":"datacentersexposed-fcb1814a448f8611","lat":38.894,"location_precision":"source supplied","lon":-104.85778,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/project-taurus","value":50.0}],"name":"Project Taurus","operator":"Raeden","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/50mw-data-center-could-be-built-in-colorado-springs/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-taurus"}],"state":"Colorado","status":"planned"},{"ai_classification":"unknown","city":"Social Circle","confidence":"medium","id":"datacentersexposed-fcb3102e330895b7","lat":33.556,"location_precision":"source supplied","lon":-83.847,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/meta-newton-county","value":460.0}],"name":"Meta Newton County","operator":"Facebook USA, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/meta-newton-county"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-fccaf135ed90911e","lat":36.0031,"location_precision":"source supplied","lon":-78.93853,"name":"Brandaleone Lab for Data and Visualization","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/10567817971"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/brandaleone-lab-for-data-and-visualization-osmnode-10567817971"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10567817971"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Kansas City","confidence":"low","contains_osm":true,"id":"datacentersexposed-fcd79323e5917c0e","lat":39.29548,"location_precision":"source supplied","lon":-94.67801,"name":"Black Rock Financial Management","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/195165374"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/black-rock-financial-management-osmway-195165374"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/195165374"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Union City","confidence":"medium","id":"datacentersexposed-fd04ea465d0012ea","lat":33.56321,"location_precision":"source supplied","lon":-84.5129,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/atl03-red-oak","value":150.0}],"name":"ATL03/Red Oak","operator":"TA Realty LLC, Brightstar Commercial Properties LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/ta-realty-files-for-1-million-sq-ft-data-center-campus-outside-atlanta-georgia/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/atl03-red-oak"}],"state":"Georgia","status":"planned"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"datacentersexposed-fd2f791ae9031ef1","lat":37.24123,"location_precision":"source supplied","lon":-121.78475,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/equinix-sv10-osmway-600806974","value":40.0}],"name":"Equinix SV10","operator":"Equinix, Inc.","osm_derived":true,"source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/600806974"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/equinix-sv10-osmway-600806974"}],"state":"California","status":"operating"},{"ai_classification":"unknown","city":"Searcy","confidence":"low","contains_osm":true,"id":"datacentersexposed-fd57ce55097abfd2","lat":35.24922,"location_precision":"source supplied","lon":-91.74091,"name":"Searcy Information Technologies","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1020721870"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/searcy-information-technologies-osmway-1020721870"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020721870"}],"state":"Arkansas","status":"unknown"},{"ai_classification":"unknown","city":"Alpharetta","confidence":"low","contains_osm":true,"id":"datacentersexposed-fd6ba7f50527ce87","lat":34.10338,"location_precision":"source supplied","lon":-84.21497,"name":"UPS Data Center","operator":"Prime Data Centers","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/1282332209"}],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/ups-data-center-osmway-1282332209"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1282332209"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"East Stroudsburg","confidence":"medium","id":"datacentersexposed-fda145152f5a340e","lat":41.00482,"location_precision":"source supplied","lon":-75.14695,"name":"Smithfield Gateway Data Center","operator":"Gateway Development","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/data-center-could-come-to-stroudsburg-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/smithfield-gateway-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Ashburn","confidence":"high","contains_osm":true,"id":"datacentersexposed-fdc76878b17936d6","lat":39.07976,"location_precision":"source supplied","lon":-77.50655,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/vantage-va-3","value":288.0}],"name":"Vantage VA 3","operator":"Vantage Data Centers Holdings, LLC","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/vantage-va-3"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560626428"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"York","confidence":"medium","id":"datacentersexposed-fdd5b185c17934e6","lat":40.00698,"location_precision":"source supplied","lon":-76.7439,"name":"Fairview Crossroads LLC Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/750000-sq-ft-data-center-could-be-built-in-fairview-township-pennsylvania/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/fairview-crossroads-llc-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-fe0469dc45e18394","lat":44.29594,"location_precision":"source supplied","lon":-120.88727,"name":"Meta","operator":"Facebook USA, Inc.","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/321385147"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-osmway-321385147"},{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/way/772827601"}],"updated":"2026-06-21","url":"https://datacentersexposed.com/facilities/meta-osmway-772827601"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/321385147"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/373945186"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/706759845"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/772827597"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/772827601"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1152747559"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1152748037"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"South Strabane Township","confidence":"medium","id":"datacentersexposed-fed3f37e26b60a37","lat":40.17106,"location_precision":"source supplied","lon":-80.16807,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/zediker-station-data-center","value":500.0}],"name":"Zediker Station Data Center","operator":"CNX Resources/Jones Lang LaSalle (JLL)","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/zediker-station-data-center"}],"state":"Pennsylvania","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-feedce12bbbf0359","lat":47.21,"location_precision":"source supplied","lon":-119.85,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/amazon-quincy","value":540.0}],"name":"AWS Quincy","operator":"Amazon Data Services, Inc.","source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-14","url":"https://datacentersexposed.com/facilities/amazon-quincy"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sperry","confidence":"medium","id":"datacentersexposed-fefb3c0e96a38faa","lat":36.26513,"location_precision":"source supplied","lon":-95.9034,"name":"Project Clydesdale","operator":"Beale Infrastructure","source_status":"under_construction","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/500-acre-data-center-campus-planned-in-tulsa-oklahoma/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/project-clydesdale"}],"state":"Oklahoma","status":"under construction"},{"ai_classification":"unknown","city":"Unknown","confidence":"medium","id":"datacentersexposed-ff25038afe444a6f","lat":39.00171,"location_precision":"source supplied","lon":-77.57102,"name":"Spring Valley Technology Park","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-10-19","url":"https://datacentersexposed.com/facilities/loudoun-spring-valley-technology-park"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Emporia","confidence":"medium","id":"datacentersexposed-ff5777af8a8458bb","lat":36.73674,"location_precision":"source supplied","lon":-77.51469,"name":"Mid-Atlantic Advanced Manufacturing Center","operator":"Arup Americas Inc","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/mid-atlantic-advanced-manufacturing-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"Nesquehoning","confidence":"medium","id":"datacentersexposed-ff597dcadc4587ca","lat":40.8556,"location_precision":"source supplied","lon":-75.8781,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/bitfarm-bitcoin-panther-creek","value":60.0}],"name":"Bitfarm Bitcoin Panther Creek","operator":"BitFarms/T5","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/bitfarm-bitcoin-panther-creek"}],"state":"Pennsylvania","status":"operating"},{"ai_classification":"unknown","city":"Ashburn","confidence":"medium","id":"datacentersexposed-ff6ff539eed3e09e","lat":39.06702,"location_precision":"source supplied","lon":-77.47857,"name":"TELOS DATA CENTER","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/telos-data-center"}],"state":"Virginia","status":"planned"},{"ai_classification":"unknown","city":"BIRMINGHAM","confidence":"medium","id":"datacentersexposed-ffa1cde1bc35de6c","lat":33.40707,"location_precision":"source supplied","lon":-86.91136,"name":"CDC BIRMINGHAM","operator":"Unknown","source_status":"operating","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://echo.epa.gov/detailed-facility-report?fid=110028270190"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/cdc-birmingham-110028270190"}],"state":"Alabama","status":"operating"},{"ai_classification":"unknown","city":"Osawatomie","confidence":"medium","id":"datacentersexposed-fff3922b89cdf5a2","lat":38.51605,"location_precision":"source supplied","lon":-94.93108,"mw":[{"basis":"Source-stated MW; load basis unspecified","source":"https://datacentersexposed.com/facilities/alcove-development-data-center","value":50.0}],"name":"Alcove Development Data Center","operator":"Unknown","source_status":"proposed","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.datacenterdynamics.com/en/news/115-acre-data-center-could-come-to-osawatomie-kansas-says-local-government/"}],"updated":"2026-06-18","url":"https://datacentersexposed.com/facilities/alcove-development-data-center"}],"state":"Kansas","status":"planned"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"datacentersexposed-ffff19f6cee92293","lat":37.86985,"location_precision":"source supplied","lon":-122.25982,"name":"Open Computing Facility","operator":"Unknown","osm_derived":true,"source_status":"mapped","sources":[{"dataset":"datacentersexposed","evidence":[{"url":"https://www.openstreetmap.org/node/5146323411"}],"updated":"2026-06-12","url":"https://datacentersexposed.com/facilities/open-computing-facility-osmnode-5146323411"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/5146323411"}],"state":"California","status":"unknown"},{"ai_classification":"Epoch AI inventory","city":"Kuna","confidence":"high","id":"epoch-0baecdaa965ebb4a","lat":43.47,"location_precision":"approximate","lon":-116.27,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-kuna","value":152.0}],"name":"Meta Kuna","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-kuna"}],"state":"Idaho","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Red Oak","confidence":"high","id":"epoch-0bf6cf4d5efd7921","lat":32.54,"location_precision":"approximate","lon":-96.79,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-red-oak","value":77.0}],"name":"Google Red Oak","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-red-oak"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Burlington","confidence":"high","id":"epoch-0c752fda8889cc0f","lat":31,"location_precision":"approximate","lon":-97.01,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam","value":0.0}],"name":"OpenAI Stargate Milam","operator":"Softbank #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-milam"}],"state":"Texas","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Santa Teresa","confidence":"high","id":"epoch-0d43f42c0e02877a","lat":31.82,"location_precision":"approximate","lon":-106.68,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-new-mexico","value":0.0}],"name":"OpenAI Stargate New Mexico","operator":"Oracle #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-new-mexico"}],"state":"New Mexico","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Dalton","confidence":"high","id":"epoch-16459cd40e8ae644","lat":34.71,"location_precision":"approximate","lon":-84.95,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-dalton-1-2","value":28.0}],"name":"CoreWeave Dalton 1 & 2","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-dalton-1-2"}],"state":"Georgia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Muskogee","confidence":"high","id":"epoch-16cf5977d71c5c64","lat":35.69,"location_precision":"approximate","lon":-95.39,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-muskogee-ok","value":0.0}],"name":"CoreWeave Muskogee OK","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-muskogee-ok"}],"state":"Oklahoma","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Denton","confidence":"high","id":"epoch-1e74bcbb9cf5ac92","lat":33.21,"location_precision":"approximate","lon":-97.21,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-denton-tx","value":262.0}],"name":"CoreWeave Denton TX","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-denton-tx"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Pryor","confidence":"high","id":"epoch-20db9e6dbf858036","lat":36.25,"location_precision":"approximate","lon":-95.32,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-pryor-north","value":368.0}],"name":"Google Pryor (North)","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-pryor-north"}],"state":"Oklahoma","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Berwick","confidence":"high","id":"epoch-27e46fc0a44b7f54","lat":41.09,"location_precision":"approximate","lon":-76.15,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/aws-berwick","value":108.0}],"name":"AWS Berwick","operator":"Amazon #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/aws-berwick"}],"state":"Pennsylvania","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Unknown","confidence":"high","id":"epoch-28ebfbea1f98d4e8","lat":33.35,"location_precision":"approximate","lon":-111.68,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-mesa","value":183.0}],"name":"Google Mesa","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-mesa"}],"state":"Unknown","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Cedar Rapids","confidence":"high","id":"epoch-2b975c3f288752c1","lat":41.92,"location_precision":"approximate","lon":-91.72,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-cedar-rapids","value":0.0}],"name":"Google Cedar Rapids","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-cedar-rapids"},{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/google-cedar-rapids-epoch"}],"state":"Iowa","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Ellendale","confidence":"high","id":"epoch-2c8363ba97b432f9","lat":46.02,"location_precision":"approximate","lon":-98.57,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-ellendale-nd","value":68.0}],"name":"CoreWeave Ellendale ND","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-ellendale-nd"}],"state":"North Dakota","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Montgomery","confidence":"high","id":"epoch-2e371aae8d55a957","lat":32.27,"location_precision":"approximate","lon":-86.33,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-montgomery","value":153.0}],"name":"Meta Montgomery","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-montgomery"}],"state":"Alabama","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Abilene","confidence":"high","id":"epoch-2fea4545dfa3f63a","lat":32.5,"location_precision":"approximate","lon":-99.79,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene","value":824.0}],"name":"OpenAI Stargate Abilene","operator":"Oracle #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-abilene"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Sandston","confidence":"high","id":"epoch-33d6a5748a9ed21b","lat":37.48,"location_precision":"approximate","lon":-77.25,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-3","value":144.0}],"name":"QTS Richmond 3","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-3"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Lancaster","confidence":"high","id":"epoch-3d14449a552fe7e6","lat":39.73,"location_precision":"approximate","lon":-82.69,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-lancaster","value":137.0}],"name":"Google Lancaster","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-lancaster"}],"state":"Ohio","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Marble","confidence":"high","id":"epoch-474c0b4c27ed4de6","lat":35.19,"location_precision":"approximate","lon":-83.92,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-marble-nc","value":65.0}],"name":"CoreWeave Marble NC","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-marble-nc"},{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coreweave-marble-nc-epoch"}],"state":"North Carolina","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Lordstown","confidence":"high","id":"epoch-491bccb74a0a53a6","lat":41.15,"location_precision":"approximate","lon":-80.88,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown","value":0.0}],"name":"OpenAI Stargate Lordstown","operator":"Softbank #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-lordstown"},{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/openai-stargate-lordstown-epoch"}],"state":"Ohio","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Springfield","confidence":"high","id":"epoch-4ab4e255898efda3","lat":41.11,"location_precision":"approximate","lon":-96.15,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-sarpy","value":80.0}],"name":"Meta Sarpy","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-sarpy"}],"state":"Nebraska","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Jeffersonville","confidence":"high","id":"epoch-4bbb19a1d8299536","lat":38.37,"location_precision":"approximate","lon":-85.66,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-jeffersonville","value":178.0}],"name":"Meta Jeffersonville","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-jeffersonville"}],"state":"Indiana","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Los Lunas","confidence":"high","id":"epoch-4c09f051fbfd0b80","lat":34.82,"location_precision":"approximate","lon":-106.79,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-los-lunas","value":118.0}],"name":"Meta Los Lunas","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-los-lunas"}],"state":"New Mexico","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"New Albany","confidence":"high","id":"epoch-4cafd7ce65ad86fb","lat":40.11,"location_precision":"approximate","lon":-82.74,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/aws-new-albany","value":213.0}],"name":"AWS New Albany","operator":"Amazon #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/aws-new-albany"}],"state":"Ohio","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Goodyear","confidence":"high","id":"epoch-51cf2510651281d7","lat":33.41,"location_precision":"approximate","lon":-112.36,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/stream-phoenix","value":64.0}],"name":"Stream Phoenix","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/stream-phoenix"}],"state":"Arizona","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Ridgeland","confidence":"high","id":"epoch-55d4e82763623e00","lat":32.41,"location_precision":"approximate","lon":-90.19,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/amazon-ridgeland","value":228.0}],"name":"Amazon Ridgeland","operator":"Amazon #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/amazon-ridgeland"}],"state":"Mississippi","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Arcola","confidence":"high","contains_osm":true,"id":"epoch-59738a1dbff1dc5b","lat":38.94,"location_precision":"approximate","lon":-77.53,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-arcola","value":77.0}],"name":"Google Arcola","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-arcola"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/693385812"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714622339"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1173770902"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Abilene","confidence":"high","id":"epoch-599c633393230b1b","lat":32.54,"location_precision":"approximate","lon":-99.55,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-shackelford","value":0.0}],"name":"OpenAI Stargate Shackelford","operator":"Oracle #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-shackelford"}],"state":"Texas","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Middleton Township, Wood County","confidence":"high","id":"epoch-5b06db2100f17430","lat":41.42,"location_precision":"approximate","lon":-83.64,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-bowling-green","value":0.0}],"name":"Meta Bowling Green","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-bowling-green"}],"state":"Ohio","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Canton","confidence":"high","id":"epoch-5bc5f50a634339be","lat":32.6,"location_precision":"approximate","lon":-90.09,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/amazon-madison-mega-site","value":284.0}],"name":"Amazon Madison Mega Site","operator":"Amazon #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/amazon-madison-mega-site"}],"state":"Mississippi","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Aiken","confidence":"high","id":"epoch-62201eb347dd45c7","lat":33.64,"location_precision":"approximate","lon":-81.84,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-aiken","value":69.0}],"name":"Meta Aiken","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-aiken"}],"state":"South Carolina","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Mount Pleasant","confidence":"high","id":"epoch-656b76b830329ba1","lat":42.68,"location_precision":"approximate","lon":-87.92,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin","value":369.0}],"name":"Microsoft Fairwater Wisconsin","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-wisconsin"}],"state":"Wisconsin","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Lancaster","confidence":"high","id":"epoch-66c73f0457718aaa","lat":40.04,"location_precision":"approximate","lon":-76.31,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-lancaster-greenfield-site","value":0.0}],"name":"CoreWeave Lancaster Greenfield site","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-lancaster-greenfield-site"},{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania — CoreWeave","publisher":"CoreWeave","retrievedAt":"2026-07-05","url":"https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx"},{"kind":"press","label":"CoreWeave plans $6bn data center in Lancaster, Pennsylvania — Data Center Dynamics","publisher":"Data Center Dynamics","retrievedAt":"2026-08-02","url":"https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/"},{"kind":"filing","label":"Community Benefits Agreement Summary — City of Lancaster, PA","publisher":"City of Lancaster, PA","retrievedAt":"2026-07-06","url":"https://www.cityoflancasterpa.gov/wp-content/uploads/2025/11/Community-Benefits-Agreement-Summary-1-1.pdf"},{"kind":"press","label":"AI cloud computing firm announces plans for $6B data center in Lancaster County","publisher":"LancasterOnline","retrievedAt":"2026-08-02","url":"https://lancasteronline.com/news/local/ai-cloud-computing-firm-announces-plans-for-6b-data-center-in-lancaster-county/article_269bec19-6d27-41f0-8486-01149492ecf0.html"}],"updated":"2026-10-30","url":"https://www.compute-atlas.com/facilities/coreweave-lancaster-pa"}],"state":"Pennsylvania","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Kansas City","confidence":"high","id":"epoch-6ab59e313f789f76","lat":39.18,"location_precision":"approximate","lon":-94.46,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-kansas-city-east","value":105.0}],"name":"Google Kansas City East","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-kansas-city-east"}],"state":"Missouri","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"The Dalles","confidence":"high","id":"epoch-6f97b04cacdc0615","lat":45.62,"location_precision":"approximate","lon":-121.21,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-the-dalles","value":154.0}],"name":"Google The Dalles","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-the-dalles"},{"dataset":"compute_atlas","evidence":[{"kind":"press","label":"Google makes move to break ground on new data center in The Dalles — site is 3500 River Road at the Port of The Dalles, a former aluminum smelter site; 290,000 sq ft; up to $600 million; described as 'the fourth such data center for Google in The Dalles'","publisher":"Columbia Community Connection","retrievedAt":"2026-08-14","url":"https://columbiacommunityconnection.com/the-dalles/google-making-moves-to-break-ground-on-first-new-data-center-in-the-dalles"}],"updated":"2026-09-10","url":"https://www.compute-atlas.com/facilities/google-the-dalles-port-river-road-or"}],"state":"Oregon","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Columbus","confidence":"high","contains_osm":true,"id":"epoch-723a30c987f06019","lat":39.85,"location_precision":"approximate","lon":-83,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-columbus","value":303.0}],"name":"Google Columbus","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-columbus"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"Epoch AI data center directory: Google Columbus (operational; building timeline from satellite imagery)","publisher":"Epoch AI","retrievedAt":"2026-10-14","url":"https://epoch.ai/data/ai-data-centers/directory/google-columbus"}],"updated":"2026-10-14","url":"https://www.compute-atlas.com/facilities/google-columbus-rathmell-road-oh"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196814"}],"state":"Ohio","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Barker","confidence":"high","id":"epoch-8459bb125d52182b","lat":43.36,"location_precision":"approximate","lon":-78.6,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/anthropic-lake-mariner","value":210.0}],"name":"Anthropic Lake Mariner","operator":"AI XPV Platform #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-lake-mariner"}],"state":"New York","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Omaha","confidence":"high","id":"epoch-86139c25fda2eed4","lat":41.34,"location_precision":"approximate","lon":-96.09,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-omaha","value":237.0}],"name":"Google Omaha","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-omaha"}],"state":"Nebraska","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Rosemount","confidence":"high","id":"epoch-8ad7b07b0135d736","lat":44.73,"location_precision":"approximate","lon":-93.06,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-rosemount","value":178.0}],"name":"Meta Rosemount","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-rosemount"}],"state":"Minnesota","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"New Albany","confidence":"high","contains_osm":true,"id":"epoch-8ba89c68489cfa1e","lat":40.06,"location_precision":"approximate","lon":-82.77,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-new-albany","value":333.0}],"name":"Google New Albany","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-new-albany"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844391358"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1222007663"}],"state":"Ohio","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Vineland","confidence":"high","contains_osm":true,"id":"epoch-8e792e280b72547d","lat":39.43,"location_precision":"approximate","lon":-75.02,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-nebius-new-jersey","value":50.0}],"name":"Microsoft-Nebius New Jersey","operator":"Nebius #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-nebius-new-jersey"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1553894888"}],"state":"New Jersey","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"San Antonio","confidence":"high","contains_osm":true,"id":"epoch-8f91091c13bf07c5","lat":29.42,"location_precision":"approximate","lon":-98.8,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-sat40","value":75.0}],"name":"Microsoft SAT40","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-sat40"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/521300038"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/639176155"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/639176157"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Memphis","confidence":"high","id":"epoch-93bda3125feeb4e8","lat":34.99,"location_precision":"approximate","lon":-90.04,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/colossus-2","value":946.0}],"name":"Colossus 2","operator":"SpaceXAI #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/colossus-2"}],"state":"Tennessee","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Fayetteville","confidence":"high","id":"epoch-95493b65dbc2fe94","lat":33.46,"location_precision":"approximate","lon":-84.52,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta","value":636.0}],"name":"Microsoft Fairwater Atlanta","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-fairwater-atlanta"}],"state":"Georgia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Midlothian","confidence":"high","id":"epoch-96593ecd4d372db3","lat":32.44,"location_precision":"approximate","lon":-97.06,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-midlothian","value":103.0}],"name":"Google Midlothian","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-midlothian"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Hillsboro","confidence":"high","id":"epoch-985a571484e434a1","lat":45.56,"location_precision":"approximate","lon":-122.94,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-qts-hillsboro-2","value":180.0}],"name":"Meta-QTS Hillsboro 2","operator":"Meta #likely","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-qts-hillsboro-2"}],"state":"Oregon","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Gallatin","confidence":"high","id":"epoch-987720243d9bf042","lat":36.41,"location_precision":"approximate","lon":-86.37,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-gallatin","value":87.0}],"name":"Meta Gallatin","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-gallatin"}],"state":"Tennessee","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Huntsville","confidence":"high","id":"epoch-9aa8d3846d28cacc","lat":34.85,"location_precision":"approximate","lon":-86.63,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-huntsville","value":146.0}],"name":"Meta Huntsville","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-huntsville"}],"state":"Alabama","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"San Antonio","confidence":"high","id":"epoch-9cab1b52206e88cf","lat":29.48,"location_precision":"approximate","lon":-98.68,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-sat14","value":47.0}],"name":"Microsoft SAT14","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-sat14"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Claude","confidence":"high","id":"epoch-9d52ad1318ba78f4","lat":35.02,"location_precision":"approximate","lon":-101.31,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/goodnight","value":0.0}],"name":"Goodnight","operator":"Google #speculative","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/goodnight"}],"state":"Texas","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Cheyenne","confidence":"high","id":"epoch-a6c3ac4f64786b1f","lat":41.08,"location_precision":"approximate","lon":-104.82,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-cheyenne","value":152.0}],"name":"Meta Cheyenne","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-cheyenne"}],"state":"Wyoming","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Clark","confidence":"high","id":"epoch-a71069e9ef7f338c","lat":39.49,"location_precision":"approximate","lon":-119.43,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-storey-county","value":161.0}],"name":"Google Storey County","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-storey-county"}],"state":"Nevada","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Sandston","confidence":"high","id":"epoch-ad1a94ee26059505","lat":37.49,"location_precision":"approximate","lon":-77.24,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-2","value":180.0}],"name":"QTS Richmond 2","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-2"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Holly Ridge","confidence":"high","id":"epoch-b56d0abf320d53fc","lat":32.51,"location_precision":"approximate","lon":-91.64,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-hyperion","value":0.0}],"name":"Meta Hyperion","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-hyperion"}],"state":"Louisiana","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"New Albany","confidence":"high","id":"epoch-b781111a5d1474b4","lat":40.09,"location_precision":"approximate","lon":-82.74,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-prometheus","value":471.0}],"name":"Meta Prometheus","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-prometheus"}],"state":"Ohio","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Eagle Mountain","confidence":"high","id":"epoch-ba9654a7c9b77ccc","lat":40.26,"location_precision":"approximate","lon":-112.03,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/qts-eagle-mountain","value":0.0}],"name":"QTS Eagle Mountain","operator":"Meta #speculative","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/qts-eagle-mountain"}],"state":"Utah","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Port Washington","confidence":"high","id":"epoch-be720379f881d8f5","lat":43.43,"location_precision":"approximate","lon":-87.86,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin","value":0.0}],"name":"OpenAI Stargate Wisconsin","operator":"Oracle #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-wisconsin"}],"state":"Wisconsin","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"New Carlisle","confidence":"high","id":"epoch-bf15b9391ecca06e","lat":41.68,"location_precision":"approximate","lon":-86.47,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle","value":1037.0}],"name":"Anthropic-Amazon New Carlisle","operator":"Amazon #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-amazon-new-carlisle"}],"state":"Indiana","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Atlanta","confidence":"high","id":"epoch-c01dbaa961fb44e5","lat":33.78,"location_precision":"approximate","lon":-84.42,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/xai-qts-atlanta","value":17.32971}],"name":"xAI QTS Atlanta","operator":"SpaceXAI #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/xai-qts-atlanta"}],"state":"Georgia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Papillion","confidence":"high","id":"epoch-c0fd1bfa7d8e4d75","lat":41.14,"location_precision":"approximate","lon":-96.15,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-papillion","value":237.0}],"name":"Google Papillion","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-papillion"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"},{"kind":"press","label":"Our work to build a more sustainable future in Nebraska (Google blog)","retrievedAt":"2026-07-24","url":"https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/our-work-to-build-a-more-sustainable-future-in-nebraska/"},{"kind":"press","label":"Omaha World-Herald — \"Google: Papillion is a go for $600 million data center — Sarpy County's 8th\"","retrievedAt":"2026-07-25","url":"https://omaha.com/news/nation-world/business/google-papillion-is-a-go-for-600-million-data-center-sarpy-countys-8th/article_71d55664-45c4-57f9-84b8-7b0c99938bfc.html"},{"kind":"press","label":"Groundbreaking launches Google data center in Papillion","publisher":"1011 NOW (KOLN/KGIN)","retrievedAt":"2026-08-14","url":"https://www.1011now.com/content/news/Groundbreaking-on-Google-data-center-in-Papillion-562163691.html"},{"kind":"press","label":"Improper redaction reveals Lincoln's Google Data Center water and electricity usage (More questions than answers about Lincoln's Google data center water, electricity usage)","publisher":"1011 NOW (KOLN)","retrievedAt":"2026-10-09","url":"https://www.1011now.com/2026/09/30/more-questions-than-answers-about-lincolns-google-data-center-water-electricity-usage/"}],"updated":"2026-10-09","url":"https://www.compute-atlas.com/facilities/google-papillion-ne"}],"state":"Nebraska","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Lincoln","confidence":"high","id":"epoch-c1cf213c556cf37a","lat":40.91,"location_precision":"approximate","lon":-96.65,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-lincoln","value":141.0}],"name":"Google Lincoln","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-lincoln"}],"state":"Nebraska","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Colorado City","confidence":"high","id":"epoch-c3a4da82a16b5d62","lat":32.4,"location_precision":"approximate","lon":-100.92,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake","value":0.0}],"name":"Anthropic Barber Lake","operator":"Cipher Mining #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/anthropic-barber-lake"}],"state":"Texas","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Goodyear","confidence":"high","contains_osm":true,"id":"epoch-c516e92dfbf7f9bb","lat":33.41,"location_precision":"approximate","lon":-112.37,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-goodyear","value":202.0}],"name":"Microsoft Goodyear","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-goodyear"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/795384117"}],"state":"Arizona","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Fort Wayne","confidence":"high","id":"epoch-cdbc7325686a56bd","lat":41.03,"location_precision":"approximate","lon":-85.05,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-fort-wayne","value":0.0}],"name":"Google Fort Wayne","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-fort-wayne"}],"state":"Indiana","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Memphis","confidence":"high","id":"epoch-ce6ce02672ab110c","lat":35.06,"location_precision":"approximate","lon":-90.16,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/colossus-1","value":340.0}],"name":"Colossus 1","operator":"SpaceXAI #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/colossus-1"}],"state":"Tennessee","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Cedar Rapids","confidence":"high","id":"epoch-d9a3692d71d9fec3","lat":41.91,"location_precision":"approximate","lon":-91.74,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/qts-cedar-rapids","value":0.0}],"name":"QTS Cedar Rapids","operator":"Meta #speculative","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/qts-cedar-rapids"}],"state":"Iowa","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"San Antonio","confidence":"high","id":"epoch-db4313cf9b4918b2","lat":29.42,"location_precision":"approximate","lon":-98.79,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/vantage-tx1","value":32.0}],"name":"Vantage TX1","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/vantage-tx1"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Barker","confidence":"high","id":"epoch-dd2a67012e873101","lat":43.35,"location_precision":"approximate","lon":-78.61,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner","value":58.0}],"name":"Core42 Lake Mariner","operator":"Core42 #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/core42-lake-mariner"}],"state":"New York","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Manassas","confidence":"high","id":"epoch-e23ec9037c914053","lat":38.74,"location_precision":"approximate","lon":-77.54,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/stack-infrastructure-nva02","value":85.0}],"name":"STACK Infrastructure NVA02","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/stack-infrastructure-nva02"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Council Bluffs","confidence":"high","contains_osm":true,"id":"epoch-e69bad8dbc5a9863","lat":41.17,"location_precision":"approximate","lon":-95.8,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-council-bluffs-east","value":237.0}],"name":"Google Council Bluffs (East)","operator":"Google #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-council-bluffs-east"},{"dataset":"compute_atlas","evidence":[{"kind":"other","label":"HIFLD Electric Retail Service Territories (ORNL/DOE-CESER, 2023-08 vintage)","publisher":"Oak Ridge National Laboratory (ORNL) / HIFLD","retrievedAt":"2026-07-23","url":"https://www.arcgis.com/home/item.html?id=597555ce8e4a4892a030784a7c657fdd"}],"updated":"2026-09-21","url":"https://www.compute-atlas.com/facilities/google-council-bluffs-ia"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720208"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720209"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720210"}],"state":"Iowa","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Afton","confidence":"high","id":"epoch-e9d46c9a24d983a4","lat":33.78,"location_precision":"approximate","lon":-100.87,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-helios","value":132.0}],"name":"Coreweave Helios","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-helios"},{"dataset":"datacentersexposed","evidence":[{"url":"https://epoch.ai/data/ai-data-centers"}],"updated":"2026-06-17","url":"https://datacentersexposed.com/facilities/coreweave-helios-epoch"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Eagle Mountain","confidence":"high","contains_osm":true,"id":"epoch-ed01378dc6f78dca","lat":40.27,"location_precision":"approximate","lon":-112.02,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-eagle-mountain","value":133.0}],"name":"Meta Eagle Mountain","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-eagle-mountain"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1024051963"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1024051997"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1035123473"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1473440674"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1473440676"}],"state":"Utah","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Cumming","confidence":"high","id":"epoch-f06ae301def920e6","lat":41.5,"location_precision":"approximate","lon":-93.79,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/microsoft-project-osmium","value":190.0}],"name":"Microsoft Project Osmium","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/microsoft-project-osmium"}],"state":"Iowa","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Sandston","confidence":"high","id":"epoch-f0d3788800996247","lat":37.49,"location_precision":"approximate","lon":-77.25,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-1","value":238.0}],"name":"QTS Richmond 1","operator":"Unknown","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/qts-richmond-1"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Abilene","confidence":"high","id":"epoch-f2d18ad1702e3979","lat":32.49,"location_precision":"approximate","lon":-99.78,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/crusoe-abilene-expansion","value":0.0}],"name":"Crusoe Abilene Expansion","operator":"Microsoft #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/crusoe-abilene-expansion"}],"state":"Texas","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Temple","confidence":"high","id":"epoch-f4388bf6640475a0","lat":31.13,"location_precision":"approximate","lon":-97.37,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/meta-temple","value":178.0}],"name":"Meta Temple","operator":"Meta #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/meta-temple"}],"state":"Texas","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Bristow","confidence":"high","contains_osm":true,"id":"epoch-f4833c0f5069c4d2","lat":38.78,"location_precision":"approximate","lon":-77.58,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/google-bristow","value":238.0}],"name":"Google Bristow","operator":"Google","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/google-bristow"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196815"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260553"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1464257783"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Chester","confidence":"high","id":"epoch-f654ff840042f7e6","lat":37.36,"location_precision":"approximate","lon":-77.33,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/coreweave-chester-va","value":82.0}],"name":"CoreWeave Chester VA","operator":"CoreWeave #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/coreweave-chester-va"}],"state":"Virginia","status":"operating","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"Epoch AI inventory","city":"Benton","confidence":"high","id":"epoch-fcf9c8290aacf2e4","lat":42.12,"location_precision":"approximate","lon":-83.88,"mw":[{"basis":"Current power estimate (Epoch AI); not metered load","source":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-michigan","value":0.0}],"name":"OpenAI Stargate Michigan","operator":"Oracle #confident","sources":[{"dataset":"epoch","evidence":[],"updated":null,"url":"https://epoch.ai/data/ai-data-centers/directory/openai-stargate-michigan"}],"state":"Michigan","status":"unknown","status_basis":"Preserved October 15 map review; CSV has no status field"},{"ai_classification":"unknown","city":"Palmdale","confidence":"low","id":"osm-006d1c4177df33d3","lat":34.5799784,"location_precision":"source supplied","lon":-118.1140073,"name":"AT&T","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/472954201"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"San Diego","confidence":"low","id":"osm-009b2675e2885c12","lat":32.8423554,"location_precision":"source supplied","lon":-117.1694226,"name":"EdgeConneX San Diego","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/31803515"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Plano","confidence":"low","id":"osm-012131113264ab46","lat":33.0060071,"location_precision":"source supplied","lon":-96.6570922,"name":"Aligned Data Centers DFW-04","operator":"Aligned Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1486780799"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-012fc59157d34f69","lat":41.6655118,"location_precision":"source supplied","lon":-93.5082089,"name":"Facebook Altoona Data Center 2","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/438078070"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-017f267e01f8b986","lat":36.2153921,"location_precision":"source supplied","lon":-86.7836293,"name":"Unnamed data center (way/894425613)","operator":"BNYM","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/894425613"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-018032d5636b5c28","lat":41.1726458,"location_precision":"source supplied","lon":-95.8025278,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720220"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-0194ec84a67ace11","lat":38.7603606,"location_precision":"source supplied","lon":-77.5193019,"name":"Amazon IAD-130","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1181391921"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-01e3d5c0446ae26f","lat":41.1755233,"location_precision":"source supplied","lon":-95.8067784,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720212"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"West Chicago","confidence":"low","id":"osm-02c77ba3e32a8257","lat":41.9053402,"location_precision":"source supplied","lon":-88.2195062,"name":"Unnamed data center (way/343593591)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/343593591"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-030386c275124354","lat":41.9943531,"location_precision":"source supplied","lon":-87.9649422,"name":"Digital Realty CH3","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/713428715"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-033a664061998682","lat":37.3780374,"location_precision":"source supplied","lon":-121.9541277,"name":"Santa Clara Data Center (SJC3)","operator":"Evocative","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/37947315"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-033a8bbd114eec6c","lat":39.7241139,"location_precision":"source supplied","lon":-82.687551,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501120016"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-033ed5da50027e04","lat":36.0558853,"location_precision":"source supplied","lon":-115.2141369,"name":"Switch Las Vegas 11","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/617194689"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0342c2cefde5fc1b","lat":33.6392624,"location_precision":"source supplied","lon":-84.5170239,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1562013293"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-03a13d3cf0ce2543","lat":32.4435639,"location_precision":"source supplied","lon":-97.0633095,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844386861"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0413ac580e0c1a74","lat":41.5406505,"location_precision":"source supplied","lon":-93.8278773,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/871745265"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-04bdd89cbe2a676d","lat":38.9959832,"location_precision":"source supplied","lon":-77.4597423,"name":"Sentinel Ashburn - Building 1","operator":"Sentinel Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544360246"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1568279137"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-05883dddb135114b","lat":47.2388186,"location_precision":"source supplied","lon":-119.8593592,"name":"Unnamed data center (way/337127832)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337127832"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337127833"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/410408067"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/410408079"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/499403698"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343761104"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1470108469"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-05ad23e9d64d0291","lat":38.9213052,"location_precision":"source supplied","lon":-77.4858007,"name":"Amazon IAD-156","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196826"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-062c17344285c267","lat":40.5442554,"location_precision":"source supplied","lon":-74.4965213,"name":"Chirisa Technology Parks - Piscataway","operator":"Chirisa Technology Parks","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/2744301"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-07efb93d9374c732","lat":35.0483475,"location_precision":"source supplied","lon":-106.5421546,"name":"Unnamed data center (way/706081342)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/706081342"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-080737cb85b20942","lat":29.44968,"location_precision":"source supplied","lon":-98.7144036,"name":"Unnamed data center (way/1432637060)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1432637060"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1432637061"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1432637062"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Birmingham","confidence":"low","id":"osm-08842227cb2cf84b","lat":33.5006749,"location_precision":"source supplied","lon":-86.8208315,"name":"DC Blox Data Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1019816009"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","id":"osm-08ed8c8f067c56bb","lat":32.8009535,"location_precision":"source supplied","lon":-96.8195234,"name":"Equinix Infomart","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/28544618"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-08f6c6a6364f4c56","lat":38.7344794,"location_precision":"source supplied","lon":-77.1528961,"name":"Unnamed data center (way/1561752472)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561752472"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561752473"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-09c397bec6f5cf25","lat":45.8552336,"location_precision":"source supplied","lon":-119.6197272,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501436324"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-09d4595f1fe037c5","lat":32.498975,"location_precision":"source supplied","lon":-99.7861809,"name":"Unnamed data center (way/1530966383)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966383"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0a40b547caed8bfc","lat":32.5390042,"location_precision":"source supplied","lon":-96.7932072,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525184"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0ac8111bf2c085b1","lat":32.498418,"location_precision":"source supplied","lon":-99.7955869,"name":"Unnamed data center (way/1530966394)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966394"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0ad7bfd7de4a660d","lat":41.4321977,"location_precision":"source supplied","lon":-82.7189574,"name":"Unnamed data center (way/383796776)","operator":"Aligned Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/383796776"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Miami","confidence":"low","id":"osm-0b342f55002f357e","lat":25.7975445,"location_precision":"source supplied","lon":-80.2300338,"name":"Unnamed data center (way/435531451)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/435531451"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0bccb274540d398f","lat":38.8026713,"location_precision":"source supplied","lon":-104.5219809,"name":"Unnamed data center (way/476609221)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/476609221"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-0c502b7a38ba98d8","lat":39.0154331,"location_precision":"source supplied","lon":-77.4673732,"name":"Digital Realty ACC9","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/649365764"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Aldie","confidence":"low","id":"osm-0c57572f1ff671eb","lat":38.9495184,"location_precision":"source supplied","lon":-77.5594451,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/897226569"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0c613f27c382c9fa","lat":39.8309301,"location_precision":"source supplied","lon":-75.1953233,"name":"Unnamed data center (way/607483487)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/607483487"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-0d9f3caacb1003fb","lat":38.989461,"location_precision":"source supplied","lon":-77.4497423,"name":"Amazon IAD-230","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1482076330"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0da5ea76b8889eb0","lat":41.1755246,"location_precision":"source supplied","lon":-95.8056388,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720213"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"low","id":"osm-0e6bc12de5ebe635","lat":33.096018,"location_precision":"source supplied","lon":-96.6815422,"name":"Unnamed data center (way/254773884)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254773884"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-0e6e82df526acfef","lat":43.6383333,"location_precision":"source supplied","lon":-89.7214027,"name":"Unnamed data center (way/1211362828)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1211362828"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Albany","confidence":"low","id":"osm-0f1d9eff670e4f4a","lat":42.6492566,"location_precision":"source supplied","lon":-73.7528179,"name":"Unnamed data center (node/14076988553)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14076988553"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"low","id":"osm-0f325c75225b5ed9","lat":40.4506391,"location_precision":"source supplied","lon":-80.0059623,"name":"Expedient Pittsburgh Nova Place","operator":"Expedient","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14277048779"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-0fc13ab221290e04","lat":29.4703276,"location_precision":"source supplied","lon":-98.6861914,"name":"Unnamed data center (way/509611426)","operator":"CHRISTUS Health","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611426"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611429"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-105822e1383c05d4","lat":35.317368,"location_precision":"source supplied","lon":-81.82624,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460089168"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","id":"osm-110df98f5212dd8d","lat":38.8023704,"location_precision":"source supplied","lon":-77.5823062,"name":"Microsoft Data Center 1","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/19787207"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Mansfield","confidence":"low","id":"osm-11609ee8e5273dd1","lat":32.5498227,"location_precision":"source supplied","lon":-97.0748553,"name":"Alinged Data Center DFW-03","operator":"Aligned Data Centers, LLC","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443620406"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","contains_osm":true,"id":"osm-12733539a575287d","lat":45.8466554,"location_precision":"source supplied","lon":-119.6037093,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697417726"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/914616810"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1027471509"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1027471510"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1126386234"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-12c6864133f5d624","lat":40.102426,"location_precision":"source supplied","lon":-82.7501414,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016627"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-12dbecf70ee732a0","lat":42.9820886,"location_precision":"source supplied","lon":-70.9505947,"name":"Information Technology Data Center","operator":"Phillips Exeter Academy","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/589070714"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-12eeb4e349684341","lat":38.9918083,"location_precision":"source supplied","lon":-77.441172,"name":"Amazon IAD-88","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465062052"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1337fc0a88a378b7","lat":41.5158346,"location_precision":"source supplied","lon":-93.702492,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881732"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Puyallup","confidence":"low","id":"osm-13ffebf1e96d9a1f","lat":47.1608506,"location_precision":"source supplied","lon":-122.2792463,"name":"Centeris SH1 Colocation","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/634638463"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Dallas","confidence":"low","id":"osm-146bd67ad3a025f0","lat":32.8079818,"location_precision":"source supplied","lon":-96.8573889,"name":"TierPoint Dallas Data Center","operator":"TierPoint","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465042594"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"San Francisco","confidence":"low","id":"osm-148afb3fcc2e257b","lat":37.788731,"location_precision":"source supplied","lon":-122.390469,"name":"365 Main Street Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460085343"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Weehawken","confidence":"low","id":"osm-1548378de1ab9f98","lat":40.7618178,"location_precision":"source supplied","lon":-74.0250281,"name":"Digital Realty New Jersey EWR10","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/279410766"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1574b1da83f70bb1","lat":41.5158177,"location_precision":"source supplied","lon":-93.7063005,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881733"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Rancho Cordova","confidence":"low","id":"osm-164659a091cac62e","lat":38.5922987,"location_precision":"source supplied","lon":-121.27744,"name":"Edgeconnex Data Center","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/933393863"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-16697d8f69d2c18e","lat":45.5540594,"location_precision":"source supplied","lon":-122.9492507,"name":"Aligned DC - PDX-01","operator":"Aligned Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1114969101"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-169b6a7151bb0476","lat":32.4984289,"location_precision":"source supplied","lon":-99.7944878,"name":"Unnamed data center (way/1530966395)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966395"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-16a859680ec58720","lat":45.6247767,"location_precision":"source supplied","lon":-121.208428,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517630"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-16d89ef89443230d","lat":33.0620387,"location_precision":"source supplied","lon":-80.0449828,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388186"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-1721873147182ae9","lat":45.8410032,"location_precision":"source supplied","lon":-119.6527688,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070144"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Florence","confidence":"low","id":"osm-173bd0ca9974ae6c","lat":38.9813135,"location_precision":"source supplied","lon":-84.6187219,"name":"Unnamed data center (way/68281408)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/68281408"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1745af35c5ca0436","lat":33.3470334,"location_precision":"source supplied","lon":-111.6042679,"name":"Unnamed data center (way/567575425)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/567575425"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Chaska","confidence":"low","id":"osm-17589b1ff4c35e40","lat":44.8073344,"location_precision":"source supplied","lon":-93.6370189,"name":"StreamData Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1015258645"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1762b2b7ec19d48a","lat":45.6231678,"location_precision":"source supplied","lon":-121.206664,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443567519"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-176c7e0475ea1e06","lat":41.1379084,"location_precision":"source supplied","lon":-96.1514321,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312801354"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Aldie","confidence":"low","id":"osm-17df00b1e68981ca","lat":38.9482582,"location_precision":"source supplied","lon":-77.5559109,"name":"Microsoft IAD11","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1124864831"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lebanon","confidence":"low","contains_osm":true,"id":"osm-18028483a3fc0298","lat":39.3889671,"location_precision":"source supplied","lon":-84.2218063,"name":"Unnamed data center (way/95349317)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/95349317"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1557769364"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Aurora","confidence":"low","id":"osm-18090024bbb6d36e","lat":39.7295585,"location_precision":"source supplied","lon":-104.7127829,"name":"Unnamed data center (way/916046040)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/916046040"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-181e5b580cd3e4ae","lat":40.9512698,"location_precision":"source supplied","lon":-73.897901,"name":"Unnamed data center (way/802054282)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/802054282"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-185183f1a094fff0","lat":40.5242776,"location_precision":"source supplied","lon":-74.547881,"name":"Unnamed data center (way/936368014)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/936368014"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-1854a3e9cc20a348","lat":39.0215698,"location_precision":"source supplied","lon":-77.4592649,"name":"Digital Realty ACC2","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1543931282"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-186c250873384c8e","lat":32.4965849,"location_precision":"source supplied","lon":-99.7922315,"name":"Unnamed data center (way/1530966390)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966390"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-187a30cfc59f2456","lat":38.7473099,"location_precision":"source supplied","lon":-77.5318265,"name":"COPT DC-6","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/224100721"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-18d11ad64d18a0da","lat":39.0660153,"location_precision":"source supplied","lon":-77.5585694,"name":"Microsoft Leesburg Building 5","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1333205263"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","id":"osm-18e287b595f9c988","lat":33.494309,"location_precision":"source supplied","lon":-112.0707916,"name":"Lumen","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/151179323"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"low","id":"osm-195ef47a31da1c91","lat":34.0584789,"location_precision":"source supplied","lon":-118.2359144,"name":"CoreSite - LA2","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13042311881"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-19cec69b1d756ffc","lat":38.9995402,"location_precision":"source supplied","lon":-77.4498559,"name":"Unnamed data center (way/696985482)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/696985482"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-1a9cb19550d3ed6f","lat":36.6894978,"location_precision":"source supplied","lon":-78.3775931,"name":"Unnamed data center (way/1074591454)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591454"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591455"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074595308"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074595309"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074595310"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-1afcfd989bf2a931","lat":45.8522387,"location_precision":"source supplied","lon":-119.6299007,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070145"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1b1aa713722645e6","lat":40.2084622,"location_precision":"source supplied","lon":-74.119242,"name":"Unnamed data center (way/1189426328)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1189426328"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-1b8f5a7500d49eae","lat":39.0195992,"location_precision":"source supplied","lon":-77.4504568,"name":"CyrusOne NVA14","operator":"PowerHouse","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188715508"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"osm-1bc0c18852835f0e","lat":38.8145928,"location_precision":"source supplied","lon":-77.6543195,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340216"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-1c11f617729ce0a5","lat":38.9567768,"location_precision":"source supplied","lon":-77.4977837,"name":"Amazon IAD-121","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/693390023"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/990537857"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Westminster","confidence":"low","id":"osm-1c32605af3c48548","lat":39.8845187,"location_precision":"source supplied","lon":-105.0801488,"name":"DataBank - DEN4","operator":"DataBank","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/295152006"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-1c66b145dcc1ea46","lat":37.3611541,"location_precision":"source supplied","lon":-121.9423402,"name":"Unnamed data center (way/1075445245)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1075445245"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1c6ee5622bff9c06","lat":38.8159745,"location_precision":"source supplied","lon":-77.6525395,"name":"Unnamed data center (way/697021949)","operator":"Amazon","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697021949"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-1c907fc94cb662f7","lat":39.0112011,"location_precision":"source supplied","lon":-77.4603947,"name":"CloudHQ LC3","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443187163"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Wichita Falls","confidence":"low","id":"osm-1cbc820e3dca28da","lat":33.9533733,"location_precision":"source supplied","lon":-98.5247859,"name":"Unnamed data center (way/747985149)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/747985149"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-1cc62199454add30","lat":38.9909679,"location_precision":"source supplied","lon":-77.4418679,"name":"Amazon IAD-89","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465062053"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1cff0fe323f43f2f","lat":37.4022094,"location_precision":"source supplied","lon":-121.8923868,"name":"Stack Infrastructure","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/553223629"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1d22c5348a784a48","lat":40.0592384,"location_precision":"source supplied","lon":-82.7626774,"name":"Unnamed data center (way/1375443893)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1375443893"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1d711506914f10f6","lat":37.7796531,"location_precision":"source supplied","lon":-122.3940005,"name":"Unnamed data center (node/10780794741)","operator":"Ntirety","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10780794741"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1daae852a9113642","lat":46.3321316,"location_precision":"source supplied","lon":-113.2926719,"name":"Unnamed data center (way/758426349)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/758426349"}],"state":"Montana","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-1e305fd7739079b1","lat":38.9914123,"location_precision":"source supplied","lon":-77.4365107,"name":"Amazon IAD-51","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056019"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1e5b8cbd5d26c7b2","lat":39.0120268,"location_precision":"source supplied","lon":-77.4715605,"name":"Unnamed data center (way/696978351)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/696978351"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Mesa","confidence":"low","id":"osm-1e7cf86930feafa9","lat":33.3520091,"location_precision":"source supplied","lon":-111.6475291,"name":"EdgeConneX PHX02 Data Center","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1015704066"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1ec9ee346e72be28","lat":34.8434819,"location_precision":"source supplied","lon":-86.6288559,"name":"Meta Huntsville Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1160814415"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Rush","confidence":"low","id":"osm-1ecde327f9d71ddf","lat":42.9972167,"location_precision":"source supplied","lon":-77.6458295,"name":"Landmax Data Systems, Inc","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1528887658"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-1f15e6ab3bf4bd9a","lat":45.8375401,"location_precision":"source supplied","lon":-119.6931286,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/914616809"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"New Palestine","confidence":"low","id":"osm-1f206506a13f9e4b","lat":39.7171971,"location_precision":"source supplied","lon":-85.941411,"name":"Unnamed data center (way/349925359)","operator":"Verizon Wireless","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/349925359"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"columbus","confidence":"low","id":"osm-1f6fb528fb96d6db","lat":32.4982544,"location_precision":"source supplied","lon":-84.8835911,"name":"Unnamed data center (way/958153770)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/958153770"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-1fb81055cdca4a31","lat":35.3166121,"location_precision":"source supplied","lon":-81.8251761,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/883809860"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-213d73dc413fb3df","lat":44.1892369,"location_precision":"source supplied","lon":-105.6104802,"name":"Unnamed data center (way/1414729942)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1414729942"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-21d52d9fd37f467e","lat":46.9399928,"location_precision":"source supplied","lon":-67.9055877,"name":"Datacenter","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1534758773"}],"state":"Maine","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-22dab78bd86d600e","lat":41.6885485,"location_precision":"source supplied","lon":-86.4730506,"name":"Unnamed data center (way/1471517731)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517731"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517732"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517733"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517734"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517735"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517736"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1471517737"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"43017","confidence":"low","id":"osm-230d7ebc784a5719","lat":40.0933004,"location_precision":"source supplied","lon":-83.133975,"name":"DartPoints Dublin","operator":"DartPoints","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124808826"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Columbus","confidence":"low","id":"osm-232b6cc205c13873","lat":39.1826345,"location_precision":"source supplied","lon":-85.8967042,"name":"DartPoints Columbus","operator":"DartPoints","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/773684159"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","contains_osm":true,"id":"osm-236339bf7b1e5d0e","lat":40.0557362,"location_precision":"source supplied","lon":-82.7565006,"name":"QTS NAL 2 DC1","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1425043212"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1425043214"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-23a6cd18249c0258","lat":33.7497273,"location_precision":"source supplied","lon":-84.58482,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844352473"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844352474"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Secaucus","confidence":"low","id":"osm-23c1b70bdc606b03","lat":40.7849038,"location_precision":"source supplied","lon":-74.0653573,"name":"CoreSite NY3","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1383916144"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-23c2fb53ea41432f","lat":41.5185369,"location_precision":"source supplied","lon":-93.7025209,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881745"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-23c383a90706b8cb","lat":38.9043442,"location_precision":"source supplied","lon":-77.4524692,"name":"Amazon IAD-134","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196797"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2454cab9f477e2f7","lat":40.1181177,"location_precision":"source supplied","lon":-83.202522,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016639"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-251220b9cf6c27c7","lat":41.6168519,"location_precision":"source supplied","lon":-93.9243968,"name":"Apple","operator":"Apple","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1318322780"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-251ca369689df50e","lat":38.9168847,"location_precision":"source supplied","lon":-77.4932514,"name":"Amazon IAD-63","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/544596573"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-2536b1aa5ef9ec6e","lat":32.9744297,"location_precision":"source supplied","lon":-96.6501581,"name":"Digital Realty","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1525436762"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530197817"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-254f65e48fb36bce","lat":32.5963048,"location_precision":"source supplied","lon":-90.089258,"name":"Unnamed data center (way/1430720170)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1430720170"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1430720171"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1430720172"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1430720173"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1430720174"}],"state":"Mississippi","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","contains_osm":true,"id":"osm-25944dc0eaff13da","lat":33.7299455,"location_precision":"source supplied","lon":-84.6233391,"name":"Douglasville","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1524793542"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981217"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-26cfac5ca5960781","lat":41.495806,"location_precision":"source supplied","lon":-93.7870549,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1318322071"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Richardson","confidence":"low","id":"osm-276f4c42e2c96cee","lat":32.9662442,"location_precision":"source supplied","lon":-96.7112265,"name":"Unnamed data center (way/597876723)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876723"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2794c95636bda07f","lat":36.1447332,"location_precision":"source supplied","lon":-115.0779284,"name":"Verizon","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254583328"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Tukwila","confidence":"low","id":"osm-27cf348645b83f54","lat":47.4950309,"location_precision":"source supplied","lon":-122.2905696,"name":"Intergate Seattle East Building 2","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/205724881"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-284b519a8d321286","lat":35.1794881,"location_precision":"source supplied","lon":-80.5701825,"name":"Unnamed data center (way/923167491)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/923167491"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-284f76de10264bb0","lat":39.0136782,"location_precision":"source supplied","lon":-77.4517194,"name":"H5 Ashburn","operator":"H5 Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/234722720"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2864b4f6077d84a3","lat":39.185856,"location_precision":"source supplied","lon":-85.8870717,"name":"Unnamed data center (way/567894059)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/567894059"}],"state":"Indiana","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-2872d473a0b4f38a","lat":38.7170622,"location_precision":"source supplied","lon":-77.4999396,"name":"CloudHQ MCC1","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/882977350"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Memphis","confidence":"low","id":"osm-291ab57ed22920a6","lat":34.997983,"location_precision":"source supplied","lon":-90.0348672,"name":"xAI Macrohard Colossus 2","operator":"xAI","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386926534"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"osm-29b38d5927520b36","lat":33.7182023,"location_precision":"source supplied","lon":-84.5847806,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1562013259"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-2aef8a96d3f6ae46","lat":38.7547679,"location_precision":"source supplied","lon":-77.5173876,"name":"QTS Manassas DC5","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1090837713"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1134911642"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260558"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Olathe","confidence":"low","id":"osm-2b2dc78276e6c304","lat":38.9391997,"location_precision":"source supplied","lon":-94.8601851,"name":"Unnamed data center (way/1392657385)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1392657385"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"North Bergen","confidence":"low","id":"osm-2b3678678116bb8f","lat":40.7968626,"location_precision":"source supplied","lon":-74.0311403,"name":"Equinix NY7 Data Center","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/95782052"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2bb1486a04222df4","lat":40.1019552,"location_precision":"source supplied","lon":-82.7519122,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016628"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Santa Fe","confidence":"low","id":"osm-2bfc8430c06846d5","lat":35.6724585,"location_precision":"source supplied","lon":-105.9565798,"name":"John F. Simms Building","operator":"SONM","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/318069356"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-2c45b7c0bf7a070d","lat":39.0102471,"location_precision":"source supplied","lon":-77.4626713,"name":"CloudHQ LC1","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/794147654"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2cf4926157016c41","lat":40.0936164,"location_precision":"source supplied","lon":-82.7514553,"name":"Amazon Web Services  CMH53","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020374277"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2de4fdb036cabef6","lat":33.0642722,"location_precision":"source supplied","lon":-80.0414534,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/610827836"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2ef928c006bd07b9","lat":41.9773625,"location_precision":"source supplied","lon":-87.9630149,"name":"Unnamed data center (way/1557957010)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1557957010"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Niagara Falls","confidence":"low","id":"osm-2fc15c6f881a7e1e","lat":43.074831,"location_precision":"source supplied","lon":-78.944809,"name":"Unnamed data center (way/832622369)","operator":"Blockfusion","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/832622369"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-2fe7491ce746a7e9","lat":41.1774894,"location_precision":"source supplied","lon":-95.8009224,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720211"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-30c93ac1989e539c","lat":38.7466335,"location_precision":"source supplied","lon":-77.4972555,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517640"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517641"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517642"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-314a25da29b20ebd","lat":34.840441,"location_precision":"source supplied","lon":-86.6288253,"name":"Meta Huntsville Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1160814416"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-3165222c22d4f496","lat":37.3722213,"location_precision":"source supplied","lon":-121.9482625,"name":"Silicon Valley SJC31","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209087373"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Northlake","confidence":"low","id":"osm-3198a5f669fe33a3","lat":41.9129628,"location_precision":"source supplied","lon":-87.9175895,"name":"Aligned Data Center - Chicago ORD-02","operator":"Aligned","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1217649350"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Baton Rouge","confidence":"low","contains_osm":true,"id":"osm-3232faed43941f12","lat":30.4539942,"location_precision":"source supplied","lon":-91.115481,"name":"DartPoints Baton Rouge 2","operator":"DartPoints","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124760832"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124761022"}],"state":"Louisiana","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-323ee36287e65aba","lat":32.4974891,"location_precision":"source supplied","lon":-99.7951309,"name":"Unnamed data center (way/1530966393)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966393"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-32e9fe5d35a96937","lat":33.1536001,"location_precision":"source supplied","lon":-117.2388464,"name":"Unnamed data center (way/930540164)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/930540164"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-332836f6019a8d27","lat":38.8048453,"location_precision":"source supplied","lon":-77.5124065,"name":"Unnamed data center (way/45583037)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45583037"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","contains_osm":true,"id":"osm-33c8ccb71adb4d99","lat":29.4291907,"location_precision":"source supplied","lon":-98.8766548,"name":"Microsoft SAT 80","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1533392812"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1533392813"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1533392814"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-33fb6acb938fa929","lat":38.9172562,"location_precision":"source supplied","lon":-77.4956744,"name":"Amazon IAD-86","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1181391920"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-34739b1b36639106","lat":41.5396705,"location_precision":"source supplied","lon":-93.8286654,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1075278062"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-359d64264f214d75","lat":41.9991249,"location_precision":"source supplied","lon":-87.9577434,"name":"Stream Chicago II","operator":"Stream","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/863162820"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-35f40eff22d302c7","lat":41.6670521,"location_precision":"source supplied","lon":-93.5065646,"name":"Facebook Altoona Data Center 3","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/556564909"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Franklin Park","confidence":"low","id":"osm-361a6ae06b1c5720","lat":41.9283557,"location_precision":"source supplied","lon":-87.8592545,"name":"Digital Realty Chicago ORD12","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/409296605"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-361d8bef73e855af","lat":38.9942215,"location_precision":"source supplied","lon":-77.4482013,"name":"QTS Ashburn Moran","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460175664"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701923200"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1064211366"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188680253"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188680254"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544360249"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Orangeburg","confidence":"low","id":"osm-362eb632597d2ffd","lat":41.0523325,"location_precision":"source supplied","lon":-73.9717745,"name":"Unnamed data center (way/1092283612)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1092283612"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Aurora","confidence":"low","id":"osm-363447d6bf4488ab","lat":41.8028612,"location_precision":"source supplied","lon":-88.2467523,"name":"CyrusOne CHI3","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1481581947"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-36d83cfa62c2ef16","lat":41.2214856,"location_precision":"source supplied","lon":-95.863822,"name":"Unnamed data center (way/191655977)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/191655977"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-36e4f5610855c73f","lat":42.0026304,"location_precision":"source supplied","lon":-87.9511119,"name":"Stream Chicago I","operator":"Stream","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/863162825"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-373caf2c9cb17b83","lat":37.062799,"location_precision":"source supplied","lon":-113.5447485,"name":"Lumen","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/835601088"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-374243306a634350","lat":38.913702,"location_precision":"source supplied","lon":-77.2258342,"name":"Unnamed data center (way/156468497)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/156468497"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-374674c978a1ca48","lat":38.9161469,"location_precision":"source supplied","lon":-77.4786956,"name":"Amazon IAD-151","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/989735624"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-3781eb385118c815","lat":33.0640078,"location_precision":"source supplied","lon":-80.0423742,"name":"Google Berkeley County Data Center","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/626226408"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"New York","confidence":"low","id":"osm-37cdf4ac05ca234f","lat":40.719928,"location_precision":"source supplied","lon":-74.0044583,"name":"Digital Realty New York JFK13","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12221811811"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-381ca9e4935e84df","lat":32.4984502,"location_precision":"source supplied","lon":-99.7922727,"name":"Unnamed data center (way/1530966387)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966387"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-385ea683ae4ceaa0","lat":39.0279064,"location_precision":"source supplied","lon":-77.4574998,"name":"Amazon IAD-71","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/556599693"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Omaha","confidence":"low","contains_osm":true,"id":"osm-38d80db09292e21d","lat":41.338343,"location_precision":"source supplied","lon":-96.0278024,"name":"Verizon","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/405034574"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/405034584"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-38da1b064f1e14e1","lat":41.4947497,"location_precision":"source supplied","lon":-93.7870201,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1318322073"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Herndon","confidence":"low","contains_osm":true,"id":"osm-38daf626662d46bf","lat":38.9211238,"location_precision":"source supplied","lon":-77.4265432,"name":"Amazon IAD-166","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343764881"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1343764882"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426663252"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-39a4937d3adb8ed2","lat":38.7459908,"location_precision":"source supplied","lon":-77.5375488,"name":"STACK","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1059036248"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-3a2d2394566baffd","lat":38.979147,"location_precision":"source supplied","lon":-77.419905,"name":"Amazon IAD-142","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1161094246"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Santa Ana","confidence":"low","id":"osm-3b530a3e60cb4b7f","lat":33.7035942,"location_precision":"source supplied","lon":-117.8501424,"name":"Xo Communications Colocation Data Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/440666998"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-3ba3b38baf95c76e","lat":39.0236982,"location_precision":"source supplied","lon":-77.4190947,"name":"Amazon IAD-117","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/744496741"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/744496750"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1555352691"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-3bd96318f46572b9","lat":38.9811304,"location_precision":"source supplied","lon":-77.4942439,"name":"Amazon IAD-180","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560627883"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-3ce03b9b21c05eb3","lat":38.8978637,"location_precision":"source supplied","lon":-77.4540825,"name":"Amazon IAD-1","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258343749"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"osm-3d2111dd969f1af9","lat":38.7779795,"location_precision":"source supplied","lon":-77.5590992,"name":"Amazon IAD-73","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/490997243"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/490997244"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"osm-3da5d0db0c3ce41c","lat":38.7430518,"location_precision":"source supplied","lon":-77.5333746,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1000784035"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1059030596"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1059037050"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1059037051"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340215"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Bristow","confidence":"low","id":"osm-3db6f8aae651c44f","lat":38.7779794,"location_precision":"source supplied","lon":-77.5949629,"name":"Digital Realty VA4","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/46831933"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Minneapolis","confidence":"low","id":"osm-3ddb1dac7ea801b9","lat":44.9887662,"location_precision":"source supplied","lon":-93.2766103,"name":"Lumen Minneapolis 3","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/343333944"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-3e635fefa52d2b11","lat":41.1755366,"location_precision":"source supplied","lon":-95.7999641,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720218"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-3f31bbc092dad0b2","lat":47.3921494,"location_precision":"source supplied","lon":-120.2174624,"name":"Unnamed data center (way/814061068)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/814061068"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/814061069"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/814061070"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/814061071"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-3f7bcf4f755aaac9","lat":38.7898846,"location_precision":"source supplied","lon":-77.5482287,"name":"Amazon IAD-14","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460059465"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Social Circle","confidence":"low","contains_osm":true,"id":"osm-40758493cf1832c6","lat":33.6004683,"location_precision":"source supplied","lon":-83.7003581,"name":"Meta Stanton Springs Data Center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1054387470"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1054387471"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1070895993"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1070895994"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-41252982a3ac09c1","lat":38.9814552,"location_precision":"source supplied","lon":-77.4175501,"name":"Amazon IAD-140","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/817338831"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-41dd55f87ea728f7","lat":37.3763668,"location_precision":"source supplied","lon":-121.9485649,"name":"Digital Realty Silicon Valley SJC11","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209076412"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-425619b154b193ae","lat":39.0126563,"location_precision":"source supplied","lon":-77.4656035,"name":"Digital Realty ACC10","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701923204"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-426112e83707f1ae","lat":29.6728187,"location_precision":"source supplied","lon":-82.2997617,"name":"HiPerGator","operator":"University of Florida","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8017899486"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-430c84849cadde5a","lat":33.7825376,"location_precision":"source supplied","lon":-84.4220352,"name":"Unnamed data center (way/1566676867)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1566676867"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1566676868"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-434a5458137d0865","lat":37.3775848,"location_precision":"source supplied","lon":-121.9506821,"name":"Lumen","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209077298"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-43594fce5fb01c2b","lat":41.9945332,"location_precision":"source supplied","lon":-87.9577513,"name":"Digital Realty CH2","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/713433204"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-43620cbd0db5dadb","lat":38.7611048,"location_precision":"source supplied","lon":-77.518221,"name":"Amazon IAD-131","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1181391922"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Delaware","confidence":"low","id":"osm-43656f3d4448dc06","lat":40.2245343,"location_precision":"source supplied","lon":-83.0457923,"name":"Unnamed data center (way/1319724559)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1319724559"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-4365e19ef8656dca","lat":40.0539392,"location_precision":"source supplied","lon":-82.7639185,"name":"Google NBY-7","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1427613543"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-447107651829e131","lat":38.98956,"location_precision":"source supplied","lon":-77.4348017,"name":"Amazon IAD-192","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188680255"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-44db3817a0a65e8b","lat":38.9865152,"location_precision":"source supplied","lon":-77.4422565,"name":"Unnamed data center (way/460056018)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056018"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-44df1b8daa766cf8","lat":34.8576151,"location_precision":"source supplied","lon":-86.6221688,"name":"Unnamed data center (way/1540172608)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1540172608"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1540172612"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Weehawken","confidence":"low","id":"osm-45d15cd3dc8f4410","lat":40.7607798,"location_precision":"source supplied","lon":-74.0257417,"name":"Cyxtera (Digital Realty Trust) Citibank Data Center","operator":"Cyxtera","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/279410762"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-463c637395846a7e","lat":32.4965635,"location_precision":"source supplied","lon":-99.7944574,"name":"Unnamed data center (way/1530966391)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966391"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Cincinnati","confidence":"low","id":"osm-46a048e78ee30bc6","lat":39.098101,"location_precision":"source supplied","lon":-84.5178496,"name":"DartPoints Cincinnati","operator":"DartPoints","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124831624"}],"state":"Kentucky","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-46dcc7091e5e128a","lat":40.5995576,"location_precision":"source supplied","lon":-74.7099684,"name":"Verizon Branchburg NEC Datacenter","operator":"Verizon","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/756382880"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-47057d8cb5fc7356","lat":37.3640012,"location_precision":"source supplied","lon":-121.94689,"name":"Vantage Santa Clara CA2","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1314010354"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-47336b457dd27bae","lat":34.0594667,"location_precision":"source supplied","lon":-117.2021665,"name":"Unnamed data center (way/765230023)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/765230023"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-477dee7b1fd44a0f","lat":38.9206107,"location_precision":"source supplied","lon":-77.4837387,"name":"Unnamed data center (way/1568581817)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1568581817"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1568581818"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"osm-4831c601ccd6104a","lat":33.4115438,"location_precision":"source supplied","lon":-112.3648536,"name":"PHX-13","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1532070753"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-48686bbb253d812d","lat":38.9848368,"location_precision":"source supplied","lon":-77.4259111,"name":"Unnamed data center (way/1022757170)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1022757170"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-48961b169931b334","lat":33.0621835,"location_precision":"source supplied","lon":-80.0396508,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388075"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-48a15a29d2a48fc0","lat":38.9991321,"location_precision":"source supplied","lon":-77.4607873,"name":"Amazon IAD-285","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344901568"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","id":"osm-48ce9ee5756286da","lat":40.053078,"location_precision":"source supplied","lon":-82.7566343,"name":"QTS NAL 2 DC2","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1425043213"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-48ef71c1081247ac","lat":41.4989008,"location_precision":"source supplied","lon":-93.7870702,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830885774"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-499c2a048b333452","lat":40.7775486,"location_precision":"source supplied","lon":-74.0726876,"name":"Equinix Secaucus NY6","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714139865"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-4aaf3108ed58e340","lat":40.9056205,"location_precision":"source supplied","lon":-74.2301845,"name":"Unnamed data center (way/966520234)","operator":"JPMorgan Chase","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/966520234"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Chaska","confidence":"low","id":"osm-4bf20a803c8d02f9","lat":44.8083314,"location_precision":"source supplied","lon":-93.6343039,"name":"UHG Data Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/304754549"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-4cefb5ffc7e065d5","lat":37.3750223,"location_precision":"source supplied","lon":-121.9581,"name":"Digital Realty Silicon Valley SJC29","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073657"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-4d2f56d0366e7864","lat":41.1726404,"location_precision":"source supplied","lon":-95.8040298,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720219"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-4d590f496aa235ef","lat":39.0154881,"location_precision":"source supplied","lon":-77.4821555,"name":"DataBank IAD1","operator":"DataBank","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300970759"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300970761"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188691869"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-4d5eafcd5f74f074","lat":45.5498253,"location_precision":"source supplied","lon":-122.8908454,"name":"Flexential Portland - Hillsboro 1","operator":"Flexential","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328703598"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-4dc135db6c752a91","lat":29.4157956,"location_precision":"source supplied","lon":-98.8045148,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1010260677"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-4ea55881e7f98d21","lat":41.1755259,"location_precision":"source supplied","lon":-95.804509,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720214"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-4eff40f9e7065e8a","lat":38.9993359,"location_precision":"source supplied","lon":-77.4418377,"name":"Vantage VA16","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544360248"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-4f73ddc49643dede","lat":39.0510366,"location_precision":"source supplied","lon":-77.534801,"name":"Google Leesburg Building 3","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460776174"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-4fcb4da01f43c352","lat":39.0442544,"location_precision":"source supplied","lon":-77.5379583,"name":"Compass IAD IE","operator":"Compass Datacenters","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1387391201"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-4fcde4aef7c46cd9","lat":40.0684176,"location_precision":"source supplied","lon":-82.7503131,"name":"NAO 1/NAO 2","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/671301768"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/802160675"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196813"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-4fd59b52da4ba44d","lat":39.0007125,"location_precision":"source supplied","lon":-77.4366571,"name":"Vantage VA15","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1489625232"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-502649e302b81ca5","lat":38.7150171,"location_precision":"source supplied","lon":-77.4951199,"name":"CloudHQ MCC3","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227614670"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-50dd5b79bfdc6da9","lat":33.0643114,"location_precision":"source supplied","lon":-80.03845,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388141"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","contains_osm":true,"id":"osm-50e38c2bb165384c","lat":38.8997236,"location_precision":"source supplied","lon":-77.4534439,"name":"Amazon IAD-9","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258343744"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258343748"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-50fbd1b7257b52fe","lat":40.5375265,"location_precision":"source supplied","lon":-74.5555236,"name":"Unnamed data center (way/460182337)","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460182337"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","id":"osm-51110a171d1adc68","lat":38.9977791,"location_precision":"source supplied","lon":-77.4438607,"name":"VeriSign Incorporated","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/12893102"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-513666b69a401ce2","lat":38.7771313,"location_precision":"source supplied","lon":-77.5561679,"name":"Unnamed data center (way/1482076328)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1482076328"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Flint","confidence":"low","id":"osm-5195cdefae00ec79","lat":42.9687271,"location_precision":"source supplied","lon":-83.779585,"name":"Unnamed data center (way/755540694)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/755540694"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-51ad21c3a1497f7b","lat":37.3733075,"location_precision":"source supplied","lon":-121.9727778,"name":"Unnamed data center (way/38305611)","operator":"Vantage","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/38305611"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460159955"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1313995085"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-52323af1bc18cfb9","lat":32.9810371,"location_precision":"source supplied","lon":-96.6563775,"name":"NTT","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/671637259"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1316023545"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1316023546"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530199676"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"low","id":"osm-5286c4ac4c4b8d19","lat":36.1427635,"location_precision":"source supplied","lon":-115.0766965,"name":"Switch Las Vegas 5","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1017460715"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-53755579a1df1a7d","lat":33.462293,"location_precision":"source supplied","lon":-84.5236765,"name":"QTS","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517635"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517636"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Carteret","confidence":"low","id":"osm-537f5129e4642c31","lat":40.5843719,"location_precision":"source supplied","lon":-74.2433813,"name":"Unnamed data center (way/729376485)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/729376485"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-53895243919d653e","lat":30.1777082,"location_precision":"source supplied","lon":-95.486593,"name":"Unnamed data center (way/744177375)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/744177375"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-53edaacd74f251de","lat":39.0217895,"location_precision":"source supplied","lon":-77.4147034,"name":"EdgeCore AS01","operator":"EdgeCore","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1555352690"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-547dcb16f2d27a58","lat":32.3096657,"location_precision":"source supplied","lon":-106.7291929,"name":"Unnamed data center (way/1235255415)","operator":"CenturyLink","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1235255415"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5498865e58658606","lat":39.589248,"location_precision":"source supplied","lon":-104.877933,"name":"Verizon","operator":"Verizon","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/465530450"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5589694ce57f3272","lat":47.4080112,"location_precision":"source supplied","lon":-120.1917998,"name":"Intergate Columbia","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460167190"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-56a18ca21b027fbe","lat":41.1205515,"location_precision":"source supplied","lon":-96.1445325,"name":"Meta Sarpy Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844394340"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-56a1a85a6750b9a8","lat":38.9848664,"location_precision":"source supplied","lon":-77.4256702,"name":"CyrusOne NVA4","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/273896096"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","id":"osm-56aec499c14e3ffc","lat":39.0304712,"location_precision":"source supplied","lon":-77.4289455,"name":"Amazon IAD-164","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/984953814"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-56e3786614dff5c4","lat":36.0557074,"location_precision":"source supplied","lon":-115.2196277,"name":"Switch Las Vegas 9","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/585998678"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-5720e31ed9243694","lat":38.9865317,"location_precision":"source supplied","lon":-77.4351775,"name":"Amazon IAD-214","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1276518679"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5755c87c93e51768","lat":35.3142602,"location_precision":"source supplied","lon":-81.8220553,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460089167"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"osm-57dc4a3dab154653","lat":45.5587993,"location_precision":"source supplied","lon":-122.9297741,"name":"QTS Data Center - Hillsboro 2","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/909742340"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/918871786"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/918871787"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/918871788"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-58fcf25eb43a2c5c","lat":47.9587538,"location_precision":"source supplied","lon":-122.1915603,"name":"4421.io","operator":"4421.io","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14085787302"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-595a90a9df63dcd7","lat":38.9798678,"location_precision":"source supplied","lon":-77.425476,"name":"Amazon IAD-175","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/954433119"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Acworth","confidence":"low","id":"osm-596d5ea3ff93e3eb","lat":34.0707004,"location_precision":"source supplied","lon":-84.6759032,"name":"Unnamed data center (way/545704217)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/545704217"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"El Segundo","confidence":"low","id":"osm-59963beb55830aa8","lat":33.9156593,"location_precision":"source supplied","lon":-118.3846186,"name":"DRT LAX12","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/424945852"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"osm-59e54b62bf6e30fc","lat":38.815021,"location_precision":"source supplied","lon":-77.64868,"name":"Amazon IAD-55","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/222672860"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5a060404243b6fba","lat":31.2861659,"location_precision":"source supplied","lon":-94.7215806,"name":"Precision Prints Lufkin Datacenter","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14101687012"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5a7e7b89bfc4c21c","lat":38.9028879,"location_precision":"source supplied","lon":-77.0291491,"name":"CoreSite DC1","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/751881301"}],"state":"District of Columbia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-5aca1ac9771dd99b","lat":39.0023088,"location_precision":"source supplied","lon":-77.4718933,"name":"CloudHQ LC4","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1381994242"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560822516"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560822517"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560822518"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560822519"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560822523"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5b989985ddfd4e46","lat":40.0593527,"location_precision":"source supplied","lon":-82.7717447,"name":"Google NBY-4","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196812"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5c96e0e7bf6292c4","lat":40.2392258,"location_precision":"source supplied","lon":-74.3195376,"name":"Verizon Freehold Data Center","operator":"Verizon","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1189915695"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-5c9aef8455c94d1e","lat":38.9473737,"location_precision":"source supplied","lon":-77.5202381,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340212"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5cc6790b0a694d8d","lat":47.2448126,"location_precision":"source supplied","lon":-119.8180948,"name":"Unnamed data center (way/1193914601)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1193914601"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-5d261ec34d163e94","lat":38.9491488,"location_precision":"source supplied","lon":-77.5235942,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1222134968"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sacramento","confidence":"low","id":"osm-5e0ec7d08fbd6236","lat":38.6442393,"location_precision":"source supplied","lon":-121.4987627,"name":"RagingWire CA3","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/190868312"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","id":"osm-5e20a1e04d91317d","lat":33.4933506,"location_precision":"source supplied","lon":-112.0705502,"name":"Unnamed data center (way/1052182309)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1052182309"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-5e3b316b27f6dcb4","lat":39.0487658,"location_precision":"source supplied","lon":-77.4453971,"name":"Visa Operations Center East","operator":"Visa","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/380282154"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-5e53f4b974e3139c","lat":38.9465392,"location_precision":"source supplied","lon":-77.5221879,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/990537821"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5e9b5e9a21b0b0e8","lat":41.4968303,"location_precision":"source supplied","lon":-93.7869962,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1075278060"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Manasquan","confidence":"low","id":"osm-5f03e708729b8335","lat":40.1295611,"location_precision":"source supplied","lon":-74.0427733,"name":"Manasquan Cable Landing Station (TAT-14)","operator":"Sprint","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1189437032"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-5fbf3b47e4e508b0","lat":29.9951976,"location_precision":"source supplied","lon":-95.5633335,"name":"Unnamed data center (way/543316327)","operator":"DXC Technology","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/543316327"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/543404966"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5fe7ed76bf45594a","lat":32.4401038,"location_precision":"source supplied","lon":-97.0609199,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1458626323"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-5ff29e46597dcade","lat":45.8406847,"location_precision":"source supplied","lon":-119.6513096,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344156"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-5ffe77a073e35cde","lat":40.1200638,"location_precision":"source supplied","lon":-83.1993191,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016637"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-606a37dfbe7df34f","lat":37.4025598,"location_precision":"source supplied","lon":-121.893391,"name":"Stack Infrastructure","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/553223628"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-606bc0e69afc243f","lat":37.0814992,"location_precision":"source supplied","lon":-113.6071292,"name":"ValorC3","operator":"ValorC3","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14277390413"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-607356bcc262c87e","lat":39.0052424,"location_precision":"source supplied","lon":-77.4464282,"name":"PowerHouse Pacific Building 1","operator":"PowerHouse Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1534356804"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Saint Louis","confidence":"low","id":"osm-609d06820c938d40","lat":38.6297601,"location_precision":"source supplied","lon":-90.1964208,"name":"TierPoint","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/253682978"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","id":"osm-61250f19eef82212","lat":33.42038,"location_precision":"source supplied","lon":-112.0413257,"name":"Iron Mountain Records Storage","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/131891022"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-61a7a05fdfb28654","lat":31.5134322,"location_precision":"source supplied","lon":-103.4491235,"name":"Unnamed data center (way/1536086683)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1536086683"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1536086684"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-6235288d42f3b511","lat":39.0248907,"location_precision":"source supplied","lon":-77.4534187,"name":"Equinix DC17","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1543931283"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-62a4da8c3ab3f3bd","lat":47.2539697,"location_precision":"source supplied","lon":-119.8136985,"name":"Vantage WA12","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/694602725"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","id":"osm-6314984b5d5f8f00","lat":40.0987619,"location_precision":"source supplied","lon":-82.7472449,"name":"Vantage Building 3","operator":"Vantage","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1427613546"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"El Segundo","confidence":"low","id":"osm-636a5e739f047f57","lat":33.9177276,"location_precision":"source supplied","lon":-118.3862234,"name":"Unnamed data center (way/424945736)","operator":"Centurylink","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/424945736"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-63a6c82077ad3fef","lat":40.0427054,"location_precision":"source supplied","lon":-74.2793066,"name":"Unnamed data center (way/1549253249)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1549253249"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1549253250"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-63e4e12e3acacc5c","lat":45.8530947,"location_precision":"source supplied","lon":-119.61968,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017491"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Denver","confidence":"low","id":"osm-64adb742450e0133","lat":39.7452303,"location_precision":"source supplied","lon":-104.9793322,"name":"Pearl Plaza Office Building","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52958203"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-64c3753de0955d6f","lat":31.0575233,"location_precision":"source supplied","lon":-97.2982979,"name":"Unnamed data center (way/1498670679)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1498670679"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-662494eef430de17","lat":41.2709381,"location_precision":"source supplied","lon":-79.814126,"name":"Unnamed data center (way/1539600946)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600946"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600947"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600948"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600949"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600950"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600951"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600952"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600953"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600954"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600955"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600956"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600957"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600958"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600959"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600960"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600961"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600962"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600963"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600964"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600965"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600966"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600967"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600968"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600969"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600971"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539600972"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603377"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603378"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603379"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603380"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603381"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1539603382"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Clifton","confidence":"low","id":"osm-66594e5f5f5815d0","lat":40.8305858,"location_precision":"source supplied","lon":-74.1245144,"name":"Digital Realty New Jersey EWR21","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460182351"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Sacramento","confidence":"low","id":"osm-66cb14a89e954f48","lat":38.6504319,"location_precision":"source supplied","lon":-121.4891868,"name":"RagingWire CA1","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/32560292"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-66cc4ad709e16d45","lat":40.0598657,"location_precision":"source supplied","lon":-83.1342839,"name":"Amazon AWS: Hilliard Data Center","operator":"Amazon Web Services us-east-2 datacenter","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460067225"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-672c728c3a97f0e1","lat":30.3428035,"location_precision":"source supplied","lon":-97.6961735,"name":"Element Critical","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/384396017"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"osm-675e53eabf77ff7c","lat":39.0747869,"location_precision":"source supplied","lon":-77.564129,"name":"Microsoft Leesburg Building 1","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/886330269"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/986829280"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Tempe","confidence":"low","id":"osm-67ba85d106e1af30","lat":33.3446197,"location_precision":"source supplied","lon":-111.8992189,"name":"Digital Realty Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/220518160"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Menomonie","confidence":"low","id":"osm-684d8e4eee04337d","lat":44.8771653,"location_precision":"source supplied","lon":-91.9199989,"name":"Unnamed data center (way/1157356188)","operator":"West Wisconsin Telcom","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1157356188"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Tuckerton","confidence":"low","id":"osm-6869cc2fcf08f049","lat":39.6150668,"location_precision":"source supplied","lon":-74.3288069,"name":"AT&T Tuckerton Cable Landing Station (TAT-14)","operator":"AT&T","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/371491126"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-68b472bbb0462a6c","lat":40.1192992,"location_precision":"source supplied","lon":-83.203226,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016638"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Secaucus","confidence":"low","id":"osm-68c829fad82c72c8","lat":40.7772907,"location_precision":"source supplied","lon":-74.0759403,"name":"Equinix New York Secaucus NY2","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/193611219"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Laurel","confidence":"low","id":"osm-692d03352b6f0837","lat":39.133687,"location_precision":"source supplied","lon":-76.8514344,"name":"Unnamed data center (way/1143804764)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1143804764"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Owings Mills","confidence":"low","id":"osm-6a0737a3528477ea","lat":39.4273178,"location_precision":"source supplied","lon":-76.8115503,"name":"Expedient Owings Mills","operator":"Expedient","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11167641842"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-6a3fbb895f2088f3","lat":38.76138,"location_precision":"source supplied","lon":-77.5392522,"name":"Unnamed data center (way/1509985717)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1509985717"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561790221"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"osm-6a647dcfcc0bc148","lat":45.5496803,"location_precision":"source supplied","lon":-122.9373872,"name":"NTT RagingWire DC - Hillsboro","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/52059176"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1454598380"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Richardson","confidence":"low","contains_osm":true,"id":"osm-6a7fbe15da22eb49","lat":32.9672759,"location_precision":"source supplied","lon":-96.7105291,"name":"Digital Realty Dallas DFW29","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876722"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876724"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876726"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876730"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/597876798"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"osm-6ad14cb7125113fb","lat":33.4090306,"location_precision":"source supplied","lon":-112.3648272,"name":"PHX-11","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1091128478"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6b4f5c522ae193da","lat":47.416868,"location_precision":"source supplied","lon":-120.2076878,"name":"Microsoft EAT02","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1071772119"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-6b5e4115c91a068a","lat":45.8398258,"location_precision":"source supplied","lon":-119.653894,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/633034074"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-6b79f1da801137f6","lat":39.0056891,"location_precision":"source supplied","lon":-77.4494637,"name":"Digital Realty IAD42","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1025002889"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-6b82c8640e12a08c","lat":38.9825519,"location_precision":"source supplied","lon":-77.4246299,"name":"Amazon IAD-145","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/744491691"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6bc1305b34a6e5af","lat":41.1704749,"location_precision":"source supplied","lon":-95.7895824,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1565614265"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6bf71307a42381f8","lat":41.5167412,"location_precision":"source supplied","lon":-93.7025134,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881731"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-6cc08002330d25a1","lat":29.4190024,"location_precision":"source supplied","lon":-98.7874813,"name":"Unnamed data center (way/1010260674)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1010260674"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344369111"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1533148752"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Minneapolis","confidence":"low","id":"osm-6cf7f6c162e65388","lat":44.9914423,"location_precision":"source supplied","lon":-93.2803397,"name":"Unnamed data center (way/45448535)","operator":"Verizon","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45448535"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"low","id":"osm-6d087537455f7bec","lat":33.138581,"location_precision":"source supplied","lon":-96.6600205,"name":"Unnamed data center (way/590213771)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/590213771"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6d35b357aaa9442e","lat":38.9492572,"location_precision":"source supplied","lon":-77.5498011,"name":"Yondr Allegro South","operator":"Yondr","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1319637945"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Tuckerton","confidence":"low","id":"osm-6d8bfdb39d533ca5","lat":39.6098738,"location_precision":"source supplied","lon":-74.3261398,"name":"GlobeNet Tuckerton Cable Landing Station","operator":"GlobeNet","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1250867182"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6de494e9ea20a936","lat":40.0929864,"location_precision":"source supplied","lon":-82.7476276,"name":"Amazon Web Services CMH62","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196801"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6df11386b3114cdf","lat":40.5528396,"location_precision":"source supplied","lon":-74.4566865,"name":"Unnamed data center (way/345650474)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/345650474"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6e2285031c0301d1","lat":39.2940482,"location_precision":"source supplied","lon":-84.4121132,"name":"Unnamed data center (way/36897140)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/36897140"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6e2a5efa854e499f","lat":36.057834,"location_precision":"source supplied","lon":-115.214258,"name":"Switch Las Vegas 8","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/585998677"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-6eb1ae18c55b5584","lat":38.7911185,"location_precision":"source supplied","lon":-77.5483863,"name":"Amazon IAD-52","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460060341"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6ee894a93682a2b2","lat":47.2370973,"location_precision":"source supplied","lon":-119.895155,"name":"Unnamed data center (way/807374322)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/807374322"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-6efdb30f0e97808a","lat":29.4157967,"location_precision":"source supplied","lon":-98.803316,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1010260676"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Austin","confidence":"low","contains_osm":true,"id":"osm-6f3e9a27b683193b","lat":30.2059267,"location_precision":"source supplied","lon":-97.6979254,"name":"Unnamed data center (way/379204766)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/379204766"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/455171103"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sandy City","confidence":"low","id":"osm-6fd383fde8eef3e8","lat":40.5908144,"location_precision":"source supplied","lon":-111.9037856,"name":"Verizon","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/943698949"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","contains_osm":true,"id":"osm-6ff477ecf9dcf48b","lat":33.7632897,"location_precision":"source supplied","lon":-84.6046613,"name":"Atlanta III","operator":"T5 Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981230"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981233"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981234"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981235"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-70ac43fa84adb4cb","lat":40.1190307,"location_precision":"source supplied","lon":-83.2002438,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196807"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"osm-71c365a48c9e917c","lat":39.051467,"location_precision":"source supplied","lon":-77.5394376,"name":"Stonewall Creek Business Park","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/706726088"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/710070925"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-7228f935916a70fc","lat":41.5176423,"location_precision":"source supplied","lon":-93.7024991,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881744"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-723b3598ab81be48","lat":38.7231919,"location_precision":"source supplied","lon":-77.4989708,"name":"CloudHQ MCC2","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996899489"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-724b9659ef1c952d","lat":38.777963,"location_precision":"source supplied","lon":-77.5471012,"name":"Iron Mountain VA-1","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996723586"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-728176dc17064364","lat":41.5158641,"location_precision":"source supplied","lon":-93.7203124,"name":"Unnamed data center (way/1368776076)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1368776076"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1368776077"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1454813845"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1454813846"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-735d4cb1e78763e8","lat":45.853786,"location_precision":"source supplied","lon":-119.6300361,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697415323"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"San Francisco","confidence":"low","id":"osm-736ff740b5ceb31c","lat":37.7236272,"location_precision":"source supplied","lon":-122.3979543,"name":"Digital Realty San Francisco SFO10","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/289620443"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-742ca6626cff8be0","lat":40.5114517,"location_precision":"source supplied","lon":-111.8882555,"name":"FiberState Datacenter","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1133047980"}],"state":"Utah","status":"unknown"},{"ai_classification":"unknown","city":"Durham","confidence":"low","contains_osm":true,"id":"osm-7457b5f851e39520","lat":35.9356302,"location_precision":"source supplied","lon":-78.8806869,"name":"Unnamed data center (way/617525579)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/617525579"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556818364"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-7458e0a377749fc9","lat":38.9823877,"location_precision":"source supplied","lon":-77.4167858,"name":"Amazon IAD-141","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/817338832"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-74c717322e012356","lat":36.4113782,"location_precision":"source supplied","lon":-86.3660037,"name":"Meta Gallatin Data Center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312795639"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-74e37b801e344ebc","lat":35.5681349,"location_precision":"source supplied","lon":-95.5124166,"name":"Unnamed data center (way/1387080629)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1387080629"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-764f69a10d237ee6","lat":38.7903463,"location_precision":"source supplied","lon":-77.5400098,"name":"Amazon IAD-24","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45776979"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-770773c7b03ec8d0","lat":40.0946297,"location_precision":"source supplied","lon":-82.7513394,"name":"Amazon Web Services  CMH50","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/562775657"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-7717438248e4adac","lat":38.9059013,"location_precision":"source supplied","lon":-77.4689724,"name":"Unnamed data center (way/251716311)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/251716311"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258520532"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Detroit","confidence":"low","contains_osm":true,"id":"osm-78260f3997c9db81","lat":42.3262876,"location_precision":"source supplied","lon":-83.0769768,"name":"Unnamed data center (way/71187940)","operator":"Verizon Wireless","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/71187940"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/903236619"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-78cac1d7ea2de57f","lat":44.9380753,"location_precision":"source supplied","lon":-123.0337222,"name":"CenturyLink","operator":"CenturyLink","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/965755845"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-7ae5b8c4ec311d9c","lat":45.5563407,"location_precision":"source supplied","lon":-122.9394067,"name":"Flexential Portland - Hillsboro 5","operator":"Flexential","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1080170580"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-7b1dcc8971117494","lat":39.0027516,"location_precision":"source supplied","lon":-77.4854486,"name":"Amazon IAD-6","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300969615"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460175672"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-7bc509aefc6fd228","lat":39.0034856,"location_precision":"source supplied","lon":-77.4485787,"name":"PowerHouse Pacific Building 2","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1534356805"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-7cbd7a18b1b77970","lat":38.7911993,"location_precision":"source supplied","lon":-77.5382664,"name":"Amazon IAD-7","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45776988"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-7cdfdc9153fa665f","lat":47.2462099,"location_precision":"source supplied","lon":-119.8132256,"name":"Unnamed data center (way/283051469)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051469"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051470"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051471"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051475"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-7dbcf1224f59b6a7","lat":39.0216753,"location_precision":"source supplied","lon":-77.4329728,"name":"Amazon IAD-10","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/48242814"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/48242816"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701930920"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701930921"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793087859"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/852039781"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/886028872"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1037871048"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"low","id":"osm-7e7b6d5b7eaf388a","lat":33.1406542,"location_precision":"source supplied","lon":-96.6595498,"name":"Unnamed data center (way/1484435248)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1484435248"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-7ecbc9fc54814923","lat":36.4084957,"location_precision":"source supplied","lon":-86.3716203,"name":"Gallatin Data Center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1213758201"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","id":"osm-7f51c6f4db9eae09","lat":39.0323054,"location_precision":"source supplied","lon":-77.4297021,"name":"Amazon IAD-163","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/930849744"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"osm-7f75f76daa02de2f","lat":38.7793815,"location_precision":"source supplied","lon":-77.5417245,"name":"Amazon IAD-75","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/667573133"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996723587"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996723588"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996723589"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-7f98ffd816151163","lat":44.7347591,"location_precision":"source supplied","lon":-93.0618605,"name":"Unnamed data center (way/1454573842)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1454573842"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1454573843"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-7fa546b71e5db196","lat":38.988724,"location_precision":"source supplied","lon":-77.447671,"name":"Amazon IAD-12","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/299929061"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056023"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056024"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-7fceb49fbbf4bbe0","lat":36.4060645,"location_precision":"source supplied","lon":-86.3666284,"name":"Meta Gallatin Data Center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312795640"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-80e1fb09b7d0b69a","lat":39.1011816,"location_precision":"source supplied","lon":-94.5788209,"name":"Unnamed data center (node/9861806598)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/9861806598"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/118650988"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8157df5ed55b0423","lat":33.061987,"location_precision":"source supplied","lon":-80.0382932,"name":"Unnamed data center (way/1069388067)","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388067"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-8176f7e37ccd6997","lat":47.2467356,"location_precision":"source supplied","lon":-119.8288659,"name":"Unnamed data center (way/283051478)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051478"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051481"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051482"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051483"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051484"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/283051485"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-81d01e36bc4cccda","lat":38.9863003,"location_precision":"source supplied","lon":-77.4418855,"name":"Amazon IAD-58","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697020849"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-81d2195fd57e3962","lat":37.3750292,"location_precision":"source supplied","lon":-121.9548775,"name":"Prime SANTA CLARA DATA CENTER","operator":"Prime","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073659"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-81e815b3d113f1c1","lat":45.5473758,"location_precision":"source supplied","lon":-122.8973869,"name":"Stack Infrastructure - POR02","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328702378"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"osm-82038c617594c2ff","lat":38.8151324,"location_precision":"source supplied","lon":-77.6529193,"name":"Amazon IAD-64","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697021948"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"osm-821bc3339343937b","lat":37.2420719,"location_precision":"source supplied","lon":-121.7817852,"name":"Equinix SV5","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/161126131"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-827b59d7b4488adb","lat":39.017225,"location_precision":"source supplied","lon":-77.4703718,"name":"NTT VA3","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/649365751"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793888429"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793888430"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188691867"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188691868"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556781864"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560827941"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-82d11ad5ed43dcb3","lat":42.675665,"location_precision":"source supplied","lon":-87.9184055,"name":"Unnamed data center (way/919948160)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/919948160"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-82d33151f3f789ba","lat":38.7894558,"location_precision":"source supplied","lon":-77.5796864,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517639"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-831258473bd34611","lat":29.4466626,"location_precision":"source supplied","lon":-98.6405797,"name":"Unnamed data center (way/254742608)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254742608"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254742609"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254742610"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390734"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390735"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390736"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390737"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390738"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390739"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390740"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390741"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390742"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390743"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390744"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390745"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390746"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390747"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390748"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390749"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390750"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1537390751"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-83802743cd936bcd","lat":39.025458,"location_precision":"source supplied","lon":-77.4542815,"name":"Equinix Ashburn DC18","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14156477686"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-83ad96dc729e3066","lat":47.2475452,"location_precision":"source supplied","lon":-119.8255073,"name":"Unnamed data center (way/499403699)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/499403699"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-83f2bd7a2b022e98","lat":47.2394776,"location_precision":"source supplied","lon":-119.8830092,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/410408073"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/410408074"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/499403180"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/694493125"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/694493126"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/694493127"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/694493128"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1429883881"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8474d2ffd253f5f5","lat":29.412977,"location_precision":"source supplied","lon":-98.8063744,"name":"Microsoft TRP3 (SAT46)","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1010260675"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-8497446757a59025","lat":38.7921874,"location_precision":"source supplied","lon":-77.5484673,"name":"Amazon IAD-59","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460060340"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Tulsa","confidence":"low","id":"osm-84a5c7735fa0aa5d","lat":36.0812515,"location_precision":"source supplied","lon":-95.8541492,"name":"Unnamed data center (way/946014659)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/946014659"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Durant","confidence":"low","id":"osm-84a9e8a01b4412b5","lat":33.9716849,"location_precision":"source supplied","lon":-96.4028488,"name":"Choctaw Nation of Oklahoma Data Center","operator":"Choctaw Nation of oklahoma","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/726150321"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-856b8422664e7214","lat":38.9097961,"location_precision":"source supplied","lon":-77.4734544,"name":"H5 IAD32","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258519959"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-859535e814c4ae55","lat":40.1038888,"location_precision":"source supplied","lon":-82.8106146,"name":"TJX Corporate Techno","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/547156394"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"osm-85bb82b067d45123","lat":38.8169707,"location_precision":"source supplied","lon":-77.6521528,"name":"Amazon IAD-94","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340217"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-86e9440db2916ff8","lat":39.0210047,"location_precision":"source supplied","lon":-77.4514888,"name":"Equinix DC10","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460050155"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chandler","confidence":"low","id":"osm-87359a5555ecb543","lat":33.2769993,"location_precision":"source supplied","lon":-111.8858906,"name":"H5 Phoenix","operator":"H5","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300959969"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-87bf518320439ca9","lat":39.0230155,"location_precision":"source supplied","lon":-77.4497875,"name":"Equinix DC12","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/596690175"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-87da0441ad4f36d3","lat":33.0663558,"location_precision":"source supplied","lon":-80.0385236,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388147"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-88121e26176fcabc","lat":45.8411742,"location_precision":"source supplied","lon":-119.6554491,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697415321"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-884715f4c735f84e","lat":45.5493273,"location_precision":"source supplied","lon":-122.9278183,"name":"Stack Infrastructure - POR01","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/471691757"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8900b597851da933","lat":37.7990205,"location_precision":"source supplied","lon":-122.2825386,"name":"Digital Realty","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377378595"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-89207e6defe81e60","lat":41.1349194,"location_precision":"source supplied","lon":-96.1440824,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1237493975"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"McLean","confidence":"low","id":"osm-898abb632fbdd764","lat":38.9199052,"location_precision":"source supplied","lon":-77.213585,"name":"DataBank IAD2","operator":"DataBank","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/239147724"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-89a88ed02b513316","lat":36.0652076,"location_precision":"source supplied","lon":-115.222045,"name":"Switch Las Vegas 14","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1421212901"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-89d51537d4b1454c","lat":36.0555857,"location_precision":"source supplied","lon":-115.2230608,"name":"Switch Las Vegas 10","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/984796364"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Naperville","confidence":"low","id":"osm-8aba4cdce37a0fca","lat":41.8109573,"location_precision":"source supplied","lon":-88.1952275,"name":"NetSource Communications, Inc","operator":"NetSource","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1562274525"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8acdcfa84491fb26","lat":42.0230765,"location_precision":"source supplied","lon":-87.961467,"name":"Unnamed data center (way/1316005112)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1316005112"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","contains_osm":true,"id":"osm-8b0ad99ea211fd4c","lat":45.8587472,"location_precision":"source supplied","lon":-119.6050828,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196816"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196817"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196818"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344154"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280344155"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-8b8e75d12de79d48","lat":38.9950727,"location_precision":"source supplied","lon":-77.4459839,"name":"EdgeCore AS02","operator":"EdgeCore","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544360247"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-8b987b81ec7196e7","lat":39.0295615,"location_precision":"source supplied","lon":-77.4596546,"name":"Amazon IAD-50","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/556599694"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8ba63c2ffeaa03c0","lat":41.5167061,"location_precision":"source supplied","lon":-93.7063257,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881734"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-8bb66bf7d61f5160","lat":42.0014952,"location_precision":"source supplied","lon":-87.9525624,"name":"EdgeConneX CHI02","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/377032058"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-8d525d19aa272285","lat":39.2906383,"location_precision":"source supplied","lon":-94.6759163,"name":"Unnamed data center (way/195165330)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/195165330"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/195165354"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/288909509"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-8e6a00c8562d6039","lat":45.5679542,"location_precision":"source supplied","lon":-122.9167725,"name":"Digital Realty PDX11 Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/734323663"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-8e89fae7b23c3774","lat":38.750815,"location_precision":"source supplied","lon":-77.1962716,"name":"Unnamed data center (way/260996040)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/260996040"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Southgate","confidence":"low","id":"osm-8fb149c21e2959dd","lat":42.213902,"location_precision":"source supplied","lon":-83.198214,"name":"Comcast","operator":"Comcast","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/812630939"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-900ee5f21a5dbdd8","lat":36.1485011,"location_precision":"source supplied","lon":-95.990514,"name":"Windstream","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13720841437"}],"state":"Oklahoma","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-907bf948941c2003","lat":45.8538757,"location_precision":"source supplied","lon":-119.6197258,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1501436323"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-9094f099e92d6bb4","lat":45.8404436,"location_precision":"source supplied","lon":-119.6549794,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/592171280"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-90aaa770282a0e23","lat":38.7345976,"location_precision":"source supplied","lon":-77.5066419,"name":"Amazon IAD-100","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996899488"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-90befc664f69e5ae","lat":39.022182,"location_precision":"source supplied","lon":-77.4576094,"name":"Lumen Ashburn","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300162689"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-90cb5439efa40370","lat":39.7440482,"location_precision":"source supplied","lon":-93.997376,"name":"CenturyLink","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1371348227"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-91504ca370d5db35","lat":40.0965342,"location_precision":"source supplied","lon":-82.7520513,"name":"Amazon Web Services CMH56","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020374278"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-91ed7f109996e9d5","lat":32.4966,"location_precision":"source supplied","lon":-99.7911324,"name":"Unnamed data center (way/1530966389)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966389"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Allen","confidence":"low","id":"osm-922dd7c8beb322cd","lat":33.1378315,"location_precision":"source supplied","lon":-96.6559451,"name":"Unnamed data center (way/590213770)","operator":"ScaleMatrix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/590213770"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9263458299d87ac4","lat":41.3419347,"location_precision":"source supplied","lon":-96.0877015,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422101112"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-929280dd69a34f23","lat":29.4700573,"location_precision":"source supplied","lon":-98.6721062,"name":"CyrusOne San Antonio III","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611439"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-93400dcc3d0a1d9e","lat":39.0028892,"location_precision":"source supplied","lon":-77.4393845,"name":"Vantage VA14","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1518761569"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"San Francisco","confidence":"low","id":"osm-936d8418045974ca","lat":37.7889916,"location_precision":"source supplied","lon":-122.3901367,"name":"360 Spear Street Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/192307107"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"osm-93b9f8b53b4839f4","lat":38.7475999,"location_precision":"source supplied","lon":-77.51948,"name":"Amazon IAD-105","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1134911640"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1134911641"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1221862807"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196825"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-9482654bfda5782d","lat":38.9869931,"location_precision":"source supplied","lon":-77.4426325,"name":"Amazon IAD-57","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/697020850"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-94e413b44f971f92","lat":39.015885,"location_precision":"source supplied","lon":-77.4531399,"name":"Amazon IAD-179","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1088203907"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-954df2f433537255","lat":32.4975274,"location_precision":"source supplied","lon":-99.7915938,"name":"Unnamed data center (way/1530966388)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966388"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-95552415fe0b21b6","lat":47.2442897,"location_precision":"source supplied","lon":-119.8148063,"name":"Unnamed data center (way/1193914602)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1193914602"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-95a6d7066db02f95","lat":38.7403853,"location_precision":"source supplied","lon":-77.5039772,"name":"Digital Realty IAD53","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1269259655"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561771300"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1568615857"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-968ce97333e5ef7e","lat":41.1143501,"location_precision":"source supplied","lon":-96.1428055,"name":"Meta Sarpy Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282101"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-96bfb7d1bfc8f593","lat":36.1405001,"location_precision":"source supplied","lon":-86.7641364,"name":"Unnamed data center (way/533842335)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/533842335"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Kirksville","confidence":"low","id":"osm-96eb320e79e531b8","lat":40.1944836,"location_precision":"source supplied","lon":-92.5812336,"name":"Unnamed data center (way/642755041)","operator":"AT&T","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/642755041"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Wallingford","confidence":"low","id":"osm-970e1d333e111701","lat":41.4788147,"location_precision":"source supplied","lon":-72.8010139,"name":"Unnamed data center (way/959969621)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/959969621"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-978fd26b1646bca3","lat":48.1462599,"location_precision":"source supplied","lon":-103.7727866,"name":"Atlas Powr Williston Datacenter","operator":"Atlas Power Holdings (ND) LLC","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1545814424"}],"state":"North Dakota","status":"unknown"},{"ai_classification":"unknown","city":"Polk City","confidence":"low","id":"osm-97e36e0012d59861","lat":28.2940687,"location_precision":"source supplied","lon":-81.8348651,"name":"Unnamed data center (way/1034230196)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1034230196"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-982e9f2b57dbb517","lat":41.1343926,"location_precision":"source supplied","lon":-96.1559041,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1237494981"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9873dffcd745e1b3","lat":41.1755307,"location_precision":"source supplied","lon":-95.8022395,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720216"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"McLean","confidence":"low","id":"osm-994c153398b7030f","lat":38.9200207,"location_precision":"source supplied","lon":-77.2116187,"name":"Lumen McLean 1","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/239147373"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"osm-996ab00f1b009a83","lat":33.4127955,"location_precision":"source supplied","lon":-112.3648636,"name":"PHX-14","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1532070754"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-998da44b419ceb62","lat":33.7651394,"location_precision":"source supplied","lon":-84.3837393,"name":"CenturyLink","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/536784688"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9a77c0da995468e2","lat":34.060998,"location_precision":"source supplied","lon":-84.2740266,"name":"Unnamed data center (way/1012918195)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1012918195"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9a79ad9426244ae1","lat":33.0644422,"location_precision":"source supplied","lon":-80.0460576,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388211"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Portsmouth","confidence":"low","id":"osm-9aaf60120f6f7727","lat":43.0761287,"location_precision":"source supplied","lon":-70.8080395,"name":"Unnamed data center (way/87058670)","operator":"FirstLight","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/87058670"}],"state":"New Hampshire","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-9abd078f0725f8c7","lat":39.0263311,"location_precision":"source supplied","lon":-77.4516315,"name":"Amazon Web Services Datacenter Complex","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460053028"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460053030"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/463571875"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-9b350ea2ee99cf16","lat":39.5700526,"location_precision":"source supplied","lon":-119.5370915,"name":"Unnamed data center (way/1210199366)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210199366"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210199367"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210199368"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-9b712c9e5b0c6f6e","lat":38.7744146,"location_precision":"source supplied","lon":-77.54223,"name":"Iron Mountain VA-4","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260556"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-9b93636c9ed2c9fa","lat":38.9967211,"location_precision":"source supplied","lon":-77.4355972,"name":"Amazon IAD-146","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/794147657"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9bc1e459d96fada1","lat":41.1736283,"location_precision":"source supplied","lon":-95.7886606,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260561"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9bd37377161ed83d","lat":38.7751744,"location_precision":"source supplied","lon":-77.5399654,"name":"Iron Mountain VA-7","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517637"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","contains_osm":true,"id":"osm-9c22be02dc5cf42c","lat":33.7627446,"location_precision":"source supplied","lon":-84.6024573,"name":"Stack Infrastructure","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981231"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981232"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9c6cca0bf470ccea","lat":41.134992,"location_precision":"source supplied","lon":-96.1467112,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844394357"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9c8e2614542f69b1","lat":36.0579919,"location_precision":"source supplied","lon":-115.2103279,"name":"Switch Las Vegas 12","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1314355599"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-9d075fec40946748","lat":39.0066187,"location_precision":"source supplied","lon":-77.4664074,"name":"Digital Realty IAD73","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701923202"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-9d32be0880eab0a6","lat":38.9048369,"location_precision":"source supplied","lon":-77.4547504,"name":"Amazon IAD-135","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196798"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Elk Grove Village","confidence":"low","id":"osm-9d7a4e6f9662485d","lat":42.0231434,"location_precision":"source supplied","lon":-87.9721861,"name":"Microsoft CHI11","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1219083552"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-9d9d22886ee218d8","lat":29.4708878,"location_precision":"source supplied","lon":-98.6730474,"name":"CyrusOne San Antonio II","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/509611438"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Tempe","confidence":"low","id":"osm-9fa11847e02aa6ce","lat":33.3955466,"location_precision":"source supplied","lon":-111.9700881,"name":"EdgeConneX","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/220014929"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Bend","confidence":"low","id":"osm-9fe01b394d1c727d","lat":44.0474074,"location_precision":"source supplied","lon":-121.3285496,"name":"Fort Rock DC","operator":"Fort Rock Data Center","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/752001022"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-a007e8bfabf76cbe","lat":38.737208,"location_precision":"source supplied","lon":-77.8262798,"name":"Unnamed data center (way/1380114462)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1380114462"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1380114463"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a02a0fd1111b95d7","lat":41.1122489,"location_precision":"source supplied","lon":-96.1416248,"name":"Meta Sarpy Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282102"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a04115cd10a5889e","lat":47.6719149,"location_precision":"source supplied","lon":-117.0959323,"name":"TierPoint","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/335468616"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a05f88033a523572","lat":32.4984632,"location_precision":"source supplied","lon":-99.7911682,"name":"Unnamed data center (way/1530966386)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966386"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a0d0d8296fe328f3","lat":47.4196379,"location_precision":"source supplied","lon":-120.2138134,"name":"Microsoft EAT04","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1173537117"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-a0f0cb93b9307867","lat":39.0263152,"location_precision":"source supplied","lon":-77.4340194,"name":"CyrusOne NVA7","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/983627455"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-a1837f1d89ba5826","lat":40.0207739,"location_precision":"source supplied","lon":-83.1241809,"name":"Unnamed data center (way/1447049070)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1447049070"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1447049071"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-a1a18b27762d567e","lat":39.0035927,"location_precision":"source supplied","lon":-77.4467729,"name":"PowerHouse Pacific Building 3","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544360250"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Reston","confidence":"low","id":"osm-a1de1f771b7133cc","lat":38.9488037,"location_precision":"source supplied","lon":-77.3294224,"name":"Evocative IAD1","operator":"Evocative","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/79159494"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a212786fb2f7d50d","lat":33.0641647,"location_precision":"source supplied","lon":-80.0436036,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388156"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Memphis","confidence":"low","id":"osm-a2353c83be689d6b","lat":34.9934882,"location_precision":"source supplied","lon":-90.0341701,"name":"xAI Macrohardrr","operator":"xAI","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1077131079"}],"state":"Mississippi","status":"unknown"},{"ai_classification":"unknown","city":"Totowa","confidence":"low","id":"osm-a2785031d4338026","lat":40.9072322,"location_precision":"source supplied","lon":-74.242222,"name":"Unnamed data center (way/1556797631)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556797631"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a322ade22ad76fad","lat":41.3455008,"location_precision":"source supplied","lon":-96.093655,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422101116"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Aldie","confidence":"low","contains_osm":true,"id":"osm-a3a00c6b4aba160c","lat":38.9498954,"location_precision":"source supplied","lon":-77.5604517,"name":"Amazon IAD-124","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/897226575"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1301654223"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1301654224"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a3e587ac4ecd2b46","lat":29.8215755,"location_precision":"source supplied","lon":-95.5708004,"name":"Unnamed data center (way/587103676)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/587103676"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a3f6d321c96aa3e0","lat":32.4965549,"location_precision":"source supplied","lon":-99.795562,"name":"Unnamed data center (way/1530966392)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966392"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-a467bd00e74b7ed7","lat":39.0167452,"location_precision":"source supplied","lon":-77.4520059,"name":"Amazon IAD-169","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1088203906"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-a5bc728601c0db32","lat":38.7369848,"location_precision":"source supplied","lon":-77.5040881,"name":"Amazon IAD-103","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227612684"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a6189e677135cda5","lat":32.499904,"location_precision":"source supplied","lon":-99.7866369,"name":"Unnamed data center (way/1530966384)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966384"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"osm-a63f7e3956a5a910","lat":37.3336326,"location_precision":"source supplied","lon":-121.8879639,"name":"Unnamed data center (way/451413811)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/451413811"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a6760f300a6157c0","lat":40.5445265,"location_precision":"source supplied","lon":-74.5377876,"name":"Rackspace Somerset NYC1","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/998933381"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a6f4d1df7ac50116","lat":38.9588464,"location_precision":"source supplied","lon":-77.5026145,"name":"CyrusOne NVA9","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544104138"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a77ee143af5b8a76","lat":45.6385144,"location_precision":"source supplied","lon":-121.2020627,"name":"Google Taylor Lake Data Center","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/700431553"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a82015479fc10cde","lat":41.1755278,"location_precision":"source supplied","lon":-95.803375,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720215"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-a8551d1646bffe45","lat":45.5476065,"location_precision":"source supplied","lon":-122.8919518,"name":"Digital Realty PDX10 Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328702750"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a863fae2dc1d7998","lat":41.4648153,"location_precision":"source supplied","lon":-75.1294195,"name":"SES - Hawley Earth Station","operator":"SES","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/10132610"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-a8b4872ca47af530","lat":38.9980776,"location_precision":"source supplied","lon":-77.4754706,"name":"QTS Ashburn 3 DC1","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1003348567"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1188680247"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"East Wenatchee","confidence":"low","id":"osm-a8bf5fb107048d76","lat":47.4072423,"location_precision":"source supplied","lon":-120.213935,"name":"Unnamed data center (way/813688319)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/813688319"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a8d0fe14b8dcee92","lat":30.0187,"location_precision":"source supplied","lon":-95.8637474,"name":"Unnamed data center (way/487170215)","operator":"DXC Technology","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/487170215"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-a9b8c6260eab57d8","lat":47.6933236,"location_precision":"source supplied","lon":-122.3173172,"name":"Unnamed data center (way/221201212)","operator":"Comcast","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/221201212"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","contains_osm":true,"id":"osm-aa12635ae6457e46","lat":38.9160727,"location_precision":"source supplied","lon":-77.4772491,"name":"Amazon IAD-150","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701931820"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/989735623"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-aa2cde213f9b471f","lat":31.5327486,"location_precision":"source supplied","lon":-103.8062715,"name":"Unnamed data center (way/1511639842)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1511639842"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1511639843"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1511639844"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1511639845"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-aae9ce229caa0498","lat":32.4980409,"location_precision":"source supplied","lon":-99.786612,"name":"Unnamed data center (way/1530966382)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966382"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ab0e5523768ee115","lat":36.1829977,"location_precision":"source supplied","lon":-115.0626696,"name":"CenturyLink","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1013396352"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","id":"osm-abb2a65170375690","lat":41.8759405,"location_precision":"source supplied","lon":-87.6314655,"name":"CoreSite Chicago Data Center (CH1)","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11098469355"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ac0d93dab4ca2ed5","lat":28.6174494,"location_precision":"source supplied","lon":-81.3934606,"name":"Unnamed data center (way/609126465)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/609126465"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ac1d5b5528c2b01b","lat":39.0436134,"location_precision":"source supplied","lon":-77.5372623,"name":"True North Data Centers","operator":"True North Data Solutions","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1387391200"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-ac6f4eb819876c6f","lat":43.4631415,"location_precision":"source supplied","lon":-116.2682325,"name":"Unnamed data center (way/1455915217)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1455915217"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1455915218"}],"state":"Idaho","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-acd24e7e8520cb94","lat":38.7788593,"location_precision":"source supplied","lon":-77.5571158,"name":"Amazon IAD601","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1015995259"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ad5b8e210b116b5a","lat":41.8072817,"location_precision":"source supplied","lon":-83.6276287,"name":"Unnamed data center (node/11815482844)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/11815482844"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-adc4ea4e00ae216d","lat":43.0821786,"location_precision":"source supplied","lon":-79.0307777,"name":"Unnamed data center (way/1109643936)","operator":"US Bitcoin","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1109643936"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-adca0db137551bda","lat":38.9835278,"location_precision":"source supplied","lon":-77.4175076,"name":"Amazon IAD-608","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340213"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-addf5b95ab171f83","lat":37.3797897,"location_precision":"source supplied","lon":-121.9499034,"name":"Unnamed data center (way/209105766)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209105766"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ae6e30ce8aeeda4b","lat":39.8484523,"location_precision":"source supplied","lon":-82.9963927,"name":"Google Lockbourne, OH","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1281982556"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-aec57b43bd48343f","lat":41.141335,"location_precision":"source supplied","lon":-104.7167599,"name":"Unnamed data center (way/1197757147)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1197757147"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1534114833"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-af29fae7430f05b3","lat":41.0768345,"location_precision":"source supplied","lon":-104.826572,"name":"Unnamed data center (way/1485867768)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1485867768"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1485867769"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Somerset","confidence":"low","contains_osm":true,"id":"osm-af356b9beeaf4cd6","lat":40.5379663,"location_precision":"source supplied","lon":-74.5457274,"name":"Unnamed data center (way/460182320)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460182320"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460182330"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/989352911"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-af7afcc81a06b4f6","lat":45.8517309,"location_precision":"source supplied","lon":-119.6196613,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386017490"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-afd85c4e292bc33b","lat":46.0123214,"location_precision":"source supplied","lon":-98.5730984,"name":"Unnamed data center (way/1422191468)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191468"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191469"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191470"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191471"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191472"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191473"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191474"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191475"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191476"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422191477"}],"state":"North Dakota","status":"unknown"},{"ai_classification":"unknown","city":"Aldie","confidence":"low","id":"osm-b023392a3d7e1019","lat":38.9510645,"location_precision":"source supplied","lon":-77.5555499,"name":"Microsoft IAD11","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560641653"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-b0d548d79c1987d0","lat":38.7681429,"location_precision":"source supplied","lon":-77.5386481,"name":"Iron Mountain VA-6","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1304357577"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b15898eddbfa3559","lat":32.8947608,"location_precision":"source supplied","lon":-96.9819377,"name":"Unnamed data center (way/1177794153)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177794153"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Dulles","confidence":"low","id":"osm-b15f61255058c1de","lat":39.0289143,"location_precision":"source supplied","lon":-77.4274784,"name":"Amazon IAD-174","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/984953813"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b18fdd5944d2f332","lat":39.3777781,"location_precision":"source supplied","lon":-77.4115448,"name":"Unnamed data center (way/178331621)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/178331621"}],"state":"Maryland","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b29fed3a47869779","lat":36.0640206,"location_precision":"source supplied","lon":-115.221109,"name":"Switch Las Vegas 15","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1263819877"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-b2d1be67b8bd4445","lat":38.9950101,"location_precision":"source supplied","lon":-77.4353604,"name":"Amazon IAD-147","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/958662382"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b323a1736feff0dc","lat":40.1570435,"location_precision":"source supplied","lon":-74.101582,"name":"Manasquan Cable Landing Station (Apollo)","operator":"Vodafone","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/459188722"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-b36a572ef8ff457d","lat":34.0370622,"location_precision":"source supplied","lon":-84.0576958,"name":"QTS Suwanee Data Center 2","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/387379196"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1207052719"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-b386564e009f2b2b","lat":37.3749324,"location_precision":"source supplied","lon":-121.9559987,"name":"Digital Realty Silicon Valley SJC16","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/209073653"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b498615e566dbd4e","lat":40.0579063,"location_precision":"source supplied","lon":-82.7653279,"name":"Google NBY-3","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196811"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"osm-b49ffcca6ef7ecd7","lat":37.4039641,"location_precision":"source supplied","lon":-121.8892308,"name":"Unnamed data center (way/460159925)","operator":"NTT Limited","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460159925"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"osm-b5487ccf70cae7fe","lat":33.7555186,"location_precision":"source supplied","lon":-84.3914814,"name":"Atlanta ATL13","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/8109664813"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-b66073706ef7743a","lat":39.0004483,"location_precision":"source supplied","lon":-77.4607956,"name":"Amazon IAD-286","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344901567"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","id":"osm-b688645c0a08866d","lat":33.7420393,"location_precision":"source supplied","lon":-84.5965614,"name":"Atlanta, GA","operator":"Data Canopy","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975063975"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Chicago","confidence":"low","id":"osm-b81ff3babf750549","lat":41.8627972,"location_precision":"source supplied","lon":-87.6413012,"name":"CoreSite Chicago Data Center (CH2)","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/841813139"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-b821d1b94c36c32d","lat":38.9149908,"location_precision":"source supplied","lon":-77.4909743,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196800"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b834210b76a2d63f","lat":42.6733205,"location_precision":"source supplied","lon":-87.8968464,"name":"Unnamed data center (way/1510420026)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510420026"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b84f477dd6d69282","lat":29.47076,"location_precision":"source supplied","lon":-98.670723,"name":"CyrusOne San Antonio IV","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1121592786"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-b86c1a514bf25b71","lat":40.7847354,"location_precision":"source supplied","lon":-74.0643545,"name":"Unnamed data center (way/354590432)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/354590432"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/451491797"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","id":"osm-b91c84a1c1457b1c","lat":29.6725909,"location_precision":"source supplied","lon":-82.2999288,"name":"UF Research Computing Center","operator":"University of Florida","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/429782814"}],"state":"Florida","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-b98b7fac4422b7b6","lat":36.0591345,"location_precision":"source supplied","lon":-115.213688,"name":"Switch Edge 1","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1017048670"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-bb1dc0460abae82c","lat":39.0133911,"location_precision":"source supplied","lon":-77.4537722,"name":"Equinix DC22","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1522636324"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-bbd90c1f4ba62856","lat":41.6677428,"location_precision":"source supplied","lon":-93.5164071,"name":"Facebook Altoona Data Center 4","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/788027103"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"East Wenatchee","confidence":"low","id":"osm-bc5865e0e8d86ae0","lat":47.4183239,"location_precision":"source supplied","lon":-120.20771,"name":"Microsoft EAT03","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1173537116"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Englewood","confidence":"low","id":"osm-bc9c86e0f79cc9b6","lat":39.5608686,"location_precision":"source supplied","lon":-104.8307237,"name":"CSquare - DEN2","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/192528287"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-bcc707bdccd9ac39","lat":35.0896825,"location_precision":"source supplied","lon":-106.6190669,"name":"Unnamed data center (node/14086231277)","operator":"UNMH","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14086231277"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Medicine Lodge","confidence":"low","id":"osm-beecc6b4bc677b11","lat":37.2784058,"location_precision":"source supplied","lon":-98.5884618,"name":"Unnamed data center (way/1498005255)","operator":"SC","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1498005255"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-bf347b49390984e6","lat":36.0234892,"location_precision":"source supplied","lon":-86.7916196,"name":"Unnamed data center (way/826001605)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/826001605"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-bf35990b5ae4afbe","lat":34.1998691,"location_precision":"source supplied","lon":-118.3437888,"name":"Unnamed data center (way/460212563)","operator":"Centurylink","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460212563"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"New Albany","confidence":"low","contains_osm":true,"id":"osm-bf6190b181eca5ca","lat":40.1024981,"location_precision":"source supplied","lon":-82.7469519,"name":"Vantage Building 1","operator":"Vantage","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1427613544"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1427613545"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Las Vegas","confidence":"low","id":"osm-bf952d96c05a90c6","lat":36.059754,"location_precision":"source supplied","lon":-115.1471723,"name":"DataBank Las Vegas LAS1","operator":"DataBank","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1034475557"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Chaska","confidence":"low","id":"osm-bfb5b27dea63a868","lat":44.8084755,"location_precision":"source supplied","lon":-93.6376348,"name":"Lightedge Data Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/874888709"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-c00eba3e0a8895eb","lat":39.0287737,"location_precision":"source supplied","lon":-77.4582461,"name":"Amazon IAD-60","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/556599695"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c0982633599c6182","lat":31.1941757,"location_precision":"source supplied","lon":-94.7967665,"name":"Unnamed data center (way/1457383500)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1457383500"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c0b688c76f497256","lat":36.3280739,"location_precision":"source supplied","lon":-83.3767035,"name":"Unnamed data center (way/904453635)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/904453635"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-c0d3b1cb0bf28053","lat":39.0088059,"location_precision":"source supplied","lon":-77.4582358,"name":"Digital Realty IAD41","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793087858"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","contains_osm":true,"id":"osm-c10a3aac1cbf6c21","lat":39.0559766,"location_precision":"source supplied","lon":-77.5473343,"name":"Amazon IAD-668","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443922527"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443922528"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460776170"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1460776171"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-c12cdd3d877f1e9d","lat":39.001791,"location_precision":"source supplied","lon":-77.438057,"name":"Vantage VA12","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/985207884"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227777116"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c12da728f7400b31","lat":41.6642482,"location_precision":"source supplied","lon":-93.5147581,"name":"Facebook Altoona Data Center 1","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/438078069"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Enterprise","confidence":"low","id":"osm-c1cd211b666aa08d","lat":36.0599191,"location_precision":"source supplied","lon":-115.210197,"name":"Switch Las Vegas 7","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/172739953"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-c1e8969a170e846d","lat":45.8361921,"location_precision":"source supplied","lon":-119.6940549,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1226439731"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","contains_osm":true,"id":"osm-c2149ec07305ddd0","lat":33.7550251,"location_precision":"source supplied","lon":-84.5872685,"name":"The Keep","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/975064004"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1149499531"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1149499532"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561981236"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c2933ace13168c15","lat":40.0565112,"location_precision":"source supplied","lon":-82.7720067,"name":"Google NBY-5","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016632"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c2bb227ce6501812","lat":44.9793795,"location_precision":"source supplied","lon":-93.2263894,"name":"Advanced Operations Center","operator":"University of Minnesota","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1544712660"}],"state":"Minnesota","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-c3dc8eb082a7e003","lat":38.9092366,"location_precision":"source supplied","lon":-77.4722656,"name":"H5 IAD31","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/258519934"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-c3f8d3bc43bf8fd3","lat":41.8885461,"location_precision":"source supplied","lon":-88.7218341,"name":"Unnamed data center (way/1312792611)","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312792611"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312792612"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1312792613"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c49ccc9e547b7143","lat":41.1725558,"location_precision":"source supplied","lon":-95.8011273,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720221"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Herndon","confidence":"low","contains_osm":true,"id":"osm-c56cc95cc891d8ea","lat":38.935591,"location_precision":"source supplied","lon":-77.4267117,"name":"Unnamed data center (way/1521913706)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1521913706"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1521913707"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c589b2108302272e","lat":47.1590698,"location_precision":"source supplied","lon":-122.2795641,"name":"Centeris","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/680666647"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c64db0d4078b202c","lat":32.4999148,"location_precision":"source supplied","lon":-99.7855378,"name":"Unnamed data center (way/1530966385)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966385"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-c681ac41e23bd383","lat":38.9101164,"location_precision":"source supplied","lon":-77.4725921,"name":"Digital Realty IAD30","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/251716328"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-c6ef6d432974126d","lat":45.8508808,"location_precision":"source supplied","lon":-119.6305237,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460070147"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c712bd092bdd5eab","lat":36.4118929,"location_precision":"source supplied","lon":-86.3696526,"name":"Meta Gallatin Data Center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1294595615"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Shreveport","confidence":"low","id":"osm-c71f02ebfc9a22c3","lat":32.5110171,"location_precision":"source supplied","lon":-93.7498076,"name":"DartPoints Shreveport","operator":"DartPoints","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124769105"}],"state":"Louisiana","status":"unknown"},{"ai_classification":"unknown","city":"Lenexa","confidence":"low","id":"osm-c73b9c27d3ae9666","lat":38.926806,"location_precision":"source supplied","lon":-94.7683728,"name":"Unnamed data center (way/1024384322)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1024384322"}],"state":"Kansas","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-c73d1fda07f0ce0a","lat":38.7904948,"location_precision":"source supplied","lon":-77.5411095,"name":"Amazon IAD-11","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/45776978"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-c83d535a86053a52","lat":39.0225001,"location_precision":"source supplied","lon":-77.4502558,"name":"Equinix DC15","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793888408"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-c856b42f6a88d15a","lat":38.9795634,"location_precision":"source supplied","lon":-77.4174915,"name":"Amazon IAD-143","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1106454555"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Plano","confidence":"low","contains_osm":true,"id":"osm-c85bc4b84d61e895","lat":33.0093142,"location_precision":"source supplied","lon":-96.6765617,"name":"Aligned  DFW-01","operator":"Aligned","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/483286527"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530200859"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-c989a148ef6687e3","lat":41.1262938,"location_precision":"source supplied","lon":-104.9018528,"name":"Unnamed data center (way/414055239)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/414055239"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/537172525"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/537172526"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/537172527"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/537172528"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177975782"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177975783"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177975784"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177975788"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177975789"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-c98b4e09dd25b2e0","lat":41.0642874,"location_precision":"source supplied","lon":-104.7856438,"name":"Unnamed data center (way/1377227154)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1377227154"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1485867694"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1485867695"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1485867696"}],"state":"Wyoming","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-c9bc7a7b287f9ffb","lat":40.1173912,"location_precision":"source supplied","lon":-83.2020737,"name":"Unnamed data center (way/1252196806)","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196806"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Karthaus","confidence":"low","id":"osm-c9d852d2323e0e82","lat":41.1410436,"location_precision":"source supplied","lon":-78.0974055,"name":"Iron City No. 1 Power Generator and Compute Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/13908533343"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-ca998441b3924858","lat":39.0151965,"location_precision":"source supplied","lon":-77.4595343,"name":"Equinix DC6","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1309123033"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-cb4f74e4e481359e","lat":35.5881079,"location_precision":"source supplied","lon":-81.2625753,"name":"Unnamed data center (way/116005354)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/116005354"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/652034566"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/873137563"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cb82c26b7817e41e","lat":33.3531912,"location_precision":"source supplied","lon":-111.6780726,"name":"Unnamed data center (way/1372772726)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1372772726"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cbd5847f1ad946fa","lat":39.3024057,"location_precision":"source supplied","lon":-94.6847918,"name":"Unnamed data center (way/195169261)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/195169261"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cbf7c3b43255ddd9","lat":35.1731955,"location_precision":"source supplied","lon":-80.928121,"name":"TierPoint - Charlotte Data Center","operator":"TierPoint","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/838817907"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-cc6b36fb0a5a46ce","lat":41.5580811,"location_precision":"source supplied","lon":-93.5276562,"name":"Unnamed data center (way/944024849)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/944024849"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/944024851"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cc820580b0b44818","lat":29.4702203,"location_precision":"source supplied","lon":-98.698835,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1502711381"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-cd10586588146d19","lat":39.0242346,"location_precision":"source supplied","lon":-77.4522875,"name":"Equinix DC16","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1123249721"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-cd14b8bd97228983","lat":38.9158051,"location_precision":"source supplied","lon":-77.4919869,"name":"Amazon IAD-61","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056017"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cd5a32e4d599ac9c","lat":37.3724077,"location_precision":"source supplied","lon":-121.973647,"name":"Digital Realty Silicon Valley SJC34","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/38305431"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cd642a7036ce9680","lat":41.6757843,"location_precision":"source supplied","lon":-93.5098305,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282103"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-cea950700dd06bcb","lat":39.56711,"location_precision":"source supplied","lon":-119.5485335,"name":"Unnamed data center (way/464097467)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/464097467"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412066"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412067"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412068"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412069"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412072"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/775412073"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1210199365"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-cf15e0a4b60f6231","lat":39.0821895,"location_precision":"source supplied","lon":-77.5651208,"name":"STACK NVA06","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1443922535"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1566629297"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-cf834a30c063aea2","lat":38.7525454,"location_precision":"source supplied","lon":-77.5124598,"name":"QTS Manassas DC2","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1464257784"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-cfa8702818c1fa55","lat":39.0006465,"location_precision":"source supplied","lon":-77.4398077,"name":"Sentinel Cloud Plaza","operator":"GI Partners","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701924664"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-cfd7ca08014c028f","lat":34.8473235,"location_precision":"source supplied","lon":-86.6269189,"name":"Meta Huntsville Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1160814413"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-d057ae85aed2ab19","lat":38.9958502,"location_precision":"source supplied","lon":-77.4712939,"name":"Amazon IAD-162","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020877488"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020877489"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282099"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"osm-d097263db5830cfb","lat":37.2412288,"location_precision":"source supplied","lon":-121.7847536,"name":"Equinix SV10","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/600806974"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d18611d4108d20a7","lat":38.789376,"location_precision":"source supplied","lon":-77.5819732,"name":"AWS","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517638"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d32262a43b63d3c0","lat":40.0940462,"location_precision":"source supplied","lon":-82.7474911,"name":"Amazon Web Services  CMH59","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1020374279"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Spokane","confidence":"low","id":"osm-d3486b366cf97894","lat":47.6542257,"location_precision":"source supplied","lon":-117.4200007,"name":"Lumen","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/444683815"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Centennial","confidence":"low","id":"osm-d3e29dc6ac5c9232","lat":39.5941551,"location_precision":"source supplied","lon":-104.8431517,"name":"Flexential - DEN5","operator":"Flexential","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/200992988"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-d42a36d329a2dd68","lat":36.6243111,"location_precision":"source supplied","lon":-87.2590216,"name":"SPC3A","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1103333137"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1470261550"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-d52e4efb18faee27","lat":39.035494,"location_precision":"source supplied","lon":-77.4506986,"name":"Amazon IAD-114","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701930929"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701930930"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d5727c5cf682562d","lat":29.9451277,"location_precision":"source supplied","lon":-95.4241979,"name":"Data Foundry","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1535715798"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-d5b0a88d83385299","lat":45.5685099,"location_precision":"source supplied","lon":-122.9198976,"name":"Digital Realty PDX11 Data Center","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1153935548"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"columbus","confidence":"low","id":"osm-d60d9c62a72b4be9","lat":32.4982046,"location_precision":"source supplied","lon":-84.8836237,"name":"DLI ONE","operator":"DLI ONE","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/958153769"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-d6204c3ce085bbcb","lat":39.0076143,"location_precision":"source supplied","lon":-77.4676305,"name":"Digital Realty IAD39","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701923203"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-d64e9739cd66c5cf","lat":32.5041907,"location_precision":"source supplied","lon":-99.7777236,"name":"Unnamed data center (way/1472056705)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056705"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056706"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056707"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056708"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056709"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056710"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056711"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056712"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056713"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1472056714"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966366"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966367"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966368"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966369"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966370"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966371"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966372"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966373"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966374"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966375"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966376"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966377"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966378"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966379"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966380"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1530966381"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-d652d3591e2b63ed","lat":39.0271087,"location_precision":"source supplied","lon":-77.4528289,"name":"Amazon IAD-80","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/596690174"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Itasca","confidence":"low","contains_osm":true,"id":"osm-d692c1ddbe208984","lat":41.9879619,"location_precision":"source supplied","lon":-88.0072217,"name":"NTT Chicago CH1","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1154636644"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1271571726"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1446350367"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1446350370"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d6e5dc09c0b39488","lat":36.0658822,"location_precision":"source supplied","lon":-115.218789,"name":"Switch Las Vegas 16","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1558897570"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d7536b62576acf99","lat":36.0327164,"location_precision":"source supplied","lon":-86.637789,"name":"Unnamed data center (way/819981888)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/819981888"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Omaha","confidence":"low","id":"osm-d7ab42c001cca9e1","lat":41.2517478,"location_precision":"source supplied","lon":-95.9259644,"name":"Omaha Switch","operator":"Cogent Communications","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1554826321"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Aldie","confidence":"low","id":"osm-d80e24c0c1745a8f","lat":38.9497902,"location_precision":"source supplied","lon":-77.5543019,"name":"Microsoft IAD11","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1560641652"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-d834d70ca4ef31e8","lat":38.997949,"location_precision":"source supplied","lon":-77.4302306,"name":"Vantage VA2","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344901575"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-d8473ae963cf25f3","lat":41.9929788,"location_precision":"source supplied","lon":-86.0984691,"name":"Unnamed data center (way/1545590995)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1545590995"}],"state":"Michigan","status":"unknown"},{"ai_classification":"unknown","city":"Los Lunas","confidence":"low","id":"osm-daaba992e6ad9969","lat":34.8258417,"location_precision":"source supplied","lon":-106.7824883,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1548035623"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Los Angeles","confidence":"low","id":"osm-daaf18a10d784be0","lat":34.0479149,"location_precision":"source supplied","lon":-118.2555689,"name":"Unnamed data center (way/495115494)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/495115494"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-dad5334e59dcbfd9","lat":37.3616469,"location_precision":"source supplied","lon":-121.9439784,"name":"Digital Realty Silicon Valley SC1","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/358455179"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Getzville","confidence":"low","id":"osm-db89e169b318346a","lat":43.0449439,"location_precision":"source supplied","lon":-78.7492033,"name":"Unnamed data center (way/916148870)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/916148870"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-dc0a42a934b9dc3b","lat":39.050601,"location_precision":"source supplied","lon":-77.5400225,"name":"Unnamed data center (way/844374689)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844374689"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-dc0ed74dd0bebcd9","lat":42.9876268,"location_precision":"source supplied","lon":-72.5517562,"name":"Unnamed data center (way/1552427895)","operator":"The Putney School","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1552427895"}],"state":"Vermont","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-dc208997ed06441e","lat":47.2501646,"location_precision":"source supplied","lon":-119.8144903,"name":"Vantage WA11","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/337127817"}],"state":"Washington","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-dc93ed6ed03fc51c","lat":41.6711866,"location_precision":"source supplied","lon":-93.5165942,"name":"Facebook Altoona Data Center 5","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830931210"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"San Jose","confidence":"low","id":"osm-dc9531d6e190dea3","lat":37.242615,"location_precision":"source supplied","lon":-121.7840216,"name":"Equinix SV11","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1227604493"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-dcd2d11bc9850343","lat":41.1755301,"location_precision":"source supplied","lon":-95.8011057,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1073720217"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Tucson","confidence":"low","id":"osm-dd8b7340e35a8ed9","lat":32.0927065,"location_precision":"source supplied","lon":-110.7874236,"name":"Unnamed data center (way/843314844)","operator":"DirecTV","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/843314844"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-dd913e2093460794","lat":32.5439608,"location_precision":"source supplied","lon":-96.7883983,"name":"Compass Data Center","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525220"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1426525221"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-dd99b312ff62bf15","lat":39.3226269,"location_precision":"source supplied","lon":-94.5947862,"name":"Unnamed data center (way/1433936352)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1433936352"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567478346"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567478347"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"osm-ddb49d1524d5239f","lat":33.7559857,"location_precision":"source supplied","lon":-84.3911712,"name":"CoreSite AT1","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12331366645"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ddc3e266efc956b2","lat":41.539814,"location_precision":"source supplied","lon":-93.8263137,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1075278061"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-de68db30fab7c026","lat":36.6799052,"location_precision":"source supplied","lon":-78.3739846,"name":"Unnamed data center (way/1074588578)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588578"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588579"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588580"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588582"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588583"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588584"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588585"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074588586"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591450"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591451"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591452"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1074591453"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1307454847"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-defc88daff850754","lat":41.5406093,"location_precision":"source supplied","lon":-93.8248434,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/438077632"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-df7a224b9baad130","lat":39.0062702,"location_precision":"source supplied","lon":-77.4683054,"name":"Digital Realty IAD40","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1518717349"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-df7bc8739375540e","lat":33.3471979,"location_precision":"source supplied","lon":-111.6324603,"name":"Unnamed data center (way/1456975947)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1456975947"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1456975948"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1456975949"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Benson","confidence":"low","id":"osm-e03219db9d493a91","lat":31.9726748,"location_precision":"source supplied","lon":-110.3047517,"name":"Unnamed data center (way/1042260902)","operator":"DirecTV","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1042260902"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-e03cbdcb1f6be834","lat":39.0136079,"location_precision":"source supplied","lon":-77.4705563,"name":"Aligned IAD-01","operator":"Aligned","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/793622740"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1088241977"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1088241982"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Haymarket","confidence":"low","id":"osm-e071592c8a404d1c","lat":38.8161031,"location_precision":"source supplied","lon":-77.6524994,"name":"Amazon IAD-84","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/828135845"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e0f52b06d6b7c945","lat":38.7908136,"location_precision":"source supplied","lon":-77.5484173,"name":"Unnamed data center (way/696992451)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/696992451"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e150838c2a64b52a","lat":38.8105602,"location_precision":"source supplied","lon":-89.9487033,"name":"Unnamed data center (way/1133944585)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1133944585"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-e1571d5e19035f5a","lat":38.9886031,"location_precision":"source supplied","lon":-77.4116516,"name":"Amazon IAD-90","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701924667"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701924668"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701924669"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Norwalk","confidence":"low","id":"osm-e17a9a9a13e00f98","lat":41.1130924,"location_precision":"source supplied","lon":-73.3886495,"name":"Unnamed data center (way/571010571)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/571010571"}],"state":"Connecticut","status":"unknown"},{"ai_classification":"unknown","city":"Fort Worth","confidence":"low","id":"osm-e31a7347601ed2f0","lat":32.8991167,"location_precision":"source supplied","lon":-97.3889496,"name":"Unnamed data center (way/1556702082)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556702082"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-e344879dfbbe1831","lat":38.773028,"location_precision":"source supplied","lon":-77.5411854,"name":"Iron Mountain VA-5","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260557"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e35378a2c31e258d","lat":36.1437196,"location_precision":"source supplied","lon":-115.0833851,"name":"CenturyLink","operator":"Lumen Technologies","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/254756938"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"Lithia Springs","confidence":"low","id":"osm-e38fa3e7aabd477f","lat":33.7259582,"location_precision":"source supplied","lon":-84.6195747,"name":"Aligned Data Centers","operator":"Aligned Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1097502169"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Gainesville","confidence":"low","contains_osm":true,"id":"osm-e3a735c92227eccc","lat":38.8028836,"location_precision":"source supplied","lon":-77.6221217,"name":"Amazon IAD-195","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1280340214"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260554"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260555"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567475191"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e3af554d35c69e6d","lat":42.0344483,"location_precision":"source supplied","lon":-87.9831631,"name":"Unnamed data center (way/1558344919)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1558344919"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-e3d8a52b5cd7f95f","lat":45.550371,"location_precision":"source supplied","lon":-122.892151,"name":"Flexential Portland - Hillsboro 1","operator":"Flexential","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/328703599"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e3e53110952bfd65","lat":41.4978557,"location_precision":"source supplied","lon":-93.7870593,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830885773"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"osm-e4a024cc8fadd2b8","lat":33.4102344,"location_precision":"source supplied","lon":-112.3648662,"name":"PHX-12","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1532070752"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e5ae574ca2f2d080","lat":40.0614927,"location_precision":"source supplied","lon":-82.7405524,"name":"LCO 1","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016634"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-e614a3018c8fb6c6","lat":38.9815474,"location_precision":"source supplied","lon":-77.4193688,"name":"Amazon IAD-603","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1177893426"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-e62506e9f1563288","lat":38.9479489,"location_precision":"source supplied","lon":-77.5230989,"name":"Amazon IAD-83","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/990537813"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Phoenix","confidence":"low","id":"osm-e70a088d1601f992","lat":33.3965617,"location_precision":"source supplied","lon":-112.0001645,"name":"1GServers","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/952157194"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e7fd9ab880a6e17d","lat":32.4421391,"location_precision":"source supplied","lon":-97.0624648,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844386860"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e849c7d8cc89cf61","lat":40.0652296,"location_precision":"source supplied","lon":-82.7411681,"name":"LCO 2","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016635"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e868f319a10a3f1a","lat":29.4189602,"location_precision":"source supplied","lon":-98.802904,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1533350872"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-e89f01d23d46ac55","lat":38.9572529,"location_precision":"source supplied","lon":-77.4978409,"name":"Unnamed data center (way/1161730862)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1161730862"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-e973ca73803d3d1b","lat":31.131912,"location_precision":"source supplied","lon":-97.3721266,"name":"Unnamed data center (way/1469988846)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1469988846"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1469988847"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-e99fa9d9893a6cfa","lat":38.9170108,"location_precision":"source supplied","lon":-77.4943665,"name":"Amazon IAD-65","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/701931819"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Wappingers Falls","confidence":"low","id":"osm-ea6ce3a13500ba27","lat":41.5990376,"location_precision":"source supplied","lon":-73.8821955,"name":"Unnamed data center (way/1556814304)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556814304"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Madison","confidence":"low","id":"osm-eb145b73720ad293","lat":43.0672971,"location_precision":"source supplied","lon":-89.436704,"name":"Unnamed data center (way/447803368)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/447803368"}],"state":"Wisconsin","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-eb9e398d279368f5","lat":41.5176108,"location_precision":"source supplied","lon":-93.7063243,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881743"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-ebef4c0613207385","lat":45.8365499,"location_precision":"source supplied","lon":-119.6898735,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1057230915"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Chandler","confidence":"low","id":"osm-ec1d6da2ab22e308","lat":33.3199157,"location_precision":"source supplied","lon":-111.809686,"name":"All About Serving Process Server","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/7578821329"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Englewood","confidence":"low","contains_osm":true,"id":"osm-ec9604404ee4890e","lat":39.5613132,"location_precision":"source supplied","lon":-104.8275726,"name":"EdgeConneX - DEN01","operator":"EdgeConneX","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14212611951"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/918943458"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ecac91508bdd916e","lat":41.7966043,"location_precision":"source supplied","lon":-88.2429853,"name":"Unnamed data center (way/1556760955)","operator":"CyrusOne","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1556760955"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-ecb899f67deee578","lat":38.7589306,"location_precision":"source supplied","lon":-77.5166938,"name":"STACK NVA05A","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260559"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","contains_osm":true,"id":"osm-ed1525957ef068e8","lat":39.0227436,"location_precision":"source supplied","lon":-77.4548911,"name":"NTT VA1","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300163083"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/610977485"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ed7b6d8b04711616","lat":42.0068512,"location_precision":"source supplied","lon":-87.9651853,"name":"STACK Chicago CHI01","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/863162822"}],"state":"Illinois","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","contains_osm":true,"id":"osm-ee05eb95f3ff2282","lat":45.5541322,"location_precision":"source supplied","lon":-122.9379069,"name":"Stack Infrastructure - POR03","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/899634245"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1243089554"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1243089555"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Atlanta","confidence":"low","id":"osm-ee74e37c5b07bb22","lat":33.7776109,"location_precision":"source supplied","lon":-84.4194579,"name":"QTS Atlanta Data Center 2","operator":"Quality Technology Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1007825570"}],"state":"Georgia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-eef09df77a904c64","lat":31.1034739,"location_precision":"source supplied","lon":-103.2385493,"name":"Unnamed data center (way/1547829413)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1547829413"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1547829414"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Chandler","confidence":"low","id":"osm-eef28fb02282b41e","lat":33.2749228,"location_precision":"source supplied","lon":-111.8866379,"name":"Digital Realty Phoenix PHX15","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/300952513"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ef88394ded3558ce","lat":41.3391392,"location_precision":"source supplied","lon":-96.0846572,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1422101108"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-efa71e3716906905","lat":35.0499451,"location_precision":"source supplied","lon":-106.542801,"name":"HPC","operator":"Sandia National Laboratories","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/relation/14930068"}],"state":"New Mexico","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-efbd80aa92b3a89a","lat":41.1235289,"location_precision":"source supplied","lon":-96.1442004,"name":"Meta Sarpy Data center","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844394339"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282100"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f00fe3b9d4e579c8","lat":38.800094,"location_precision":"source supplied","lon":-77.6102003,"name":"NTT VA10","operator":"NTT","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1561771299"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-f06a84e802cbc1b3","lat":39.0018258,"location_precision":"source supplied","lon":-77.4527034,"name":"Digital Realty IAD43","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1344901569"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f0f3e54566206ddf","lat":35.3156695,"location_precision":"source supplied","lon":-81.8221092,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1109074150"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-f1bd1b34764fec7e","lat":45.841373,"location_precision":"source supplied","lon":-119.6579323,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/633034071"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-f2d1f92a76e29c86","lat":37.3709193,"location_precision":"source supplied","lon":-121.9472166,"name":"Digital Realty Silicon Valley SJC37","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1314012931"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f33ee324c6d16c0d","lat":40.0539595,"location_precision":"source supplied","lon":-82.7675946,"name":"Google NBY-6","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1386016633"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f3977af41e5181b1","lat":41.5185012,"location_precision":"source supplied","lon":-93.7063325,"name":"Microsoft","operator":"Microsoft","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/830881742"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f402d3aae9338df8","lat":35.9295133,"location_precision":"source supplied","lon":-84.310567,"name":"Frontier (supercomputer)","operator":"Oak Ridge National Laboratory","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/10648552506"}],"state":"Tennessee","status":"unknown"},{"ai_classification":"unknown","city":"Omaha","confidence":"low","id":"osm-f4334364f57e9a49","lat":41.2204018,"location_precision":"source supplied","lon":-96.1476408,"name":"Unnamed data center (way/607753694)","operator":"Verizon Wireless","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/607753694"}],"state":"Nebraska","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f48e8f87cf8a601f","lat":40.0526729,"location_precision":"source supplied","lon":-83.1274235,"name":"Unnamed data center (way/1411056682)","operator":"Oppidan","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1411056682"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-f49935910515e1e6","lat":39.0164403,"location_precision":"source supplied","lon":-77.4619542,"name":"Equinix DC4","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1309123034"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f53fafa32f6ac405","lat":39.7240422,"location_precision":"source supplied","lon":-82.6911124,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196824"}],"state":"Ohio","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f5b4088d1837f059","lat":45.5266839,"location_precision":"source supplied","lon":-122.8755048,"name":"Data Center","operator":"Oregon Health & Science University","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/369728508"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f63d3f4de307a647","lat":41.1736261,"location_precision":"source supplied","lon":-95.7921884,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1287260560"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"New York","confidence":"low","id":"osm-f651700ecf124ab9","lat":40.7176766,"location_precision":"source supplied","lon":-74.0084414,"name":"Digital Realty New York JFK12","operator":"Digital Realty","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/12221880448"}],"state":"New York","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-f6a91f94f290b537","lat":35.8983268,"location_precision":"source supplied","lon":-81.547464,"name":"Unnamed data center (way/186515922)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/186515922"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/844372538"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","id":"osm-f6d61179b41ddc0f","lat":29.4775403,"location_precision":"source supplied","lon":-98.697766,"name":"Vantage Data Centers TX21","operator":"Vantage Data Centers","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1535752110"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-f84bc20d9a22603e","lat":39.0263574,"location_precision":"source supplied","lon":-77.4508704,"name":"Amazon IAD-79","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/463571876"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","contains_osm":true,"id":"osm-f8667136a74094d3","lat":38.7359728,"location_precision":"source supplied","lon":-77.5048957,"name":"Amazon IAD-102","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996899486"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/996899487"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Englewood","confidence":"low","id":"osm-f896f935a3e88629","lat":39.5590684,"location_precision":"source supplied","lon":-104.8335336,"name":"US Signal - CO01","operator":"US Signal","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/778989332"}],"state":"Colorado","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f8bf19dfdcd8043c","lat":33.0620982,"location_precision":"source supplied","lon":-80.0411281,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1069388095"}],"state":"South Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Springfield","confidence":"low","id":"osm-f9e0d49de802fa9a","lat":38.7419821,"location_precision":"source supplied","lon":-77.1861732,"name":"Amazon DCA-64","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1536981894"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-f9ee3a7652cf0f95","lat":36.0617389,"location_precision":"source supplied","lon":-115.2132922,"name":"Switch12","operator":"Switch","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/172739950"}],"state":"Nevada","status":"unknown"},{"ai_classification":"unknown","city":"San Antonio","confidence":"low","id":"osm-fa90f624c830228e","lat":29.5801522,"location_precision":"source supplied","lon":-98.5413037,"name":"Unnamed data center (way/1310628998)","operator":"HEB","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1310628998"}],"state":"Texas","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-fa92de91520024f6","lat":39.0117541,"location_precision":"source supplied","lon":-77.4624624,"name":"CloudHQ LC2","operator":"CloudHQ","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/794147655"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","id":"osm-fac3706fa42bb477","lat":38.9905701,"location_precision":"source supplied","lon":-77.4370586,"name":"Amazon IAD-56","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/460056020"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Ashburn","confidence":"low","id":"osm-facdec94f94ce52d","lat":39.0223584,"location_precision":"source supplied","lon":-77.4610917,"name":"Equinix DC3","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/298242260"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-fafc325842e9dc53","lat":39.0696487,"location_precision":"source supplied","lon":-77.5607711,"name":"Microsoft Leesburg Building 3","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1128589933"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fb13838f00adb726","lat":45.8098277,"location_precision":"source supplied","lon":-119.8589037,"name":"Unnamed data center (way/1510517629)","operator":"amazon web services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1510517629"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Pittsburgh","confidence":"low","id":"osm-fb844cb09ba9d779","lat":40.427371,"location_precision":"source supplied","lon":-80.0425212,"name":"Expedient Pittsburgh South","operator":"Expedient","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/537807168"}],"state":"Pennsylvania","status":"unknown"},{"ai_classification":"unknown","city":"Asheville","confidence":"low","id":"osm-fbb2f572a35e3b07","lat":35.4883165,"location_precision":"source supplied","lon":-82.5575361,"name":"DartPoints Asheville","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14124835505"}],"state":"North Carolina","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fbfd86a1ad0ecee6","lat":37.5529209,"location_precision":"source supplied","lon":-121.9808321,"name":"Petadata","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/node/14081154610"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Goodyear","confidence":"low","id":"osm-fc306f392c225e11","lat":33.4393768,"location_precision":"source supplied","lon":-112.377048,"name":"Unnamed data center (way/938592711)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/938592711"}],"state":"Arizona","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fc3486b958f6591a","lat":41.675801,"location_precision":"source supplied","lon":-93.5060373,"name":"Meta","operator":"Meta","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1253282104"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Santa Clara","confidence":"low","id":"osm-fcb5330888755f5e","lat":37.3784704,"location_precision":"source supplied","lon":-121.9549839,"name":"Equinix Santa Clara SV2","operator":"Equinix","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/37947314"}],"state":"California","status":"unknown"},{"ai_classification":"unknown","city":"Hillsboro","confidence":"low","id":"osm-fcdfea1b6d2cc4ee","lat":45.5528982,"location_precision":"source supplied","lon":-122.9379804,"name":"Stack Infrastructure - POR03","operator":"Stack Infrastructure","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1243089557"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Huntsville","confidence":"low","id":"osm-fd540f8cf4fee49a","lat":34.73654,"location_precision":"source supplied","lon":-86.6731017,"name":"George C. Wallace Alabama Supercomputer Center","operator":"Alabama Supercomputer Authority","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/408012357"}],"state":"Alabama","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","contains_osm":true,"id":"osm-fd72253ff4847c88","lat":39.3163852,"location_precision":"source supplied","lon":-94.5773319,"name":"Unnamed data center (way/1567485997)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567485997"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567486004"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1567486005"}],"state":"Missouri","status":"unknown"},{"ai_classification":"unknown","city":"Boardman","confidence":"low","id":"osm-fd7e94bfb548c8bb","lat":45.8414702,"location_precision":"source supplied","lon":-119.6517858,"name":"Amazon Web Services","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196819"}],"state":"Oregon","status":"unknown"},{"ai_classification":"unknown","city":"Manassas","confidence":"low","id":"osm-fd9039051f3ab587","lat":38.7755471,"location_precision":"source supplied","lon":-77.5451498,"name":"Iron Mountain VA-3","operator":"Iron Mountain","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1283698132"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fd946339e1d64c0b","lat":41.171118,"location_precision":"source supplied","lon":-95.7924753,"name":"Google","operator":"Google","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1565614266"}],"state":"Iowa","status":"unknown"},{"ai_classification":"unknown","city":"Sterling","confidence":"low","contains_osm":true,"id":"osm-fdb11620e17f6ed6","lat":38.9493217,"location_precision":"source supplied","lon":-77.5198747,"name":"Amazon IAD-62","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/545396372"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/693381106"},{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/693381107"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Leesburg","confidence":"low","id":"osm-fe47e88ff6cf1473","lat":39.069656,"location_precision":"source supplied","lon":-77.5594332,"name":"Microsoft Leesburg Building 4","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1128589934"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fe5e842d1f0564d2","lat":37.4943952,"location_precision":"source supplied","lon":-77.2374867,"name":"Unnamed data center (way/429040021)","operator":"Bank of America","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/429040021"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-fefa0ee2c411c931","lat":40.160755,"location_precision":"source supplied","lon":-74.0530625,"name":"Wall Township Cable Landing Station","operator":"Tata","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/808909814"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ff2055b879d6c443","lat":40.7842844,"location_precision":"source supplied","lon":-74.0652426,"name":"CoreSite Secaucus Campus","operator":"CoreSite","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/714139868"}],"state":"New Jersey","status":"unknown"},{"ai_classification":"unknown","city":"Chantilly","confidence":"low","id":"osm-ff24ce9863af57b0","lat":38.9159035,"location_precision":"source supplied","lon":-77.4905509,"name":"Amazon IAD-155","operator":"Amazon Web Services","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/1252196799"}],"state":"Virginia","status":"unknown"},{"ai_classification":"unknown","city":"Unknown","confidence":"low","id":"osm-ff4dd491270ae10b","lat":41.2519538,"location_precision":"source supplied","lon":-95.9258479,"name":"Unnamed data center (way/466516719)","operator":"Unknown","osm_derived":true,"source_status":"unknown","sources":[{"dataset":"osm","evidence":[],"updated":null,"url":"https://www.openstreetmap.org/way/466516719"}],"state":"Nebraska","status":"unknown"}]