DAILY BRIEFING ·

Power quality, fast storage and liquid-cooled drives

Three new briefs published October 18, covering company announcements dated October 13–15. These are partnerships and product samples, not newly operating campuses.

MHI and Ingeteam target the quality of AI power, not just its supply

The development

Mitsubishi Heavy Industries, or MHI, and Ingeteam announced a partnership on October 15 aimed at U.S. data centers. They signed a memorandum of understanding: an initial agreement to work together, not an announcement that a finished system has entered service.

MHI brings expertise in combining power and cooling equipment into a working system. Ingeteam supplies equipment and software that convert and control electricity. The companies plan to make Ingeteam’s products more widely available through MHI’s group and explore combining them into larger energy systems.

Source: MHI and Ingeteam joint announcement ·

How it works

The announcement distinguishes having enough electricity from delivering it in a form equipment can reliably use. AI computing can change its power demand quickly. The companies say these changing demands create electrical-quality problems that can affect equipment reliability and working life.

Think of ordering a delivery: the amount arriving matters, but so does whether it arrives in a usable condition. Here the companies want to coordinate power equipment and controls, not simply promise a larger electricity supply. Their announcement provides no measured performance improvement for a named customer installation.

What changes for nearby people

The companies link their work to keeping the electricity grid stable while data centers grow. People and businesses share that power system, but any effect on their bills or outages remains unclear. It also gives no local job count, water-use figure or named community project from which to judge those effects.

The AI connection

The proposed combination could help operators manage more power-hungry computing equipment as a complete system. The companies describe reliability, efficiency and expansion as goals. They are also considering future work on electricity distribution and energy-management systems, but those options still need technical and commercial evaluation.

Next steps

Watch for specific products, customer projects and published performance measurements. This is an initial U.S.-focused agreement; the announcement does not give a completed deployment’s size or an opening date.

Read the full brief →

Siemens backs supercapacitors to soften AI power swings

The news

Siemens announced an investment and exclusive partnership with Skeleton Technologies on October 14. It plans to add Skeleton’s supercapacitors—devices for handling rapid changes in electrical power—to its data-center equipment offering. Siemens receives exclusive rights to sell and expand the products in the data-center market.

The companies are targeting existing facilities as well as new AI installations. Siemens says the equipment can be added to existing electrical systems rather than requiring a complete facility redesign. The investment amount remains undisclosed.

Source: Siemens company announcement ·

Inside the technology

Siemens describes thousands of AI chips changing their electricity demand together. Their demand can rise or fall in a tiny fraction of a second and combine into megawatt-scale changes within seconds. Megawatts measure how fast electricity is being used. That is a problem of sudden changes, not just the total amount of electricity consumed.

The company compares the storage equipment to a shock absorber: it is intended to soften abrupt electrical swings before they disturb equipment or the grid. That comparison describes its proposed role, not a promise that every power problem disappears. The release presents expected benefits, not measured results from a named customer installation.

Costs and community effects

Siemens says the approach is designed to reduce disturbances on the utility side of a data center’s electricity connection. That could matter to the wider power system, but the announcement does not quantify a benefit for nearby households. Household bill savings, fewer neighborhood outages and local job gains remain unproven.

What AI operators gain

The aim is to fit more computing capability into facilities and expand faster while limiting major upgrades. Being able to add equipment to existing buildings could help operators avoid a complete redesign. Those are Siemens’ stated goals; the announcement does not demonstrate a particular increase in computing capacity or a guaranteed construction-time saving.

What comes next

Completion still depends on the usual closing formalities. Watch for completed customer installations and published measurements showing how well the equipment handles rapid demand changes.

Read the full brief →

Liquid cooling reaches Kioxia’s enterprise SSDs

Kioxia’s CM9-DLC storage drives support cold plates, but the company describes customer samples rather than mass production.

Why it matters: Dense servers require thermal planning beyond their main processors. Storage compatibility is another piece of that design.

Source date: Oct 13, 2026

Kioxia company announcement

Read the full brief →

Sources linked below.

MHI and Ingeteam joint announcement · Siemens company announcement · Kioxia company announcement